MARKET ANALYSIS

OF
STANDARD SCHEDULE RATES 2010

MILITARY ENGINEER SERVICES


PREFACE

It is a mystery for each one of us how SSR has been made, what constants
are considered, whether material rates includes overhead and profit or not. In
order to overcome this, an effort has been made to compile Market Analysis of
SSR 2010 Items. It contains market analysis of all items of different section
except Section 19 “Electrical Work”, Section 22 “Heating, Ventilation & Air
Conditioning”, Section 23 “Lift”, Section 26 “Solar Heater System”, Section 27
“Fire Hydrant”, Section 28 “Inclinator” and Section 29 “Rain Water Harvesting”.
The item numbers used are same as given in SSR 2010. However wherever a
table is made in SSR, each column of the table is given number from 0.01to 0.15
depending on number of column.

I am very thankful to all who shared data with me and worked with me for
compiling this document. I hope this data will be useful to all MES officers,
Subordinates and Contractors. This data will ensure uniformity while preparing
market analysis as well as environment will be aware of the constants, factors
and wastage considered against each item.

I am also thankful to my wife and children to support me when I was


involved in compiling this data and could not give adequate time to them. Any
error in compiling data is regretted. I request all users to mail me any error if
noticed so that I can correct the same.

Narendra Saigal
Director (Contracts)
Military Engineer Services
Email:narendrasaigal@gmail.com
Standard Schedule Rate 2010
Earth Work
ITEM No. 3001.01
Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in Soft/loose Soil
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.01 1.69
2 Mazdoor-man, 1 Day Rs. 169.00 0.07 11.83
Rs.13.52
After rounding off: Rs.15.90 Total Amount of M and L Rs.13.52
Add 17.5 % OH and CP Rs.2.37
Total Rs.15.89

ITEM No. 3001.02


Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in Hard/Dense soil
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.12 20.28
Rs.23.66
After rounding off: Rs.27.80 Total Amount of M and L Rs.23.66
Add 17.5 % OH and CP Rs.4.14
Total Rs.27.80

ITEM No. 3001.03


Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in Mud.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.025 4.225
2 Mazdoor-man, 1 Day Rs. 169.00 0.2 33.8
Rs.38.03
After rounding off: Rs.44.70 Total Amount of M and L Rs.38.03
Add 17.5 % OH and CP Rs.6.65
Total Rs.44.68

ITEM No. 3001.04


Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in Soft / disintegrated
rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.03 5.07
2 Mazdoor-man, 1 Day Rs. 169.00 0.28 47.32
Rs.52.39
After rounding off: Rs.61.60 Total Amount of M and L Rs.52.39
Add 17.5 % OH and CP Rs.9.17
Total Rs.61.56

2 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3001.05
Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in Hard rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.08 13.52
2 Mazdoor-man, 1 Day Rs. 169.00 0.58 98.02
Rs.111.54
After rounding off: Rs.131.10 Total Amount of M and L Rs.111.54
Add 17.5 % OH and CP Rs.19.52
Total Rs.131.06

ITEM No. 3002.01


Add to (or deduct from) last item for every 3 cm or part thereof above or below 15 cm depth, Soft / loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.001 0.169
Rs.1.86
After rounding off: Rs.2.20 Total Amount of M and L Rs.1.86
Add 17.5 % OH and CP Rs.0.33
Total Rs.2.18

ITEM No. 3002.02


Add to (or deduct from) last item for every 3 cm or part thereof above or below 15 cm depth, Hard / dense soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.012 2.028
2 Mate 1 Day Rs. 169.00 0.002 0.338
Rs.2.37
After rounding off: Rs.2.80 Total Amount of M and L Rs.2.37
Add 17.5 % OH and CP Rs.0.41
Total Rs.2.78

ITEM No. 3002.03


Add to (or deduct from) last item for every 3 cm or part thereof above or below 15 cm depth, Mud.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.003 0.507
2 Mazdoor-man, 1 Day Rs. 169.00 0.024 4.056
Rs.4.56
After rounding off: Rs.5.40 Total Amount of M and L Rs.4.56
Add 17.5 % OH and CP Rs.0.80
Total Rs.5.36

3 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3002.04
Add to (or deduct from) last item for every 3 cm or part thereof above or below 15 cm depth, Soft
/disintegrated rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.0025 0.4225
2 Mazdoor-man, 1 Day Rs. 169.00 0.03 5.07
Rs.5.49
After rounding off: Rs.6.50 Total Amount of M and L Rs.5.49
Add 17.5 % OH and CP Rs.0.96
Total Rs.6.45

ITEM No. 3002.05


Add to (or deduct from) last item for every 3 cm or part thereof above or below 15 cm depth, Hard rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.01 1.69
2 Mazdoor-man, 1 Day Rs. 169.00 0.06 10.14
Rs.11.83
After rounding off: Rs.13.90 Total Amount of M and L Rs.11.83
Add 17.5 % OH and CP Rs.2.07
Total Rs.13.90

ITEM No. 3003.01


Rough excavation not exceeding 1.5 m deep and getting out in, Soft / loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.03 5.07
2 Mazdoor-man, 1 Day Rs. 169.00 0.24 40.56
Rs.45.63
After rounding off: Rs.53.60 Total Amount of M and L Rs.45.63
Add 17.5 % OH and CP Rs.7.99
Total Rs.53.62

ITEM No. 3003.02


Rough excavation not exceeding 1.5 m deep and getting out in, Hard / dense soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.05 8.45
2 Mazdoor-man, 1 Day Rs. 169.00 0.46 77.74
Rs.86.19
After rounding off: Rs.101.30 Total Amount of M and L Rs.86.19
Add 17.5 % OH and CP Rs.15.08
Total Rs.101.27

4 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3003.03
Rough excavation not exceeding 1.5 m deep and getting out in, Mud.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.08 13.52
2 Mazdoor-man, 1 Day Rs. 169.00 0.8 135.2
Rs.148.72
After rounding off: Rs.174.70 Total Amount of M and L Rs.148.72
Add 17.5 % OH and CP Rs.26.03
Total Rs.174.75

ITEM No. 3003.04


Rough excavation not exceeding 1.5 m deep and getting out in, Soft /disintegrated rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.04 175.76
2 Mate 1 Day Rs. 169.00 0.12 20.28
Rs.196.04
After rounding off: Rs.230.30 Total Amount of M and L Rs.196.04
Add 17.5 % OH and CP Rs.34.31
Total Rs.230.35

ITEM No. 3003.05


Rough excavation not exceeding 1.5 m deep and getting out in, Hard rock.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Blasting powder 1 Kg Rs. 49.99 0.4 19.996
2 Safty fuse No. 11 1 No. Rs. 20.00 3.23 64.6
Rs.84.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
2 Mate 1 Day Rs. 169.00 0.18 30.42
Rs.294.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.450.20 Total Amount of M and L Rs.383.16
Add 17.5 % OH and CP Rs.67.05
Total Rs.450.21

5 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3004.01
Excavating over areas, not exceeding 1.5 m deep and getting out Soft / loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.04 6.76
2 Mazdoor-man, 1 Day Rs. 169.00 0.35 59.15
Rs.65.91
After rounding off: Rs.77.40 Total Amount of M and L Rs.65.91
Add 17.5 % OH and CP Rs.11.53
Total Rs.77.44

ITEM No. 3004.02


Excavating over areas, not exceeding 1.5 m deep and getting out Hard / dense soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.62 104.78
2 Mate 1 Day Rs. 169.00 0.06 10.14
Rs.114.92
After rounding off: Rs.135.00 Total Amount of M and L Rs.114.92
Add 17.5 % OH and CP Rs.20.11
Total Rs.135.03

ITEM No. 3004.03


Excavating over areas, not exceeding 1.5 m deep and getting out Mud.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.1 16.9
2 Mazdoor-man, 1 Day Rs. 169.00 1.02 172.38
Rs.189.28
After rounding off: Rs.222.40 Total Amount of M and L Rs.189.28
Add 17.5 % OH and CP Rs.33.12
Total Rs.222.40

ITEM No. 3004.04


Excavating over areas, not exceeding 1.5 m deep and getting out Soft /disintegrated rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.41 238.29
2 Mate 1 Day Rs. 169.00 0.14 23.66
Rs.261.95
After rounding off: Rs.307.80 Total Amount of M and L Rs.261.95
Add 17.5 % OH and CP Rs.45.84
Total Rs.307.79

6 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3004.05
Excavating over areas, not exceeding 1.5 m deep and getting out Hard rock.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Blasting powder 1 Kg Rs. 49.99 0.4 19.996
2 Safty fuse No. 11 1 No. Rs. 20.00 5 100
Rs.120.00
Labour
1 Mate 1 Day Rs. 169.00 0.21 35.49
2 Mazdoor-man, 1 Day Rs. 169.00 2.12 358.28
Rs.393.77
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.609.00 Total Amount of M and L Rs.518.27
Add 17.5 % OH and CP Rs.90.70
Total Rs.608.96

ITEM No. 3005.01


Add to items 03003 and 03004 for each additional 1.5 m or part thereof in depth beyond the first 1.5m Soft /
loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
Rs.40.56
After rounding off: Rs.47.70 Total Amount of M and L Rs.40.56
Add 17.5 % OH and CP Rs.7.10
Total Rs.47.66

ITEM No. 3005.02


Add to item 3003 and 3004 for each additional 1.5m or part there of in depth beyond the first 1.5m in hard soil
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
2 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.40.56
After rounding off: Rs.47.70 Total Amount of M and L Rs.40.56
Add 17.5 % OH and CP Rs.7.10
Total Rs.47.66

7 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3005.03
Add to item 03003 and 03004 for each additional 1.5m or part thereof in depth beyond the first 1.5m Mud.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.23 38.87
Rs.42.25
After rounding off: Rs.49.60 Total Amount of M and L Rs.42.25
Add 17.5 % OH and CP Rs.7.39
Total Rs.49.64

ITEM No. 3005.04


Add to item 03003 and 03004 for each additional 1.5m or part thereof in depth beyond the first 1.5m Soft
/disintegrated rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.03 5.07
2 Mazdoor-man, 1 Day Rs. 169.00 0.26 43.94
Rs.49.01
After rounding off: Rs.57.60 Total Amount of M and L Rs.49.01
Add 17.5 % OH and CP Rs.8.58
Total Rs.57.59

ITEM No. 3005.05


Add to item 03003 and 03004 for each additional 1.5m or part thereof in depth beyond the first 1.5m Hard
rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.03 5.07
2 Mazdoor-man, 1 Day Rs. 169.00 0.26 43.94
Rs.49.01
After rounding off: Rs.57.60 Total Amount of M and L Rs.49.01
Add 17.5 % OH and CP Rs.8.58
Total Rs.57.59

ITEM No. 3006.01


Excavation in trenches, n. exc. 1.5 m wide and n.exc 1.5 m in depth ;for foundation, etc or for
shaft,well,cesspit,manhole,pier holes etc.n. exc. 10 sq m on plan and n. exc. 1.5 m in depth and getting out
soft/loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.0532 8.9908
2 Mazdoor-man, 1 Day Rs. 169.00 0.527 89.063
Rs.98.05
After rounding off: Rs.115.20 Total Amount of M and L Rs.98.05
Add 17.5 % OH and CP Rs.17.16
Total Rs.115.21

8 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3006.02
Excavation in trenches, n. exc. 1.5 m wide and n.exc 1.5 m in depth ;for foundation, etc or for
shaft,well,cesspit,manhole,pier hole etc.n. exc. 10 sq m on plan and n. exc. 1.5 m in depth and getting out
Hard/Dense soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.0927 15.6663
2 Mazdoor-man, 1 Day Rs. 169.00 0.927 156.663
Rs.172.33
After rounding off: Rs.202.50 Total Amount of M and L Rs.172.33
Add 17.5 % OH and CP Rs.30.16
Total Rs.202.49

ITEM No. 3006.03


Excavation in trenches, n. exc. 1.5 m wide and n.exc 1.5 m in depth ;for foundation, etc or
shaft,well,cesspit,manhole,pier holes etc.n. exc. 10 sq m on plan and n. exc. 1.5 m in depth and getting out
Mud.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.5275 258.1475
2 Mate 1 Day Rs. 169.00 0.1527 25.8063
Rs.283.95
After rounding off: Rs.333.60 Total Amount of M and L Rs.283.95
Add 17.5 % OH and CP Rs.49.69
Total Rs.333.65

ITEM No. 3006.04


Excavation in trenches, n. exc. 1.5 m wide and n.exc 1.5 m in depth ;for foundation, etc or for
shaft,well,cesspit,manhole,pier holes etc.n. exc. 10 sq m on plan and n. exc. 1.5 m in depth and getting out
soft/disintregated rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.118 357.942
2 Mate 1 Day Rs. 169.00 0.212 35.828
Rs.393.77
After rounding off: Rs.462.70 Total Amount of M and L Rs.393.77
Add 17.5 % OH and CP Rs.68.91
Total Rs.462.68

9 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3006.05
Excavation in trenches, n. exc. 1.5 m wide and n.exc 1.5 m in depth ;for foundation, etc or for
shaft,well,cesspit,manhole,pier holes etc.n. exc. 10 sq m on plan and n. exc. 1.5 m in depth and getting out
soft/disintregated rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.938 665.522
2 Mate 1 Day Rs. 169.00 0.3935 66.5015
Rs.732.02
After rounding off: Rs.860.10 Total Amount of M and L Rs.732.02
Add 17.5 % OH and CP Rs.128.10
Total Rs.860.13

ITEM No. 3007.01


Add to items 03006 for each additional 1.5 m or part thereof in depth beyond the first 1.5m Soft / loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
Rs.40.56
After rounding off: Rs.47.70 Total Amount of M and L Rs.40.56
Add 17.5 % OH and CP Rs.7.10
Total Rs.47.66

ITEM No. 3007.02


Add to items 03006 for each additional 1.5 m or part thereof in depth beyond the first 1.5m Hard/Dence soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
2 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.40.56
After rounding off: Rs.47.70 Total Amount of M and L Rs.40.56
Add 17.5 % OH and CP Rs.7.10
Total Rs.47.66

ITEM No. 3007.03


Add to items 03006 for each additional 1.5 m or part thereof in depth beyond the first 1.5m Mud.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.23 38.87
2 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.42.25
After rounding off: Rs.49.60 Total Amount of M and L Rs.42.25
Add 17.5 % OH and CP Rs.7.39
Total Rs.49.64

10 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3007.04
Add to items 03006 for each additional 1.5 m or part thereof in depth beyond the first 1.5m Soft /disintregated
rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.26 43.94
2 Mate 1 Day Rs. 169.00 0.03 5.07
Rs.49.01
After rounding off: Rs.57.60 Total Amount of M and L Rs.49.01
Add 17.5 % OH and CP Rs.8.58
Total Rs.57.59

ITEM No. 3007.05


Add to items 03006 for each additional 1.5 m or part thereof in depth beyond the first 1.5m Hard rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.03 5.07
2 Mazdoor-man, 1 Day Rs. 169.00 0.26 43.94
Rs.49.01
After rounding off: Rs.57.60 Total Amount of M and L Rs.49.01
Add 17.5 % OH and CP Rs.8.58
Total Rs.57.59

ITEM No. 3008.01


Add to items 03004 to 03007 for scooping out from inside and below the steining in well sinking including use
of dredgers and all other appliances, erection and removal of weighed platform and working in water
(measurement shall be for area bound by external circumference/perimeter of wall x depth sunk) Soft / loose
soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Well sinker 1 Day Rs. 192.00 0.8 153.6
2 Mazdoor-man, 1 Day Rs. 169.00 1.6 270.4
Rs.424.00
Sundry
1 Sundries 1 Re Rs. 9.00 0.65 5.85
Rs.5.85
After rounding off: Rs.505.10 Total Amount of M and L Rs.429.85
Add 17.5 % OH and CP Rs.75.22
Total Rs.505.07

11 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3008.02
Add to items 03004 to 03007 for scooping out from inside and below the steining in well sinking including use
of dredgers and all other appliances, erection and removal of weighed platform and working in water
(measurement shall be for area bound by external circumference/perimeter of wall x depth sunk) Hard /
dense soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
2 Well sinker 1 Day Rs. 192.00 0.87 167.04
Rs.450.96
Sundry
1 Sundries 1 Re Rs. 9.00 0.65 5.85
Rs.5.85
After rounding off: Rs.536.80 Total Amount of M and L Rs.456.81
Add 17.5 % OH and CP Rs.79.94
Total Rs.536.75

ITEM No. 3009.01


Returning, filling in, including spreading, levelling watering and well ramming in layers not exceeding 25 cm.
Soft / loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.02 3.38
3 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
Rs.35.49
After rounding off: Rs.41.70 Total Amount of M and L Rs.35.49
Add 17.5 % OH and CP Rs.6.21
Total Rs.41.70

ITEM No. 3009.02


Returning, filling in, including spreading, levelling watering and well ramming in layers not exceeding 25 cm.
Hard / dense soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.02 3.38
3 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
Rs.35.49
After rounding off: Rs.41.70 Total Amount of M and L Rs.35.49
Add 17.5 % OH and CP Rs.6.21
Total Rs.41.70

12 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3009.04
Returning, filling in, including spreading, levelling watering and well ramming in layers not exceeding 25 cm.
Soft /disintegrated rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.02 3.38
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.47.32
After rounding off: Rs.55.60 Total Amount of M and L Rs.47.32
Add 17.5 % OH and CP Rs.8.28
Total Rs.55.60

ITEM No. 3010.01


Excavating in post holes (or similar holes ) each not exceeding 0.5 cu. m. getting out, returning, filling in and
ramming earth or broken rubble mixed with earth around, in layers not exceeding 25cm, watering, and
removing surplus spoil to a distance n. exc 50mand making good surface Soft / loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.36 60.84
2 Mate 1 Day Rs. 169.00 0.03 5.07
3 Bhisty including mussack 1 Day Rs. 169.00 0.002 0.338
Rs.66.25
After rounding off: Rs.77.80 Total Amount of M and L Rs.66.25
Add 17.5 % OH and CP Rs.11.59
Total Rs.77.84

ITEM No. 3010.02


Excavating in post holes (or similar holes ) each not exceeding 0.5 cu. m. getting out, returning, filling in and
ramming earth or broken rubble mixed with earth around, in layers not exceeding 25cm, watering, and
removing surplus spoil to a distance n. exc 50mand making good surface Hard / dense soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.002 0.338
2 Mate 1 Day Rs. 169.00 0.045 7.605
3 Mazdoor-man, 1 Day Rs. 169.00 0.53 89.57
Rs.97.51
After rounding off: Rs.114.60 Total Amount of M and L Rs.97.51
Add 17.5 % OH and CP Rs.17.06
Total Rs.114.58

13 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3010.03
Excavating in post holes (or similar holes ) each not exceeding 0.5 cu. m. getting out, returning, filling in and
ramming earth or broken rubble mixed with earth around, in layers not exceeding 25cm, watering, and
removing surplus spoil to a distance n. exc 50mand making good surface Soft /disintegrated rock.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.002 0.338
2 Mate 1 Day Rs. 169.00 0.106 17.914
3 Mazdoor-man, 1 Day Rs. 169.00 1.063 179.647
Rs.197.90
After rounding off: Rs.232.50 Total Amount of M and L Rs.197.90
Add 17.5 % OH and CP Rs.34.63
Total Rs.232.53

ITEM No. 3010.04


Excavating in post holes (or similar holes ) each not exceeding 0.5 cu. m. getting out, returning, filling in and
ramming earth or broken rubble mixed with earth around, in layers not exceeding 25cm, watering, and
removing surplus spoil to a distance n. exc 50mand making good surface Hard Rock
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Safty fuse No. 11 1 No. Rs. 20.00 0.2 4
2 Blasting powder 1 Kg Rs. 49.99 1.28 63.9872
Rs.67.99
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.002 0.338
2 Mazdoor-man, 1 Day Rs. 169.00 1.063 179.647
3 Mate 1 Day Rs. 169.00 0.106 17.914
Rs.197.90
After rounding off: Rs.312.40 Total Amount of M and L Rs.265.89
Add 17.5 % OH and CP Rs.46.53
Total Rs.312.42

ITEM No. 3011.01


Surface dressing not exceeding 15 cm deep Soft/loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.03 5.07
2 Mate 1 Day Rs. 169.00 0.01 1.69
Rs.6.76
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.76
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.94

14 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3011.02
Surface dressing not exceeding 15 cm deep Hard / dense soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.0105 1.7745
2 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
Rs.8.53
After rounding off: Rs.10.00 Total Amount of M and L Rs.8.53
Add 17.5 % OH and CP Rs.1.49
Total Rs.10.03

ITEM No. 3012.01


Site Clearance Soft/loose soil.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.0066 1.1154
2 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
Rs.4.50
After rounding off: Rs.5.30 Total Amount of M and L Rs.4.50
Add 17.5 % OH and CP Rs.0.79
Total Rs.5.28

ITEM No. 3013.01


Use and waste of timbering as planking and strutting for excavations in trenches in soil, including wales, struts,
open poling boards, etc. as may be necessary and fixing and removal with materials and labour, Not exceeding
1.5 m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.003 54
Rs.54.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
2 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.15.76
After rounding off: Rs.82.00 Total Amount of M and L Rs.69.76
Add 17.5 % OH and CP Rs.12.21
Total Rs.81.97

15 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3013.02
Use and waste of timbering as planking and strutting for excavations in trenches in soil, including wales, struts,
open poling boards, etc. as may be necessary and fixing and removal with materials and labour, Exceeding 1.5
m and not exceeding 3m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0035 63
Rs.63.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
2 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.19.70
After rounding off: Rs.97.20 Total Amount of M and L Rs.82.70
Add 17.5 % OH and CP Rs.14.47
Total Rs.97.17

ITEM No. 3013.03


Use and waste of timbering as planking and strutting for excavations in trenches in soil, including wales, struts,
open poling boards, etc. as may be necessary and fixing and removal with materials and labour, Exceeding 3m
and not exceeding 5m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.004 72
Rs.72.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.06 10.14
2 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.23.64
After rounding off: Rs.112.40 Total Amount of M and L Rs.95.64
Add 17.5 % OH and CP Rs.16.74
Total Rs.112.38

ITEM No. 3013.04


Use and waste of timbering as planking and strutting for excavations in trenches in soil, including wales, struts,
open poling boards, etc. as may be necessary and fixing and removal , Not Exceeding 1.5 m deep (except
timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
2 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
Rs.15.76
After rounding off: Rs.18.50 Total Amount of M and L Rs.15.76
Add 17.5 % OH and CP Rs.2.76
Total Rs.18.52

16 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3013.05
Use and waste of timbering as planking and strutting for excavations in trenches in soil, including wales, struts,
open poling boards, etc. as may be necessary and fixing and removal, Exceeding 1.5 m and not Exceeding 3m
deep (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
Rs.19.70
After rounding off: Rs.23.10 Total Amount of M and L Rs.19.70
Add 17.5 % OH and CP Rs.3.45
Total Rs.23.15

ITEM No. 3013.06


Use and waste of timbering as planking and strutting for excavations in trenches in soil, including wales, struts,
open poling boards, etc. as may be necessary and fixing and removal , Exceeding 3m and not Exceeding 5m
deep. (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.06 10.14
2 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.23.64
After rounding off: Rs.27.80 Total Amount of M and L Rs.23.64
Add 17.5 % OH and CP Rs.4.14
Total Rs.27.78

ITEM No. 3014.01


Use and waste of timbering as planking and strutting for excavations in shafts, wells, cesspits, manholes and
pier holes in soil, including wales, struts, open poling boards, etc. as may be necessary and fixing and remocal
with materials and labour Not exceeding 1.5 m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.003 54
Rs.54.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.07 15.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.07 11.83
Rs.27.58
After rounding off: Rs.95.90 Total Amount of M and L Rs.81.58
Add 17.5 % OH and CP Rs.14.28
Total Rs.95.86

17 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3014.02
Use and waste of timbering as planking and strutting for excavations in shafts, wells, cesspits, manholes and
pier holes in soil, including wales, struts, open poling boards, etc. as may be necessary and fixing and remocal
with materials and labour , Exceeding 1.5 m and not exceeding 3m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0035 63
Rs.63.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.08 18
2 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
Rs.31.52
After rounding off: Rs.111.10 Total Amount of M and L Rs.94.52
Add 17.5 % OH and CP Rs.16.54
Total Rs.111.06

ITEM No. 3014.03


Use and waste of timbering as planking and strutting for excavations in shafts, wells, cesspits, manholes and
pier holes in soil, including wales, struts, open poling boards, etc. as may be necessary and fixing and remocal
with materials and labour Exceeding 3m and not exceeding 5m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.004 72
Rs.72.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.09 15.21
Rs.35.46
After rounding off: Rs.126.30 Total Amount of M and L Rs.107.46
Add 17.5 % OH and CP Rs.18.81
Total Rs.126.27

ITEM No. 3014.04


Use and waste of timbering as planking and strutting for excavations in shafts, wells, cesspits, manholes and
pier holes in soil, including wales, struts, open poling boards, etc. as may be necessary and fixing and removal,
Not exceeding 1.5 m (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.07 11.83
2 Carpenter, joiner 1 Day Rs. 225.00 0.07 15.75
Rs.27.58
After rounding off: Rs.32.40 Total Amount of M and L Rs.27.58
Add 17.5 % OH and CP Rs.4.83
Total Rs.32.41

18 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3014.05
Use and waste of timbering as planking and strutting for excavations in shafts, wells, cesspits, manholes and
pier holes in soil, including wales, struts, open poling boards, etc. as may be necessary and fixing and removal,
Exceeding 1.5 m and not Exceeding 3 m deep (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
2 Carpenter, joiner 1 Day Rs. 225.00 0.08 18
Rs.31.52
After rounding off: Rs.37.00 Total Amount of M and L Rs.31.52
Add 17.5 % OH and CP Rs.5.52
Total Rs.37.04

ITEM No. 3014.06


Use and waste of timbering as planking and strutting for excavations in shafts, wells, cesspits, manholes and
pier holes in soil, including wales, struts, open poling boards, etc. as may be necessary and fixing and removal
Exceeding 3 m and not Exceeding 5 m deep (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.09 15.21
2 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.35.46
After rounding off: Rs.41.70 Total Amount of M and L Rs.35.46
Add 17.5 % OH and CP Rs.6.21
Total Rs.41.67

ITEM No. 3015.01


Use and waste of timbering as planking and strutting for excavatiing over areas in soil (as for basemnts, etc.)
and including use and waste of raking shores and fixing and removal with materials and labour Not exceeding
1.5 m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.003 54
Rs.54.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
2 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.19.70
After rounding off: Rs.86.60 Total Amount of M and L Rs.73.70
Add 17.5 % OH and CP Rs.12.90
Total Rs.86.60

19 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3015.02
Use and waste of timbering as planking and strutting for excavatiing over areas in soil (as for basemnts, etc.)
and including use and waste of raking shores and fixing and removal with materials and labour Exceeding 1.5
m and not exceeding 3m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.003491 62.838
Rs.62.84
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.06 10.14
Rs.23.64
After rounding off: Rs.101.60 Total Amount of M and L Rs.86.48
Add 17.5 % OH and CP Rs.15.13
Total Rs.101.61

ITEM No. 3015.03


Use and waste of timbering as planking and strutting for excavatiing over areas in soil (as for basemnts, etc.)
and including use and waste of raking shores and fixing and removal with materials and labour Exceeding 3 m
and not exceeding 5 m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.004 72
Rs.72.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.07 15.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.07 11.83
Rs.27.58
After rounding off: Rs.117.00 Total Amount of M and L Rs.99.58
Add 17.5 % OH and CP Rs.17.43
Total Rs.117.01

ITEM No. 3015.04


Use and waste of timbering as planking and strutting for excavatiing over areas in soil (as for basemnts, etc.)
and including use and waste of raking shores and fixing and removal Not Exceeding 1.5 m deep (except timber
).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
2 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.19.70
After rounding off: Rs.23.10 Total Amount of M and L Rs.19.70
Add 17.5 % OH and CP Rs.3.45
Total Rs.23.15

20 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3015.05
Use and waste of timbering as planking and strutting for excavatiing over areas in soil (as for basemnts, etc.)
and including use and waste of raking shoress and fixing and removal Exceeding 1.5 m and not Exceeding 3m
deep (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.06 10.14
2 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.23.64
After rounding off: Rs.27.80 Total Amount of M and L Rs.23.64
Add 17.5 % OH and CP Rs.4.14
Total Rs.27.78

ITEM No. 3015.06


Use and waste of timbering as planking and strutting for excavatiing over areas in soil (as for basemnts, etc.)
and including use and waste of raking shores and fixing and removal Exceeding 3m and not Exceeding 5m
deep.(except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.07 11.83
2 Carpenter, joiner 1 Day Rs. 225.00 0.07 15.75
Rs.27.58
After rounding off: Rs.32.40 Total Amount of M and L Rs.27.58
Add 17.5 % OH and CP Rs.4.83
Total Rs.32.41

ITEM No. 3016.01


Extra only on item no 03013 to 03015 above if tightly driven close butt-jointed sheating is ordered including
packing cavities behind the sheeting with suitable material where necessary with material and labour Not
exceeding 1.5 m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.002 36
Rs.36.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
2 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
Rs.6.30
After rounding off: Rs.49.70 Total Amount of M and L Rs.42.30
Add 17.5 % OH and CP Rs.7.40
Total Rs.49.71

21 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3016.02
Extra only on item 03013 to 03015 above if tightly driven close butt-jointed sheating is ordered including
packing cavities behind thesheeting with suitable material where necessary with material and labour
Exceeding 1.5 m and not exceeding 3m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.002 36
Rs.36.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
2 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.7.88
After rounding off: Rs.51.60 Total Amount of M and L Rs.43.88
Add 17.5 % OH and CP Rs.7.68
Total Rs.51.56

ITEM No. 3016.03


Extra only on item no 03013 to 03015 above if tightly driven close butt-jointed sheating is ordered including
packing cavities behind the sheeting with suitable material where necessary with material and labour
Exceeding 3m and not exceeding 5m deep.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.002 36
Rs.36.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.03 5.07
2 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.11.82
After rounding off: Rs.56.20 Total Amount of M and L Rs.47.82
Add 17.5 % OH and CP Rs.8.37
Total Rs.56.19

ITEM No. 3016.04


Extra only on item no 03013 to 03015 above if tightly driven close butt-jointed sheating is ordered including
packing cavities behind the sheeting with suitable material where necessary Not Exceeding 1.5 m deep
(except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
2 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
Rs.6.30
After rounding off: Rs.7.40 Total Amount of M and L Rs.6.30
Add 17.5 % OH and CP Rs.1.10
Total Rs.7.41

22 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3016.05
Extra only on item 03013 to 03015 above if tightly driven close butt-jointed sheating is ordered including
packing cavities behind the sheeting with suitable material where necessary Exceeding 1.5 m and not
Exceeding 3m deep (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
Rs.7.88
After rounding off: Rs.9.30 Total Amount of M and L Rs.7.88
Add 17.5 % OH and CP Rs.1.38
Total Rs.9.26

ITEM No. 3016.06


Extra only on item 03013 to 03015 above if tightly driven close butt-jointed sheating is ordered including
packing cavities behind the sheeting with suitable material where necessary Exceeding 3m and not Exceeding
5m deep (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.03 5.07
Rs.11.82
After rounding off: Rs.13.90 Total Amount of M and L Rs.11.82
Add 17.5 % OH and CP Rs.2.07
Total Rs.13.89

ITEM No. 3017


Spreading and levelling in layers not exceeding 25cm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.01 1.69
2 Mazdoor-man, 1 Day Rs. 169.00 0.09 15.21
Rs.16.90
After rounding off: Rs.19.90 Total Amount of M and L Rs.16.90
Add 17.5 % OH and CP Rs.2.96
Total Rs.19.86

ITEM No. 3018


Add for well ramming including watering as required.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.01 1.69
3 Mazdoor-man, 1 Day Rs. 169.00 0.14 23.66
Rs.27.04
After rounding off: Rs.31.80 Total Amount of M and L Rs.27.04
Add 17.5 % OH and CP Rs.4.73
Total Rs.31.77

23 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3019.01
Sand filling under floors or in foundations including watering and consolidation with material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for filling 1 Cum Rs. 500.00 1.1 550
Rs.550.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.14 23.66
2 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
3 Mate 1 Day Rs. 169.00 0.01 1.69
Rs.27.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.016 0.144
Rs.0.14
After rounding off: Rs.678.20 Total Amount of M and L Rs.577.18
Add 17.5 % OH and CP Rs.101.01
Total Rs.678.19

ITEM No. 3019.02


Sand filling under floors or in foundations including watering and consolidation except sand .
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.14 23.66
2 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
3 Mate 1 Day Rs. 169.00 0.01 1.69
Rs.27.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.016 0.144
Rs.0.14
After rounding off: Rs.31.90 Total Amount of M and L Rs.27.18
Add 17.5 % OH and CP Rs.4.76
Total Rs.31.94

ITEM No. 3020.01


Forming embankments including raising (or lowering ) earth, spreading in layers not exceeding 30 cm thick,
watering, ramming/rolling and finishing to required size, shape etc., not exceeding 1.5m high from base Soils.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.02 3.38
3 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
Rs.42.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.50.70 Total Amount of M and L Rs.43.15
Add 17.5 % OH and CP Rs.7.55
Total Rs.50.70

24 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3021.01
Add for each additional 1.5m or part thereof in height above the first 1.5m Soils.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.02 3.38
3 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
Rs.42.25
After rounding off: Rs.49.60 Total Amount of M and L Rs.42.25
Add 17.5 % OH and CP Rs.7.39
Total Rs.49.64

ITEM No. 3022.01


Boring holes 2m deep in soil for under-reamed piles and getting out and disposal of spoil to a distance of not
exceeding 50 m, diameter of piles 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.94 158.86
2 Mate 1 Day Rs. 169.00 0.09 15.21
Rs.174.07
After rounding off: Rs.204.50 Total Amount of M and L Rs.174.07
Add 17.5 % OH and CP Rs.30.46
Total Rs.204.53

ITEM No. 3022.02


Boring holes 2m deep in soil for underreamed piles and getting out and disposal of spoil to a distance of not
exceeding 50 m, diameter of piles 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.13 190.97
2 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.209.56
After rounding off: Rs.246.20 Total Amount of M and L Rs.209.56
Add 17.5 % OH and CP Rs.36.67
Total Rs.246.23

ITEM No. 3022.03


Boring holes 2m deep in soil for unde-rreamed piles and getting out and disposal of spoil to a distance of not
exceeding 50 m diameter of piles 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.13 21.97
2 Mazdoor-man, 1 Day Rs. 169.00 1.31 221.39
Rs.243.36
After rounding off: Rs.285.90 Total Amount of M and L Rs.243.36
Add 17.5 % OH and CP Rs.42.59
Total Rs.285.95

25 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3023.01
Add to above item(03022.01) for each additional under-reaming 200mm diameter of piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.04 6.76
2 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
Rs.69.29
After rounding off: Rs.81.40 Total Amount of M and L Rs.69.29
Add 17.5 % OH and CP Rs.12.13
Total Rs.81.42

ITEM No. 3023.02


Add to above item(03022.02) for each additional unde-rreaming 250mm diameter of piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.47 79.43
2 Mate 1 Day Rs. 169.00 0.05 8.45
Rs.87.88
After rounding off: Rs.103.30 Total Amount of M and L Rs.87.88
Add 17.5 % OH and CP Rs.15.38
Total Rs.103.26

ITEM No. 3023.03


Add to above item (03022.03) for each additional unde-rreaming 300mm diameter of piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.56 94.64
2 Mate 1 Day Rs. 169.00 0.06 10.14
Rs.104.78
After rounding off: Rs.123.10 Total Amount of M and L Rs.104.78
Add 17.5 % OH and CP Rs.18.34
Total Rs.123.12

ITEM No. 3024.01


Add to item 03022.01 for each metre depth (intermediate depths to be paid pro-rate) 200mm diameter of
piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
2 Mate 1 Day Rs. 169.00 0.03 5.07
Rs.47.32
After rounding off: Rs.55.60 Total Amount of M and L Rs.47.32
Add 17.5 % OH and CP Rs.8.28
Total Rs.55.60

26 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3024.02
Add to item 03022.02 for each metre depth (intermediate depths to be paid pro-rate) 250mm diameter of
piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.31 52.39
2 Mate 1 Day Rs. 169.00 0.04 6.76
Rs.59.15
After rounding off: Rs.69.50 Total Amount of M and L Rs.59.15
Add 17.5 % OH and CP Rs.10.35
Total Rs.69.50

ITEM No. 3024.03


Add to item 03022.03 for each metre depth (intermediate depths to be paid pro-rate) 300mm diameter of
piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
2 Mate 1 Day Rs. 169.00 0.04 6.76
Rs.69.29
After rounding off: Rs.81.40 Total Amount of M and L Rs.69.29
Add 17.5 % OH and CP Rs.12.13
Total Rs.81.42

ITEM No. 3025.01


Boring for bored cast in situ piles 16 metres in soil and getting out and disposal of spoil to a distance 50
meteres using DMC method (Direct mud circulation ) 350mm diameter of piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 5.71 964.99
2 Mate 1 Day Rs. 169.00 1.62 273.78
3 Well sinker 1 Day Rs. 192.00 3.22 618.24
4 Roof tiler, thatcher 1 Day Rs. 192.00 0.48 92.16
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.48 92.16
Rs.2,041.33
Plant & Machiner
1 Pile driving machinary 1 Day Rs. 5,000.00 1 5000
Rs.5,000.00
After rounding off: Rs.8,273.60 Total Amount of M and L Rs.7,041.33
Add 17.5 % OH and CP Rs.1,232.23
Total Rs.8,273.56

27 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3025.02
Boring for bored cast in situ piles 16 metres in soil and getting out and disposal of spoil to a distance 50
meteres using DMC method (Direct mud circulation ) 430mm diameter of piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 2.44 412.36
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.74 142.08
3 Well sinker 1 Day Rs. 192.00 4.86 933.12
4 Mazdoor-man, 1 Day Rs. 169.00 8.62 1456.78
5 Pump -Attendant 1 Day Rs. 192.00 0.74 142.08
Rs.3,086.42
Plant & Machiner
1 Pile driving machinary 1 Day Rs. 5,000.00 1 5000
Rs.5,000.00
After rounding off: Rs.9,501.50 Total Amount of M and L Rs.8,086.42
Add 17.5 % OH and CP Rs.1,415.12
Total Rs.9,501.54

ITEM No. 3025.03


Boring for bored cast in situ piles 16 metres in soil and getting out and disposal of spoil to a distance 50
meteres using DMC method (Direct mud circulation ) 500mm diameter of piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 11.65 1968.85
2 Mate 1 Day Rs. 169.00 3.3 557.7
3 Pump -Attendant 1 Day Rs. 192.00 1 192
4 Operator (pneumatic tools) 1 Day Rs. 192.00 1 192
5 Well sinker 1 Day Rs. 192.00 6.58 1263.36
Rs.4,173.91
Plant & Machiner
1 Pile driving machinary 1 Day Rs. 5,000.00 1 5000
Rs.5,000.00
After rounding off: Rs.10,779.30 Total Amount of M and L Rs.9,173.91
Add 17.5 % OH and CP Rs.1,605.43
Total Rs.10,779.34

28 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3026.01
Add/Deduct to above for each metre depth 200mm diameter of piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.36 60.84
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.03 5.76
3 Well sinker 1 Day Rs. 192.00 0.2 38.4
4 Mate 1 Day Rs. 169.00 0.1 16.9
5 Roof tiler, thatcher 1 Day Rs. 192.00 0.03 5.76
Rs.127.66
Plant & Machiner
1 Pile driving machinary 1 Day Rs. 5,000.00 0.06 300
Rs.300.00
After rounding off: Rs.502.50 Total Amount of M and L Rs.427.66
Add 17.5 % OH and CP Rs.74.84
Total Rs.502.50

ITEM No. 3026.02


Add/Deduct to above for each metre depth 250mm diameter of piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.15 25.35
2 Mazdoor-man, 1 Day Rs. 169.00 0.54 91.26
3 Pump -Attendant 1 Day Rs. 192.00 0.05 9.6
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.05 9.6
5 Well sinker 1 Day Rs. 192.00 0.3 57.6
Rs.193.41
Plant & Machiner
1 Pile driving machinary 1 Day Rs. 5,000.00 0.06 300
Rs.300.00
After rounding off: Rs.579.80 Total Amount of M and L Rs.493.41
Add 17.5 % OH and CP Rs.86.35
Total Rs.579.76

29 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3026.03
Add/Deduct to above for each metre depth 300mm diameter of piles.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.06 11.52
2 Well sinker 1 Day Rs. 192.00 0.4 76.8
3 Pump -Attendant 1 Day Rs. 192.00 0.06 11.52
4 Mate 1 Day Rs. 169.00 0.21 35.49
5 Mazdoor-man, 1 Day Rs. 169.00 0.73 123.37
Rs.258.70
Plant & Machiner
1 Pile driving machinary 1 Day Rs. 5,000.00 0.06 300
Rs.300.00
After rounding off: Rs.656.50 Total Amount of M and L Rs.558.70
Add 17.5 % OH and CP Rs.97.77
Total Rs.656.47

ITEM No. 3029.01


Removing excavated material not exceeding 50 m and depositing where directed at a level not exceeding 1.5m
above the starting point Soils.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.44 74.36
2 Mate 1 Day Rs. 169.00 0.044 7.436
Rs.81.80
After rounding off: Rs.96.10 Total Amount of M and L Rs.81.80
Add 17.5 % OH and CP Rs.14.31
Total Rs.96.11

ITEM No. 3029.02


Removing excavated material not exceeding 50 m and depositing where directed at a level not exceeding 1.5m
above the starting point Rocks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.6 101.4
2 Mate 1 Day Rs. 169.00 0.0635 10.7315
Rs.112.13
After rounding off: Rs.131.80 Total Amount of M and L Rs.112.13
Add 17.5 % OH and CP Rs.19.62
Total Rs.131.75

30 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3030.01
Add for each additional 50m or part thereof beyond 50m and upto a total distance of 250m Soils.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.06 10.14
2 Mate 1 Day Rs. 169.00 0.006 1.014
Rs.11.15
After rounding off: Rs.13.10 Total Amount of M and L Rs.11.15
Add 17.5 % OH and CP Rs.1.95
Total Rs.13.11

ITEM No. 3030.02


Add for each additional 50m or part thereof beyond 50m and upto a total distance of 250m Rocks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.007 1.183
2 Mazdoor-man, 1 Day Rs. 169.00 0.07 11.83
Rs.13.01
After rounding off: Rs.15.30 Total Amount of M and L Rs.13.01
Add 17.5 % OH and CP Rs.2.28
Total Rs.15.29

ITEM No. 3031.01


Removing excavated material exceeding 250 m but not exceeding 500 m and depoditing where directed Soils.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
Rs.37.18
Plant & Machiner
1 Hire of lorry 5 T capacity 1 Day Rs. 1,000.00 0.09 90
Rs.90.00
After rounding off: Rs.149.40 Total Amount of M and L Rs.127.18
Add 17.5 % OH and CP Rs.22.26
Total Rs.149.44

ITEM No. 3031.02


Removing excavated material exceeding 250 m but not exceeding 500 m and depoditing where directed Rocks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.3 50.7
Rs.50.70
Plant & Machiner
1 Hire of lorry 5 T capacity 1 Day Rs. 1,000.00 0.12 120
Rs.120.00
After rounding off: Rs.200.60 Total Amount of M and L Rs.170.70
Add 17.5 % OH and CP Rs.29.87
Total Rs.200.57

31 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3032.01
Add to item 03031.01 for each additional 500m or part thereof beyond 500m and upto a total distance of 1.5
Km. Soils.
Particulars Size Unit SSR Qty Amount (SSR)
Plant & Machiner
1 Hire of lorry 5 T capacity 1 Day Rs. 1,000.00 0.0102 10.2
Rs.10.20
After rounding off: Rs.12.00 Total Amount of M and L Rs.10.20
Add 17.5 % OH and CP Rs.1.79
Total Rs.11.99

ITEM No. 3032.02


Add to item 03031.02 for each additional 500m or part thereof beyond 500m and upto a total distance of 1.5
Km. Rocks.
Particulars Size Unit SSR Qty Amount (SSR)
Plant & Machiner
1 Hire of lorry 5 T capacity 1 Day Rs. 1,000.00 0.0119 11.9
Rs.11.90
After rounding off: Rs.14.00 Total Amount of M and L Rs.11.90
Add 17.5 % OH and CP Rs.2.08
Total Rs.13.98

