CONTRACT NO.

: 560-S27
CONTRACTOR NAME: SAUDI WITHCON CO., LTD.

THE REAL CARD


Rework Elimination Action List
Supt: SYED MAJID HUSSAIN/ SHAIKH RIZWAN AHMAD Foreman/GF: GUL FAYAZ AHMED
Date: 10TH JUNE 2013 Time: 6:30 AM

Task Description:
CONCRETE POURING ACTIVITIES (DIVISION WALL) ;

1. CONSTRUCTION JOINTS
2. TOP SLAB CONCRETE SURFACE LEVEL
3. REBARS CLEANING DURING POURING ACTIVITIES
4. FORMS AND SCAFFOLDING
5. REINFORCEMENTS

Task Location: C4 T263

Key Hold Points


1. Testing agencies on site.
2. Cleaning and Housekeeping to receive the concrete pouring is acceptable.
3. Material has been stored porperly and has no adverse qualities.
4. Crew has adequate training and experience in previous work to complete task.
5. Conducted a workshop and pre-task briefing related to the task.

Personal Quality Commitment


1. Quality is my value and will not be compromised for cost or schedule.
2. I will take pride in my work.
3. If I am unsure of how to complete a task or do not understand the directions given me, I will ask my superviisor
for clarification.
4. If I see a colleague making a mistake I will tell him.
5. I will ensure that I have the necessary tools and materials and making sure that they are in good condition.

Foreman: GUL FAYAZ AHMED Signature:


Crew Member Signature Assigned Task
IKRAMUDDIN MASON
HANS RAJ MASON
SINAPAR
JAY KUMAR

New Crew Members Signature Assigned Task


MASON
MASON
MASON
MASON
MASON

2 of 2
2 of 2
CONTRACT NO.: 560-S27 Project Manager: ES KIM
CONTRACTOR NAME: SAUDI WITHCON CO., LTD. RC Facility Contract Supervisor: AJ PETTET
DATE: 10TH JUNE 2013 Task Description: CONST. OF NEW CONCRETE BOX CULVERT

THE REAL CARD


Rework Elimination Action List
Specific Task Details Work Environment
Y N N/A Y N N/A

● MAXIMUM FALL DISTANCE OF CONCRETE IS 1.5M ✘ ● Working environment ✘

facilities quality work


● ENSURE THE MAXIMUM LAYER OF CONCRETE TO AVOID COLD JOINTS ✘ (lighting, access, etc.)
CAREFULLY PLACED IN HORIZONTALLY MANNERS ● Work is adjusted for ✘

● VIBRATOR HANDLING IS ALWAYS VERTICAL, AND KEEP THE INSERTION ✘ hot/cold weather
TIMING FOR NOT LESS THAN 5 SECONDS NOR MORE THAN 15 SECONDS ✘ ● Other:
● COVER THE EXPOSED VERTICAL REBAR BY POLYETHYLENE SHEET ✘

● CLEAN THE REBARS ALWAYS DURING THE POURING ACTIVITIES ✘

● LEVEL THE TOP SURFACE OF CONCRETE ALWAYS EVEN IN THE JOINTS


● AFTER ONE HOUR OR TOTALLY SETTLE UP OR DRY PROCEED TO


Permits/Drawings
JETWASH TO EXPOSE THE AGGREGATES Y N N/A

● STARRT Card completed ✘

● RIGHT AFTER THE FIRST SETTLEMENT DURING FINISHING IMMEDIATELY ✘ ● Work package has been ✘

APPLY THE CURING SYSTEM AND COVER IMMEDIATELY WITH BURLAP discussed and is at work
AND POLYETHYLENE COVER SHEET site
● SPARE VIBRATORS, FUEL FOR VIBRATOR AVAILABLE ✘ ● Grout card has been ✘

● EMERGENCY CREW STANDBY ✘ completed


● SURFACE LEVEL ALWAYS MONITOR BY LEVEL MACHINE ✘ ● Other:

Tools Skills Material


Y N N/A Y N N/A Y N N/A

● Required tools identified ✘ ● Required craft training for ✘ ● Material available at work ✘

and available applicable tasks confirmed site, it has been approved


● Crew knows how to use ✘ and up to date and is in good condition
tools effectively. ● Adequate crew size ✘ ● Material has clearly ✘

● Required cranes/lifts/ ✘ available for required task marked expiration date and
scaffold etc. identified and ● New members on crew? ✘ is within limits
available ● Have new members been ✘ ● Stone to be used is wet ✘

● Mechanical mixer ✘ briefed on work activities with no excess water


for mortar available and fully understand ● CMU units with flat ends ✘

● Other: requirements? are available.


● Other: ● Other:
Vibrator Equipment
1 of 2
Vibrator Equipment
Mason None

1 of 2