A CHAU INDUSTRIAL TECHNOLOGY JOINT STOCK COMPANY


A CHAU building, no.25 Tan Mai, Hoang Mai Dist, Ha Noi City, Viet Nam
Tel: (+84-4) 3665 8812 Fax: (+84-4) 3664 9647

Company / customer SUNGLIM.TT CO.,LTD


Project description BAU ZON SOLAR POWER PLANT SUBSTATION
Job number LSX 07.62.19
Drawing number MV

Switchgear INCOMING (01 PANEL)


Rated voltage 24 KV
Rated Current 1600 A

Rated Frequency 50 Hz

Manufacturing Date 2019

Cabinet Type INDOOR

Designed by Checked by Approved by Created on Number of pages


D.V.THAI D.M.DUNG L.D.TRUNG 11.09.2019 31

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
COVER PAGE DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 1 TOTAL : 31
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 1 NEXT PAGE. 3

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
DRAWING LIST DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 2 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

P RO TECTIO N AND HUM IDITY P RO TECTIO N AND HUM IDITY


MEAS UR IN G RELAY C ONT ROL LER MEAS UR IN G RELAY C ONT ROL LER

LAMP LAMP LAMP LAMP

LAMP LAMP LAMP LAMP

OPE N-CL OSE OPE N-CL OSE


L OCAL - RE MOTE SYNC CHECK L OCAL - RE MOTE SYNC CHECK
C IR CUIT B REAKER C IR CUIT B REAKER

E AR TH SWITCH E AR TH SWITCH
VOL TAGE INDIC ATOR VOL TAGE INDIC ATOR
INDIC AT OR INDIC AT OR

LAMP LAMP

PREVIOUS PAGE. 2 NEXT PAGE. 4

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
ARRANGEMENT VIEW DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 3 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 3 NEXT PAGE. 5

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
POWER CIRCUIT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 4 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 4 NEXT PAGE. 6

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
POWER CIRCUIT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 5 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 5 NEXT PAGE. 7

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
POWER CIRCUIT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 6 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 6 NEXT PAGE. 8

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
INPUT CURRENT-VOLTAGE RELAY DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 7 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 7 NEXT PAGE. 9

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
SUPPLY CIRCUIT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 8 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

thieu output của F50 di


đóng cho chức năng 25
anh

PREVIOUS PAGE. 8 NEXT PAGE. 10

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
CONTROL CIRCUIT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 9 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 9 NEXT PAGE. 11

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
CONTROL CIRCUIT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 10 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

a đổi MCCB trạng thái


này lên on giúp e nhé, k
sau thí nghiệm lại bắt
đổi.

anh xem có tin hieu khoa


dong VCB, cho tiep diem
thuong dong vao day ạ.

PREVIOUS PAGE. 10 NEXT PAGE. 12

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
CONTROL CIRCUIT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 11 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 11 NEXT PAGE. 13

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
RELAY PROTECTION INPUT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 12 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 12 NEXT PAGE. 14

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
CONTROL CIRCUIT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 13 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 13 NEXT PAGE. 15

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
CONTROL CIRCUIT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 14 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

PREVIOUS PAGE. 14 NEXT PAGE. 16

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL SIGNAL SPARE DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 15 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

0 I

PREVIOUS PAGE. 15 NEXT PAGE. 17

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
CIRCUIT BREAKER DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 16 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

anh cho them cau dau,


de ket noi tin hieu
EXTERNAL TRIP
NHÉ,để em gửi tín hiệu
trip về, để lockout mạch
đóng.

PREVIOUS PAGE. 16 NEXT PAGE. 18

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
RELAY PROTECTION DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 17 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

O
90
1 2

LOCAL REMOTE

1 LOCAL X X
2 REMOTE X X

C
1 01 o
o
45
90 IC
2 02
O
3 03 CLOSE
45
o

4 04 IO

OPEN
1 IO X X X
2 O X
LED
3 C X
4 IC X X X

1 01
2 02
3 03
4 04

NO COM NC 110V 0V 220V


AUXILIARY VOLTAGE

L1 L2 L3
VOLTAGE INDICATOR

PREVIOUS PAGE. 17 NEXT PAGE. 19

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
EQIUPMENT LIST CONTROL DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 18 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
X1 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
24KV IN X1:2
24KV IN X1:3
24KV IN X1:4
24KV IN X1:5

24KV IN XB:4
24KV IN HES:1
24KV IN KES:C2
24KV IN RES:14

F50.X10:11 IN 24KV
24KV IN XB:3
24KV IN X1:14
X1:13 IN 24KV 24KV IN X1:15
X1:14 IN 24KV

24KV IN X1:17
24KV IN X1:21
24KV IN XE:3

24KV IN XE:1
24KV IN KES:C1
24KV IN F50.X11:1

24KV IN F50.X13:1
24KV IN F50.X13:3
24KV IN F50.X13:5
24KV IN F50.X13:7

PREVIOUS PAGE. 18 NEXT PAGE. 20

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL CONTROL DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 19 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
X2 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
24KV IN F50.X10:13
F50.X10:14 IN 24KV
24KV IN KBF:A1
KBF:A2 IN 24KV