ITEM No. 3033.01


Removing excavated material exceeding 1.50 KM but not exceeding 5 KM and depositing where directed Soils.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.42.25
Plant & Machiner
1 Hire of lorry 5 T capacity 1 Day Rs. 1,000.00 0.135 135
Rs.135.00
After rounding off: Rs.208.30 Total Amount of M and L Rs.177.25
Add 17.5 % OH and CP Rs.31.02
Total Rs.208.27

ITEM No. 3033.02


Removing excavated material exceeding 1.50 KM but not exceeding 5 KM and depositing where directed Rocks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.3 50.7
Rs.50.70
Plant & Machiner
1 Hire of lorry 5 T capacity 1 Day Rs. 1,000.00 0.15 150
Rs.150.00
After rounding off: Rs.235.80 Total Amount of M and L Rs.200.70
Add 17.5 % OH and CP Rs.35.12
Total Rs.235.82

32 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3034.01
Add to item 03033.01 for each additional 1 KM or part thereof, beyond 5 KM and upto a total distance of 10
Km Soils.
Particulars Size Unit SSR Qty Amount (SSR)
Plant & Machiner
1 Hire of lorry 5 T capacity 1 Day Rs. 1,000.00 0.0128 12.8
Rs.12.80
After rounding off: Rs.15.00 Total Amount of M and L Rs.12.80
Add 17.5 % OH and CP Rs.2.24
Total Rs.15.04

ITEM No. 3034.02


Add to item 03033.02 for each additional 1 KM or part thereof, beyond 5 KM and upto a total distance of 10
Km Rocks.
Particulars Size Unit SSR Qty Amount (SSR)
Plant & Machiner
1 Hire of lorry 5 T capacity 1 Day Rs. 1,000.00 0.01535 15.35
Rs.15.35
After rounding off: Rs.18.00 Total Amount of M and L Rs.15.35
Add 17.5 % OH and CP Rs.2.69
Total Rs.18.04

ITEM No. 3035.01


Raising only, spoil from excavations, etc. (Where not otherwise provided for) every additional 1.5m or part
thereof beyond the first 1.5m when the spoil is to be deposited at a level exceeding 1.5m above the starting
point Soils.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.17 28.73
2 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.32.11
After rounding off: Rs.37.70 Total Amount of M and L Rs.32.11
Add 17.5 % OH and CP Rs.5.62
Total Rs.37.73

ITEM No. 3035.02


Raising only, spoil from excavations, etc. (Where not otherwise provided for) every additional 1.5m or part
thereof beyond the first 1.5m when the spoil is to be deposited at a level exceeding 1.5m above the starting
point Rocks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.21 35.49
2 Mate 1 Day Rs. 169.00 0.03 5.07
Rs.40.56
After rounding off: Rs.47.70 Total Amount of M and L Rs.40.56
Add 17.5 % OH and CP Rs.7.10
Total Rs.47.66

33 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3036.01
Felling of tree exceeding 30 cm girth including cutting of trunk and branches and stacking of serviceable
material and disposal of unserviceable material to a distance not exceeding 50m and clearing site. Girth of tree
exceeding 30 cm and not exceeding 100 cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Sawyer 1 Day Rs. 192.00 0.4 76.8
2 Mazdoor-man, 1 Day Rs. 169.00 1.23 207.87
3 Mate 1 Day Rs. 169.00 0.19 32.11
Rs.316.78
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.377.50 Total Amount of M and L Rs.321.28
Add 17.5 % OH and CP Rs.56.22
Total Rs.377.50

ITEM No. 3036.02


Felling of tree exceeding 30 cm girth including cutting of trunk and branches and stacking of serviceable
material and disposal of unserviceable material to a distance not exceeding 50m and clearing site. Girth of tree
exceeding 100 cm and not exceeding 150 cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Sawyer 1 Day Rs. 192.00 0.7 134.4
2 Mate 1 Day Rs. 169.00 0.33 55.77
3 Mazdoor-man, 1 Day Rs. 169.00 2.56 432.64
Rs.622.81
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.737.10 Total Amount of M and L Rs.627.31
Add 17.5 % OH and CP Rs.109.78
Total Rs.737.09

34 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3036.03
Felling of tree exceeding 30 cm girth including cutting of trunk and branches and stacking of serviceable
material and disposal of unserviceable material to a distance not exceeding 50m and clearing site. Girth of tree
exceeding 150 cm and not exceeding 200 cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.3795 64.1355
2 Mazdoor-man, 1 Day Rs. 169.00 3 507
3 Sawyer 1 Day Rs. 192.00 0.8 153.6
Rs.724.74
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.856.90 Total Amount of M and L Rs.729.24
Add 17.5 % OH and CP Rs.127.62
Total Rs.856.85

ITEM No. 3036.04


Felling of tree exceeding 30 cm girth including cutting of trunk and branches and stacking of serviceable
material and disposal of unserviceable material to a distance not exceeding 50m and clearing site. Girth of tree
exceeding 200 cm and not exceeding 250 cm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.44 74.36
2 Mazdoor-man, 1 Day Rs. 169.00 3.45 583.05
3 Sawyer 1 Day Rs. 192.00 0.9 172.8
Rs.830.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.980.80 Total Amount of M and L Rs.834.71
Add 17.5 % OH and CP Rs.146.07
Total Rs.980.78

35 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3036.05
Felling of tree exceeding 30 cm girth including cutting of trunk and branches and stacking of serviceable
material and disposal of unserviceable material to a distance not exceeding 50m and clearing site. Girth of tree
exceeding 250 cm and not exceeding 300 cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.44 74.36
2 Mazdoor-man, 1 Day Rs. 169.00 3.6 608.4
3 Sawyer 1 Day Rs. 192.00 0.9 172.8
Rs.855.56
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.1,010.60 Total Amount of M and L Rs.860.06
Add 17.5 % OH and CP Rs.150.51
Total Rs.1,010.57

ITEM No. 3037.01


Grubbing up tree trunk including cutting of trunk portion protruding over ground, digging out roots, filling
holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a
distance not exceeding 50m and clearing site. Girth of tree exceeding 30 cm and not exceeding 100 cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.19 32.11
2 Mazdoor-man, 1 Day Rs. 169.00 2.52 425.88
3 Sawyer 1 Day Rs. 192.00 0.07 13.44
Rs.471.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.559.20 Total Amount of M and L Rs.475.93
Add 17.5 % OH and CP Rs.83.29
Total Rs.559.22

36 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3037.02
Grubbing up tree trunk including cutting of trunk portion protruding over ground, digging out roots, filling
holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a
distance not exceeding 50m and clearing site.Girth of tree exceeding 100 cm and not exceeding 150 cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.33 55.77
2 Mazdoor-man, 1 Day Rs. 169.00 4 676
3 Sawyer 1 Day Rs. 192.00 0.11 21.12
Rs.752.89
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.889.90 Total Amount of M and L Rs.757.39
Add 17.5 % OH and CP Rs.132.54
Total Rs.889.93

ITEM No. 3037.03


Grubbing up tree trunk including cutting of trunk portion protruding over ground, digging out roots, filling
holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a
distance not exceeding 50m and clearing site.Girth of tree exceeding 150 cm and not exceeding 200 cm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.38 64.22
2 Mazdoor-man, 1 Day Rs. 169.00 4.5 760.5
3 Sawyer 1 Day Rs. 192.00 0.14 26.88
Rs.851.60
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.1,005.90 Total Amount of M and L Rs.856.10
Add 17.5 % OH and CP Rs.149.82
Total Rs.1,005.92

37 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3037.04
Grubbing up tree trunk including cutting of trunk portion protruding over ground, digging out roots, filling
holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a
distance not exceeding 50m and clearing site.Girth of tree exceeding 200 cm and not exceeding 250 cm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.44 74.36
2 Mazdoor-man, 1 Day Rs. 169.00 5.1 861.9
3 Sawyer 1 Day Rs. 192.00 0.19 36.48
Rs.972.74
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.1,148.30 Total Amount of M and L Rs.977.24
Add 17.5 % OH and CP Rs.171.02
Total Rs.1,148.26

ITEM No. 3037.05


Grubbing up tree trunk including cutting of trunk portion protruding over ground, digging out roots, filling
holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a
distance not exceeding 50m and clearing site.Girth of tree exceeding 250 cm and not exceeding 300 cm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 5.3 895.7
2 Mate 1 Day Rs. 169.00 0.44 74.36
3 Sawyer 1 Day Rs. 192.00 0.19 36.48
Rs.1,006.54
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.1,188.00 Total Amount of M and L Rs.1,011.04
Add 17.5 % OH and CP Rs.176.93
Total Rs.1,187.97

ITEM No. 3038


Selecting stone, brick, concrete, etc. suitable for handpacking, filling of hardcore from excavated spoil heaps,
removing and piling in convenient places within 50m of spoil heaps, etc. and raising or lowering to required
level (measured after selection).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.06 10.14
2 Mazdoor-man, 1 Day Rs. 169.00 0.64 108.16
Rs.118.30
After rounding off: Rs.139.00 Total Amount of M and L Rs.118.30
Add 17.5 % OH and CP Rs.20.70
Total Rs.139.00

38 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3039.01
Hand packing (any thickness) at back of walls over arches etc. & raising (or lowering) to the required level with
material and labour Broken stone or boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone 10-25cm 1 Cum Rs. 500.00 1.15 575
Rs.575.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Mate 1 Day Rs. 169.00 0.07 11.83
Rs.130.13
After rounding off: Rs.828.50 Total Amount of M and L Rs.705.13
Add 17.5 % OH and CP Rs.123.40
Total Rs.828.53

ITEM No. 3039.02


Hand packing (any thickness) at back of walls over arches etc. & raising (or lowering) to the required level with
material and labour Broken bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Brick bats not exceeding 300 mm gauge 1 Cum Rs. 400.00 1.1 440
Rs.440.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Mate 1 Day Rs. 169.00 0.07 11.83
Rs.130.13
After rounding off: Rs.669.90 Total Amount of M and L Rs.570.13
Add 17.5 % OH and CP Rs.99.77
Total Rs.669.90

ITEM No. 3039.03


Hand packing (any thickness) at back of walls over arches etc. and raising (or lowering) to the required level,
except materials.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Mate 1 Day Rs. 169.00 0.07 11.83
Rs.130.13
After rounding off: Rs.152.90 Total Amount of M and L Rs.130.13
Add 17.5 % OH and CP Rs.22.77
Total Rs.152.90

39 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3040.01
Loose filling with aggregates of gauge 80 to 150 mm in soakage pits, soakage wells, with material and labour
Broken stone or boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken stones 80 - 150 mm graded 1 Cum Rs. 425.00 1 425
Rs.425.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.175 29.575
2 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.32.96
After rounding off: Rs.538.10 Total Amount of M and L Rs.457.96
Add 17.5 % OH and CP Rs.80.14
Total Rs.538.10

ITEM No. 3040.02


Loose filling with aggregates of gauge 80 to 150 mm in soakage pits, soakage wells, with material and labour
Broken bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Brick of gauge 80 mm to 150 mm 1 Cum Rs. 409.99 1 409.99
Broken bricks of gauge 80-150 mm graded
Rs.409.99
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.175 29.575
2 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.32.96
After rounding off: Rs.520.50 Total Amount of M and L Rs.442.95
Add 17.5 % OH and CP Rs.77.52
Total Rs.520.46

ITEM No. 3040.03


Loose filling with aggregates of gauge 80 to 150 mm in soakage pits, soakage wells, etc. except materials.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.175 29.575
2 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.32.96
After rounding off: Rs.38.70 Total Amount of M and L Rs.32.96
Add 17.5 % OH and CP Rs.5.77
Total Rs.38.72

40 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3041.01
Loose filling with aggregates of gauge 40 to 80 mm in soakage pits, soakage wells, with material and labour
Broken stone or boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken stones 40 to 80mm 1 Cum Rs. 449.99 1 449.99
Rs.449.99
Labour
1 Mate 1 Day Rs. 169.00 0.35 59.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
Rs.65.91
After rounding off: Rs.606.20 Total Amount of M and L Rs.515.90
Add 17.5 % OH and CP Rs.90.28
Total Rs.606.18

ITEM No. 3041.02


Loose filling with aggregates of gauge 40 to 80 mm in soakage pits, soakage wells, with material and labour
Broken bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Bricks of gauge 40 to 80mm graded* 1 Cum Rs. 420.00 1 420
Rs.420.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.35 59.15
2 Mate 1 Day Rs. 169.00 0.04 6.76
Rs.65.91
After rounding off: Rs.570.90 Total Amount of M and L Rs.485.91
Add 17.5 % OH and CP Rs.85.03
Total Rs.570.94

ITEM No. 3041.03


Loose filling with aggregates of gauge 40 to 80 mm in soakage pits, soakage wells, etc. except materials.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.04 6.76
2 Mazdoor-man, 1 Day Rs. 169.00 0.35 59.15
Rs.65.91
After rounding off: Rs.77.40 Total Amount of M and L Rs.65.91
Add 17.5 % OH and CP Rs.11.53
Total Rs.77.44

41 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3042.01
Hardcore of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick,
watered and rammed to a true surface with material and labour. Broken stone or boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hard Core not exc. 63mm gauge stone 1 Cum Rs. 500.00 1.26 630
Rs.630.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Mate 1 Day Rs. 169.00 0.07 11.83
3 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
Rs.131.82
After rounding off: Rs.895.10 Total Amount of M and L Rs.761.82
Add 17.5 % OH and CP Rs.133.32
Total Rs.895.14

ITEM No. 3042.02


Hard core of gauge not exceeding 63mm deposited, spread and levelled in layers not exceeding 15cm thick,
watered and rammed to a true surface all as specified.of broken bricks
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hard core Brick aggregate not exc.63mm gauge 1 Cum Rs. 420.00 1.26 529.2
Rs.529.20
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.07 11.83
3 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
Rs.131.82
After rounding off: Rs.776.70 Total Amount of M and L Rs.661.02
Add 17.5 % OH and CP Rs.115.68
Total Rs.776.70

ITEM No. 3042.03


Hardcore of gauge not exceeding 63 mm, deposited, spread and levelled in layers not exceeding 15 cm thick,
watered and rammed to a true surface with except material.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.07 11.83
3 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
Rs.131.82
After rounding off: Rs.154.90 Total Amount of M and L Rs.131.82
Add 17.5 % OH and CP Rs.23.07
Total Rs.154.89

42 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3043.01
Hardcore of gauge not exceeding 100 mm, deposited, spread and levelled in layers not exceeding 15 cm thick,
watered and rolled/rammed to a true surface with material and labour. Broken stone or boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hard Core not exc. 100mm gauge stone 1 Cum Rs. 449.99 1.26 566.9874
Rs.566.99
Labour
1 Mate 1 Day Rs. 169.00 0.07 11.83
2 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
3 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
Rs.131.82
After rounding off: Rs.821.10 Total Amount of M and L Rs.698.81
Add 17.5 % OH and CP Rs.122.29
Total Rs.821.10

ITEM No. 3043.02


Hardcore of gauge not exceeding 100 mm, deposited, spread and levelled in layers not exceeding 15 cm thick,
watered and rolled/rammed to a true surface with material and labour. Broken bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hard core brick not exc. 100mm 1 Cum Rs. 420.00 1.26 529.2
Rs.529.20
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.07 11.83
3 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
Rs.131.82
After rounding off: Rs.776.70 Total Amount of M and L Rs.661.02
Add 17.5 % OH and CP Rs.115.68
Total Rs.776.70

ITEM No. 3043.03


Hardcore of gauge not exceeding 100 mm, deposited, spread and levelled in layers not exceeding 15 cm thick,
watered and rolled/rammed to a true surface with except material.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.07 11.83
2 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
3 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
Rs.131.82
After rounding off: Rs.154.90 Total Amount of M and L Rs.131.82
Add 17.5 % OH and CP Rs.23.07
Total Rs.154.89

43 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3044
Shingle filling in floors or pavings, laid in layers not exceeding 15cm thick, spread, levelled, and blinded with
earth and rammed including watering.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Single, gravel 25mm 1 Cum Rs. 425.00 1.06 450.5
Rs.450.50
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
3 Mate 1 Day Rs. 169.00 0.07 11.83
Rs.131.82
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.694.80 Total Amount of M and L Rs.591.32
Add 17.5 % OH and CP Rs.103.48
Total Rs.694.80

ITEM No. 3045


Moorum/red bajri filling in floors or pavings, laid in layers not exceeding 15 cm thick, spread, levelled and
rammed including watering.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Moorum/ red Bajari 1 Cum Rs. 300.00 1.1 330
Rs.330.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Mate 1 Day Rs. 169.00 0.07 11.83
3 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
Rs.131.82
After rounding off: Rs.542.60 Total Amount of M and L Rs.461.82
Add 17.5 % OH and CP Rs.80.82
Total Rs.542.64

44 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3046.01
Breaking the termite mounds, making holes with crow bars and pouring anti - termite chemical emulsion at
the rate of 4 litres per cubic metre of mound With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.2 52
Rs.52.00
Labour
1 Mate 1 Day Rs. 169.00 0.06 10.14
Rs.10.14
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.001 0.3
Rs.0.30
After rounding off: Rs.73.40 Total Amount of M and L Rs.62.44
Add 17.5 % OH and CP Rs.10.93
Total Rs.73.37

ITEM No. 3046.02


Breaking the termite mounds, making holes with crow bars and pouring anti - termite chemical emulsion at
the rate of 4 litres per cubic metre of mound Except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.06 10.14
Rs.10.14
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.0009 0.27
Rs.0.27
After rounding off: Rs.12.20 Total Amount of M and L Rs.10.41
Add 17.5 % OH and CP Rs.1.82
Total Rs.12.23

ITEM No. 3047.01


Treating the bottom and sides of excavation at the rate of 5 litres of emulsion per square metre of surface area
With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.2485 64.61
Rs.64.61
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.3.38
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.0019 0.57
Rs.0.57
After rounding off: Rs.80.60 Total Amount of M and L Rs.68.56
Add 17.5 % OH and CP Rs.12.00
Total Rs.80.56

45 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3047.02
Treating the bottom and sides of excavation at the rate of 5 litres of emulsion per square metre of surface area
Except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.3.38
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.0019 0.57
Rs.0.57
After rounding off: Rs.4.60 Total Amount of M and L Rs.3.95
Add 17.5 % OH and CP Rs.0.69
Total Rs.4.64

ITEM No. 3048.01


Treating the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical
surface (Area of the substructure in contact with backfill to be measured) With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.375 97.5
Rs.97.50
Labour
1 Mate 1 Day Rs. 169.00 0.06 10.14
Rs.10.14
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.001 0.3
Rs.0.30
After rounding off: Rs.126.80 Total Amount of M and L Rs.107.94
Add 17.5 % OH and CP Rs.18.89
Total Rs.126.83

ITEM No. 3048.02


Treating the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical
surface (Area of the substructure in contact with backfill to be measured) Except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.0599 10.1231
Rs.10.12
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.001 0.3
Rs.0.30
After rounding off: Rs.12.20 Total Amount of M and L Rs.10.42
Add 17.5 % OH and CP Rs.1.82
Total Rs.12.25

46 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3049.01
Treating the top surface of filled earth at the rate of 5 litres of emulsion per square metre of surface With
material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.2496 64.896
Rs.64.90
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.3.38
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.001 0.3
Rs.0.30
After rounding off: Rs.80.60 Total Amount of M and L Rs.68.58
Add 17.5 % OH and CP Rs.12.00
Total Rs.80.58

ITEM No. 3049.02


Treating the top surface of filled earth at the rate of 5 litres of emulsion per square metre of surface Except
emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.3.38
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.001 0.3
Rs.0.30
After rounding off: Rs.4.30 Total Amount of M and L Rs.3.68
Add 17.5 % OH and CP Rs.0.64
Total Rs.4.32

ITEM No. 3050.01


Treating the soil under plinth protection at the rate 5 litres of emulsion per square metre of surface area With
material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.2497 64.922
Rs.64.92
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.3.38
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.001 0.3
Rs.0.30
After rounding off: Rs.80.60 Total Amount of M and L Rs.68.60
Add 17.5 % OH and CP Rs.12.01
Total Rs.80.61

47 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3050.02
Treating the soil under plinth protection at the rate 5 litres of emulsion per square metre of surface area
Except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.3.38
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.001 0.3
Rs.0.30
After rounding off: Rs.4.30 Total Amount of M and L Rs.3.68
Add 17.5 % OH and CP Rs.0.64
Total Rs.4.32

ITEM No. 3051.01


Treating the soil along with external perimeter of building at the rate of 2.25 litre of emulsion per metre of the
perimetre wall material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.1123 29.198
Rs.29.20
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.3.38
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.001 0.3
Rs.0.30
After rounding off: Rs.38.60 Total Amount of M and L Rs.32.88
Add 17.5 % OH and CP Rs.5.75
Total Rs.38.63

ITEM No. 3051.02


Treating the soil along with external perimeter of building at the rate of 2.25 litre of emulsion per metre of the
perimetre wall Except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.02 3.38
Rs.3.38
Plant & Machiner
1 Spray unit 1 Day Rs. 300.00 0.001 0.3
Rs.0.30
After rounding off: Rs.4.30 Total Amount of M and L Rs.3.68
Add 17.5 % OH and CP Rs.0.64
Total Rs.4.32

48 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3052.01
Providing and injecting chemical emulsion for post constructional Anti- termite Treatment, Along external wall
where the apron is not provided using chemical emulsion at the rate of 7.5 litres per sq.m of the sub-structure
to a depth of 300 mm including excavation channel along the wall and rodding etc. complete,With material
and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.375 97.5
Rs.97.50
Labour
1 Mate 1 Day Rs. 169.00 0.25 42.25
Rs.42.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.171.60 Total Amount of M and L Rs.146.05
Add 17.5 % OH and CP Rs.25.56
Total Rs.171.61

ITEM No. 3052.02


Providing and injecting chemical emulsion for post constructional Anti- termite Treatment, Along external wall
where the apron is not provided using chemical emulsion at the rate of 7.5 litres per sq.m of the sub-structure
to a depth of 300 mm including excavation channel along the wall and rodding etc. complete Except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.25 42.25
Rs.42.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.705 6.345
Rs.6.35
After rounding off: Rs.57.10 Total Amount of M and L Rs.48.60
Add 17.5 % OH and CP Rs.8.50
Total Rs.57.10

49 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3053.01
Along the external wall below concrete or masonry apron using chemical emulsion 2.25 litres per linear metre
including drilling and plugging holes etc. in apron. material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.1125 29.25
Rs.29.25
Labour
1 Mate 1 Day Rs. 169.00 0.08 13.52
Rs.13.52
Sundry
1 Sundries 1 Re Rs. 9.00 0.28 2.52
Rs.2.52
After rounding off: Rs.53.20 Total Amount of M and L Rs.45.29
Add 17.5 % OH and CP Rs.7.93
Total Rs.53.22

ITEM No. 3053.02


Along the external wall below concrete or masonry apron using chemical emulsion 2.25 litres per linear metre
including drilling and plugging holes etc. in apron. Except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.08 13.52
Rs.13.52
Sundry
1 Sundries 1 Re Rs. 9.00 0.281 2.529
Rs.2.53
After rounding off: Rs.18.90 Total Amount of M and L Rs.16.05
Add 17.5 % OH and CP Rs.2.81
Total Rs.18.86

ITEM No. 3054.01


Treatment of soil under existing floors using emulsion @ one litre per hole, 300mm apart including drilling and
plugging 12mm dia holes with cement mortar 1:2 ( 1 cement :2 coarse sand) to match the existing floors
material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.05 13
Rs.13.00
Labour
1 Mate 1 Day Rs. 169.00 0.25 42.25
Rs.42.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.72.30 Total Amount of M and L Rs.61.55
Add 17.5 % OH and CP Rs.10.77
Total Rs.72.32

50 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3054.02
Treatment of soil under existing floors using emulsion @ one litre per hole, 300mm apart including drilling and
plugging 12mm dia holes with cement mortar 1:2 ( 1 cement :2 coarse sand) to match the existing floors
Except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.25 42.25
Rs.42.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.57.00 Total Amount of M and L Rs.48.55
Add 17.5 % OH and CP Rs.8.50
Total Rs.57.05

ITEM No. 3055.01


Of voids in masonry using chemical emulsion using one litre per hole at300 mm intervals including drilling
holes at 45 degrees and replugging them with cement mortar 1:2 ( 1 cement :2 coarse sand) to match the
existing floors M& L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.05 13
Rs.13.00
Labour
1 Mate 1 Day Rs. 169.00 0.25 42.25
Rs.42.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.72.30 Total Amount of M and L Rs.61.55
Add 17.5 % OH and CP Rs.10.77
Total Rs.72.32

ITEM No. 3055.02


Of voids in masonry using chemical emulsion using one litre per hole at300 mm intervals including drilling
holes at 45 degrees and replugging them with cement mortar 1:2 ( 1 cement :2 coarse sand) to match the
existing floors except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.25 42.25
Rs.42.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.57.00 Total Amount of M and L Rs.48.55
Add 17.5 % OH and CP Rs.8.50
Total Rs.57.05

51 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3056.01
At points of contact of wood work by chemical emulsion (in oil or kerosene based solution) @ 0.5 litre/hole by
drilling 6mm dia holes at a downward angle of 45 degree at 150 mm centre to centre and sealing the same.
material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anti-termite Chemical 1 Litre Rs. 260.00 0.02 5.2
Rs.5.20
Labour
1 Mate 1 Day Rs. 169.00 0.1 16.9
Rs.16.90
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.27.60 Total Amount of M and L Rs.23.45
Add 17.5 % OH and CP Rs.4.10
Total Rs.27.55

ITEM No. 3056.02


At points of contact of wood work by chemical emulsion (in oil or kerosene based solution) @ 0.5 litre/hole by
drilling 6mm dia holes at a downward angle of 45 degree at 150 mm centre to centre and sealing the same.
Except emulsion.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.1 16.9
Rs.16.90
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.25
Add 17.5 % OH and CP Rs.3.19
Total Rs.21.44

ITEM No. 3057.01


Aggreate for loose filling, of gauge 80mm to 150mm graded Broken stone / boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken stones 80 - 150 mm graded 1 Cum Rs. 425.00 1 425
Rs.425.00
After rounding off: Rs.499.40 Total Amount of M and L Rs.425.00
Add 17.5 % OH and CP Rs.74.38
Total Rs.499.38

52 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3057.02
Aggreate for loose filling, of gauge 80mm to 150mm graded Broken bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Brick of gauge 80 mm to 150 mm 1 Cum Rs. 409.99 1 409.99
Broken bricks of gauge 80-150 mm graded
Rs.409.99
After rounding off: Rs.481.70 Total Amount of M and L Rs.409.99
Add 17.5 % OH and CP Rs.71.75
Total Rs.481.74

ITEM No. 3058.01


Aggreate for loose filling, of gauge 40mm to 80mm graded Broken stone / boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken stones 40 to 80mm 1 Cum Rs. 449.99 1 449.99
Rs.449.99
After rounding off: Rs.528.70 Total Amount of M and L Rs.449.99
Add 17.5 % OH and CP Rs.78.75
Total Rs.528.74

ITEM No. 3058.02


Aggreate for loose filling, of gauge 40mm to 80mm graded Broken bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Bricks of gauge 40 to 80mm graded* 1 Cum Rs. 420.00 1 420
Rs.420.00
After rounding off: Rs.493.50 Total Amount of M and L Rs.420.00
Add 17.5 % OH and CP Rs.73.50
Total Rs.493.50

ITEM No. 3059.01


Hard core, broken to gauge not exceeding 63mm Broken stone / boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hard Core not exc. 63mm gauge stone 1 Cum Rs. 500.00 1 500
Rs.500.00
After rounding off: Rs.587.50 Total Amount of M and L Rs.500.00
Add 17.5 % OH and CP Rs.87.50
Total Rs.587.50

ITEM No. 3059.02


Hard core, broken to gauge not exceeding 63mm Broken bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Bricks of gauge not exc. 63 mm graded 1 Cum Rs. 420.00 1 420
Rs.420.00
After rounding off: Rs.493.50 Total Amount of M and L Rs.420.00
Add 17.5 % OH and CP Rs.73.50
Total Rs.493.50

53 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Earth Work
ITEM No. 3060.01
Hard core, broken to gauge exc 63mm and not exceeding 100mm Broken stone / boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brocken stone /boulders broken to gauge exc 63mm and n exc 100 1 Cum Rs. 449.99 1 449.99
mm
Rs.449.99
After rounding off: Rs.528.70 Total Amount of M and L Rs.449.99
Add 17.5 % OH and CP Rs.78.75
Total Rs.528.74

ITEM No. 3060.02


Hard core, broken to gauge exc 63mm and not exceeding 100mm Broken bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken bricks exc 63 mm but n exc 100 mm graded* 1 Cum Rs. 419.91 1 419.91
Rs.419.91
After rounding off: Rs.493.40 Total Amount of M and L Rs.419.91
Add 17.5 % OH and CP Rs.73.48
Total Rs.493.39

ITEM No. 3061


Blasting powder.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Blasting powder 1 Kg Rs. 49.99 1 49.99
Rs.49.99
After rounding off: Rs.58.70 Total Amount of M and L Rs.49.99
Add 17.5 % OH and CP Rs.8.75
Total Rs.58.74

ITEM No. 3062


Safety fuse.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Safty fuse No. 11 1 No. Rs. 20.00 1 20
Rs.20.00
After rounding off: Rs.23.50 Total Amount of M and L Rs.20.00
Add 17.5 % OH and CP Rs.3.50
Total Rs.23.50

ITEM No. 3063


chlorophyriphos or lindane emulsifiable consentrate conforming to IS:8944 or IS :632 respectively
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cholorophyriphos or lindane emulsifiable concentrates 1 No. Rs. 260.00 1 260
Rs.260.00
After rounding off: Rs.305.50 Total Amount of M and L Rs.260.00
Add 17.5 % OH and CP Rs.45.50
Total Rs.305.50

54 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4001.01
Lime concrete with 40 mm graded stone aggregate Lime mortar 1:2 mix.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Graded stone aggregate 40 mm 1 Cum Rs. 500.00 0.9 450
2 Lime Semi-hydraulic 50 Kg Rs. 190.00 2.56 486.4
3 Sand for concrete 1 Cum Rs. 500.00 0.4 200
Rs.1,136.40
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
4 Bhisty including mussack 1 Day Rs. 169.00 0.27 45.63
Rs.387.45
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,818.50 Total Amount of M and L Rs.1,547.68
Add 17.5 % OH and CP Rs.270.84
Total Rs.1,818.52

ITEM No. 4001.02


Lime concrete with 40 mm graded stone aggregate Lime mortar 1:3 mix.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime Semi-hydraulic 50 Kg Rs. 190.00 1.8429 350.151
2 Graded stone aggregate 40 mm 1 Cum Rs. 500.00 0.9 450
3 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.1,020.15
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
3 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
4 Bhisty including mussack 1 Day Rs. 169.00 0.27 45.63
Rs.387.45
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,681.90 Total Amount of M and L Rs.1,431.43
Add 17.5 % OH and CP Rs.250.50
Total Rs.1,681.93

55 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4002.01
Lime concrete with 40 mm graded brick aggregate Lime mortar 1:2 mix.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime Semi-hydraulic 50 Kg Rs. 190.00 2.56 486.4
2 Bk aggregate, broken 40mm 1 Cum Rs. 450.00 0.9 405
3 Sand for concrete 1 Cum Rs. 500.00 0.4 200
Rs.1,091.40
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mason (Stone mason) 1 Day Rs. 225.00 0.1301 29.2725
3 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
4 Bhisty including mussack 1 Day Rs. 169.00 0.27 45.63
Rs.387.47
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,765.70 Total Amount of M and L Rs.1,502.70
Add 17.5 % OH and CP Rs.262.97
Total Rs.1,765.67

ITEM No. 4002.02


Lime concrete with 40 mm graded brick aggregate Lime mortar 1:3 mix.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime Semi-hydraulic 50 Kg Rs. 190.00 1.843 350.17
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Bk aggregate, broken 40mm 1 Cum Rs. 450.00 0.9 405
Rs.975.17
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
4 Bhisty including mussack 1 Day Rs. 169.00 0.27 45.63
Rs.387.45
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,629.10 Total Amount of M and L Rs.1,386.45
Add 17.5 % OH and CP Rs.242.63
Total Rs.1,629.08

56 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4003.01
Lime concrete with 40 mm graded brick aggregate with bricks supplied by the M.E.S. free of charge Lime
mortar 1:2 mix.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime Semi-hydraulic 50 Kg Rs. 190.00 2.56 486.4
2 Sand for concrete 1 Cum Rs. 500.00 0.4 200
Rs.686.40
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.27 45.63
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
4 Mazdoor-man, 1 Day Rs. 169.00 1.79 302.51
Rs.390.83
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,293.70 Total Amount of M and L Rs.1,101.06
Add 17.5 % OH and CP Rs.192.69
Total Rs.1,293.74

ITEM No. 4003.02


Lime concrete with 40 mm graded brick aggregate , but with bricks supplied by the M.E.S. free of charge Lime
mortar 1:3 mix.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime Semi-hydraulic 50 Kg Rs. 190.00 1.843 350.17
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.570.17
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.27 45.63
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
4 Mazdoor-man, 1 Day Rs. 169.00 1.815 306.735
Rs.395.06
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,162.10 Total Amount of M and L Rs.989.05
Add 17.5 % OH and CP Rs.173.08
Total Rs.1,162.14

57 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4004.01
Portland cement concrete type A0, M-20 grade and mix by volume 1:1.5:3 with 12.5 mm nominal size of
graded coarse aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.42 210
2 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
3 Cement ordinay portland 50 Kg Rs. 230.00 8.04 1849.2
Rs.2,542.20
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.3,281.10 Total Amount of M and L Rs.2,792.41
Add 17.5 % OH and CP Rs.488.67
Total Rs.3,281.08

ITEM No. 4005.01


Portland cement concrete type A1, M-20 grade and mix by volume 1:1.5:3 with 20 mm nominal size of graded
coarse aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Cement ordinay portland 50 Kg Rs. 230.00 8.04 1849.2
Rs.2,521.20
Labour
1 Mate 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.0778 14.9376
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.227.88
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.0778 26.484676
Rs.26.48
After rounding off: Rs.3,261.30 Total Amount of M and L Rs.2,775.56
Add 17.5 % OH and CP Rs.485.72
Total Rs.3,261.29

58 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4006.01
Portland cement concrete type A2, M-20 grade and mix by volume 1:1.5:3 with 40 mm nominal size of graded
coarse aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.84 420
2 Cement ordinay portland 50 Kg Rs. 230.00 8.04 1849.2
3 Sand for concrete 1 Cum Rs. 500.00 0.42 210
Rs.2,479.20
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
4 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.3,207.10 Total Amount of M and L Rs.2,729.41
Add 17.5 % OH and CP Rs.477.65
Total Rs.3,207.06

ITEM No. 4007.01


Portland cement concrete type B0, M-15 grade and mix by volume 1:2:4 with 12.5 mm nominal size of graded
coarse aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
Rs.2,112.10
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
2 Mate 1 Day Rs. 169.00 0.11 18.59
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,775.70 Total Amount of M and L Rs.2,362.31
Add 17.5 % OH and CP Rs.413.40
Total Rs.2,775.71

59 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4008.01
Portland cement concrete type B1, M-15 grade and mix by volume 1:2:4 with 20 mm nominal size of graded
coarse aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
Rs.2,091.10
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
2 Mate 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,751.00 Total Amount of M and L Rs.2,341.31
Add 17.5 % OH and CP Rs.409.73
Total Rs.2,751.04

ITEM No. 4009.01


Portland cement concrete type B2, M-15 grade and mix by volume 1:2:4 with 40 mm nominal size of graded
coarse aggregate.Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.84 420
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
Rs.2,049.10
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,701.70 Total Amount of M and L Rs.2,299.31
Add 17.5 % OH and CP Rs.402.38
Total Rs.2,701.69

60 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4010.01
Portland cement concrete type C0, M-10 grade and mix by volume 1:3:6 with 12.5 mm nominal size of graded
coarse aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.25 977.5
2 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.87 500.25
3 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.1,697.75
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,288.90 Total Amount of M and L Rs.1,947.96
Add 17.5 % OH and CP Rs.340.89
Total Rs.2,288.85

ITEM No. 4011.01


Portland cement concrete type C1, M-10 grade and mix by volume 1:3:6 with 20 mm nominal size of graded
coarse aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.25 977.5
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.87 478.5
Rs.1,676.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,263.30 Total Amount of M and L Rs.1,926.21
Add 17.5 % OH and CP Rs.337.09
Total Rs.2,263.30

61 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4012.01
Portland cement concrete type C2, M-10 grade and mix by volume 1:3:6 with 40 mm nominal size of graded
coarse aggregate.Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.25 977.5
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.87 435
Rs.1,632.50
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.1105 18.6745
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.226.46
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,212.30 Total Amount of M and L Rs.1,882.79
Add 17.5 % OH and CP Rs.329.49
Total Rs.2,212.28

ITEM No. 4012.02


Portland cement concrete type C2, M-10 grade and mix by volume 1:3:6 with 40 mm nominal size of graded
coarse aggregate. Brick coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.25 977.5
2 Broken Brick coarse aggregate (40 mm Nominal size) 1 Cum Rs. 450.00 0.87 391.5
3 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.1,589.00
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
4 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,161.10 Total Amount of M and L Rs.1,839.21
Add 17.5 % OH and CP Rs.321.86
Total Rs.2,161.07

62 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4012.03
Portland cement concrete type C2, M-10 grade and mix by volume 1:3:6 with 40 mm nominal size of graded
coarse aggregate. Brick coarse aggregate made out of bricks supplied by M.E.S. free of charge.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.25 977.5
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.1,197.50
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
4 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,701.10 Total Amount of M and L Rs.1,447.71
Add 17.5 % OH and CP Rs.253.35
Total Rs.1,701.06

ITEM No. 4013.01


Portland cement concrete type D2, M-7.5 grade and mix by volume 1:4:8 with 40 mm nominal size of graded
coarse aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.44 220
2 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.88 440
3 Cement ordinay portland 50 Kg Rs. 230.00 3.24 745.2
Rs.1,405.20
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
4 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,945.10 Total Amount of M and L Rs.1,655.41
Add 17.5 % OH and CP Rs.289.70
Total Rs.1,945.11

63 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4013.02
Portland cement concrete type D2, M-7.5 grade and mix by volume 1:4:8 with 40 mm nominal size of graded
coarse aggregate. Brick coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 3.24 745.2
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Broken Brick coarse aggregate (40 mm Nominal size) 1 Cum Rs. 450.00 0.88 396
Rs.1,361.20
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
2 Mate 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,893.40 Total Amount of M and L Rs.1,611.41
Add 17.5 % OH and CP Rs.282.00
Total Rs.1,893.41

ITEM No. 4013.03


Portland cement concrete type D2, M-7.5 grade and mix by volume 1:4:8 with 40 mm nominal size of graded
coarse aggregate. Brick coarse aggregate made out of bricks supplied by M.E.S. free of charge.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 3.24 745.2
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.965.20
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
4 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,428.10 Total Amount of M and L Rs.1,215.41
Add 17.5 % OH and CP Rs.212.70
Total Rs.1,428.11

64 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4014.01
Portland cement concrete type E2, M-5 grade and mix by volume 1:5:10 with 40 mm nominal size of graded
coarse aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.58 593.4
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.88 440
Rs.1,253.40
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
4 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,766.70 Total Amount of M and L Rs.1,503.61
Add 17.5 % OH and CP Rs.263.13
Total Rs.1,766.74

ITEM No. 4014.02


Portland cement concrete type E2, M-5 grade and mix by volume 1:5:10 with 40 mm nominal size of graded
coarse aggregate. Brick coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Brick coarse aggregate (40 mm Nominal size) 1 Cum Rs. 450.00 0.88 396
2 Cement ordinay portland 50 Kg Rs. 230.00 2.58 593.4
3 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.1,209.40
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,715.00 Total Amount of M and L Rs.1,459.61
Add 17.5 % OH and CP Rs.255.43
Total Rs.1,715.04

65 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4014.03
Portland cement concrete type E2, M-5 grade and mix by volume 1:5:10 with 40 mm nominal size of graded
coarse aggregate.Brick coarse aggregate made out of bricks supplied by M.E.S. free of charge.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.58 593.4
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.813.40
Labour
1 Mate 1 Day Rs. 169.00 0.11 18.59
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
4 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,249.70 Total Amount of M and L Rs.1,063.61
Add 17.5 % OH and CP Rs.186.13
Total Rs.1,249.74

ITEM No. 4015.01


Portland cement concrete type F2 type and mix by volume 1:7:12 with 40 mm nominal size of graded coarse
aggregate. Graded coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.1 483
2 Sand for concrete 1 Cum Rs. 500.00 0.5 250
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.85 425
Rs.1,158.00
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,654.60 Total Amount of M and L Rs.1,408.21
Add 17.5 % OH and CP Rs.246.44
Total Rs.1,654.65

66 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4015.02
Portland cement concrete type F2 type and mix by volume 1:7:12 with 40 mm nominal size of graded coarse
aggregate. Brick coarse aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.1 483
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Broken Brick coarse aggregate (40 mm Nominal size) 1 Cum Rs. 450.00 0.85 382.5
Rs.1,085.50
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
4 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,569.50 Total Amount of M and L Rs.1,335.71
Add 17.5 % OH and CP Rs.233.75
Total Rs.1,569.46

ITEM No. 4015.03


Portland cement concrete type F2 type and mix by volume 1:7:12 with 40 mm nominal size of graded coarse
aggregate. Brick coarse aggregate made out of bricks supplied by M.E.S. free of charge.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.1 483
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.703.00
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.1,120.00 Total Amount of M and L Rs.953.21
Add 17.5 % OH and CP Rs.166.81
Total Rs.1,120.02

67 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4016.01
Poartland cement concrete M-20 Design Mix with 12.5 mm graded coase aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7 1610
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
Rs.2,303.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
2 Mate 1 Day Rs. 169.00 0.11 18.59
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
4 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
Rs.226.38
Plant & Machiner
1 Concrete mixer with fuel 1 Day Rs. 595.75 0.07 41.7025
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.759 75.9
Rs.75.90
After rounding off: Rs.3,110.20 Total Amount of M and L Rs.2,646.98
Add 17.5 % OH and CP Rs.463.22
Total Rs.3,110.20

ITEM No. 4017.01


Portland cement concrete M-20 Design Mix with 20 mm nominal size of graded coase aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7 1610
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,282.00
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.226.38
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,063.80 Total Amount of M and L Rs.2,607.46
Add 17.5 % OH and CP Rs.456.31
Total Rs.3,063.76

68 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4018.01
Portland cement concrete M-20 Design Mix with 40 mm nominal size of graded coase aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7 1610
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.84 420
Rs.2,240.00
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
4 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.226.38
Plant & Machiner
1 Concrete mixer with fuel 1 Day Rs. 595.75 0.07 41.7025
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7401 74.01
Rs.74.01
After rounding off: Rs.3,034.00 Total Amount of M and L Rs.2,582.09
Add 17.5 % OH and CP Rs.451.87
Total Rs.3,033.96

ITEM No. 4019.01


Portland cement concrete M-25 Design Mix with 12.5 mm nominal size of graded coase aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
3 Sand for concrete 1 Cum Rs. 500.00 0.42 210
Rs.2,441.00
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.226.38
Plant & Machiner
1 Concrete mixer with fuel 1 Day Rs. 595.75 0.07 41.7025
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.8 80
Rs.80.00
After rounding off: Rs.3,277.20 Total Amount of M and L Rs.2,789.08
Add 17.5 % OH and CP Rs.488.09
Total Rs.3,277.17

69 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4020.01
Portland cement concrete M-25 Design Mix with 20 mm nominal size of graded coase aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
3 Sand for concrete 1 Cum Rs. 500.00 0.42 210
Rs.2,420.00
Labour
1 Mate 1 Day Rs. 169.00 0.11 18.59
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
4 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
Rs.226.38
Plant & Machiner
1 Concrete mixer with fuel 1 Day Rs. 595.75 0.07 41.7025
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.6153 61.53
Rs.61.53
After rounding off: Rs.3,230.80 Total Amount of M and L Rs.2,749.61
Add 17.5 % OH and CP Rs.481.18
Total Rs.3,230.79

