Fire Certificate

Inspection Checklist

1 SCDF/CED/FC/GC 1 July 2014


CED FC ACS
AIR-CONDITIONING SYSTEM

Name of Building :
* Status of Inspection
A AHU Yes N.A.
i Smoke cut-off system provided within return air stream of AHU Ok

ii Activation of smoke-cut-off system shuts down AHU Ok

iii Manual reset provision for AHU Ok

iv No storage in AHU room Ok

v Smoke detector provided and tested in order Ok

* Status of Inspection
B FIRE DAMPERS Yes N.A.
i Fire Dampers are properly installed Ok

ii Motorised Fire dampers operate upon activation of auto fire alarm detectors Ok
iii No obstruction to dampers louver (blades) movement Ok

iv Access door for inspection of Fire dampers provided Ok

v Fire dampers of approved rating and with PSB label Ok

Date of inspection and testing of system:

2 SCDF/CED/FC/GC 1 July 2014


CED FC ASCS
ATRIUM SMOKE CONTROL SYSTEM

Name of Building :
* Status of Inspection
S/No. DETAILS:- Yes N.A.
i Smoke detectors provided at the perimeter of the Atrium N.A

ii Separate manual reset switch provided N.A

iii Functions under Secondary supply provided N.A

iv Auto supply mode activated by fire alarm system (where applicable) under N.A
Secondary power supply
v Manual activation provision installed N.A

vi System extraction air fan operate upon activation of fire alarm N.A

vii Smoke curtains operate upon activation of fire alarm N.A

viii Ventilation louvers operation by fire alarm and under secondary power N.A
supply are in order
ix All fire scenarios where is / are designed under the engineered smoke N.A
control system has / have been tested
x Air-condition cut-off upon activation of fire alarm N.A

Date of inspection and testing of system:

3 SCDF/CED/FC/GC 1 July 2014


CED FC AFAS
AUTOMATIC FIRE ALARM SYSTEM

Name of Building:

Name of Monitoring Company : Building Code No :


* Status of Inspection
S/No. HEAT / SMOKE DETECTOR TEST Yes N.A.
i Sufficient coverage Ok

ii Detector points not painted Ok

iii Detector points unobstructed Ok

iv System connected to monitoring company / 995 Ok

v Alarm signal transmission received by monitoring company Ok

vi Zone tested is indicated correctly on main-alarm panel Ok

vii Audible fault alarm & fault indication light provide at main-alarm panel Ok

viii Zoning diagram provided next to the main-alarm panel Ok

ix Zone tested is indicated correctly on sub-alarm panel Ok

x Audible fault alarm & fault indication light provide at sub-alarm panel Ok

xi Zoning diagram / mimic panel provided next to the sub-alarm panel Ok

xii Alarm bells in operational condition Ok

xiii Alarm general sounding throughout the building Ok

Date of inspection and testing of system:

4 SCDF/CED/FC/GC 1 July 2014


CED FC AFSS
AUTOMATIC FIRE SUPPRESSION SYSTEM FOR COOKING HOOD

Name of Building :
* Status of Inspection
A GENERAL Yes N.A.
i System connected to Main / Sub Fire Alarm Panel N.A
ii Automatic cut-off device for gas fuel supply provided N.A
iii Emergency manual release for extinguishing agent provided N.A
iv Sign “IN CASE OF FIRE – PULL TO RELEASE”CALL 995 is provided N.A

* Status of Inspection
B CYLINDER FOR EXTINGUISHING AGENT Yes N.A.
i PSB Approved label provided N.A
ii Rigidly mounted N.A
iii Service by fire safety work contractor (competent personnel) N.A
iv Date of service N.A

* Status of Inspection
C NOZZLE & PIPE WORKS Yes N.A.
i Rigidly mounted N.A
ii Free of grease (internal & external) N.A
iii Free of obstruction N.A
iv Double layer provided N.A

* Status of Inspection
D HEAT ACTIVATING DEVICE Yes N.A.
i Fusible link enclosed in piping N.A
ii Free of obstruction N.A
iii Free of grease N.A
iv Properly installed N.A
v Ensure in functioning condition (conduct simulated test) N.A

Date of inspection and testing of system:

5 SCDF/CED/FC/GC 1 July 2014


CED FC CPSES
CAR PARK SMOKE EXTRACT SYSTEM

Name of Building :
* Status of Inspection
S/No. DETAILS:- Yes N.A.
i Intake / discharge location with at least 5m separation N.A

ii Exhaust discharge directed to external N.A

iii Connected to secondary power supply & fire alarm system N.A

iv Failure of the Exhaust Fan will cut off the corresponding supply fan N.A

Date of inspection and testing of system:

6 SCDF/CED/FC/GC 1 July 2014


CED FC DRS
DRY RISER SYSTEM

Name of Building:

DRY RISER : size 2 way (100mm) No. /4 way (150mm) No.