24KV IN FP:11
FP:12 IN 24KV
24KV IN F50.X10:3
F50.X10:4 IN 24KV
F50.X11:15 IN 24KV

PREVIOUS PAGE. 19 NEXT PAGE. 21

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL CONNECT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 20 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
X4 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
24KV IN F50.X10:23
F50.X10:24 IN 24KV
24KV IN F50.X11:17
F50.X11:18 IN 24KV
24KV IN F50.X11:20
F50.X11:21 IN 24KV
24KV IN F50.X11:23
F50.X11:24 IN 24KV
24KV IN SLR1:6
SLR1:8 IN 24KV
24KV IN KBF:3
KBF:4 IN 24KV
24KV IN KBF:5
KBF:6 IN 24KV
24KV IN F50.X10:6
F50.X10:7 IN 24KV

24KV
IN

Wire properties
X5 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
FAC:2 IN 24KV 24KV IN T1:5
24KV IN SD1:COM
FAC:4 IN 24KV 24KV IN T1:6
HC1:N IN 24KV
RC1:N IN 24KV
SD1:NC IN 24KV 24KV IN HC1:L
T1:8 IN 24KV 24KV IN RC1:L
24KV IN T1:9
24KV IN T1:10
24KV IN T1:11
24KV IN T1:12

PREVIOUS PAGE. 20 NEXT PAGE. 22

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL SPARE-HEATER DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 21 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XA1 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
XA1:2 IN 24KV
, , , XA1:3,XA1:1 IN,IN 24KV,24KV
, , , XA1:2,XA1:4 IN,IN 24KV,24KV
24KV IN CT1:1S2

24KV
IN

Wire properties
XA2 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
XA2:2 IN 24KV
, , , XA2:3,XA2:1 IN,IN 24KV,24KV
, , , XA2:2,XA2:4 IN,IN 24KV,24KV
XA2:3 IN 24KV 24KV IN XA2:5
24KV IN XA2:6
24KV IN XA2:7
24KV IN XA2:8
24KV IN XA2:9

PREVIOUS PAGE. 21 NEXT PAGE. 23

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL CT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 22 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XA3 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

24KV IN XA3:3
XA3:2 IN 24KV 24KV IN GND3

24KV
IN

Wire properties
XA4 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
XGA1:01 IN 24KV
XGA1:02 IN 24KV
XGA1:03 IN 24KV
XGA1:04 IN 24KV

PREVIOUS PAGE. 22 NEXT PAGE. 24

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL CT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 23 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XAC Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
24KV IN FAC:1
24KV IN FAC:3

24KV
IN

Wire properties
XDC Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
24KV IN FM:1
24KV IN FM:3

24KV
IN

Wire properties
XP Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

24KV
IN

Wire properties
XR Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

PREVIOUS PAGE. 23 NEXT PAGE. 25

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL SUPPLY DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 24 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XV1 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

24KV
IN

Wire properties
XV2 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

24KV
IN

Wire properties
XV3 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
F50.X13:10 IN 24KV
F50.X13:9 IN 24KV

24KV
IN

Wire properties
XVP Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

PREVIOUS PAGE. 24 NEXT PAGE. 26

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL VT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 25 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XE Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
X1:24 IN 24KV 24KV IN SE1:1
SE1:2 IN 24KV 24KV IN XB:13
24KV IN SE1:3
24KV IN SE1:5
24KV IN SE2:1
24KV IN SE1:7
SE1:4 IN 24KV 24KV IN HES:3
SE1:6 IN 24KV 24KV IN HES:2
24KV IN RES:13
SE2:2 IN 24KV 24KV IN F50.X11:11
SE1:8 IN 24KV 24KV IN F50.X11:13
24KV IN SE1:9
SE1:10 IN 24KV
24KV IN SE2:3
SE2:4 IN 24KV
24KV IN SE2:5
SE2:6 IN 24KV
24KV IN SE2:7
SE2:8 IN 24KV
24KV IN SE2:9
SE2:10 IN 24KV
24KV IN RES:9
RES:1 IN 24KV
24KV IN RES:10
RES:2 IN 24KV
24KV IN RES:11
RES:3 IN 24KV
24KV IN RES:12
RES:4 IN 24KV

PREVIOUS PAGE. 25 NEXT PAGE. 27

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL ES DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 26 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XT Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
24KV IN VTT:37
24KV IN VTT:41
VTT:38 IN 24KV 24KV IN HVT:X1
VTT:42 IN 24KV 24KV IN HVS:X1
24KV IN VTT:43
VTT:44 IN 24KV
24KV IN VTT:45
VTT:46 IN 24KV
24KV IN VTT:47
VTT:48 IN 24KV
24KV IN VTT:49
VTT:50 IN 24KV
24KV IN VTT:51
VTT:52 IN 24KV
24KV IN VTT:53
VTT:54 IN 24KV
24KV IN VTT:55
VTT:56 IN 24KV
24KV IN VTT:57
VTT:58 IN 24KV

