K L M N P Q R S
PROJECT: PATIO SUITES T1
110mm x 75mm
1115
RECTANGULAR DS, T/B
2858
110mm x 75mm MAKATI DEVELOPMENT CORPORATION
2 2 RECTANGULAR DS, T/B
BD
9
Notes:
3479
STUB-OUT 1463 1274 2563 2563 637 637 857 535
3577
IE (7F) 2253
511 3
IE (7F) 1033
Date
50 mmØ
50 FCO
673
100 mmØ
249 910
100 mmØ
8300
N 84045 m
mØ FD FD FD FD FD FD VIRGIL JR. G. PALANCA
E 151587 IE (7F) 492 FCO TSD OFFICER
FCO WC GT GT GT 1.0% GT WC
100 mmØ
IE (6F) 2660 WM 1.0% 1.0% WB WB
WB WB WB 1.0% WM WB
100 mmØ
100 mmØ
IE (7F) 2445 IE (6F) 2566 50 mmØ 50 mmØ IE (7F) 2445
VIRGIL JR. G. PALANCA
IE (6F) 2565
25 mmØ
50 mmØ 50 mmØ 50 mmØ
50 mmØ
WC WC WC WC
100 mmØ
IE (7F) 2466
N 81285 830
75 mmØ
Vs Riser GERARD R. AÑASCO
Name & Signature
relocated
75 mmØ
75 mmØ
E 154277 TSD SUPERVISOR
50 mmØ
75 mmØ
75 mmØ
50 mmØ
50 mmØ
GT 100mmØ VS, F/B
75 mmØ GT
150mmØ DS, F/A, T/B Vs Riser
TSD HEAD
800
E 151747 50mmØ CDS, FA 50mmØ CDS, F/A 50mmØ CDS, F/A, T/B E 174057
3 150mmØ SS, F/A 150mmØ SS, T/B 100mmØ VS, F/B, T/A 11
IE (6F) 2462 150mmØ SS, F/A, T/B DRAWING SCALE NOTES:
100mmØ VS, F/B, T/A FROM LEFT TO RIGHT:
IE (7F) 595 THIS DRAWING IS ORIGINALLY SCALED AT A1 PAPER SIZE.
150mmØ SS, F/A, T/B
FROM LEFT TO RIGHT: 150mmØ DS, F/A, T/B WHEN USING A3 PAPER SIZE:
6400
2185
100mmØ VS, F/B, T/A 100mmØ VS, F/B, T/A
2 150mmØ SS, F/A, T/B FD WM IE (6F) 2663 IE (6F) 2663 WM FD 150mmØ SS, F/A, T/B
BD IE (6F) 2468 50 mmØ 50 mmØ
100 mmØ IE (6F) 2467
WB GT GT WB
10
100 mmØ
Ø
0
mm
IE (6F) 2652
75 mmØ
mm
75 mmØ
0
Ø
10
110mm x 75mm WC IE (7F) 2260
2
2041
WC
885 162
RECTANGULAR DS, T/B IE (7F) 2260
FD FCO FCO FD
1087 1552 2653 1087
163 886
IE (7F) 2260 FD
2053
FD FCO FCO
110mm x 75mm WC REVISIONS
75 mmØ
75 mmØ
SEWER/SOLID WASTE PIPE IE (7F) 2260 IE (6F) 2515
RECTANGULAR DS, T/B WC IE (6F) 2637 110mm x 75mm
Ø
mm
100 mmØ GT GT RECTANGULAR DS, F/A, T/B
0
WB 100 mmØ No. Description Date
10
DRAIN PIPE (DP) IE (6F) 2468 WB IE (6F) 2467 5/31/201
BD 50 mmØ IE (6F) 2663 IE (6F) 2663 50 mmØ 1 See RFI-PL-0017-00. 8
FD WM 340 504 1096 WM FD
N 69997 IE (6F) 2513
6400
VENT PIPE (VP) 550 1554 5/25/201
2950 2 See responded RFI-PL-0004-00.
2 E 154479
100MMØ WS, F/A, T/B FROM LEFT TO RIGHT: 8
FROM LEFT TO RIGHT: 100mmØ VS, F/B, T/A 5/30/201
IE (7F) 2258 N 69998 3 Approved layout as per DCM last Feb. 07, 2018.
