FSSD Fire Checklist
FSSD Fire Checklist
Inspection Checklist
Name of Building :
* Status of Inspection
A AHU Yes N.A.
i Smoke cut-off system provided within return air stream of AHU Ok
* Status of Inspection
B FIRE DAMPERS Yes N.A.
i Fire Dampers are properly installed Ok
ii Motorised Fire dampers operate upon activation of auto fire alarm detectors Ok
iii No obstruction to dampers louver (blades) movement Ok
Name of Building :
* Status of Inspection
S/No. DETAILS:- Yes N.A.
i Smoke detectors provided at the perimeter of the Atrium N.A
iv Auto supply mode activated by fire alarm system (where applicable) under N.A
Secondary power supply
v Manual activation provision installed N.A
vi System extraction air fan operate upon activation of fire alarm N.A
viii Ventilation louvers operation by fire alarm and under secondary power N.A
supply are in order
ix All fire scenarios where is / are designed under the engineered smoke N.A
control system has / have been tested
x Air-condition cut-off upon activation of fire alarm N.A
Name of Building:
vii Audible fault alarm & fault indication light provide at main-alarm panel Ok
x Audible fault alarm & fault indication light provide at sub-alarm panel Ok
Name of Building :
* Status of Inspection
A GENERAL Yes N.A.
i System connected to Main / Sub Fire Alarm Panel N.A
ii Automatic cut-off device for gas fuel supply provided N.A
iii Emergency manual release for extinguishing agent provided N.A
iv Sign “IN CASE OF FIRE – PULL TO RELEASE”CALL 995 is provided N.A
* Status of Inspection
B CYLINDER FOR EXTINGUISHING AGENT Yes N.A.
i PSB Approved label provided N.A
ii Rigidly mounted N.A
iii Service by fire safety work contractor (competent personnel) N.A
iv Date of service N.A
* Status of Inspection
C NOZZLE & PIPE WORKS Yes N.A.
i Rigidly mounted N.A
ii Free of grease (internal & external) N.A
iii Free of obstruction N.A
iv Double layer provided N.A
* Status of Inspection
D HEAT ACTIVATING DEVICE Yes N.A.
i Fusible link enclosed in piping N.A
ii Free of obstruction N.A
iii Free of grease N.A
iv Properly installed N.A
v Ensure in functioning condition (conduct simulated test) N.A
Name of Building :
* Status of Inspection
S/No. DETAILS:- Yes N.A.
i Intake / discharge location with at least 5m separation N.A
iii Connected to secondary power supply & fire alarm system N.A
iv Failure of the Exhaust Fan will cut off the corresponding supply fan N.A
Name of Building:
* Status of Inspection
B RISER Yes N.A.
i Not passing through unprotected area / Fire rated Ok
ii Air release valve provided Ok
iii Earthling provided Ok
* Status of Inspection
C LANDING VALVE Yes N.A.
i 0.76m to 1m above finished floor level Ok
ii Condition of hand wheel satisfactory Ok
iii Blank Cap provided Ok
iv Strapped and padlocked in closed position Ok
v Labelled / Numbered Ok
vi Clear of Obstruction Ok
vii Landing valve painted in yellow colour Ok
* Status of Inspection
D TESTING OF HYDROSTATIC PRESSURE Yes N.A.
i Pressure constant at 200 PSI for 2 hrs Ok
ii Air release valve functioning Ok
CED FC ESCS
ENGINEERED SMOKE CONTROL SYSTEM
Name of Building :
* Status of Inspection
iii Auto supply mode activated by fire alarm system under normal power N.A
supply
iv Auto supply mode activated by fire alarm system under secondary power N.A
supply
v Manual activation provision installed N.A
Name of Building :
* Status of Inspection
A Hose Yes N.A.
i Non-kinking reinforced rubber Ok
ii Length of hose (30m) Ok
iii Nozzle condition satisfactory Ok
iv Locking device provided in-order Ok
v Condition of stop cock satisfactory Ok
vi Clear of obstruction Ok
vii Labelling provided for cabinet Ok
viii Labelling provided for instruction signage Ok
ix No locking device provided Ok
* Status of Inspection
B Testing Yes N.A.
i No Leakage detected Ok
ii 6m throw achievable or flow rate of 0.4 litre / sec Ok
* Status of Inspection
C Pump Yes N.A.
i Pump can be manually tested Ok
ii Auto changeover from normal to secondary power supply Ok
iii Auto changeover from duty to standby pump operation in order Ok
iv Differentiated Ok
Name of Building :
(No. of Passenger Lift ______________ Cargo Lift ______________ Fire Lift ______________)
* Status of Inspection
A Passenger and Fire Lift Yes N.A.