* Status of Inspection
A BREECHING INLET Yes N.A.
i Inlet housed in glass fronted protective enclosure Ok
ii Properly installed / secured Ok
iii Clear of Obstruction Ok
iv About 0.76m above finished floor level Ok
v Labelled “DRY RISER INLET” and differentiated Ok
vi Inlet painted in yellow colour Ok

* Status of Inspection
B RISER Yes N.A.
i Not passing through unprotected area / Fire rated Ok
ii Air release valve provided Ok
iii Earthling provided Ok

* Status of Inspection
C LANDING VALVE Yes N.A.
i 0.76m to 1m above finished floor level Ok
ii Condition of hand wheel satisfactory Ok
iii Blank Cap provided Ok
iv Strapped and padlocked in closed position Ok
v Labelled / Numbered Ok
vi Clear of Obstruction Ok
vii Landing valve painted in yellow colour Ok

* Status of Inspection
D TESTING OF HYDROSTATIC PRESSURE Yes N.A.
i Pressure constant at 200 PSI for 2 hrs Ok
ii Air release valve functioning Ok

Date of inspection and testing of system:

CED FC ESCS
ENGINEERED SMOKE CONTROL SYSTEM

Name of Building :
* Status of Inspection

7 SCDF/CED/FC/GC 1 July 2014


S/No. DETAILS:- Yes N.A.
i Separate manual reset switch provided N.A

ii Functions under secondary supply provided N.A

iii Auto supply mode activated by fire alarm system under normal power N.A
supply
iv Auto supply mode activated by fire alarm system under secondary power N.A
supply
v Manual activation provision installed N.A

vi Air exhaust fan operate upon operation of fire alarm N.A

vii Air condition system cut-off upon activation of system N.A

viii Smoke curtain operate upon activation of system N.A

Date of inspection and testing of system:

8 SCDF/CED/FC/GC 1 July 2014


CED FC HRS
HOSE REEL SYSTEM (WITH PUMP)

Name of Building :
* Status of Inspection
A Hose Yes N.A.
i Non-kinking reinforced rubber Ok
ii Length of hose (30m) Ok
iii Nozzle condition satisfactory Ok
iv Locking device provided in-order Ok
v Condition of stop cock satisfactory Ok
vi Clear of obstruction Ok
vii Labelling provided for cabinet Ok
viii Labelling provided for instruction signage Ok
ix No locking device provided Ok

* Status of Inspection
B Testing Yes N.A.
i No Leakage detected Ok
ii 6m throw achievable or flow rate of 0.4 litre / sec Ok

* Status of Inspection
C Pump Yes N.A.
i Pump can be manually tested Ok
ii Auto changeover from normal to secondary power supply Ok
iii Auto changeover from duty to standby pump operation in order Ok
iv Differentiated Ok

Date of inspection and testing of system:

9 SCDF/CED/FC/GC 1 July 2014


CED FC LIFT
LIFT

Name of Building :
(No. of Passenger Lift ______________ Cargo Lift ______________ Fire Lift ______________)
* Status of Inspection
A Passenger and Fire Lift Yes N.A.
i Lift homing under fire alarm activation in order (Clause 13.1.3) Ok
ii Lift homing under secondary power supply (Clause 13.1.2) Ok
iii Warning notice for fire situation provided (Clause 13.1.8) Ok
iv PSB (SISIR) approved EBOPS provided (Clause 12.3) Ok
v EBOPS supply to lift car bell, lighting and fan in order Ok
vi Lift differentiated with numbers Ok
vii Storey Numbering for lift lobbies provided Ok
viii Lifts home at designated floor Ok

* Status of Inspection
B Fire Lift (Size & Capacity __________________________) Yes N.A.
i Lift travel from ground to top level within 1 minute Ok
ii Fire lift operated under fire switch in order Ok
iii Labelled “FIRE LIFT” Ok
iv Fire switch properly enclosed in labelled glass fronted cover Ok
v No combustible furnishing Ok

