Kentledge Method 190X300% - PLTU Suralaya Jawa 9 & 10 - Rev.1 PDF
Kentledge Method 190X300% - PLTU Suralaya Jawa 9 & 10 - Rev.1 PDF
B PR
RATAMA
A INDONE
ESIA
CT
PROJEC : PILING WORKS
W FOR
F PLT
TU SURAL
LAYA JAW
WA 9 & 100.
ON
REVISIO : 01
Pro
oject Qualitty Method
M Staatement:
Mannagement S System Static
S Axiaal Load Tesst (Kentledgge Test Meethod)
Pro
oject Name:: Project
P No.: QWP Ref.
R No.:
Pilin
ng Works forr PLTU 19-04
1 BPI-QWPP-PM-19-04-002
Suraalaya Jawa 9 & 10
Pag
ge 2 of 5 Issue:
I 00, Rev:
R 01 Date: 100 July 20199
SECTION TABLE OF
F CONTEN
NTS
1.0 INTRODU
UCTION
2.0 SCOPE
3.0 RESPONS
SIBILITIES
4.0 PROCEDU
URE
4.1 General
4.2 Equuipment
4.3 Loaading Procedure
5.0 ATTACHM
MENT
Pag
ge 3 of 5 Issue:
I 00, Rev:
R 01 Date: 100 July 20199
1.0 INT
TRODUCTIION
Note: Detaiils of the pro ocedures conntained hereiin may be reeviewed periiodically andd modified based
b on the
actual site rrequirementss.
2.0 SCOPE
3.0 ESPONSIBIL
RE LITIES
4.0 ROCEDURE
PR E
4.1 neral
Gen
Concrete bllocks (dimennsion 1 m x 1 m x 1.5 m)m will be useed for testingg an axial loaading test onn pile shownn
in the draw
wing attachedd. The concreete block hass to be arrannged on the top (total quaantity 236 noos) and steell
cross beamss WF 600 (qquantity 35 noos).
One hydrauulic jack of 1000 ton capaacity will be placed in gaap between thhe pile head and the main beam, andd
the transferrred load cann be read on the
t calibratedd pressure gaauge. Cyclic load will bee applied usinng hydraulic
jack controllled by calibrrated pressurre gauge andd vibrating wire
w load cell (VWLC).
While the vvertical movement of thee pile dead is measured by dial gaugges mounted on the referrence beams
using a steeel beam WFF-200 and 2 dial gauges for the horizzontal movem ment, the suupport of thee beam were
founded at 6.00 m awayy from the ceenter of pile, one end of beam
b was freee and the othher end was fixed
Pro
oject Qualitty Method
M Staatement:
Mannagement S System Static
S Axiaal Load Tesst (Kentledgge Test Meethod)
Pro
oject Name:: Project
P No.: QWP Ref.
R No.:
Pilin
ng Works forr PLTU 19-04
1 BPI-QWPP-PM-19-04-002
Suraalaya Jawa 9 & 10
Pag
ge 4 of 5 Issue:
I 00, Rev:
R 01 Date: 100 July 20199
4.2 Equ
uipment
Electric Pu
ump Brand : ENERPA AC PEM 541
10 J
Qty : 1 set
Maximum Pressure
P : 10,000 Psi
Pressure G
Gauge Brand : ENERPA AC GP-10S
Qty : 1 unit
Capacity : 10,000 Psi
The equipmment’s used for this testiing consistedd of 1 unit ppressure gauuge and 4 unnits dial gaugge that have
been calibraated at reputaable calibratiion laboratorry.
Pag
ge 5 of 5 Issue:
I 00, Rev:
R 01 Date: 100 July 20199
CYCLE P
PERCENT TEST STEP OF LOADIING
LOAD
NO OF DESIGN
O LOAD IN MINUTE
DURATION
LOAD (TONS))
I 0 0 -
25 75 A 0-10-20
0-30-40-50-60-(70-80-90-1
100-110-120)
50 150 B 0-10-20
0-30-40-50-60
25 75 C 0-10-20
0
0 0 B 0-10-20
0-30-40-50-60
II 50 150 C 0-10-20
0
75 225 A 0-10-20
0-30-40-50-60-(70-80-90-1
100-110-120)
100 300 B 0-10-20
0-30-40-50-60
75 225 C 0-10-20
0
50 150 C 0-10-20
0
0 0 B 0-10-20
0-30-40-50-60
IV 50 150 C 0-10-20
0
100 300 C 0-10-20
0
150 450 C 0-10-20
0
175 525 A 0-10-20
0-30-40-50-60-(70-80-90-1
100-110-120)
200 600 D 0-10-20
0-30-40-50-60-(70-80-90-1
100-110-120)
And theen every hour
150 450 B 0-10-20
0-30-40-50-60
100 300 B 0-10-20
0-30-40-50-60
50 150 B 0-10-20
0-30-40-50-60
0 0 B 0-10-20
0-30-40-50-60
V 50 150 C 0-10-20
0
100 300 C 0-10-20
0
150 450 C 0-10-20
0
200 600 C 0-10-20
0
210 630 C 0-10-20
0
220 660 C 0-10-20
0
230 690 C 0-10-20
0
240 720 C 0-10-20
0
250 750 A 0-10-20
0-30-40-50-60-(70-80-90-1
100-110-120)
200 600 C 0-10-20
0
150 450 C 0-10-20
0
100 300 C 0-10-20
0
50 150 C 0-10-20
0
0 0 B 0-10-20
0-30-40-50-60
VI 50 150 C 0-10-20
0
100 300 C 0-10-20
0
150 450 C 0-10-20
0
200 600 C 0-10-20
0
250 750 C 0-10-20
0
260 780 C 0-10-20
0
270 810 C 0-10-20
0
280 840 C 0-10-20
0
290 870 C 0-10-20
0
300 900 D 0-10-20
0-30-40-50-60-(70-80-90-1
100-110-120)
And theen every hour
225 675 B 0-10-20
0-30-40-50-60
150 450 B 0-10-20
0-30-40-50-60
75 225 B 0-10-20
0-30-40-50-60
0 0 E 0-10-20
0-30-40-50-60-(70-80-90-1
100-110-120)
NOTE :
A: 1 HOU
UR IF RATE OF SETT <0.25 MM/HOUR, MAX 2 HOURS
B: 1 HOU
UR
C: 20 MIN
NUTES
D: 12 HOU
URS IF RATE OF SETT <00.25 MM/HOUR, MAX 24 HOURS
H
E: 2 HOU
URS
T
Table 1. Loadding & Readding Procedurre
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
NTS J910-VK02-POZEN-165629
JAWA 9&10 6/8/19
SUP COAL FIRED STEAM POWER PLANT
SCHEMATIC COMPRESION FOR D.600 3 x 190 T
BAUER BPI /1904 /027 /IFC /RO