GENERAL NOTES:

1. ALL WORK TO COMPLY WITH NEW YORK CITY BUILDING CODE.


7. WHERE APPLICABLE, THE SOIL UNDER SLAB WHICH IS ON THE GROUND SHALL BE LMW Engineering Group, LLC.
COMPACTED TO HIGH DENSITY EQUIVALENT TO A MINIMUM OF 95% MAXIMUM REINFORCING BAR NOTES:
2. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS AT THE DENSITY AT OPTIMUM MOISTURE DETERMINE BY THE SOIL COMPACTION TEST SPECIAL INSPECTION AS PER BUILDING CODE
SITE AS REQUIRED TO VERIFY THE DRAWINGS AND TO PERFORM THIS WORK (ASTM D-1557). THE MAXIMUM LIFT FOR THE COMPACTION WILL BE 12 INCHES. 1. REINFORCING BARS TO BE DEFORMED AND CONFORM TO ASTM A-996 GRADE 60 WITH SPECIAL INSPECTIONS CODE/SECTION
PROPERLY. ANY DISCREPANCY BETWEEN THE DRAWINGS AND THE SURVEY MINIMUM YIELD STRESS Fy=60,000 PSI Structural Steel - Welding BC 1704.3.1
8. SEE ARCHITECTURAL DRAWINGS FOR ALL WATERPROOFING AND DAMPROOFING
SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE. 2. ALL CONTINUOUS REINFORCING BARS TO BE LAPPED 36 BAR DIAMETERS AT SPLICES Structural Steel - Details, High Strength Bolting BC 1704.3.2, BC 1704.3.3
DETAILS.
AND CORNERS UNLESS OTHERWISE INDICATED. LAP CONTINUOUS BOTTOM BARS AT Structural Cold - Formed Steel BC 1704.3.4
3. DETAILS NOT SHOWN OR SPECIFIED BUT NECESSARY FOR PROPER AND SUPPORTS AND TOP BARS AT CENTER OF SPANS. SPLICES SPACED CLOSER THAN 12
ACCEPTABLE CONSTRUCTION AND INSTALLATION OF ANY PART OF THE WORK AS Concrete - Cast-in-Place BC 1704.4
STRUCTURAL CONCRETE NOTES: BAR DIAMETERS TO EACH OTHER OR 6" FROM ANY OUTSIDE EDGE SHALL BE
Concrete - Precast BC 1704.4
DETERMINED BY THE OWNER REPRESENTATIVE SHALL BE INCLUDED IN THE WORK INCREASED TO 43 BAR DIAMETERS (20%).
1. ALL CAST-IN-PLACE CONCRETE SHALL BE AIR ENTRAINED, NORMAL WEIGHT STONE Concrete - Prestressed BC 1704.4
THE SAME AS IF HEREIN SPECIFIED OR INDICATED CONCRETE, AND SHALL HAVE 5950 PSI MINIMUM 28 DAY COMPRESSIVE STRENGTH . 3. PROVIDE CORNER BARS AT ALL WALL INTERSECTIONS. Concrete Sampling and Testing BC 1905.6, BC 1913.10
4. THE INTENT OF THE STRUCTURAL DRAWINGS IS TO SHOW THE MAIN STRUCTURAL 2. ALL REINFORCING BARS SHALL BE NEW BILLET STEEL CONFORMING TO THE 4. PROVIDE (1) #5 BAR x 3'-O' LONGER THAN OPENING FOR EACH 4" OF WALL THICKNESS, Concrete Design Mix BC 1905.3, BC 1913.5
FEATURES AND DESIGN FOR THE COMPLETED PROJECT. FOR ARCHITECTURAL STANDARDS OF ASTM A615 GRADE 60. OVER ALL OPENINGS UNLESS OTHERWISE INDICATED. Masonry BC 1704.5 SHIMING TAM ARCHITECT, PC.
DETAILS AND OTHER COMPONENTS THAT MAY BE NECESSARY TO CONSTRUCT 3. ALL WELDED WIRE FABRIC SHALL CONFORM TO THE STANDARDS OF ASTM A185. Wood - Installation of High-Load Diaphragms
5. ALL BARS SHALL BE HELD SECURELY IN PROPER POSITION WHILE PLACING BC 1704.6.1 ARCHITECTS & ENGINEERS
THE PROJECT SEE ARCHITECTURAL AND CONSULTANTS DRAWINGS. 4. ALL CONCRETE REINFORCEMENT SHALL BE DETAILED, FABRICATED, LABELED, CONCRETE. IF REQUIRED, ADDITIONAL BARS OR STIRRUPS SHALL BE PROVIDED BY Wood - Installation of Metal-Plate-Connected to Trusses BC 1704.6.2
SUPPORTED AND SPACED IN FORM AND SECURED IN PLACE IN ACCORDANCE WITH THE CONTRACTOR TO PROPERLY SUPPORT BARS. Wood - Installation of Prefabricated I-Joists BC 1704.6.3
5. REFER TO ARCHITECTURAL, HVAC, MECHANICAL AND ELECTRICAL DRAWINGS FOR
THE PROCEDURES AND REQUIREMENTS OUTLINED IN THE LATEST EDITION OF THE
VERIFICATION OF LOCATIONS AND DIMENSIONS OF ALL CHASES, SLOTS, INSERTS, 6. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE AS FOLLOWS: Subgrade Inspection BC 1704.7.1
"BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE", ACI 318-99 AND THE
CURBS, OPENINGS, SLEEVES, ANCHOR BOLTS, FLOOR PITCHES AND ALL OTHER "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE Subsurface Conditions - Fill Placement & In-Place Density BC 1704.7.2, BC 1704.7.3
PROJECT REQUIREMENTS NOT SHOWN ON STRUCTURAL DRAWINGS. THE a. FOOTINGS AND OTHER MEMBERS PLACED DIRECTLY ON GROUND 3"
STRUCTURES", ACI 315. Deep Foundation Elements BC 1704.8
CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL STRUCTURES 5. CHECKED SHOP DRAWINGS SHOWING REINFORCING DETAILS, INCLUDING STEEL b. CONCRETE THAT AFTER REMOVAL OF FORMS IS IN CONTACT WITH THE GROUND Vertical Masonry Foundation Elements BC 1704.9
AGAINST DAMAGE DURING CONSTRUCTION. SIZES, SPACING AND PLACEMENT, SHALL BE SUBMITTED TO THE ARCHITECT FOR OR EXPOSED TO WEATHER 2" FOR BARS LARGER THAN #5, AND 1-1/2" FOR #5 Underpinning BC 1704.20.3, BC 1814
REVIEW PRIOR TO FABRICATION. BARS OR SMALLER. Sprayed Fire-Resistant Material
6. SECTIONS AND DETAILS SHOWN SHALL BE CONSIDERED TO BE TYPICAL FOR ALL BC 1704.11
SIMILAR CONDITIONS. 6. THE CONTRACTOR SHALL SUBMIT DETAILED DRAWINGS SHOWING THE LOCATIONS OF c. SLABS AND WALLS NOT EXPOSED TO WEATHER OR GROUND 3/4". Structural Stability - Existing Buildings BC 1704.20.1
ALL CONSTRUCTION JOINTS, CURBS, SLAB DEPRESSIONS, SLEEVES, OPENINGS, ETC. Excavation - Sheeting, Shoring, and Bracing BC 1704.20.2, BC 3304.4.1
d. BEAMS AND GIRDERS NOT EXPOSED TO WEATHER OR GROUND 1- 1 /2".
7. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS SHOWING THE COMPLETE 7. ALL REINFORCING SPLICES SHALL CONFORM TO THE REQUIREMENTS OF ACI 318. BUT
LAYOUT AND DETAILS OF ALL STRUCTURAL WORK TO BE PERFORMED. THE IN NO CASE SHALL IT BE LESS THAN 40 DIAMETERS, UNLESS NOTED OTHERWISE. 7. CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD AND
CONTRACTOR MAY NOT PERFORM WORK UNTIL THE SHOP DRAWINGS HAVE BEEN NOTIFY THE ARCHITECT OF ANY DISCREPANCIES.
8. ALL WELDED WIRE FABRIC SHALL BE LAPPED TWO (2) FULL MESH PANELS AND TIED DRAWING LIST:
APPROVED. 8. CONTRACTOR SHALL INSTALL ALL PIPE SLEEVES, BOXED OPENINGS, ANCHOR BOLTS,
STRUCTURAL DESIGN CRITERIA:
SECURELY.
9. WHERE REQUIRED, DOWELS SHALL MATCH SIZE AND NUMBER OF MAIN REINFORCING, BEARING PLATES, ETC. AS REQUIRED FOR VARIOUS TRADES. 1. CODES AND STANDARDS: G-001 GENERAL NOTES AND PLOT PLAN
UNLESS OTHERWISE NOTED. 9. PROVIDE SHOP DRAWINGS PRIOR TO PLACEMENT OF CONCRETE. A. NYC BUILDING CODE. (NYC-2014)
EXCAVATION NOTES: 10. ALL WALLS AND STRUCTURAL SLABS SHALL BE REINFORCED WITH AT LEAST #5 @12 B. BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE ( ACI
10. THE ARCHITECT HAS NOT BEEN RETAINED TO PROVIDE FIELD SUPERVISION, NOR FO-101 FOUNDATION PLAN & SCHEDULE
INCHES EACH WAY AND EACH FACE, UNLESS NOTED OTHERWISE. ALL SLAB SHALL BE 318)
1. THE PERIMETER OF THE GENERAL EXCAVATION SHALL BE RETAINED BY A SOIL CONTROLLED INSPECTIONS AS PER NEW YORK CITY BUILDING CODE.
RETENTION SYSTEM ( WHERE APPLICABLE). THE INSTALLATION, MAINTENANCE
REINFORCED WITH AT LEAST ONE (1) LAYER OF #5 @12" O.C.E.W. IN MIDDLE., UNLESS C. BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES ( FO-102 SUB- CELLAR PLAN
NOTED OTHERWISE. ACI 530-08), AND SPECIFICATIONS FOR MASONRY STRUCTURES ( FO-103 CELLAR PLAN
AND REMOVAL (WHERE REQUIRED) SHALL BE THE COMPLETE AND SOLE
11. CONSTRUCTION JOINTS IN ALL CONTINUOUS FOOTINGS, WALLS, SLABS AND BEAMS ACI 530.1-08)
RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL PROVIDE ALL FO-104 FOUNDATION SECTIONS AND DETAILS
SHALL BE NO FURTHER APART THAN 60 FEET IN ANY DIRECTION. D. SPECIFICATIONS FOR THE DESIGN, FABRICATION AND ERECTION
MEASURES AND PRECAUTIONS NECESSARY TO PREVENT DAMAGE AND MINIMIZE
12. ALL ADJOINING SURFACES NOT CAST MONOLITHICALLY SHALL BE ROUGHENED TO OF STRUCTURAL STEEL FOR BUILDINGS, AMERICAN INSTITUTE OF
SETTLEMENT OF EXISTING OR NEW CONSTRUCTION INSIDE AND OUTSIDE THE STEEL CONSTRUCTION (AISC)
INCH AMPLITUDE FOR THE ENTIRE INTERSECTION SURFACE ACCORDING TO ACI
PROJECT LIMITS. ANY DAMAGE TO NEW OR EXISTING CONSTRUCTION INSIDE OR
RECOMMENDATIONS AND SHALL BE COATED WITH BONDING COMPOUND BEFORE 2. DESIGN LOADS: S-101 1ST FLOOR PLAN
OUTSIDE OF THE PROJECT LIMITS, CAUSED BY CONSTRUCTION TECHNIQUES OR
PLACING CONCRETE.
MOVEMENTS OF THE SOIL RETENTION SYSTEM IS THE RESPONSIBILITY OF THE A. LIVE LOADS: S-102 2ND- 4TH FLOOR PLAN
13. NO CALCIUM CHLORIDE SHALL BE USED IN ANY CONCRETE WITHOUT THE ARCHITECT'S · LOBBY AND FIRST FLOOR CORRIDORS : 100 Psf
CONTRACTOR. THE DESIGN OF THE SOIL RETENTION SYSTEM WILL BE PROVIDED S-103 5TH FLOOR PLAN
PRIOR REVIEW AND WRITTEN APPROVAL.
BY THE OWNER. THE CONTRACTOR WILL ASSIST THE OWNER IN THE APPROVAL · CORRIDORS ABOVE FIRST FLOOR : 40 Psf
14. BAR SUPPORTS IN CONTACT WITH EXPOSED SURFACES SHALL BE PLASTIC TIPPED. S-104 6TH- 8TH FLOOR PLAN
PROCESS FOR THE RETENTION SYSTEM IF SO REQUIRED. THE CONTRACTOR · RESIDENTIAL : 40 Psf
SHALL PROVIDE ALL CONTROLLED INSPECTIONS REQUIRED BY THE CITY BUILDING 15. PLACE SLAB IN ACCORDANCE WITH ACI 302, "GUIDE FOR CONCRETE FLOOR AND SLAB
· ELEVATOR MACHINE ROOM : 150 Psf S-105 9TH FLOOR PLAN
CODE RELATING TO THE RETENTION SYSTEM. CONSTRUCTION".
· ROOF : 40 Psf S-106 ROOF PLAN
16. CONCRETE AND REINFORCING MATERIALS TO CONFORM TO THE FOLLOWING
2. THE CONTRACTOR SHALL COORDINATE ALL ELEMENTS OF THE SOIL RETENTION STANDARDS; · HEATER ROOM : 300 Psf S-107 ELEVATOR MACHINE ROOM PLAN
SYSTEM WITH ALL ELEMENTS OF THE PERMANENT BUILDING. B. DEAD LOAD : PER MATERIAL

NORTH
a. PORTLAND CEMENT AS PER ASTM C 150.
3. PRIOR TO ANY EXCAVATION OR INSTALLATION OF ELEMENTS OF THE SOIL b. AIR ENTRAINING PORTLAND CEMENT AS PER ASTM C 175. S-201 SCHEDULE AND DETAILS - 1

D
E
C. GROUND SNOW LOAD, Pg : 20 Psf NU

AR
RETENTION SYSTEM, THE CONTRACTOR SHALL ESTABLISH SURVEY POINTS E
c. CONCRETE AGGREGATES AS PER ASTM C 33. S-202 SCHEDULE AND DETAILS - 2 TH AV

EV
AROUND THE PERIMETER OF THE AREA TO BE EXCAVATED AND OTHER POINTS UP D. ROOF SNOW LOAD:
d. WATER SHALL BE CLEAN AND FREE OF ANY INJURIOUS AMOUNTS OF OILS, ACIDS, 97

L
TO 200 FEET BEYOND THE PERIMETER. THESE POINTS SHALL BE SURVEYED FOR a. FLAT ROOF SNOW LOAD, Pf : 20 Psf

U
ALKALIS, SALT, ORGANIC MATERIALS AND DELETERIOUS SUBSTANCES.

BO
VERTICAL AND HORIZONTAL MOVEMENT AT FREQUENT INTERVALS DURING b. SNOW EXPOSURE FACTOR, Ca : 0.9
10 030
17. SLUMP SHALL NOT EXCEED 5" PLUS OR MINUS 1" FOR STONE AGGREGATE CONCRETE. K:

IN
ACTUAL EXCAVATION AND CONTINUING DURING EACH SUBSEQUENT PHASE OF c. SNOW LOAD IMPORTANCE FACTOR, I : 1.0 S-401 TYPICAL STRUCTURAL DETAILS - 1
OC

PH
THE WORK AND SUBMITTED TO THE ARCHITECT FOR INFORMATION. 18. ALL REINFORCEMENT SHALL BE SECURELY HELD IN PLACE WHILE PLACING BL
d. THERMAL FACTOR, Ct : 1.0

UT
S-402 TYPICAL STRUCTURAL DETAILS - 2
CONCRETE. IF REQUIRED ADDITIONAL BARS OR STIRRUPS SHALL BE PROVIDED BY THE

ET

S
4. ALL EXCAVATION SHALL BE BASED ON ENGINEERED DRAWINGS PREPARED BY THE CONTRACTOR TO FURNISH SUPPORT TO ALL BARS. E. LATERAL LOADS:

RE
CONTRACTOR INCLUDING PLANS AND SECTIONS OF EXCAVATION SEQUENCES. a. WIND LOADS:

T
19. ALL BEAMS AND SLABS SHALL BE CAST MONOLITHICALLY UNLESS OTHERWISE NOTED.

S
THE EXCAVATION SEQUENCES SHALL BE CONTROLLED TO MATCH THE · BASIC WIND SPEED : 98mph

AM
20. MINIMUM CONCRETE COVER FOR REINFORCEMENT SHALL BE 1" FOR SLABS, 1" FOR
REQUIREMENTS OF THE DESIGN OF THE SOIL RETENTION SYSTEM AND TO PERMIT · WIND IMPORTANCE FACTOR, I : 1.0

LTH
WALLS AND 1" FOR BEAMS.
MONITORING OF WALL AND GROUND MOVEMENTS. · EXPOSURE :B

A
21. CONTRACTOR SHALL SUBMIT CONCRETE DESIGN MIXES TO ENGINEER FOR REVIEW

W
5. THE GENERAL EXCAVATION ACROSS THE SITE SHALL NOT EXTEND DEEPER THAN AND APPROVAL. b. SEISMIC LOADS:
THE SLAB-ON-GRADE SUBGRADE ELEVATION. THE EXCAVATIONS FOR FOOTINGS, 22. ALL CONCRETE SHALL BE CONTROLLED CONCRETE AND SHALL BE TESTED IN · SITE CLASS :D
GRADE BEAMS, PILE CAPS, MATS, PITS, SLABS, ETC. SHALL BE EXCAVATED ON AN ACCORDANCE WITH CITY BUILDING CODE REQUIREMENTS. · IMPORTANCE FACTOR, I : 1.0 THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
INDIVIDUAL, LOCALIZED BASIS DOWN FROM THE SLAB-ON-GRADE SUBGRADE 23. ALL REINFORCING BARS SHALL BE LAPPED AS INDICATED ON THE DRAWINGS. UNLESS THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
· SEISMIC DESIGN CATEGORY :B PROSECUTION.
LEVEL. OTHERWISE NOTED, TERMINATE CONTINUOUS BARS AT DISCONTINUOUS ENDS WITH
· RESPONSE MODIFICATION COEFFICIENT, R :5
STANDARD HOOKS.
6. ALL EXCAVATION BELOW THE SLAB LEVEL REQUIRED FOR PITS SHALL BE · SPECTRAL RESPONSE COEFFICIENT Sds : 0.2836
24. ALL CONCRETE SHALL BE CURED FOR A MINIMUM OF 4 DAYS. CURING SHALL BE
RETAINED BY LOCALIZED SOIL RETENTION SYSTEMS AS MAY BE NECESSARY
PERFORMED BY COVERING FRESHLY PLACED CONCRETE WITH PLASTIC SHEETS AND · BASIC-SEISMIC-FORCE RESISTING SYSTEM No. Revision Comment Date
BASED ON A DESIGN USING APPROPRIATED EARTH AND HYDRAULIC PRESSURES MAINTAINING SHEETS IN PLACE UNTIL CONCRETE IS CURED. : ORDINARY REINF. CONC. SHEAR WALL
AND OTHER CONSTRUCTION LOADS.
25. SEE ARCHITECTURAL DRAWINGS FOR TYPE AND LOCATION OF ALL FLOOR FINISHES, EXIST. EXIST. EXIST. EXIST.
ADJ. ADJ. ADJ. ADJ.
7. THE CONTRACTOR SHALL PROVIDE POSITIVE PROTECTION (MAT/SHEET FLOOR DEPRESSIONS AND CURBS. GARAGE GARAGE GARAGE GARAGE
PROPERTY LINE
COVERINGS) FOR ALL EXCAVATION SLOPES TO PROTECT SLOPES FROM 26. SEE ARCHITECTURAL DRAWINGS FOR ALL WATERPROOFING/DAMPROOFING DETAILS.
125.17'
INSTABILITY AND DETERIORATION DUE TO RAIN, WIND OR SNOW/ICE. 27. SEE ARCHITECTURAL, HVAC, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL
WALL/SLAB OPENINGS.
8. THE CONTRACTOR SHALL PROVIDE SURFACE DRAINAGE CHANNELS AND SUMPS

PROPERTY LINE
AND SUMP PUMPS TO PROTECT ALL EXCAVATIONS FROM FLOODING. FLOODING 28. SEE SPECIFICATION SECTION "CAST-IN-PLACE CONCRETE" FOR ADDITIONAL
REQUIREMENTS.
OF ANY EXCAVATION AFTER APPROVAL OF THE SUBGRADE WILL BE CAUSE FOR
COMPLETE RE-PREPARATION AND APPROVAL OF THE SUBGRADE. PROPERTY LINE

9. PROVIDE A DRAINAGE PANEL AGAINST THE OUTSIDE FACE OF THE FOUNDATION


WALL AT LOCATIONS INDICATED ON THE ARCHITECTURAL DRAWINGS.

10. THE OWNER'S SOIL TESTING LABORATORY SHALL REVIEW AND MONITOR THE EXIST. ADJ.
1-STORY
EXCAVATION, DEWATERING AND SOIL RETENTION SYSTEMS. THE CONTRACTOR VACANT LOT PROPOSED 9 STORY BUILDING AT MASONRY

100.17'
100.17'
BUILDING
SHALL PROVIDE, INSTALL AND SURVEY: (A) VERTICAL AND HORIZONTAL 97-16 SUTPHIN BLVD.
MOVEMENTS OF THE TOP OF THE SOIL RETENTION SYSTEM AND (B) BENCH MARKS QUEENS, NEW YORK
ADJACENT TO AND AWAY FROM THE SITE PERIMETER FOR VERTICAL AND BLOCK: 100.0 LOTS: 12 & 15

97TH AVENUE
HORIZONTAL MOVEMENTS.

(50' WIDE)
11. SEE PLUMBING AND ELECTRICAL DRAWINGS FOR UNDERGROUND UTILITY AND PROPERTY LINE
GROUNDING REQUIREMENTS.

GENERAL FOUNDATION NOTES: PROPOSED NINE (9) STORIES BUILDING


1. ALL FOOTINGS SHALL BEAR ON SOIL WITH 3TONS BEARING CAPACITY. THE
WITH CELLAR AND SUB- CELLAR
BOTTOM OF THE FOOTING ELEVATIONS AND SOIL BEARING CAPACITIES AS SHOW
ON THE DRAWINGS ARE ESTIMATED FROM THE SOIL BEARING DATA. FINAL EXACT @ 97-18 SUTPHIN BOULEVARD, JAMAICA,
ELEVATIONS SHALL BE FIELD VERIFIED BY THE GEOTECHNICAL CONSULTANT AND NY 11435; BLOCK: 10030; LOT: 12
EL. 42.71'
125.17' EL. 43.63' EL. 44.08' 100.13'

±11'-0"

±12'-6"
REVIEWED BY THE ARCHlTECT/ENGINEER DURING CONSTRUCTION. PROPERTY LINE CURB CONCRETE SIDEWALK
TC 42.39' TC 42.25' TC 42.44'
2. THE SOIL SUBGRADE FOR ALL FOOTINGS AND SLABS SHALL BE INSPECTED AND BC 41.85' BC 42.18'
TC 43.00' TC 43.01' TC 43.73'
BC 42.42' BC 42.64' BC 42.93' BC 43.53'
APPROVED BY THE OWNER'S TESTING LABORATORY IMMEDIATELY PRIOR TO
PLACING FOUNDATION CONCRETE OR CONCRETE MUD SLABS.

±30'-0"
3. DO NOT BACK FILL AGAINST BASEMENT WALLS UNTIL GROUND FLOOR AND LOWER
146TH STREET
LEVEL SLABS HAVE BEEN PLACED AND THE CONCRETE HAS ATTAINED FULL
DESIGN STRENGTH.

4. NO FOOTINGS OR SLABS SHALL BE PLACED INTO OR AGAINST SUBGRADE GENERAL NOTES AND
CONTAINING FREE WATER, FROST OR ICE. SHOULD WATER OR FROST ENTER A PLOT PLAN
PILE CAP OR FOOTING EXCAVATION AFTER SUBGRADE APPROVAL, THE
H)
WIDT BC 42.9
7'
SUBGRADE SHALL BE RE-INSPECTED AFTER REMOVAL OF WATER OR FROST. CURB ULAR 6'
D. ( IRREG .53'
TC 43.2
DATE: 10/01/2018
HIN BLV BC 42 2'
5. THE CONTRACTOR (WHERE APPLICABLE) SHALL PROVIDE ALL NECESSARY SUTP TC 43
.0
PROPERTY LINE PROJECT NO.: 18-5080
.28'
BC 42 9'
MEASURES TO PREVENT ANY FROST OR ICE FROM PENETRATING ANY FOOTING, TC 42
.7 CURB
OF NEW Y DESIGN BY: DC DWG BY: S/K
OR SLAB SUBGRADE BEFORE AND AFTER PLACING OF CONCRETE AND UNTIL .06'
BC 42 8' TE IN G WA O

A
.5 NG

RK
TC 42 K EM CHK. BY:

ST
SUCH SUBGRADES ARE FULLY PROTECTED BY THE PERMANENT RIDING SIDEWAL JW

JI
1.77
' RETE
BC 4 .31' CONC
STRUCTURE. 2 DWG. NO.:

EE R
TC 4

LICEN
'
1.43
BC 4 .97'

GIN
6. WHERE APPLICABLE, ALL 11-65 MATERIALS UNDER THE SLAB SHALL BE REMOVED,
T C 4 1
G-001.00

SE

EN
REPLACED WITH COMPACTED GRANULAR MATERIAL AND TOPPED OFF WITH 6 07 4 35 4

D
PR L
INCHES OF CRUSHED STONE. THE GRANULAR MATERIAL MAY BE SAND OR O F E S S I O NA
CAD FILE NO.:
SAND/GRAVEL. 1 OF 16
LMW Engineering Group, LLC.
PROPERTY LINE

#8 @ 10" BOT #8 @ 10" BOT

16'-11"


SHIMING TAM ARCHITECT, PC.
29'-8"

ARCHITECTS & ENGINEERS


30'-6"

3'-2"
4'-3"
4'-0"
8'-8"
41'-1"
NOTES:
1. BASIC BARS IN MAT 1 ARE #8 @8" E.W. T&B.
2. THE BARS SHOWN IN THE PLAN ARE ADDITIONAL BARS.

MAT 1
C SCALE: 1/8" = 1'-0"
FO-104
4'-0"

4'-0"

4'-0"
I
FW1
GB1 WF1 GB1
SF1 SF1
6'-0" 6'-0"
11'-2"

GRADE BEAM DETAILS


WF2

SCALE: 3/4" = 1'-0"

WF2
6'-0" 4'-6" 4'-6" 4'-6" 4'-6" 4'-6" 4'-9" 6'-0" 4'-0"
9'-0"

9'-6"
9'-0"

9'-0"

9'-0"

9'-0"
GB1 24 #8
H GB1
3'-6"

4'-6"

4'-9"
4'-6"

4'-6"

4'-6"

4'-6"
3'-0" 3'-0"
6'-0"

6'-0"
G.1

2'-6"
3'-0"

3'-0"
SF3 SF3 SF3 SF3 SF3 SF4
4'-8"

NORTH
2'-0"

2'-0"
SF1 SF1

D
E
G NU

AR
12 #8 E
TH AV

EV
4'-0" 11'-9" 10'-6" 97
D 4'-0"

L
CF2

OU
FO-104
030
6'-6"

NB
10
K:
GB1: 48 x 30 OC

I H
BL

TP
6'-0"

6'-0"
F.1 6'-9" 6'-3"

SU
T
13'-6"

12'-6"

EE R
1'-10"

ST
F

AM
GB1 GB1

TH
6'-3"
6'-9"

5'-0" 5'-0"

L
WA
26'-6"
28'-6"
9'-6"

22'-4"
SF5 FOUNDATION SCHEDULE
68'-6"

SF6 THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE


24'-1"

THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN


B NAME LENGHT WIDTH DEPTH REINFORCEMENT
PROSECUTION.
FO-104

3'-0"
5'-0" 2'-0" SF1 6'-0" 6'-0" 3'-0" #8@12" E.W. BOT
5'-0"
E GB1 SF2 8'-0" 8'-0" 3'-0" #8@12" E.W. BOT
No. Revision Comment Date
GB1
FW1

2'-0"
SF3 9'-0" 9'-0" 3'-0" #8@12" E.W. BOT

FW1
FO-104 SF4 #8@10" E.W. BOT
2'-0" 9'-6" 9'-6" 3'-0"

6'-0"

5'-0"
8'-5"

6'-9"
8'-0"

2'-0" SF5 12'-6" 12'-6" 4'-0" #8@10" E.W. BOT


MAT 2

16'-11"
GB1 SF6 13'-6" 13'-6" 4'-0" #8@8" E.W. BOT
MAT 3
19'-5" #8@8" E.W. BOT
3'-0"

CF1 24'-1" 11'-9" 3'-0"


10'-0" 13'-4" CF2 22'-4" 10'-6" 3'-0" #8@8" E.W. BOT
D CF5
CF1 CF3 10'-4" 6'-0" 3'-0" #8@12" E.W. T&B.
2'-8"

13'-6" MAT 1
4'-11"

3'-0"
28'-5" CF4 18'-2" 12'-0" 3'-0" #8@8" E.W. BOT
WF3

CF5 22'-9" 10'-0" 3'-0" #8@8" E.W. BOT


GB1
3'-2"

12'-0"
4'-3"

2'-0"
MAT1 41'-1" 16'-11" 3'-0" SEE PLAN AND DETAIL
C.1
2'-0"

2'-0"

CF4 MAT2 28'-6" 13'-6" 3'-0" #8@8" E.W. T&B.


2'-0" 2'-0"

WF3
MAT3 26'-6" 13'-4" 3'-0" #8@8" E.W. T&B.
5'-10"

2'-0" 2'-0"
6'-0"

41'-1" WF1 VARIES 4'-0" 2'-0" #6@12" E.W. T&B.


5'-0" 8'-0" WF2 VARIES 6'-0" 3'-0" #8@10" E.W. T&B.
8'-0" 6'-0" 9'-0"
C 8'-0" SF3
GB1 WF3 VARIES 8-0" 3'-0" #8@10" E.W. T&B.
GB1

22'-9"
6'-0" SF2 6'-0"
CF3 CF3 NOTES:
5'-6"

4'-6"
4'-0"
18'-2"

1. SEE FOUNDATION PLAN FOR LOCATION.


3'-0"

3'-0" 4'-0" 4'-6" 2. MINIMUM BOTTOM OF FOOTING SHALL BE 4'-0" BELOW GRADE. PROPOSED NINE (9) STORIES BUILDING
8'-0"

9'-0"

B WITH CELLAR AND SUB- CELLAR


10'-4"

10'-4"

@ 97-18 SUTPHIN BOULEVARD, JAMAICA,


5'-0"

GB1 WF1 WF1 WF1 WF1 WF1 GB1 NY 11435; BLOCK: 10030; LOT: 12
FW1
A
4'-0"

4'-0"

4'-0"

4'-0"

4'-0"

4'-0"
2'-10"

PROPERTY LINE
2'-0"

8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10"
1'-0"
110'-0" 15'-0" FOUNDATION PLAN & SCHEDULE
2"
FOUNDATION WALL SCHEDULE
1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 TAG WALL THICKNESS FLOOR VERT. REINF. HORIZ. REINF.
DATE: 10/01/2018
FW1 12" CONCRETE CELLAR #6 @ 12" E.F. #6 @ 12" E.F. PROJECT NO.: 18-5080
OF NEW Y DESIGN BY: DC DWG BY: S/K
FW1 12" CONCRETE SUB-CELLAR #7 @ 12" E.F. #7 @ 12" E.F. TE IN G WA O

A
NG

RK
EM CHK. BY:

ST
JW

JI
FOUNDATION PLAN SUTPHIN BOULEVARD DWG. NO.:

EE R
LICEN
NO
RT
H

GIN
SCALE: 3/16" = 1'-0" (IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD)
FO-101.00

SE

EN
07 4 35 4

D
PR L
O F E SS IONA
CAD FILE NO.:
2 OF 16
LMW Engineering Group, LLC.

PROPERTY LINE

SHIMING TAM ARCHITECT, PC.


ARCHITECTS & ENGINEERS
29'-8"

30'-6"

2X
12 C 2X1
2
C1 FO-104 C1
1'-0"

I
FW1

1'-0"
11'-2"

16 16 16 16 16 X1
6
2X X 2X X X 2
C1 C12 C 1 C12 C 12 C1

1'-8"
2"

1'-8"
H 2 2
2X1 2X1
C1 C1

2"
3'-6"

6"

G.1

NORTH

D
E
4'-8"

NU

AR
E
TH AV

EV
97

L
OU
G
10"

10"
30

NB
SW1 : 100
SW8 K
OC

I H
8 BL

TP
X2 4
16 X2
6'-6"

SU
C 6

T
C1

EE
2"
24 1'-1" X2
4

R
2X 2

ST
F.1 C1 C1
6"

AM
1'-10"

TH L
WA
F
17'-5"

D
FO-104 THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.
9'-6"
68'-6"

24 16
SUB- CELLAR FLOOR B 12 24 2X2
6
2X 2X EL. +28.40' (-15.00') FO-104 12
X
12
X
C1 No. Revision Comment Date
C1 C1 C C
1'-4"
SW3 1'-9" SW4 SW4 3'-5"
E
10"

10"

10"
10"
FW1

6"

10"
4"
4"

A
2'-0"

7"
X1
2
X12 8'-8" 10'-5"
C1 2
C 12 FO-104
2'-0"
8"
SW5

SW7
8'-5"

6'-9"

6
1'-7" X1

FW1
2
C1
2'-10"

2'-10"

10" 19'-5" 10"


10"

D 2 2
X1 X1
6"

SW6 2 2
2 12 C1 C1
2 X1 2X
4'-11"

C1 C 1 3'-5"
8"

C.1
1'-1"

1'-1"
SUB CELLAR NOTES:
2 4
6X
5'-10"

24 C1
1 6X 2" 1. TOP OF SLAB DATUM ELEVATION IS: 28.40'
C
1'-1" 2. UNLESS NOTED OTHERWISE, SLAB ON GRADE
8"

SHALL BE 6". REINFORCED WITH 6x6-W2.9x2.9


C WELDED WIRE MESH.
3. ALL BARS EXPOSED TO WEATHER SHALL BE
2 X16 16 X 16 X16 PROPOSED NINE (9) STORIES BUILDING
X1 2X
5'-6"

12 C 12 C 1 C12 C12 EPOXY COATED.


WITH CELLAR AND SUB- CELLAR
C
4. REFER TO ARCHITECTURAL & MEP DRAWINGS
1'-7" 1'-0" FOR SIZE & LOCATION OF SLAB OPENINGS. U.N.O.
B @ 97-18 SUTPHIN BOULEVARD, JAMAICA,
5. PROVIDE SLEEVES IN SLAB FOR PLUMBING
NY 11435; BLOCK: 10030; LOT: 12
4"

2 2 2 2 PENETRATIONS SEE M.E.P. DRAWINGS FOR


2X1 2 X1 2X1 2 X1
5'-0"

C1 C1 C1 C1 PENETRATION LOCATION AND SIZES.


10" 10" 6. REFER TO ARCHITECTURAL DRAWINGS FOR
FW1 COLUMN COORDINATES.
A

1'-0"
2'-10"

PROPERTY LINE
2'-0"

SUB- CELLAR PLAN


8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10"
1'-0"
15'-0"
2" 110'-0"
DATE: 10/01/2018
1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 PROJECT NO.: 18-5080
OF NEW Y
TE IN G WA O DESIGN BY: DC DWG BY: S/K

A
NG

RK
EM

ST
CHK. BY: JW

JI
DWG. NO.:

EE R
LICEN

GIN
SUTPHIN BOULEVARD FO-102.00

SE
SUB- CELLAR PLAN

EN
07 4 35 4

D
NO PR L
RT
H (IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD) O F E S S I O NA
SCALE: 3/16" = 1'-0" CAD FILE NO.:
3 OF 16
LMW Engineering Group, LLC.

PROPERTY LINE

SHIMING TAM ARCHITECT, PC.


ARCHITECTS & ENGINEERS
29'-8"

30'-6"

REAR YARD
12 1 2
EL. +38.40'
12X 2X
C C1

I
FW4 BELOW
#5 @ 12" T


#5 @ 12" T 4'-0"

4'-0"
11'-2"

16 16 16 16 16 X1
6
2X X X X X 2
C1 C12 C 12 C12 C 12 C1
3'-6"

3'-6"
1'-8"
2"

4'-0" 1'-8"
8'-0" #5 @ 12" T E.W.
H 1 2 1 2
#5 @ 12" T E.W. 8'-0" 2X 2X 4'-0"
C1 C1

2"
3'-6"

4'-0"

4'-0"
6"
#5 @ 12" T

#5 @ 12" T
G.1

NORTH
• •
6'-0"

D
6'-0"
E
4'-8"

NU

AR
E
TH AV

EV
SW1 SW8 97

L
OU
G
10"

10"
30

NB
: 100
8'-4" 8'-4" K
OC

I H
8 BL

TP
6 X2 4
X2
6'-6"

C1

SU
6

T
C1

EE
2"
4'-6"

4'-6"
24 1'-1" X2
4

R
X
12 2

ST
F.1 C C1
8'-0" #5 @ 12" T E.W. 6'-0" #5 @ 12" T E.W. 6"
4'-0"

4'-0"

AM
BM 12 x 20
1'-10"

TH
6'-0" 6'-0"
5'-0" #5 @ 12" T E.W. #5 @ 12" T E.W. BM 10 x 16

L
WA
F
4'-0"

4'-0"

16'-8"
17'-5"

8'-0"

BM 12 x 20
6'-0" 5'-0"
3'-6"

3'-6"
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.
9'-6"
68'-6"

X2
4 16
CELLAR FLOOR B 12 24 2X2
6
12 12X EL. +38.40' (-5.00') FO-104 12
X
12
X
C1 No. Revision Comment Date
C C C C
3'-6"

3'-6"
10"
1'-9" 3'-5"

7"
SW4 BM 10 x 16 BM 10 x 16 SW4 BM 10 x 16
SW3 5'-6" #5 @ 12" T E.W.
E
10"

10"

10"
#5 @ 12" T E.W.
5'-0"
6"

BM 8 x 10

4"
5'-0" 3'-0"
A
4"
FW1

10"

C1 3'-0" 5'-0"
2 8'-8" 10'-5"
4'-0"

4'-4"
#5 @ 12" T

#5 @ 12" T E.W.
X1 2X

3'-6"
2 12 FO-104

FW1
1
6'-0"

C
BM 8 x 10

6'-0"
SW5

• 8"

SW7
6'-9"
8'-5"

BM 8 x 10 C1 BM 8 x 10
1'-7"

BM 10 x 16
2X CELLAR CONCRETE SLAB NOTES:
16
2'-10"

2'-10"

19'-5"
1. TOP OF SLAB ELEVATION IS 38.40'
10"

D BM 8 x 10 12 12
2. UNLESS NOTED OTHERWISE, SLAB SHALL BE 9".
6"

SW6 X X
12 12
BM 8 x 10

3. TOP BAR: PROVIDE #5 @ 12" O.C. EACH WAY. EXCEPT (U.O.N).


12 C C
BM 8 x 10

2X PLACE NORTH-SOUTH BARS THIRD. PLACE EAST-WEST BARS


4'-11"

C 1
BM 12 x 18

9" 3'-5" FOURTH.


4. BOT. BAR: PROVIDE #5 @ 12" O.C. EACH WAY (U.0.N). SPLICE ON
BM 8 x 10
C.1 COLUMN TO COLUMN LINE . PROVIDE HOOK AT EACH END. PLACE
1'-1"

BM 8 x 10
1'-1"
BM 8 x 10 EAST-WEST BARS FIRST AND PLACE NORTH-SOUTH BARS SECOND.
4
6 X2 5. ALL REBAR SHOWN IN PLAN ARE ADDITIONAL.
5'-10"

X2
4 12 C1
16 2X 6. " " INDICATES ADDITIONAL TOP BARS ON PLAN, #5 @ 12"
C1 2"

4'-0"
C TYP. AROUND THE PERIMETER (U.N.O.) SEE PLAN FOR LENGTH.
4'-0"

#5 @ 12" T 1'-1"
#5 @ 12" T E.W. #5 @ 12" T 7. " " INDICATES BOTTOM BAR REINFORCEMENT.


8'-0" 8'-0"
8'-0" 8'-0" 8. ALL BARS EXPOSED TO WEATHER SHALL BE EPOXY COATED.
#5 @ 12" T E.W.

3'-6"
8"

16 16 16 16 9. REFER TO ARCHITECTURAL & MEP DRAWINGS FOR SIZE & PROPOSED NINE (9) STORIES BUILDING
BM 8 x 10
3'-6"

2 X X X X
X1
5'-6"

12 C 12 C 12 C12 C 12 LOCATION OF SLAB OPENINGS. U.N.O.


WITH CELLAR AND SUB- CELLAR
BM 10 x 16
C
10. PROVIDE SLEEVES IN SLAB FOR PLUMBING PENETRATIONS SEE
1'-0" 1'-7" BM 8 x 10 1'-0" M.E.P. DRAWINGS FOR PENETRATION LOCATION AND SIZES.
B @ 97-18 SUTPHIN BOULEVARD, JAMAICA,
11. FOR COLUMN SIZES AND REINFORCEMENT SEE COLUMN SCHEDULE
NY 11435; BLOCK: 10030; LOT: 12
4"

2 2 2 2 S-201.
BM 8 x 10

2 X1 2 X1 2 X1 2 X1
5'-0"

C1 EL. +43.40' C1 C1 C1 12. REFER TO ARCH SLAB EDGE DRAWINGS FOR COLUMN
10" 10" COORDINATES.
FW1
13. ADD (2) #6 T/B BETWEEN EACH SLEEVE WITH 6" CLEAR SPACE MIN.
A

1'-0"
(TYP.).
2'-10"

PROPERTY LINE
14. START OF COLUMN -
2'-0"

15. END OF COLUMN -

CELLAR PLAN
8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10"
1'-0"
15'-0"
2" 110'-0"
DATE: 10/01/2018

1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 PROJECT NO.: 18-5080


OF NEW Y DESIGN BY: DC DWG BY: S/K
TE IN G WA O

A
NG

RK
EM CHK. BY: JW

ST
JI
DWG. NO.:

EE R
LICEN
SUTPHIN BOULEVARD

GIN
CELLAR PLAN FO-103.00

SE

EN
NO 07 4 35 4

D
RT PR L
H (IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD) O F E S S I O NA
SCALE: 3/16" = 1'-0" CAD FILE NO.:
4 OF 16
8" CONC.SLAB, SEE
PLAN FOR DOUBLE HEIGHT
HOTEL USE
LMW Engineering Group, LLC.
REINFORCEMENT

UPPER 1ST
UPPER 1ST FLR. HOTEL FLOOR FLR.(BEYOND) HOTEL FLOOR UPPER 1ST FLR.
EL. +48.40' BEYOND EL. +48.40' BEYOND EL. +48.40'

1.3 Ld
5'-0"
5'-0"
HOTEL LOBBY SIDE 8" CONC.SLAB, SEE
STAIRS (C) HOTEL LOBBY PLAN FOR
REINFORCEMENT 10" CONC. SHEAR SHIMING TAM ARCHITECT, PC.
10" CONC. SHEAR WALL, SEE ARCHITECTS & ENGINEERS
LOWER FIRST FLR. LOWER FIRST FLR. SCHEDULE FOR
WALL, SEE SCHEDULE EL. +43.40' (+5.00')
EL. +43.40' (+5.00') REINF.
FOR REINF.

10'-0"
10'-0"

HOTEL USE

1.3 Ld
8" CONC.SLAB, SEE

5'-0"
5'-0"
8" CONC.SLAB, SEE PLAN FOR
PLAN FOR REINFORCEMENT
REINFORCEMENT
HOTEL FLOOR HOTEL FLOOR CELLAR FLR.
CELLAR FLR. BEYOND BEYOND
EL. +38.40' (-5.00') EL. +38.40' (-5.00')

DOUBLE HEIGHT

10" CONC. SHEAR


10" CONC. SHEAR WALL, SEE
10" CONC. SHEAR WALL, SEE SCHEDULE FOR

10'-0"
10'-0"

10'-0"
WALL, SEE 4'-2" 10'-4" 4'-11" SCHEDULE FOR REINF.
SCHEDULE FOR REINF.
10" CONC. SHEAR
REINF.
WALL, SEE
SCHEDULE FOR
10" 10" REINF. 10" 10"
DOWEL, SPACING AND SIZE DOWEL, SPACING AND SIZE DOWEL, SPACING AND SIZE
TO MATCH VERTICAL SHEAR TO MATCH VERTICAL SHEAR TO MATCH VERTICAL SHEAR
WALL REBAR WALL REBAR WALL REBAR
SHEAR WALL OPENING 6" SLAB ON GRADE WITH
BEYOND, SEE PLANS & 6 x 6 - W2.9 x W2.9 W.W.M. SUB CELLAR FLR. 6" SLAB ON GRADE WITH
SUB CELLAR FLR. SUB CELLAR FLR. SUB CELLAR FLR.

1.3 Ld

1.3 Ld
1.3 Ld

1.3 Ld
REINF.SCHEDULE EL. +28.40' 6 x 6 - W2.9 x W2.9 W.W.M.
EL. +28.40' EL. +28.40' EL. +28.40'

NORTH
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

19'-5" 6'-9"

D
E
NU

1.3 Ld

1.3 Ld
1.3 Ld

1.3 Ld

AR
E
TH AV

EV
97
ENVIRONMENTAL VAPOR

L
OU
5'-6"
5'-6"
BARRIER (SEE ARCH. DWG.)
30

NB
ENVIRONMENTAL VAPOR 10" CONC. SHEAR : 100
BARRIER (SEE ARCH. DWG.) K
OC

I
WALL, SEE REINF.

H
BL

TP
SCHEDULE 4'-9"

SU
T
EE
COMPACTED CRUSHED STONE ELEVATOR PIT COMPACTED CRUSHED STONE ELEVATOR PIT

R
OR GRAVEL 45° TO FTG AROUND EL. +22.90' OR GRAVEL 45° TO FTG AROUND 2'-8" 10" EL. +22.90'

ST
12'-4" 10" 2'-0" 10" 7'-8" 2'-0" 10" 2'-8"
ELEVATOR PIT ELEVATOR PIT

AM
TH
8'-1"

2'-0"
2'-0"
12'-9"

L
SUMP PIT SUMP PIT

WA
3'-0"

3'-0"
3'-0"

EL. 20.9' EL. 20.9'

5'-0"
5'-0"
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN

3'-0"
3'-0"
PROSECUTION.

2'-0"
36" THICK CONC.
36" THICK CONC. MAT MAT FOOTING, PLAN
FOOTING, PLAN & & REINF. SCHED.
No. Revision Comment Date
REINF. SCHED.
28'-1" 2'-0" 3'-6" 2'-9" 5'-9" 2'-0" 3'-6" 2'-0" 6"

A SECTION A
FO-104 SCALE: 3/8" = 1'-0" B SECTION B
FO-104 SCALE: 3/8" = 1'-0"

1'-0" 1'-0"

8" CONC. SLAB, SEE PLAN ⅊


FOR REINF. 2" 1'-0" 7'-10"
8" CONC. SLAB, SEE PLAN
CELLAR FLR. CELLAR FLR. FOR REINF.
EL. +38.40' (-5.00') EL. +38.40' (-5.00')
8"

CONC. STAIRS. SEE


ARCH'L PLANS PROPOSED NINE (9) STORIES BUILDING
WITH CELLAR AND SUB- CELLAR
12" CONC. FDN. WALL, NON- STRUCTURAL
12" CONC. FDN. WALL, 12"x16" CONC. SEE REINF. SCHEDULE WALL. SEE ARCH'L
SEE REINF. SCHEDULE COLUMN, SEE REINF. PLAN
@ 97-18 SUTPHIN BOULEVARD, JAMAICA,
SCHEDULE NY 11435; BLOCK: 10030; LOT: 12

1.3 Ld
6" SLAB ON GRADE WITH 6" SLAB ON GRADE WITH
SUB CELLAR FLR.
1.3 Ld

6 x 6 - W2.9 x W2.9 W.W.M. 6 x 6 - W2.9 x W2.9 W.W.M.


EL. +28.40' 3'-0"

SUB CELLAR FLR. SUB CELLAR FLR. 6" SLAB ON GRADE WITH
FOUNDATION SECTIONS AND DETAILS

6"
X X X X X X X X X X X X X X X X X X X X X X X X X

EL. +28.40' EL. +28.40' 6 x 6 - W2.9 x W2.9 W.W.M.


6"

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

3'-0"
DATE: 10/01/2018
VAPOR BARRIER (SEE ARCH. DWG.)
2'-0"

PROJECT NO.: 18-5080


COMPACTED CRUSHED STONE OF NEW Y
3'-0"

DESIGN BY: DC DWG BY: S/K


VAPOR BARRIER (SEE ARCH. DWG.) TE IN G WA O

A
NG

RK
EM CHK. BY: JW

ST
JI
COMPACTED CRUSHED STONE
DWG. NO.:

EE R
CONC. WALL FOOTING. SEE

LICEN
CONC. WALL FOOTING. SEE 4'-0" 12'-6"
PLAN AND SCHEDULE PLAN AND SCHEDULE

GIN
D SECTION D FO-104.00

SE

EN
9'-0" CONC. WALL FOOTING. SEE 07 4 35 4

D
FO-104 SCALE: 3/8" = 1'-0" PR L
C SECTION C PLAN AND SCHEDULE O F E S S I O NA
CAD FILE NO.:
FO-104 SCALE: 3/8" = 1'-0" 5 OF 16
LMW Engineering Group, LLC.

PROPERTY LINE

SHIMING TAM ARCHITECT, PC.


ARCHITECTS & ENGINEERS
29'-8"

30'-6"

12 X1
2
1 2X 2
C C1

I
#5 @ 12" T
REAR YARD


#5 @ 12" T EL. +40.40' 4'-0"

4'-0"
11'-2"

16 16 6 6 6 X1
6
1 2X 2X 2X
1
2X
1
2X
1 2
C C1 C1 C1 C1 C1
SW2

3'-6"

3'-6"

SW9
1'-8"
2"

4'-0" 1'-8"
8'-0" #5 @ 12" T E.W.
H 12 12
#5 @ 12" T E.W. 8'-0" 2X 2X 4'-0"
C1 1

2"
C
3'-6"

4'-0"

4'-0"
#5 @ 12" T E.W.

#5 @ 12" T
G.1

NORTH
10"
• 10"
#5 @ 12" T

34'-6"
6'-0"

6'-0"

D
E
4'-8"

NU

AR
6" E
TH AV

EV
SW1 97
SW8

U L
G
10"

10"

BO
10 030
K:

IN
8'-4"
8'-4" OC

PH
2 8 BL
6X 24

UT
6'-6"

C1 6X

ET
C1

S
2"
4'-6"

4'-6"
24 4

RE
X 1'-1" X2
12 C1
2
F.1

T
C

S
8'-0" #5 @ 12" T E.W. 6'-0" #5 @ 12" T E.W. 6"
4'-0"

4'-0"

AM
1'-10"

LTH
6'-0" 6'-0"
5'-0" #5 @ 12" T E.W. #5 @ 12" T E.W.
BM 12 x 20

F
4'-0"

4'-0"

W A
17'-5"

8'-0"
6'-0" 5'-0" BM 10 x 16
3'-6"

3'-6"

BM 12 x 20
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
1ST FLOOR CONCRETE SLAB NOTES: THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
9'-6"

PROSECUTION.
68'-6"

X2
4
X1
6 1ST FLOOR (UPPER)
EL. +48.40' (+5.00')
B X1
2
X2
4 1. TOP OF SLAB ELEVATION IS 48.40'
2 2 2 2
C1 C1
FO-104
C1 C1 2. UNLESS NOTED OTHERWISE, SLAB SHALL BE 9". No. Revision Comment Date
3'-6"

3'-6"
10"
3. TOP BAR: PROVIDE #5 @ 12" O.C. EACH WAY. EXCEPT (U.O.N).

7"
1'-9" SW4 BM 10 x 16 BM 10 x 16 SW4
5'-6" #5 @ 12" T E.W. EL. +43.40'
E 5'-0" PLACE NORTH-SOUTH BARS THIRD. PLACE EAST-WEST BARS
10"

10"

10"
A
10"

5'-0" FOURTH.
6"
4"

BM 10 x 16 SW3 C1 3'-0" #5 @ 12" T E.W.


2 FO-104 8'-8" 10'-5" 5'-0" 3'-0" 4. BOT. BAR: PROVIDE #5 @ 12" O.C. EACH WAY (U.0.N). SPLICE ON
4'-0"

#5 @ 12" T E.W.
X1 2X BM 10 x 16

3'-6"
#5 @ 12" T

2 12
C1
BM 8 x 10
6'-0"

COLUMN TO COLUMN LINE . PROVIDE HOOK AT EACH END. PLACE

UPPER AND LOWER


UPPER

6'-0"
UPPER C1

BEAM BM 10X16
SW5

• SW7
EAST-WEST BARS FIRST AND PLACE NORTH-SOUTH BARS SECOND.
8'-5"

6'-9"

BM 8 x 10 2X
C1 26
2X 5. ALL REBAR SHOWN IN PLAN ARE ADDITIONAL.
16
UPPER AND LOWER 6. " " INDICATES ADDITIONAL TOP BARS ON PLAN, #5 @ 12"
BEAM BM 8 x 10 6"
UPPER AND LOWER

BEAM BM 10 x 16 TYP. AROUND THE PERIMETER (U.N.O.) SEE PLAN FOR LENGTH.
UPPER AND LOWER

BEAM BM 8 x 10

UPPER AND LOWER

10"

10"

10"
BEAM B 10 x 16

D SW6 BM 10 x 16 BM 10 x 16 SW6 12 12
7. " " INDICATES BOTTOM BAR REINFORCEMENT.
UPPER AND LOWER X X
C12 C12 8. ALL BARS EXPOSED TO WEATHER SHALL BE EPOXY COATED.
BEAM BM 8 x 10
4'-11"

6'-0"

10" 9. REFER TO ARCHITECTURAL & MEP DRAWINGS FOR SIZE &

• LOCATION OF SLAB OPENINGS. U.N.O.

SW9
#5 @ 12" T

UPPER AND LOWER


UPPER AND LOWER 10. PROVIDE SLEEVES IN SLAB FOR PLUMBING PENETRATIONS SEE
C.1
SW2

BEAM BM 8 x 10
BEAM BM 8 x 10 M.E.P. DRAWINGS FOR PENETRATION LOCATION AND SIZES.
UPPER AND LOWER OW

30'-8"
L
OW BEAM BM 8 x 10 X 24 BE 11. FOR COLUMN SIZES AND REINFORCEMENT SEE COLUMN SCHEDULE
C1 2 2 4
EL
5'-10"

24 B 12 2 C1 16X S-201.
2X 24 2X X1
C
C1

4'-0"
1
C 16X 2 12. REFER TO ARCH SLAB EDGE DRAWINGS FOR COLUMN
4'-0"

1ST FLOOR (LOWER)


#5 @ 12" T 1'-1" C COORDINATES.
EL. +43.40' (+0.00') #5 @ 12" T E.W. #5 @ 12" T

C 8'-0"


UPPER AND LOWER

8'-0" 13. ADD (2) #6 T/B BETWEEN EACH SLEEVE WITH 6" CLEAR SPACE MIN.
BEAM BM 8 x 10

8'-0" 8'-0"
#5 @ 12" T E.W. (TYP.).
6"

3'-6"
16 16 16 16 PROPOSED NINE (9) STORIES BUILDING
3'-6"

2 14. START OF COLUMN -


1 2X X X X
5'-6"

2X C1 C 12 C12 C12
1ST FLOOR (UPPER) C 1
15. END OF COLUMN - WITH CELLAR AND SUB- CELLAR
UPPER AND LOWER

EL. +48.40' (+5.00')


BEAM BM 8 x 10

B @ 97-18 SUTPHIN BOULEVARD, JAMAICA,


C1 2 2 2
NY 11435; BLOCK: 10030; LOT: 12
2X
12 2 X1 2 X1 2 X1
5'-0"

C1 C1 C1
10" 10"

A
2'-10"

PROPERTY LINE
EL. +43.40'
2'-0"

EL. +42.71' EL. +44.08'

1ST FLOOR PLAN


8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10"
1'-0"
38'-7" 10'-5" 12'-0" 10'-5" 38'-7" 15'-0"
2"
DATE: 10/01/2018
1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 PROJECT NO.: 18-5080
OF NEW Y DESIGN BY: DC DWG BY: S/K
TE IN G WA O

A
NG

RK
EM CHK. BY: JW

ST
JI
DWG. NO.:

EE R
LICEN
SUTPHIN BOULEVARD

GIN
S-101.00

SE
ST

EN
07 4 35 4
1 FLOOR PLAN

D
NO (IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD) PR L
RT
H
O F E SS IONA
SCALE: 3/16" = 1'-0" CAD FILE NO.:
6 OF 16
LMW Engineering Group, LLC.

PROPERTY LINE

SHIMING TAM ARCHITECT, PC.


ARCHITECTS & ENGINEERS
29'-8"

30'-6"

2 2
2 X1 2 X1
C1 C1

I
#5 @ 12" T


#5 @ 12" T 4'-0"

4'-0"
11'-2"

6 6
2X1 16 16 16 16 2 X1
SW2

C1 2X 12
X
12
X 2X C1
C1 C C C 1

3'-6"
3'-6"

SW9
1'-8"
2"

4'-0" 1'-8"
#5 @ 12" T E.W.
H 1 2 1 2
#5 @ 12" T E.W. 12X 2X 4'-0"
C1

2"
C
3'-6"

4'-0"
6"
4'-0"


#5 @ 12" T

#5 @ 12" T
G.1

NORTH
10"
• 4'-6"
• 10" 2ND- 4TH FLOOR CONCRETE SLAB NOTES:


#5 @ 12" T & B
6'-0"

6'-0"

D
E
4'-8"

NU

AR
1. TOP OF SLAB ELEVATION IS: E
4'-6" TH AV

EV
#5 @ 12" T & B
SW1 SW8 2ND FLOOR: +58.40'. 97

U L
G 3RD FLOOR: +68.40'.
10"

BO
10"
4TH FLOOR: +78.40'. 10 030
K:

IN
8'-4" OC
OW

PH
8'-4" 2. UNLESS NOTED OTHERWISE, SLAB SHALL BE 9".
4 BEL W BL
2 LO

UT
6'-6"

6X 28 24 BE 3. TOP BAR: PROVIDE #5 @ 12" O.C. EACH WAY. EXCEPT (U.O.N).

T
C1 16X 2X 24

S
EE
2" 1
4'-6"

4'-6"
24 C 1'-1" C 16X 24 PLACE NORTH-SOUTH BARS THIRD. PLACE EAST-WEST BARS

R
2X C 2X FOURTH.

ST
F.1 C1 6'-0" C 1
8'-0" #5 @ 12" T E.W. #5 @ 12" T E.W. 6"
4'-0"

4'-0"

AM
4. BOT. BAR: PROVIDE #5 @ 12" O.C. EACH WAY (U.0.N). SPLICE ON
2"
1'-10"

TH
2"
6'-0" COLUMN TO COLUMN LINE . PROVIDE HOOK AT EACH END. PLACE
5'-0" #5 @ 12" T E.W. 6'-0" #5 @ 12" T E.W. BM 10 x 16

L
BM 12 x 20

F EAST-WEST BARS FIRST AND PLACE NORTH-SOUTH BARS SECOND.


4'-0"

4'-0"

WA
17'-5"

8'-0"

BM 12 x 20
5. ALL REBAR SHOWN IN PLAN ARE ADDITIONAL.
5'-0" 5'-0"
3'-6"

3'-6"
6. " " INDICATES ADDITIONAL TOP BARS ON PLAN, #5 @ 12"
TYP. AROUND THE PERIMETER (U.N.O.) SEE PLAN FOR LENGTH. THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
7. " " INDICATES BOTTOM BAR REINFORCEMENT. PROSECUTION.
9'-6"

2ND FLOOR- EL. +58.40' (+15.00')

FLOOR EGRESS ONLY


68'-6"

68'-6"
8. ALL BARS EXPOSED TO WEATHER SHALL BE EPOXY COATED.

BM 10 x 16 FOR 1ST
3RD FLOOR- EL. +68.40' (+25.00') 4
2 4 16 2 X2
2X 2X 4TH FLOOR- EL. +78.40' (+35.00') C1 9. REFER TO ARCHITECTURAL & MEP DRAWINGS FOR SIZE &
No. Revision Comment Date
C1 C1 4" LOCATION OF SLAB OPENINGS. U.N.O.

3'-6"
3'-6"

2"
1'-9" 5'-0" BM 10 x 16 10. PROVIDE SLEEVES IN SLAB FOR PLUMBING PENETRATIONS SEE

4"
5'-6" #5 @ 12" T E.W. SW4 BM 10 x 16 BM 10 x 16 SW4
E
10"

10"

10"
M.E.P. DRAWINGS FOR PENETRATION LOCATION AND SIZES.
10"

5'-0" 5'-0" #5 @ 12" T E.W.


6"

5'-0" 3'-0"
4"

SW3 11. FOR COLUMN SIZES AND REINFORCEMENT SEE COLUMN SCHEDULE
8'-8" 10'-5"
SW5

#5 @ 12" T E.W.
S-201.
BM 8 x 10
#5 @ 12" T
6'-0"

16
6'-0"

6'-0"

6'-0"
SW7
2X W 12. REFER TO ARCH SLAB EDGE DRAWINGS FOR COLUMN
• 1
6'-9"
8'-5"

BM 8 x 10 C LO
#5 @ 12" T E COORDINATES.
2 6B
6'-0" 2X 13. ADD (2) #6 T/B BETWEEN EACH SLEEVE WITH 6" CLEAR SPACE MIN.


19'-5" C1
(TYP.).
10"

14. START OF COLUMN -


D BM 8 x 10
6"

SW6 15. END OF COLUMN -


16
4'-11"

2X
6'-0"

C1

#5 @ 12" T

C.1
4
#5 @ 12" T & B

#5 @ 12" T & B
SW2

2X2
5'-10"

6'-0"
24 C1
6'-0"

2X
C1 2"

SW9
#5 @ 12" T 1'-1"
4'-0" #5 @ 12" T E.W. #5 @ 12" T

C 8'-0"


#5 @ 12" T E.W.
8'-0"
4'-0" • • 8'-0" 8'-0"
6"

3'-6"
4'-0" 4'-0"
6 16 6 6 PROPOSED NINE (9) STORIES BUILDING
3'-6"

X1 2X X1 X1
5'-6"

2 2 2
C1 C 1 C1 C1 WITH CELLAR AND SUB- CELLAR

B @ 97-18 SUTPHIN BOULEVARD, JAMAICA,


NY 11435; BLOCK: 10030; LOT: 12
2 2 2 2
2 X1 2 X1 2 X1 2X1
5'-0"

C1 C1 C1 C1
10" 10"

A
GLASS AWNING @
2'-10"

PROPERTY LINE
#5 @ 12" T & B
2'-0"

2ND FLOOR

2ND - 4TH FLOOR PLAN


8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10"
1'-0"
38'-7" 32'-11" 38'-7" 15'-0"
2"
DATE: 10/01/2018
1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 PROJECT NO.: 18-5080
OF NEW Y DESIGN BY: DC DWG BY: S/K
TE IN G WA O

A
NG

RK
EM CHK. BY:

ST
JW

JI
DWG. NO.:

EE R
LICEN
SUTPHIN BOULEVARD

GIN
2ND- 4TH FLOOR PLAN S-102.00

SE

EN
NO 07 4 35 4

D
RT PR L
H (IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD) O F E SS IONA
SCALE: 3/16" = 1'-0" CAD FILE NO.:
7 OF 16
LMW Engineering Group, LLC.

PROPERTY LINE

SHIMING TAM ARCHITECT, PC.


ARCHITECTS & ENGINEERS
29'-8"

30'-6"

1 2 2
2X 2 X1
C1 C1

I
#5 @ 12" T


#5 @ 12" T 4'-0"

4'-0"
11'-2"

6 16
2X1 X 16 X 16 X 16 X1
6
2X
C1 C 12 C 12 C12 C 12 C 1
4'-0"
SW2

3'-6"

SW9
1'-8"
2"

4'-0" 1'-8"
#5 @ 12" T E.W.
H 2 12
#5 @ 12" T E.W. 8'-0" X1 2X 6'-0" 4'-0"
C 12 C1
3'-0"
3'-6"

4'-0"
2"
#5 @ 12" T

#5 @ 12" T
G.1

NORTH
10"
• • 10"
6'-0"

6'-0"

D
5TH FLOOR CONCRETE SLAB NOTES: E
4'-8"

NU

AR
E
TH AV

EV
SW1 SW8 97

UL
1. TOP OF SLAB ELEVATION IS 88.40'
G
10"

BO
10"
2. UNLESS NOTED OTHERWISE, SLAB SHALL BE 9".
10 030
K:

HIN
8'-4" 8'-4" 3. TOP BAR: PROVIDE #5 @ 12" O.C. EACH WAY. EXCEPT (U.O.N). OC
BL

TP
4 PLACE NORTH-SOUTH BARS THIRD. PLACE EAST-WEST BARS
X2
6'-6"

24

SU
6

T
C1 2X FOURTH.

EE
2" C1
4'-6"

4'-6"
24 1'-1" X2
4

R
2X 2 4. BOT. BAR: PROVIDE #5 @ 12" O.C. EACH WAY (U.0.N). SPLICE ON

ST
F.1 C1 6'-0" C1
8'-0" #5 @ 12" T E.W. #5 @ 12" T E.W. 6" COLUMN TO COLUMN LINE . PROVIDE HOOK AT EACH END. PLACE
4'-0"

4'-0"

AM
2"
EAST-WEST BARS FIRST AND PLACE NORTH-SOUTH BARS SECOND.
2"
1'-10"

TH
5'-0" 8'-0" 6'-0"
6'-0" #5 @ 12" T E.W. BM 10 x 16

L
5. ALL REBAR SHOWN IN PLAN ARE ADDITIONAL.
BM 12 x 20

F
4'-0"

4'-0"

WA
16'-10"

58'-6"
#5 @ 12" T E.W.

BM 12 x 20
6. " " INDICATES ADDITIONAL TOP BARS ON PLAN, #5 @ 12"
5'-0" 5'-0"

3'-6"
3'-6"

TYP. AROUND THE PERIMETER (U.N.O.) SEE PLAN FOR LENGTH.


7. " " INDICATES BOTTOM BAR REINFORCEMENT. THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
8. ALL BARS EXPOSED TO WEATHER SHALL BE EPOXY COATED. PROSECUTION.
9'-6"

9. REFER TO ARCHITECTURAL & MEP DRAWINGS FOR SIZE &


68'-6"

4 6 5TH FLOOR X24 16 LOCATION OF SLAB OPENINGS. U.N.O.


X2 X1 12 2X
C1
2
C1
2 EL. +88.40' (+45.00') C C1 No. Revision Comment Date
4" 10. PROVIDE SLEEVES IN SLAB FOR PLUMBING PENETRATIONS SEE
3'-6"

3'-6"
1'-9" 5'-0" M.E.P. DRAWINGS FOR PENETRATION LOCATION AND SIZES.

4"
SW3 5'-6" #5 @ 12" T E.W. SW4 BM 10 x 16 BM 10 x 16 SW4
E 11. FOR COLUMN SIZES AND REINFORCEMENT SEE COLUMN SCHEDULE
10"

10"

10"
10"

5'-0" 5'-0" S-201.


6"

#5 @ 12" T E.W.
4"

5'-0" 3'-0" BM 10 x 16
#5 @ 12" T

2"
8'-8" 10'-5"

#5 @ 12" T E.W.
12. REFER TO ARCH SLAB EDGE DRAWINGS FOR COLUMN
6'-0"

6'-0"

6'-0"
COORDINATES.
BM 8 x 10

6'-0"
SW5

SW7
6'-9"
8'-5"

BM 8 x 10 13. ADD (2) #6 T/B BETWEEN EACH SLEEVE WITH 6" CLEAR SPACE MIN.
• C1
2X
16 #5 @ 12" T
(TYP.).


19'-5" 14. START OF COLUMN -
6'-0"
6"

15. END OF COLUMN -


10"

D
#5 @ 12" T

BM 8 x 10 SW6
4'-11"

6'-0"


SW2

SW9
C.1 • •
#5 @ 12" T & B

#5 @ 12" T & B

24
2X
5'-10"

6'-0"
24 C 1
6'-0"

2X
1'-1" C1
#5 @ 12" T 8'-0" #5 @ 12" T E.W. #5 @ 12" T
4'-0"

#5 @ 12" T E.W.
C


8'-0"

3'-6"
4'-0" 6 16 16 16 8'-0" 8'-0" PROPOSED NINE (9) STORIES BUILDING
3'-6"

X1
6"

2X 2X X
5'-6"

C 12 C1 C1 C12 WITH CELLAR AND SUB- CELLAR

B @ 97-18 SUTPHIN BOULEVARD, JAMAICA,


SW2 BELOW

SW9 BELOW
NY 11435; BLOCK: 10030; LOT: 12
2 2 2 12
2 X1 2 X1 2X1 2X
5'-0"

C1 C1 C1 C 1

A
2'-10"

PROPERTY LINE
2'-0"

5TH FLOOR PLAN


8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10"
1'-0"
38'-7" 32'-11" 38'-7" 15'-0"
2"
DATE: 10/01/2018
1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 PROJECT NO.: 18-5080
OF NEW Y
TE IN G WA O DESIGN BY: DC DWG BY: S/K

A
NG

RK
EM

ST
CHK. BY: JW

JI
DWG. NO.:

EE R
LIC EN

GIN
SUTPHIN BOULEVARD S-103.00
5TH FLOOR PLAN

SE

EN
07 4 35 4

D
NO PR L
RT
H (IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD) O F E S IONA
SCALE: 3/16" = 1'-0" S
CAD FILE NO.:
8 OF 16
LMW Engineering Group, LLC.

PROPERTY LINE

SHIMING TAM ARCHITECT, PC.


ARCHITECTS & ENGINEERS
29'-8"

30'-6"

12 2
2X 2 X1
C1 C1

I
#5 @ 12" T


#5 @ 12" T 4'-0"

4'-0"
11'-2"

16 6
2X X 16 16 X1
6 16 2 X1
C1 12 2X 12 12
X
C1
C C1 C C
3'-6"

3'-6"
SW2

SW9
1'-8"
2"

4'-0" 1'-8"
8'-0" #5 @ 12" T E.W.
H 6TH- 8TH FLOOR CONCRETE SLAB NOTES:
#5 @ 12" T E.W. 8'-0" 4'-0"

2"
3'-6"

4'-0"

4'-0"
1. TOP OF SLAB ELEVATION IS:
6TH FLOOR: +98.40'.
#5 @ 12" T

#5 @ 12" T
G.1

NORTH
10"
• • 10" 7TH FLOOR: +108.40'.
8TH FLOOR: +118.40'.
6'-0"

6'-0"

D
E
4'-8"

NU

AR
2. UNLESS NOTED OTHERWISE, SLAB SHALL BE 9". E
TH AV

EV
SW1 SW8 3. TOP BAR: PROVIDE #5 @ 12" O.C. EACH WAY. EXCEPT (U.O.N). 97

U L
G
10"

PLACE NORTH-SOUTH BARS THIRD. PLACE EAST-WEST BARS

BO
10"
FOURTH. 10 030
K:

IN
8'-4" 8'-4" OC

PH
4. BOT. BAR: PROVIDE #5 @ 12" O.C. EACH WAY (U.0.N). SPLICE ON BL
24

UT
6'-6"

6X 24 COLUMN TO COLUMN LINE . PROVIDE HOOK AT EACH END. PLACE

T
C1 2X

S
EE
2" C1 EAST-WEST BARS FIRST AND PLACE NORTH-SOUTH BARS SECOND.
4'-6"

4'-6"
24 4
1'-1" X2

R
2X 2

ST
F.1 C1 C1 5. ALL REBAR SHOWN IN PLAN ARE ADDITIONAL.
5'-0"

5'-0"
8'-0" #5 @ 12" T E.W. 6'-0" #5 @ 12" T E.W. 6"

AM
6. " " INDICATES ADDITIONAL TOP BARS ON PLAN, #5 @ 12"
1'-10"

TH
6'-0" 6'-0" TYP. AROUND THE PERIMETER (U.N.O.) SEE PLAN FOR LENGTH.
BM 10 x 16
2"

2"
5'-0" 8'-0" 5'-0"

L
BM 12 x 20

F
4'-0"

WA
4'-0"
7. " " INDICATES BOTTOM BAR REINFORCEMENT.
58'-6"

58'-6"
17'-5"

BM 12 x 20
#5 @ 12" T E.W.
#5 @ 12" T E.W. 8. ALL BARS EXPOSED TO WEATHER SHALL BE EPOXY COATED.
3'-6"

3'-6"
5'-0"
9. REFER TO ARCHITECTURAL & MEP DRAWINGS FOR SIZE &
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
LOCATION OF SLAB OPENINGS. U.N.O. THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.
9'-6"

10. PROVIDE SLEEVES IN SLAB FOR PLUMBING PENETRATIONS SEE


6TH FLOOR- EL. +98.40' (+55.00') 24 M.E.P. DRAWINGS FOR PENETRATION LOCATION AND SIZES.
24 16 2X 16
X 2X
7TH FLOOR- EL. +108.40' (+65.00')
C1 12X
C12 C1 8TH FLOOR- EL. +118.40' (+75.00') 4"
C 11. FOR COLUMN SIZES AND REINFORCEMENT SEE COLUMN SCHEDULE
S-201.
No. Revision Comment Date
3'-6"

3'-6"
1'-9"

4"
SW3 5'-6" 5'-0" SW4 BM 10 x 16 BM 10 x 16 SW4 5'-0" 12. REFER TO ARCH SLAB EDGE DRAWINGS FOR COLUMN
E
10"

10"

10"
COORDINATES.
10"

#5 @ 12" T E.W. 5'-0" #5 @ 12" T E.W.


6"
4"

5'-0" 3'-0" BM 10 x 16 13. ADD (2) #6 T/B BETWEEN EACH SLEEVE WITH 6" CLEAR SPACE MIN.
#5 @ 12" T

2"
8'-8" 10'-5"

#5 @ 12" T E.W.
(TYP.).
6'-0"

6'-0"
6'-0"

BM 8 x 10

6'-0"
SW5

• 14. START OF COLUMN -

SW7
6'-9"
8'-5"

BM 8 x 10
15. END OF COLUMN -
#5 @ 12" T


19'-5"
6'-0"
10"

D BM 8 x 10
6"

#5 @ 12" T

SW9
SW6
1 6
4'-11"

2X
SW2

6'-0"

C1

C.1
BM 14 x 24

4
BM 18 x 24

#5 @ 12" T
X2 #5 @ 12" T

2
5'-10"

6'-0"
C1


8'-0" X2 12 12
6'-0"

12 2X 2X 8'-0"
C C1 C1
1'-1" 4"
7'-0" #5 @ 12" T E.W.
C 8'-0" #5 @ 12" T E.W.
8'-0"
7'-0"
6"

6"
6"

16 1 6 6 6 PROPOSED NINE (9) STORIES BUILDING


2X 2X X1 X1
5'-6"

2 2
C1 C1 C1 C1 WITH CELLAR AND SUB- CELLAR

B @ 97-18 SUTPHIN BOULEVARD, JAMAICA,


NY 11435; BLOCK: 10030; LOT: 12
12'-0"

5'-0"

A
2'-10"

PROPERTY LINE

6TH- 8TH FLOOR PLAN


8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10"
1'-0"
37'-7" 34'-11" 37'-7" 15'-0"
2"
DATE: 10/01/2018
1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 PROJECT NO.: 18-5080
OF NEW Y DESIGN BY: DC DWG BY: S/K
TE IN G WA O

A
NG

RK
EM CHK. BY:

ST
JW

JI
DWG. NO.:

EE R
LICEN
SUTPHIN BOULEVARD

GIN
6TH- 8TH FLOOR PLAN S-104.00

SE

EN
NO 07 4 35 4

D
RT PR L
H (IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD) O F E S S I O NA
SCALE: 3/16" = 1'-0" CAD FILE NO.:
9 OF 16
LMW Engineering Group, LLC.

PROPERTY LINE

SHIMING TAM ARCHITECT, PC.


ARCHITECTS & ENGINEERS
29'-8"

30'-6"

2 2
2X1 2 X1
C1 C1

I
#5 @ 12" T


#5 @ 12" T 4'-0"

4'-0"
11'-2"

6 6
2X1 X 16 X 16 X 16 X 16 2 X1
C1 12 12 12 12 C1
19'-10"

C C C C

3'-6"
3'-6"
SW2

SW9
1'-8"
2"

4'-0" 1'-8"
8'-0" #5 @ 12" T E.W.
H #5 @ 12" T E.W. 8'-0" 4'-0" 9TH FLOOR CONCRETE SLAB NOTES:

2"
3'-6"

4'-0"

4'-0"
1. TOP OF SLAB ELEVATION IS 128.40'
#5 @ 12" T

#5 @ 12" T
G.1

NORTH
10"
• • 10" 2.
3.
UNLESS NOTED OTHERWISE, SLAB SHALL BE 9".
TOP BAR: PROVIDE #5 @ 12" O.C. EACH WAY. EXCEPT (U.O.N).
6'-0"

6'-0"

D
9TH FLOOR E
4'-8"

NU

AR
PLACE NORTH-SOUTH BARS THIRD. PLACE EAST-WEST BARS E
EL. +128.40' (+85.00') TH AV

EV
38'-6"
SW1 SW8 FOURTH. 97

L
OU
G
10"

4. BOT. BAR: PROVIDE #5 @ 12" O.C. EACH WAY (U.0.N). SPLICE ON

10"
30

B
COLUMN TO COLUMN LINE . PROVIDE HOOK AT EACH END. PLACE
: 100

IN
8'-4" 8'-4" K
EAST-WEST BARS FIRST AND PLACE NORTH-SOUTH BARS SECOND. OC

PH
BL
24

UT
6'-6"

6X X2
4 5. ALL REBAR SHOWN IN PLAN ARE ADDITIONAL.

T
C1

S
2

EE
#5 @ 12" B
2" C1
4'-6"

4'-6"
24 1'-1" X2
4 6. " " INDICATES ADDITIONAL TOP BARS ON PLAN, #5 @ 12"

R
2X 2

ST
1 C1 TYP. AROUND THE PERIMETER (U.N.O.) SEE PLAN FOR LENGTH.
F.1 C
5'-0"

5'-0"
8'-0" #5 @ 12" T E.W. 6'-0" #5 @ 12" T E.W. 6"

AM
7. " " INDICATES BOTTOM BAR REINFORCEMENT.
1'-10"

TH
6'-0" 6'-0" BM 10 x 16 8. ALL BARS EXPOSED TO WEATHER SHALL BE EPOXY COATED.
2"

2"
BM 12 x 20

5'-0" 8'-0"

L
#5 @ 12" T E.W.

WA
F
4'-0"

4'-0"
58'-6"

9. REFER TO ARCHITECTURAL & MEP DRAWINGS FOR SIZE &


17'-5"

BM 12 x 20
#5 @ 12" T E.W.


#5 @ 12" B 5'-0" 5'-0" LOCATION OF SLAB OPENINGS. U.N.O.

3'-6"
3'-6"

10. PROVIDE SLEEVES IN SLAB FOR PLUMBING PENETRATIONS SEE


THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
M.E.P. DRAWINGS FOR PENETRATION LOCATION AND SIZES. THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.
9'-6"

11. FOR COLUMN SIZES AND REINFORCEMENT SEE COLUMN SCHEDULE


24 6 S-201.
24 16 2X 2X1
2X 2X C1 C1 12. REFER TO ARCH SLAB EDGE DRAWINGS FOR COLUMN No. Revision Comment Date
C1 C1 4" COORDINATES.
3'-6"

3'-6"
1'-9"

4"
SW3 5'-6" 5'-0" SW4 BM 10 x 16 BM 10 x 16 SW4 5'-0" 13. ADD (2) #6 T/B BETWEEN EACH SLEEVE WITH 6" CLEAR SPACE MIN.
E
10"

10"

10"
(TYP.).
10"

5'-0"
4"

#5 @ 12" T E.W. #5 @ 12" T E.W. 5'-0" 3'-0" BM 10 x 16 14. START OF COLUMN -


#5 @ 12" T

2"
8'-8" 10'-5"

#5 @ 12" T E.W.
15. END OF COLUMN -
6'-0"

6'-0"

6'-0"
BM 8 x 10

6'-0"
SW5


SW7
8'-5"

6'-9"

BM 8 x 10

#5 @ 12" T


#5 @ 12" T 19'-5" 5'-0"

10"

8'-0" #5 @ 12" T
D


#5 @ 12" T

BM 8 x 10
SW6 8'-0"
4'-0"

16

4'-11"

12X
SW2 BELOW

SW9 BELOW
C.1
4
2 X2
5'-10"

6'-0"
24 12 12 C1
6'-0"

2X 2 X 2X
C1 C1 C1 2"
1'-1" 4"
#5 @ 12" T E.W.
6"

7'-0"
C 8'-0" #5 @ 12" T E.W.
8'-0"
7'-0"
6"

6"

PROPOSED NINE (9) STORIES BUILDING


5'-6"

WITH CELLAR AND SUB- CELLAR

B @ 97-18 SUTPHIN BOULEVARD, JAMAICA,


NY 11435; BLOCK: 10030; LOT: 12
12'-0"

5'-0"

A
2'-10"

PROPERTY LINE

9TH FLOOR PLAN


8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10"
1'-0"
51'-6" 7'-0" 51'-6" 15'-0"
2"
DATE: 10/01/2018
1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 PROJECT NO.: 18-5080
OF NEW Y
TE IN G WA O DESIGN BY: DC DWG BY: S/K

A
NG

RK
EM

ST
CHK. BY: JW

JI
DWG. NO.:

EE R
LICEN

GIN
SUTPHIN BOULEVARD S-105.00
9TH FLOOR PLAN

SE

EN
07 4 35 4

D
NO PR L
R TH
(IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD) O F E S S I O NA
SCALE: 3/16" = 1'-0" CAD FILE NO.:
10 OF 16
LMW Engineering Group, LLC.

PROPERTY LINE

SHIMING TAM ARCHITECT, PC.


ARCHITECTS & ENGINEERS
29'-8"

30'-6"

2 12
2X1 2X
C1 C1

I
#5 @ 12" T


#5 @ 12" T 4'-0"

4'-0"
11'-2"

6 16
2X1 X16 16 16 16 2X ROOF CONCRETE SLAB NOTES:
C1 12 2X 2X 2X C1

SW9
C C1 C1 C1
19'-10"

3'-6"
3'-6"

1'-8"
1. TOP OF SLAB ELEVATION IS 138.40'.
2"

4'-0" 8'-0" 4'-0" 4'-0" 4'-0" #5 @ 12" T E.W.


8'-0" 2. UNLESS NOTED OTHERWISE, SLAB SHALL BE 9".
H #5 @ 12" T E.W. 8'-0" #5 @ 12" T E.W. #5 @ 12" T E.W. #5 @ 12" T E.W. #5 @ 12" T E.W. 4'-0"
4'-0" 4'-0" 4'-0" 8'-0"

2"
3. TOP BAR: PROVIDE #5 @ 12" O.C. EACH WAY. EXCEPT (U.O.N).
3'-6"

4'-0"

4'-0"
1'-8"
4'-0"

4'-0"

4'-0"

4'-0"
SW2

PLACE NORTH-SOUTH BARS THIRD. PLACE EAST-WEST BARS


FOURTH.

#5 @ 12" T
G.1
#5 @ 12" T

NORTH
10"
• • 10" 4. BOT. BAR: PROVIDE #5 @ 12" O.C. EACH WAY (U.0.N). SPLICE ON
COLUMN TO COLUMN LINE . PROVIDE HOOK AT EACH END. PLACE
6'-0"

6'-0"

D
E
4'-8"

NU

AR
EAST-WEST BARS FIRST AND PLACE NORTH-SOUTH BARS SECOND. E
TH AV

EV
38'-6"
5. ALL REBAR SHOWN IN PLAN ARE ADDITIONAL. 97
39'-2"

SW1 SW8

#6 @ 6" T & B

UL
G 6. " " INDICATES ADDITIONAL TOP BARS ON PLAN, #5 @ 12"

BO
10"

10"
PUNCHING SHEAR REINF. TYP. AROUND THE PERIMETER (U.N.O.) SEE PLAN FOR LENGTH. 10 030
K:

HIN
8'-4" REQUIRED, SHEAR STUDS 6X9-1/2 8'-4" OC
7. " " INDICATES BOTTOM BAR REINFORCEMENT. BL

TP
@ 3". SEE TYP. DETAIL @ S-401 24 C1
6'-6"

6X

SU
2X

T
C1 24 8. ALL BARS EXPOSED TO WEATHER SHALL BE EPOXY COATED.

EE
2"
4'-6"

4'-6"
24 1'-1" X2
4

#5 @ 12" B

TR
SW9
2X 12
9. REFER TO ARCHITECTURAL & MEP DRAWINGS FOR SIZE &
F.1 C1 C

S
5'-0"

5'-0"
#5 @ 12" T E.W. 6" LOCATION OF SLAB OPENINGS. U.N.O.
8'-0" 6'-0"

M
#5 @ 12" T E.W.

HA
10. PROVIDE SLEEVES IN SLAB FOR PLUMBING PENETRATIONS SEE
1'-10"

6'-0" 6'-0" 5'-0"

LT
2"

2"
5'-0" 8'-0" M.E.P. DRAWINGS FOR PENETRATION LOCATION AND SIZES.
F

WA
4'-0"

4'-0"

17'-1"

#5 @ 12" T E.W. 11. FOR COLUMN SIZES AND REINFORCEMENT SEE COLUMN SCHEDULE

BM 12 x 20
#5 @ 12" T E.W. 5'-0"
BM 12 x 20

3'-6"
3'-6"

S-201.


#5 @ 12" B
12. REFER TO ARCH SLAB EDGE DRAWINGS FOR COLUMN THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
PUNCHING SHEAR REINF. COORDINATES. THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
REQUIRED, SHEAR STUDS 6X9-1/2 PROSECUTION.
9'-6"

SW2

13. ADD (2) #6 T/B BETWEEN EACH SLEEVE WITH 6" CLEAR SPACE MIN.
ROOF @ 3". SEE TYP. DETAIL @ S-401
4 (TYP.).
24 EL. +138.40' (+95.00') X2 16
2X 12 1 2X
C1
C C 14. START OF COLUMN - No. Revision Comment Date

#5 @ 12" T
• 4"
3'-6"

3'-6"
4'-0"
15. END OF COLUMN -
1'-9" BM 10 x 16

4"
SW3 5'-6" 5'-0" SW10 5'-0"
E
10"
10"

5'-0"
4"

#5 @ 12" T E.W. #5 @ 12" T E.W.

2"
8'-8" 10'-5"
6'-0"

6'-0"
SW7
SW5

6'-9"
8'-5"

#5 @ 12" T #5 @ 12" T


19'-5"
5'-0" 5'-0"
10"

10"

10"

D
#5 @ 12" T

BM 10 x 16 SW6 BM 10 x 16


5'-0"
19'-4"

4'-11"

C.1
24
2X
5'-10"

6'-0"
24 12 12 C 1
6'-0"

2X 2X 2X
C1 C1 C1
1'-1" 4"
6"

7'-0"
C #5 @ 12" T E.W.
#5 @ 12" T E.W.
7'-0"
6"

6"

PROPOSED NINE (9) STORIES BUILDING


5'-6"

WITH CELLAR AND SUB- CELLAR

B @ 97-18 SUTPHIN BOULEVARD, JAMAICA,


NY 11435; BLOCK: 10030; LOT: 12
12'-0"

5'-0"

A
2'-10"

PROPERTY LINE

ROOF PLAN
8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10"
1'-0"
24'-0" 27'-6" 7'-0" 27'-6" 24'-0" 15'-0"
2"
DATE: 10/01/2018
1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 PROJECT NO.: 18-5080
OF NEW Y
TE IN G WA O DESIGN BY: DC DWG BY: S/K

A
NG

RK
EM

ST
CHK. BY: JW

JI
DWG. NO.:

EE R
LICEN

GIN
SUTPHIN BOULEVARD S-106.00

SE
ROOF PLAN

EN
07 4 35 4

D
NO PR
RT L
H (IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD) O F E S S I O NA
SCALE: 3/16" = 1'-0" CAD FILE NO.:
11 OF 16
LMW Engineering Group, LLC.

PROPERTY LINE

21'-5"

SHIMING TAM ARCHITECT, PC.


ARCHITECTS & ENGINEERS
30'-6"

14'-3"
I
SW2 BELOW
11'-2"

SW9 BELOW
H
3'-6"

G.1

NORTH

D
E
NU
4'-8"

AR
E
TH AV

EV
97

UL
G

BO
10 030
K:

HIN
SW1 BELOW SW8 BELOW OC
BL

TP
6'-6"

SU
T
EE
TR
F.1

M S
HA
1'-10"

LT
WA
F

BM 12 x 20

SW9 BELOW
BM 12 x 20
SW2 BELOW

21'-5"
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.
9'-6"

6
2X1
C1 No. Revision Comment Date
SW10 BELOW BM 10 x 16
E
14'-3"

SW3 BELOW

SW7 BELOW
SW5 BELOW
8'-5"

ELEVATOR MACHINE ROOM


EL. +148.40' (+105.00')

D
SW6 BELOW
4'-11"

C.1
5'-10"

C
PROPOSED NINE (9) STORIES BUILDING
5'-6"

WITH CELLAR AND SUB- CELLAR

@ 97-18 SUTPHIN BOULEVARD, JAMAICA,


B
NY 11435; BLOCK: 10030; LOT: 12
5'-0"

A
2'-10"

PROPERTY LINE

ELEVATOR MACHINE
8'-6" 3'-10" 12'-0" 13'-4" 3'-11" 6'-2" 9'-2" 3'-8" 7'-9" 2'-2" 13'-8" 11'-8" 4'-4" 8'-0" 15'-10" ROOM PLAN
1'-0"

DATE: 10/01/2018
PROJECT NO.: 18-5080
1 1.2 2 3 4 4.1 5 5.1 6 6.1 7 8 9 9.1 10 OF NEW Y DESIGN BY: DC DWG BY: S/K
TE IN G WA O

A
NG

RK
EM CHK. BY: JW

ST
JI
DWG. NO.:

EE R
LICEN

GIN
SUTPHIN BOULEVARD S-107.00

SE
ELEVATOR MACHINE ROOM PLAN

EN
07 4 35 4
NO

D
RT PR L
H (IRREGULAR WIDE) (GUILFORD STREET) (STUPHIN ROAD) O F E S IONA
SCALE: 3/16" = 1'-0" S
CAD FILE NO.:
12 OF 16
LMW Engineering Group, LLC.

