The MoEF &CC has reconstituted the District Environment Impact Assessment Authority
(DEIAA) to Grant EC for B2 Category of minor minerals in the EIA Zero draft
(2019).The composition of DEIAA and DEAC is exactly the same as given in the EIA
15.01.2016). The Zero Draft has widened the powers of the DEIAA to grant EC to the
5-25 ha category of minor minerals apart from the 0-5 ha category and has excluded
As per the Deepak Kumar v. State of Haryana1, The Hon’ble Supreme Court while
under EIA Notification, 2006 and the harmful effects to the environment by mining of
“leases of minor mineral including their renewal for an area of less than five hectares
be granted by the States/Union Territories only after getting environmental clearance
from the MoEF.”
The MoEF issued an Office Memorandum No. L-llOll/47/2011-IA.II(M) dated
18.05.2012, in compliance of the Judgment of the Hon’ble Supreme Court in the matter
of Deepak Kumar (Supra). The Office Memorandum stated that all mining projects of
minor minerals including their renewal, irrespective of the size of the lease would hence
forth require prior environment clearance following the procedure prescribed under EIA
“3.In order to ensure compliance of the above referred order of the Hon'ble Supreme
Court dated 27.2.2012, it has now been decided that all mining projects of minor
minerals including their renewal, irrespective of the size of the lease would hence forth
require prior environment clearance. Mining projects with lease area up to less than 50
ha including projects of minor mineral with lease area less than 5 ha would be treated
as category 'B' as defined in the EIA Notification, 2006 and will be considered by the
respective SEIAAs notified by MoEF and following the procedure prescribed under EIA
Notification, 2006.”
24.12.2013, categorized the category of ‘B’ projects/ activities into Category ‘B1’ and
1
Deepak Kumar v. State of Haryana (2012) 4 SCC 629
‘B2’, by breaking up of Category B under the EIA Notification 2006, into B1 and B2 and
exempting the B2 category(0-5 ha) from the process laid down in the EIA Notification,
2006.
The MoEF again in 2016, vide Notification S.O. 141 (E) dated 15.01.2016 established
district level District Environment Impact Assessment Authority (DEIAA) and the District
Expert Appraisal Committee (DEAC). The changes brought out by the notifications are
as follows:
II. Creation of DEIAA for granting Environmental Clearance for all category B2
projects of minor minerals and setting up of eleven member body –DEAC for
III. DEIAA and DEAC given power to grant EC for individual mining leases up to
5 ha and cluster mining leases up to 25ha on the basis of ,Form 1M, Pre –
Feasibility Report, approved Mining plan and EMP .The requirement of EIA
IV. The SEIA and SEIAA under the Notification dated 15.01.2016 is given
leases greater than 5 ha and below 25 ha. The requirement of EIA study and
V. Further the Notification dated 15.01.2016 stipulates that for mining leases
below 25 ha in cluster only one public hearing is required and the final
Environment Impact Report for the entire cluster shall be prepared after the
Public Hearing.
The DEIAA and DEAC lacked environmental experts and professionals and was
clearance for mining of minor minerals. These issues were raised before the NGT in the
matter of Satendra Pandey v. MoEF & Anr and other connected matters.
The Hon’ble NGT vide order dated 13.09.2018 in the matter of Satendra Pandey v.
MoEF & Anr (Original Application No. 186 of 2016) had held that DEIAA, is not a
competent authority to grant Environmental Clearances and also held that the
competent authority to grant EC is the SEIAA for 0-5 ha category. The Tribunal further
held that EIA study and Public Consultation is mandatory for the 5-25 ha category of
mines for grant of EC. The Tribunal directed the MoEF &CC to issue a new Notification
to bring the EIA, Notification 2006 in consonance with the Judgment of the Supreme
order dated 11.12.2018, directed the Ministry of Environment and Forest to comply
with the Order of the Tribunal dated 13.09.2018. The Hon’ble NGT had also expressly
stayed the Notification dated 15.01.2016, until a new notification has been issued by
Comments
The MoEF & CC in the EIA Zero draft (2019), has completely gone against Order of
the National Green Tribunal and has severely diluted the process of Appraisal of mining
projects of minor minerals and has re-constituted the District Level Environment Impact
Assessment Authority (DEIAA) to appraise mining projects falling under the category of
The purpose of EIA is to examine the all possible options and impacts of the proposed
activity based on which permission for such activity is given. The EMP is a requirement
of the activity in the first place. The projects falling in B2 category have been
completely exempted from the EIA study and from making an EMP.
2
Ibid
The other important aspect of the EIA Zero draft is the Public Consultation aspect.
According to the Zero draft that for mining leases below 25 ha, either individual or
contradiction with the statutory requirement of public hearing. The affected population
must be made aware of all possible impacts of the proposed activity and should be able
Lack of Experts
The qualification of Experts is exactly the same with a very minute change in the “Age”
part, the maximum age has been increased to 75 years with an extension up to 78
years.
The Chairperson of DEIAA will be the District Magistrate /District Collector and the
Chairperson of the DEAC will be the Executive Engineer , Irrigation Department, theses
Divisional Officer, the other two members are DFO and Expert to be nominated by
Divisional Commissioner. For the DEAC , The Member Secretary will be Assistant
Director or Deputy Director or District Mines Officer or Geologist in the district . The
other members will be from Sub-Divisional Officer Forest, representative of the remote
occupational health expert or medical officer, engineer form Zila Parishad , State
Pollution Control Board or Committee , senior most assistant engineer-PWD and the
these posts are administrative and not even necessarily without any knowledge or
Only one expert member is provided in the DEAC out of a composition of four and the
DEIAA provides for three expert members out of a composition of eleven. The
Notification states that serving members of the State Government are ‘ex-officio’
.Therefore, in addition to their expertise , their availability of time to examine the issue