Date of inspection and testing of system:

10 SCDF/CED/FC/GC 1 July 2014


CED FC OSF

OTHER SYSTEMS AND FIXTURES

1) HOSE REEL (without pump)


* Status of Inspection
A Hose Yes N.A.
i Non-kinking reinforced rubber N.A
ii Length of hose (30m) N.A
iii Nozzle condition satisfactory N.A
iv No locking device provided N.A
v Condition of stop cock satisfactory N.A
vi Clear of obstruction N.A
vii Labelling provided for cabinet N.A
iv Labelling provided for instruction signage N.A

* Status of Inspection
B Testing Yes N.A.
i No Leakage detected N.A
ii 6m throw achievable/0.4 l/sec N.A

Date of inspection and testing:

2) PORTABLE FIRE EXTINGUISHER


* Status of Inspection
S/No Details: Yes N.A.
i Properly hung on bracket Ok

ii Clear of obstruction Ok

iii Service by licensed contractor Ok

iv PSB label Ok

v Date of service Ok

Date of inspection:

11 SCDF/CED/FC/GC 1 July 2014


CED FC OSF

3) MANUAL ALARM SYSTEM (CALL POINT)


* Status of Inspection
S/No Details: Yes N.A.
i The colour for all fire alarm panels, bell ,conduit Ok
and trunking are painted red
ii Clear of obstruction Ok

iii Fire alarm zoning diagrams provided near fire Ok


alarm panel
iv General sounding throughout the building Ok

v Located about 1.4m from floor level Ok

vi Alarm bell in operational condition Ok

vii The fire alarm sounding distinguishable from any other alarm Ok
system
viii Audible fault alarm & fault indication light Ok
provided at sub / main panel
ix Zone tested is indicated correctly on the fire Ok
alarm main / sub panel
x “IN CASE OF FIRE CALL 995” signage provided N.A

Date of inspection and testing:

4) EXIT SIGN AND EMERGENCY LIGHTING


* Status of Inspection
A Exit Sign / Exit Directional Sign Yes N.A.
i Exit Sign adequately provided along :- Ok
a) Staircase
b) Escape Routes
c) Public Area
ii Exit Sign Visible Ok

iii Directional Exit Sign provided where necessary Ok

iv Exit Sign operation in order Ok

v Exit Sign connected to secondary power supply Ok


tested in order
vi Exit sign complied with CP 19 colour code Ok
(green and white combination)

12 SCDF/CED/FC/GC 1 July 2014


CED FC OSF

* Status of Inspection
B Emergency Lighting Yes N.A.
i Emergency Lighting provide along :- Ok
a) Staircase
b) Escape Route
c) Public Area
d) Essential plant rooms
ii Automatic operation tested in order Ok

iii Emergency lighting provided is sufficient Ok

iv Identification ( Cl 7.8 CP 19 ) Ok

v Emergency Lighting connected to secondary Ok


power supply

Date of inspection and testing:

5) fire door and exit door


* Status of Inspection
A Fire Door Yes N.A.
i Fire door installed at follow location are in order Ok
a) Staircases
b) Escape Routes
c) Public Area
ii Fire doors provided with PSB label Ok

iii Swing of door in direction of escape Ok

iv No stopper detected Ok

v Self-closer provided Ok

vi Doors are closed fitting T.B.A

vii Clear of obstruction Ok

viii Panel above the door same rating as the wall T.B.A

ix No locking device for doors passing to the fire fighting Ok


staircase
x Viewing glass panel at fire rated door does not exceed 650 Ok
cm2

13 SCDF/CED/FC/GC 1 July 2014


CED FC OSF

* Status of inspection
B Exit Door Yes N.A.
i Doors unlocked during operating hour T.B.A

ii Clear of obstruction Ok

Date of inspection:

6) DUCT RISER
* Status of inspection
S/No Details: Yes N.A.
i Fire stopped accordingly Ok

ii Protected by fire-resisting enclosure Ok

iii No Storage Ok

Date of inspection:

7) STAIRCASE (ENCLOSED OPEN )


* Status of Inspection
S/No Details: Yes N.A.
i Standard Stairway Numbering System provided Ok
ii Clear of obstruction Ok
iii No combustible furnishing Ok
vi Fully compartmented Ok
v Service pipe (gas, oil and ventilation) other that water pipe not Ok
passing through protected
staircase, lobbies area