PD PARKING DRAIN 100mmØ VS, F/B, T/A FD 50mmØ CDS, F/A, T/B 8
E 170252
371
50mmØ CDS, F/A, T/B 150mmØ SS, F/A, T/B 6/19/201
FD 150mmØ SS, F/A, T/B
25mmØ CDP
STUB-OUT
3 FD 3 2219
4 See RFI-PL-0018-00.
8
FLOOR DRAIN 4 N 66098
2020
1640
2500
FROM LEFT TO RIGHT: 75mm x 50mm RECTANGULAR CDS, F/A,
717 1002 E 173709
50mmØ CDS, F/A, T/B 260
FCO FLOOR CLEANOUT T/B 150mmØ DS, F/A, T/B
100mmØ VS, F/B, T/A
150mmØ SS, F/A, T/B 150mmØ DS, F/A, T/B
13
GCO GROUND CLEANOUT 134 758 2177 IE (7F) 2613 FROM LEFT TO RIGHT:
IE (7F) 2576 150mmØ SS, F/A, T/B
2660
IE (7F) 289 IE (7F) 658 IE (7F) 571
100mmØ VS, F/B, T/A
IE (7F) 2212
CCO CEILING CLEANOUT IE (6F) 2520 IE (7F) 2473 50mmØ CDS, F/A, T/B
50 mmØ 829
GT
IE (6F) 2653
14
75 mmØ
GT
176
536
25 mmØ
FCO
1.0%
100 mmØ
75 mmØ
FCO
100 mmØ
100 mmØ
75 mmØ
WC WC
1400
1643
1050
1
1941
DS DRAIN STACK 1 1.0%
IE (7F) 2212
1815
1816
WB IE (7F) 2212 WM WB
FCO WC
1
3299
3299
75 mmØ
FD WB IE (6F) 2500 FD 75 mmØ
WM WM
IE (6F) 2528
25 mmØ
1088
SS SOIL/SEWER STACK WB FD WB
25 mmØ
WC WB IE (7F) 2258 WB WC
FCO 100 mmØ FCO WC FD WC FCO 1.0% 100 mmØ FCO
Ø
912
913
mm
7050
FD FD
FD
1 885 FROM TOP TO BOTTOM:
25mmØ CDP 150mmØ SS, F/A, T/B
T/B TO BELOW
506 557 897 1370 497 705 STUB-OUT
3 100mmØ VS, F/B, T/A 4 715 486 1370 897 558 505
IE INVERT ELEVATION 3 IE (7F) 2257 4 25mmØ CDP
3
CHERRY IDIANG
STUB-OUT CMG
GT GREASE TRAP
15 3142 3093 1165
2740
PIPE 75mm x 50mm
RECTANGULAR CDS, T/B 2 2 MAYLINDE C. HOMEZ
WC WATER CLOSET 110mm x 75mm 110mm x 75mm 110mm x 75mm PM
RECTANGULAR DS, T/B RECTANGULAR DS, T/B
WB WASH BASIN
RECTANGULAR DS, T/B 16
75mm x 50mm
JOSE D. PANDONGAN JR.
WM WASHING MACHINE RECTANGULAR CDS, T/B MEPFS SUPERVISOR
BD BALCONY DRAIN
JESON LAURILLA
7TH FLOOR LEVEL MIT
SD SLOPE DRAIN
1 SEWER & DRAINAGE LAYOUT
INVERT ELEVATION LEGEND: IFC-PST1-PL-0008
1 : 100 MM
1/1 SCALE: JOHN PAUL GRANADEROS
FLOOR LEVEL FFL EMCD
IE 2F VALUE
SHEET INFORMATION: ISSUE DATE:
07/31/19
INVERT ELEVATION ELEVATION FROM x FOR APPROVAL
FLOOR LEVEL FFL ISSUED FOR CONSTRUCTION
NOTES: ARCHITECTURAL CONSULTANT STRUCTURAL CONSULTANT: MECHANICAL CONSULTANT: FIRE PROTECTION CONSULTANT: VERTICAL TRANSPORT CONSULTANT: PROJECT: OWNER: SHEET CONTENTS: SHEET NO: REFERENCE DRAWINGS: STAMP
Aidea Incorporated SY^2 + ASSOCIATES, Inc. ecoSolutions ecoSolutions D1-CD-07
ANY INCONSISTENCY / DISCREPANCY OR MISSING 30F BPI - Philam Life Makati Bldg., 6811 Unit 504 Pryce Center, 1179 Chino Roces Unit 2007 20th Floor, The Trade and Unit 2007 20th Floor, The Trade and
INFORMATION WITH IFC PLAN, PLEASE ADVISE THE
MDC-TSD FOR CLARIFICATIONS OF ANY Ayala Ave., Salcedo Village 1229 Makati City, Ave. Cor. Bagtikan St. Makati City, Financial Tower, 32nd St. Cor. 7th Ave., Financial Tower, 32nd St. Cor. 7th Ave.,
REVISION/CHANGES/ALTERATION OF INFORMATION Philippines Philippines Fort Bonifacio, Taguig City 1634, Philippines Fort Bonifacio, Taguig City 1634, Philippines
ACCENDO COMMERCIAL CORP. IFC-PST1-PL-0008
DUE TO SITE CONDITION/CONSTRUCTION
METHODOLOGY FOR PROPER COORDINATION AND
DOCUMENTATION.
LANDSCAPE CONSULTANT: ELECTRICAL CONSULTANT: PLUMBING CONSULTANT: CIVIL WORKS CONSULTANT: QUANTITY CONSULTANT: PATIO SUITES TOWER 1 7TH FLOOR LEVEL
SEWER & DRAINAGE LAYOUT 1/1
Inspiralandesign ecoSolutions ecoSolutions 2F ABREEZA MALL ADMIN. OFFICE, J.P. LAUREL AVE., DAVAO CITY
FOR OTHER DETAILS AND SPECIFICATIONS,
MAKATI DEVELOPMENT CORPORATION PLEASE CROSS-REFERENCE FCD FROM
27 Malipajo St. Corner Mercury St., Pillar Unit 2007 20th Floor, The Trade and Unit 2007 20th Floor, The Trade and
Village, Las Pinas, 1749 Metro Manila, Financial Tower, 32nd St. Cor. 7th Ave., Financial Tower, 32nd St. Cor. 7th Ave.,
CONSULTANTS.
Philippines Fort Bonifacio, Taguig City 1634, Philippines Fort Bonifacio, Taguig City 1634, Philippines
BARANGAY 20-B POBLACION WEST BAJADA, DAVAO CITY
Ctrl No. : IFC- PST1-PL-0008-00
FILE PATH:
C:\Users\davao.tsd2\Documents\PLUMBING_PATIO SUITES_mdcvismin.pq69@gmail.com.rvt