ITEM No. 4021.01


Portland cement concrete M-25 Design Mix with 40 mm nominal size of graded coase aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.84 420
3 Sand for concrete 1 Cum Rs. 500.00 0.42 210
Rs.2,378.00
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.226.38
Plant & Machiner
1 Concrete mixer with fuel 1 Day Rs. 595.75 0.07 41.7025
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.603 60.3
Rs.60.30
After rounding off: Rs.3,180.00 Total Amount of M and L Rs.2,706.38
Add 17.5 % OH and CP Rs.473.62
Total Rs.3,180.00

70 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4022.01
Portland cement concrete M-30 Design Mix with 12.5 mm nominal size of graded coase aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 8.2 1886
2 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
3 Sand for concrete 1 Cum Rs. 500.00 0.42 210
Rs.2,579.00
Labour
1 Mate 1 Day Rs. 169.00 0.11 18.59
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.226.38
Plant & Machiner
1 Concrete mixer with fuel 1 Day Rs. 595.75 0.07 41.7025
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.8415 84.15
Rs.84.15
After rounding off: Rs.3,444.20 Total Amount of M and L Rs.2,931.23
Add 17.5 % OH and CP Rs.512.97
Total Rs.3,444.20

ITEM No. 4023.01


Portland cement concrete M-30 Design Mix with 20 mm nominal size of graded coase aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 8.2 1886
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,558.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
2 Mate 1 Day Rs. 169.00 0.11 18.59
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.226.38
Plant & Machiner
1 Concrete mixer with fuel 1 Day Rs. 595.75 0.07 41.7025
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.6563 65.63
Rs.65.63
After rounding off: Rs.3,397.80 Total Amount of M and L Rs.2,891.71
Add 17.5 % OH and CP Rs.506.05
Total Rs.3,397.76

71 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4024.01
Portland cement concrete M-30 Design Mix with 40 mm nominal size of graded coase aggregate.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 8.2 1886
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.84 420
Rs.2,516.00
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.226.38
Plant & Machiner
1 Concrete mixer with fuel 1 Day Rs. 595.75 0.07 41.7025
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.823 82.3
Rs.82.30
After rounding off: Rs.3,368.00 Total Amount of M and L Rs.2,866.38
Add 17.5 % OH and CP Rs.501.62
Total Rs.3,368.00

ITEM No. 4025.01


Cement concrete in foundations, filling and mass- concrete Type B2, 1:2:4 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.18 1421.4
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.84 420
Rs.2,051.40
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
Rs.507.36
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Pin Vibrator 1 Day Rs. 340.43 0.07 23.82982
Rs.47.66
After rounding off: Rs.3,062.50 Total Amount of M and L Rs.2,606.42
Add 17.5 % OH and CP Rs.456.12
Total Rs.3,062.54

72 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4025.02
Cement concrete in foundations, filling and mass- concrete Type C2, 1:3:6 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.26 979.8
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.88 440
Rs.1,639.80
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 1.7704 299.1976
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
Rs.507.43
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Pin Vibrator 1 Day Rs. 340.43 0.07 23.82982
Rs.47.66
After rounding off: Rs.2,579.00 Total Amount of M and L Rs.2,194.89
Add 17.5 % OH and CP Rs.384.11
Total Rs.2,578.99

ITEM No. 4025.03


Cement concrete in foundations, filling and mass- concrete Type D2, 1:4:8 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 3.24 745.2
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.88 440
Rs.1,405.20
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
Rs.507.36
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0 0
2 Pin Vibrator 1 Day Rs. 340.43 0.07 23.82982
3 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.47.66
After rounding off: Rs.2,303.30 Total Amount of M and L Rs.1,960.22
Add 17.5 % OH and CP Rs.343.04
Total Rs.2,303.26

73 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4025.04
Cement concrete in foundations, filling and mass- concrete Type E2, 1:5:10 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.58 593.4
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.88 440
Rs.1,253.40
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
5 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.507.36
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Pin Vibrator 1 Day Rs. 340.43 0.07 23.82982
Rs.47.66
After rounding off: Rs.2,124.90 Total Amount of M and L Rs.1,808.42
Add 17.5 % OH and CP Rs.316.47
Total Rs.2,124.89

ITEM No. 4025.05


Cement concrete in foundations, filling and mass- concreteType F2, 1:7:12 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.1 483
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.85 425
Rs.1,118.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
2 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.507.36
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Pin Vibrator 1 Day Rs. 340.43 0.07 23.82982
Rs.47.66
After rounding off: Rs.1,965.80 Total Amount of M and L Rs.1,673.02
Add 17.5 % OH and CP Rs.292.78
Total Rs.1,965.80

74 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4026.01
Cement Concrete in surface channels and drains Type B2, 1:2:4 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.84 420
Rs.2,049.10
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.26 58.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
Rs.536.61
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,087.20 Total Amount of M and L Rs.2,627.41
Add 17.5 % OH and CP Rs.459.80
Total Rs.3,087.21

ITEM No. 4026.02


Cemente Concrete in surface channels and drains Type C2, 1:3:6 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.25 977.5
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.87 478.5
Rs.1,676.00
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
3 Mason (Stone mason) 1 Day Rs. 225.00 0.26 58.5
4 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
5 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.536.61
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.2,648.80 Total Amount of M and L Rs.2,254.31
Add 17.5 % OH and CP Rs.394.50
Total Rs.2,648.82

75 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4026.03
Cement concrete in surface channels and drains Type D2, 1:4:8 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.88 440
2 Cement ordinay portland 50 Kg Rs. 230.00 3.24 745.2
3 Sand for concrete 1 Cum Rs. 500.00 0.44 220
Rs.1,405.20
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.26 58.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
Rs.536.61
Plant & Machiner
1 Pin Vibrator 1 Day Rs. 340.43 0.07 23.82982
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.47.66
After rounding off: Rs.2,337.60 Total Amount of M and L Rs.1,989.47
Add 17.5 % OH and CP Rs.348.16
Total Rs.2,337.63

ITEM No. 4026.04


Cement concrete in surface channels and drains Type E2, 1:5:10 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.58 593.4
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.88 440
Rs.1,253.40
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.26 58.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
Rs.536.61
Plant & Machiner
1 Surface Vibrator 1 Day Rs. 425.53 0.07 29.7871
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.53.62
After rounding off: Rs.2,166.30 Total Amount of M and L Rs.1,843.63
Add 17.5 % OH and CP Rs.322.63
Total Rs.2,166.26

76 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4026.05
Cement concrete in surface channels and drains Type F2, 1:7:2 mix, (40 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.1 483
2 Sand for concrete 1 Cum Rs. 500.00 0.5 250
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.85 425
Rs.1,158.00
Labour
1 Mate 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
3 Bhisty including mussack 1 Day Rs. 169.00 0.79 133.51
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mason (Stone mason) 1 Day Rs. 225.00 0.26 58.5
Rs.536.61
Plant & Machiner
1 Surface Vibrator 1 Day Rs. 425.53 0.07 29.7871
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.53.62
After rounding off: Rs.2,054.20 Total Amount of M and L Rs.1,748.23
Add 17.5 % OH and CP Rs.305.94
Total Rs.2,054.17

ITEM No. 4027.01


Cement concrete in walls or retaining walls, any thickness, size or shape including pillasters, buttresses,
coumns pillars boundary pillars and posts (including caps and bases) Type B2, 1:2:4 mix, (40 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.84 420
Rs.2,049.10
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
2 Mason (Stone mason) 1 Day Rs. 225.00 0.531 119.475
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mazdoor-man, 1 Day Rs. 169.00 2.46 415.74
5 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.700.68
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,280.00 Total Amount of M and L Rs.2,791.48
Add 17.5 % OH and CP Rs.488.51
Total Rs.3,279.99

77 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4027.02
Cemente Concrete in walls or retaining walls, any thickness, size or shape including pillasters, buttresses,
coumns pillars boundary pillars and posts (including caps and bases) Type C2, 1:3:6 mix, (40 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.25 977.5
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.87 435
Rs.1,632.50
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 2.46 415.74
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
5 Mason (Stone mason) 1 Day Rs. 225.00 0.53 119.25
Rs.700.45
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.2,790.20 Total Amount of M and L Rs.2,374.65
Add 17.5 % OH and CP Rs.415.56
Total Rs.2,790.22

78 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4027.03
Cemente concrete in walls or retaining walls, any thickness, size or shape including pillasters, buttresses,
coumns pillars boundary pillars and posts (including caps and bases) Type D2, 1:4:8 mix, (40 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 3.24 745.2
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.88 440
Rs.1,405.20
Labour
1 Mate 1 Day Rs. 169.00 0.11 18.59
2 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
3 Mazdoor-man, 1 Day Rs. 169.00 2.46 415.74
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mason (Stone mason) 1 Day Rs. 225.00 0.53 119.25
Rs.700.45
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.2,523.10 Total Amount of M and L Rs.2,147.35
Add 17.5 % OH and CP Rs.375.79
Total Rs.2,523.14

79 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4027.04
Cemente Concrete in walls or retaining walls, any thickness, size or shape including pillasters, buttresses,
coumns pillars boundary pillars and posts (including caps and bases) Type E2, 1:5:10 mix, (40 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.58 593.4
2 Sand for concrete 1 Cum Rs. 500.00 0.44 220
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.88 440
Rs.1,253.40
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 2.46 415.74
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
5 Mason (Stone mason) 1 Day Rs. 225.00 0.53 119.25
Rs.700.45
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.2,344.80 Total Amount of M and L Rs.1,995.55
Add 17.5 % OH and CP Rs.349.22
Total Rs.2,344.77

80 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4027.05
Cemente concrete in walls or retaining walls, any thickness, size or shape including pillasters, buttresses,
coumns pillars boundary pillars and posts (including caps and bases) Type F2, 1:7:12 mix, (40 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.1 483
2 Sand for concrete 1 Cum Rs. 500.00 0.5 250
3 Stone aggregate graded 40 mm 1 Cum Rs. 500.00 0.85 425
Rs.1,158.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
2 Mate 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 2.46 415.74
4 Mason (Stone mason) 1 Day Rs. 225.00 0.53 119.25
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.700.45
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.2,232.70 Total Amount of M and L Rs.1,900.15
Add 17.5 % OH and CP Rs.332.53
Total Rs.2,232.68

81 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4028.01
Cement concrete in in roof kerbs or mud stops, rounded or chamfered on edges With Type B0, 1:2:4 mix, (12.5
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
2 Nails 1 Kg Rs. 45.00 1.68 75.6
3 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
4 Cement ordinay portland 50 Kg Rs. 230.00 6.71 1543.3
5 Sand for concrete 1 Cum Rs. 500.00 0.42 210
Rs.2,743.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.269 60.525
2 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
3 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
4 Mazdoor-man, 1 Day Rs. 169.00 2.12 358.28
5 Mate 1 Day Rs. 169.00 0.11 18.59
6 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.730.58
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,110.50 Total Amount of M and L Rs.3,498.30
Add 17.5 % OH and CP Rs.612.20
Total Rs.4,110.51

82 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4028.02
Cement concrete in in roof kerbs or mud stops, rounded or chamfered on edges With B1 Type, 1:2:4 mix, (20
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Nails 1 Kg Rs. 45.00 1.68 75.6
4 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
5 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
Rs.2,598.70
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 2.12 358.28
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
6 Carpenter, joiner 1 Day Rs. 225.00 0.269 60.525
Rs.730.58
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.3,939.90 Total Amount of M and L Rs.3,353.10
Add 17.5 % OH and CP Rs.586.79
Total Rs.3,939.90

83 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4028.03
Cement concrete in in roof kerbs or mud stops, rounded or chamfered on edges With C1 Type, 1:3:6 mix, (20
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 1.68 75.6
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
3 Cement ordinay portland 50 Kg Rs. 230.00 4.25 977.5
4 Sand for concrete 1 Cum Rs. 500.00 0.42 210
5 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,157.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.269 60.525
2 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
4 Mazdoor-man, 1 Day Rs. 169.00 2.12 358.28
5 Mate 1 Day Rs. 169.00 0.11 18.59
6 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.730.58
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.3,421.00 Total Amount of M and L Rs.2,911.50
Add 17.5 % OH and CP Rs.509.51
Total Rs.3,421.02

84 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4029.01
Cemente cocrete, in lintels upto 1.5 mm clear span, cills,steps; seismic and other similar bands, plinth courses,
string courses, lacing courses parapets and railings upto 60 cm in height,copings mkneelers, apex stones bed
plates, kerbs not providing for in item 0028,water troughand like including weathering ,slightly rounded or
chamfered angles and throating,as directed.Type B0, 1:2:4 mix, (12.5 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 1.36 61.2
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0182 291.2
3 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
4 Sand for concrete 1 Cum Rs. 500.00 0.42 210
5 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
Rs.2,464.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1.06 238.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
6 Mazdoor-man, 1 Day Rs. 169.00 2.83 478.27
Rs.1,041.98
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.4,169.10 Total Amount of M and L Rs.3,548.18
Add 17.5 % OH and CP Rs.620.93
Total Rs.4,169.11

85 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4029.02
Cement concrete , in lintels upto 1.5 mm clear span, oils,steps; seismic and other similar bands, plinth courses,
string courses, lacing courses parapets and railings upto 60 cm in heights coping kneelers, apex stone bed
plate,kerbs not provided for in item 04028, water trough and the like including weathering, slightly
champhered angles and throating, as directed.With B1 Type, 1:2:4 mix, (20 mm graded aggregate
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
4 Nails 1 Kg Rs. 45.00 1.36 61.2
5 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0182 291.2
Rs.2,443.50
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
2 Carpenter, joiner 1 Day Rs. 225.00 1.06 238.5
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Mazdoor-man, 1 Day Rs. 169.00 2.83 478.27
5 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
6 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.1,041.98
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.4,144.40 Total Amount of M and L Rs.3,527.18
Add 17.5 % OH and CP Rs.617.26
Total Rs.4,144.44

86 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4029.03
Cement concrete , in lintels upto 1.5 mm clear span, oils,steps; seismic and other similar bands, plinth courses,
string courses, lacing courses parapets and railings upto 60 cm in height,copings mkneelers, apex stones bed
plates, kerbs not providing for in item 04028,water troughs and the like including weathering, slightly rounded
or chamfered angles and throating as directed. With C1 Type, 1:3:6 mix, (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 1.36 61.2
2 Cement ordinay portland 50 Kg Rs. 230.00 4.25 977.5
3 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0182 291.2
4 Sand for concrete 1 Cum Rs. 500.00 0.44 220
5 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.87 478.5
Rs.2,028.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1.06 238.5
2 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mazdoor-man, 1 Day Rs. 169.00 2.83 478.27
5 Mate 1 Day Rs. 169.00 0.11 18.59
6 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.1,041.98
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.3,656.70 Total Amount of M and L Rs.3,112.08
Add 17.5 % OH and CP Rs.544.61
Total Rs.3,656.70

87 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4030.01
Pre-cast cement concrete block masonry with solid blocks, exceeding 10 cm in width and setting mortar,
complete With B1 Type, 1:2:4 mix, (20 mm graded aggregate) set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.89 1584.7
2 Sand for concrete 1 Cum Rs. 500.00 0.49 245
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,291.70
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 4.24 716.56
4 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
5 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.1,107.08
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,021.60 Total Amount of M and L Rs.3,422.61
Add 17.5 % OH and CP Rs.598.96
Total Rs.4,021.57

ITEM No. 4030.02


Pre-cast cement concrete block masonry with solid blocks, exceeding 10 cm in width and setting mortar,
complete With C1 Type, 1:3:6 mix, (20 mm graded aggregate) set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.98 1145.4
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.87 478.5
3 Sand for concrete 1 Cum Rs. 500.00 0.51 255
Rs.1,878.90
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 4.24 716.56
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.1,107.08
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.3,536.50 Total Amount of M and L Rs.3,009.81
Add 17.5 % OH and CP Rs.526.72
Total Rs.3,536.53

88 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4030.03
Pre-cast cement concrete block masonry with solid blocks, exceeding 10 cm in width and setting mortar,
complete With B1 Type, 1:2:4 mix, (20 mm graded aggregate) set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.64 1527.2
2 Sand for concrete 1 Cum Rs. 500.00 0.49 245
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,234.20
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 4.26 719.94
4 Mate 1 Day Rs. 169.00 0.115 19.435
5 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.1,111.31
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.3,959.00 Total Amount of M and L Rs.3,369.33
Add 17.5 % OH and CP Rs.589.63
Total Rs.3,958.97

ITEM No. 4030.04


Pre-cast cement concrete block masonry with solid blocks, exceeding 10 cm in width and setting mortar,
complete With C1 Type, 1:3:6 mix, (20 mm graded aggregate) set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.87 478.5
2 Cement ordinay portland 50 Kg Rs. 230.00 4.73 1087.9
3 Sand for concrete 1 Cum Rs. 500.00 0.51 255
Rs.1,821.40
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
3 Mazdoor-man, 1 Day Rs. 169.00 4.24 716.56
4 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
5 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.1,107.08
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.3,469.00 Total Amount of M and L Rs.2,952.31
Add 17.5 % OH and CP Rs.516.65
Total Rs.3,468.96

89 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4030.05
Pre-cast cement concrete block masonry with solid blocks, exceeding 10 cm in width and setting mortar,
complete Except blocks or slabs set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.72 165.6
2 Sand for concrete 1 Cum Rs. 500.00 0.07 35
Rs.200.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.44 99
2 Mazdoor-man, 1 Day Rs. 169.00 0.88 148.72
3 Bhisty including mussack 1 Day Rs. 169.00 0.2 33.8
Rs.281.52
After rounding off: Rs.566.50 Total Amount of M and L Rs.482.12
Add 17.5 % OH and CP Rs.84.37
Total Rs.566.49

ITEM No. 4030.06


Pre-cast cement concrete block masonry with solid blocks, exceeding 10 cm in width and setting mortar,
complete Except blocks or slabs set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.47 108.1
2 Sand for concrete 1 Cum Rs. 500.00 0.07 35
Rs.143.10
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.44 99
2 Mazdoor-man, 1 Day Rs. 169.00 0.88 148.72
3 Bhisty including mussack 1 Day Rs. 169.00 0.2 33.8
Rs.281.52
After rounding off: Rs.498.90 Total Amount of M and L Rs.424.62
Add 17.5 % OH and CP Rs.74.31
Total Rs.498.93

90 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4031.01
Pre-cast cement concrete hollow block masonry exceed 10 cm in width and setting mortar, complete With
1:2:4 mix, using 16 mm graded aggregate as per IS 383,) set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.504 289.8
2 Cement ordinay portland 50 Kg Rs. 230.00 4.422 1017.06
3 Sand for concrete 1 Cum Rs. 500.00 0.322 161
Rs.1,467.86
Labour
1 Mate 1 Day Rs. 169.00 0.07 11.83
2 Mazdoor-man, 1 Day Rs. 169.00 3.82 645.58
3 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
4 Bhisty including mussack 1 Day Rs. 169.00 0.67 113.23
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
Rs.1,022.58
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,954.30 Total Amount of M and L Rs.2,514.27
Add 17.5 % OH and CP Rs.440.00
Total Rs.2,954.27

ITEM No. 4031.02


Pre-cast cement concrete hollow block masonry exceed 10 cm in width and setting mortar, complete With
1:3:6 mix, using 16 mm graded aggregate as per IS 383,) set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.522 300.15
2 Cement ordinay portland 50 Kg Rs. 230.00 3.276 753.48
3 Sand for concrete 1 Cum Rs. 500.00 0.334 167
Rs.1,220.63
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 3.82 645.58
3 Mate 1 Day Rs. 169.00 0.07 11.83
4 Bhisty including mussack 1 Day Rs. 169.00 0.67 113.23
5 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
Rs.1,022.58
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,663.80 Total Amount of M and L Rs.2,267.04
Add 17.5 % OH and CP Rs.396.73
Total Rs.2,663.77

91 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4031.03
Pre-cast cement concrete hollow block masonry exceed 10 cm in width and setting mortar, complete With
1:2:4 mix, using 16 mm graded aggregate as per IS 383,) set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 4.17 959.1
2 Sand for concrete 1 Cum Rs. 500.00 0.322 161
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.504 289.8
Rs.1,409.90
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 3.82 645.58
4 Mate 1 Day Rs. 169.00 0.07 11.83
5 Bhisty including mussack 1 Day Rs. 169.00 0.67 113.23
Rs.1,022.58
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,886.20 Total Amount of M and L Rs.2,456.31
Add 17.5 % OH and CP Rs.429.85
Total Rs.2,886.16

ITEM No. 4031.04


Pre-cast cement concrete hollow block masonry exceed 10 cm in width and setting mortar, complete With
1:3:6 mix, using 16 mm graded aggregate as per IS 383,) set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 2.799 643.77
2 Sand for concrete 1 Cum Rs. 500.00 0.334 167
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.522 300.15
Rs.1,110.92
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Bhisty including mussack 1 Day Rs. 169.00 0.67 113.23
3 Mazdoor-man, 1 Day Rs. 169.00 3.82 645.58
4 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
5 Mate 1 Day Rs. 169.00 0.07 11.83
Rs.1,022.58
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.2,534.90 Total Amount of M and L Rs.2,157.33
Add 17.5 % OH and CP Rs.377.53
Total Rs.2,534.86

92 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4031.05
Pre-cast cement concrete hollow block masonry exceed 10 cm in width and setting mortar, complete Except
blocks or slabs set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.07 35
2 Cement ordinay portland 50 Kg Rs. 230.00 0.72 165.6
Rs.200.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.2 33.8
2 Mason (Stone mason) 1 Day Rs. 225.00 0.44 99
3 Mazdoor-man, 1 Day Rs. 169.00 0.88 148.72
Rs.281.52
After rounding off: Rs.566.50 Total Amount of M and L Rs.482.12
Add 17.5 % OH and CP Rs.84.37
Total Rs.566.49

ITEM No. 4031.06


Pre-cast cement concrete hollow block masonry exceed 10 cm in width and setting mortar, complete Except
blocks or slabs set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.47 108.1
2 Sand for concrete 1 Cum Rs. 500.00 0.07 35
Rs.143.10
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.44 99
2 Mazdoor-man, 1 Day Rs. 169.00 0.88 148.72
3 Bhisty including mussack 1 Day Rs. 169.00 0.2 33.8
Rs.281.52
After rounding off: Rs.498.90 Total Amount of M and L Rs.424.62
Add 17.5 % OH and CP Rs.74.31
Total Rs.498.93

93 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4032.01
Providing pre-cast cement concrete B1 type,1;2;4(using 20 mm graded aggregrate)set in cement mortar in
window or door cills, lintels bressumers, steps, quoin blocks (for use with masonry), string courses, copings,
kneelers, apex stones, pier caps, columns, posts, boundary pillars, bed plates, pintle blocks, anchorage
blocks,bonders (for stone walling ),corbels,brackets, etc.(of any section indicated ),with plain fair faces
including champhers,weathering, throating etc and setting in cement mortar 1;4 complete with joint to match.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 1.68 75.6
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
3 Sand for concrete 1 Cum Rs. 500.00 0.474 237
4 Cement ordinay portland 50 Kg Rs. 230.00 6.552 1506.96
5 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
Rs.2,713.56
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.4 315
2 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
5 Mazdoor-man, 1 Day Rs. 169.00 5.3 895.7
Rs.1,362.72
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,817.60 Total Amount of M and L Rs.4,100.11
Add 17.5 % OH and CP Rs.717.52
Total Rs.4,817.63

94 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4032.02
Providing pre-cast cement concrete Type C1-(1;3;6)(20mm graded aggregate) in window or door cills, lintels
bressumers, steps, quoin blocks (for use with masonry), string courses, copings, kneelers, apex stones, pier
caps, columns, posts, boundary pillars,bed plate,pintle blocks anchorage blocks,bonders (for stone walling
),corbels,brackets, etc.(of any section indicated ),with plain fair faces including champhers,weathering,
throating etc and setting in cement mortar 1;4 complete with joint to match.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 1.68 75.6
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
3 Cement ordinay portland 50 Kg Rs. 230.00 4.616 1061.68
4 Sand for concrete 1 Cum Rs. 500.00 0.494 247
5 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.87 478.5
Rs.2,294.78
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.4 315
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 5.3 895.7
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.1,362.72
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,325.60 Total Amount of M and L Rs.3,681.33
Add 17.5 % OH and CP Rs.644.23
Total Rs.4,325.56

95 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4032.03
Providing pre-cast cement concrete Type B-1 (1;2:4)in window or door cills, lintels bressumers, steps, quoin
blocks (for use with masonry), string courses, copings, kneelers, apex stones, pier caps, columns, posts,
boundary pillars, bed plates, pintle blocks, anchorage blocks, bonders (for stone walling), corbels, brackets,
etc. (of any section indicated), with plain fair faces, including chamfers, weatherings throating etc and setting
in cement mortar 1:6 complete with joints to match
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 1.68 75.6
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
3 Cement ordinay portland 50 Kg Rs. 230.00 6.526 1500.98
4 Sand for concrete 1 Cum Rs. 500.00 0.49 245
5 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,715.58
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.4 315
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 5.3 895.7
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.1,362.72
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,820.00 Total Amount of M and L Rs.4,102.13
Add 17.5 % OH and CP Rs.717.87
Total Rs.4,820.00

96 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4032.04
Providing pre-cast cement concrete in Type C1 1:3:6 (20mm graded aggregate) in window or door cills, lintels
bressumers, steps, quoin blocks (for use with masonry), string courses, copings, kneelers, apex stones, pier
caps, columns, posts, boundary pillars, bed plates, pintle blocks, anchorage blocks, bonders (for stone walling)
corbels, brackets etc (of any section indicated) with plain fair faces, including chamfers, weatherings, throating
etc and setting in cement mortrar 1:6 complet with joints to match
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.87 478.5
3 Cement ordinay portland 50 Kg Rs. 230.00 4.542 1044.66
4 Nails 1 Kg Rs. 45.00 1.68 75.6
5 Sand for concrete 1 Cum Rs. 500.00 0.49 245
Rs.2,275.76
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
2 Mason (Stone mason) 1 Day Rs. 225.00 1.4 315
3 Mate 1 Day Rs. 169.00 0.11 18.59
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
5 Mazdoor-man, 1 Day Rs. 169.00 5.3 895.7
Rs.1,362.72
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,303.20 Total Amount of M and L Rs.3,662.31
Add 17.5 % OH and CP Rs.640.90
Total Rs.4,303.21

ITEM No. 4032.05


Providing pre-cast cement concrete Excepts blocks in window or door cills, lintels bressumers, steps, quoin
blocks (for use with masonry), string courses, copings, kneelers, apex stones, pier caps, columns, posts,
boundary pillars, bed plates, pintle blocks, anchorage blocks, bonders (for stone walling) corbels, brackets etc
(of any section indicated with plain fair faces including chamfers, weatherings throating and setting in cement
mortar 1:4 complete with joints to match
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.382 87.86
2 Sand for concrete 1 Cum Rs. 500.00 0.07 35
Rs.122.86
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.4 236.6
2 Bhisty including mussack 1 Day Rs. 169.00 0.18 30.42
3 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
Rs.426.77
After rounding off: Rs.645.80 Total Amount of M and L Rs.549.63
Add 17.5 % OH and CP Rs.96.19
Total Rs.645.82

97 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4032.06
Providing pre-cast cement concrete Except blocks or slabs set in window or door cills, lintels bressumers,
steps, quoin blocks (for use with masonry), string courses, copings, kneelers, apex stones, pier caps, columns,
posts, boundary pillars, bed plates, pintle blocks, anchorage blocks, bonders (for stone walling) corbels,
brackets etc (of any section indicated with plain fair faces, including chamfers, weatherings, throating etc and
setting in cement mortar 1:6 complete with joints to match
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.356 81.88
2 Sand for concrete 1 Cum Rs. 500.00 0.07 35
Rs.116.88
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
2 Mazdoor-man, 1 Day Rs. 169.00 1.4 236.6
3 Bhisty including mussack 1 Day Rs. 169.00 0.18 30.42
Rs.426.77
After rounding off: Rs.638.80 Total Amount of M and L Rs.543.65
Add 17.5 % OH and CP Rs.95.14
Total Rs.638.79

ITEM No. 4033.01


Providing precast cement concrete in landings cover slabs (for manholes etc.) chullah, hoods, chajjas, water
troughs mangers, shelves and similar articles with plain faces With B1 Type, 1:2:4 mix, (using 20 mm graded
aggregate) set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Nails 1 Kg Rs. 45.00 1.68 75.6
3 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
4 Cement ordinay portland 50 Kg Rs. 230.00 6.552 1506.96
5 Sand for concrete 1 Cum Rs. 500.00 0.474 237
Rs.2,713.56
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.4 315
2 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
3 Mazdoor-man, 1 Day Rs. 169.00 5.3 895.7
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
5 Mate 1 Day Rs. 169.00 0.11 18.59
Rs.1,362.72
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,817.60 Total Amount of M and L Rs.4,100.11
Add 17.5 % OH and CP Rs.717.52
Total Rs.4,817.63

98 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4033.02
Providing Precast cemente concrete in landings cover slabs (for manholes etc.) chullah, hoods, chajjas, water
troughs mangers, shelves and similar articles with plain faces With C1 Type, 1:3:6 mix, (using 20 mm graded
aggregate) set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.87 478.5
2 Sand for concrete 1 Cum Rs. 500.00 0.494 247
3 Nails 1 Kg Rs. 45.00 1.68 75.6
4 Cement ordinay portland 50 Kg Rs. 230.00 4.616 1061.68
5 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
Rs.2,294.78
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
2 Mate 1 Day Rs. 169.00 0.11 18.59
3 Mason (Stone mason) 1 Day Rs. 225.00 1.4 315
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
5 Mazdoor-man, 1 Day Rs. 169.00 5.3 895.7
Rs.1,362.72
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,325.60 Total Amount of M and L Rs.3,681.33
Add 17.5 % OH and CP Rs.644.23
Total Rs.4,325.56

99 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4033.03
Providing Precast cemente concrete in landings cover slabs (for manholes etc.) chullah, hoods, chajjas, water
troughs mangers, shelves and similar articles with plain faces With B1 Type, 1:2:4 mix, (using 20 mm graded
aggregate) set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 1.68 75.6
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
3 Cement ordinay portland 50 Kg Rs. 230.00 6.526 1500.98
4 Sand for concrete 1 Cum Rs. 500.00 0.49 245
5 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,715.58
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.4 315
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 5.3 895.7
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.1,362.72
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,820.00 Total Amount of M and L Rs.4,102.13
Add 17.5 % OH and CP Rs.717.87
Total Rs.4,820.00

100 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4033.04
Providing precast cement concrete in landings cover slabs (for manholes etc.) chullah, hoods, chajjas, water
troughs mangers, shelves and similar articles with plain faces With C1 Type, 1:3:6 mix, (using 20 mm graded
aggregate) set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 1.68 75.6
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.027 432
3 Cement ordinay portland 50 Kg Rs. 230.00 4.542 1044.66
4 Sand for concrete 1 Cum Rs. 500.00 0.49 245
5 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.87 478.5
Rs.2,275.76
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.4 315
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 5.3 895.7
4 Mate 1 Day Rs. 169.00 0.11 18.59
5 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.1,362.72
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.4,303.20 Total Amount of M and L Rs.3,662.31
Add 17.5 % OH and CP Rs.640.90
Total Rs.4,303.21

ITEM No. 4033.05


Providing precast cement concrete in landings cover slabs (for manholes etc.) chullah, hoods, chajjas, water
troughs mangers, shelves and similar articles with plain faces Except blocks or slabs set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.382 87.86
2 Sand for concrete 1 Cum Rs. 500.00 0.07 35
Rs.122.86
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
2 Mazdoor-man, 1 Day Rs. 169.00 1.4 236.6
3 Bhisty including mussack 1 Day Rs. 169.00 0.18 30.42
Rs.426.77
After rounding off: Rs.645.80 Total Amount of M and L Rs.549.63
Add 17.5 % OH and CP Rs.96.19
Total Rs.645.82

101 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4033.06
Providing precast cement concrete in landings cover slabs (for manholes etc.) chullah, hoods, chajjas, water
troughs mangers, shelves and similar articles with plain faces Except blocks or slabs set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.07 35
2 Cement ordinay portland 50 Kg Rs. 230.00 0.356 81.88
Rs.116.88
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.4 236.6
2 Bhisty including mussack 1 Day Rs. 169.00 0.18 30.42
3 Mason (Stone mason) 1 Day Rs. 225.00 0.71 159.75
Rs.426.77
After rounding off: Rs.638.80 Total Amount of M and L Rs.543.65
Add 17.5 % OH and CP Rs.95.14
Total Rs.638.79

ITEM No. 4034.01


Providing precast cement concrete louvers and jallies, 25mm thick (measured solid), including all mouldings
but excluding frame (precast frame shall be measured separately and paid for under item 04032) With B0
Type, 1:2:4 mix, (using 12.5 graded aggregate)set in cement mortar1;4
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.02 4.6
2 Sand for concrete 1 Cum Rs. 500.00 0.041 20.5
3 Jalli (type B0) 25 mm thick precast RCC 1 Sqm Rs. 200.00 1 200
Rs.225.10
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.125 28.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
3 Bhisty including mussack 1 Day Rs. 169.00 0.0126 2.1294
Rs.51.38
After rounding off: Rs.324.90 Total Amount of M and L Rs.276.48
Add 17.5 % OH and CP Rs.48.38
Total Rs.324.86

102 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4034.02
Providing precast cement concrete louvers and jallies, 25mm thick (measured solid), including all mouldings
but excluding frame (precast frame shall be measured separately and paid for under item 04032) With Type C-
0, 1:3:6 mix, (using 12.5 graded aggregate)set in cement mortar1;4
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.02 4.6
2 pre cast jalli (type C-0)25mm thick 1 Sqm Rs. 190.00 1 190
3 Sand for concrete 1 Cum Rs. 500.00 0.041 20.5
Rs.215.10
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0 0
2 Mason (Stone mason) 1 Day Rs. 225.00 0.125 28.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
4 Bhisty including mussack 1 Day Rs. 169.00 0.0125 2.1125
Rs.51.36
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.002 0.68084
Rs.0.68
After rounding off: Rs.313.90 Total Amount of M and L Rs.267.14
Add 17.5 % OH and CP Rs.46.75
Total Rs.313.89

ITEM No. 4034.03


Providing precast cement concrete louvers and jallies, 25mm thick (measured solid), including all mouldings
but excluding frame (precast frame shall be measured separately and paid for under item 04032) With Type B-
0, 1:2:4 mix, (using 12.5 graded aggregate) set in cement mortar1;6
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.014 3.22
2 Sand for concrete 1 Cum Rs. 500.00 0.041 20.5
3 Jalli (type B0) 25 mm thick precast RCC 1 Sqm Rs. 200.00 1 200
Rs.223.72
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
2 Bhisty including mussack 1 Day Rs. 169.00 0.0125 2.1125
3 Mason (Stone mason) 1 Day Rs. 225.00 0.125 28.125
Rs.51.36
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.002 0.68084
Rs.0.68
After rounding off: Rs.324.00 Total Amount of M and L Rs.275.76
Add 17.5 % OH and CP Rs.48.26
Total Rs.324.02

103 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4034.04
Providing precast cement concrete louvers and jallies, 25mm thick (measured solid), including all mouldings
but excluding frame (precast frame shall be measured separately and paid for under item 04032) With Type
C0, 1:3:6 mix, (using 12.5 graded aggregate) set in cement morter 1:6
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 pre cast jalli (type C-0)25mm thick 1 Sqm Rs. 190.00 1 190
2 Cement ordinay portland 50 Kg Rs. 230.00 0.014 3.22
3 Sand for concrete 1 Cum Rs. 500.00 0.041 20.5
Rs.213.72
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.125 28.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
3 Bhisty including mussack 1 Day Rs. 169.00 0.0125 2.1125
Rs.51.36
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.002 0.68084
Rs.0.68
After rounding off: Rs.312.30 Total Amount of M and L Rs.265.76
Add 17.5 % OH and CP Rs.46.51
Total Rs.312.27

ITEM No. 4034.05


Providing precast cement concrete louvers and jallies, 25mm thick (measured solid), including all mouldings
but excluding frame (precast frame shall be measured separately and paid for under item 04032) Except blocks
or slabs set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.02 4.6
2 Sand for concrete 1 Cum Rs. 500.00 0.03 15
Rs.19.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
2 Bhisty including mussack 1 Day Rs. 169.00 0.0125 2.1125
3 Mason (Stone mason) 1 Day Rs. 225.00 0.125 28.125
Rs.51.36
After rounding off: Rs.83.40 Total Amount of M and L Rs.70.96
Add 17.5 % OH and CP Rs.12.42
Total Rs.83.38

104 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4034.06
Providing precast cement concrete louvers and jallies, 25mm thick (measured solid), including all mouldings
but excluding frame (precast frame shall be measured separately and paid for under item 04032) Except blocks
or slabs set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.014 3.22
2 Sand for concrete 1 Cum Rs. 500.00 0.03 15
Rs.18.22
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
2 Bhisty including mussack 1 Day Rs. 169.00 0.0125 2.1125
3 Mason (Stone mason) 1 Day Rs. 225.00 0.125 28.125
Rs.51.36
After rounding off: Rs.81.80 Total Amount of M and L Rs.69.58
Add 17.5 % OH and CP Rs.12.18
Total Rs.81.76

ITEM No. 4035.01


Add to or deduct from item 04034.01 for each 10 mm thickness or part there of over 25 mm thick With Type B
0, 1:2:4 mix, (using 12.5 graded aggregate) set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.008 1.84
2 Sand for concrete 1 Cum Rs. 500.00 0.0242 12.1
3 Jalli (type B0) 10 mm additional thickness for precast RCC 1 Sqm Rs. 30.00 1 30
Rs.43.94
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.0051 0.8619
2 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
3 Mason (Stone mason) 1 Day Rs. 225.00 0.005 1.125
Rs.2.83
After rounding off: Rs.55.00 Total Amount of M and L Rs.46.77
Add 17.5 % OH and CP Rs.8.19
Total Rs.54.96

105 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4035.02
Add to or deduct from item 04034.02 for each 10 mm thickness or part there of over 25 mm thick With Type C
0, 1:3:6 mix, (using 12.5 graded aggregate) set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.008 1.84
2 Sand for concrete 1 Cum Rs. 500.00 0.0244 12.2
3 Jalli (type C0) 10 mm additional thickness for precast RCC 1 Sqm Rs. 28.00 1 28
Rs.42.04
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.005 0.845
2 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
3 Mason (Stone mason) 1 Day Rs. 225.00 0.005 1.125
Rs.2.82
After rounding off: Rs.52.70 Total Amount of M and L Rs.44.86
Add 17.5 % OH and CP Rs.7.85
Total Rs.52.70

ITEM No. 4035.03


Add to or deduct from item 04035.03 for each 10 mm thickness or part there of over 25 mm thick With B0
Type, 1:2:4 mix, (using 12.5 graded aggregate) set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.0056 1.288
2 Sand for concrete 1 Cum Rs. 500.00 0.0242 12.1
3 Jalli (type B0) 10 mm additional thickness for precast RCC 1 Sqm Rs. 30.00 1 30
Rs.43.39
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.005 1.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.005 0.845
3 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
Rs.2.82
After rounding off: Rs.54.30 Total Amount of M and L Rs.46.20
Add 17.5 % OH and CP Rs.8.09
Total Rs.54.29

106 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4035.04
Add to or deduct from item 04034.04 for each 10 mm thickness or part there of over 25 mm thick With C0
Type, 1:3:6 mix, (using 12.5 graded aggregate) set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.0056 1.288
2 Sand for concrete 1 Cum Rs. 500.00 0.0244 12.2
3 Jalli (type C0) 10 mm additional thickness for precast RCC 1 Sqm Rs. 28.00 1 28
Rs.41.49
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.005 1.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.005 0.845
3 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
Rs.2.82
After rounding off: Rs.52.10 Total Amount of M and L Rs.44.30
Add 17.5 % OH and CP Rs.7.75
Total Rs.52.06

ITEM No. 4035.05


Add to or deduct from item04034.05 for each 10 mm thickness or part there of over 25 mm thick Except blocks
or slabs set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.008 1.84
2 Sand for concrete 1 Cum Rs. 500.00 0.02 10
Rs.11.84
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.005 1.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.005 0.845
3 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
Rs.2.82
After rounding off: Rs.17.20 Total Amount of M and L Rs.14.66
Add 17.5 % OH and CP Rs.2.56
Total Rs.17.22

107 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4035.06
Add to or deduct from item 04034.06 for each 10 mm thickness or part there of over 25 mm thick Except
blocks or slabs set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.0056 1.288
2 Sand for concrete 1 Cum Rs. 500.00 0.02 10
Rs.11.29
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
2 Mazdoor-man, 1 Day Rs. 169.00 0.005 0.845
3 Mason (Stone mason) 1 Day Rs. 225.00 0.005 1.125
Rs.2.82
After rounding off: Rs.16.60 Total Amount of M and L Rs.14.10
Add 17.5 % OH and CP Rs.2.47
Total Rs.16.57

ITEM No. 4036.01


Providing precast cement concrete solid building blocks or slabs 10 cm thick (with plain or interlocking joints as
directed) and setting in mortar, complete, in walls With B1 Type, 1:2:4 mix, (using 20 mm graded aggregate)
set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 0.252 11.34
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
3 Cement ordinay portland 50 Kg Rs. 230.00 0.687 158.01
4 Sand for concrete 1 Cum Rs. 500.00 0.0527 26.35
5 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.084 46.2
Rs.307.50
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
3 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
4 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
Rs.131.96
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.519.20 Total Amount of M and L Rs.441.85
Add 17.5 % OH and CP Rs.77.32
Total Rs.519.17

108 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4036.02
Providing precast cement concrete solid building blocks or slabs 10 cm thick (with plain or interlocking joints as
directed) and setting in mortar, complete, in walls With C1 Type, 1:3:6 mix, (using 20 mm graded aggregate)
set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.5131 118.013
2 Sand for concrete 1 Cum Rs. 500.00 0.0547 27.35
3 Nails 1 Kg Rs. 45.00 0.252 11.34
4 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.087 47.85
5 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0045 72
Rs.276.55
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
3 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
4 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
Rs.131.96
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.482.80 Total Amount of M and L Rs.410.90
Add 17.5 % OH and CP Rs.71.91
Total Rs.482.81

109 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4036.03
Providing precast cement concrete solid building blocks or slabs 10 cm thick (with plain or interlocking joints as
directed) and setting in mortar, complete, in walls With Type B 1, 1:2:4 mix, (using 20 mm graded aggregate)
set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 0.252 11.34
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
3 Cement ordinay portland 50 Kg Rs. 230.00 0.667 153.41
4 Sand for concrete 1 Cum Rs. 500.00 0.0527 26.35
5 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.084 46.2
Rs.302.90
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
4 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
Rs.131.96
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.513.80 Total Amount of M and L Rs.437.25
Add 17.5 % OH and CP Rs.76.52
Total Rs.513.77

110 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4036.04
Providing precast cement concrete solid building blocks or slabs 10 cm thick (with plain or interlocking joints as
directed) and setting in mortar, complete, in walls With Type C 1, 1:3:6 mix, (using 20 mm graded aggregate)
set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.087 47.85
3 Cement ordinay portland 50 Kg Rs. 230.00 0.5042 115.966
4 Nails 1 Kg Rs. 45.00 0.252 11.34
5 Sand for concrete 1 Cum Rs. 500.00 0.0547 27.35
Rs.268.11
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
3 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
Rs.131.96
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.472.90 Total Amount of M and L Rs.402.45
Add 17.5 % OH and CP Rs.70.43
Total Rs.472.88

ITEM No. 4036.05


Providing precast cement concrete solid building blocks or slabs 10 cm thick (with plain or interlocking joints as
directed) and setting in mortar, complete, in walls Except blocks or slabs set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.07 16.1
2 Sand for concrete 1 Cum Rs. 500.00 0.0107 5.35
Rs.21.45
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
2 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
Rs.130.62
After rounding off: Rs.178.70 Total Amount of M and L Rs.152.07
Add 17.5 % OH and CP Rs.26.61
Total Rs.178.68