i Lift homing under fire alarm activation in order (Clause 13.1.3) Ok
ii Lift homing under secondary power supply (Clause 13.1.2) Ok
iii Warning notice for fire situation provided (Clause 13.1.8) Ok
iv PSB (SISIR) approved EBOPS provided (Clause 12.3) Ok
v EBOPS supply to lift car bell, lighting and fan in order Ok
vi Lift differentiated with numbers Ok
vii Storey Numbering for lift lobbies provided Ok
viii Lifts home at designated floor Ok
* Status of Inspection
B Fire Lift (Size & Capacity __________________________) Yes N.A.
i Lift travel from ground to top level within 1 minute Ok
ii Fire lift operated under fire switch in order Ok
iii Labelled “FIRE LIFT” Ok
iv Fire switch properly enclosed in labelled glass fronted cover Ok
v No combustible furnishing Ok
* Status of Inspection
B Testing Yes N.A.
i No Leakage detected N.A
ii 6m throw achievable/0.4 l/sec N.A
ii Clear of obstruction Ok
iv PSB label Ok
v Date of service Ok
Date of inspection:
vii The fire alarm sounding distinguishable from any other alarm Ok
system
viii Audible fault alarm & fault indication light Ok
provided at sub / main panel
ix Zone tested is indicated correctly on the fire Ok
alarm main / sub panel
x “IN CASE OF FIRE CALL 995” signage provided N.A
* Status of Inspection
B Emergency Lighting Yes N.A.
i Emergency Lighting provide along :- Ok
a) Staircase
b) Escape Route
c) Public Area
d) Essential plant rooms
ii Automatic operation tested in order Ok
iv Identification ( Cl 7.8 CP 19 ) Ok
iv No stopper detected Ok
v Self-closer provided Ok
viii Panel above the door same rating as the wall T.B.A
* Status of inspection
B Exit Door Yes N.A.
i Doors unlocked during operating hour T.B.A
ii Clear of obstruction Ok
Date of inspection:
6) DUCT RISER
* Status of inspection
S/No Details: Yes N.A.
i Fire stopped accordingly Ok
iii No Storage Ok
Date of inspection:
Date of inspection:
Date of inspection:
9) THEATRE
* Status of Inspection
A AUDITORIUM Yes N.A.
i Approved occupant load N.A
* Status of Inspection
B STAGE Yes N.A.
i Provided with self-closing fire rated door N.A
* Status of Inspection
C PROJECTION ROOM Yes N.A.
I Provided with self-closing fire rated door N.A
Name of Building:
Location of Fans
iii Both fans operating under fire alarm (if double) N.A
vii Force require to open any door is not more than 110 N Ok
viii Independent system for smoke lobby / protected corridor connected to T.B.A
secondary power supply
Name of Building:
HYDRANT No .:
* Status of Inspection
A HYDRANT Yes N.A.
i Rigidly mounted on ground Ok
ii Cover for spindle chamber visible Ok
iii Spindle depth not more than 1 metre Ok
iv Blank cap provided Ok
v Spindle chamber and Hydrant clear of obstruction Ok
vi Hydrant painted with yellow colour band Ok
Name of Building:
Name of Building :
* Status of Inspection
A One-way Communication Yes N.A.
i Operational test in order Ok
ii Standby battery provided Ok
iii Secondary power supply provided Ok
iv Over riding switch provided at Fire Command Center (FCC) Ok
* Status of Inspection
B Two-way communication Yes N.A.
i Operation tested in order Ok
ii Standby battery provided Ok
iii Secondary power supply provided Ok
iv Provided at Strategic Location Ok
v To label & colour in red Ok
vi 1.5m above the floor Ok
vii Operational test is indicated correctly at panel in FCC Ok
Name of Building:
* Status of Inspection
B RISER Yes N.A.
i Earthing provided N.A
ii Air release valve provided N.A
iii Not passing through unprotected area / fire rated N.A
* Status of Inspection
C LANDING VALVES Yes N.A.
i 0.76m to 1m above finished floor level N.A
ii Condition of hand wheel satisfactory N.A
iii Blank Cap provided N.A
iv Strapped and padlocked in closed position N.A
v Labelled / Numbered N.A
vi Clear of Obstruction N.A
* Status of Inspection
D WATER TANK Yes N.A.
i Overflow pipe provided N.A
ii Inflow pipe provided N.A
iii Compartmented N.A
* Status of Inspection
E TRANSFER PUMP Yes N.A.
i Pump can be manually tested N.A
ii Auto changeover from normal to secondary power supply in order N.A
iii Auto changeover from duty to standby pump operation in order N.A
* Status of Inspection
F PUMP OPERATION CONTROL PANEL Yes N.A.
