Download as pdf or txt
Download as pdf or txt
You are on page 1of 47

Opportunities of the digitalization for construction

Jan Byfors

2015-03-17 NCC AB 1
Jan Byfors

CTO
R&D
BIM, Digitalization

Smart Built Environment (SIP)


IoT (SIP)

SIS, Swedish Standard Institute

2014-01-08 NCC Construction Sverige AB 2


Productivity in different
industries

Productivity in Construction is Low!


Why?

• Locally-based
• Cost driven / Risk elimination - not particularly innovative
• Project-based
• Large number of stakeholders involved
• Design and production separated
• Weak learning
(New constellations in every project, strong loyalty to projects
low experience feedback)
• Unclear ownership and control over the process
• Strong institutional norms, rules and procedures
• Information intensive
Digitalization is the solution!

2015-03-15 NCC Construction Sverige AB 5


Construction is lagging behind!

Source: The 2012 industry digitization index: pwc

2015-08-19 NCC Construction Sverige AB 6


Construction is lagging behind, but catching up ….

Source: The 2012 industry digitization index: pwc

2015-08-19 NCC Construction Sverige AB 7


… the sector has already started its journey
towards digitalization

….and that is BIM

2016-04-06 NCC AB 8
What is BIM?

Building Information Model


What is BIM?

Building Information Model


Building Information Modelling
Implementation Industrialization/automation of
levels • detail design
3 • supply and logistic
• production
Integration of
• design and analysis
2 • design and cost estimation
• design and planning
3D-design

1 • visualization
• coordination
• cooperation Kunz & Fischer CIFE Stanford
Collaboration

2015-03-17 NCC AB 12
Benefits!
Quality
For who?
• More alternative solutions – optimization • Architects and technical consultants
• Visualizations for better understanding • Contractors
and decisions • Real estate companies
• Better buildings, roads, railways etc • Clients and end users
Economy
• Better coordination through visualization
• More efficient processes
• Less errors in design and production
• Lower resource consumption through optimization

Time
• Shorter processes - increased understanding
• Increased collaboration through unified information
• Reduction of delays in construction and production
• More efficient logistics
BIM – a way of working

80% way of working 20% technology

2014-09-17 NCC AB 14
Digitalization

ICT
BIM
Virtual Reality
Augmented Reality
Big Data
Opportunities for Construction?
Clouding
3D Printing
Internet of Things
Artificial Intelligence
Automation

2016-04-06 NCC AB 15
Virtual Reality

2016-04-06 NCC AB 16
Holoportation => Distributed collaboration

2016-04-06 NCC AB 17
Droners and Scanning

2016-04-06 NCC AB 18
APPs for
Construction

2015-03-18 NCC Construction Sverige AB 19


Augmented Reality

2014-10-16 Samhällsbyggnadsdagarna 20
Augmented reality

2016-04-06 NCC AB 21
Machine Guidance

2016-04-06 NCC AB 22
3D Printing

2016-04-06 NCC AB 23
3D printing and
robotics
IoT => Smart Homes

2016-04-06 NCC AB 25
Smart Buildings

2016-04-06 NCC AB 26
Facility Management

2016-04-06 NCC AB 27
Tenant service

2016-04-06 NCC AB 28
Smart Cities

2016-04-06 NCC AB 29
Big Data – City Models
Clients

Roads

Properties

Levels

Land usage

Real world

2014-10-16 Samhällsbyggnadsdagarna 30
AI – Artificial Intelligence

2016-04-06 NCC AB 31
Digitalization is a game changer

2014-09-17 NCC AB 32
New business logics

2016-04-06 NCC AB 33
Sharing is the new norm

2016-04-06 NCC AB 34
Hoffice –
Sharing your home with local freelancers

Structured working process


Impact on Construction?

2016-04-06 NCC AB 36
Digitalization is a game changer

Digitalization is moving fast

2014-09-17 NCC AB 37
Smart Built Environment
200 MSEK for Digitalization of the Swedish Building Sector

The Building Sectors Stakeholders


2016-04-06 39
Standardization

2016-04-06 40
Standardization

Industrialization

Test beds – innovation labs

Knowledge transfer

2016-04-06 41
2016-04-06 42
Digitalization is a game changer

Digitalization is moving fast

2014-09-17 NCC AB 43
2016-04-06 NCC AB 44
?

2016-04-06 NCC AB 45
2016-04-06 NCC AB 46
We have to adapt to the technology!
A well-known restaurant in New York hired a consultant to find out why
2004 they got top rating 2014 they were totally dissed

2004:
2014
• •Before
Mean time
looking to order
at the 8 customers
menu the minutes take
•up The
their smartphones.
food is served in about 6
• 20% ask the waiter how to connect Wifi
min
• Mean time to order 21 minutes
• •TheLess
food isthan 1%
served send6 back
in about min food
• •30% take pictures
Mean visitingof food
time 1 hour and 5
• 20% send back food for heating
minutes
• 50% ask the waiter if he could take a group
photo
• 20% of customers collide with other customers
going in and out of the restaurant while texting
• Mean visiting time1 hour and 55 min

2014-10-16 Samhällsbyggnadsdagarna 47

You might also like