Professional Documents
Culture Documents
Well Integrity Management: Data, Visualization
Well Integrity Management: Data, Visualization
“application of technical, operational, and organizational solutions to reduce risk of uncontrolled release of
formation fluids throughout the life cycle of a well” – NORSOK Standard D-010
Safety and
Environment
Integrity Remedial
Monitoring Measures Regulatory
Equipment
Compliance
Integrity: Failure
Tubing, Casing, Scenarios, Risk
Annulus, Well Monitoring License to
Head / Tree Recording Continuous
Improvement:
Operate
and
Assurance and
Evaluation Prevention
Reputation
Joint industry
project to address
well integrity
- Energy Global
4
3
Data quality across systems not cross referenced
Collate Well history, equipment, design, Well
Data work, pressure production, etc. 4
Inadequacy of data in various systems
5
Use data to calculate MOASP vs. design, Lack of standard processes / roles leading to inconsistency
Analyze
assess anomalies, history, production vs. 6
Data capability Missing / over lapping accountability
7
Evaluate and Risk classification / management is subjective, inconsistent
Risk classification, prioritization, decision
Manage on next steps 8
Risks Manual tracking / operations to take risk mitigation action
9
Unclear picture of the overall WI health for the leadership
Take Track Wellwork / other action to be done,
Remedial notify, report 10
Significant manual effort for reporting, calculations, recording
Action
5
Increased emphasis on safety is causing companies move
towards the right side of the continuum
A staged approach towards addressing various facets of WI will help us progress towards maturity
6
While the silver bullet remains elusive, we have seen a few things work well to
help the progression
1
Manual effort to collate data from multiple sources
2 DATA
Repetitive entry of key data for processing: header, design
3
Data quality across systems not cross referenced
4
Inadequacy of data in various systems PROCESS
5
Lack of standard processes / roles leading to inconsistency
6
Missing / over lapping accountability
RISK MANAGEMENT
7
Risk classification / management is subjective, inconsistent
8
Manual tracking / operations to take risk mitigation action
9 Unclear picture of the overall WI health for the leadership VISUALIZATION
10 Significant manual effort for reporting, calculations, recording
7
• Assessment
• Improvement
• Ongoing model for DQ
• DQ value
Base Management
Well Handover
Processes
Well Workover
Processes
BENEFITS
• Accountabilities
• Ability to measure
KPIs
Risk Identification Risk Assessment Risk Mitigation
• Standards
• Tracking to closure
Roles and responsibilities defined by RACI Matrix
9
Inputs by users
Impact Score
Data from related Risk
systems Algorithm
Probability Score
Weightages and
parameters
BENEFITS
• Custom algorithm to calculate likelihood and consequences
score for an anomaly • Objectivity
Color:
Darker the color,
more is the impact
High:
Low:
Size:
Nos. of anomalies
in the Asset
12
Color:
Risk Category
(Category 1 to 4)
Size:
# of anomalies
13
Color:
Production Volume
(High, Med, Low)
Size:
1 small square = 1
Anomaly
14
Color:
Production Category
of the well
(High, Med, Low)
15
Summary
• Win themes
• Staged approach
• Visualize better
Thank You
© 2014 Infosys Limited, Bangalore, India. All Rights Reserved. Infosys believes the information in this document is accurate as of its publication date; such information is subject to change
without notice. Infosys acknowledges the proprietary rights of other companies to the trademarks, product names and such other intellectual property rights mentioned in this document. Except
as expressly permitted, neither this documentation nor any part of it may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, printing,
photocopying, recording or otherwise, without the prior permission of Infosys Limited and/ or any named intellectual property rights holders under this document.
Questions?
Contact: