ITEMIZED COST

PROJECT: : 100 Linear Meter of Seawall Constructed


LOCATION : Brgy. Inolinan, San Ricardo,So. Leyte
CONTRACTOR : J'NER CEPADA CONSTRUCTION

UNIT COST ORIGINAL CONTRACT


ITEM NO. DESCRIPTION UNIT ADDITIVE
(Php)
QUANTITY AMOUNT (Php) QUANTITY

3A BOULDERS CU.M. 850.00 204.00 173,400.00


3A PVC #2 PCS. 350.00 40.00 14,000.00

PROJECT TITLE PREPARED BY: Checked/Recom. Appr


CONSTRUCTION OF SEAWALL (100 L.M.)
LOCATION: NERIO D. CEPADA JR. VAAN S. RUDILLAS
Brgy. Inolinan, San Ricardo, Southern Leyte Proprietor Municipal Engineer
SUBMITTE
D BY: VERIFIED AS TO QUANTITIES COST CONCURRED: RECOMMENDING APPROVAL:

ARLEE D. VESTAL VINCENT T. SY III LETECIA M. OLARTE HON. ROY Y. SALINAS ELISEA B. ORAPA
Project Engineer Chief, Planning and Chief, Construction Section Municipal Mayor PARO II
DPWH Design Section DAR, SOGOD, SO
ITEMIZED COST OF REVISION

PROPOSED REVISION
ADDITIVE DEDUCTIVE EXTRA WORK NO. REVISE QUANTITY & AMOUN
AMOUNT (Php) QUANTITY AMOUNT (Php) QUANTITY UNIT COST (Php) AMOUNT (Php) QUANTITY

204.00 850.00 173,400.00 408.00


40.00 14,000.00

Checked/Recom. Approval APPROVED BY: SHEET CONTENTS:


TYPICAL SECTION ( SEAWALL)
VAAN S. RUDILLAS ANELITA E. BONOTAN ROY Y. SALINAS PROTECTION
Municipal Engineer MPDC Municipal Mayor NOTES ON STONE (FOR STONE
MASONRY)
DING APPROVAL: APPROVED:

ELISEA B. ORAPA ALLAN D. EWAY MA. MARGARITA C. JUNIA, D.M


PARO II OIC-Assistant District Engineer District Engineer
DAR, SOGOD, SO. LEYTE
REVISE QUANTITY & AMOUNT
AMOUNT (Php)

346,800.00
(14,000.00)

SHEET #