111 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4036.06
Providing precast cement concrete solid building blocks or slabs 10 cm thick (with plain or interlocking joints as
directed) and setting in mortar, complete, in walls Except blocks or slabs set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.05 11.5
2 Sand for concrete 1 Cum Rs. 500.00 0.0107 5.35
Rs.16.85
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
2 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
3 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
Rs.130.62
After rounding off: Rs.173.30 Total Amount of M and L Rs.147.47
Add 17.5 % OH and CP Rs.25.81
Total Rs.173.28

ITEM No. 4037.01


Precst cement concrete 7.5 cm thick solid blocks With Type B 1, 1:2:4 mix, (using 20 mm graded aggregate)
set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.0437 21.85
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.0672 36.96
3 Nails 1 Kg Rs. 45.00 0.252 11.34
4 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
5 Cement ordinay portland 50 Kg Rs. 230.00 0.5636 129.628
Rs.265.38
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.21 47.25
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
3 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
4 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
Rs.129.71
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.467.00 Total Amount of M and L Rs.397.47
Add 17.5 % OH and CP Rs.69.56
Total Rs.467.03

112 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4037.02
Precast cement concrete 7.5 cm thick solid blocks With C1 Type, 1:3:6 mix, (using 20 mm graded aggregate)
set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 0.252 11.34
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.0696 38.28
3 Sand for concrete 1 Cum Rs. 500.00 0.0459 22.95
4 Cement ordinay portland 50 Kg Rs. 230.00 0.4333 99.659
5 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
Rs.237.83
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
2 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
4 Mason (Stone mason) 1 Day Rs. 225.00 0.21 47.25
Rs.129.71
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.434.70 Total Amount of M and L Rs.369.93
Add 17.5 % OH and CP Rs.64.74
Total Rs.434.66

ITEM No. 4037.03


Precast cement concrete 7.5 cm thick solid blocks With B1 Type, 1:2:4 mix, (using 20 mm graded aggregate)
set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
2 Sand for concrete 1 Cum Rs. 500.00 0.0437 21.85
3 Cement ordinay portland 50 Kg Rs. 230.00 0.5436 125.028
4 Nails 1 Kg Rs. 45.00 0.252 11.34
5 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.0672 36.96
Rs.260.78
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
2 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
3 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
4 Mason (Stone mason) 1 Day Rs. 225.00 0.21 47.25
Rs.129.71
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.461.60 Total Amount of M and L Rs.392.87
Add 17.5 % OH and CP Rs.68.75
Total Rs.461.63

113 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4037.04
Precast cement concrete 7.5 cm thick solid blocks With Type C 1, 1:3:6 mix, (using 20 mm graded aggregate)
set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 0.252 11.34
2 Cement ordinay portland 50 Kg Rs. 230.00 0.4133 95.059
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.0696 38.28
4 Sand for concrete 1 Cum Rs. 500.00 0.0459 22.95
5 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
Rs.233.23
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.21 47.25
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
3 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
4 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
Rs.129.71
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.429.30 Total Amount of M and L Rs.365.33
Add 17.5 % OH and CP Rs.63.93
Total Rs.429.26

ITEM No. 4037.05


Precast cement concrete 7.5 cm thick solid blocks Except blocks or slabs set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.07 16.1
2 Sand for concrete 1 Cum Rs. 500.00 0.0107 5.35
Rs.21.45
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.21 47.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
3 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
Rs.128.37
After rounding off: Rs.176.00 Total Amount of M and L Rs.149.82
Add 17.5 % OH and CP Rs.26.22
Total Rs.176.04

114 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4037.06
Precast cement concrete 7.5 cm thick solid blocks Except blocks or slabs set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.0107 5.35
2 Cement ordinay portland 50 Kg Rs. 230.00 0.05 11.5
Rs.16.85
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.0505 8.5345
2 Mason (Stone mason) 1 Day Rs. 225.00 0.21 47.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
Rs.128.45
After rounding off: Rs.170.70 Total Amount of M and L Rs.145.30
Add 17.5 % OH and CP Rs.25.43
Total Rs.170.73

ITEM No. 4038.01


Providing precast cement concrete hollow block 10 cm thick Type 1:2:4 mix, using 16 mm graded aggregate as
per IS 383, set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.0546 31.395
2 Sand for concrete 1 Cum Rs. 500.00 0.0325 16.25
3 Cement ordinay portland 50 Kg Rs. 230.00 0.4361 100.303
4 Nails 1 Kg Rs. 45.00 0.252 11.34
5 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
Rs.224.89
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
3 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
4 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
Rs.131.96
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.422.10 Total Amount of M and L Rs.359.23
Add 17.5 % OH and CP Rs.62.87
Total Rs.422.10

115 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4038.02
Providing precast cement concrete hollow block 10 cm thick Type 1:3:6 mix, using 16 mm graded aggregate as
per IS 383, set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.0339 16.95
2 Nails 1 Kg Rs. 45.00 0.252 11.34
3 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
4 Cement ordinay portland 50 Kg Rs. 230.00 0.3302 75.946
5 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.0565 32.4875
Rs.202.32
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
3 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
4 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
Rs.131.96
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.395.60 Total Amount of M and L Rs.336.67
Add 17.5 % OH and CP Rs.58.92
Total Rs.395.59

ITEM No. 4038.03


Providing precast cement concrete hollow block 10 cm thick Type 1:2:4 mix, using 16 mm graded aggregate as
per IS 383, set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
2 Cement ordinay portland 50 Kg Rs. 230.00 0.4261 98.003
3 Sand for concrete 1 Cum Rs. 500.00 0.0325 16.25
4 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.0546 31.395
5 Nails 1 Kg Rs. 45.00 0.252 11.34
Rs.222.59
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
2 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
3 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
4 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
Rs.131.96
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.419.40 Total Amount of M and L Rs.356.93
Add 17.5 % OH and CP Rs.62.46
Total Rs.419.40

116 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4038.04
Providing precast cement concrete hollow block 10 cm thick Type 1:3:6 mix, using 16 mm graded aggregate as
per IS 383, set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 1 Kg Rs. 45.00 0.252 11.34
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.0041 65.6
3 Cement ordinay portland 50 Kg Rs. 230.00 0.3202 73.646
4 Sand for concrete 1 Cum Rs. 500.00 0.0339 16.95
5 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.0566 32.545
Rs.200.08
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.007 1.344
3 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
4 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
Rs.131.96
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.007 2.38294
Rs.2.38
After rounding off: Rs.393.00 Total Amount of M and L Rs.334.43
Add 17.5 % OH and CP Rs.58.52
Total Rs.392.95

ITEM No. 4038.05


Providing precast cement concrete hollow block 10 cm thick Except blocks or slabs set in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.035 8.05
2 Sand for concrete 1 Cum Rs. 500.00 0.0052 2.6
Rs.10.65
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
3 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
Rs.130.62
After rounding off: Rs.166.00 Total Amount of M and L Rs.141.27
Add 17.5 % OH and CP Rs.24.72
Total Rs.165.99

117 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4038.06
Providing precast cement concrete hollow block 10 cm thick Except blocks or slabs set in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.0053 2.65
2 Cement ordinay portland 50 Kg Rs. 230.00 0.0251 5.773
Rs.8.42
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
2 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
3 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
Rs.130.62
After rounding off: Rs.163.40 Total Amount of M and L Rs.139.04
Add 17.5 % OH and CP Rs.24.33
Total Rs.163.38

ITEM No. 4039.01


Providing reinforced cement concrete(nominal mix) in foundation & including rafts, footings, foundation
beams; plinth beams; bases for columns, etc,; basment slabs, under -reamed piles and mass concrete Cement
concrete B0 type, 1:2:4 mix (using 12.5 mm graded aggregate)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
Rs.2,112.10
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
3 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
4 Mate 1 Day Rs. 169.00 0.12 20.28
5 Mason (Stone mason) 1 Day Rs. 225.00 0.18 40.5
Rs.506.78
Plant & Machiner
1 Pin Vibrator 1 Day Rs. 340.43 0.07 23.82982
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.47.66
After rounding off: Rs.3,133.20 Total Amount of M and L Rs.2,666.54
Add 17.5 % OH and CP Rs.466.64
Total Rs.3,133.18

118 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4039.02
Providing reinforced cement concrete (nominal mix) in foundation & including rafts, footings, foundation
beams; plinth beams; bases for columns, etc,; basment slabs, under -reamed piles and mass concrete Cement
concrete B1 type, 1:2:4 mix (using 20 mm graded aggregate)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.17 1419.1
2 Sand for concrete 1 Cum Rs. 500.00 0.42 210
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,091.10
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.18 40.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 1.77 299.13
4 Mate 1 Day Rs. 169.00 0.12 20.28
5 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.506.78
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,101.50 Total Amount of M and L Rs.2,639.58
Add 17.5 % OH and CP Rs.461.93
Total Rs.3,101.51

119 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4040.01
Providing reinforced cement concrete (nominal mix)in walls, retaining walls, basement walls, ballast walls and
the like; any thickness; above top of footings; including attached pilasters and buttresses Cement concrete B0
type, 1:2:4 mix (using 12.5 mm graded aggregat
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
2 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
3 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
Rs.2,175.81
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 2.83 478.27
3 Mate 1 Day Rs. 169.00 0.29 49.01
4 Mason (Stone mason) 1 Day Rs. 225.00 0.88 198
5 Bhisty including mussack 1 Day Rs. 169.00 0.77 130.13
Rs.882.29
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.3,642.30 Total Amount of M and L Rs.3,099.80
Add 17.5 % OH and CP Rs.542.47
Total Rs.3,642.27

120 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4040.02
Providing reinforced cement concrete (nominal mix)in walls, retaining walls, basement walls, ballast walls and
the like; any thickness; above top of footings; including attached pilasters and buttresses Cement concrete B1
type, 1:2:4 mix (using 20 mm graded aggregate)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
3 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
Rs.2,154.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.88 198
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 2.83 478.27
4 Mate 1 Day Rs. 169.00 0.29 49.01
5 Bhisty including mussack 1 Day Rs. 169.00 0.77 130.13
Rs.882.29
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,617.60 Total Amount of M and L Rs.3,078.80
Add 17.5 % OH and CP Rs.538.79
Total Rs.3,617.59

121 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4041.01
Providing reinforced cement concrete (nominal mix)in slabs supported on walls, beams and columns; in floors,
roofs, landings balconies, canopies, deck slabs and in shelves and the like Cement concrete B0 type, 1:2:4 mix
(using 12.5 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
Rs.2,175.81
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
3 Mazdoor-man, 1 Day Rs. 169.00 2.46 415.74
4 Mason (Stone mason) 1 Day Rs. 225.00 0.53 119.25
5 Mate 1 Day Rs. 169.00 0.25 42.25
Rs.724.11
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.3,456.40 Total Amount of M and L Rs.2,941.62
Add 17.5 % OH and CP Rs.514.78
Total Rs.3,456.41

122 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4041.02
Providing reinforced cement concrete (nominal mix)in slabs supported on walls, beams and columns; in floors,
roofs, landings balconies, canopies, deck slabs and in shelves and the like Cement concrete B1 type, 1:2:4 mix
(using 20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,154.81
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Bhisty including mussack 1 Day Rs. 169.00 0.7 118.3
3 Mate 1 Day Rs. 169.00 0.25 42.25
4 Mason (Stone mason) 1 Day Rs. 225.00 0.53 119.25
5 Mazdoor-man, 1 Day Rs. 169.00 2.4605 415.8245
Rs.722.50
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.3,429.80 Total Amount of M and L Rs.2,919.02
Add 17.5 % OH and CP Rs.510.83
Total Rs.3,429.84

ITEM No. 4042.01


Providing reinforced cement concrete (nominal mix)in chajjas Cement concrete B0 type, 1:2:4 mix (using 12.5
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
Rs.2,175.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.1 247.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.2 38.4
3 Mazdoor-man, 1 Day Rs. 169.00 3.18 537.42
4 Mate 1 Day Rs. 169.00 0.32 54.08
5 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
Rs.997.39
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.1 25.532
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.1 34.042
Rs.59.57
After rounding off: Rs.3,798.50 Total Amount of M and L Rs.3,232.77
Add 17.5 % OH and CP Rs.565.74
Total Rs.3,798.51
123 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4042.02
Providing reinforced cement concrete (nominal mix)in chajjas Cement concrete B1 type, 1:2:4 mix (using 20
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,154.81
Labour
1 Mate 1 Day Rs. 169.00 0.32 54.08
2 Mason (Stone mason) 1 Day Rs. 225.00 1.1 247.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.71 119.99
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.2 38.4
5 Mazdoor-man, 1 Day Rs. 169.00 3.18 537.42
Rs.997.39
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.1 34.042
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.1 25.532
Rs.59.57
After rounding off: Rs.3,773.80 Total Amount of M and L Rs.3,211.77
Add 17.5 % OH and CP Rs.562.06
Total Rs.3,773.83

ITEM No. 4043.01


Providing reinforced cement concrete (nominal mix)in beams, cantilevers, bressummers, lintels over 1.5 m
span Cement concrete B0 type, 1:2:4 mix (using 12.5 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
2 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
3 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
Rs.2,175.81
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 2.83 478.27
3 Mate 1 Day Rs. 169.00 0.29 49.01
4 Bhisty including mussack 1 Day Rs. 169.00 0.7 118.3
5 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
Rs.910.96
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.3,676.00 Total Amount of M and L Rs.3,128.47
Add 17.5 % OH and CP Rs.547.48
Total Rs.3,675.95

124 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4043.02
Providing reinforced cement concrete (nominal mix)in beams, cantilevers, bressummers, lintels over 1.5 m
span Cement concrete B1 type, 1:2:4 mix (using 20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
3 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
Rs.2,154.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.06 238.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 2.83 478.27
4 Mate 1 Day Rs. 169.00 0.29 49.01
5 Bhisty including mussack 1 Day Rs. 169.00 0.7 118.3
Rs.910.96
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,651.30 Total Amount of M and L Rs.3,107.47
Add 17.5 % OH and CP Rs.543.81
Total Rs.3,651.28

ITEM No. 4044.01


Providing reinforced cement concrete (nominal mix)in columns, pillars, piers, posts and struts Cement
concrete B0 type, 1:2:4 mix (using 12.5 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
Rs.2,175.81
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.2 38.4
2 Bhisty including mussack 1 Day Rs. 169.00 0.7 118.3
3 Mazdoor-man, 1 Day Rs. 169.00 3.18 537.42
4 Mason (Stone mason) 1 Day Rs. 225.00 1.18 265.5
5 Mate 1 Day Rs. 169.00 0.32 54.08
Rs.1,013.70
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.1 25.532
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.1 34.042
Rs.59.57
After rounding off: Rs.3,817.70 Total Amount of M and L Rs.3,249.08
Add 17.5 % OH and CP Rs.568.59
Total Rs.3,817.67

125 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4044.02
Providing reinforced cement concrete (nominal mix)in columns, pillars, piers, posts and struts Cement
concrete B1 type, 1:2:4 mix (using 20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,154.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.18 265.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.2 38.4
3 Mazdoor-man, 1 Day Rs. 169.00 3.18 537.42
4 Mate 1 Day Rs. 169.00 0.32 54.08
5 Bhisty including mussack 1 Day Rs. 169.00 0.7 118.3
Rs.1,013.70
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.1 25.532
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.1 34.042
Rs.59.57
After rounding off: Rs.3,793.00 Total Amount of M and L Rs.3,228.08
Add 17.5 % OH and CP Rs.564.91
Total Rs.3,793.00

ITEM No. 4045.01


Providing reinforced cement concrete (nominal mix)in chullah hoods; stairways (except spiral staircases)
including steps (square or spandri), string pieces, carriages, etc, complete, any section straight or winding, but
excluding landings; RCC water tanks upto 1500 li
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,175.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.41 317.25
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
3 Mazdoor-man, 1 Day Rs. 169.00 3.18 537.42
4 Bhisty including mussack 1 Day Rs. 169.00 0.7 118.3
5 Mate 1 Day Rs. 169.00 0.32 54.08
Rs.1,040.49
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.3,807.20 Total Amount of M and L Rs.3,240.13
Add 17.5 % OH and CP Rs.567.02
Total Rs.3,807.15

126 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4045.02
Providing reinforced cement concrete (nominal mix)in chullah hoods; stairways (except spiral staircases)
including steps (square or spandri), string pieces, carriages, etc, complete, any section straight or winding, but
excluding landings; RCC water tanks upto 1500 li
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,154.81
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.07 13.44
2 Mazdoor-man, 1 Day Rs. 169.00 3.18 537.42
3 Mate 1 Day Rs. 169.00 0.32 54.08
4 Bhisty including mussack 1 Day Rs. 169.00 0.7 118.3
5 Mason (Stone mason) 1 Day Rs. 225.00 1.41 317.25
Rs.1,040.49
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.23.83
After rounding off: Rs.3,782.50 Total Amount of M and L Rs.3,219.13
Add 17.5 % OH and CP Rs.563.35
Total Rs.3,782.48

ITEM No. 4046.01


Providing reinforced cement concrete (nominal mix)in spiral staircases (including landings) Cement concrete
B0 type, 1:2:4 mix (using 12.5 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
2 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
3 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
Rs.2,175.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.82 634.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 6.71 1133.99
4 Mate 1 Day Rs. 169.00 0.67 113.23
5 Bhisty including mussack 1 Day Rs. 169.00 0.7 118.3
Rs.2,026.90
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.4,987.20 Total Amount of M and L Rs.4,244.41
Add 17.5 % OH and CP Rs.742.77
Total Rs.4,987.18

127 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4046.02
Providing reinforced cement concrete (nominal mix)in spiral staircases (including landings) Cement concrete
B1 type, 1:2:4 mix (using 20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,154.81
Labour
1 Mate 1 Day Rs. 169.00 0.67 113.23
2 Bhisty including mussack 1 Day Rs. 169.00 0.7 118.3
3 Mazdoor-man, 1 Day Rs. 169.00 6.71 1133.99
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mason (Stone mason) 1 Day Rs. 225.00 2.82 634.5
Rs.2,026.90
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.4,962.50 Total Amount of M and L Rs.4,223.41
Add 17.5 % OH and CP Rs.739.10
Total Rs.4,962.51

ITEM No. 4047.01


Providing reinforced cement concrete (nominal mix)in arches Cement concrete B0 type, 1:2:4 mix (using 12.5
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,175.81
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 3.27 552.63
3 Mate 1 Day Rs. 169.00 0.32 54.08
4 Bhisty including mussack 1 Day Rs. 169.00 0.86 145.34
5 Mason (Stone mason) 1 Day Rs. 225.00 1.11 249.75
Rs.1,028.68
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,814.30 Total Amount of M and L Rs.3,246.19
Add 17.5 % OH and CP Rs.568.08
Total Rs.3,814.28

128 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4047.02
Providing reinforced cement concrete (nominal mix)in arches Cement concrete B1 type, 1:2:4 mix (using 20
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,154.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.11 249.75
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 3.27 552.63
4 Mate 1 Day Rs. 169.00 0.33 55.77
5 Bhisty including mussack 1 Day Rs. 169.00 0.86 145.34
Rs.1,030.37
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,791.60 Total Amount of M and L Rs.3,226.88
Add 17.5 % OH and CP Rs.564.70
Total Rs.3,791.59

ITEM No. 4048.01


Providing reinforced cement concrete (nominal mix)in domes, vaults, shell roofs, arch ribs and folded plates
Cement concrete B0 type, 1:2:4 mix (using 12.5 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
2 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
3 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
Rs.2,175.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.18 265.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.91 153.79
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mazdoor-man, 1 Day Rs. 169.00 3.42 577.98
5 Mate 1 Day Rs. 169.00 0.35 59.15
Rs.1,083.30
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,878.50 Total Amount of M and L Rs.3,300.81
Add 17.5 % OH and CP Rs.577.64
Total Rs.3,878.45

129 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4048.02
Providing reinforced cement concrete (nominal mix)in domes, vaults, shell roofs, arch ribs and folded plates
Cement concrete B1 type, 1:2:4 mix (using 20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,154.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.18 265.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 3.42 577.98
4 Mate 1 Day Rs. 169.00 0.35 59.15
5 Bhisty including mussack 1 Day Rs. 169.00 0.91 153.79
Rs.1,083.30
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,853.80 Total Amount of M and L Rs.3,279.81
Add 17.5 % OH and CP Rs.573.97
Total Rs.3,853.78

ITEM No. 4049.01


Providing reinforced cement concrete (nominal mix)in chimneys and shafts Cement concrete B0 type, 1:2:4
mix (using 12.5 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,175.81
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.82 138.58
2 Mason (Stone mason) 1 Day Rs. 225.00 0.97 218.25
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mazdoor-man, 1 Day Rs. 169.00 3 507
5 Mate 1 Day Rs. 169.00 0.3 50.7
Rs.941.41
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,711.70 Total Amount of M and L Rs.3,158.92
Add 17.5 % OH and CP Rs.552.81
Total Rs.3,711.73

130 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4049.02
Providing reinforced cement concrete (nominal mix)in chimneys and shafts Cement concrete B 1 type, 1:2:4
mix (using 20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,154.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.75 168.75
2 Bhisty including mussack 1 Day Rs. 169.00 0.8 135.2
3 Mate 1 Day Rs. 169.00 0.298 50.362
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mazdoor-man, 1 Day Rs. 169.00 2.979 503.451
Rs.884.64
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.3,620.40 Total Amount of M and L Rs.3,081.15
Add 17.5 % OH and CP Rs.539.20
Total Rs.3,620.36

ITEM No. 4050.01


Providing reinforcement cement concrete (nominal mix) in1:2:4 type B0 (using 12.5 mm graded aggregate) as
in well steining and well curb.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
Rs.2,175.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.7 157.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 3.47 586.43
4 Mate 1 Day Rs. 169.00 0.347 58.643
5 Bhisty including mussack 1 Day Rs. 169.00 0.08 13.52
Rs.842.97
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.3,596.10 Total Amount of M and L Rs.3,060.48
Add 17.5 % OH and CP Rs.535.58
Total Rs.3,596.07

131 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4050.02
Providing reinforcement cement concrete (nominal mix) as in Cement concrete B 1 type, 1:2:4 mix (using 20
mm graded aggregate)as inwell steining and well curb.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
3 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
Rs.2,154.81
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.08 13.52
2 Mason (Stone mason) 1 Day Rs. 225.00 0.7 157.5
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mazdoor-man, 1 Day Rs. 169.00 3.47 586.43
5 Mate 1 Day Rs. 169.00 0.347 58.643
Rs.842.97
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.3,571.40 Total Amount of M and L Rs.3,039.48
Add 17.5 % OH and CP Rs.531.91
Total Rs.3,571.39

ITEM No. 4051.01


Providing reinforcement cement concrete (nominal mix) in1:2:4 type B0 as in fins facias louvers parapets and
railings exc 60 cm in height, newels, balustrade and the like.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
Rs.2,175.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.88 198
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 3.315 560.235
4 Mate 1 Day Rs. 169.00 0.332 56.108
5 Bhisty including mussack 1 Day Rs. 169.00 0.8 135.2
Rs.976.42
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
After rounding off: Rs.3,752.90 Total Amount of M and L Rs.3,193.93
Add 17.5 % OH and CP Rs.558.94
Total Rs.3,752.87

132 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4051.02
Providing reinforcement cement concrete (nominal mix) in1:2:4 type B1 as in fins facias louvers parapets and
railings exc 60 cm in height, newels, balustrade and the like.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,154.81
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.316 560.404
2 Mate 1 Day Rs. 169.00 0.331 55.939
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mason (Stone mason) 1 Day Rs. 225.00 0.88 198
5 Bhisty including mussack 1 Day Rs. 169.00 0.8 135.2
Rs.976.42
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
After rounding off: Rs.3,728.20 Total Amount of M and L Rs.3,172.93
Add 17.5 % OH and CP Rs.555.26
Total Rs.3,728.20

ITEM No. 4052.01


Extra over item 04039.01,04040.01&04044.01 for doing work inwater retaining structures.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.21 35.49
Rs.55.74
After rounding off: Rs.65.50 Total Amount of M and L Rs.55.74
Add 17.5 % OH and CP Rs.9.75
Total Rs.65.49

ITEM No. 4052.02


Extra over item 04039.02,04040.2,04044.2,for doing work in water retaining structures.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.21 35.49
2 Mason (Stone mason) 1 Day Rs. 225.00 0.09 20.25
Rs.55.74
After rounding off: Rs.65.50 Total Amount of M and L Rs.55.74
Add 17.5 % OH and CP Rs.9.75
Total Rs.65.49

133 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4053.01
Reinforced cement concrete (design mix)in:- Foundations, including rafts, footings, foundation beams; plinth
beams; bases for columns, etc.; basement slabs, un-der-reamed piles and mass concrete M-20 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,377.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.1 22.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.4 67.6
3 Mate 1 Day Rs. 169.00 0.112 18.928
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mazdoor-man, 1 Day Rs. 169.00 1.13 190.97
Rs.326.88
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,315.20 Total Amount of M and L Rs.2,821.43
Add 17.5 % OH and CP Rs.493.75
Total Rs.3,315.18

134 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4053.02
Reinforced cement concrete (design mix)in:- Foundations, including rafts, footings, foundation beams; plinth
beams; bases for columns, etc.; basement slabs, un-der-reamed piles and mass concrete M-25 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
3 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
Rs.2,423.60
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 1.59 268.71
3 Mate 1 Day Rs. 169.00 0.159 26.871
4 Bhisty including mussack 1 Day Rs. 169.00 0.4 67.6
5 Mason (Stone mason) 1 Day Rs. 225.00 0.1 22.5
Rs.412.56
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.3,482.20 Total Amount of M and L Rs.2,963.56
Add 17.5 % OH and CP Rs.518.62
Total Rs.3,482.19

135 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4053.03
Reinforced cement concrete (design mix)in:- Foundations, including rafts, footings, foundation beams; plinth
beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete M-30 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
3 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
Rs.2,469.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.1 22.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 2.084 352.196
4 Mate 1 Day Rs. 169.00 0.2084 35.2196
5 Bhisty including mussack 1 Day Rs. 169.00 0.4 67.6
Rs.504.40
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.3,649.20 Total Amount of M and L Rs.3,105.70
Add 17.5 % OH and CP Rs.543.50
Total Rs.3,649.19

136 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4054.01
Reinforced cement concrete (design mix)in:- Walls, retaining walls, basement walls, ballast walls and the like;
any thickness; above top of footings; including attached pilasters and buttresses M-20 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,377.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.663 450.047
2 Mate 1 Day Rs. 169.00 0.2693 45.5117
3 Bhisty including mussack 1 Day Rs. 169.00 0.35 59.15
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mason (Stone mason) 1 Day Rs. 225.00 0.7 157.5
Rs.739.09
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,799.50 Total Amount of M and L Rs.3,233.64
Add 17.5 % OH and CP Rs.565.89
Total Rs.3,799.53

137 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4054.02
Reinforced cement concrete (design mix)in:- Walls, retaining walls, basement walls, ballast walls and the like;
any thickness; above top of footings; including attached pilasters and buttresses M-25 (20 mm graded
agggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
3 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
Rs.2,423.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.44 74.36
2 Mason (Stone mason) 1 Day Rs. 225.00 0.7 157.5
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mazdoor-man, 1 Day Rs. 169.00 3.045 514.605
5 Mate 1 Day Rs. 169.00 0.304 51.376
Rs.824.72
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.3,966.50 Total Amount of M and L Rs.3,375.72
Add 17.5 % OH and CP Rs.590.75
Total Rs.3,966.47

138 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4054.03
Reinforced cement concrete (design mix)in:- Walls, retaining walls, basement walls, ballast walls and the like;
any thickness; above top of footings; including attached pilasters and buttresses M-30 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
3 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
Rs.2,469.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.44 74.36
2 Mate 1 Day Rs. 169.00 0.354 59.826
3 Mazdoor-man, 1 Day Rs. 169.00 3.5385 598.0065
4 Mason (Stone mason) 1 Day Rs. 225.00 0.7 157.5
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.916.57
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,133.50 Total Amount of M and L Rs.3,517.87
Add 17.5 % OH and CP Rs.615.63
Total Rs.4,133.50

139 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4055.01
Reinforced cement concrete (design mix)in:- Slabs supported on walls, beams and col-umns in floors, roofs,
landings, balconies, canopies, deck slabs and in shelves and the like M-20 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,377.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.4 90
2 Bhisty including mussack 1 Day Rs. 169.00 0.39 65.91
3 Mate 1 Day Rs. 169.00 0.209 35.321
4 Mazdoor-man, 1 Day Rs. 169.00 2.093 353.717
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.571.83
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,603.00 Total Amount of M and L Rs.3,066.38
Add 17.5 % OH and CP Rs.536.62
Total Rs.3,603.00

140 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4055.02
Reinforced cement concrete (design mix)in:- Slabs supported on walls, beams and col-umns in floors, roofs,
landings, balconies, canopies, deck slabs and in shelves and the like M-25 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,423.60
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 2.554 431.626
3 Mate 1 Day Rs. 169.00 0.255 43.095
4 Bhisty including mussack 1 Day Rs. 169.00 0.39 65.91
5 Mason (Stone mason) 1 Day Rs. 225.00 0.4 90
Rs.657.51
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.3,770.00 Total Amount of M and L Rs.3,208.51
Add 17.5 % OH and CP Rs.561.49
Total Rs.3,770.00

141 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4055.03
Reinforced cement concrete (design mix)in:- Slabs supported on walls, beams and col-umns in floors, roofs,
landings, balconies, canopies, deck slabs and in shelves and the like M-30 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,469.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.11 525.59
2 Bhisty including mussack 1 Day Rs. 169.00 0.311 52.559
3 Mate 1 Day Rs. 169.00 0.3111 52.5759
4 Mason (Stone mason) 1 Day Rs. 225.00 0.4 90
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.747.60
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.3,935.00 Total Amount of M and L Rs.3,348.91
Add 17.5 % OH and CP Rs.586.06
Total Rs.3,934.97

142 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4056.01
Reinforced cement concrete (design mix)in:- Chajjas M-20 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
3 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
Rs.2,377.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.05 515.45
2 Mate 1 Day Rs. 169.00 0.305 51.545
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mason (Stone mason) 1 Day Rs. 225.00 1 225
5 Bhisty including mussack 1 Day Rs. 169.00 0.357 60.333
Rs.879.21
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,964.20 Total Amount of M and L Rs.3,373.76
Add 17.5 % OH and CP Rs.590.41
Total Rs.3,964.17

143 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4056.02
Reinforced cement concrete (design mix)in:- Chajjas M-25 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
3 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
Rs.2,423.60
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 3.45 583.05
3 Mate 1 Day Rs. 169.00 0.345 58.305
4 Bhisty including mussack 1 Day Rs. 169.00 0.424 71.656
5 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.964.89
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.4,131.20 Total Amount of M and L Rs.3,515.89
Add 17.5 % OH and CP Rs.615.28
Total Rs.4,131.17

144 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4056.03
Reinforced cement concrete (design mix)in:- Chajjas M-30 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,469.60
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mate 1 Day Rs. 169.00 0.39 65.91
3 Bhisty including mussack 1 Day Rs. 169.00 0.4825 81.5425
4 Mason (Stone mason) 1 Day Rs. 225.00 1 225
5 Mazdoor-man, 1 Day Rs. 169.00 3.9 659.1
Rs.1,058.43
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,300.20 Total Amount of M and L Rs.3,659.73
Add 17.5 % OH and CP Rs.640.45
Total Rs.4,300.19

145 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4057.01
Reinforced cement concrete (design mix)in:- Beams, cantilevers, bressummers, lintels over 1.5m span M-20
(20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,377.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.611 441.259
2 Mate 1 Day Rs. 169.00 0.261 44.109
3 Bhisty including mussack 1 Day Rs. 169.00 0.4 67.6
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mason (Stone mason) 1 Day Rs. 225.00 0.85 191.25
Rs.771.10
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,837.10 Total Amount of M and L Rs.3,265.65
Add 17.5 % OH and CP Rs.571.49
Total Rs.3,837.14

146 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4057.02
Reinforced cement concrete (design mix)in:- Beams, cantilevers, bressummers, lintels over 1.5m span M-25
(20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
3 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
Rs.2,423.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.8485 190.9125
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 3.04 513.76
4 Mate 1 Day Rs. 169.00 0.304 51.376
5 Bhisty including mussack 1 Day Rs. 169.00 0.437 73.853
Rs.856.78
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.4,004.10 Total Amount of M and L Rs.3,407.78
Add 17.5 % OH and CP Rs.596.36
Total Rs.4,004.15

147 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4057.03
Reinforced cement concrete (design mix)in:- Beams, cantilevers, bressummers, lintels over 1.5m span M-30
(20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,469.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.4395 74.2755
2 Mate 1 Day Rs. 169.00 0.353 59.657
3 Mason (Stone mason) 1 Day Rs. 225.00 0.85 191.25
4 Mazdoor-man, 1 Day Rs. 169.00 3.53 596.57
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.948.63
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,171.20 Total Amount of M and L Rs.3,549.93
Add 17.5 % OH and CP Rs.621.24
Total Rs.4,171.17

148 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4058.01
Reinforced cement concrete (design mix)in:- Columns, pillars,piers,posts and strutsM-20 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
3 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
Rs.2,377.60
Labour
1 Mate 1 Day Rs. 169.00 0.3 50.7
2 Bhisty including mussack 1 Day Rs. 169.00 0.402 67.938
3 Mazdoor-man, 1 Day Rs. 169.00 3 507
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.877.52
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,962.20 Total Amount of M and L Rs.3,372.07
Add 17.5 % OH and CP Rs.590.11
Total Rs.3,962.18

149 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4058.02
Reinforced cement concrete (design mix)in:- Columns, pillars,piers,posts and struts M-25 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
3 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
Rs.2,423.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.58 605.02
2 Mate 1 Day Rs. 169.00 0.358 60.502
3 Bhisty including mussack 1 Day Rs. 169.00 0.421 71.149
4 Mason (Stone mason) 1 Day Rs. 225.00 1 225
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.988.55
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.4,159.00 Total Amount of M and L Rs.3,539.55
Add 17.5 % OH and CP Rs.619.42
Total Rs.4,158.97

150 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4058.03
Reinforced cement concrete (design mix)in:-Columns, pillars,piers,posts and struts M-30 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,469.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1 225
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Bhisty including mussack 1 Day Rs. 169.00 0.4045 68.3605
4 Mate 1 Day Rs. 169.00 0.408 68.952
5 Mazdoor-man, 1 Day Rs. 169.00 4.08 689.52
Rs.1,078.71
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,324.00 Total Amount of M and L Rs.3,680.01
Add 17.5 % OH and CP Rs.644.00
Total Rs.4,324.02

151 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4059.01
Reinforced cement cocrete (design mix) M-20 (20mm graded aggregate )in:-Chullah hoods; stairways (except
spiral staircases) including steps (square or spandril), string pieces, carriages, etc., complete, any section
straight or winding, but excluding landings; RCC water tanks upto 1500 ltr.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,377.60
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 3.06 517.14
3 Mate 1 Day Rs. 169.00 0.306 51.714
4 Bhisty including mussack 1 Day Rs. 169.00 0.406 68.614
5 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.889.35
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,976.10 Total Amount of M and L Rs.3,383.90
Add 17.5 % OH and CP Rs.592.18
Total Rs.3,976.08

152 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4059.02
Reinforced cement conrete (design mix)M-25(20mm graded aggregate )in:- Chullah hoods; stairways (except
spiral staircases) including steps (square or spandril), string pieces, carriages, etc., complete, any section
straight or winding, but excluding landings; RCC water tanks upto 1500 ltr.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
Rs.2,423.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1 225
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Bhisty including mussack 1 Day Rs. 169.00 0.429 72.501
4 Mate 1 Day Rs. 169.00 0.35 59.15
5 Mazdoor-man, 1 Day Rs. 169.00 3.5 591.5
Rs.975.03
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.4,143.10 Total Amount of M and L Rs.3,526.03
Add 17.5 % OH and CP Rs.617.06
Total Rs.4,143.09

153 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4059.03
Reinforced cement concrete (design mix) M-30 (20 mm graded aggregate)in:- Chullah hoods; stairways (except
spiral staircases) including steps (square or spandril), string pieces, carriages, etc., complete, any section
straight or winding, but excluding landings; RCC water tanks upto 1500 Ltr .
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
Rs.2,469.60
Labour
1 Mate 1 Day Rs. 169.00 0.401 67.769
2 Mason (Stone mason) 1 Day Rs. 225.00 1 225
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Bhisty including mussack 1 Day Rs. 169.00 0.4115 69.5435
5 Mazdoor-man, 1 Day Rs. 169.00 4.01 677.69
Rs.1,066.88
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,310.10 Total Amount of M and L Rs.3,668.18
Add 17.5 % OH and CP Rs.641.93
Total Rs.4,310.12

154 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4060.01
Reinforced cement concrete (design mix)in:- Spiral staircases (in-cluding landings) M-20 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
Rs.2,377.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 5.545 937.105
2 Mate 1 Day Rs. 169.00 0.554 93.626
3 Bhisty including mussack 1 Day Rs. 169.00 0.713 120.497
4 Mason (Stone mason) 1 Day Rs. 225.00 3.1 697.5
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.1,875.61
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.5,134.90 Total Amount of M and L Rs.4,370.16
Add 17.5 % OH and CP Rs.764.78
Total Rs.5,134.94

155 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4060.02
Reinforced cement concrete (design mix)in:- Spiral staircases (in-cluding landings) M-25 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
Rs.2,423.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 3.12 702
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 6 1014
4 Mate 1 Day Rs. 169.00 0.6 101.4
5 Bhisty including mussack 1 Day Rs. 169.00 0.739 124.891
Rs.1,969.17
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.5,311.20 Total Amount of M and L Rs.4,520.17
Add 17.5 % OH and CP Rs.791.03
Total Rs.5,311.20

156 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4060.03
Reinforced cement concrete (design mix)in:-Spiral staircases (in-cluding landings) M-30 (20 mm graded
aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,469.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 3.12 702
2 Mazdoor-man, 1 Day Rs. 169.00 6.479 1094.951
3 Bhisty including mussack 1 Day Rs. 169.00 0.7655 129.3695
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mate 1 Day Rs. 169.00 0.6479 109.4951
Rs.2,062.70
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.5,480.20 Total Amount of M and L Rs.4,664.00
Add 17.5 % OH and CP Rs.816.20
Total Rs.5,480.20

157 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4061.01
Reinforced cement concrete (design mix)in:- Arches M-20 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
Rs.2,377.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.05 236.25
2 Mazdoor-man, 1 Day Rs. 169.00 2.94 496.86
3 Mate 1 Day Rs. 169.00 0.294 49.686
4 Bhisty including mussack 1 Day Rs. 169.00 0.438 74.022
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.883.70
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,969.40 Total Amount of M and L Rs.3,378.25
Add 17.5 % OH and CP Rs.591.19
Total Rs.3,969.44

158 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4061.02
Reinforced cement concrete (design mix)in:- Arches M-25 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
3 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
Rs.2,423.60
Labour
1 Mate 1 Day Rs. 169.00 0.341 57.629
2 Mason (Stone mason) 1 Day Rs. 225.00 1.05 236.25
3 Mazdoor-man, 1 Day Rs. 169.00 3.41 576.29
4 Bhisty including mussack 1 Day Rs. 169.00 0.4285 72.4165
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.969.47
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.4,136.50 Total Amount of M and L Rs.3,520.47
Add 17.5 % OH and CP Rs.616.08
Total Rs.4,136.55

159 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4061.03
Reinforced cement concrete (design mix)in:-Arches M-30 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,469.60
Labour
1 Mate 1 Day Rs. 169.00 0.3884 65.6396
2 Mason (Stone mason) 1 Day Rs. 225.00 1.05 236.25
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mazdoor-man, 1 Day Rs. 169.00 3.884 656.396
5 Bhisty including mussack 1 Day Rs. 169.00 0.45 76.05
Rs.1,061.22
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,303.50 Total Amount of M and L Rs.3,662.52
Add 17.5 % OH and CP Rs.640.94
Total Rs.4,303.46

160 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4062.01
Reinforced cement concrete (design mix)in:- Domes, vaults, shell roofs, arch ribs and folded plates M-20 (20
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,377.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.444 75.036
2 Mate 1 Day Rs. 169.00 0.308 52.052
3 Mazdoor-man, 1 Day Rs. 169.00 3.08 520.52
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mason (Stone mason) 1 Day Rs. 225.00 1.16 261
Rs.935.49
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.4,030.30 Total Amount of M and L Rs.3,430.04
Add 17.5 % OH and CP Rs.600.26
Total Rs.4,030.30

161 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4062.02
Reinforced cement concrete (design mix)in:- Domes, vaults, shell roofs, arch ribs and folded plates M-25 (20
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
Rs.2,423.60
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mate 1 Day Rs. 169.00 0.354 59.826
3 Mason (Stone mason) 1 Day Rs. 225.00 1.16 261
4 Mazdoor-man, 1 Day Rs. 169.00 3.54 598.26
5 Bhisty including mussack 1 Day Rs. 169.00 0.445 75.205
Rs.1,021.17
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.4,197.30 Total Amount of M and L Rs.3,572.17
Add 17.5 % OH and CP Rs.625.13
Total Rs.4,197.30

162 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4062.03
Reinforced cement concrete (design mix)in:-Domes, vaults, shell roofs, arch ribs and folded plates M-30 (20
mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
Rs.2,469.60
Labour
1 Mate 1 Day Rs. 169.00 0.405 68.445
2 Mason (Stone mason) 1 Day Rs. 225.00 1.16 261
3 Mazdoor-man, 1 Day Rs. 169.00 4.05 684.45
4 Bhisty including mussack 1 Day Rs. 169.00 0.4272 72.1968
5 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
Rs.1,112.97
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,364.30 Total Amount of M and L Rs.3,714.27
Add 17.5 % OH and CP Rs.650.00
Total Rs.4,364.27

163 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4063.01
Reinforced cement concrete (design mix)in:- Chimneys and shaftsM-20 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
3 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
Rs.2,377.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.404 68.276
2 Mate 1 Day Rs. 169.00 0.248 41.912
3 Mazdoor-man, 1 Day Rs. 169.00 2.48 419.12
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.781.19
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,849.00 Total Amount of M and L Rs.3,275.74
Add 17.5 % OH and CP Rs.573.25
Total Rs.3,848.99

164 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4063.02
Reinforced cement concrete (design mix)in:- Chimneys and shafts M-25 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
3 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
Rs.2,423.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.402 67.938
2 Mazdoor-man, 1 Day Rs. 169.00 2.97 501.93
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mason (Stone mason) 1 Day Rs. 225.00 1 225
5 Mate 1 Day Rs. 169.00 0.297 50.193
Rs.871.94
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.4,022.00 Total Amount of M and L Rs.3,422.94
Add 17.5 % OH and CP Rs.599.01
Total Rs.4,021.96

165 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4063.03
Reinforced cement concrete (design mix)in:-Chimneys and shafts M-30 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,469.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1 225
2 Mazdoor-man, 1 Day Rs. 169.00 3.43 579.67
3 Mate 1 Day Rs. 169.00 0.343 57.967
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Bhisty including mussack 1 Day Rs. 169.00 0.4395 74.2755
Rs.963.79
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,189.00 Total Amount of M and L Rs.3,565.09
Add 17.5 % OH and CP Rs.623.89
Total Rs.4,188.99

166 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4064.01
Reinforced cement concrete (design mix)in:- well steining and well curbsM-20 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
Rs.2,377.60
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
2 Mazdoor-man, 1 Day Rs. 169.00 2.27 383.63
3 Mate 1 Day Rs. 169.00 0.227 38.363
4 Bhisty including mussack 1 Day Rs. 169.00 0.3845 64.9805
5 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.738.85
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,799.30 Total Amount of M and L Rs.3,233.41
Add 17.5 % OH and CP Rs.565.85
Total Rs.3,799.25

167 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4064.02
Reinforced cement concrete (design mix)in:- well steining and well curbs M-25 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
3 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
Rs.2,423.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.72 459.68
2 Mate 1 Day Rs. 169.00 0.272 45.968
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mason (Stone mason) 1 Day Rs. 225.00 1 225
5 Bhisty including mussack 1 Day Rs. 169.00 0.397 67.093
Rs.824.62
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.857 85.7
Rs.85.70
After rounding off: Rs.3,966.40 Total Amount of M and L Rs.3,375.62
Add 17.5 % OH and CP Rs.590.73
Total Rs.3,966.36

168 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4064.03
Reinforced cement concrete (design mix)in:-well steining and well curbs M-30 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
Rs.2,469.60
Labour
1 Mate 1 Day Rs. 169.00 0.322 54.418
2 Mazdoor-man, 1 Day Rs. 169.00 3.22 544.18
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Bhisty including mussack 1 Day Rs. 169.00 0.3905 65.9945
5 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.916.47
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,133.40 Total Amount of M and L Rs.3,517.77
Add 17.5 % OH and CP Rs.615.61
Total Rs.4,133.38

169 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4065.01
Reinforced cement concrete (design mix)in:- fins facias louvers parapets and railings exc 60 cm in height,
newels, balustrade and the likeM-20 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
3 Cement ordinay portland 50 Kg Rs. 230.00 7.2 1656
Rs.2,377.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.06 517.14
2 Mason (Stone mason) 1 Day Rs. 225.00 1 225
3 Bhisty including mussack 1 Day Rs. 169.00 0.406 68.614
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
5 Mate 1 Day Rs. 169.00 0.306 51.714
Rs.889.35
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.7525 75.25
Rs.75.25
After rounding off: Rs.3,976.10 Total Amount of M and L Rs.3,383.90
Add 17.5 % OH and CP Rs.592.18
Total Rs.3,976.08

170 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4065.02
Reinforced cement concrete (design mix)in:- fins facias louvers parapets and railings exc 60 cm in height,
newels, balustrade and the like M-25 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
2 Cement ordinay portland 50 Kg Rs. 230.00 7.4 1702
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
Rs.2,423.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1 225
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 3.52 594.88
4 Mate 1 Day Rs. 169.00 0.352 59.488
5 Bhisty including mussack 1 Day Rs. 169.00 0.4095 69.2055
Rs.975.45
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.07 23.8294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.41.70
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.8525 85.25
Rs.85.25
After rounding off: Rs.4,143.10 Total Amount of M and L Rs.3,526.01
Add 17.5 % OH and CP Rs.617.05
Total Rs.4,143.06

171 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4065.03
Reinforced cement concrete (design mix)in:-fins facias louvers parapets and railings exc 60 cm in height,
newels, balustrade and the like M-30 (20 mm graded aggregate).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.902 496.1
2 Sand for concrete 1 Cum Rs. 500.00 0.451 225.5
3 Cement ordinay portland 50 Kg Rs. 230.00 7.6 1748
Rs.2,469.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1 225
2 Mate 1 Day Rs. 169.00 0.286 48.334
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
4 Mazdoor-man, 1 Day Rs. 169.00 2.85 481.65
5 Bhisty including mussack 1 Day Rs. 169.00 0.4175 70.5575
Rs.852.42
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.7 238.294
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.07 17.8724
Rs.256.17
Sundry
1 Add for designing and quality control 1 No. Rs. 100.00 0.9 90
Rs.90.00
After rounding off: Rs.4,310.10 Total Amount of M and L Rs.3,668.19
Add 17.5 % OH and CP Rs.641.93
Total Rs.4,310.12

ITEM No. 4066.01


Extra over item 04053.01,04053.01&04058.01 for doing work inwater retaining structures.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.21 35.49
Rs.55.74
After rounding off: Rs.65.50 Total Amount of M and L Rs.55.74
Add 17.5 % OH and CP Rs.9.75
Total Rs.65.49

ITEM No. 4066.02


Extra over item 04053.02,04054.02 &04058.02 for doing work in water retaining structure.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.21 35.49
Rs.55.74
After rounding off: Rs.65.50 Total Amount of M and L Rs.55.74
Add 17.5 % OH and CP Rs.9.75
Total Rs.65.49

172 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4066.03
Extra over item 04053.03,04054.03&04058.03 for doing work in water retaining structure.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.21 35.49
Rs.55.74
After rounding off: Rs.65.50 Total Amount of M and L Rs.55.74
Add 17.5 % OH and CP Rs.9.75
Total Rs.65.49

ITEM No. 4067.01


RCC (1:1½:3) type A1 as in bored piles 16 m length from cut off level with dia of pile 450 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 2.34 1287
2 Sand for concrete 1 Cum Rs. 500.00 1.17 585
3 Cement ordinay portland 50 Kg Rs. 230.00 22.39 5149.7
Rs.7,021.70
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.2578 283.005
2 Mate 1 Day Rs. 169.00 0.655 110.695
3 Mazdoor-man, 1 Day Rs. 169.00 6.55 1106.95
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.38 72.96
5 Bhisty including mussack 1 Day Rs. 169.00 1.208 204.152
Rs.1,777.76
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.19 48.5108
2 Metal Sheeting &pilling Equipment 1 No. Rs. 500.00 0.506 253
3 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.19 64.6798
Rs.366.19
After rounding off: Rs.10,769.60 Total Amount of M and L Rs.9,165.65
Add 17.5 % OH and CP Rs.1,603.99
Total Rs.10,769.64

173 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4067.02
RCC (1:1½:3) type A1 as in bored piles 16 m length from cut off level with dia of pile 500 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 2.9 1595
2 Sand for concrete 1 Cum Rs. 500.00 1.45 725
3 Cement ordinay portland 50 Kg Rs. 230.00 27.66 6361.8
Rs.8,681.80
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.46 88.32
2 Mazdoor-man, 1 Day Rs. 169.00 8.8 1487.2
3 Mate 1 Day Rs. 169.00 0.88 148.72
4 Bhisty including mussack 1 Day Rs. 169.00 1.3138 222.0322
5 Mason (Stone mason) 1 Day Rs. 225.00 1.5 337.5
Rs.2,283.77
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.23 58.7236
2 Metal Sheeting &pilling Equipment 1 No. Rs. 500.00 0.56 280
3 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.23 78.2966
Rs.417.02
After rounding off: Rs.13,374.50 Total Amount of M and L Rs.11,382.59
Add 17.5 % OH and CP Rs.1,991.95
Total Rs.13,374.55

ITEM No. 4067.03


RCC (1:1½:3) type A1 as in bored piles 16 m length from cut off level with dia of pile 530 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 31.04 7139.2
2 Sand for concrete 1 Cum Rs. 500.00 1.65 825
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 3.3 1815
Rs.9,779.20
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.6 115.2
2 Mason (Stone mason) 1 Day Rs. 225.00 1.8 405
3 Mazdoor-man, 1 Day Rs. 169.00 9.1 1537.9
4 Bhisty including mussack 1 Day Rs. 169.00 1.403 237.107
5 Mate 1 Day Rs. 169.00 0.91 153.79
Rs.2,449.00
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.3 102.126
2 Metal Sheeting &pilling Equipment 1 No. Rs. 500.00 0.53 265
3 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.3 76.596
Rs.443.72
After rounding off: Rs.14,889.50 Total Amount of M and L Rs.12,671.92
Add 17.5 % OH and CP Rs.2,217.59
Total Rs.14,889.50

174 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4068.01
Add to item 04067.01 for each addl 1 meter length for 450 mm dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 1.278 293.94
2 Sand for concrete 1 Cum Rs. 500.00 0.067 33.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.134 73.7
Rs.401.14
Labour
1 Mate 1 Day Rs. 169.00 0.045 7.605
2 Mazdoor-man, 1 Day Rs. 169.00 0.45 76.05
3 Bhisty including mussack 1 Day Rs. 169.00 0.1246 21.0574
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.02 3.84
5 Mason (Stone mason) 1 Day Rs. 225.00 0.061 13.725
Rs.122.28
Plant & Machiner
1 Metal Sheeting &pilling Equipment 1 No. Rs. 500.00 0.1 50
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.01 2.5532
3 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.01 3.4042
Rs.55.96
After rounding off: Rs.680.80 Total Amount of M and L Rs.579.37
Add 17.5 % OH and CP Rs.101.39
Total Rs.680.77

ITEM No. 4068.02


Add to item 04067.02or each addl 1 meter length for 500 mm dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 1.63 374.9
2 Sand for concrete 1 Cum Rs. 500.00 0.085 42.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.17 93.5
Rs.510.90
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.08 18
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.02 3.84
3 Mazdoor-man, 1 Day Rs. 169.00 0.52 87.88
4 Mate 1 Day Rs. 169.00 0.052 8.788
5 Bhisty including mussack 1 Day Rs. 169.00 0.1545 26.1105
Rs.144.62
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.01 2.5532
2 Metal Sheeting &pilling Equipment 1 No. Rs. 500.00 0.1 50
3 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.01 3.4042
Rs.55.96
After rounding off: Rs.836.00 Total Amount of M and L Rs.711.48
Add 17.5 % OH and CP Rs.124.51
Total Rs.835.98

175 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4068.03
Add to item 04067.03 for each addl 1 meter length for 530 mm dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 1.7 391
2 Sand for concrete 1 Cum Rs. 500.00 0.09 45
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.18 99
Rs.535.00
Labour
1 Mate 1 Day Rs. 169.00 0.065 10.985
2 Mason (Stone mason) 1 Day Rs. 225.00 0.13 29.25
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.024 4.608
4 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
5 Bhisty including mussack 1 Day Rs. 169.00 0.157 26.533
Rs.181.23
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.012 4.08504
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.012 3.06384
3 Metal Sheeting &pilling Equipment 1 No. Rs. 500.00 0.11 55
Rs.62.15
After rounding off: Rs.914.60 Total Amount of M and L Rs.778.37
Add 17.5 % OH and CP Rs.136.22
Total Rs.914.59

ITEM No. 4069.01


Deduct from item 04067.01 for each 1 m length for 450 mm dia pile.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 1.278 293.94
2 Sand for concrete 1 Cum Rs. 500.00 0.067 33.5
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.134 73.7
Rs.401.14
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.115 19.435
2 Mason (Stone mason) 1 Day Rs. 225.00 0.061 13.725
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.02 3.84
4 Mazdoor-man, 1 Day Rs. 169.00 0.35 59.15
5 Mate 1 Day Rs. 169.00 0.035 5.915
Rs.102.07
Plant & Machiner
1 Metal Sheeting &pilling Equipment 1 No. Rs. 500.00 0.09 45
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.01 3.4042
3 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.01 2.5532
Rs.50.96
After rounding off: Rs.651.10 Total Amount of M and L Rs.554.16
Add 17.5 % OH and CP Rs.96.98
Total Rs.651.14

176 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4069.02
Deduct from item 04067.02 for each 1 m length for 500 mm dia pile.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.085 42.5
2 Cement ordinay portland 50 Kg Rs. 230.00 1.63 374.9
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.17 93.5
Rs.510.90
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.143 24.167
2 Mate 1 Day Rs. 169.00 0.043 7.267
3 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.02 3.84
5 Mason (Stone mason) 1 Day Rs. 225.00 0.07 15.75
Rs.123.69
Plant & Machiner
1 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.01 2.5532
2 Metal Sheeting &pilling Equipment 1 No. Rs. 500.00 0.095 47.5
3 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.01 3.4042
Rs.53.46
After rounding off: Rs.808.50 Total Amount of M and L Rs.688.05
Add 17.5 % OH and CP Rs.120.41
Total Rs.808.46

ITEM No. 4069.03


Deduct from item 04067.03 for each 1 m length for 450 mm dia pile.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.18 99
2 Sand for concrete 1 Cum Rs. 500.00 0.09 45
3 Cement ordinay portland 50 Kg Rs. 230.00 1.7 391
Rs.535.00
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.12 27
2 Bhisty including mussack 1 Day Rs. 169.00 0.154 26.026
3 Mate 1 Day Rs. 169.00 0.065 10.985
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.024 4.608
5 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
Rs.178.47
Plant & Machiner
1 Metal Sheeting &pilling Equipment 1 No. Rs. 500.00 0.11 55
2 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.012 4.08504
3 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.012 3.06384
Rs.62.15
After rounding off: Rs.911.40 Total Amount of M and L Rs.775.62
Add 17.5 % OH and CP Rs.135.73
Total Rs.911.35

177 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4073.01
Providing reinforcement concrete in type B1,1:2:4 (20mm graded stone aggregate) in precast post, fencing
posts, straining or terminal posts, struts etc for fencing, average sectional area n. exc 100 sq. cm with or
without chamfered angles and flat, splayed,rounded or mitered tops as directed and fixed
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
4 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.014 224
Rs.2,378.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.87 420.75
2 Bhisty including mussack 1 Day Rs. 169.00 0.0905 15.2945
3 Mate 1 Day Rs. 169.00 0.684 115.596
4 Operator (pneumatic tools) 1 Day Rs. 192.00 0.35 67.2
5 Mazdoor-man, 1 Day Rs. 169.00 6.84 1155.96
Rs.1,774.80
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.14 47.6588
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.21 53.6172
Rs.101.28
After rounding off: Rs.4,999.50 Total Amount of M and L Rs.4,254.89
Add 17.5 % OH and CP Rs.744.61
Total Rs.4,999.49

ITEM No. 4073.02


Fixing only reinforcement concrete in type B1,1:2:4 (20mm graded stone aggregate) precast post, fencing
posts, straining or terminal posts, struts etc for fencing, average sectional area n. exc 100 sq. cm with or
without chamfered angles and flat, splayed,rounded or mitered tops as directed
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.9 490.1
2 Mason (Stone mason) 1 Day Rs. 225.00 0.92 207
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.16 30.72
Rs.727.82
After rounding off: Rs.855.20 Total Amount of M and L Rs.727.82
Add 17.5 % OH and CP Rs.127.37
Total Rs.855.19

178 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4074.01
Providing reinforcement concrete in type B1,1:2:4 (20mm graded stone aggregate) in precast post, fencing
posts, straining or terminal posts, struts etc for fencing, average sectional area exceeding 100 and not
exceeding 250Sq.cm. with or without chamfered angles and flat, splayed,rounded or mitered tops as directed
and fixed .
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
2 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
3 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
4 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.015 240
Rs.2,394.81
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.0905 15.2945
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.35 67.2
3 Mate 1 Day Rs. 169.00 0.627 105.963
4 Mason (Stone mason) 1 Day Rs. 225.00 1.69 380.25
5 Mazdoor-man, 1 Day Rs. 169.00 6.27 1059.63
Rs.1,628.34
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.21 71.4882
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.14 35.7448
Rs.107.23
After rounding off: Rs.4,853.20 Total Amount of M and L Rs.4,130.38
Add 17.5 % OH and CP Rs.722.82
Total Rs.4,853.20

ITEM No. 4074.02


Fixing only reinforcement concrete in type B1,1:2:4 (20mm graded stone aggregate) precast post, fencing
posts, straining or terminal posts, struts etc for fencing, average sectional area exceeding 100 and not
exceeding 250Sq.cm. with or without chamfered angles and flat, splayed,rounded or mitered tops as directed
and fixed
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.74 166.5
2 Mazdoor-man, 1 Day Rs. 169.00 2.51 424.19
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.16 30.72
Rs.621.41
After rounding off: Rs.730.20 Total Amount of M and L Rs.621.41
Add 17.5 % OH and CP Rs.108.75
Total Rs.730.16

179 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4075.01
Providing reinforcement concrete in type B1,1:2:4 (20mm graded stone aggregate) in precast post, fencing
posts, straining or terminal posts, struts etc for fencing, average sectional area exceeding Exceeding 250 and
not exceeding 400Sq.cm, with or without chamfered angles and flat, splayed,rounded or mitered tops as
directed and fixed .
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.015 240
2 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
3 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
4 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.84 462
Rs.2,394.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.2 270
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.35 67.2
3 Mazdoor-man, 1 Day Rs. 169.00 5.48 926.12
4 Bhisty including mussack 1 Day Rs. 169.00 0.9 152.1
5 Mate 1 Day Rs. 169.00 0.548 92.612
Rs.1,508.03
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.14 47.6588
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.21 53.6172
Rs.101.28
After rounding off: Rs.4,704.80 Total Amount of M and L Rs.4,004.12
Add 17.5 % OH and CP Rs.700.72
Total Rs.4,704.84

ITEM No. 4075.02


Fixing only reinforcement concrete in type B1,1:2:4 (20mm graded stone aggregate) in precast post, fencing
posts, straining or terminal posts, struts etc for fencing, average sectional area exceeding Exceeding 250 and
not exceeding 400Sq.cm, with or without chamfered angles and flat, splayed,rounded or mitered tops as
directed and fixed .
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.27 383.63
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.12 23.04
3 Mason (Stone mason) 1 Day Rs. 225.00 0.5 112.5
Rs.519.17
After rounding off: Rs.610.00 Total Amount of M and L Rs.519.17
Add 17.5 % OH and CP Rs.90.85
Total Rs.610.02

180 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4076.01
Precast reinforcement concrete in type B0, 1:2:4 (12.5mm graded stone aggregate) in door and window
frames, any size, single or double rebated, including arrangement for fixing of hinges and fixtures as required.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 6.397 1471.31
2 Sand for concrete 1 Cum Rs. 500.00 0.443 221.5
3 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.84 483
Rs.2,175.81
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 4.55 1023.75
2 Mate 1 Day Rs. 169.00 0.964 162.916
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.35 67.2
4 Bhisty including mussack 1 Day Rs. 169.00 2.5026 422.9394
5 Mazdoor-man, 1 Day Rs. 169.00 9.64 1629.16
Rs.3,305.97
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.14 47.6588
2 Vibrator ( Nedle type 40 mm)S 1 Day Rs. 255.32 0.21 53.6172
Rs.101.28
After rounding off: Rs.6,560.10 Total Amount of M and L Rs.5,583.05
Add 17.5 % OH and CP Rs.977.03
Total Rs.6,560.09

ITEM No. 4076.02


fixing only Precast reinforcement concrete in type B0, 1:2:4 (12.5mm graded stone aggregate) in door and
window frames, any size, single or double rebated, including arrangement for fixing of hinges and fixtures as
required.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.9 427.5
2 Mazdoor-man, 1 Day Rs. 169.00 3.8 642.2
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.35 67.2
Rs.1,136.90
After rounding off: Rs.1,335.90 Total Amount of M and L Rs.1,136.90
Add 17.5 % OH and CP Rs.198.96
Total Rs.1,335.86

181 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4077
Grouting 25mm thick under stanchion bases or grillages, etc including any temporary shuttering to edges with
cement mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.522 120.06
2 Sand for concrete 1 Cum Rs. 500.00 0.0268 13.4
3 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.001155 18.48
Rs.151.94
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.34 76.5
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.14 26.88
3 Mazdoor-man, 1 Day Rs. 169.00 0.86 145.34
4 Bhisty including mussack 1 Day Rs. 169.00 0.3 50.7
Rs.299.42
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.00175 0.595735
Rs.0.60
After rounding off: Rs.531.00 Total Amount of M and L Rs.451.96
Add 17.5 % OH and CP Rs.79.09
Total Rs.531.05

ITEM No. 4078


Add to or deduct from item 04077 for each 5mm thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.1404 32.292
2 Timber scantling for shuttering 1 Cum Rs. 16,000.00 0.00024 3.84
3 Sand for concrete 1 Cum Rs. 500.00 0.0053 2.65
Rs.38.78
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.05 8.45
2 Mason (Stone mason) 1 Day Rs. 225.00 0.05 11.25
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.01 1.92
4 Mazdoor-man, 1 Day Rs. 169.00 0.13 21.97
Rs.43.59
Plant & Machiner
1 Concrete Mixer 0.14 cubic metre 1 Day Rs. 340.42 0.00035 0.119147
Rs.0.12
After rounding off: Rs.96.90 Total Amount of M and L Rs.82.49
Add 17.5 % OH and CP Rs.14.44
Total Rs.96.93

182 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4079
Extra for forming fair finished drain or channel 30cm inner girth in cement concrete, using extra cement,
including forms, moulds, mitred/stopped ends etc.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.0083 1.909
Rs.1.91
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.04 9
2 Mazdoor-man, 1 Day Rs. 169.00 0.005 0.845
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.005 0.96
Rs.10.81
After rounding off: Rs.14.90 Total Amount of M and L Rs.12.71
Add 17.5 % OH and CP Rs.2.22
Total Rs.14.94

ITEM No. 4080


Add or deduct for each 25mm girth or part thereof over or under 30cm inner girth in cement concrete ,using
extra cement,including forms, moulds,mitred/stopped ends etc
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.00069 0.1587
Rs.0.16
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.001 0.169
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.001 0.192
3 Mason (Stone mason) 1 Day Rs. 225.00 0.005 1.125
Rs.1.49
After rounding off: Rs.1.90 Total Amount of M and L Rs.1.64
Add 17.5 % OH and CP Rs.0.29
Total Rs.1.93

ITEM No. 4081


Forming mortice holes n exc. 50 cu cm for balusters, newals, rag - bolts, etc. and grouting with cement mortar
1:2 after balusters, etc. are fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.005 1.15
2 Sand for concrete 1 Cum Rs. 500.00 0.0004 0.2
Rs.1.35
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.001 0.192
3 Mason (Stone mason) 1 Day Rs. 225.00 0.028 6.3
Rs.9.87
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.22
Add 17.5 % OH and CP Rs.1.96
Total Rs.13.19

183 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4082
Forming mortice hole exc 50 but n exc 100cu cm for blauster,newels ragbolt,etcand grouting with cement
mortar1:2 after blauster etc are fixed
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 0.0006 0.3
2 Cement ordinay portland 50 Kg Rs. 230.00 0.01 2.3
Rs.2.60
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.001 0.192
2 Mason (Stone mason) 1 Day Rs. 225.00 0.057 12.825
3 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
Rs.19.78
After rounding off: Rs.26.30 Total Amount of M and L Rs.22.38
Add 17.5 % OH and CP Rs.3.92
Total Rs.26.29

ITEM No. 4083


Forming dovetailed cavities, n. exc 10cmx 10cm at top and 20cmx20cm at bottom in concrete cast-in-situ
(plain or reinforced) for holding down bolts, etc. for machinery, stanchions, etc. including temporary forms or
moulds and carefully grouting round bolts (after fixing )with cement concrete typeB1 1;2;4(20 mm graded
aggregrate ) or cement mortar 1;3 as directed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.0006 0.138
2 Sand for concrete 1 Cum Rs. 500.00 0.0002 0.1
Rs.0.24
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.0004 0.0768
2 Mason (Stone mason) 1 Day Rs. 225.00 0.01 2.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.014 2.366
Rs.4.69
After rounding off: Rs.5.80 Total Amount of M and L Rs.4.93
Add 17.5 % OH and CP Rs.0.86
Total Rs.5.79

184 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4084.01
Cutting opening in cement concrete walls (any description) for door, window and other openings (with or
without reveals) or enlarging existing openings, including trimming surfaces to receive rendering etc. With or
without reinforcement
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.6 608.4
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.3 57.6
3 Mason (Stone mason) 1 Day Rs. 225.00 1.2 270
Rs.936.00
After rounding off: Rs.1,099.80 Total Amount of M and L Rs.936.00
Add 17.5 % OH and CP Rs.163.80
Total Rs.1,099.80

ITEM No. 4084.02


Cutting opening in cement concrete walls (any description) for door, window and other openings (with or
without reveals) or enlarging existing openings, including trimming surfaces to receive rendering etc. where
reinforcement is cut through
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.5 337.5
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.703 134.976
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.47 90.24
4 Mazdoor-man, 1 Day Rs. 169.00 5.2 878.8
Rs.1,441.52
After rounding off: Rs.1,693.80 Total Amount of M and L Rs.1,441.52
Add 17.5 % OH and CP Rs.252.27
Total Rs.1,693.78

ITEM No. 4085.01


Cutting upto a depth of 2.5cm into concrete walls and trimming surface as required, girth exc. 30cm. with or
without reinforcement
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.12 23.04
2 Mason (Stone mason) 1 Day Rs. 225.00 0.2 45
3 Mazdoor-man, 1 Day Rs. 169.00 0.15 25.35
Rs.93.39
After rounding off: Rs.109.70 Total Amount of M and L Rs.93.39
Add 17.5 % OH and CP Rs.16.34
Total Rs.109.73

185 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4085.02
Cutting upto a depth of 2.5cm into concrete walls and trimming surface as required, girth exc. 30cm. where
reinforcement is cut through
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.253 42.757
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.21 40.32
3 Blacksmith, tinsmith 1 Day Rs. 192.00 0.21 40.32
4 Mason (Stone mason) 1 Day Rs. 225.00 0.21 47.25
Rs.170.65
After rounding off: Rs.200.50 Total Amount of M and L Rs.170.65
Add 17.5 % OH and CP Rs.29.86
Total Rs.200.51

ITEM No. 4086.01


Add to item04085 for every 2.5 cm extra or part thereof in depth upto 30cm depth. With or without
reinforcement
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.15 25.35
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.1 19.2
3 Mason (Stone mason) 1 Day Rs. 225.00 0.12 27
Rs.71.55
After rounding off: Rs.84.10 Total Amount of M and L Rs.71.55
Add 17.5 % OH and CP Rs.12.52
Total Rs.84.07

ITEM No. 4086.02


Add to item 04085 for every 2.5 cm extra or part thereof in depth upto 30cm depth. Where reinforcement is
cut through
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.13 24.96
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.16 30.72
3 Mason (Stone mason) 1 Day Rs. 225.00 0.16 36
4 Mazdoor-man, 1 Day Rs. 169.00 0.205 34.645
Rs.126.33
After rounding off: Rs.148.40 Total Amount of M and L Rs.126.33
Add 17.5 % OH and CP Rs.22.11
Total Rs.148.43

186 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4087.01
Cutting channels, grooves or rebates n. exc 15cm girth, and trimming surface. with or without reinforcement
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.05 11.25
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.01 1.92
3 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
Rs.30.07
After rounding off: Rs.35.30 Total Amount of M and L Rs.30.07
Add 17.5 % OH and CP Rs.5.26
Total Rs.35.33

ITEM No. 4087.02


Cutting channels, grooves or rebates n. exc 15cm girth, and trimming surface. where reinforcement is cut
through
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.1055 20.256
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.045 8.64
3 Mason (Stone mason) 1 Day Rs. 225.00 0.05 11.25
4 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.82.40
After rounding off: Rs.96.80 Total Amount of M and L Rs.82.40
Add 17.5 % OH and CP Rs.14.42
Total Rs.96.82

ITEM No. 4088.01


Cutting channels, grooves or rebates exc 15cm but n.exc 30cm girth, and trimming surface. With or without
reinforcement
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.2 33.8
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.01 1.92
3 Mason (Stone mason) 1 Day Rs. 225.00 0.08 18
Rs.53.72
After rounding off: Rs.63.10 Total Amount of M and L Rs.53.72
Add 17.5 % OH and CP Rs.9.40
Total Rs.63.12

187 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4088.02
Cutting channels,groves or rebate exc 15cm but n.exc 30cm girth.where reinforcement is cut through
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.155 29.76
2 Mason (Stone mason) 1 Day Rs. 225.00 0.142 31.95
3 Blacksmith, tinsmith 1 Day Rs. 192.00 0.15 28.8
4 Mazdoor-man, 1 Day Rs. 169.00 0.3 50.7
Rs.141.21
After rounding off: Rs.165.90 Total Amount of M and L Rs.141.21
Add 17.5 % OH and CP Rs.24.71
Total Rs.165.92

ITEM No. 4089.01


Cutting holes into or through cement concrete slabs, chajjas, etc. reinforced or otherwise.Not exc 100 Sq cm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.0155 2.6195
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0 0
3 Mason (Stone mason) 1 Day Rs. 225.00 0.01 2.25
Rs.4.87
After rounding off: Rs.5.70 Total Amount of M and L Rs.4.87
Add 17.5 % OH and CP Rs.0.85
Total Rs.5.72

ITEM No. 4089.02


Cutting holes into or through cement concrete slabs, chajjas, etc. reinforced or otherwise.Exc 100 sq.0cm but
nexc250 sq.cm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.003 0.576
2 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
3 Mason (Stone mason) 1 Day Rs. 225.00 0.009 2.025
Rs.5.98
After rounding off: Rs.7.00 Total Amount of M and L Rs.5.98
Add 17.5 % OH and CP Rs.1.05
Total Rs.7.03

188 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4089.03
Cutting holes into or through cement concrete slabs, chajjas, etc. reinforced or otherwise.Exc 250 sq.cm but
n.0exc 500 sq.0cm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.0251 4.2419
2 Mason (Stone mason) 1 Day Rs. 225.00 0.011 2.475
3 Operator (pneumatic tools) 1 Day Rs. 192.00 0.003 0.576
Rs.7.29
After rounding off: Rs.8.60 Total Amount of M and L Rs.7.29
Add 17.5 % OH and CP Rs.1.28
Total Rs.8.57

ITEM No. 4089.04


Cutting holes into or through cement concrete slabs, chajjas, etc. reinforced or otherwise.Exc 500 sqcm but
nexc 1 Sqm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.03 5.07
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.003 0.576
3 Mason (Stone mason) 1 Day Rs. 225.00 0.015 3.375
Rs.9.02
After rounding off: Rs.10.60 Total Amount of M and L Rs.9.02
Add 17.5 % OH and CP Rs.1.58
Total Rs.10.60

ITEM No. 4090.01


Addto item 4089 above if reinforcement is cut through Not exc 100 Sq cm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.001 0.192
2 Mason (Stone mason) 1 Day Rs. 225.00 0.005 1.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.011 1.859
Rs.3.18
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.18
Add 17.5 % OH and CP Rs.0.56
Total Rs.3.73

ITEM No. 4090.02


Add to item 4089 above if reinforcement is cut through Exc 100 sq.0cm but n.0exc 250 sqcm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.001 0.192
2 Mazdoor-man, 1 Day Rs. 169.00 0.013 2.197
3 Mason (Stone mason) 1 Day Rs. 225.00 0.007 1.575
Rs.3.96
After rounding off: Rs.4.70 Total Amount of M and L Rs.3.96
Add 17.5 % OH and CP Rs.0.69
Total Rs.4.66

189 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4090.03
Add to item 4089 aboveif reinforcement is cut through .Exc 250 sq.0cm but n.0exc 500 sq.0cm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.008 1.8
2 Operator (pneumatic tools) 1 Day Rs. 192.00 0.002 0.384
3 Mazdoor-man, 1 Day Rs. 169.00 0.015 2.535
Rs.4.72
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.72
Add 17.5 % OH and CP Rs.0.83
Total Rs.5.54

ITEM No. 4090.04


Add to item 4089 aboveif reinforcement is cut through . Exc 500 sq.0cm but n.0exc 1 Sqm
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Operator (pneumatic tools) 1 Day Rs. 192.00 0.002 0.384
2 Mason (Stone mason) 1 Day Rs. 225.00 0.01 2.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.0195 3.2955
Rs.5.93
After rounding off: Rs.7.00 Total Amount of M and L Rs.5.93
Add 17.5 % OH and CP Rs.1.04
Total Rs.6.97

ITEM No. 4091.01


Cutting out concrete blocks, slabs, brickwork or stone masonry (in alternate course) forming toothing &
bonding new work in mortar into old work including new materials entering old wall in PCC (1:2:4) type
B1(20mm graded aggregate ) set in CM 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for mortar 1 Cum Rs. 500.00 0.0223 11.15
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.029 15.95
3 Sand for concrete 1 Cum Rs. 500.00 0.02 10
4 Cement ordinay portland 50 Kg Rs. 230.00 0.2429 55.867
Rs.92.97
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.1 354.9
2 Mate 1 Day Rs. 169.00 0.21 35.49
3 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
4 Mason (Stone mason) 1 Day Rs. 225.00 0.35 78.75
Rs.480.97
After rounding off: Rs.674.40 Total Amount of M and L Rs.573.94
Add 17.5 % OH and CP Rs.100.44
Total Rs.674.38

190 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4091.02
Cutting out concrete blocks, slabs, brickwork or stone masonry (in alternate course) forming toothing &
bonding new work in mortar into old work including new materials entering old wall in PCC (1:3:6) type
C1(20mm graded aggregate ) set in CM 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.015 8.25
2 Sand for concrete 1 Cum Rs. 500.00 0.02 10
3 Cement ordinay portland 50 Kg Rs. 230.00 0.1564 35.972
4 Sand for mortar 1 Cum Rs. 500.00 0.0223 11.15
Rs.65.37
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
2 Mazdoor-man, 1 Day Rs. 169.00 2.1 354.9
3 Mate 1 Day Rs. 169.00 0.21 35.49
4 Mason (Stone mason) 1 Day Rs. 225.00 0.4 90
Rs.492.22
After rounding off: Rs.655.20 Total Amount of M and L Rs.557.59
Add 17.5 % OH and CP Rs.97.58
Total Rs.655.17

ITEM No. 4091.03


Cutting out concrete blocks, slabs, brickwork or stone masonry (in alternate course) forming toothing &
bonding new work in mortar into old work including new materials entering old wall in PCC (1:2:4) type
B1(20mm graded aggregate ) set in CM 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.029 15.95
2 Sand for concrete 1 Cum Rs. 500.00 0.02 10
3 Cement ordinay portland 50 Kg Rs. 230.00 0.218 50.14
4 Sand for mortar 1 Cum Rs. 500.00 0.0223 11.15
Rs.87.24
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.34 76.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
3 Mazdoor-man, 1 Day Rs. 169.00 1.85 312.65
4 Mate 1 Day Rs. 169.00 0.21 35.49
Rs.436.47
After rounding off: Rs.615.40 Total Amount of M and L Rs.523.71
Add 17.5 % OH and CP Rs.91.65
Total Rs.615.36

191 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4091.04
Cutting out concrete blocks, slabs, brickwork or stone masonry (in alternate course) forming toothing &
bonding new work in mortar into old work including new materials entering old wall in PCC (1:3:6) type
C1(20mm graded aggregate ) set in CM 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.11 25.3
2 Stone aggregate graded 20 mm 1 Cum Rs. 550.00 0.015 8.25
3 Sand for concrete 1 Cum Rs. 500.00 0.0335 16.75
4 Sand for concrete 1 Cum Rs. 500.00 0.02 10
Rs.60.30
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
2 Mason (Stone mason) 1 Day Rs. 225.00 0.28 63
3 Mate 1 Day Rs. 169.00 0.2 33.8
4 Mazdoor-man, 1 Day Rs. 169.00 2 338
Rs.446.63
After rounding off: Rs.595.60 Total Amount of M and L Rs.506.93
Add 17.5 % OH and CP Rs.88.71
Total Rs.595.64

ITEM No. 4091.05


Cutting out concrete blocks, slabs, brickwork or stone masonry (in alternate course) forming toothing &
bonding new work in mortar into old work including new materials entering old wall except blocks or slabs set
in CM 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 0.02 4.6
2 Sand for mortar 1 Cum Rs. 500.00 0.0056 2.8
Rs.7.40
Labour
1 Mate 1 Day Rs. 169.00 0.21 35.49
2 Mazdoor-man, 1 Day Rs. 169.00 1.65 278.85
3 Mason (Stone mason) 1 Day Rs. 225.00 0.3 67.5
4 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
Rs.393.67
After rounding off: Rs.471.30 Total Amount of M and L Rs.401.07
Add 17.5 % OH and CP Rs.70.19
Total Rs.471.26

192 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4091.06
Cutting out concrete blocks, slabs, brickwork or stone masonry (in alternate course) forming toothing &
bonding new work in mortar into old work including new materials entering old wall in PCC (1:2:4) type B1 set
in CM 1:6. except blocks or slabs set in CM 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for mortar 1 Cum Rs. 500.00 0.0056 2.8
2 Cement ordinay portland 50 Kg Rs. 230.00 0.01 2.3
Rs.5.10
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
2 Mason (Stone mason) 1 Day Rs. 225.00 0.24 54
3 Mate 1 Day Rs. 169.00 0.15 25.35
4 Mazdoor-man, 1 Day Rs. 169.00 1.5 253.5
Rs.344.68
After rounding off: Rs.411.00 Total Amount of M and L Rs.349.78
Add 17.5 % OH and CP Rs.61.21
Total Rs.410.99

ITEM No. 4092


Supply only polyester triangular fibre as secondary reinforcement in all type of concrete and mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 polyester triangular fibre 1 Kg Rs. 275.00 1 275
Rs.275.00
After rounding off: Rs.323.10 Total Amount of M and L Rs.275.00
Add 17.5 % OH and CP Rs.48.13
Total Rs.323.13

ITEM No. 4093.01


Graded coarse Aggregate (63 mm size).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Graded coarse Aggregate (63 mm size) 1 Cum Rs. 500.00 1 500
Rs.500.00
After rounding off: Rs.587.50 Total Amount of M and L Rs.500.00
Add 17.5 % OH and CP Rs.87.50
Total Rs.587.50

ITEM No. 4093.02


Graded coarse Aggregate (40 mm size).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Graded course agg. 40mm gauge 1 Cum Rs. 500.00 1 500
Rs.500.00
After rounding off: Rs.587.50 Total Amount of M and L Rs.500.00
Add 17.5 % OH and CP Rs.87.50
Total Rs.587.50

193 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4093.03
Graded coarse Aggregate (20 mm size).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 graded stone aggregate 20 mm 1 Cum Rs. 550.00 1.000001 550.00055
Rs.550.00
After rounding off: Rs.646.30 Total Amount of M and L Rs.550.00
Add 17.5 % OH and CP Rs.96.25
Total Rs.646.25

ITEM No. 4093.04


Graded coarse Aggregate (12.5 mm size).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Graded stone aggregate 12.5 mm 1 Cum Rs. 575.00 1 575
Rs.575.00
After rounding off: Rs.675.60 Total Amount of M and L Rs.575.00
Add 17.5 % OH and CP Rs.100.63
Total Rs.675.63

ITEM No. 4094.01


Broken Brick coarse aggregate (63 mm Nominal size).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Brick coarse aggregate (63 mm Nominal size) 1 Cum Rs. 425.00 1 425
Rs.425.00
After rounding off: Rs.499.40 Total Amount of M and L Rs.425.00
Add 17.5 % OH and CP Rs.74.38
Total Rs.499.38

ITEM No. 4094.02


Broken Brick coarse aggregate (40 mm Nominal size).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Brick coarse aggregate (40 mm Nominal size) 1 Cum Rs. 450.00 1 450
Rs.450.00
After rounding off: Rs.528.80 Total Amount of M and L Rs.450.00
Add 17.5 % OH and CP Rs.78.75
Total Rs.528.75

ITEM No. 4094.03


Broken Brick coarse aggregate (20 mm Nominal size).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken Brick coarse aggregate (20 mm Nominal size) 1 Cum Rs. 450.00 1 450
Rs.450.00
After rounding off: Rs.528.80 Total Amount of M and L Rs.450.00
Add 17.5 % OH and CP Rs.78.75
Total Rs.528.75

194 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4094.04
Broken Brick coarse aggregate (12.5 mm Nominal size).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bk aggregate, broken 12.5 mm 1 Cum Rs. 450.00 1 450
Rs.450.00
After rounding off: Rs.528.80 Total Amount of M and L Rs.450.00
Add 17.5 % OH and CP Rs.78.75
Total Rs.528.75

ITEM No. 4095


Fine aggregate (sand)for concrete.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for concrete 1 Cum Rs. 500.00 1 500
Rs.500.00
After rounding off: Rs.587.50 Total Amount of M and L Rs.500.00
Add 17.5 % OH and CP Rs.87.50
Total Rs.587.50

ITEM No. 4096


Surki (Burnt clay pozzolona).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Surki (Burnt clay pozzolona) 1 Cum Rs. 350.01 1 350.01
Rs.350.01
After rounding off: Rs.411.30 Total Amount of M and L Rs.350.01
Add 17.5 % OH and CP Rs.61.25
Total Rs.411.26

ITEM No. 4097.01


Lime, unslaked (Fat or Magnesium).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime, unslaked (Fat or Magnesium) 50 Kg Rs. 183.27 1 183.27
Rs.183.27
After rounding off: Rs.215.30 Total Amount of M and L Rs.183.27
Add 17.5 % OH and CP Rs.32.07
Total Rs.215.34

ITEM No. 4097.02


Lime, slaked (Semi hydraulic or kankar).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime,slaked (semi hydraulic or kankar) 50 Kg Rs. 190.00 1 190
Rs.190.00
After rounding off: Rs.223.20 Total Amount of M and L Rs.190.00
Add 17.5 % OH and CP Rs.33.25
Total Rs.223.25

195 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Concrete
ITEM No. 4097.03
Lime, slaked (Eminently hydraulic lime).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime, slaked (eminently hydraulic lime) 50 Kg Rs. 174.41 1 174.41
Rs.174.41
After rounding off: Rs.204.90 Total Amount of M and L Rs.174.41
Add 17.5 % OH and CP Rs.30.52
Total Rs.204.93

ITEM No. 4098


Cement, Ordinary portland, portland pozzolana or portland slag.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement ordinay portland 50 Kg Rs. 230.00 1.000001 230.00023
Rs.230.00
After rounding off: Rs.270.30 Total Amount of M and L Rs.230.00
Add 17.5 % OH and CP Rs.40.25
Total Rs.270.25

ITEM No. 4099


Integral waterproofing compound.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Integral waterproofing compound 1 Kg Rs. 30.00 1.00001 30.0003
Rs.30.00
After rounding off: Rs.35.30 Total Amount of M and L Rs.30.00
Add 17.5 % OH and CP Rs.5.25
Total Rs.35.25

ITEM No. 4100


Integral waterproofing liquid.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Integral waterproofing liquid 1 Litre Rs. 165.00 1 165
Rs.165.00
After rounding off: Rs.193.90 Total Amount of M and L Rs.165.00
Add 17.5 % OH and CP Rs.28.88
Total Rs.193.88

196 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5001.01
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius Old size bricks laid
dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.526 1130.9
Rs.1,130.90
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.28 63
2 Mazdoor-man, 1 Day Rs. 169.00 0.56 94.64
Rs.157.64
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.1,519.90 Total Amount of M and L Rs.1,293.49
Add 17.5 % OH and CP Rs.226.36
Total Rs.1,519.85

ITEM No. 5001.02


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius modular bricks laid
dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.65 1300
Rs.1,300.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.28 63
2 Mazdoor-man, 1 Day Rs. 169.00 0.56 94.64
Rs.157.64
Sundry
1 Sundries 1 Re Rs. 9.00 0.56 5.04
Rs.5.04
After rounding off: Rs.1,718.60 Total Amount of M and L Rs.1,462.68
Add 17.5 % OH and CP Rs.255.97
Total Rs.1,718.65

ITEM No. 5001.03


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius Except bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.28 63
2 Mazdoor-man, 1 Day Rs. 169.00 0.56 94.64
Rs.157.64
Sundry
1 Sundries 1 Re Rs. 9.00 0.56 5.04
Rs.5.04
After rounding off: Rs.191.10 Total Amount of M and L Rs.162.68
Add 17.5 % OH and CP Rs.28.47
Total Rs.191.15

197 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5001.04
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius Old size bricks in mud
mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
2 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.900.20
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.62 139.5
2 Mazdoor-man, 1 Day Rs. 169.00 1.15 194.35
3 Bhisty including mussack 1 Day Rs. 169.00 0.03 5.07
Rs.338.92
Sundry
1 Sundries 1 Re Rs. 9.00 0.56 5.04
Rs.5.04
After rounding off: Rs.1,461.90 Total Amount of M and L Rs.1,244.16
Add 17.5 % OH and CP Rs.217.73
Total Rs.1,461.89

ITEM No. 5001.05


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius Modular bricks in
mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,033.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.03 5.07
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.62 139.5
3 Mazdoor-man, 1 Day Rs. 169.00 1.15 194.35
Rs.338.92
Sundry
1 Sundries 1 Re Rs. 9.00 0.56 5.04
Rs.5.04
After rounding off: Rs.1,617.90 Total Amount of M and L Rs.1,376.96
Add 17.5 % OH and CP Rs.240.97
Total Rs.1,617.93

198 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5001.06
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius Except bricks in mud
mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.23.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.03 5.07
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.62 139.5
3 Mazdoor-man, 1 Day Rs. 169.00 1.15 194.35
Rs.338.92
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.431.10 Total Amount of M and L Rs.366.87
Add 17.5 % OH and CP Rs.64.20
Total Rs.431.07

ITEM No. 5002.01


Brick work with sub-class' B' in curved work on plan with mean radius n exc 6m Old size bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.526 1130.9
Rs.1,130.90
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.35 78.75
Rs.197.05
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.1,566.20 Total Amount of M and L Rs.1,332.90
Add 17.5 % OH and CP Rs.233.26
Total Rs.1,566.16

199 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5002.02
Brick work with sub-class'B' bricks, in curved work on plan with mean radius n exc 6m modular bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.65 1300
Rs.1,300.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.35 78.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
Rs.197.05
Sundry
1 Sundries 1 Re Rs. 9.00 0.555 4.995
Rs.5.00
After rounding off: Rs.1,764.90 Total Amount of M and L Rs.1,502.05
Add 17.5 % OH and CP Rs.262.86
Total Rs.1,764.90