PREVIOUS PAGE. 26 NEXT PAGE. 28

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL VT TRUCK DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 27 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XB Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
FM:2 IN 24KV 24KV IN CB:25
CB:35 IN 24KV 24KV IN FM:4
X1:12 IN 24KV 24KV IN CB:4
CB:14 IN 24KV
CB:30 IN 24KV
CB:20 IN 24KV
SCO1:7 IN 24KV 24KV IN CB:31
F50.X10:22 IN 24KV
F50.X10:18 IN 24KV 24KV IN CB:8

24KV IN CB:41
CB:18 IN 24KV
XE:2 IN 24KV 24KV IN CB:10
X1:20 IN 24KV 24KV IN CB:49
24KV IN CB:11
24KV IN CB:12
24KV IN CB:23
24KV IN CB:5
24KV IN CB:24
CB:50 IN 24KV 24KV IN HT1:X1
CB:51 IN 24KV 24KV IN HS1:X1
CB:22 IN 24KV 24KV IN SCO1:4
CB:21 IN 24KV 24KV IN SCO1:2
CB:47 IN 24KV
24KV IN VD1:COM
CB:33 IN 24KV 24KV IN F50.X11:3
CB:15 IN 24KV 24KV IN F50.X11:5
CB:34 IN 24KV 24KV IN F50.X11:7
24KV IN CB:57
CB:58 IN 24KV
24KV IN CB:52
CB:53 IN 24KV 24KV IN F50.X11:8
24KV IN F50.X11:10
24KV IN CB:6
CB:16 IN 24KV
24KV IN CB:28
CB:38 IN 24KV
24KV IN CB:26
CB:36 IN 24KV
24KV IN CB:29
CB:39 IN 24KV
24KV IN CB:7
CB:17 IN 24KV
24KV IN CB:9
CB:19 IN 24KV

PREVIOUS PAGE. 27 NEXT PAGE. 29

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL CB DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 28 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XB Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
24KV IN CB:12
CB:48 IN 24KV
24KV IN CB:55
CB:56 IN 24KV

PREVIOUS PAGE. 28 NEXT PAGE. 30

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL CB DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 29 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XF1 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
XAC:1 IN 24KV
XAC:2 IN 24KV
XDC:1 IN 24KV
XDC:2 IN 24KV

24KV
IN

Wire properties
XF2 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
XVP:1 IN 24KV
XVP:2 IN 24KV
XVP:3 IN 24KV
XVP:4 IN 24KV
X2:1 IN 24KV
X2:2 IN 24KV
X2:3 IN 24KV
X2:4 IN 24KV
X2:6 IN 24KV
X2:7 IN 24KV
X2:8 IN 24KV
X2:9 IN 24KV
X2:10 IN 24KV
X2:11 IN 24KV
X2:12 IN 24KV
X2:13 IN 24KV
X2:14 IN 24KV
X2:15 IN 24KV
X2:16 IN 24KV
X2:17 IN 24KV

24KV
IN

Wire properties
XF3 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
X2:18 IN 24KV
X2:19 IN 24KV
X2:20 IN 24KV

PREVIOUS PAGE. 29 NEXT PAGE. 31

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL PLUG CONNECT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 30 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XF3 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length
X2:21 IN 24KV
X2:22 IN 24KV
X2:23 IN 24KV
X2:24 IN 24KV
X2:25 IN 24KV
X2:26 IN 24KV
X2:27 IN 24KV
X2:28 IN 24KV
X2:29 IN 24KV
X2:30 IN 24KV
X2:31 IN 24KV
X2:32 IN 24KV
X2:33 IN 24KV

24KV
IN

Wire properties
XM1 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

24KV
IN

Wire properties
XM2 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

PREVIOUS PAGE. 30 NEXT PAGE. 32

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL PLUG CONNECT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 31 TOTAL : 32
0 1 2 3 4 5 6 7 8 9

24KV
IN

Wire properties
XM2 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

24KV
IN

Wire properties
XM3 Wire properties
Length Core Cable ID Device ID Location Installation Colour Size Number Jumper Number Size Colour Installation Location Device ID Cable ID Core Length

PREVIOUS PAGE. 31 NEXT PAGE.

11.09.2019 APPROVED BY : L.D.TRUNG TITLE CUSTOMER : SUNGLIM.TT CO.,LTD = 24KV + IN SCALE 1:1
11.09.2019 CHECKED BY : D.M.DUNG PROJECT : JOB NO : LSX 07.62.19
11.09.2019 DESIGNED BY : D.V.THAI
TERMINAL PLUG CONNECT DWG NO : MV
BAU ZON SOLAR POWER PLANT SUBSTATION
Rev. DESCRIPTION DATE PARTICIPANTS SIGNATURE PAGE : 32 TOTAL : 32