COLUMN SCHEDULE
Col. No.
A B C C.1 D E F F.1 G H I
Col. No.
SHIMING TAM ARCHITECT, PC.
FLOOR 3 4* 7* 8 3* 4 5 6 7 3* 5* 6* 8* 4* 4.1 7* 8* 3* 4* 4.1* 3* 4.1* 7* 8* 9.1* 3 8* 5* 6.1* 3 8* 2* 4* 5 6 7* 9* 2 9 FLOOR ARCHITECTS & ENGINEERS

ELEVATOR MACHINE ELEVATOR MACHINE


ROOF ROOF
EL. +148.40' (+105.00') EL. +148.40' (+105.00')

ROOF ROOF
EL. +138.40' (+95.00') EL. +138.40' (+95.00')

2
9TH FLOOR 9TH FLOOR

2
EL. +128.40' (+85.00') EL. +128.40' (+85.00')

6
C12x24

C12x24

C12x24

C12x24

C12x24
6

14#8

14#8
14#8

14#8

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1
14#8

10#7

10#7

10#7

10#7

10#7

10#7
8TH FLOOR 8TH FLOOR
EL. +118.40' (+75.00') EL. +118.40' (+75.00')

8#7

8#7
1

16

24

24
10#7
C12x1
12 x

12 x

14#8
8#7

8#7

C12x24

12 x

16 x

12 x
14#8
10#7

NORTH
16#8
10#7
C12x1
7TH FLOOR 7TH FLOOR
C

D
E
EL. +108.40' (+65.00') EL. +108.40' (+65.00') NU

AR
E
TH AV

EV
C

C
97

UL
BO
10 030
K:

HIN
OC
6

2
BL

TP
6TH FLOOR 6TH FLOOR

SU
T
EE
EL. +98.40' (+55.00') EL. +98.40' (+55.00')

TR
10#7

10#7

10#7

10#7

14#8

S
14#8

M
HA
C12x24

C12x24

C12x24

C12x24

C12x24

LT
6

14#8

WA
14#8

14#8
C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1
10#7

10#7

10#7

10#7

10#7

10#7

8#7

8#7
10#7
C12x1
5TH FLOOR 5TH FLOOR
EL. +88.40' (+45.00') EL. +88.40' (+45.00')
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.
C12x24
10#7
2

2
C12x1

14#8

No. Revision Comment Date


TH TH
4 FLOOR 4 FLOOR

12 x 16

24

24
EL. +78.40' (+35.00') EL. +78.40' (+35.00')

10#7

16 x

12 x
16#8

14#8
6

2
6
1

1
3RD FLOOR 3RD FLOOR
C

C
6

EL. +68.40' (+25.00') EL. +68.40' (+25.00')


x

12 x

12 x
8#7

8#7
10#7

10#7

10#7

10#7
C 12

C 12

C 12

C 12
8#7

8#7

8#7

8#7

C12x24

C12x24

C12x24

C12x24

C12x24
14#8
14#8

14#8

14#8
14#8
C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1
10#7

10#7

10#7

10#7

10#7
10#7
C

C
10#7
C12x1
C12x24

8#7

8#7
2ND FLOOR
14#8

2ND FLOOR
10#7
C12x1

EL. +58.40' (+15.00') EL. +58.40' (+15.00')


2

2
1ST FLOOR 1ST FLOOR
EL. +48.40' (+5.00') EL. +48.40' (+5.00')

PROPOSED NINE (9) STORIES BUILDING


6

2
WITH CELLAR AND SUB- CELLAR
6
2

@ 97-18 SUTPHIN BOULEVARD, JAMAICA,


26

28

24

CELLAR CELLAR NY 11435; BLOCK: 10030; LOT: 12


1

EL. +38.40' (-5.00') EL. +38.40' (-5.00')


C12x24

C12x24

C12x24

C12x24
x

x
14#8

14#8

14#8

14#8
10#7
C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1
12 x

16 x

16 x

10#7

10#7
10#7

10#7

10#7

10#7
10#7

10#7

10#7

10#7
C16x24

C16x24

16#8
16#8

18#8
10#7
C 12

C 12

C 12

C 12

C 12

C 12
C12x1
16#8

16#8
C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

C12x1

8#7

8#7

8#7

8#7
8#7

8#7

8#7

8#7

8#7
8#7

8#7

8#7

8#7

8#7

8#7
8#7

SUB- CELLAR SUB- CELLAR


EL. +28.40' (-15.00') EL. +28.40' (-15.00')

SCHEDULE AND DETAILS - 1


GRAVITY LOAD IN KIPS GRAVITY LOAD IN KIPS
(UN-FACTORED) 92 35 36 100 59 130 217 324 163 672 671 56 34 60 102 113 44 244 540 343 47 567 473 573 880 728 492 141 172 368 302 332 366 300 410 95 95 (UN-FACTORED)
DATE: 10/01/2018
FLOOR 3 4* 7* 8 3* 4 5 6 7 3* 5* 6* 8* 4* 4.1 7* 8* 3* 4* 4.1* 3* 4.1* 7* 8* 9.1* 3 8* 5* 6.1* 3 8* 2* 4* 5 6 7* 9* 2 9 FLOOR
PROJECT NO.: 18-5080
Col. No.
Col. No. OF NEW Y DESIGN BY: DC DWG BY: S/K
A B C C.1 D E F F.1 G.1 H I TE IN G WA O

A
NG

RK
EM CHK. BY: JW

ST
JI
DWG. NO.:

EE R
LICEN

GIN
S-201.00

SE

EN
07 4 35 4

D
PR L
O F E S IONA
S
CAD FILE NO.:
13 OF 16
LMW Engineering Group, LLC.

10"
SHEAR WALL SCHEDULE
ZONE REINF.
TAG WALL THICKNESS FLOOR VERT. REINF. HORIZ. REINF. REMARKS
END CORNER
SW1 10" CONCRETE CELLAR ~ BULKHEAD #5 @ 12" E.F. #5 @ 12" E.F. 4 - #7 6 - #7 END AND CORNER ZONE (SEE DETAIL)
SW2 10" CONCRETE 1ST FLOOR ~ BULKHEAD #5 @ 12" E.F. #5 @ 12" E.F. 4 - #7 6 - #7 END AND CORNER ZONE (SEE DETAIL)
SW3 10" CONCRETE CELLAR ~ BULKHEAD #5 @ 12" E.F. #5 @ 12" E.F. 4 - #7 6 - #7 END AND CORNER ZONE (SEE DETAIL)
#4 @ 12" TIES
(TYP.) SW4 10" CONCRETE CELLAR ~ BULKHEAD #5 @ 12" E.F. #5 @ 12" E.F. 4 - #7 6 - #7 END AND CORNER ZONE (SEE DETAIL)
CELLAR ~ BULKHEAD #5 @ 12" E.F. 4 - #7 6 - #7 END AND CORNER ZONE (SEE DETAIL)
SHIMING TAM ARCHITECT, PC.
SW5 10" CONCRETE #5 @ 12" E.F.
ARCHITECTS & ENGINEERS
SW6 10" CONCRETE CELLAR ~ BULKHEAD #5 @ 12" E.F. #5 @ 12" E.F. 4 - #7 6 - #7 END AND CORNER ZONE (SEE DETAIL)

SW7 10" CONCRETE CELLAR ~ BULKHEAD #5 @ 12" E.F. #5 @ 12" E.F. 4 - #7 6 - #7 END AND CORNER ZONE (SEE DETAIL)
SW8 10" CONCRETE CELLAR ~ BULKHEAD #5 @ 12" E.F. #5 @ 12" E.F. 4 - #7 6 - #7 END AND CORNER ZONE (SEE DETAIL)
SW9 ST #5 @ 12" E.F. 4 - #7 6 - #7 END AND CORNER ZONE (SEE DETAIL)
10" CONCRETE 1 FLOOR ~ BULKHEAD #5 @ 12" E.F.
SEE SW
SCHEDULE

DET. 1
SCALE: 3/4" = 1'-0"

SEE SW
SCHEDULE 6" #4 @ 12"
MIN. TIES (TYP.)
10"
MIN.
6"

NORTH
#4 @ 12"

D
E
NU

AR
TIES (TYP.) E
TH AV

EV
97

UL
BO
10 030
K:

HIN
OC
BL

TP
SU
T
EE
10"

STR
DET. 2

M
HA
SCALE: 3/4" = 1'-0"

LT
WA
THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
PROSECUTION.

No. Revision Comment Date

BEAM DETAILS
SCALE: 3/4" = 1'-0"

1'-2" 1'-6"
1'-0"
4 - #8 6 - #8
10"
2 - #8

8" 2 - #7
2'-0"

2'-0"
1'-8"
1'-4"

2 - #6 #4 @ 12" O.C. #5 @ 12" O.C.


#4 @ 10" O.C. STIRRUPS
STIRRUPS
10"

#3 @ 12" O.C. STIRRUPS #4 @ 8" O.C. STIRRUPS STIRRUPS PROPOSED NINE (9) STORIES BUILDING
2 - #6 2 - #7 3 - #8 8 - #8 12 - #8 WITH CELLAR AND SUB- CELLAR

@ 97-18 SUTPHIN BOULEVARD, JAMAICA,


NY 11435; BLOCK: 10030; LOT: 12

BM 8 x 10 BM 10 x 16 BM 12 x 20 BM 14 x 24 BM 18 x 24

SCHEDULE AND DETAILS - 2

DATE: 10/01/2018
PROJECT NO.: 18-5080
OF NEW Y DESIGN BY: DC DWG BY: S/K
TE IN G WA O

A
NG

RK
EM CHK. BY: JW

ST
JI
DWG. NO.:

EE R
LICEN

GIN
S-202.00

SE

EN
07 4 35 4

D
PR L
O F E S IONA
S
CAD FILE NO.:
14 OF 16
LMW Engineering Group, LLC.

COL. CORE
SEE BEAM SCHEDULE TOP REBAR SPLICE 2 #3 @ 3" EACH
BETWEEN 1/4 TO 3/4 SPAN SIDE
LAP SPLICE
0.25 L1 #4 0R #5 @ 12"O.C. 0.35 L CLASS 'B'
#4 OR #5 @6" O.C. 0.35 L
#4 OR #5 @ 6"O.C.
FOR HB BEAM
FOR HB BEAM
#4 OR #5 @4" O.C.
STIRRUP SHEAR REINFORCEMENT SCHEDULE
2"MAX. 2"MAX.

# 5 @ 12" O.C. T/B (TYP.


SLAB REINF.) SHIMING TAM ARCHITECT, PC.
ARCHITECTS & ENGINEERS

12 - #3 @ 3" O.C.

#5 @ 12" O.C. T/B (TYP. 3"


SLAB REINF.)
#3 OR #4 @ 6" O.C. STIRRUP #3 OR #4 @ 6" O.C. STIRRUP

3"
U.O.N. (SEE BEAM SCHED.) U.O.N. ( SEE BEAM SCHED.)

CROSS STRIP BEAM


BOTTOM REBAR SPLICE AT
2" MAX. 2" MAX. 2" MAX. SUPPORT

L1 L2 12 - #3 @ 3" 12 - #3 @ 3"
O.C. O.C.
NOTES:
1. L DENOTES LARGER OF L1 & L2 CONC. COL. 12 - #3 @ 3" O.C.
2. LAP SEE SPLICE SCHEDULE REINFORCED CONCRETE BEAM DETAIL (TYP.) (SEE PLAN)

SCALE: N.T.S.

# 5 @ 12" O.C. T/B (TYP.


SLAB REINF.)
0"
4'-
L
CA
PI

2 DETAIL 2
TY

ADDITIONAL
BARS 2-#6 T/B S-400 SCALE: N.T.S.

2 - #5 EACH CORNER E.F.


2 - #5 TOP & BOT E.F.
2 - #5 EACH SIDE E.F.
REINF. BARS
POURED CONC.

NORTH
(SEE PLAN)
WALL

D
E
NU

AR
E
TH AV

EV
CONC. SLAB 97

L
OU
OPENING
030

B
TENSION LAP 10
K:

HIN
STANDARD STANDARD
SPLICE OC
HOOK HOOK BL

TP
SU
ADDITIONAL OPENING

T
EE
BARS 2-#6 T/B

R
ST
AM
LAP SPLICE
TENSION
LAP SPLICE

TH
TENSION
STANDARD HOOK

L
WA
2-#6 BARS T/B THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
(TYP. EACH CORNER) THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
CORNER WALL CROSS WALL PROSECUTION.

No. Revision Comment Date


TYPICAL SLAB OPENING DETAIL WALL OPENING TYPICAL DETAIL TYPICAL DETAIL HORIZONTAL REINFORCEMENT AT
SCALE: N.T.S. SCALE: N.T.S.
CORNERS AND JUNCTIONS OF WALLS AND BEAMS
SCALE: N.T.S.