ITEM No. 5002.03


Brick work with sub-class'B' bricks, in curved work on plan with mean radius n exc 6m Except bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.35 78.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
Rs.197.05
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.237.40 Total Amount of M and L Rs.202.00
Add 17.5 % OH and CP Rs.35.35
Total Rs.237.35

200 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5002.04
Brick work with sub-class'B' bricks, in curved work on plan with mean radius n exc 6m Old size bricks in mud
mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
Rs.900.20
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.77 173.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.44 243.36
3 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
Rs.423.37
Sundry
1 Sundries 1 Re Rs. 9.00 0.56 5.04
Rs.5.04
After rounding off: Rs.1,561.10 Total Amount of M and L Rs.1,328.61
Add 17.5 % OH and CP Rs.232.51
Total Rs.1,561.12

ITEM No. 5002.05


Brick work with sub-class'B' bricks, in curved work on plan with mean radius n exc 6m Modular bricks in mud
mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,033.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.77 173.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.44 243.36
Rs.423.37
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.1,717.10 Total Amount of M and L Rs.1,461.32
Add 17.5 % OH and CP Rs.255.73
Total Rs.1,717.05

201 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5002.06
Brick work with sub-class'B' bricks, in curved work on plan with mean radius n exc 6m Except bricks in mud
mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.23.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.77 173.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.44 243.36
Rs.423.37
Sundry
1 Sundries 1 Re Rs. 9.00 0.555 4.995
Rs.5.00
After rounding off: Rs.530.40 Total Amount of M and L Rs.451.37
Add 17.5 % OH and CP Rs.78.99
Total Rs.530.35

ITEM No. 5003.01


Brick work with sub-class'B' bricks, in circular well steining (any radius) constructed from the base or curb Old
size bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.526 1130.9
Rs.1,130.90
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.44 324
2 Mazdoor-man, 1 Day Rs. 169.00 0.44 74.36
Rs.398.36
After rounding off: Rs.1,796.90 Total Amount of M and L Rs.1,529.26
Add 17.5 % OH and CP Rs.267.62
Total Rs.1,796.88

202 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5003.02
Brick work with sub-class'B' bricks, in circular well steining (any radius) constructed from the base or curb
modular bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.65 1300
Rs.1,300.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.44 324
2 Mazdoor-man, 1 Day Rs. 169.00 0.44 74.36
Rs.398.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.2,001.40 Total Amount of M and L Rs.1,703.31
Add 17.5 % OH and CP Rs.298.08
Total Rs.2,001.39

ITEM No. 5003.03


Brick work with sub-class'B' bricks, in curved work on plan in circular well steining (any radius) constructed
from the base or curb Except bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.44 324
2 Mazdoor-man, 1 Day Rs. 169.00 0.44 74.36
Rs.398.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.473.90 Total Amount of M and L Rs.403.31
Add 17.5 % OH and CP Rs.70.58
Total Rs.473.89

203 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5003.04
Brick work with sub-class'B' bricks, in curved work on plan in circular well steining (any radius) constructed
from the base or curb Old size bricks in mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
Rs.900.20
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.92 432
2 Mazdoor-man, 1 Day Rs. 169.00 0.77 130.13
3 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
Rs.568.89
Sundry
1 Sundries 1 Re Rs. 9.00 0.56 5.04
Rs.5.04
After rounding off: Rs.1,732.10 Total Amount of M and L Rs.1,474.13
Add 17.5 % OH and CP Rs.257.97
Total Rs.1,732.10

ITEM No. 5003.05


Brick work with sub-class'B' bricks, in curved work on plan in circular well steining (any radius) constructed
from the base or curb Modular bricks in mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
2 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.1,033.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.92 432
2 Mazdoor-man, 1 Day Rs. 169.00 0.77 130.13
3 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
Rs.568.89
Sundry
1 Sundries 1 Re Rs. 9.00 0.56 5.04
Rs.5.04
After rounding off: Rs.1,888.10 Total Amount of M and L Rs.1,606.93
Add 17.5 % OH and CP Rs.281.21
Total Rs.1,888.14

204 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5003.06
Brick work with sub-class'B' bricks, in curved work on plan in circular well steining (any radius) constructed
from the base or curb Except bricks in mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.23.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.92 432
3 Mazdoor-man, 1 Day Rs. 169.00 0.77 130.13
Rs.568.89
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.701.30 Total Amount of M and L Rs.596.84
Add 17.5 % OH and CP Rs.104.45
Total Rs.701.29

ITEM No. 5004.01


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.228 108.3
2 Lime unslakeds* 1 Kg Rs. 3.80 38.64 146.832
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.4087 878.705
Rs.1,133.84
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.56 5.04
Rs.5.04
After rounding off: Rs.1,923.50 Total Amount of M and L Rs.1,637.05
Add 17.5 % OH and CP Rs.286.48
Total Rs.1,923.53

205 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5004.02
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 55.59 211.242
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
Rs.1,205.29
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
3 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.72 6.48
Rs.6.48
After rounding off: Rs.2,009.20 Total Amount of M and L Rs.1,709.94
Add 17.5 % OH and CP Rs.299.24
Total Rs.2,009.18

ITEM No. 5004.03


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.2185 103.7875
3 Lime unslakeds* 1 Kg Rs. 3.80 74.04 281.352
Rs.1,262.34
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.72 6.48
Rs.6.48
After rounding off: Rs.2,076.20 Total Amount of M and L Rs.1,766.99
Add 17.5 % OH and CP Rs.309.22
Total Rs.2,076.22

206 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5004.04
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
2 Ordinary portland cement. 1 Kg Rs. 4.60 34.65 159.39
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
4 Lime unslakeds* 1 Kg Rs. 3.80 37.05 140.79
Rs.1,294.23
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.72 6.48
Rs.6.48
After rounding off: Rs.2,113.70 Total Amount of M and L Rs.1,798.88
Add 17.5 % OH and CP Rs.314.80
Total Rs.2,113.69

207 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5004.05
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
2 Lime unslakeds* 1 Kg Rs. 3.80 20.86 79.268
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
4 Ordinary portland cement. 1 Kg Rs. 4.60 43.6 200.56
Rs.1,273.88
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.72 6.48
Rs.6.48
After rounding off: Rs.2,089.80 Total Amount of M and L Rs.1,778.53
Add 17.5 % OH and CP Rs.311.24
Total Rs.2,089.77

208 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5004.06
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 56.81 261.326
2 Lime unslakeds* 1 Kg Rs. 3.80 27.71 105.298
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
4 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
Rs.1,360.67
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.72 6.48
Rs.6.48
After rounding off: Rs.2,191.80 Total Amount of M and L Rs.1,865.33
Add 17.5 % OH and CP Rs.326.43
Total Rs.2,191.76

ITEM No. 5004.07


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 47.93 220.478
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
Rs.1,214.53
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
2 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.56 5.04
Rs.5.04
After rounding off: Rs.2,093.40 Total Amount of M and L Rs.1,781.63
Add 17.5 % OH and CP Rs.311.79
Total Rs.2,093.42

209 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5004.08
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Ordinary portland cement. 1 Kg Rs. 4.60 64.06 294.676
Rs.1,288.73
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.2,180.50 Total Amount of M and L Rs.1,855.74
Add 17.5 % OH and CP Rs.324.75
Total Rs.2,180.49

ITEM No. 5004.09


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Ordinary portland cement. 1 Kg Rs. 4.60 95.84 440.864
Rs.1,434.91
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Bhisty including mussack 1 Day Rs. 169.00 0.202 34.138
3 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
Rs.561.72
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.2,351.90 Total Amount of M and L Rs.2,001.59
Add 17.5 % OH and CP Rs.350.28
Total Rs.2,351.87

210 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5004.1
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 114.14 525.044
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
Rs.1,519.09
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
3 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,448.60 Total Amount of M and L Rs.2,083.95
Add 17.5 % OH and CP Rs.364.69
Total Rs.2,448.64

ITEM No. 5004.11


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Add if sub-class 'A' bricks or brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.408 61.2
Rs.61.20
After rounding off: Rs.71.90 Total Amount of M and L Rs.61.20
Add 17.5 % OH and CP Rs.10.71
Total Rs.71.91

ITEM No. 5004.12


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius, with old size bricks
in Bricks or brick tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.408 877.2
Rs.877.20
After rounding off: Rs.1,030.70 Total Amount of M and L Rs.877.20
Add 17.5 % OH and CP Rs.153.51
Total Rs.1,030.71

211 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5005.01
Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0232 11.02
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
3 Lime unslakeds* 1 Kg Rs. 3.80 3.664 13.9232
Rs.134.59
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.237.10 Total Amount of M and L Rs.201.80
Add 17.5 % OH and CP Rs.35.32
Total Rs.237.12

ITEM No. 5005.02


Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
2 Lime unslakeds* 1 Kg Rs. 3.80 5.198 19.7524
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0232 11.02
Rs.140.42
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.244.00 Total Amount of M and L Rs.207.63
Add 17.5 % OH and CP Rs.36.34
Total Rs.243.97

212 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5005.03
Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
2 Lime unslakeds* 1 Kg Rs. 3.80 6.92 26.296
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0206 9.785
Rs.145.73
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
3 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.250.20 Total Amount of M and L Rs.212.94
Add 17.5 % OH and CP Rs.37.26
Total Rs.250.21

ITEM No. 5005.04


Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
3 Lime unslakeds* 1 Kg Rs. 3.80 3.464 13.1632
4 Ordinary portland cement. 1 Kg Rs. 4.60 3.77 17.342
Rs.151.51
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.257.00 Total Amount of M and L Rs.218.72
Add 17.5 % OH and CP Rs.38.28
Total Rs.256.99

213 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5005.05
Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
2 Lime unslakeds* 1 Kg Rs. 3.80 1.95 7.41
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0237 11.2575
4 Ordinary portland cement. 1 Kg Rs. 4.60 4.36 20.056
Rs.148.37
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Mazdoor-women (18 years and above) 1 Day Rs. 169.00 0.225 38.025
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.253.30 Total Amount of M and L Rs.215.58
Add 17.5 % OH and CP Rs.37.73
Total Rs.253.31

214 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5005.06
Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0237 11.2575
2 Lime unslakeds* 1 Kg Rs. 3.80 2.59 9.842
3 Ordinary portland cement. 1 Kg Rs. 4.60 5.78 26.588
4 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
Rs.157.34
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.263.80 Total Amount of M and L Rs.224.55
Add 17.5 % OH and CP Rs.39.30
Total Rs.263.84

ITEM No. 5005.07


Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0231 10.9725
2 Ordinary portland cement. 1 Kg Rs. 4.60 4.52 20.792
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
Rs.141.41
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.255.90 Total Amount of M and L Rs.217.78
Add 17.5 % OH and CP Rs.38.11
Total Rs.255.89

215 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5005.08
Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.023 10.925
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
3 Ordinary portland cement. 1 Kg Rs. 4.60 6.05 27.83
Rs.148.41
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.75.11
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.263.80 Total Amount of M and L Rs.224.50
Add 17.5 % OH and CP Rs.39.29
Total Rs.263.79

ITEM No. 5005.09


Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.023 10.925
2 Ordinary portland cement. 1 Kg Rs. 4.60 9.05 41.63
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
Rs.162.21
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.280.00 Total Amount of M and L Rs.238.30
Add 17.5 % OH and CP Rs.41.70
Total Rs.280.00

216 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5005.1
Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.023 10.925
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
3 Ordinary portland cement. 1 Kg Rs. 4.60 15.85 72.91
Rs.193.49
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.023 3.887
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.74.26
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.315.80 Total Amount of M and L Rs.268.74
Add 17.5 % OH and CP Rs.47.03
Total Rs.315.77

ITEM No. 5005.11


Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Add if sub-class 'A' bricks or brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.051 7.65
Rs.7.65
After rounding off: Rs.9.00 Total Amount of M and L Rs.7.65
Add 17.5 % OH and CP Rs.1.34
Total Rs.8.99

ITEM No. 5005.12


Brick work with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls with old
size bricks built in Bricks or brick tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.051 109.65
Rs.109.65
After rounding off: Rs.128.80 Total Amount of M and L Rs.109.65
Add 17.5 % OH and CP Rs.19.19
Total Rs.128.84

217 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5006.01
Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 1.62 6.156
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0099 4.7025
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
Rs.86.11
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
3 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.180.40 Total Amount of M and L Rs.153.50
Add 17.5 % OH and CP Rs.26.86
Total Rs.180.36

ITEM No. 5006.02


Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
2 Lime unslakeds* 1 Kg Rs. 3.80 2.034 7.7292
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
Rs.90.10
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.184.80 Total Amount of M and L Rs.157.31
Add 17.5 % OH and CP Rs.27.53
Total Rs.184.84

218 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5006.03
Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 2.71 10.298
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0134 6.365
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
Rs.91.91
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.187.00 Total Amount of M and L Rs.159.12
Add 17.5 % OH and CP Rs.27.85
Total Rs.186.97

ITEM No. 5006.04


Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 1.355 5.149
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
3 Ordinary portland cement. 1 Kg Rs. 4.60 0.65 2.99
4 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
Rs.87.71
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.2245 37.9405
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
Rs.65.62
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.181.90 Total Amount of M and L Rs.154.84
Add 17.5 % OH and CP Rs.27.10
Total Rs.181.93

219 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5006.05
Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 0.883 4.0618
2 Lime unslakeds* 1 Kg Rs. 3.80 0.763 2.8994
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
4 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
Rs.86.53
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
Rs.65.71
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.180.10 Total Amount of M and L Rs.153.32
Add 17.5 % OH and CP Rs.26.83
Total Rs.180.15

ITEM No. 5006.06


Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.202 5.5292
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
4 Lime unslakeds* 1 Kg Rs. 3.80 1.01 3.838
Rs.88.94
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.65.71
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.182.90 Total Amount of M and L Rs.155.63
Add 17.5 % OH and CP Rs.27.24
Total Rs.182.87

220 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5006.07
Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.77 8.142
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
Rs.87.71
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
2 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.70.88
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.187.50 Total Amount of M and L Rs.159.59
Add 17.5 % OH and CP Rs.27.93
Total Rs.187.51

ITEM No. 5006.08


Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 2.37 10.902
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
Rs.90.47
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
2 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.70.88
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.190.80 Total Amount of M and L Rs.162.35
Add 17.5 % OH and CP Rs.28.41
Total Rs.190.76

221 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5006.09
Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.55 16.33
Rs.95.90
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.70.88
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.197.10 Total Amount of M and L Rs.167.77
Add 17.5 % OH and CP Rs.29.36
Total Rs.197.14

ITEM No. 5006.1


Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
2 Ordinary portland cement. 1 Kg Rs. 4.60 4.55 20.93
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
Rs.100.50
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.209.60 Total Amount of M and L Rs.178.40
Add 17.5 % OH and CP Rs.31.22
Total Rs.209.62

222 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5006.11
Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Add if sub-class 'A' bricks or brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.035 5.25
Rs.5.25
After rounding off: Rs.6.20 Total Amount of M and L Rs.5.25
Add 17.5 % OH and CP Rs.0.92
Total Rs.6.17

ITEM No. 5006.12


Brick work with sub-class 'B' bricks brick tiles in brick-on-edge walls (less than 1/2 brick thick ), using old size
bricks built in Bricks or brick tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.035 75.25
Rs.75.25
After rounding off: Rs.88.40 Total Amount of M and L Rs.75.25
Add 17.5 % OH and CP Rs.13.17
Total Rs.88.42

ITEM No. 5007.01


Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0168 7.98
3 Lime unslakeds* 1 Kg Rs. 3.80 2.84 10.792
Rs.180.02
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
3 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.340.40 Total Amount of M and L Rs.289.66
Add 17.5 % OH and CP Rs.50.69
Total Rs.340.35

223 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5007.02
Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Lime unslakeds* 1 Kg Rs. 3.80 4.045 15.371
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0181 8.5975
Rs.185.22
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
3 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.346.50 Total Amount of M and L Rs.294.86
Add 17.5 % OH and CP Rs.51.60
Total Rs.346.46

ITEM No. 5007.03


Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.016 7.6
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
3 Lime unslakeds* 1 Kg Rs. 3.80 5.38 20.444
Rs.189.29
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
2 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.351.30 Total Amount of M and L Rs.298.98
Add 17.5 % OH and CP Rs.52.32
Total Rs.351.30

224 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5007.04
Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 2.7 10.26
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0181 8.5975
4 Ordinary portland cement. 1 Kg Rs. 4.60 2.775 12.765
Rs.192.87
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
2 Mazdoor-man, 1 Day Rs. 169.00 0.364 61.516
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
Rs.107.42
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.354.30 Total Amount of M and L Rs.301.50
Add 17.5 % OH and CP Rs.52.76
Total Rs.354.26

ITEM No. 5007.05


Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0181 8.5975
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.208 14.7568
4 Lime unslakeds* 1 Kg Rs. 3.80 1.52 5.776
Rs.190.38
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
2 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.352.60 Total Amount of M and L Rs.300.11
Add 17.5 % OH and CP Rs.52.52
Total Rs.352.63

225 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5007.06
Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 2.02 7.676
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0181 8.5975
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
4 Ordinary portland cement. 1 Kg Rs. 4.60 4.154 19.1084
Rs.196.63
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
3 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.360.00 Total Amount of M and L Rs.306.36
Add 17.5 % OH and CP Rs.53.61
Total Rs.359.98

ITEM No. 5007.07


Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.018 8.55
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.53 16.238
Rs.186.04
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
3 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.360.80 Total Amount of M and L Rs.307.06
Add 17.5 % OH and CP Rs.53.74
Total Rs.360.80

226 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5007.08
Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.018 8.55
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
3 Ordinary portland cement. 1 Kg Rs. 4.60 4.71 21.666
Rs.191.47
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
3 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
Rs.120.04
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.367.20 Total Amount of M and L Rs.312.49
Add 17.5 % OH and CP Rs.54.69
Total Rs.367.18

ITEM No. 5007.09


Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 7.05 32.43
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.018 8.55
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
Rs.202.23
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.379.80 Total Amount of M and L Rs.323.26
Add 17.5 % OH and CP Rs.56.57
Total Rs.379.83

227 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5007.1
Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.018 8.55
3 Ordinary portland cement. 1 Kg Rs. 4.60 9.05 41.63
Rs.211.43
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Mazdoor-man, 1 Day Rs. 169.00 0.4 67.6
Rs.119.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.390.40 Total Amount of M and L Rs.332.23
Add 17.5 % OH and CP Rs.58.14
Total Rs.390.37

ITEM No. 5007.11


Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Add if sub-class 'A' bricks or
brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.075 11.25
Rs.11.25
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.25
Add 17.5 % OH and CP Rs.1.97
Total Rs.13.22

ITEM No. 5007.12


Brickwork with sub-class 'B' bricks in one brick thick honey-comb walling built in Bricks or brick tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
Rs.161.25
After rounding off: Rs.189.50 Total Amount of M and L Rs.161.25
Add 17.5 % OH and CP Rs.28.22
Total Rs.189.47

228 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5008.01
Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.007 3.325
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
3 Lime unslakeds* 1 Kg Rs. 3.80 1.32 5.016
Rs.87.89
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.166.70 Total Amount of M and L Rs.141.85
Add 17.5 % OH and CP Rs.24.82
Total Rs.166.67

ITEM No. 5008.02


Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
3 Lime unslakeds* 1 Kg Rs. 3.80 1.75 6.65
Rs.90.14
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
3 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.169.30 Total Amount of M and L Rs.144.10
Add 17.5 % OH and CP Rs.25.22
Total Rs.169.31

229 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5008.03
Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 2.133 8.1054
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0074 3.515
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
Rs.91.17
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.170.50 Total Amount of M and L Rs.145.08
Add 17.5 % OH and CP Rs.25.39
Total Rs.170.47

ITEM No. 5008.04


Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
2 Ordinary portland cement. 1 Kg Rs. 4.60 1.269 5.8374
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0063 2.9925
4 Lime unslakeds* 1 Kg Rs. 3.80 1.166 4.4308
Rs.92.81
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.056 0.504
Rs.0.50
After rounding off: Rs.172.50 Total Amount of M and L Rs.146.77
Add 17.5 % OH and CP Rs.25.69
Total Rs.172.46

230 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5008.05
Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
3 Ordinary portland cement. 1 Kg Rs. 4.60 1.468 6.7528
4 Lime unslakeds* 1 Kg Rs. 3.80 0.065 0.247
Rs.90.49
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
2 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.169.70 Total Amount of M and L Rs.144.45
Add 17.5 % OH and CP Rs.25.28
Total Rs.169.72

ITEM No. 5008.06


Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 0.758 2.8804
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
4 Ordinary portland cement. 1 Kg Rs. 4.60 1.91 8.786
Rs.95.16
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
3 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.175.20 Total Amount of M and L Rs.149.07
Add 17.5 % OH and CP Rs.26.09
Total Rs.175.15

231 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5008.07
Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
3 Ordinary portland cement. 1 Kg Rs. 4.60 1.61 7.406
Rs.90.90
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.177.90 Total Amount of M and L Rs.151.41
Add 17.5 % OH and CP Rs.26.50
Total Rs.177.91

ITEM No. 5008.08


Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
3 Ordinary portland cement. 1 Kg Rs. 4.60 2.156 9.9176
Rs.93.41
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.180.90 Total Amount of M and L Rs.153.92
Add 17.5 % OH and CP Rs.26.94
Total Rs.180.86

232 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5008.09
Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 3.22 14.812
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
Rs.98.30
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.186.60 Total Amount of M and L Rs.158.82
Add 17.5 % OH and CP Rs.27.79
Total Rs.186.61

ITEM No. 5008.1


Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 4.14 19.044
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
Rs.102.54
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.2 33.8
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
Rs.59.68
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.195.90 Total Amount of M and L Rs.166.72
Add 17.5 % OH and CP Rs.29.18
Total Rs.195.89

233 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5008.11
Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Add if sub-class 'A' bricks or
brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.037 5.55
Rs.5.55
After rounding off: Rs.6.50 Total Amount of M and L Rs.5.55
Add 17.5 % OH and CP Rs.0.97
Total Rs.6.52

ITEM No. 5008.12


Brick work with sub class 'B' bricks in half brick thick honey-comb walling built in Bricks or brick tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.037 79.55
Rs.79.55
After rounding off: Rs.93.50 Total Amount of M and L Rs.79.55
Add 17.5 % OH and CP Rs.13.92
Total Rs.93.47

ITEM No. 5009.01


Brick work with sub class 'B' bricks in brick-on-edge honey- comb walling (less than half thick) built in Lime
mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
2 Lime unslakeds* 1 Kg Rs. 3.80 0.593 2.2534
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0037 1.7575
Rs.57.76
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.131.30 Total Amount of M and L Rs.111.72
Add 17.5 % OH and CP Rs.19.55
Total Rs.131.27

234 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5009.02
Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Lime
mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
3 Lime unslakeds* 1 Kg Rs. 3.80 0.854 3.2452
Rs.58.90
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.132.60 Total Amount of M and L Rs.112.85
Add 17.5 % OH and CP Rs.19.75
Total Rs.132.60

ITEM No. 5009.03


Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Lime
mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 1.137 4.3206
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0036 1.71
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
Rs.59.78
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
2 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.133.70 Total Amount of M and L Rs.113.78
Add 17.5 % OH and CP Rs.19.91
Total Rs.133.69

235 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5009.04
Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Cement
lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 0.004 0.0184
2 Lime unslakeds* 1 Kg Rs. 3.80 0.569 2.1622
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
4 Brick Old B-75 1000 No. Rs. 2,150.00 0.0263 56.545
Rs.60.63
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
3 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.134.70 Total Amount of M and L Rs.114.62
Add 17.5 % OH and CP Rs.20.06
Total Rs.134.68

236 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5009.05
Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Cement
lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
3 Lime unslakeds* 1 Kg Rs. 3.80 0.32 1.216
4 Ordinary portland cement. 1 Kg Rs. 4.60 0.716 3.2936
Rs.60.16
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
3 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.134.10 Total Amount of M and L Rs.114.11
Add 17.5 % OH and CP Rs.19.97
Total Rs.134.08

237 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5009.06
Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Cement
lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 0.933 4.2918
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
4 Lime unslakeds* 1 Kg Rs. 3.80 0.37 1.406
Rs.61.35
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
2 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.135.50 Total Amount of M and L Rs.115.30
Add 17.5 % OH and CP Rs.20.18
Total Rs.135.48

ITEM No. 5009.07


Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Cement
mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
3 Ordinary portland cement. 1 Kg Rs. 4.60 0.79 3.634
Rs.59.28
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
Rs.60.02
After rounding off: Rs.140.20 Total Amount of M and L Rs.119.30
Add 17.5 % OH and CP Rs.20.88
Total Rs.140.18

238 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5009.08
Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Cement
mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
3 Ordinary portland cement. 1 Kg Rs. 4.60 1.05 4.83
Rs.60.48
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.142.20 Total Amount of M and L Rs.120.99
Add 17.5 % OH and CP Rs.21.17
Total Rs.142.17

ITEM No. 5009.09


Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Cement
mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.57 7.222
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
Rs.62.87
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.145.00 Total Amount of M and L Rs.123.39
Add 17.5 % OH and CP Rs.21.59
Total Rs.144.98

239 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5009.1
Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Cement
mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 2.02 9.292
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
Rs.64.94
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.2 33.8
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
Rs.59.68
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.151.70 Total Amount of M and L Rs.129.12
Add 17.5 % OH and CP Rs.22.60
Total Rs.151.72

ITEM No. 5009.11


Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in Add if
sub-class 'A' bricks or brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.025 3.75
Rs.3.75
After rounding off: Rs.4.40 Total Amount of M and L Rs.3.75
Add 17.5 % OH and CP Rs.0.66
Total Rs.4.41

ITEM No. 5009.12


Brick work with sub class 'B' bricks in brick-on- edge honey- comb walling (less than half thick) built in bricks or
brick tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.025 53.75
Rs.53.75
After rounding off: Rs.63.20 Total Amount of M and L Rs.53.75
Add 17.5 % OH and CP Rs.9.41
Total Rs.63.16

240 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5010.01
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Lime mortar
1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 36.127 137.2826
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.228 108.3
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,255.58
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
2 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
3 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.28 2.52
Rs.2.52
After rounding off: Rs.2,063.60 Total Amount of M and L Rs.1,756.28
Add 17.5 % OH and CP Rs.307.35
Total Rs.2,063.62

ITEM No. 5010.02


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Lime mortar
1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 51.98 197.524
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,324.37
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.277 2.493
Rs.2.49
After rounding off: Rs.2,144.40 Total Amount of M and L Rs.1,825.04
Add 17.5 % OH and CP Rs.319.38
Total Rs.2,144.42

241 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5010.03
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Lime mortar
1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 69.23 263.074
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.2185 103.7875
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,376.86
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
3 Bhisty including mussack 1 Day Rs. 169.00 0.115 19.435
Rs.484.59
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.27 2.43
Rs.2.43
After rounding off: Rs.2,200.10 Total Amount of M and L Rs.1,872.39
Add 17.5 % OH and CP Rs.327.67
Total Rs.2,200.06

ITEM No. 5010.04


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Cement lime
mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 34.65 131.67
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
4 Ordinary portland cement. 1 Kg Rs. 4.60 37.7 173.42
Rs.1,431.94
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
2 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
3 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.28 2.52
Rs.2.52
After rounding off: Rs.2,270.80 Total Amount of M and L Rs.1,932.63
Add 17.5 % OH and CP Rs.338.21
Total Rs.2,270.84

242 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5010.05
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Cement lime
mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 19.5 74.1
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Ordinary portland cement. 1 Kg Rs. 4.60 43.6 200.56
4 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,401.51
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.27 2.43
Rs.2.43
After rounding off: Rs.2,235.00 Total Amount of M and L Rs.1,902.11
Add 17.5 % OH and CP Rs.332.87
Total Rs.2,234.98

243 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5010.06
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Cement lime
mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 56.81 261.326
2 Lime unslakeds* 1 Kg Rs. 3.80 22.53 85.614
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
4 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,473.79
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.145 24.505
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.807 181.575
Rs.489.66
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.02 8.5106
Rs.8.51
Sundry
1 Sundries 1 Re Rs. 9.00 0.28 2.52
Rs.2.52
After rounding off: Rs.2,320.00 Total Amount of M and L Rs.1,974.48
Add 17.5 % OH and CP Rs.345.53
Total Rs.2,320.02

ITEM No. 5010.07


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Cement
mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
2 Ordinary portland cement. 1 Kg Rs. 4.60 47.93 220.478
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
Rs.1,347.33
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.2,244.70 Total Amount of M and L Rs.1,910.38
Add 17.5 % OH and CP Rs.334.32
Total Rs.2,244.70

244 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5010.08
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Cement
mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
2 Ordinary portland cement. 1 Kg Rs. 4.60 64.06 294.676
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
Rs.1,421.53
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
3 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.2,331.90 Total Amount of M and L Rs.1,984.58
Add 17.5 % OH and CP Rs.347.30
Total Rs.2,331.88

ITEM No. 5010.09


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Cement
mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 95.84 440.864
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,567.71
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
3 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.2,503.70 Total Amount of M and L Rs.2,130.77
Add 17.5 % OH and CP Rs.372.88
Total Rs.2,503.65

245 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5010.1
Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Cement
mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 123 565.8
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,692.65
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.2 33.8
Rs.561.39
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,651.80 Total Amount of M and L Rs.2,256.83
Add 17.5 % OH and CP Rs.394.94
Total Rs.2,651.77

ITEM No. 5010.11


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Add if sub-
class 'A' bricks or brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.505 75.75
Rs.75.75
After rounding off: Rs.89.00 Total Amount of M and L Rs.75.75
Add 17.5 % OH and CP Rs.13.26
Total Rs.89.01

ITEM No. 5010.12


Brick work with sub-class 'B' bricks, straight or curved on plan exceeding 6m mean radius built in Bricks or brick
tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.505 1010
Rs.1,010.00
After rounding off: Rs.1,186.80 Total Amount of M and L Rs.1,010.00
Add 17.5 % OH and CP Rs.176.75
Total Rs.1,186.75

246 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5011.01
Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in Lime
mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 3.426 13.0188
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0213 10.1175
Rs.125.14
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.225.40 Total Amount of M and L Rs.191.81
Add 17.5 % OH and CP Rs.33.57
Total Rs.225.37

ITEM No. 5011.02


Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in Lime
mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 4.91 18.658
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0232 11.02
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
Rs.131.68
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.233.10 Total Amount of M and L Rs.198.35
Add 17.5 % OH and CP Rs.34.71
Total Rs.233.06

247 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5011.03
Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in Lime
mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0206 9.785
3 Lime unslakeds* 1 Kg Rs. 3.80 6.59 25.042
Rs.136.83
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.239.10 Total Amount of M and L Rs.203.50
Add 17.5 % OH and CP Rs.35.61
Total Rs.239.11

ITEM No. 5011.04


Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in
Cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
3 Lime unslakeds* 1 Kg Rs. 3.80 2.56 9.728
4 Ordinary portland cement. 1 Kg Rs. 4.60 4.9 22.54
Rs.145.62
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.249.40 Total Amount of M and L Rs.212.29
Add 17.5 % OH and CP Rs.37.15
Total Rs.249.44

248 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5011.05
Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in
Cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
2 Ordinary portland cement. 1 Kg Rs. 4.60 4.36 20.056
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.039 18.525
4 Lime unslakeds* 1 Kg Rs. 3.80 1.44 5.472
Rs.146.05
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.250.00 Total Amount of M and L Rs.212.72
Add 17.5 % OH and CP Rs.37.23
Total Rs.249.95

249 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5011.06
Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in
Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
3 Lime unslakeds* 1 Kg Rs. 3.80 1.91 7.258
4 Ordinary portland cement. 1 Kg Rs. 4.60 5.78 26.588
Rs.147.20
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.65.71
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.001 0.42553
Rs.0.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.251.30 Total Amount of M and L Rs.213.87
Add 17.5 % OH and CP Rs.37.43
Total Rs.251.30

ITEM No. 5011.07


Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in
Cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
3 Ordinary portland cement. 1 Kg Rs. 4.60 4.52 20.792
Rs.134.14
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.246.50 Total Amount of M and L Rs.209.79
Add 17.5 % OH and CP Rs.36.71
Total Rs.246.51

250 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5011.08
Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in
Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 6.05 27.83
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
Rs.141.18
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.254.70 Total Amount of M and L Rs.216.74
Add 17.5 % OH and CP Rs.37.93
Total Rs.254.67

ITEM No. 5011.09


Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in
Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
2 Ordinary portland cement. 1 Kg Rs. 4.60 9.05 41.63
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
Rs.154.98
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.270.90 Total Amount of M and L Rs.230.54
Add 17.5 % OH and CP Rs.40.34
Total Rs.270.88

251 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5011.1
Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in
Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.023 10.925
3 Ordinary portland cement. 1 Kg Rs. 4.60 11.62 53.452
Rs.166.38
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.289.00 Total Amount of M and L Rs.245.98
Add 17.5 % OH and CP Rs.43.05
Total Rs.289.03

ITEM No. 5011.11


Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in Add
if sub-class 'A' bricks or brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.051 7.65
Rs.7.65
After rounding off: Rs.9.00 Total Amount of M and L Rs.7.65
Add 17.5 % OH and CP Rs.1.34
Total Rs.8.99

ITEM No. 5011.12


Brickwork with sub-class 'B' bricks, straight or curved on plan to any radius in half brick thick walls, built in
Bricks or brick tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
Rs.102.00
After rounding off: Rs.119.80 Total Amount of M and L Rs.102.00
Add 17.5 % OH and CP Rs.17.85
Total Rs.119.85

252 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5013.01
Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Lime mortar
1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 2.136 8.1168
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0135 6.4125
3 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
Rs.116.53
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.135 1.215
Rs.1.22
After rounding off: Rs.226.60 Total Amount of M and L Rs.192.85
Add 17.5 % OH and CP Rs.33.75
Total Rs.226.60

ITEM No. 5013.02


Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Lime mortar
1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 3.074 11.6812
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
3 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
Rs.120.57
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
4 Bullock cart with driver for mortar mill 1 Day Rs. 148.00 0.001 0.148
Rs.75.26
Sundry
1 Sundries 1 Re Rs. 9.00 0.13 1.17
Rs.1.17
After rounding off: Rs.231.50 Total Amount of M and L Rs.196.99
Add 17.5 % OH and CP Rs.34.47
Total Rs.231.47

253 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5013.03
Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Lime mortar
1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 4.09 15.542
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0129 6.1275
3 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
Rs.123.67
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Bullock cart with driver for mortar mill 1 Day Rs. 148.00 0.001 0.148
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
4 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.75.26
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.235.20 Total Amount of M and L Rs.200.18
Add 17.5 % OH and CP Rs.35.03
Total Rs.235.22

ITEM No. 5013.04


Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Cement lime
mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 2.3 10.58
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
3 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
4 Lime unslakeds* 1 Kg Rs. 3.80 2.1 7.98
Rs.127.69
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Bullock cart with driver for mortar mill 1 Day Rs. 148.00 0.001 0.148
3 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
4 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.65.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.228.90 Total Amount of M and L Rs.194.80
Add 17.5 % OH and CP Rs.34.09
Total Rs.228.89

254 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5013.05
Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Cement lime
mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 1.19 4.522
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
3 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
4 Ordinary portland cement. 1 Kg Rs. 4.60 2.65 12.19
Rs.125.84
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Bullock cart with driver for mortar mill 1 Day Rs. 148.00 0.001 0.148
3 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
4 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.65.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.226.70 Total Amount of M and L Rs.192.95
Add 17.5 % OH and CP Rs.33.77
Total Rs.226.72

ITEM No. 5013.06


Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Cement lime
mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 1.5 5.7
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
3 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
4 Ordinary portland cement. 1 Kg Rs. 4.60 3.42 15.732
Rs.130.56
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.108 24.3
2 Bullock cart with driver for mortar mill 1 Day Rs. 148.00 0.001 0.148
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
4 Mazdoor-man, 1 Day Rs. 169.00 0.225 38.025
Rs.65.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.232.30 Total Amount of M and L Rs.197.67
Add 17.5 % OH and CP Rs.34.59
Total Rs.232.26

255 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5013.07
Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Cement
mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 2.7 12.42
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
3 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
Rs.121.55
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.232.50 Total Amount of M and L Rs.197.91
Add 17.5 % OH and CP Rs.34.63
Total Rs.232.55

ITEM No. 5013.08


Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Cement
mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 3.56 16.376
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
3 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
Rs.125.50
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.237.20 Total Amount of M and L Rs.201.87
Add 17.5 % OH and CP Rs.35.33
Total Rs.237.19

256 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5013.09
Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Cement
mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 5.35 24.61
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
3 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
Rs.133.74
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.246.90 Total Amount of M and L Rs.210.10
Add 17.5 % OH and CP Rs.36.77
Total Rs.246.87

ITEM No. 5013.1


Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Cement
mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 11.62 53.452
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.051 102
Rs.166.80
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.285.70 Total Amount of M and L Rs.243.17
Add 17.5 % OH and CP Rs.42.56
Total Rs.285.73

257 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5013.11
Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Add if sub-
class 'A' bricks or brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.051 7.65
Rs.7.65
After rounding off: Rs.9.00 Total Amount of M and L Rs.7.65
Add 17.5 % OH and CP Rs.1.34
Total Rs.8.99

ITEM No. 5013.12


Brick work with sub classs 'B' brick tiles in brick - on edge wall (less than 1/2 brick thick), built in Bricks or brick
tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.051 102
Rs.102.00
After rounding off: Rs.119.80 Total Amount of M and L Rs.102.00
Add 17.5 % OH and CP Rs.17.85
Total Rs.119.85

ITEM No. 5014.01


Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
2 Lime unslakeds* 1 Kg Rs. 3.80 2.257 8.5766
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
Rs.169.46
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
3 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.328.00 Total Amount of M and L Rs.279.15
Add 17.5 % OH and CP Rs.48.85
Total Rs.328.00

258 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5014.02
Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
2 Lime unslakeds* 1 Kg Rs. 3.80 3.074 11.6812
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0129 6.1275
Rs.171.81
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
3 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.330.80 Total Amount of M and L Rs.281.54
Add 17.5 % OH and CP Rs.49.27
Total Rs.330.81

ITEM No. 5014.03


Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 4.09 15.542
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0129 6.1275
Rs.175.67
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
2 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.335.30 Total Amount of M and L Rs.285.40
Add 17.5 % OH and CP Rs.49.95
Total Rs.335.35

259 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5014.04
Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
2 Lime unslakeds* 1 Kg Rs. 3.80 2.17 8.246
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
4 Ordinary portland cement. 1 Kg Rs. 4.60 2.23 10.258
Rs.179.39
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
3 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.339.70 Total Amount of M and L Rs.289.12
Add 17.5 % OH and CP Rs.50.60
Total Rs.339.72

ITEM No. 5014.05


Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
2 Lime unslakeds* 1 Kg Rs. 3.80 1.22 4.636
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
4 Ordinary portland cement. 1 Kg Rs. 4.60 2.579 11.8634
Rs.177.39
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.32 54.08
3 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
Rs.99.99
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.327.40 Total Amount of M and L Rs.278.67
Add 17.5 % OH and CP Rs.48.77
Total Rs.327.43

260 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5014.06
Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
2 Ordinary portland cement. 1 Kg Rs. 4.60 3.332 15.3272
3 Lime unslakeds* 1 Kg Rs. 3.80 1.62 6.156
4 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
Rs.182.37
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.18 40.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.032 5.408
Rs.108.44
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0005 0.212765
Rs.0.21
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.343.20 Total Amount of M and L Rs.292.10
Add 17.5 % OH and CP Rs.51.12
Total Rs.343.22

ITEM No. 5014.07


Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
2 Ordinary portland cement. 1 Kg Rs. 4.60 2.62 12.052
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
Rs.172.94
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.345.40 Total Amount of M and L Rs.293.97
Add 17.5 % OH and CP Rs.51.44
Total Rs.345.41

261 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5014.08
Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 3.45 15.87
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
Rs.176.76
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.349.90 Total Amount of M and L Rs.297.78
Add 17.5 % OH and CP Rs.52.11
Total Rs.349.90

ITEM No. 5014.09


Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 5.64 25.944
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
Rs.186.83
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
3 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.361.70 Total Amount of M and L Rs.307.86
Add 17.5 % OH and CP Rs.53.88
Total Rs.361.73

262 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5014.1
Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.077 154
3 Ordinary portland cement. 1 Kg Rs. 4.60 7.28 33.488
Rs.194.38
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Mazdoor-man, 1 Day Rs. 169.00 0.4 67.6
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
Rs.119.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.370.10 Total Amount of M and L Rs.315.00
Add 17.5 % OH and CP Rs.55.12
Total Rs.370.12

ITEM No. 5014.11


Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Add if sub-class 'A' bricks or
brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.077 11.55
Rs.11.55
After rounding off: Rs.13.60 Total Amount of M and L Rs.11.55
Add 17.5 % OH and CP Rs.2.02
Total Rs.13.57

ITEM No. 5014.12


Brick work with sub classs 'B' bricks in one brick thick honey comb work, built in Bricks or brick tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bricks 19X9X9cm sub class B 1000 No. Rs. 2,000.00 0.07699 153.98
Rs.153.98
After rounding off: Rs.180.90 Total Amount of M and L Rs.153.98
Add 17.5 % OH and CP Rs.26.95
Total Rs.180.93

263 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5015.01
Brick work with sub class 'B' bricks in half brick thick, Deto Lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 0.995 3.781
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
Rs.76.82
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.153.70 Total Amount of M and L Rs.130.78
Add 17.5 % OH and CP Rs.22.89
Total Rs.153.66

ITEM No. 5015.02


Brick work with sub class 'B' bricks in half brick thick, Deto Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0057 2.7075
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
3 Lime unslakeds* 1 Kg Rs. 3.80 1.356 5.1528
Rs.77.86
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
3 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.154.90 Total Amount of M and L Rs.131.81
Add 17.5 % OH and CP Rs.23.07
Total Rs.154.88

264 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5015.03
Brick work with sub class 'B' bricks in half brick thick, Deto Lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 1.806 6.8628
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0057 2.7075
3 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
Rs.79.57
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
3 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.156.90 Total Amount of M and L Rs.133.52
Add 17.5 % OH and CP Rs.23.37
Total Rs.156.89

ITEM No. 5015.04


Brick work with sub class 'B' bricks in half brick thick, Deto Cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 0.99 4.554
2 Lime unslakeds* 1 Kg Rs. 3.80 0.904 3.4352
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
4 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
Rs.81.03
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.158.60 Total Amount of M and L Rs.134.98
Add 17.5 % OH and CP Rs.23.62
Total Rs.158.61

265 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5015.05
Brick work with sub class 'B' bricks in half brick thick, Deto Cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
3 Lime unslakeds* 1 Kg Rs. 3.80 0.509 1.9342
4 Ordinary portland cement. 1 Kg Rs. 4.60 1.138 5.2348
Rs.80.21
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.056 0.504
Rs.0.50
After rounding off: Rs.157.70 Total Amount of M and L Rs.134.17
Add 17.5 % OH and CP Rs.23.48
Total Rs.157.65

ITEM No. 5015.06


Brick work with sub class 'B' bricks in half brick thick, Deto Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.47 6.762
2 Lime unslakeds* 1 Kg Rs. 3.80 0.676 2.5688
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
4 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
Rs.82.37
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.016 2.704
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.09 20.25
Rs.53.37
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.0002 0.085106
Rs.0.09
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.160.20 Total Amount of M and L Rs.136.32
Add 17.5 % OH and CP Rs.23.86
Total Rs.160.18

266 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5015.07
Brick work with sub class 'B' bricks in half brick thick, Deto Cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
3 Ordinary portland cement. 1 Kg Rs. 4.60 1.525 7.015
Rs.80.06
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.165.20 Total Amount of M and L Rs.140.57
Add 17.5 % OH and CP Rs.24.60
Total Rs.165.17

ITEM No. 5015.08


Brick work with sub class 'B' bricks in half brick thick, Deto Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
3 Ordinary portland cement. 1 Kg Rs. 4.60 1.97 9.062
Rs.82.10
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.167.60 Total Amount of M and L Rs.142.62
Add 17.5 % OH and CP Rs.24.96
Total Rs.167.57

267 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5015.09
Brick work with sub class 'B' bricks but in half brick thick, Deto Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
3 Ordinary portland cement. 1 Kg Rs. 4.60 2.51 11.546
Rs.84.59
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.170.50 Total Amount of M and L Rs.145.10
Add 17.5 % OH and CP Rs.25.39
Total Rs.170.49

