A -02

TO KACHERI P -07 P -01


TO RAWAT A -01

25mm EXP. JOINT 44375 25mm EXP. JOINT 44375 DECK SLAB 25mm EXP. JOINT 44375 25mm EXP. JOINT
DECK SLAB DECK SLAB
X-SLPE % X-SLPE % X-SLPE % X-SLPE % X-SLPE % X-SLPE %
10500

44400 6 SPANS x 44400 44400


SPAN LENGTH LENGTH OF SPANS SPAN LENGTH

HALF PLAN WITH & WITHOUT DECK SLAB


(TOTAL 8 SPANS OF 44.400m EACH)

TO KACHERI TO RAWAT
25mm EXP. JOINT 25mm EXP. JOINT 25mm EXP. JOINT 25mm EXP. JOINT
44300 44275 44275
FRL GIRDER LENGTH FRL GIRDER LENGTH FRL GIRDER LENGTH FRL

8000
4+4-Ø1000 PILES
TIP LEVEL 51.548
87.328
7600 ABUTMENT-1
85.328
TIP LEVEL 4+3+4-Ø1000 PILES
51.548 83.380
TIP LEVEL 51.548

81.380 3+2+3-Ø1000 PILES


ABUTMENT -2 TIP LEVEL 51.548

PIER-1
ELEVATION OF BRIDGE
3+2+3-Ø1000 PILES
TIP LEVEL 47.048

PIER-7
Pile Detail
Existing & Top
Pile Cap Tip Level Length No. of
Sr.No New Pile cap level of
Thickness of Piles of Pile Piles
Level pile
Abt-1 - 1.2 - 51.548 - 4+4

P-1 87.328 2 85.328 51.548 33.78 3+2+3

P2 87.245 2 85.245 51.548 33.697 3+2+3


*AS PER SITE
$TOP OF PILE CAP LEVEL OF ADDITIONAL BRIDGE WILL NOT BE HIGHER THEN P3 82.710 2 80.710 47.048 33.662 3+2+3
EXISTING TOP OF PILE CAP LEVEL P4 82.689 2 80.689 47.048 33.641 3+2+3
P5 82.701 2 80.701 47.048 33.653 3+2+3
NOTES:-
1. THE ABOVE LEVELS HAVE BEEN PROVIDED BY THE CONTRACTOR.THE SAME P6 82.691 2 80.691 47.048 33.643 3+2+3
NEEDS TO BE VERIFIED BY THE ENGINEER AT THE SITE.
2. MISTAKE,IF ANY, SHOULD BE IMMEDIATELY NOTIFIED TO THE ENGINEER. P7 83.380 2 81.380 47.048 34.332 3+2+3

Abt-2 - 1.2 - 51.548 - 4+3+4 DATE


REVISED DEC, 2017

CECON 04 DESIGNED BY Dr. M IQBAL

Civil Engineers & Consultants NATIONAL HIGHWAY AUTHORITY 03


02
DRAWN BY

CHECKED BY
ARIF RAO
HASSAM ULLAH
SWAN BRIDGE (NBC)
ELEVATION N TS
H# 470, Street 17,Chaklala Scheme 3 Rawalpindi
E-mail:cecon.rwp@gmail.com URL:www.cmiqbal.com
ISLAMABAD 01 Km: 1534 (N-5) DATE DWG. NO.

You might also like