Checklist for : Earthworks (Replacement For Unsuitable Material)
No.

Location : Other Information:

Item Description Con Con SC Remarks


Yes No Y N

1 Peg out the extent of the area where


unsuitable material needs to be
replaced

2 Carry out cross-section survey.

3 Determine the locations of the spoilt


tips for the disposal of unsuitable
materials

4 Is replacement material to be used


approved ?
( attach test result to confirm )

5 Check for existing utilities before


excavation

6 Is survey of excavated level required


before filling of replacement material?

7 Carry out Field Density Test of


replacement material
( attach test result )

8 FINAL INSPECTION WITH COMMENTS P F Date:

Signed for Contractor Designation : Date :

Signed for SC Designation : Date :