ITEM No. 5015.1


Brick work with sub class 'B' bricks in half brick thick, Deto Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
2 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.23 14.858
Rs.87.90
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.2 33.8
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.59.68
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.174.90 Total Amount of M and L Rs.148.84
Add 17.5 % OH and CP Rs.26.05
Total Rs.174.88

ITEM No. 5015.11


Brick work with sub class 'B' bricks in half brick thick, Deto Add if sub-class 'A' bricks or brick tiles are used.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rate difference Class A & B 1000 No. Rs. 150.00 0.035 5.25
Rs.5.25
After rounding off: Rs.6.20 Total Amount of M and L Rs.5.25
Add 17.5 % OH and CP Rs.0.92
Total Rs.6.17
268 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5015.12
Brick work with sub class 'B' bricks in half brick thick, Deto Bricks or brick tiles only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.035 70
Rs.70.00
After rounding off: Rs.82.20 Total Amount of M and L Rs.70.00
Add 17.5 % OH and CP Rs.12.25
Total Rs.82.25

ITEM No. 5016.01


Brick work with fly ash bricks straight or curved on plan exc 6m mean radius Old size bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.526 1209.8
Rs.1,209.80
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.56 94.64
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.28 63
Rs.157.64
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,610.00 Total Amount of M and L Rs.1,370.23
Add 17.5 % OH and CP Rs.239.79
Total Rs.1,610.02

ITEM No. 5016.02


Brick work with fly ash bricks straight or curved on plan exc 6m mean radius Modular bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.65 1397.5
Rs.1,397.50
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.56 94.64
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.28 63
Rs.157.64
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,830.60 Total Amount of M and L Rs.1,557.93
Add 17.5 % OH and CP Rs.272.64
Total Rs.1,830.57

269 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5016.03
Brick work with fly ash bricks straight or curved on plan exc 6m mean radius except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.56 94.64
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.28 63
Rs.157.64
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.188.50 Total Amount of M and L Rs.160.43
Add 17.5 % OH and CP Rs.28.08
Total Rs.188.51

ITEM No. 5016.04


Brick work with fly ash bricks straight or curved on plan exc 6m mean radius Old size bricks in mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.408 938.4
2 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.961.40
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.15 194.35
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.62 139.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.03 5.07
Rs.338.92
Sundry
1 Sundries 1 Re Rs. 9.00 0.305 2.745
Rs.2.75
After rounding off: Rs.1,531.10 Total Amount of M and L Rs.1,303.07
Add 17.5 % OH and CP Rs.228.04
Total Rs.1,531.10

270 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5016.05
Brick work with fly ash bricks straight or curved on plan exc 6m mean radius Modular bricks in mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
2 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.505 1085.75
Rs.1,108.75
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.15 194.35
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.62 139.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.03 5.07
Rs.338.92
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,704.30 Total Amount of M and L Rs.1,450.46
Add 17.5 % OH and CP Rs.253.83
Total Rs.1,704.29

ITEM No. 5016.06


Brickwork withfly ash bricks stright or curved on plan not exc 6 mmean radius in mud morter Except bricks
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.23.00
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.03 5.07
2 Mazdoor-man, 1 Day Rs. 169.00 1.15 194.35
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.62 139.5
Rs.338.92
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.428.50 Total Amount of M and L Rs.364.71
Add 17.5 % OH and CP Rs.63.82
Total Rs.428.53

271 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5017.01
Brickwork with fly ash bricks , but in curved work on plan mean radius n exc 6 m old size bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.526 1209.8
Rs.1,209.80
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.35 78.75
Rs.197.05
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,656.30 Total Amount of M and L Rs.1,409.64
Add 17.5 % OH and CP Rs.246.69
Total Rs.1,656.33

ITEM No. 5017.02


Brick work with fly ash bricks in curved work on plan mean radius n exc 6 m modular bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.65 1397.5
Rs.1,397.50
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.35 78.75
Rs.197.05
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,876.90 Total Amount of M and L Rs.1,597.34
Add 17.5 % OH and CP Rs.279.53
Total Rs.1,876.87

ITEM No. 5017.03


Brickwork with fly ash brick in curved work on plan mean radius n exc 6 m except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.35 78.75
Rs.197.05
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.234.80 Total Amount of M and L Rs.199.84
Add 17.5 % OH and CP Rs.34.97
Total Rs.234.81

272 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5017.04
Brickwork with fly ash bricks in curved work on plan mean radius n exc 6 m in mud mortar old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.408 938.4
2 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.961.40
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.77 173.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.44 243.36
Rs.423.37
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,630.40 Total Amount of M and L Rs.1,387.56
Add 17.5 % OH and CP Rs.242.82
Total Rs.1,630.38

ITEM No. 5017.05


Brick work with fly ash bricks, in curved work on plan mean radius n exc 6 m in mud mortar modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.505 1085.75
2 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.1,108.75
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.44 243.36
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.77 173.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
Rs.423.37
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,803.50 Total Amount of M and L Rs.1,534.91
Add 17.5 % OH and CP Rs.268.61
Total Rs.1,803.52

273 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5017.06
Brickwork with with fly ash bricks, but in curved work on plan mean radius n exc 6 m in mud mortar except
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.23.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.77 173.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.44 243.36
3 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
Rs.423.37
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.527.80 Total Amount of M and L Rs.449.16
Add 17.5 % OH and CP Rs.78.60
Total Rs.527.76

ITEM No. 5018.01


Brickwork with fly ash bricks, in circular well steining (any radius) constructed from the base or curb in old size
bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.526 1209.8
Rs.1,209.80
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.44 74.36
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.44 324
Rs.398.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,892.90 Total Amount of M and L Rs.1,610.95
Add 17.5 % OH and CP Rs.281.92
Total Rs.1,892.87

274 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5018.02
Brickwork with fly sh,bricks, in circular well steining (any radius) constructed from the base or curb in modular
bricks laid dry.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.65 1397.5
Rs.1,397.50
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.44 324
2 Mazdoor-man, 1 Day Rs. 169.00 0.44 74.36
Rs.398.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,113.40 Total Amount of M and L Rs.1,798.65
Add 17.5 % OH and CP Rs.314.76
Total Rs.2,113.41

ITEM No. 5018.03


Brickwork with fly ash bricks, but in circular well steining (any radius) constructed from the base or curb
except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.44 324
2 Mazdoor-man, 1 Day Rs. 169.00 0.44 74.36
Rs.398.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.305 2.745
Rs.2.75
After rounding off: Rs.471.30 Total Amount of M and L Rs.401.11
Add 17.5 % OH and CP Rs.70.19
Total Rs.471.30

275 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5018.04
Brickwork with fly ash brick, but in circular well steining (any radius) constructed from the base or curb in old
size bricks in mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.408 938.4
2 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.961.40
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.77 130.13
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.92 432
Rs.568.89
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,801.40 Total Amount of M and L Rs.1,533.08
Add 17.5 % OH and CP Rs.268.29
Total Rs.1,801.37

ITEM No. 5018.05


Brickwork with fly ash brick, in circular well steining (any radius) constructed from the base or curb in modular
bricks in mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.505 1085.75
2 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.1,108.75
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.77 130.13
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.92 432
Rs.568.89
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.1,974.50 Total Amount of M and L Rs.1,680.43
Add 17.5 % OH and CP Rs.294.08
Total Rs.1,974.51

276 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5018.06
Brickwork work with fly ash bricks, in circular well steining (any radius) constructed from the base or curb
except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.23 23
Rs.23.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.92 432
2 Mazdoor-man, 1 Day Rs. 169.00 0.77 130.13
3 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
Rs.568.89
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.698.70 Total Amount of M and L Rs.594.68
Add 17.5 % OH and CP Rs.104.07
Total Rs.698.75

ITEM No. 5019.01


Brickwork with fly ash bricks, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:8 using
old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 47.93 220.478
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.408 938.4
Rs.1,275.73
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,162.70 Total Amount of M and L Rs.1,840.58
Add 17.5 % OH and CP Rs.322.10
Total Rs.2,162.68

277 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5019.02
Brickwork with fly ash bricks, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:6 using
old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 64 294.4
2 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.408 938.4
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
Rs.1,349.65
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,249.50 Total Amount of M and L Rs.1,914.50
Add 17.5 % OH and CP Rs.335.04
Total Rs.2,249.54

ITEM No. 5019.03


Brickwork with fly ash bricks, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:4 using
old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.408 938.4
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Ordinary portland cement. 1 Kg Rs. 4.60 95.84 440.864
Rs.1,496.11
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.202 34.138
Rs.561.72
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,421.20 Total Amount of M and L Rs.2,060.63
Add 17.5 % OH and CP Rs.360.61
Total Rs.2,421.24

278 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5019.04
Brickwork with fly ash bricks, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:3 using
old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.408 938.4
2 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.23 644.6762
Rs.1,583.08
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
After rounding off: Rs.2,520.50 Total Amount of M and L Rs.2,145.14
Add 17.5 % OH and CP Rs.375.40
Total Rs.2,520.54

ITEM No. 5019.05


Brickwork with fly ash bricks, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:8 using
modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
2 Ordinary portland cement. 1 Kg Rs. 4.60 44.3 203.78
3 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.505 1085.75
Rs.1,406.38
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
2 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,316.20 Total Amount of M and L Rs.1,971.23
Add 17.5 % OH and CP Rs.344.97
Total Rs.2,316.20

279 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5019.06
Brickwork with fly ash bricks, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:6 using
modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
2 Ordinary portland cement. 1 Kg Rs. 4.60 58.4 268.64
3 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.505 1085.75
Rs.1,471.24
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,392.40 Total Amount of M and L Rs.2,036.09
Add 17.5 % OH and CP Rs.356.32
Total Rs.2,392.41

ITEM No. 5019.07


Brickwork with fly ash bricks, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:4 using
modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 87.9 404.34
2 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.505 1085.75
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
Rs.1,606.94
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,551.90 Total Amount of M and L Rs.2,171.79
Add 17.5 % OH and CP Rs.380.06
Total Rs.2,551.86

280 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5019.08
Brickwork with fly ash bricks, straight or curved on plan exc 6 m mean radius, built in cement mortar 1:3 using
modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 113.3 521.18
2 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.505 1085.75
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
Rs.1,723.78
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
2 Bhisty including mussack 1 Day Rs. 169.00 0.2 33.8
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
Rs.561.39
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.2,688.30 Total Amount of M and L Rs.2,287.96
Add 17.5 % OH and CP Rs.400.39
Total Rs.2,688.35

ITEM No. 5020.01


Brickwork with flyash bricks, straight or curved on plan to any radius in half brick thick walls built in cement
mortar 1:8 using old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 4.43 20.378
2 burnt fly ash buiding bricks old size. 1000 No. Rs. 2,300.00 0.051 117.3
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
Rs.149.03
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.264.80 Total Amount of M and L Rs.225.40
Add 17.5 % OH and CP Rs.39.44
Total Rs.264.84

281 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5020.02
Brickwork with flyash bricks, straight or curved on plan to any radius in half brick thick walls built in cement
mortar 1:6 using old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 6 27.6
2 burnt fly ash buiding bricks old size. 1000 No. Rs. 2,300.00 0.051 117.3
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.023 10.925
Rs.155.83
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.272.80 Total Amount of M and L Rs.232.19
Add 17.5 % OH and CP Rs.40.63
Total Rs.272.83

ITEM No. 5020.03


Brickwork with flyash bricks, straight or curved on plan to any radius in half brick thick walls built in cement
mortar 1:4 using old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 9 41.4
2 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.051 117.3
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.023 10.925
Rs.169.63
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.289.00 Total Amount of M and L Rs.245.99
Add 17.5 % OH and CP Rs.43.05
Total Rs.289.04

282 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5020.04
Brickwork with flyash bricks, straight or curved on plan to any radius in half brick thick walls built in cement
mortar 1:3 using old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 11.33 52.118
2 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.051 117.3
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.023 10.925
Rs.180.34
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.301.60 Total Amount of M and L Rs.256.71
Add 17.5 % OH and CP Rs.44.92
Total Rs.301.63

ITEM No. 5020.05


Brickwork with flyash bricks, straight or curved on plan to any radius in half brick thick walls built in cement
mortar 1:8 using modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 3.27 15.042
2 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.051 109.65
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
Rs.136.04
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.249.60 Total Amount of M and L Rs.212.41
Add 17.5 % OH and CP Rs.37.17
Total Rs.249.58

283 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5020.06
Brickwork with flyash bricks, straight or curved on plan to any radius in half brick thick walls built in cement
mortar 1:6 using modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.051 109.65
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
3 Ordinary portland cement. 1 Kg Rs. 4.60 4.32 19.872
Rs.140.87
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.255.30 Total Amount of M and L Rs.217.24
Add 17.5 % OH and CP Rs.38.02
Total Rs.255.26

ITEM No. 5020.07


Brickwork with flyash bricks, straight or curved on plan to any radius in half brick thick walls built in cement
mortar 1:4 using modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 6.5 29.9
2 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.051 109.65
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
Rs.150.90
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.267.10 Total Amount of M and L Rs.227.36
Add 17.5 % OH and CP Rs.39.79
Total Rs.267.15

284 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5020.08
Brickwork with flyash bricks, straight or curved on plan to any radius in half brick thick walls built in cement
mortar 1:3 using modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 8.37 38.502
2 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.051 109.65
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.023 10.925
Rs.159.08
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.493 4.437
Rs.4.44
After rounding off: Rs.280.40 Total Amount of M and L Rs.238.62
Add 17.5 % OH and CP Rs.41.76
Total Rs.280.38

ITEM No. 5021.01


Brickwork with fly ash bricks or brick tiles in brick-on-edge walls (less than ½ brick thick),built in cement mortar
1:8 usning old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.7 7.82
2 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.035 80.5
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
Rs.92.64
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
2 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.198.60 Total Amount of M and L Rs.169.01
Add 17.5 % OH and CP Rs.29.58
Total Rs.198.59

285 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5021.02
Brickwork with fly ash bricks or brick tiles in brick-on-edge walls (less than ½ brick thick),built in cement mortar
1:6 usning old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 2.37 10.902
2 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.035 80.5
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
Rs.95.72
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.202.20 Total Amount of M and L Rs.172.09
Add 17.5 % OH and CP Rs.30.12
Total Rs.202.21

ITEM No. 5021.03


Brickwork with fly ash bricks or brick tiles in brick-on-edge walls (less than ½ brick thick),built in cement mortar
1:4 using old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.035 80.5
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.55 16.33
Rs.101.15
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.208.60 Total Amount of M and L Rs.177.52
Add 17.5 % OH and CP Rs.31.07
Total Rs.208.59

286 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5021.04
Brickwork with fly ash bricks or brick tiles in brick-on-edge walls (less than ½ brick thick),built in cement mortar
1:3 using old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.035 80.5
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
3 Ordinary portland cement. 1 Kg Rs. 4.60 4.55 20.93
Rs.105.75
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.31 2.79
Rs.2.79
After rounding off: Rs.215.80 Total Amount of M and L Rs.183.65
Add 17.5 % OH and CP Rs.32.14
Total Rs.215.79

ITEM No. 5021.05


Brickwork with fly ash bricks or brick tiles in brick-on-edge walls (less than ½ brick thick),built in cement mortar
1:8 using modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.051 109.65
2 Ordinary portland cement. 1 Kg Rs. 4.60 2.7 12.42
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
Rs.129.20
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.241.50 Total Amount of M and L Rs.205.56
Add 17.5 % OH and CP Rs.35.97
Total Rs.241.54

287 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5021.06
Brickwork with fly ash bricks or brick tiles in brick-on-edge walls (less than ½ brick thick),built in cement mortar
1:6 using modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 3.56 16.376
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
3 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.051 109.65
Rs.133.15
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.246.20 Total Amount of M and L Rs.209.52
Add 17.5 % OH and CP Rs.36.67
Total Rs.246.18

ITEM No. 5021.07


Brickwork with fly ash bricks or brick tiles in brick-on-edge walls (less than ½ brick thick),built in cement mortar
1:4 using modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 5.35 24.61
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
3 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.051 109.65
Rs.141.39
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.255.90 Total Amount of M and L Rs.217.75
Add 17.5 % OH and CP Rs.38.11
Total Rs.255.86

288 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5021.08
Brickwork with fly ash bricks or brick tiles in brick-on-edge walls (less than ½ brick thick),built in cement mortar
1:3 using modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.051 109.65
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0239 11.3525
3 Ordinary portland cement. 1 Kg Rs. 4.60 11.62 53.452
Rs.174.45
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.028 4.732
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.75.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.294.70 Total Amount of M and L Rs.250.82
Add 17.5 % OH and CP Rs.43.89
Total Rs.294.72

ITEM No. 5022.01


Brickwork with fly ash bricks in one brick thick honey-comb walling,built in cement mortar 1:8 using old size
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 3.45 15.87
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.018 8.55
3 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.075 172.5
Rs.196.92
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.373.90 Total Amount of M and L Rs.318.22
Add 17.5 % OH and CP Rs.55.69
Total Rs.373.90

289 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5022.02
Brickwork with fly ash bricks in one brick thick honey-comb walling,built in cement mortar 1:6 using old size
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 4.55 20.93
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.018 8.55
3 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.075 172.5
Rs.201.98
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.379.80 Total Amount of M and L Rs.323.28
Add 17.5 % OH and CP Rs.56.57
Total Rs.379.85

ITEM No. 5022.03


Brickwork with fly ash bricks in one brick thick honey-comb walling,built in cement mortar 1:4 using old size
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.075 172.5
2 Ordinary portland cement. 1 Kg Rs. 4.60 7.05 32.43
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.018 8.55
Rs.213.48
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.393.40 Total Amount of M and L Rs.334.78
Add 17.5 % OH and CP Rs.58.59
Total Rs.393.36

290 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5022.04
Brickwork with fly ash bricks in one brick thick honey-comb walling,built in cement mortar 1:3 using old size
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 9.05 41.63
2 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.075 172.5
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.018 8.55
Rs.222.68
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.404.20 Total Amount of M and L Rs.343.98
Add 17.5 % OH and CP Rs.60.20
Total Rs.404.17

ITEM No. 5022.05


Brickwork with fly ash bricks in one brick thick honey-comb walling,built in cement mortar 1:8 using modular
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.077 165.55
2 Ordinary portland cement. 1 Kg Rs. 4.60 2.62 12.052
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
Rs.184.49
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
2 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
3 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.359.30 Total Amount of M and L Rs.305.79
Add 17.5 % OH and CP Rs.53.51
Total Rs.359.30

291 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5022.06
Brickwork with fly ash bricks in one brick thick honey-comb walling,built in cement mortar 1:6 using modular
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.015 7.125
2 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.077 165.55
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.45 15.87
Rs.188.55
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
2 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
3 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.364.10 Total Amount of M and L Rs.309.84
Add 17.5 % OH and CP Rs.54.22
Total Rs.364.06

ITEM No. 5022.07


Brickwork with fly ash bricks in one brick thick honey-comb walling,built in cement mortar 1:4 using modular
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.077 165.55
2 Ordinary portland cement. 1 Kg Rs. 4.60 5.64 25.944
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
Rs.198.38
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
2 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
3 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.375.60 Total Amount of M and L Rs.319.68
Add 17.5 % OH and CP Rs.55.94
Total Rs.375.62

292 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5022.08
Brickwork with fly ash bricks in one brick thick honey-comb walling,built in cement mortar 1:3 using modular
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.077 165.55
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0145 6.8875
3 Ordinary portland cement. 1 Kg Rs. 4.60 7.28 33.488
Rs.205.93
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.04 6.76
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.2 45
3 Mazdoor-man, 1 Day Rs. 169.00 0.404 68.276
Rs.120.04
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.384.50 Total Amount of M and L Rs.327.22
Add 17.5 % OH and CP Rs.57.26
Total Rs.384.49

ITEM No. 5023.01


Brickwork with fly ash bricks in half brick thick honey-comb walling, built in cement mortar 1:8 using old size
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.6 7.36
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
3 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.037 85.1
Rs.96.40
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.185.30 Total Amount of M and L Rs.157.68
Add 17.5 % OH and CP Rs.27.59
Total Rs.185.27

293 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5023.02
Brickwork with fly ash bricks in half brick thick honey-comb walling, in cement mortar 1:6 using old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
2 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.037 85.1
3 Ordinary portland cement. 1 Kg Rs. 4.60 2.16 9.936
Rs.98.98
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.188.30 Total Amount of M and L Rs.160.26
Add 17.5 % OH and CP Rs.28.04
Total Rs.188.30

ITEM No. 5023.03


Brickwork with fly ash bricks in half brick thick honey-comb walling, built in cement mortar 1:4 using old size
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.037 85.1
2 Ordinary portland cement. 1 Kg Rs. 4.60 3.22 14.812
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
Rs.103.85
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.145 1.305
Rs.1.31
After rounding off: Rs.194.10 Total Amount of M and L Rs.165.18
Add 17.5 % OH and CP Rs.28.91
Total Rs.194.08

294 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5023.04
Brickwork with fly ash bricks in half brick thick honey-comb walling, built in cement mortar 1:3 using old size
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0083 3.9425
2 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.037 85.1
3 Ordinary portland cement. 1 Kg Rs. 4.60 4.14 19.044
Rs.108.09
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
3 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.199.00 Total Amount of M and L Rs.169.36
Add 17.5 % OH and CP Rs.29.64
Total Rs.199.00

ITEM No. 5023.05


Brickwork with fly ash bricks in half brick thick honey-comb walling, built in cement mortar 1:8 using modular
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
2 Ordinary portland cement. 1 Kg Rs. 4.60 1.16 5.336
3 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.035 75.25
Rs.83.63
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
3 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.170.30 Total Amount of M and L Rs.144.90
Add 17.5 % OH and CP Rs.25.36
Total Rs.170.26

295 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5023.06
Brickwork with fly ash bricks in half brick thick honey-comb walling, built in cement mortar 1:6 using modular
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
2 Ordinary portland cement. 1 Kg Rs. 4.60 1.53 7.038
3 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.035 75.25
Rs.85.33
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.172.30 Total Amount of M and L Rs.146.61
Add 17.5 % OH and CP Rs.25.66
Total Rs.172.26

ITEM No. 5023.07


Brickwork with fly ash bricks, in half-brick thick hon-ey-comb walling built in cement mortar 1:4 using modular
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.035 75.25
2 Ordinary portland cement. 1 Kg Rs. 4.60 2.51 11.546
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
Rs.89.84
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
3 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.177.60 Total Amount of M and L Rs.151.11
Add 17.5 % OH and CP Rs.26.44
Total Rs.177.56

296 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5023.08
brickwork with fly ash bricks, in half-brick thick hon-ey-comb walling built in cement mortar 1:3 using modular
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0064 3.04
2 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.035 75.25
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.23 14.858
Rs.93.15
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.135 1.215
Rs.1.22
After rounding off: Rs.181.40 Total Amount of M and L Rs.154.38
Add 17.5 % OH and CP Rs.27.02
Total Rs.181.40

ITEM No. 5024.01


Brickwork with fly ash bricks in brick-on-edge honey-comb walling (less than half brick thick), built in cement
mortar 1:8 using old bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
2 Ordinary portland cement. 1 Kg Rs. 4.60 0.79 3.634
3 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.025 57.5
Rs.63.03
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
3 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.146.10 Total Amount of M and L Rs.124.31
Add 17.5 % OH and CP Rs.21.75
Total Rs.146.07

297 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5024.02
Brickwork with fly ash bricks in brick-on-edge honey-comb walling (less than half brick thick), built in cement
mortar 1:6 using old bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.05 4.83
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
3 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.025 57.5
Rs.64.23
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
3 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.147.50 Total Amount of M and L Rs.125.51
Add 17.5 % OH and CP Rs.21.96
Total Rs.147.47

ITEM No. 5024.03


Brickwork with fly ash wrick in brick-on-edge honey-comb walling (less than half brick thick), built in cement
mortar 1:4 using old bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.025 57.5
2 Ordinary portland cement. 1 Kg Rs. 4.60 1.57 7.222
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
Rs.66.62
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.150.30 Total Amount of M and L Rs.127.90
Add 17.5 % OH and CP Rs.22.38
Total Rs.150.28

298 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5024.04
Brickwork with fly ash bricks in brick-on-edge honey-comb walling (less than half brick thick), built in cement
mortar 1:3 using old bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.025 57.5
2 Ordinary portland cement. 1 Kg Rs. 4.60 2.02 9.292
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.004 1.9
Rs.68.69
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.202 34.138
3 Bhisty including mussack 1 Day Rs. 169.00 0.02 3.38
Rs.60.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.152.70 Total Amount of M and L Rs.129.97
Add 17.5 % OH and CP Rs.22.74
Total Rs.152.71

ITEM No. 5025.01


Bricks work curved on plan with mean radius not exceeding 6m with bricks roughly cut to radius or bricks with
wedge shaped joints Material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.016 34.4
2 Lime unslakeds* 1 Kg Rs. 3.80 0.7 2.66
3 Ordinary portland cement. 1 Kg Rs. 4.60 1.4 6.44
4 Sand for masonary mortar 1 Cum Rs. 475.00 0.008 3.8
Rs.47.30
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.024 4.056
2 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.019 4.275
Rs.10.02
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.002 0.85106
Rs.0.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.69.10 Total Amount of M and L Rs.58.80
Add 17.5 % OH and CP Rs.10.29
Total Rs.69.09

299 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5025.02
Bricks work curved on plan with mean radius not exceeding 6m with bricks roughly cut to radius or bricks with
wedge shaped joints (Fly ash Bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 0.7 2.66
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.008 3.8
3 Ordinary portland cement. 1 Kg Rs. 4.60 1.4 6.44
4 burnt fly ash brick old size B-75 1000 No. Rs. 2,160.00 0.016 34.56
Rs.47.46
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.019 4.275
3 Mazdoor-man, 1 Day Rs. 169.00 0.024 4.056
Rs.10.02
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.002 0.85106
Rs.0.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.32 2.88
Rs.2.88
After rounding off: Rs.71.90 Total Amount of M and L Rs.61.21
Add 17.5 % OH and CP Rs.10.71
Total Rs.71.92

ITEM No. 5025.03


Bricks work curved on plan with mean radius not exceeding 6m with bricks roughly cut to radius or bricks with
wedge shaped joints Except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 0.7 2.66
2 Ordinary portland cement. 1 Kg Rs. 4.60 1.4 6.44
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.008 3.8
Rs.12.90
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.024 4.056
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.019 4.275
3 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
Rs.10.02
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.002 0.85106
Rs.0.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.28.70 Total Amount of M and L Rs.24.40
Add 17.5 % OH and CP Rs.4.27
Total Rs.28.67

300 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5026.01
Brickwork curved to plan with mean radius n. exc.6m but with fair cut and rubbed bricks or purpose moulded
bricks Material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 2.4 9.12
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.05 107.5
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.025 11.875
4 Ordinary portland cement. 1 Kg Rs. 4.60 4.5 20.7
Rs.149.20
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.045 7.605
2 Mazdoor-man, 1 Day Rs. 169.00 0.19 32.11
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.22 49.5
Rs.89.22
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.005 2.12765
Rs.2.13
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.283.70 Total Amount of M and L Rs.241.44
Add 17.5 % OH and CP Rs.42.25
Total Rs.283.69

301 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5026.02
Brick work curved to plan with mean radius n.exc 6mwith fair cut and rubed bricks or purpose moulded bricks
fly ash bricks Material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 2.4 9.12
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.025 11.875
3 Ordinary portland cement. 1 Kg Rs. 4.60 4.5 20.7
4 Burnt clay fly ash old size building brick tiles designation 75 (5/cm2) 1000 No. Rs. 2,160.00 0.05 108
Rs.149.70
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.045 7.605
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.22 49.5
3 Mazdoor-man, 1 Day Rs. 169.00 0.19 32.11
Rs.89.22
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.006 2.55318
Rs.2.55
Sundry
1 Sundries 1 Re Rs. 9.00 0.83 7.47
Rs.7.47
After rounding off: Rs.292.50 Total Amount of M and L Rs.248.93
Add 17.5 % OH and CP Rs.43.56
Total Rs.292.50

ITEM No. 5026.03


Brickwork curved to plan with mean radius n. exc. 6m with fair cut and rubbed bricks or purpose moulded
bricks Except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.025 11.875
2 Lime unslakeds* 1 Kg Rs. 3.80 2.4 9.12
3 Ordinary portland cement. 1 Kg Rs. 4.60 4.5 20.7
Rs.41.70
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.19 32.11
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.22 49.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.045 7.605
Rs.89.22
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.005 2.12765
Rs.2.13
Sundry
1 Sundries 1 Re Rs. 9.00 0.09 0.81
Rs.0.81
After rounding off: Rs.157.30 Total Amount of M and L Rs.133.85
Add 17.5 % OH and CP Rs.23.42
Total Rs.157.27

302 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5027.01
Brickwork in independent chimney shafts (as for large steam boilers), square, rectangular or polygonal on plan
Material and labour (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.52 117
2 Mazdoor-man, 1 Day Rs. 169.00 0.46 77.74
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.213.33
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.012 5.10636
Rs.5.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.257.20 Total Amount of M and L Rs.218.93
Add 17.5 % OH and CP Rs.38.31
Total Rs.257.24

ITEM No. 5027.02


Brickwork in independent chimney shafts (as for large steam boilers),square,rectangular or polygonal on plan
Material and Labour (fly ash bricks)
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.52 117
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 0.46 77.74
Rs.213.33
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.012 5.10636
Rs.5.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.257.20 Total Amount of M and L Rs.218.93
Add 17.5 % OH and CP Rs.38.31
Total Rs.257.24

303 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5027.03
Brickwork in independent chimney shafts (as for large steam boilers), square, rectangular or polygonal on plan
Except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.52 117
3 Mazdoor-man, 1 Day Rs. 169.00 0.46 77.74
Rs.213.33
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.012 5.10636
Rs.5.11
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.257.20 Total Amount of M and L Rs.218.93
Add 17.5 % OH and CP Rs.38.31
Total Rs.257.24

ITEM No. 5028.01


Brickwork in independent chimney shaft (as for large steam boiler ), but curved on plan to any radious
Material and labour (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.05 107.5
Rs.107.50
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.155 26.195
2 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.74 166.5
Rs.302.55
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.017 7.23401
Rs.7.23
Sundry
1 Sundries 1 Re Rs. 9.00 0.24 2.16
Rs.2.16
After rounding off: Rs.492.80 Total Amount of M and L Rs.419.44
Add 17.5 % OH and CP Rs.73.40
Total Rs.492.84

304 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5028.02
Brickwork in independent chimney shafts (as for large steam boiler ) but curved on plan to any radious
Material and labour (fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash brick old size B-75 1000 No. Rs. 2,160.00 0.0536 115.776
Rs.115.78
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.74 166.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.155 26.195
3 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
Rs.302.55
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.017 7.23401
Rs.7.23
Sundry
1 Sundries 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.501.80 Total Amount of M and L Rs.427.09
Add 17.5 % OH and CP Rs.74.74
Total Rs.501.82

ITEM No. 5028.03


Brickwork in independent Chimney shaft (as for alrge stream boiler ) but curved on plan to any radious Except
bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.74 166.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.155 26.195
3 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
Rs.302.55
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.017 7.23401
Rs.7.23
Sundry
1 Sundries 1 Re Rs. 9.00 0.36 3.24
Rs.3.24
After rounding off: Rs.367.80 Total Amount of M and L Rs.313.02
Add 17.5 % OH and CP Rs.54.78
Total Rs.367.80

305 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5029.01
Brickwork in underpinning to walls in short lengths (labour etc., cutting out old walls measured separately)
Material and labour (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.221 1.989
Rs.1.99
After rounding off: Rs.662.80 Total Amount of M and L Rs.564.05
Add 17.5 % OH and CP Rs.98.71
Total Rs.662.76

ITEM No. 5029.02


Brickwork in underpinning to walls in short lengths (labour etc., cutting out old walls measured separately)
Material and labour (fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
3 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.221 1.989
Rs.1.99
After rounding off: Rs.662.80 Total Amount of M and L Rs.564.05
Add 17.5 % OH and CP Rs.98.71
Total Rs.662.76

ITEM No. 5029.03


Brickwork in underpinning to walls in short lengths (labour etc., cutting out old walls measured separately)
Except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.221 1.989
Rs.1.99
After rounding off: Rs.662.80 Total Amount of M and L Rs.564.05
Add 17.5 % OH and CP Rs.98.71
Total Rs.662.76

306 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5030.01
Brickswork in arches with selected uncut bricks with wedge shaped joints Material and labour (clay Bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.05 107.5
Rs.107.50
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.5 112.5
Rs.112.50
Sundry
1 Sundries 1 Re Rs. 9.00 0.89 8.01
Rs.8.01
After rounding off: Rs.267.90 Total Amount of M and L Rs.228.01
Add 17.5 % OH and CP Rs.39.90
Total Rs.267.91

ITEM No. 5030.02


Brickswork in arches with selected uncut bricks with wedge shaped joints Material and labour (fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.05 115
Rs.115.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.5 112.5
Rs.112.50
Sundry
1 Sundries 1 Re Rs. 9.00 0.89 8.01
Rs.8.01
After rounding off: Rs.276.70 Total Amount of M and L Rs.235.51
Add 17.5 % OH and CP Rs.41.21
Total Rs.276.72

ITEM No. 5030.03


Brickswork in arches with selected uncut bricks with wedge shaped joints Except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.5 112.5
Rs.112.50
Sundry
1 Sundries 1 Re Rs. 9.00 0.89 8.01
Rs.8.01
After rounding off: Rs.141.60 Total Amount of M and L Rs.120.51
Add 17.5 % OH and CP Rs.21.09
Total Rs.141.60

307 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5031.01
Brickwork in arches and vaults with purpose moulded or faircut and rubbed bricks and joints of uniform
thickness Material and labour (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.05 107.5
Rs.107.50
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 2.25 506.25
Rs.506.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.89 8.01
Rs.8.01
After rounding off: Rs.730.60 Total Amount of M and L Rs.621.76
Add 17.5 % OH and CP Rs.108.81
Total Rs.730.57

ITEM No. 5031.02


Brickwork in arches and vaults with purpose moulded or faircut and rubbed bricks and joints of uniform
thickness Material and labour (fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.05 115
Rs.115.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 2.247 505.575
Rs.505.58
Sundry
1 Sundries 1 Re Rs. 9.00 0.89 8.01
Rs.8.01
After rounding off: Rs.738.60 Total Amount of M and L Rs.628.59
Add 17.5 % OH and CP Rs.110.00
Total Rs.738.59

ITEM No. 5031.03


Brickwork in arches and vaults with purpose moulded or faircut and rubbed bricks and joints of uniform
thickness Except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 2.25 506.25
Rs.506.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.88 7.92
Rs.7.92
After rounding off: Rs.604.10 Total Amount of M and L Rs.514.17
Add 17.5 % OH and CP Rs.89.98
Total Rs.604.15

308 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5032.01
For using clay bricks of class designation 100 instead of class designation 75 (Clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for clay brick class designation 100 in stead designation 75 1000 No. Rs. 1,204.30 0.05 60.215
Rs.60.22
After rounding off: Rs.70.80 Total Amount of M and L Rs.60.22
Add 17.5 % OH and CP Rs.10.54
Total Rs.70.75

ITEM No. 5032.02


For using clay bricks of class designation 100 instead of class designation 75 (fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for fly ash brick designation100 in lieu of designation 75 1000 No. Rs. 1,204.30 0.05 60.215
Rs.60.22
After rounding off: Rs.70.80 Total Amount of M and L Rs.60.22
Add 17.5 % OH and CP Rs.10.54
Total Rs.70.75

ITEM No. 5033.01


For using brick of class designation 125 instead of class designation 75 Material and labour (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for clay bricks designation of 125 instead of designation 75 1000 No. Rs. 2,400.00 0.05 120
Rs.120.00
After rounding off: Rs.141.00 Total Amount of M and L Rs.120.00
Add 17.5 % OH and CP Rs.21.00
Total Rs.141.00

ITEM No. 5033.02


For using brick of class designation 125 instead of class designation 75 (fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for flym ash bricks designation 125 instead of designation 75 1000 No. Rs. 2,400.00 0.05 120
Rs.120.00
After rounding off: Rs.141.00 Total Amount of M and L Rs.120.00
Add 17.5 % OH and CP Rs.21.00
Total Rs.141.00

309 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5034
Extra over brickwork for labour in cutting & building in brickwork around steel joints, stanchions, girders, etc.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.011 23.65
Rs.23.65
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.269 45.461
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.269 60.525
Rs.105.99
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.153.50 Total Amount of M and L Rs.130.63
Add 17.5 % OH and CP Rs.22.86
Total Rs.153.49

ITEM No. 5035


Extra over brickwork for forming cavity 4 to 8cm; with and including not less than 5 numbers of bitumen
coated galvanised iron wall ties (20mmx 5mm, 20cm long of approved pattern) for 1 sq.metre forming weep
holes and fixing and fixing only of gratings.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Clamps GI 1 Kg Rs. 50.00 0.8 40
Rs.40.00
Labour
1 Hammermen 1 Day Rs. 192.00 0.05 9.6
2 Mazdoor-man, 1 Day Rs. 169.00 0.015 2.535
3 Blacksmith, tinsmith 1 Day Rs. 192.00 0.05 9.6
4 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.035 7.875
Rs.29.61
Sundry
1 Sundries 1 Re Rs. 9.00 0.094 0.846
Rs.0.85
After rounding off: Rs.82.80 Total Amount of M and L Rs.70.46
Add 17.5 % OH and CP Rs.12.33
Total Rs.82.79

310 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5036
Extra over brickwork for closing cavity at jambs, calls and heads of opening etc. (supply and fixing of flashing
etc. not included).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.912 8.7952
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0051 2.4225
Rs.11.22
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.154 34.65
2 Bhisty including mussack 1 Day Rs. 169.00 0.061 10.309
3 Mazdoor-man, 1 Day Rs. 169.00 0.308 52.052
Rs.97.01
Sundry
1 Sundries 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.128.40 Total Amount of M and L Rs.109.31
Add 17.5 % OH and CP Rs.19.13
Total Rs.128.44

ITEM No. 5037


Extra over brickwork for splayed, bullnosed or any other type of purpose modulded bricks (volume of purpose
moulded bricks measured ignoring all wants viz., splays, grooves, chamfers, etc.).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.1 215
Rs.215.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.27 60.75
Rs.60.75
After rounding off: Rs.324.00 Total Amount of M and L Rs.275.75
Add 17.5 % OH and CP Rs.48.26
Total Rs.324.01

ITEM No. 5038.01


Fair cutting exc. 10 cm width or girth on exposed surfaces of brickwork as to fire place apertures, splayed
angles, weathering, cornices, groins, ec. including rubbed finish and waste Straight or raking cutting.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.011 23.65
Rs.23.65
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.5399 121.4775
Rs.121.48
After rounding off: Rs.170.50 Total Amount of M and L Rs.145.13
Add 17.5 % OH and CP Rs.25.40
Total Rs.170.52

311 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5038.02
Fair cutting exc. 10 cm width or girth on exposed surfaces of brickwork as to fire place apertures, splayed
angles, weathering, cornices, groins, ec. including rubbed finish and waste Circular cutting.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.011 23.65
Rs.23.65
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.08 243
Rs.243.00
After rounding off: Rs.313.30 Total Amount of M and L Rs.266.65
Add 17.5 % OH and CP Rs.46.66
Total Rs.313.31

ITEM No. 5039.01


Fair cutting exc. 10 cm width or girth on exposed surfaces of brickwork such as in splays, chamfers, etc.
including rubbed finish and waste Straight or raking cutting.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.004 8.6
Rs.8.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.07 15.75
Rs.15.75
After rounding off: Rs.28.60 Total Amount of M and L Rs.24.35
Add 17.5 % OH and CP Rs.4.26
Total Rs.28.61

ITEM No. 5039.02


Fair cutting exc. 10 cm width or girth on exposed surfaces of brickwork such as in splays, chamfers, etc.
including rubbed finish and waste Circular cutting.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.004 8.6
Rs.8.60
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.14 31.5
Rs.31.50
After rounding off: Rs.47.10 Total Amount of M and L Rs.40.10
Add 17.5 % OH and CP Rs.7.02
Total Rs.47.12

312 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5040.01
Damp proof course to horizontal or vertical including necessary formwork 15mmthick in cement mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0171 8.1225
2 Ordinary portland cement. 1 Kg Rs. 4.60 11.18 51.428
Rs.59.55
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.043 7.267
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.05 11.25
Rs.18.52
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.92.30 Total Amount of M and L Rs.78.56
Add 17.5 % OH and CP Rs.13.75
Total Rs.92.31

ITEM No. 5040.02


Damp proof course to horizontal or vertical including necessary formwork 20mmthick in cement mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 14.68 67.528
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0225 10.6875
Rs.78.22
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.08 18
2 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
Rs.26.45
Sundry
1 Sundries 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.124.20 Total Amount of M and L Rs.105.70
Add 17.5 % OH and CP Rs.18.50
Total Rs.124.20

313 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5040.03
Damp proof course to horizontal or vertical including necessary formwork 25mmthick in cement concrete
1:2:4, type B-0.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 7.71 35.466
2 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.021 12.075
3 Sand for concrete 1 Cum Rs. 500.00 0.0105 5.25
Rs.52.79
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.018 3.042
2 Mazdoor-man, 1 Day Rs. 169.00 0.047 7.943
3 Mason (Stone mason) 1 Day Rs. 225.00 0.02 4.5
Rs.15.49
After rounding off: Rs.80.20 Total Amount of M and L Rs.68.28
Add 17.5 % OH and CP Rs.11.95
Total Rs.80.22

ITEM No. 5040.04


Damp proof course to horizontal or vertical including necessary formwork 40mmthick in cement concrete
1:2:4, type B-0.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 12.34 56.764
2 Stone aggregate graded 12.5mm 1 Cum Rs. 575.00 0.0336 19.32
3 Sand for concrete 1 Cum Rs. 500.00 0.0168 8.4
Rs.84.48
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.0834 14.0946
2 Bhisty including mussack 1 Day Rs. 169.00 0.0301 5.0869
3 Mason (Stone mason) 1 Day Rs. 225.00 0.0426 9.585
Rs.28.77
After rounding off: Rs.133.10 Total Amount of M and L Rs.113.25
Add 17.5 % OH and CP Rs.19.82
Total Rs.133.07

314 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5041
Applying evenly a coat of blown type bitumen at the rate of 1.5 kg per square metre and blinding with clean
dry sand @ 0.05 cu.m per sq.m.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bitumen blown grade 1 Kg Rs. 32.50 1.53 49.725
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.05 23.75
Rs.73.48
Labour
1 Painter (ordinary) 1 Day Rs. 192.00 0.027 5.184
2 Mate 1 Day Rs. 169.00 0.027 4.563
Rs.9.75
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.98.40 Total Amount of M and L Rs.83.72
Add 17.5 % OH and CP Rs.14.65
Total Rs.98.37

ITEM No. 5042


Polythene film, 50 micron thick, laid on a coat of bitumen primer, @ 0.30 to 0.50 kg per sq.m.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Polythene Film 50 micron 1 Kg Rs. 100.00 0.045 4.5
2 Bitumen primer 1 Kg Rs. 52.00 0.3 15.6
Rs.20.10
Labour
1 Painter (ordinary) 1 Day Rs. 192.00 0.027 5.184
2 Mate 1 Day Rs. 169.00 0.027 4.563
Rs.9.75
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.35.60 Total Amount of M and L Rs.30.30
Add 17.5 % OH and CP Rs.5.30
Total Rs.35.60

315 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5043
Polythene film, with 150 micron thick,laid on a coat of bitumen primer ,@0.3 to 0.5 kg per sq. m.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bitumen primer 1 Kg Rs. 52.00 0.3 15.6
2 Polythene Film 100 micron 1 Kg Rs. 100.00 0.135 13.5
Rs.29.10
Labour
1 Mate 1 Day Rs. 169.00 0.027 4.563
2 Painter (ordinary) 1 Day Rs. 192.00 0.027 5.184
Rs.9.75
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.50.90 Total Amount of M and L Rs.43.35
Add 17.5 % OH and CP Rs.7.59
Total Rs.50.93

