Professional Documents
Culture Documents
Lift and Shift Webinar 11082018
Lift and Shift Webinar 11082018
Lift and Shift Webinar 11082018
http://www.beastute.com 1
AGENDA
Astute Overview
Useful Links
Q&A
ASTUTE BUSINESS SOLUTIONS
Overview
3
ABOUT ASTUTE
Since 2006 Global Oracle Cloud Experience Oracle Velocity Oracle Cloud
HQ at presence - Standard 20 Years of Partner Marketplace
Pleasanton, Dallas, TX Partner, cross-industry OCI Reseller Solutions for
CA Madison, WI Oracle Gold experience OCI Specialized PeopleSoft
Ex-PeopleSoft Toronto, Ca Partner
Hyderabad, IN
CLOUD SERVICES & SOLUTIONS
Advisory Services
Managed
Cloud Strategy &
Roadmap, P2P, POC, Services
Reference Architecture SLA-Based Services for
all OCI IaaS and PaaS
Services including
Oracle Apps - PS, EBS
Implementation Services
Migration Services Oracle Integration Cloud, Oracle
Lift & Shift PS and EBS to OCI, DR Analytics Cloud, Chatbot for
on OCI, Backup and Archive PeopleSoft using Oracle Digital
Storage to OCI Assistant
PEOPLESOFT LIFT AND SHIFT TO OCI EXPERIENCE
Top Oracle Partner for PS to OCI
12 Lift and Shift to OCI completed- including HCM 9.2, FSCM 9.2,
CS9.2, Portal 9.1. EBS Migration, 4 DR Projects, 2 OMC Projects,
Multiple POC’s
Live Reporting
Reporting Dashboard
Access to pre-packaged reports to get live test metrics, defect metrics filtered by
user, module, year and test results
9
DRIVERS TO MOVE PS TO CLOUD
Hardware Refresh
High Upfront Capital
Investment, Overheads and 01 Obsolescence Need Agility
delays in procuring and Improve Time to Market, Create
maintaining, aging and Destroy Instances on
infrastructure
Agility
02 Demand, Automate Cloning
and Configuration, Speed up
maintenance, Stay Current
Security Threats 03 Vulnerability
Vulnerability to various Internal
and External Security threats,
lack of data encryption and 04 Reduce Cost
Budget Constraints
data masking, need for privacy Do MORE WITH LESS,
compliance (HIPAA, GDPR) manage every growing
business demands with
limited resources
10
DRIVERS TO MOVE PS TO CLOUD
In Short:
11
Define YOUR Business Drivers for Cloud
al
on
G
et nte
ti
C
os ra
ou r B
e
C pe
t o usi
t
f D ne
ce
● Focus on core business ● Move granular cost controls
at ss
du
a
● Improve Service Levels ● Eliminate Wasteful Spend
Re
● Be Agile ● Optimize Resource Costs
CORE BUSINESS
OBJECTIVES
● Engage MSP to deliver SLA-based
● Deploy reliable and cost
SP t
M por
App and Infra support
Im isa
effective DR solution
pl ste
D
● Bundle in core-services for App
vi up
● Test DR for effectiveness
em r
and Infra upgrade and patching
es S
ic rm
a
en ec
rv fo
t R ov
R
Se ans
ob er
Tr
us y
t
12
EVALUATE CLOUD AGAINST YOUR BUSINESS NEED
How will YOU evaluate Cloud? Innovation
● One-click, One-click PT upgrade, automated cloning, monitoring
● Automated start/stop of PeopleSoft, automated refresh
● Automated scale up and down
● Automated Testing with PTF for PUM, Tools Patch, Tax Update
Operational Cost
● Reduce Infrastructure TCO
● Reduce Manual effort
● Speed up new feature adoption
Performance, Security
● Encrypt data, Mask Data, Secure Data
● Improve performance for online and batch
OCI vs. Other - Cost Comparison
Private Line Network (1 Gbps, 100TB Data, Monthly) $155 +21X +37X +15X
www.storagereview.com/oracle_cloud_infrastructure_compute_bare_metal_instances_review
www.storagereview.com/amazon_ec2_i3metal_review
1
5
OCI vs. Other - PeopleSoft-specific Comparison
Automation - Provisioning
Performance - Infrastructure
Performance SLA
Oracle Certification 16
16
ADVANTAGES OF RUNNING PEOPLESOFT ON OCI
04 Higher Performance Bare Metal and Dense I/O for higher performance
Improve Payroll, batch and online performance
Upgrade on OCI
Lift and Shift to OCI
03 One-click automation for PeopleTools
Upgrade and Patching, Faster V9.2
Upgrades, Deploy High Performance
VM’s for load testing, Automate build
and tear-down of Dev/Test instances
19
MORE USE CASES FOR PEOPLESOFT ON OCI
PS Non-Production On OCI
Start by moving Non-Production instances, build efficiency and
reduce cost and effort for patching, testing, development
04
Performance Testing on OCI
Scale up copies of Production on OCI with multiple
05 app/web/scheduler servers, larger database and to
run stress tests, load tests and measure performance
20
CONDUCTING A POC
Lift and Shift one PeopleSoft Non-Production instance to OCI, execute one or more defined
Use Cases on that OCI instance. Measure and validate against expected outcomes. Plan
next phase of migration.