Date of inspection:

8) EXTERNAL FIRE FIGHTING ACCESS OPENING


* Status of Inspection
S/No Details: Yes N.A.
i Clear of obstruction internal and external Ok
ii (Red or Orange) External marking provided Ok
iii Signage “Fire Fighting Access – Do Not Obstruct” provided Ok
vi Readily open from inside and outside Ok

Date of inspection:

14 SCDF/CED/FC/GC 1 July 2014


CED FC OSF

9) THEATRE
* Status of Inspection
A AUDITORIUM Yes N.A.
i Approved occupant load N.A

ii Seats firmly fixed N.A

iii Exit doors provided with panic bolts N.A

iv Hose reel tested in order N.A

v Exit signs in good working order N.A

vi Exit signs provide with secondary power supply N.A


Complying with CP 19
vii Beacon light operation in order N.A

v Emergency lighting auto changeover tested in N.A


Order

* Status of Inspection
B STAGE Yes N.A.
i Provided with self-closing fire rated door N.A

ii Fire extinguisher provided N.A

iii No storage N.A

Iv Smoke curtain provided N.A

* Status of Inspection
C PROJECTION ROOM Yes N.A.
I Provided with self-closing fire rated door N.A

Ii Fire extinguisher provided N.A

Iii Emergency lighting tested in order N.A

Iv Emergency message slide / public address system tested in N.A


order
V Shutter operated smoothly / fire rated glass N.A
Installed
Vi No smoking sign displayed N.A

Date of inspection and testing:

15 SCDF/CED/FC/GC 1 July 2014


CED FC PS
PRESSURISATION SYSTEM

Name of Building:

Location of Fans

Fans supply to (staircase / lift lobby / corridor / )


* Status of Inspection
S/No. DETAILS:- Yes N.A.
i Separate manual reset switch provided Ok

ii Fan operation at high speed under fire alarm (if single) Ok

iii Both fans operating under fire alarm (if double) N.A

iv Fan operating upon secondary power supply (Fire mode) T.B.A

v Fan in operation can only be stopped manually Ok

vi Average air velocity not less than 1 m/s Ok

vii Force require to open any door is not more than 110 N Ok

viii Independent system for smoke lobby / protected corridor connected to T.B.A
secondary power supply

Date of inspection and testing of system:

16 SCDF/CED/FC/GC 1 July 2014


CED FC PHS
PRIVATE HYDRANT SYSTEM

Name of Building:

HYDRANT No .:
* Status of Inspection
A HYDRANT Yes N.A.
i Rigidly mounted on ground Ok
ii Cover for spindle chamber visible Ok
iii Spindle depth not more than 1 metre Ok
iv Blank cap provided Ok
v Spindle chamber and Hydrant clear of obstruction Ok
vi Hydrant painted with yellow colour band Ok

F TESTING OF STATIC PORESSURE AND FLOW RATE


i
HYDRANT NO. STATIC PRESSURE FLOW RATE IN L/SEC REMARKS

Date of inspection and testing of system:

17 SCDF/CED/FC/GC 1 July 2014


CED FC SGS
STANDBY GENERATOR SET

Name of Building:

Location of Standby generator set(s):


* Status of Inspection
A GENERATOR OPERATION Yes N.A.
i Automatically changeover within 15 sec. Ok
ii Smoke exhaust in-order Ok
iii No storage T.B.A

B GENERATOR SET TESTED ON FULL LOAD - SUPPLY TO THE * Status of Inspection


FOLLOWING SYSTEMS SIMULTANEOUSLY Yes N.A.
i Emergency lighting - Common corridor / staircases Ok
- Fire pump rooms Ok
- Generator / switch rooms Ok
- Illuminated exit / directional exit signs Ok
ii Fire pump system - Wet riser main pump N.A
- Wet riser transfer pump N.A
- Sprinkler main pump Ok
- Sprinkler transfer pump Ok
- Hose reel pump Ok
iii Lift system - Homing of lifts Ok
- Operation of fire lift Ok
iv Mechanical - Atrium fan N.A
Ventilation system - Engineered smoke control system fan N.A
- Pressurisation fan Ok
- Car park smoke extract system fan N.A
- Fire pump room fan Ok
- Smoke stop lobby Ok
v Public addressing system Ok

Date of inspection and testing of system:

18 SCDF/CED/FC/GC 1 July 2014


CED FC VCS
VOICE COMMUNICATION SYSTEM

Name of Building :
* Status of Inspection
A One-way Communication Yes N.A.
i Operational test in order Ok
ii Standby battery provided Ok
iii Secondary power supply provided Ok
iv Over riding switch provided at Fire Command Center (FCC) Ok

* Status of Inspection
B Two-way communication Yes N.A.
i Operation tested in order Ok
ii Standby battery provided Ok
iii Secondary power supply provided Ok
iv Provided at Strategic Location Ok
v To label & colour in red Ok
vi 1.5m above the floor Ok
vii Operational test is indicated correctly at panel in FCC Ok

Date of inspection and testing of system:

19 SCDF/CED/FC/GC 1 July 2014


CED FC WRS
WET RISER SYSTEM

Name of Building:

WET RISER: Size: Nos.


* Status of Inspection
A BREECHING INLET Yes N.A.
i Inlet housed in glass fronted protective enclosure N.A
ii Properly installed / secured N.A
iii Clear of Obstruction N.A
iv About 0.76m above finished floor level N.A
v Labelled “WET RISER INLET” and differentiated N.A

* Status of Inspection
B RISER Yes N.A.
i Earthing provided N.A
ii Air release valve provided N.A
iii Not passing through unprotected area / fire rated N.A

* Status of Inspection
C LANDING VALVES Yes N.A.
i 0.76m to 1m above finished floor level N.A
ii Condition of hand wheel satisfactory N.A
iii Blank Cap provided N.A
iv Strapped and padlocked in closed position N.A
v Labelled / Numbered N.A
vi Clear of Obstruction N.A

* Status of Inspection
D WATER TANK Yes N.A.
i Overflow pipe provided N.A
ii Inflow pipe provided N.A
iii Compartmented N.A

* Status of Inspection
E TRANSFER PUMP Yes N.A.
i Pump can be manually tested N.A
ii Auto changeover from normal to secondary power supply in order N.A
iii Auto changeover from duty to standby pump operation in order N.A

* Status of Inspection
F PUMP OPERATION CONTROL PANEL Yes N.A.
i Pump numbering tallied with actual control panel indicator N.A
ii Clear from drain off test facilities N.A
iii Power to pump indicator light “on” N.A
iv Sheltered / weather proof N.A

FSSD FC (02 - 02)

20 SCDF/CED/FC/GC 1 July 2014


* Status of Inspection
G PUMP Yes N.A.
i Auto changeover from normal to secondary power supply in order N.A
ii Auto changeover from duty to standby pump operation in order N.A
iii All valves to pumps kept strapped and padlocked N.A
iv Top most landing valve fully opened (under pump gravity feed) and flow N.A
rate in order
v Discharge for the test drain pipe provided N.A

* Status of Inspection
H TESTING OF STATIC PRESSURE AND FLOW RATE Yes N.A.
i Running pressure in between 3.5 bar to 5.5 bar N.A
ii Static pressure less than 8 bar N.A

* Status of Inspection
I PUMP ROOM VENTILATION Yes N.A.
i Mechanical ventilation fan provided are in working order T.B.A

FLOW RATE TEST ON WET RISER SYSTEM


STACK STOREY STATIC FLOW RATE IN PUMP(P)/ REMARKS
NO TESTED PRESSURE L/SEC GRAVITY (G) FEED

Date of inspection and testing of system:

21 SCDF/CED/FC/GC 1 July 2014


CED FC SPRS
AUTOMATIC SPRINKLER SYSTEM

Name of Building:

Storey serve:
* Status of Inspection
A LAYOUT Yes N.A.
i Sufficient Coverage Ok
ii Sprinkler Head Obstructed Ok
iii Cut-off sprinkler head provided (toilets, staircase landings, etc) Ok
iv Protective guard provided for sprinkler head (if applicable) Ok

* Status of Inspection
B BREECHING INLET Yes N.A.
i Clear of obstruction Ok
ii Inlet housed in protective enclosure Ok
iii Labelled “SPRINKLER BREECHING INLET” Ok
iv 2/4 way inlet provided Ok
v About 0.76m above surrounding road or pavement level Ok
vi Rigidity supported Ok
vii Inlet connected to main sprinkler Tank/Break Tank Ok

