PRACTICA 5: Gas Gathering & Pipeline Simulation
PRACTICA 5: Gas Gathering & Pipeline Simulation
In this exercise, a gas gathering system located on varied terrain is simulated using the
steady state capabilities of HYSYS. The following figure shows the physical configuration
of this system superimposed on a topographic map. The system consists of four wells
distributed over an area of approximately 2.0 square km, connected to a gas plant via a
network of pipelines.
There are four gas wells, we need to gather the gas from the wells and transfer it to the
plant through pipelines shown below:
Schedule 40 steel pipes is used throughout and all branches are buried at a depth of 1
m (3 ft). All pipes are uninsulated Consider inner and outer HTC and the pipe wall in heat
transfer estimation. (Ambient Temperature = 5oC)
• Calculate the pressure drop and the heat loses inside each branch.
Solución:
Se ingresan los datos para cada pozo de gas como se muestra en los recuadros. Como
se describe la practica todas las tuberías son de acero cedula 40, enterradas a una
profundidad de 1 m con una temperatura ambiente de 5°C. Luego de realizar la
simulación hallamos las pérdidas de presiones y el calor perdido en cada tramo de
tubería hacia la planta de gas.
UNIVERSIDAD NACIONAL SAN LUIS GONZAGA
ESCUELA DE POSGRADO DE LA UNICA
MAESTRÍA EN INGENIERÍA QUÍMICA – PROCESOS QUÍMICOS Y AMBIENTALES
Los resultados obtenidos después de haber hecho la simulación son los siguientes:
Unit Q1 Q2 Q3 Q4 Q5 Q6 Q7
Heat Flow kJ/h 12426 8527 16579 12237 10242 9003 11068
Delta P kPa 652.75 82.35 1798.04 786.26 290.91 1425.47 164.88