21
SAMPLE POC TIMELINE
22
PEOPLESOFT ON OCI
Roadmap, Timeline, Best Practices
PROPOSED ROADMAP TO CLOUD
IMPROVE
Automate, Standardize,
4 Measure, Report, Improve
DEPLOY
PS Migration to OCI -
STABILIZE Implement Hybrid Cloud
Integrate, Test, Model, OCI and 3rd-Party,
Validate, Production 3 2 Onboard MSP and Start
Cutover, Post Go Transition
Live MSP Support
PREPARE
Cloud Roadmap
and Strategy, RFP,
1
Vendor Selection,
OCI Contract
24
MIGRATION CONSIDERATIONS
Migration of PS and EBS to OCI should be seamless and non-disruptive
Move,
Thorough Phased Optimize Improve,
Planning Approach Spend Extend
Consider Execute in Phases Ramp Up internal Move PS to take
dependencies and to de-risk the move team, negotiate advantage of OCI
constraints from to Cloud. Move PS fixed-fee vendor Automation
other in-flight and EBS first and services, optimize capabilities. Extend
projects, resource middleware and software to Autonomous
availability, and connected apps maintenance Integration Cloud,
change soon after. Autonomous 25
management Warehouse
ASTUTE APPROACH FOR LIFT & SHIFT
Disaster Recovery on OCI Astute will implement DR right after Production Lift
● Implement DR on OCI using Data Guard to
create a standby DB and App Stack,Test and 3 and Shift is complete. Astute will test and validate
DR on a regular basis as part of the MSP service
Validate
offering.
ASSESS
Comprehensive
current state DESIGN
assessment of Design specific SPRINT GO LIVE
application, architecture for 2-4 weeks Prepare go-live plan
infrastructure & in-scope applications, detailed checklist, final
business middleware, database, copy of Production. Move
processes and infrastructure to OCI and Go-Live!
Negotiate and Finalize Contract Management - Oracle OCI and Vendor MSP Contracts
SELECT OCI and
MSP Contracts C M O C
Provision OCI, O Governance and PMO - Co-Manage Move and Improve with MSP, OCI and Oracle CSM
ENGAGE Onboard MSP
C M O C
Design OCI Deploy OCI, Migrate Integrate Hybrid Cloud on OCI, Test and Migrate Prod, Go
DEPLOY Plumbing, Build PS Non-Prod Validate, Stage Prod Live
M M M C
Secure OCI Validate pre and Go Live Support,
STABILIZE Break/Fix
M C post migration
SAMPLE TIMELINE PROPOSED - 6 MONTHS INCLUDES TIME TO PREP, DESIGN, BUILD, EXECUTE, TEST AND GO LIVE.
TIMELINE MAY BE CUSTOMIZED ACCORDING TO MSP CONTRACT AND TO ACCOMODATE Syneos Health BUSINESS EVENTS
C Customer M MSP O Oracle 28
PEOPLESOFT ON OCI
Some Useful Links
www.PeopleSoftinfo.com
https://video.oracle.com/
Copyright © 2017, Astute 31
OCI MIGRATION METHODOLOGY - LIFT & SHIFT
https://beastute.com/event-road-show-2018/
OCI MIGRATION METHODOLOGY - LIFT & SHIFT
https://docs.oracle.com/cd/E52319_01/infoportal/cloudmgr.html
Q&A
OCI provides benefits of flexibility, scalability, cost savings,security and reliability to your business
Astute can assess your current situation and provide a cloud assessment report
You can move full stack of Non-Production and Production instances, DR, Backup and Archival and Read Only DBs etc.
Oracle cloud Infrastructure is safe by default. It is HIPAA, PCI-DSS and SOC certified
5.Is it possible to integrate data in the cloud with other systems on premise or third party?
Yes, most clients have specific integration requirements rather than just a general stream of data and OCI allows secured
and seamless integration with on-prem and third party systems. OCI will work as an extension of the on-prem network.
35