STIRRUPS AND TIE HOOKS


DEFORMED BAR TENSION DEVELOPMENT LENGTH l d DEFORMED BAR COMPRESSION DEFORMED BAR COMPRESSION LAP SPLICE 12d for No.6, 7, 8
DEVELOPMENT LENGTH l d (19, 22, 25)

(7
6d m
FOR NORMAL WEIGHT STONE CONCRETE & UN-COATED BARS FOR NORMAL WEIGHT STONE CONCRETE & UN-COATED BARS

5
,3 )m
6d for No. 3, 4, 5 (10, 13, 16)

m
A or G
FOR NORMAL WEIGHT STONE CONCRETE & UN-COATED BARS Detailing Dimension

in in.
Hook

A or G

.
Hook
BAR 3,000 PSI CONC. 4,000 PSI CONC. 5,000 PSI CONC. 6,000 PSI CONC. BAR 3,000 PSI 4,000 PSI 5,000 PSI 6,000 PSI BAR 3,000 PSI 4,000 PSI 5,000 PSI 6,000 PSI
SIZE CASE I CASE II CASE I CASE II CASE I CASE II CASE I CASE II SIZE CONCRETE CONCRETE CONCRETE CONCRETE SIZE CONCRETE CONCRETE CONCRETE CONCRETE
D D

H
D D

H
#3

d
#3 17" 25" 15" 22" 13" 20" 12" 18" #3 9" 8" 8" 8" 12" 12" 12" 12"

A or G
Detailing Dimension

Detailing Dimension

12d
#4 22" 33" 19" 29" 17" 26" 16" 24" #4 11" 10" 9" 9" #4 15" 15" 15" 15"
A or G 90°

Dimension
6d

Detailing
#5 28" 42" 24" 36" 22" 32" 20" 30" #5 14" 12" 12" 12" #5 19" 19" 19" 19"

#6 33" 50" 29" 43" 26" 39" 24" 35" #6 17" 15" 14" 14" #6 23" 23" 23" 23" HOOK
d Detailing Dimension
d d A or G
#7 48" 72" 42" 63" 38" 56" 34" 51" #7 20" 17" 16" 16" #7 27" 27" 27" 27"
D D
#8 55" 83" 48" 72" 43" 64" 39" 59" #8 22" 19" 18" 18" #8 30" 30" 30" 30" 90° 135° D

J
d
#9 62" 93" 54" 81" 48" 72" 44" 66" #9 35" 22" 21" 21" #9 34" 34" 34" 34" 180° PROPOSED NINE (9) STORIES BUILDING
135° WITH CELLAR AND SUB- CELLAR
#10 70" 105" 61" 91" 54" 81" 50" 74" #10 28" 25" 23" 23" #10 39" 39" 39" 39" ℄ Beam ℄ Beam 4d or
2 1/2" in. (60 mm) min.
#11 78" 116" 67" 101" 60" 90" 55" 82" #11 31" 27" 26" 26" #11 43" 43" 43" 43" ℄ Beam ℄ Beam @ 97-18 SUTPHIN BOULEVARD, JAMAICA,
NY 11435; BLOCK: 10030; LOT: 12
NOTES: STIRRUP (TIES SIMILAR) 135 DEGREE SEISMIC STIRRUP/TIE
Bar size, D,* 180 degree hook 90 degree hook
DEFORMED BAR TENSION LAP SPLICES - CLASS B STIRRUP AND TIE HOOK DIMENSIONS HOOK DIMENSIONS
1. FOR HORIZONTAL REINFORCEMENT WITH MORE THAN 12 IN OF FRESH No. in (mm) A or G, ft-in. (mm) J, ft-in. (mm) A or G, ft-in. (mm)
FOR NORMAL WEIGHT STONE CONCRETE & UN-COATED BARS ALL GRADES ALL GRADES
CONCRETE CAST BELOW IT, l d SHALL BE 1.3 x THE VALUES GIVEN ABOVE. 3 (10) 2 1/4 (60) 5 (125) 3 (80) 6 (155)
2. FOR EPOXY-COATED BARS WITH CONCRETE COVER LESS THAN 3db OR Bar size, D,* 90 degree hook 135 degree hook Bar size, D,* 135 degree hook 4 (13) 3 (80) 6 (155) 4 (105) 8 (200)
BAR 3,000 PSI CONC. 4,000 PSI CONC. 5,000 PSI CONC. 6,000 PSI CONC.
CLEAR SPACING LESS THAN 6db, l d SHALL BE 1.5 x THE VALUES GIVEN ABOVE. No. in (mm) Hook A or G, ft-in. (mm) Hook A or G, ft-in. (mm) H approx., ft-in. (mm) No. in (mm) Hook A or G, ft-in. (mm) H approx., ft-in. (mm) 5 (16) 3 3/4 (95) 7 (180) 5 (130) 10 (250)
SIZE CASE I CASE II CASE I CASE II CASE I CASE II CASE I CASE II FOR ALL OTHER EPOXY-COATED BARS, l d SHALL BE 1.2 x THE VALUES GIVEN 3 (10) 1 1/2 (40) 4 (105) 4 (105) 2 1/2 (65) 3 (10) 1 1/2 (40) 4 1/4 (110) 3 (80) 6 (19) 4 1/2 (115) 8 (205) 6 (155) 1-0 (300)
#3 22" 33" 19" 28" 17" 25" 16" 23" ABOVE. 4 (13) 7 (22) 5 1/4 (135) 10 (250) 7 (175) 1-2 (375)
2 (50) 4 1/2 (115) 4 1/2 (115) 3 (80) 4 (13) 2 (50) 4 1/2 (115) 3 (80)
5 (16) 2 1/2 (65) 6 (155) 5 1/2 (140) 3 3/4 (95) 5 (16) 2 1/2 (65) 5 1/2 (140) 3 3/4 (95) 8 (25) 6 (155) 11 (275) 8 (205) 1-4 (425) TYPICAL STRUCTURAL DETAILS - 1
#4 29" 43" 25" 37" 23" 34" 21" 31"
CASE I: CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS 6 (19) 4 1/2 (115) 1-0 (305) 8 (205) 4 1/2 (115) 6 (19) 4 1/2 (115) 8 (205) 4 1/2 (115) 9 (29) 9 1/2 (240) 1-3 (375) 11 3/4 (300) 1-7 (475)
#5 36" 54" 31" 47" 28" 42" 26" 38" THAN db, AND STIRRUPS OR TIES THROUGHOUT l d NOT LESS THAN 7 (22) 5 1/4 (135) 1-2 (355) 9 (230) 5 1/4 (135) 7 (23) 5 1/4 (135) 9 (230) 5 1/4 (135) 10 (32) 10 3/4 (275) 1-5 (425) 1-1 1/4 (335) 1-10 (550)
THE CODE MINIMUM OR CLEAR SPACING OF BARS BEING DEVELOPED 8 (25) 6 (155) 8 (25) 10 1/2 (270) 6 (155) 11 (36) 12 (305) 1-7 (475) 1-2 3/4 (375) 2-0 (600)
1-4 (410) 10 1/2 (270) 6 (155) 6 (155)
#6 43" 65" 37" 56" 34" 50" 31" 46" OR SPLICED NOT LESS THAN 2db AND CLEAR COVER NOT LESS THAN db. DATE: 10/01/2018
14 (43) 18 1/4 (465) 2-3 (675) 1-9 3/4 (550) 2-7 (775)
CASE II: OTHER CASES.
*Finished bend diameters include "spring PROJECT NO.: 18-5080
#7 63" 94" 54" 81" 49" 73" 45" 67" Table 1 - Standard Hooks: All specific sizes 18 (57) 24 (610) 3-0 (925) 2-4 1/2 (725) 3-5 (1050)
back" effect when bars straighten out slightly OF NEW Y
recommended meet minimum requirements TE IN G WA O DESIGN BY: DC DWG BY: S/K
after being bent and are slightly larger than *Finished bend diameters include "spring back"

A
#8 72" 107" 62" 93" 56" 83" 51" 76" NG

RK
of ACI 318 EM

ST
CHK. BY: JW

JI
minimum bend diameters in 3.7.2. effect when bars straighten out slightly after being
#9 81" 121" 70" 105" 63" 94" 57" 86" DWG. NO.:

EE R
bent and are slightly larger than minimum bend

LICEN
diameters in 3.7.2.

GIN
91" 136" 79" 118" 71" 106" 64" 96"
#10
S-401.00

SE

EN
07 4 35 4

D
#11 101" 151" 87" 131" 78" 117" 71" 107" PR L
O F E SS IONA
CAD FILE NO.:
15 OF 16
EXTERIOR ℄ INTERIOR LMW Engineering Group, LLC.

SUPPORT SUPPORT
0.22* L1 0.22* L1 0.22* L1
OR DIM. IN PLAN OR DIM. IN PLAN OR DIM. IN PLAN
℄ INTERIOR
EXTERIOR
℄ SUPPORT EXT. TOP/BOT. ADDITIONAL TOP CONT. TOP BARS, ADDITIONAL
SUPPORT
0.30 L1 0.30 L2 BARS INTO CANT. BARS, (SEE PLAN) (SLICE IF REQ'D.) TOP. BARS
MIN. 50% MIN. 50% 0.30 L1 MIN. 50%
REMAINDER 0.20 L1 REMAINDER 0.20 L1 0.20 L2 REMAINDER

SLAB THICKENSS
OR DIM. SHOWN ON PLAN OR DIM. SHOWN ON PLAN OR DIM SHOWN ON PLAN
EXT. TOP/BOT. BARS ADDITIONAL TOP CONT. TOP BARS, ADDITIONAL

T
INTO CANT. BARS, (SEE PLAN) (SLICE IF REQ'D.) TOP. BARS
6"

SLAB THICKENSS
6"
ADDITIONAL CONT. BOT. BARS MIN.
MIN.
HOOK 2 BOT. BARS FACE OF
BOT. BARS SHIMING TAM ARCHITECT, PC.

T
6" INTO SUPPORT SUPPORT ARCHITECTS & ENGINEERS
6"
6" COL. BEYOND
ADDITIONAL CONT. BOT. BARS MIN.
MIN. SPLICES SHALL BE PERMITTED IN THIS AREA STOP 50% OF ADDT'L 0.15L2
HOOK 2 BOT. BARS BOT. BARS 0.15L1
BOT. BARS HERE MAX
6" INTO SUPPORT LC1 LC2
LC1 LC2
L1 L2
L1 L2

COLUMN STRIP 0.5 COL. STRIP MIDDLE STRIP COLUMN STRIP


0.5 COL. STRIP MIDDLE STRIP
0.25L* 0.25L* 0.25L* 0.25L* 0.25L* 0.25L* NOTES:
COL. BEYOND OR DIM. SHOWN ON PLAN OR DIM. SHOWN ON PLAN OR DIM. SHOWN ON PLAN
OR DIM. SHOWN ON PLAN OR DIM. SHOWN ON PLAN OR DIM. SHOWN ON PLAN 1. REBARS ARE TYPICAL FOR BOTH DIRECTIONS.
2. LC1, LC2 = LENGTH OF CLEAR SPANS 1, 2 (FACE OF SUPPORT TO FACE OF SUPPORT).

TYPICAL COLUMN STRIP - FLAT PLATE TYPICAL MIDDLE STRIP - FLAT PLATE 3.
4.
L = THE GREATER LENGTH OF CLEAR SPAN LC1 OR LC2.
L1, L2 = LENGTH OF SPANS 1, 2 FROM CENTERLINE OF SUPPORT TO CENTERLINE OF SUPPORT.
SCALE: N.T.S. SCALE: N.T.S.
5. L* = LEAST DIMENSION OF L1 AND LENGTH OF SPAN TRANSVERSE TO L1 (CENTER TO CENTER OF SUPPORT)
OR LEAST DIMENSION OF L2 AND LENGTH OF A TRANSVERSE TO L2 (CENTER TO CENTER OF SUPPORT).
6. ADD'L TOP/BOTT. REBARS ARE AT SAME LAYER WITH CONT. REBARS. (U.O.N.)

FLOOR SLAB SEE PLAN

1 7/16" RAKE
10" x 8" BEAM TYP. 1 - #3 EA. NOSE

#3 @ 12 TEMP.

NORTH
REINF. BAR (SEE SCHED.)

D
E
NU

AR
E
TH AV

EV
97

UL
SEE PLAN

BO
CONT. POUR 030

10"
10

STORY HEIGHT SEE ARCH'L.DWG.


1/
K:

HIN
2'-6 4 'L1 OC
"M ' BL

TP
IN.

FOR NO. OF RISER

SU
ET
1'-6" 1'-6" 1'-0"

RE T
SEE PLAN

MS
1 - #3 EA. NOSE

A
1 7/16" RAKE TYP.

LTH
#5 @ 12"

WA
"
SEE SCHED. 2'-0
' THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE
'L1 THE PROPERTY OF LMW, INFRINGEMENT WILL RESULT IN
1/4 MIN. PROSECUTION.
"
3'-6
SEE SCHED.
THICKNESS

No. Revision Comment Date


SLAB 'D'

"
2'-0 '
#3 @ 12 TEMP.
'L1
1/4 "MIN.
3'-6
10" x 8" BEAM

CONT. POUR SPAN 'L1'

TYPICAL CONCRETE STAIR DETAIL


SCALE: N.T.S.

CL WALL PROPOSED NINE (9) STORIES BUILDING


WITH CELLAR AND SUB- CELLAR
WATER PROOFING #4 @ 12" x 3'-0" IN ADDITION
1" 2" 1"
TO NORMAL WALL REINF. @ 97-18 SUTPHIN BOULEVARD, JAMAICA,
W1.7 TRUSS WALL
3/8" STEEL PLATE
STD. STEEL PIPE
SLEEVE AS REQ'D.
REINF. @ 16" O.C. NY 11435; BLOCK: 10030; LOT: 12
8" CMU #5 @ 12" T & B x 5'-0" (IN ADDITION
CUT-BACK TO TO NORMAL SLAB REINF.)
#4 DOWELS @ 48" O.C.
RECEIVE #4 @ 48" O.C. ON
2"
4"

GROUTED CELL
OPENING SIZE

PLACE DOWELS NEAR OUTSIDE ROUGHEN CONC. & COAT


2 - #5 CONT. FACE OF WALL WHERE THERE IS WITH CEMENT BEFORE

6"
#3 @ 24" O.C. NO HORIZ. REINF. NEW CONC.
6" CONC. SLAB ON GRADE

6" POROUS FILL


W/ 6x6-W2.9xW2.9 WWM NOTE:
SEE MECH'L. DWGS. SUB-CELLAR FLR.
1. KEY WIDTH NOT TO EXCEED 1/3 DEPTH OF WALL OR
SEALER 1 1/2"
#4 @ 12 (T) E.W. DEEP CONT. VAPOR BARRIER BEAM. VERTICAL CONSTRUCTION JOINT PERMITTED
SEE MECH'L.

X X X X X X X X X X

IN WALL OR GRADE. TYPICAL STRUCTURAL DETAILS - 2


DWGS

CONT. WELD TAMPED LEAD


T/SLAB 1 1/2" DEEP 95% COMPACTED FILL 2. BEAM AT ANY POINT 4'-0" MIN. AWAY FROM FACE OF
OAKUM PACKED SUPPORTING SUPPORTING PIER, BUTTRESS
1
AND/OR WALL OPENING.
1 DATE: 10/01/2018
WATER PROOFING CONTRACTOR TO SUPPLY LOCATION OF JTS. 3. PROVIDE ONE VERTICAL CONSTRUCTION JOINT FOR
#4 @ 24 E.W. 1'-0" TO ARCH. & ENGINEER BEFORE POURING EVERY 40'-0" OF A STRAIGHT RUN OF WALL. PROJECT NO.: 18-5080
OF NEW Y
TE IN G WA O DESIGN BY: DC DWG BY: S/K
TYPICAL HOUSEKEEPING DETAIL OF WATER PROOFED SLEEVE TYP. DET. FOR CMU PARTITIONS CONSTRUCTION JT. DET. AT TYP. VERT. CONSTRUCTION

A
NG

RK
EM

ST
CHK. BY: JW

JI
SCALE: N.T.S.
PAD DETAIL THRU WALL WITH WATER PROOFING SCALE: N.T.S.
ON SLAB ON GRADE SCALE: N.T.S.
SLAB ON GRADE SCALE: N.T.S.
JOINT IN WALL DWG. NO.:

EE R
LIC EN
SCALE: N.T.S.

GIN
S-402.00

SE

EN
07 4 35 4

D
PR L
O F E S IONA
S
CAD FILE NO.:
16 OF 16

You might also like