* Status of Inspection
C SPRINKLER TANK Yes N.A.
i Access panel and ladder provided Ok
ii Overflow pipe provided Ok
iii Compartmented Ok

* Status of Inspection
D TRANSFER PUMP Yes N.A.
i Pumps can be manually tested N.A
ii Inflow pipe provided N.A
iii Compartmented N.A

* Status of Inspection
E TRANSFER PUMP Yes N.A.
i Pump can be manually tested N.A
i Auto changeover from normal to emergency power supply in order N.A
iii Auto changeover from duty to standby pump operation in order N.A

* Status of Inspection
F PUMPS Yes N.A.
i Auto change over from duty to standby pumps operation in order Ok
ii Auto change over from normal to emergency power supply in order Ok
iii Differentiated Ok
iv Discharge for the test drain pipe provided Ok
v Pressure gauge provided Ok
vi Cut in pressure tested in orders Ok

22 SCDF/CED/FC/GC 1 July 2014


* Status of Inspection
G SPRINKLER CONTROL VALVE Yes N.A.
i Gong provided in order Ok
ii Labelled to indicate storey served Ok
iii Strapped and padlocked in open position Ok
iv Approximately 1m high Ok
v Clear of obstruction Ok
vi Location plate with label provided at the access door (if enclosed) Ok

* Status of Inspection
H SPRINKLER PIPE Yes N.A.
i Not passing through unprotected area/fire rated Ok
ii Not encased by concrete Ok

* Status of Inspection
I PUMP INDICATOR PANEL Yes N.A.
i Pump numbering tallied with actual operation Ok
ii Selector switch in Auto position N.A
iii Power to pump indicator light “ON” Ok

* Status of Inspection
J DRAIN TEST Yes N.A.
i Drain off at control valve/pump room Ok
ii Cut-in pressure of pumps not less than 80% of running pressure Ok

(K) DRAIN OFF TEST RESULT


Control Valve Installed Duty Pump Standby Pump REMARKS
Location Coverage Pressure Cut-in Pre Running Pre Cut-in Pre Running Pre

Date of inspection and testing of system:

CED FC PFP

PASSIVE FIRE PROTECTION TO STRUCTURAL STEEL COLUMNS AND BEAMS

Name of Building :
* Status of Inspection
A Intumescent Paint provided with signage Yes N.A.
i Name of Supplier N.A
ii Fire resistance rating of the intumescent paint N.A
iii Date of painting N.A
iv Expected date of re-painting N.A
v Caution notice: “Caution: No other paint/coating shall be applied to the N.A
Surfaces of the structural steel members protected by the intumescent paint
system”
vi No storage of highly flammable/combustible materials within the vicinity of N.A
23 SCDF/CED/FC/GC 1 July 2014
Structural steel members protected by the intumescent paint

* Status of Inspection
B Dry Board Yes N.A.
i No alterations and additions work to the dry board N.A
(unless approval is obtained)
ii Check for any damages or tempering to the dry board N.A

* Status of Inspection
C Spray-On Material Yes N.A.
i No alterations and additions work to the spray-on material N.A
(unless approval is obtained)
ii Check for any damages or tempering to the spray-on material N.A

Date of inspection and testing of system: ______________________________________

CED FC CAGSS
CLEAN AGENT GAS SUPPRESSION SYSTEM

Name of Building :
* Status of Inspection
A GENERAL Yes N.A.
i System connected to Main / Sub Fire Alarm Panel Ok
ii Emergency manual release for extinguishing agent provided Ok
iii Sign “IN CASE OF FIRE – PULL TO RELEASE”CALL 995 is provided N.A

* Status of Inspection
B CYLINDER FOR EXTINGUISHING AGENT Yes N.A.
i Cylinder information tag label provided Ok
ii Rigidly mounted Ok
iii Service by fire safety work contractor (competent personnel) Ok
iv Date of service Ok

* Status of Inspection
C NOZZLE & PIPE WORKS Yes N.A.
i Rigidly mounted Ok
ii Free of obstruction Ok
iii Double layer provided if applicable Ok

24 SCDF/CED/FC/GC 1 July 2014


* Status of Inspection
D ACTIVATING DEVICE Yes N.A.
i Detectors, Manual Release, Abort Switch provided Ok
ii Free of obstruction Ok
iii Properly installed Ok
iv Ensure in functioning condition (conduct simulated test) Ok

Date of inspection and testing of system:

25 SCDF/CED/FC/GC 1 July 2014