i Pump numbering tallied with actual control panel indicator N.A
ii Clear from drain off test facilities N.A
iii Power to pump indicator light “on” N.A
iv Sheltered / weather proof N.A
* Status of Inspection
H TESTING OF STATIC PRESSURE AND FLOW RATE Yes N.A.
i Running pressure in between 3.5 bar to 5.5 bar N.A
ii Static pressure less than 8 bar N.A
* Status of Inspection
I PUMP ROOM VENTILATION Yes N.A.
i Mechanical ventilation fan provided are in working order T.B.A
Name of Building:
Storey serve:
* Status of Inspection
A LAYOUT Yes N.A.
i Sufficient Coverage Ok
ii Sprinkler Head Obstructed Ok
iii Cut-off sprinkler head provided (toilets, staircase landings, etc) Ok
iv Protective guard provided for sprinkler head (if applicable) Ok
* Status of Inspection
B BREECHING INLET Yes N.A.
i Clear of obstruction Ok
ii Inlet housed in protective enclosure Ok
iii Labelled “SPRINKLER BREECHING INLET” Ok
iv 2/4 way inlet provided Ok
v About 0.76m above surrounding road or pavement level Ok
vi Rigidity supported Ok
vii Inlet connected to main sprinkler Tank/Break Tank Ok
* Status of Inspection
C SPRINKLER TANK Yes N.A.
i Access panel and ladder provided Ok
ii Overflow pipe provided Ok
iii Compartmented Ok
* Status of Inspection
D TRANSFER PUMP Yes N.A.
i Pumps can be manually tested N.A
ii Inflow pipe provided N.A
iii Compartmented N.A
* Status of Inspection
E TRANSFER PUMP Yes N.A.
i Pump can be manually tested N.A
i Auto changeover from normal to emergency power supply in order N.A
iii Auto changeover from duty to standby pump operation in order N.A
* Status of Inspection
F PUMPS Yes N.A.
i Auto change over from duty to standby pumps operation in order Ok
ii Auto change over from normal to emergency power supply in order Ok
iii Differentiated Ok
iv Discharge for the test drain pipe provided Ok
v Pressure gauge provided Ok
vi Cut in pressure tested in orders Ok
* Status of Inspection
H SPRINKLER PIPE Yes N.A.
i Not passing through unprotected area/fire rated Ok
ii Not encased by concrete Ok
* Status of Inspection
I PUMP INDICATOR PANEL Yes N.A.
i Pump numbering tallied with actual operation Ok
ii Selector switch in Auto position N.A
iii Power to pump indicator light “ON” Ok
* Status of Inspection
J DRAIN TEST Yes N.A.
i Drain off at control valve/pump room Ok
ii Cut-in pressure of pumps not less than 80% of running pressure Ok
CED FC PFP
Name of Building :
* Status of Inspection
A Intumescent Paint provided with signage Yes N.A.
i Name of Supplier N.A
ii Fire resistance rating of the intumescent paint N.A
iii Date of painting N.A
iv Expected date of re-painting N.A
v Caution notice: “Caution: No other paint/coating shall be applied to the N.A
Surfaces of the structural steel members protected by the intumescent paint
system”
vi No storage of highly flammable/combustible materials within the vicinity of N.A
23 SCDF/CED/FC/GC 1 July 2014
Structural steel members protected by the intumescent paint
* Status of Inspection
B Dry Board Yes N.A.
i No alterations and additions work to the dry board N.A
(unless approval is obtained)
ii Check for any damages or tempering to the dry board N.A
* Status of Inspection
C Spray-On Material Yes N.A.
i No alterations and additions work to the spray-on material N.A
(unless approval is obtained)
ii Check for any damages or tempering to the spray-on material N.A
CED FC CAGSS
CLEAN AGENT GAS SUPPRESSION SYSTEM
Name of Building :
* Status of Inspection
A GENERAL Yes N.A.
i System connected to Main / Sub Fire Alarm Panel Ok
ii Emergency manual release for extinguishing agent provided Ok
iii Sign “IN CASE OF FIRE – PULL TO RELEASE”CALL 995 is provided N.A
* Status of Inspection
B CYLINDER FOR EXTINGUISHING AGENT Yes N.A.
i Cylinder information tag label provided Ok
ii Rigidly mounted Ok
iii Service by fire safety work contractor (competent personnel) Ok
iv Date of service Ok
* Status of Inspection
C NOZZLE & PIPE WORKS Yes N.A.
i Rigidly mounted Ok
ii Free of obstruction Ok
iii Double layer provided if applicable Ok