ITEM No. 5044.01


Cutting chases, plainning in, making good to facings where required and pointing in cement mortar 1:3 to ends
or edges of landings, steps, sillls, sunshades, shelves, lintels, etc; and cutting chases for concealed water tubing
or concealed conduit wiring,wiring, etc. and making good,cutting exceeding 20cm girth in brick wall.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0128 6.08
2 Ordinary portland cement. 1 Kg Rs. 4.60 5.916 27.2136
Rs.33.29
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.96 216
2 Mazdoor-man, 1 Day Rs. 169.00 0.96 162.24
Rs.378.24
Sundry
1 Sundries 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.485.30 Total Amount of M and L Rs.413.06
Add 17.5 % OH and CP Rs.72.29
Total Rs.485.35

316 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5044.02
Cutting chases, plainning in, making good to facings where required and pointing in cement mortar 1:3 to ends
or edges of landings, steps, sillls, sunshades, shelves, lintels, etc; and cutting chases for concealed water tubing
or concealed conduit wiring,wiring, etc. and making good,cutting exceeding 20cm girth instone concrete block
or slab wall.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0128 6.08
2 Ordinary portland cement. 1 Kg Rs. 4.60 5.916 27.2136
Rs.33.29
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.056 237.6
2 Mazdoor-man, 1 Day Rs. 169.00 1.056 178.464
Rs.416.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.529.80 Total Amount of M and L Rs.450.89
Add 17.5 % OH and CP Rs.78.91
Total Rs.529.79

ITEM No. 5045.01


Cutting chases, plainning in, making good to facings where required and pointing in cement mortar 1:3 to ends
or edges of landings, steps, sillls, sunshades, shelves, lintels, etc; and cutting chases for concealed water tubing
or concealed conduit wiring, etc., and making good cutting not exc 10 cm girth in brick walls
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.002 0.95
2 Ordinary portland cement. 1 Kg Rs. 4.60 0.99 4.554
Rs.5.50
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.17 38.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.17 28.73
Rs.66.98
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.85.80 Total Amount of M and L Rs.73.02
Add 17.5 % OH and CP Rs.12.78
Total Rs.85.80

317 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5045.02
Cutting chases, plainning in, making good to facings where required and pointing in cement mortar 1:3 to ends
or edges of landings, steps, sillls, sunshades, shelves, lintels, etc; and cutting chases for concealed water tubing
or concealed conduit wiring, etc., and making good cutting not exc 10 cm girth in stone concrete block or slab
wall.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 0.99 4.554
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0021 0.9975
Rs.5.55
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.187 42.075
2 Mazdoor-man, 1 Day Rs. 169.00 0.187 31.603
Rs.73.68
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.93.70 Total Amount of M and L Rs.79.77
Add 17.5 % OH and CP Rs.13.96
Total Rs.93.73

ITEM No. 5046.01


Cutting chases, plainning in, making good to facings where required and pointing in cement mortar 1:3 to ends
or edges of landings, steps, sillls, sunshades, shelves, lintels, etc; and cutting chases for concealed water tubing
or concealed conduit wiring, etc., and making good cutting exc. 10 cm but not exc. 20 cm girth Brick wall.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.47 6.762
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0032 1.52
Rs.8.28
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.24 40.56
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.24 54
Rs.94.56
Sundry
1 Sundries 1 Re Rs. 9.00 0.065 0.585
Rs.0.59
After rounding off: Rs.121.50 Total Amount of M and L Rs.103.43
Add 17.5 % OH and CP Rs.18.10
Total Rs.121.53

318 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5046.02
Cutting chases, plainning in, making good to facings where required and pointing in cement mortar 1:3 to ends
or edges of landings, steps, sillls, sunshades, shelves, lintels, etc; and cutting chases for concealed water tubing
or concealed conduit wiring, etc., and making good cutting exc. 10 cm but not exc. 20 cm girth Stone concrete
block walls
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.47 6.762
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0023 1.0925
Rs.7.85
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.264 44.616
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.264 59.4
Rs.104.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.132.10 Total Amount of M and L Rs.112.41
Add 17.5 % OH and CP Rs.19.67
Total Rs.132.08

ITEM No. 5047.01


Cutting holes into or through brick walls built in mud mortar and making good in cement mortar 1:3 or cement
concrete 1:2:4 type B-1 as required Superficial area not exceeding 150 sq.cm .
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.004 0.9
2 Mazdoor-man, 1 Day Rs. 169.00 0.004 0.676
Rs.1.58
Sundry
1 Sundries 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.2.30 Total Amount of M and L Rs.1.94
Add 17.5 % OH and CP Rs.0.34
Total Rs.2.27

319 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5047.02
Cutting holes into or through brick walls built in mud mortar and making good in cement mortar 1:3 or cement
concrete 1:2:4 type B-1 as required Superficial area exceeding 150 sq.cm but n. exc.400sq. Cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.006 1.014
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.006 1.35
Rs.2.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.3.50 Total Amount of M and L Rs.2.99
Add 17.5 % OH and CP Rs.0.52
Total Rs.3.52

ITEM No. 5047.03


Cutting holes into or through brick walls built in mud mortar and making good in cement mortar 1:3 or cement
concrete 1:2:4 type B-1 as required Superficial area not exceeding 400 sq.cm but not exc. 0.10 sq.m.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.013 2.197
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.013 2.925
Rs.5.12
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.6.70 Total Amount of M and L Rs.5.66
Add 17.5 % OH and CP Rs.0.99
Total Rs.6.65

ITEM No. 5048.01


Cutting holes into or through in brick walls built in lime mortar and stone walls built in mud mortar Superficial
area not exceeding 150 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.006 1.014
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.006 1.35
Rs.2.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.3.20 Total Amount of M and L Rs.2.72
Add 17.5 % OH and CP Rs.0.48
Total Rs.3.20

320 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5048.02
Cutting holes into or through brick walls built in lime mortar and stone walls built in mud mortar Superficial
area exceeding 150 sq.cm but not exc. 400 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.011 2.475
2 Mazdoor-man, 1 Day Rs. 169.00 0.011 1.859
Rs.4.33
Sundry
1 Sundries 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.5.80 Total Amount of M and L Rs.4.96
Add 17.5 % OH and CP Rs.0.87
Total Rs.5.83

ITEM No. 5048.03


Cutting holes into or through in brick walls built in lime mortar and stone walls built in mud mortar Superficial
area exceeding 400 sq.cm but not exc. 0.10 sq.m.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.012 2.7
2 Mazdoor-man, 1 Day Rs. 169.00 0.012 2.028
Rs.4.73
Sundry
1 Sundries 1 Re Rs. 9.00 0.08 0.72
Rs.0.72
After rounding off: Rs.6.40 Total Amount of M and L Rs.5.45
Add 17.5 % OH and CP Rs.0.95
Total Rs.6.40

ITEM No. 5049.01


Cutting holes into or through brick walls built in cement mortar or cement lime mortar and stone walls built in
lime mortar or walls of lime concrete Superficial area not exceeding 150 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.0072 1.62
2 Mazdoor-man, 1 Day Rs. 169.00 0.0072 1.2168
Rs.2.84
Sundry
1 Sundries 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.3.80 Total Amount of M and L Rs.3.20
Add 17.5 % OH and CP Rs.0.56
Total Rs.3.76

321 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5049.02
Cutting holes into or through brick walls built in cement mortar or cement lime mortar and stone walls built in
lime mortar or walls of lime concrete Superficial area exceeding 150 sq.cm but not exc. 400 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.012 2.7
2 Mazdoor-man, 1 Day Rs. 169.00 0.012 2.028
Rs.4.73
Sundry
1 Sundries 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.6.30 Total Amount of M and L Rs.5.36
Add 17.5 % OH and CP Rs.0.94
Total Rs.6.30

ITEM No. 5049.03


Cutting holes into or through brick walls built in cement mortar or cement lime mortar and stone walls built in
lime mortar or walls of lime concrete Superficial area exceeding 400 sq.cm but not exc. 0.10 sq.m.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.016 3.6
2 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
Rs.6.30
Sundry
1 Sundries 1 Re Rs. 9.00 0.079 0.711
Rs.0.71
After rounding off: Rs.8.20 Total Amount of M and L Rs.7.02
Add 17.5 % OH and CP Rs.1.23
Total Rs.8.24

ITEM No. 5050.01


Cutting holes into or through stone walls built in cement mortar or cement lime mortar and walls of cement
concrete Superficial area not exceeding 150 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.0096 2.16
2 Mazdoor-man, 1 Day Rs. 169.00 0.0096 1.6224
Rs.3.78
Sundry
1 Sundries 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.4.90 Total Amount of M and L Rs.4.14
Add 17.5 % OH and CP Rs.0.72
Total Rs.4.87

322 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5050.02
Cutting holes into or through stone walls built in cement mortar or cement lime mortar and walls of cement
concrete Superficial area not exceeding 150 sq.cm but not exc. 400 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.016 3.6
2 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
Rs.6.30
Sundry
1 Sundries 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.8.10 Total Amount of M and L Rs.6.93
Add 17.5 % OH and CP Rs.1.21
Total Rs.8.15

ITEM No. 5050.03


Cutting holes into or through stone walls built in cement mortar or cement lime mortar and walls of cement
concrete Superficial area not exceeding 400 sq.cm but not exc. 0.10 sq.m.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.021 3.549
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.021 4.725
Rs.8.27
Sundry
1 Sundries 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.10.50 Total Amount of M and L Rs.8.90
Add 17.5 % OH and CP Rs.1.56
Total Rs.10.46

ITEM No. 5051.01


Cutting openings, through brick walls for door, window and other openings or enlarging existing openings,
converting windows into door openings, etc., or cutting out defective brickwork for under - pinning, including
providing, fixing and removing shoring, cleaning and stacking bricks, removing surplus serviceable bricks, hard-
core,etc.. To store and rubbish not exc. 50mbrick wall built in mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.335 75.375
2 Mazdoor-man, 1 Day Rs. 169.00 0.71 119.99
Rs.195.37
Plant & Machiner
1 Hire of lorry 5 T capacity 1 Day Rs. 1,000.00 0.0383 38.3
Rs.38.30
Sundry
1 Sundries 1 Re Rs. 9.00 0.97 8.73
Rs.8.73
After rounding off: Rs.284.80 Total Amount of M and L Rs.242.40
Add 17.5 % OH and CP Rs.42.42
Total Rs.284.81

323 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5051.02
Cutting openings, through brick walls for door, window and other openings or enlarging existing openings,
converting windows into door openings, etc., or cutting out defective brickwork for under - pinning, including
providing, fixing and removing shoring, cleaning and stacking bricks, removing surplus serviceable bricks, hard-
core,etc.. to store and rubbish not exc. 50m add if brick wall built in lime mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.355 59.995
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.177 39.825
Rs.99.82
After rounding off: Rs.117.30 Total Amount of M and L Rs.99.82
Add 17.5 % OH and CP Rs.17.47
Total Rs.117.29

ITEM No. 5051.03


Cutting openings, through brick walls for door, window and other openings or enlarging existing openings,
converting windows into door openings, etc., or cutting out defective brickwork for under - pinning, including
providing, fixing and removing shoring, cleaning and stacking bricks, removing surplus serviceable bricks, hard-
core,etc.. to store and rubbish not exc. 50m add if brick wall built in cement mortar or cement lime mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.71 119.99
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.355 79.875
Rs.199.87
After rounding off: Rs.234.80 Total Amount of M and L Rs.199.87
Add 17.5 % OH and CP Rs.34.98
Total Rs.234.84

ITEM No. 5052.01


Forming jambs, etc., to openngs (to foregoing item), including cutting, toothing and properly bonding into old
work, also facing, jointing and pointing to mach existing work, complet, in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.019 40.85
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0203 9.6425
3 Lime unslakeds* 1 Kg Rs. 3.80 4.29 16.302
Rs.66.79
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.3 67.5
Rs.185.80
Sundry
1 Sundries 1 Re Rs. 9.00 0.27 2.43
Rs.2.43
After rounding off: Rs.299.70 Total Amount of M and L Rs.255.02
Add 17.5 % OH and CP Rs.44.63
Total Rs.299.65

324 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5052.02
Forming jambs, etc., to openngs (to foregoing item), including cutting, toothing and properly bonding into old
work, also facing, jointing and pointing to mach existing work, complete, cement mortar1:6 or cement lime
mortar 1:1:8 .
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0043 2.0425
2 Ordinary portland cement. 1 Kg Rs. 4.60 1.016 4.6736
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.019 40.85
Rs.47.57
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.48 108
2 Mazdoor-man, 1 Day Rs. 169.00 0.98 165.62
Rs.273.62
Sundry
1 Sundries 1 Re Rs. 9.00 0.275 2.475
Rs.2.48
After rounding off: Rs.380.30 Total Amount of M and L Rs.323.66
Add 17.5 % OH and CP Rs.56.64
Total Rs.380.30

ITEM No. 5052.03


Forming jambs, etc., to openngs (to foregoing item), including cutting, toothing and properly bonding into old
work, also facing, jointing and pointing to mach existing work, complete, cement mortar1:4 or cement lime
mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0043 2.0425
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.019 40.85
3 Ordinary portland cement. 1 Kg Rs. 4.60 1.53 7.038
Rs.49.93
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.25 211.25
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.6 135
Rs.346.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.33 2.97
Rs.2.97
After rounding off: Rs.469.00 Total Amount of M and L Rs.399.15
Add 17.5 % OH and CP Rs.69.85
Total Rs.469.00

325 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5053.01
Making good under cills or over arches, lintels and bressummers, including all-pinning when necessary in lime
mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
2 Lime unslakeds* 1 Kg Rs. 3.80 1.83 6.954
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.038 81.7
Rs.92.74
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.112 25.2
2 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
Rs.28.58
Sundry
1 Sundries 1 Re Rs. 9.00 0.34 3.06
Rs.3.06
After rounding off: Rs.146.10 Total Amount of M and L Rs.124.38
Add 17.5 % OH and CP Rs.21.77
Total Rs.146.15

ITEM No. 5053.02


Making good under cills or over arches, lintels and bressummers, including all-pinning when necessary cement
mortar1:6 or cement lime mortar 1:1:8 ..
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
2 Ordinary portland cement. 1 Kg Rs. 4.60 2.16 9.936
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.038 81.7
Rs.95.96
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.28 47.32
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.14 31.5
Rs.78.82
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.210.70 Total Amount of M and L Rs.179.28
Add 17.5 % OH and CP Rs.31.37
Total Rs.210.65

326 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5053.03
Making good under cills or over arches, lintels and bressummers, including all-pinning when necessary cement
mortar1:4 or cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0091 4.3225
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.038 81.7
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.25 14.95
Rs.100.97
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.428 72.332
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.214 48.15
Rs.120.48
Sundry
1 Sundry* 1 Re Rs. 9.00 0.44 3.96
Rs.3.96
After rounding off: Rs.264.90 Total Amount of M and L Rs.225.41
Add 17.5 % OH and CP Rs.39.45
Total Rs.264.86

ITEM No. 5054.01


Cutting holes in brick walls in mud mortar for inserting holdfasts and making good dismantled portion in
cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of embedded portion of holdfasts or lugs
measured from the face of the jamb into the wall Not exceeding half brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.063 10.647
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.063 14.175
Rs.24.82
Sundry
1 Sundry* 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.30.90 Total Amount of M and L Rs.26.26
Add 17.5 % OH and CP Rs.4.60
Total Rs.30.86

327 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5054.02
Cutting holes in brick walls in mud mortar for inserting holdfasts and making good dismantled portion in
cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of embedded portion of holdfasts or lugs
measured from the face of the jamb into the wall Exceeding half brick but not exc. One brick
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.125 28.125
Rs.49.25
Sundry
1 Sundry* 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.60.20 Total Amount of M and L Rs.51.23
Add 17.5 % OH and CP Rs.8.97
Total Rs.60.20

ITEM No. 5054.03


Cutting holes in brick walls in mud mortar for inserting holdfasts and making good dismantled portion in
cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of embedded portion of holdfasts or lugs
measured from the face of the jamb into the wall Exceeding one brick but not exc. Two brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.167 28.223
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.167 37.575
Rs.65.80
Sundry
1 Sundry* 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.79.10 Total Amount of M and L Rs.67.33
Add 17.5 % OH and CP Rs.11.78
Total Rs.79.11

ITEM No. 5055.01


Cutting holes in brick walls built in lime mortar and stone walls built in mud mortar and making good
dismantled portion in cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of embedded portion
of holdfasts or lugs measured from the face of the jamb into the wall (Depth of embedded portion of holdfasts
or lugs measured from the face of the jamb into the wall ) Not exceeding half brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.094 15.886
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.094 21.15
Rs.37.04
Sundry
1 Sundry* 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.45.30 Total Amount of M and L Rs.38.57
Add 17.5 % OH and CP Rs.6.75
Total Rs.45.32

328 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5055.02
Cutting holes in brick walls built in lime mortar and stone walls built in mud mortar and making good
dismantled portion in cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of embedded portion
of holdfasts or lugs measured from the face of the jamb into the wall (Depth of embedded portion of holdfasts
or lugs measured from the face of the jamb into the wall ) Exceeding half brick but not exc. One brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.188 42.3
2 Mazdoor-man, 1 Day Rs. 169.00 0.188 31.772
Rs.74.07
Sundry
1 Sundry* 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.89.40 Total Amount of M and L Rs.76.05
Add 17.5 % OH and CP Rs.13.31
Total Rs.89.36

ITEM No. 5055.03


Cutting holes in brick walls built in lime mortar and stone walls built in mud mortar and making good
dismantled portion in cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of embedded portion
of holdfasts or lugs measured from the face of the jamb into the wall (Depth of embedded portion of holdfasts
or lugs measured from the face of the jamb into the wall ) Exceeding one brick but not exc. Two brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.25 56.25
Rs.98.50
Sundry
1 Sundry* 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.117.50 Total Amount of M and L Rs.100.03
Add 17.5 % OH and CP Rs.17.51
Total Rs.117.54

329 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5056.01
Cutting holes in brick walls built in cement mortar or cement lime mortar and stone walls built in lime mortar
and making good dismantled portion in cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of
embedded portion of holdfasts or lugs measured from the face of the jamb into the wall (Depth of embedded
portion of holdfasts or lugs measured from the face of the jamb into the wall ) Not exceeding half brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.094 15.886
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.094 21.15
Rs.37.04
Sundry
1 Sundry* 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.45.30 Total Amount of M and L Rs.38.57
Add 17.5 % OH and CP Rs.6.75
Total Rs.45.32

ITEM No. 5056.02


Cutting holes in brick walls built in cement mortar or cement lime mortar and stone walls built in lime
mortarand making good dismantled portion in cement 1:3 or cement concrete 1:2:4 Type B-1 as required
Depth of embedded portion of holdfasts or lugs measured from the face of the jamb into the wall (Depth of
embedded portion of holdfasts or lugs measured from the face of the jamb into the wall ) Exceeding half brick
but not exc. One brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.22 49.5
Rs.86.68
Sundry
1 Sundry* 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.104.20 Total Amount of M and L Rs.88.66
Add 17.5 % OH and CP Rs.15.52
Total Rs.104.18

330 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5056.03
Cutting holes in brick walls built in cement mortar or cement lime mortar and stone walls built in lime
mortarand making good dismantled portion in cement 1:3 or cement concrete 1:2:4 Type B-1 as required
Depth of embedded portion of holdfasts or lugs measured from the face of the jamb into the wall (Depth of
embedded portion of holdfasts or lugs measured from the face of the jamb into the wall ) Exceeding one brick
but not exc. Two brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.29 65.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.29 49.01
Rs.114.26
Sundry
1 Sundry* 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.136.40 Total Amount of M and L Rs.116.06
Add 17.5 % OH and CP Rs.20.31
Total Rs.136.37

ITEM No. 5057.01


Cutting holes instone walls built in cement mortar or in cement lime mortar and making good dismantled
portion in cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of embedded portion of holdfasts
or lugs measured from the face of the jamb into the wall Not exceeding half brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.111 18.759
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.111 24.975
Rs.43.73
Sundry
1 Sundry* 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.53.70 Total Amount of M and L Rs.45.71
Add 17.5 % OH and CP Rs.8.00
Total Rs.53.71

ITEM No. 5057.02


Cutting holes instone walls built in cement mortar or in cement lime mortar and making good dismantled
portion in cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of embedded portion of holdfasts
or lugs measured from the face of the jamb into the wall Exceeding half brick but not exc. One brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.222 49.95
2 Mazdoor-man, 1 Day Rs. 169.00 0.222 37.518
Rs.87.47
Sundry
1 Sundry* 1 Re Rs. 9.00 0.28 2.52
Rs.2.52
After rounding off: Rs.105.70 Total Amount of M and L Rs.89.99
Add 17.5 % OH and CP Rs.15.75
Total Rs.105.74

331 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5057.03
Cutting holes instone walls built in cement mortar or in cement lime mortar and making good dismantled
portion in cement 1:3 or cement concrete 1:2:4 Type B-1 as required Depth of embedded portion of holdfasts
or lugs measured from the face of the jamb into the wall Exceeding one brick but not exc. Two brick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.333 56.277
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.333 74.925
Rs.131.20
Sundry
1 Sundry* 1 Re Rs. 9.00 0.19 1.71
Rs.1.71
After rounding off: Rs.156.20 Total Amount of M and L Rs.132.91
Add 17.5 % OH and CP Rs.23.26
Total Rs.156.17

ITEM No. 5058.01


Cutting out bricks (old brick walls built in mud mortar) forming toothing for, and holding new into old work
including value of new materials entering old walls and jointing and pointing (measured on vertical face in
contact with old wall only), New work
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
2 Mud mortar 1 Cum Rs. 100.00 0.009 0.9
Rs.61.10
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.43 96.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
Rs.169.42
Sundry
1 Sundry* 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.271.40 Total Amount of M and L Rs.231.02
Add 17.5 % OH and CP Rs.40.43
Total Rs.271.44

332 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5058.02
Cutting out bricks (old brick walls built in mud mortar) forming toothing for, and holding new into old work
including value of new materials entering old walls and jointing and pointing (measured on vertical face in
contact with old wall only), New work
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0076 3.61
3 Lime unslakeds* 1 Kg Rs. 3.80 1.808 6.8704
Rs.70.68
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.43 96.75
Rs.169.42
Sundry
1 Sundry* 1 Re Rs. 9.00 0.051 0.459
Rs.0.46
After rounding off: Rs.282.70 Total Amount of M and L Rs.240.56
Add 17.5 % OH and CP Rs.42.10
Total Rs.282.66

ITEM No. 5058.03


Cutting out bricks (old brick walls built in mud mortar) forming toothing for, and holding new into old work
including value of new materials entering old walls and jointing and pointing (measured on vertical face in
contact with old wall only), New work
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
2 Lime unslakeds* 1 Kg Rs. 3.80 0.9014 3.42532
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
4 Ordinary portland cement. 1 Kg Rs. 4.60 1.96 9.016
Rs.76.73
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.43 96.75
Rs.169.42
Sundry
1 Sundry* 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.289.80 Total Amount of M and L Rs.246.64
Add 17.5 % OH and CP Rs.43.16
Total Rs.289.80

333 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5058.04
Cutting out bricks (old brick walls built in mud mortar) forming toothing for, and holding new into old work
including value of new materials entering old walls and jointing and pointing (measured on vertical face in
contact with old wall only), New work
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 2.03 9.338
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
Rs.73.62
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.43 96.75
Rs.169.42
Sundry
1 Sundry* 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.286.20 Total Amount of M and L Rs.243.54
Add 17.5 % OH and CP Rs.42.62
Total Rs.286.16

ITEM No. 5058.05


Cutting out bricks (old brick walls built in mud mortar) forming toothing for, and holding new into old work
including value of new materials entering old walls and jointing and pointing (measured on vertical face in
contact with old wall only), New work
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 3.059 14.0714
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
Rs.78.36
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.43 96.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
Rs.169.42
Sundry
1 Sundry* 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.291.70 Total Amount of M and L Rs.248.27
Add 17.5 % OH and CP Rs.43.45
Total Rs.291.72

334 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5058.06
Cutting out bricks (old brick walls built in mud mortar ) forming toothing for, and holding new into old work
including value of new materials entering old walls and jointing and pointing (measured on vertical face in
contact with old wall only), New work
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.944 18.1424
Rs.82.43
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.43 72.67
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.43 96.75
Rs.169.42
Sundry
1 Sundry* 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.296.50 Total Amount of M and L Rs.252.34
Add 17.5 % OH and CP Rs.44.16
Total Rs.296.50

ITEM No. 5059.01


Cutting out decayed brickwork and refacing with new bricks (1 course of headers to 3 course of stretchers) and
making good (New work built in) Mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.04 4
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
Rs.165.25
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.75 168.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.75 126.75
Rs.295.50
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.542.60 Total Amount of M and L Rs.461.79
Add 17.5 % OH and CP Rs.80.81
Total Rs.542.60

335 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5059.02
Cutting out decayed brickwork and refacing with new bricks (1 course of headers to 3 course of stretchers) and
making good (New work built in) Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.038 18.05
3 Lime unslakeds* 1 Kg Rs. 3.80 9.04 34.352
Rs.213.65
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.78 175.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.78 131.82
Rs.307.32
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.613.30 Total Amount of M and L Rs.521.96
Add 17.5 % OH and CP Rs.91.34
Total Rs.613.31

ITEM No. 5059.03


Cutting out decayed brickwork and refacing with new bricks (1 course of headers to 3 course of stretchers) and
making good (New work built in) Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 4.5068 17.12584
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.042 19.95
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
4 Ordinary portland cement. 1 Kg Rs. 4.60 9.799 45.0754
Rs.243.40
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.78 131.82
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.78 175.5
Rs.307.32
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.648.30 Total Amount of M and L Rs.551.71
Add 17.5 % OH and CP Rs.96.55
Total Rs.648.26

336 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5059.04
Cutting out decayed brickwork and refacing with new bricks (1 course of headers to 3 course of stretchers) and
making good (New work built in) Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
3 Ordinary portland cement. 1 Kg Rs. 4.60 10.168 46.7728
Rs.228.35
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.81 182.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.81 136.89
Rs.319.14
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.644.50 Total Amount of M and L Rs.548.48
Add 17.5 % OH and CP Rs.95.98
Total Rs.644.47

ITEM No. 5059.05


Cutting out decayed brickwork and refacing with new bricks (1 course of headers to 3 course of stretchers) and
making good (New work built in) Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
3 Ordinary portland cement. 1 Kg Rs. 4.60 15.293 70.3478
Rs.251.93
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.81 182.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.81 136.89
Rs.319.14
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.672.20 Total Amount of M and L Rs.572.10
Add 17.5 % OH and CP Rs.100.12
Total Rs.672.22

337 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5059.06
Cutting out decayed brickwork and refacing with new bricks (1 course of headers to 3 course of stretchers) and
making good (New work built in) Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
3 Ordinary portland cement. 1 Kg Rs. 4.60 19.721 90.7166
Rs.272.30
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.81 136.89
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.81 182.25
Rs.319.14
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.696.10 Total Amount of M and L Rs.592.43
Add 17.5 % OH and CP Rs.103.67
Total Rs.696.10

ITEM No. 5060.01


Cutting out decayed brick from old walls built in mud mortar and making good with new bricks in detached
patches of not more than 7 bricks each patch. New work built in Mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
2 Mud mortar 1 Cum Rs. 100.00 0.08 8
Rs.233.75
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.94 158.86
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.94 211.5
Rs.370.36
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.711.00 Total Amount of M and L Rs.605.10
Add 17.5 % OH and CP Rs.105.89
Total Rs.710.99

338 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5060.02
Cutting out decayed brick from old walls built in mud mortar and making good with new bricks in detached
patches of not more than 7 bricks each patch. New work built in Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 18.08 68.704
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.076 36.1
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
Rs.330.55
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.94 211.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.94 158.86
Rs.370.36
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.824.70 Total Amount of M and L Rs.701.90
Add 17.5 % OH and CP Rs.122.83
Total Rs.824.74

ITEM No. 5060.03


Cutting out decayed brick from old walls built in mud mortar and making good with new bricks in detached
patches of not more than 7 bricks each patch. New work built in Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0956 45.41
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
3 Ordinary portland cement. 1 Kg Rs. 4.60 19.598 90.1508
4 Lime unslakeds* 1 Kg Rs. 3.80 9.0136 34.25168
Rs.395.56
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.94 158.86
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.94 211.5
Rs.370.36
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.901.10 Total Amount of M and L Rs.766.91
Add 17.5 % OH and CP Rs.134.21
Total Rs.901.12

339 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5060.04
Cutting out decayed brick from old walls built in mud mortar and making good with new bricks in detached
patches of not more than 7 bricks each patch. New work built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
2 Ordinary portland cement. 1 Kg Rs. 4.60 20.336 93.5456
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
Rs.359.96
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.125 190.125
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.125 253.125
Rs.443.25
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.944.90 Total Amount of M and L Rs.804.20
Add 17.5 % OH and CP Rs.140.73
Total Rs.944.93

ITEM No. 5060.05


Cutting out decayed brick from old walls built in mud mortar and making good with new bricks in detached
patches of not more than 7 bricks each patch. New work built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
3 Ordinary portland cement. 1 Kg Rs. 4.60 30.586 140.6956
Rs.407.11
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.125 253.125
2 Mazdoor-man, 1 Day Rs. 169.00 1.125 190.125
Rs.443.25
Sundry
1 Sundry* 1 Re Rs. 9.00 0.39 3.51
Rs.3.51
After rounding off: Rs.1,003.30 Total Amount of M and L Rs.853.87
Add 17.5 % OH and CP Rs.149.43
Total Rs.1,003.29

340 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5060.06
Cutting out decayed brick from old walls built in mud mortar and making good with new bricks in detached
patches of not more than 7 bricks each patch. New work built in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
3 Ordinary portland cement. 1 Kg Rs. 4.60 39.442 181.4332
Rs.447.84
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.125 253.125
2 Mazdoor-man, 1 Day Rs. 169.00 1.125 190.125
Rs.443.25
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.1,048.20 Total Amount of M and L Rs.892.08
Add 17.5 % OH and CP Rs.156.11
Total Rs.1,048.20

ITEM No. 5061.02


Cutting out bricks (old brick wall built in lime mortar ), forming toothing for and bonding value of new
materials entering old walls and jointing and pointing (measured on vertical face in contact with old wall only ),
new work built in Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0076 3.61
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
3 Lime unslakeds* 1 Kg Rs. 3.80 1.808 6.8704
Rs.70.68
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.532 119.7
2 Mazdoor-man, 1 Day Rs. 169.00 0.638 107.822
Rs.227.52
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.351.60 Total Amount of M and L Rs.299.24
Add 17.5 % OH and CP Rs.52.37
Total Rs.351.60

341 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5061.03
Cutting out bricks (old brick wall built in lime mortar ), forming toothing for and bonding value of new
materials entering old walls and jointing and pointing (measured on vertical face in contact with old wall only ),
new work built in Cement lime morta
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
2 Lime unslakeds* 1 Kg Rs. 3.80 0.9014 3.42532
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
4 Ordinary portland cement. 1 Kg Rs. 4.60 1.96 9.016
Rs.76.73
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.532 119.7
2 Mazdoor-man, 1 Day Rs. 169.00 0.638 107.822
Rs.227.52
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.358.70 Total Amount of M and L Rs.305.28
Add 17.5 % OH and CP Rs.53.42
Total Rs.358.71

ITEM No. 5061.04


Cutting out bricks (old brick wall built in lime mortar ), forming toothing for and bonding value of new
materials entering old walls and jointing and pointing (measured on vertical face in contact with old wall only ),
new work built in Cement mortar 1:6
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
2 Ordinary portland cement. 1 Kg Rs. 4.60 2.034 9.3564
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
Rs.73.64
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.685 115.765
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.579 130.275
Rs.246.04
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.376.80 Total Amount of M and L Rs.320.72
Add 17.5 % OH and CP Rs.56.13
Total Rs.376.84

342 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5061.05
Cutting out bricks (old brick wall built in lime mortar ), forming toothing for and bonding value of new
materials entering old walls and jointing and pointing (measured on vertical face in contact with old wall only ),
new work built in Cement mortar 1:4
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
2 Ordinary portland cement. 1 Kg Rs. 4.60 3.059 14.0714
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
Rs.78.36
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.685 115.765
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.579 130.275
Rs.246.04
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.382.30 Total Amount of M and L Rs.325.39
Add 17.5 % OH and CP Rs.56.94
Total Rs.382.33

ITEM No. 5061.06


Cutting out bricks (old brick wall built in lime mortar ), forming toothing for and bonding value of new
materials entering old walls and jointing and pointing (measured on vertical face in contact with old wall only ),
new work built in Cement mortar 1:3
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.944 18.1424
Rs.82.43
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.579 130.275
2 Mazdoor-man, 1 Day Rs. 169.00 0.685 115.765
Rs.246.04
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.387.10 Total Amount of M and L Rs.329.46
Add 17.5 % OH and CP Rs.57.66
Total Rs.387.11

343 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5062.02
Cutting out decayed brickwork (old brick work walls built in lime mortar) and refacing with new bricks (1
course of headers to 3 course of stretchers ) and making good. New work built in Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Lime unslakeds* 1 Kg Rs. 3.80 9.04 34.352
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.038 18.05
Rs.213.65
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.839 188.775
2 Mazdoor-man, 1 Day Rs. 169.00 0.945 159.705
Rs.348.48
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.661.70 Total Amount of M and L Rs.563.17
Add 17.5 % OH and CP Rs.98.55
Total Rs.661.72

ITEM No. 5062.03


Cutting out decayed brickwork (old brick work walls built in lime mortar) and refacing with new bricks (1
course of headers to 3 course of stretchers ) and making good. New work built in Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 9.799 45.0754
2 Lime unslakeds* 1 Kg Rs. 3.80 4.5086 17.13268
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
4 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
Rs.243.79
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.945 159.705
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.839 188.775
Rs.348.48
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.697.10 Total Amount of M and L Rs.593.30
Add 17.5 % OH and CP Rs.103.83
Total Rs.697.13

344 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5062.04
Cutting out decayed brickwork (old brick work walls built in lime mortar) and refacing with new bricks (1
course of headers to 3 course of stretchers ) and making good. New work built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Ordinary portland cement. 1 Kg Rs. 4.60 10.1732 46.79672
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
Rs.228.38
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.975 164.775
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.869 195.525
Rs.360.30
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.692.90 Total Amount of M and L Rs.589.71
Add 17.5 % OH and CP Rs.103.20
Total Rs.692.91

ITEM No. 5062.05


Cutting out decayed brickwork (old brick work walls built in lime mortar) and refacing with new bricks (1
course of headers to 3 course of stretchers ) and making good. New work built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 15.293 70.3478
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
Rs.251.93
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.975 164.775
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.869 195.525
Rs.360.30
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.720.50 Total Amount of M and L Rs.613.22
Add 17.5 % OH and CP Rs.107.31
Total Rs.720.53

345 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5062.06
Cutting out decayed brickwork (old brick work walls built in lime mortar) and refacing with new bricks (1
course of headers to 3 course of stretchers ) and making good. New work built in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
3 Ordinary portland cement. 1 Kg Rs. 4.60 19.72 90.712
Rs.272.29
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.869 195.525
2 Mazdoor-man, 1 Day Rs. 169.00 0.975 164.775
Rs.360.30
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.744.50 Total Amount of M and L Rs.633.63
Add 17.5 % OH and CP Rs.110.88
Total Rs.744.51

ITEM No. 5063.02


Cutting out decayed bricks built in lime mortar from old walls in mortar and making good with new bricks in
detached patches of not more than 7 bricks each patch (new work built in ) Lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
2 Lime unslakeds* 1 Kg Rs. 3.80 18.08 68.704
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.076 36.1
Rs.330.55
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.105 186.745
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.999 224.775
Rs.411.52
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.873.10 Total Amount of M and L Rs.743.06
Add 17.5 % OH and CP Rs.130.04
Total Rs.873.10

346 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5063.03
Cutting out decayed bricks built in lime mortar from old walls in mortar and making good with new bricks in
detached patches of not more than 7 bricks each patch (new work built in ) Cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime unslakeds* 1 Kg Rs. 3.80 9.0136 34.25168
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
3 Ordinary portland cement. 1 Kg Rs. 4.60 19.598 90.1508
4 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
Rs.390.81
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.105 186.745
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.999 224.775
Rs.411.52
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.943.90 Total Amount of M and L Rs.803.32
Add 17.5 % OH and CP Rs.140.58
Total Rs.943.90

ITEM No. 5063.04


Cutting out decayed bricks built in lime mortar from old walls in mortar and making good with new bricks in
detached patches of not more than 7 bricks each patch (new work built in ) Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 20.336 93.5456
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
Rs.359.96
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.29 218.01
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.184 266.4
Rs.484.41
Sundry
1 Sundry* 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.993.90 Total Amount of M and L Rs.845.90
Add 17.5 % OH and CP Rs.148.03
Total Rs.993.93

347 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5063.05
Cutting out decayed bricks built in lime mortar from old walls in mortar and making good with new bricks in
detached patches of not more than 7 bricks each patch (new work built in ) Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
2 Ordinary portland cement. 1 Kg Rs. 4.60 30.504 140.3184
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
Rs.406.73
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.184 266.4
2 Mazdoor-man, 1 Day Rs. 169.00 1.29 218.01
Rs.484.41
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.1,048.30 Total Amount of M and L Rs.892.17
Add 17.5 % OH and CP Rs.156.13
Total Rs.1,048.30

ITEM No. 5063.06


Cutting out decayed bricks built in lime mortar from old walls in mortar and making good with new bricks in
detached patches of not more than 7 bricks each patch (new work built in ) Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 39.44 181.424
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
Rs.447.83
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.29 218.01
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.184 266.4
Rs.484.41
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.1,096.50 Total Amount of M and L Rs.933.23
Add 17.5 % OH and CP Rs.163.32
Total Rs.1,096.55

348 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5064.04
Cutting out bricks, (old brick walls built in cement or lime mortar ) forming toothing for, and bonding new into
old work including value of new materials entering old walls and jointing and ponting (measured on vertical
face in contact with old walll only
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 2.0326 9.34996
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
Rs.73.63
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.745 125.905
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.619 139.275
Rs.265.18
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.399.30 Total Amount of M and L Rs.339.85
Add 17.5 % OH and CP Rs.59.47
Total Rs.399.32

ITEM No. 5064.05


Cutting out bricks, (old brick walls built in cement or lime mortar ) forming toothing for, and bonding new into
old work including value of new materials entering old walls and jointing and ponting (measured on vertical
face in contact with old walll only
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 3.0504 14.03184
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
Rs.78.32
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.745 125.905
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.619 139.275
Rs.265.18
Sundry
1 Sundry* 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.404.30 Total Amount of M and L Rs.344.13
Add 17.5 % OH and CP Rs.60.22
Total Rs.404.35

349 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Brick Work
ITEM No. 5064.06
Cutting out bricks, (old brick walls built in cement or lime mortar ) forming toothing for, and bonding new into
old work including value of new materials entering old walls and jointing and ponting (measured on vertical
face in contact with old walll only
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0086 4.085
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.028 60.2
3 Ordinary portland cement. 1 Kg Rs. 4.60 3.944 18.1424
Rs.82.43
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.745 125.905
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.619 139.275
Rs.265.18
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.409.60 Total Amount of M and L Rs.348.60
Add 17.5 % OH and CP Rs.61.00
Total Rs.409.60

ITEM No. 5065.04


Cutting out decayed brickwork (built in cement or cement lime mortar and refacing with new bricks (1 course
of headers to 3 course of stretches a) and making refacing good. New work built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
2 Ordinary portland cement. 1 Kg Rs. 4.60 10.1732 46.79672
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
Rs.228.38
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.909 204.525
2 Mazdoor-man, 1 Day Rs. 169.00 1.035 174.915
Rs.379.44
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.715.40 Total Amount of M and L Rs.608.85
Add 17.5 % OH and CP Rs.106.55
Total Rs.715.40

350 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5065.05
Cutting out decayed brickwork (built in cement or cement lime mortar and refacing with new bricks (1 course
of headers to 3 course of stretches a) and making refacing good. New work built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 15.293 70.3478
2 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
Rs.251.93
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.035 174.915
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.909 204.525
Rs.379.44
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.743.00 Total Amount of M and L Rs.632.36
Add 17.5 % OH and CP Rs.110.66
Total Rs.743.02

ITEM No. 5065.06


Cutting out decayed brickwork (built in cement or cement lime mortar and refacing with new bricks (1 course
of headers to 3 course of stretches a) and making refacing good. New work built in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.075 161.25
2 Ordinary portland cement. 1 Kg Rs. 4.60 19.72 90.712
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
Rs.272.29
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.909 204.525
2 Mazdoor-man, 1 Day Rs. 169.00 1.035 174.915
Rs.379.44
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.767.00 Total Amount of M and L Rs.652.77
Add 17.5 % OH and CP Rs.114.23
Total Rs.767.00

351 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5066.04
Cutting out decayed bricks from old walls built in cement or cement lime mortar and making good with new
bricks in detached patches of not more than 7 bricks each patch. New work built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
2 Ordinary portland cement. 1 Kg Rs. 4.60 20.336 93.5456
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
Rs.359.96
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.224 275.4
2 Mazdoor-man, 1 Day Rs. 169.00 1.356 229.164
Rs.504.56
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.1,017.00 Total Amount of M and L Rs.865.51
Add 17.5 % OH and CP Rs.151.46
Total Rs.1,016.97

ITEM No. 5066.05


Cutting out decayed bricks from old walls built in cement or cement lime mortar and making good with new
bricks in detached patches of not more than 7 bricks each patch. New work built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 30.506 140.3276
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
3 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
Rs.406.74
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.35 228.15
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.224 275.4
Rs.503.55
Sundry
1 Sundry* 1 Re Rs. 9.00 0.23 2.07
Rs.2.07
After rounding off: Rs.1,072.00 Total Amount of M and L Rs.912.36
Add 17.5 % OH and CP Rs.159.66
Total Rs.1,072.02

352 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5066.06
Cutting out decayed bricks from old walls built in cement or cement lime mortar and making good with new
bricks in detached patches of not more than 7 bricks each patch. New work built in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.105 225.75
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0856 40.66
3 Ordinary portland cement. 1 Kg Rs. 4.60 39.44 181.424
Rs.447.83
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.35 228.15
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.224 275.4
Rs.503.55
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.1,119.00 Total Amount of M and L Rs.952.37
Add 17.5 % OH and CP Rs.166.67
Total Rs.1,119.04

ITEM No. 5067.01


Filleting in any position and to any shape in cement lime mortar 1:1:6 including all mitres, stops, etc. section of
fillet not exceeding 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.002 0.95
2 Lime unslakeds* 1 Kg Rs. 3.80 0.225 0.855
3 Ordinary portland cement. 1 Kg Rs. 4.60 0.49 2.254
Rs.4.06
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.033 7.425
2 Mazdoor-man, 1 Day Rs. 169.00 0.033 5.577
Rs.13.00
Sundry
1 Sundry* 1 Re Rs. 9.00 0.025 0.225
Rs.0.23
After rounding off: Rs.20.30 Total Amount of M and L Rs.17.29
Add 17.5 % OH and CP Rs.3.03
Total Rs.20.31

353 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5067.02
Filleting in any position and to any shape in cement lime mortar 1:1:6 including all mitres, stops, etc. section of
fillet exc 25 sqcm but not not exceeding 50 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 0.7349 3.38054
2 Lime unslakeds* 1 Kg Rs. 3.80 0.338 1.2844
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0032 1.52
Rs.6.18
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.041 9.225
2 Mazdoor-man, 1 Day Rs. 169.00 0.041 6.929
Rs.16.15
Sundry
1 Sundry* 1 Re Rs. 9.00 0.025 0.225
Rs.0.23
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.56
Add 17.5 % OH and CP Rs.3.95
Total Rs.26.51

ITEM No. 5067.03


Filleting in any position and to any shape in cement lime mortar 1:1:6 including all mitres, stops, etc. Add if in
repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.005 0.845
Rs.0.85
After rounding off: Rs.1.00 Total Amount of M and L Rs.0.85
Add 17.5 % OH and CP Rs.0.15
Total Rs.0.99

ITEM No. 5068.01


Filleting in any position and to any shape in cement mortar 1:4 including all mitres, stops, etc. section of fillet
not exceeding 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0021 0.9975
2 Ordinary portland cement. 1 Kg Rs. 4.60 0.7646 3.51716
Rs.4.51
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.033 7.425
2 Mazdoor-man, 1 Day Rs. 169.00 0.033 5.577
Rs.13.00
Sundry
1 Sundry* 1 Re Rs. 9.00 0.025 0.225
Rs.0.23
After rounding off: Rs.20.80 Total Amount of M and L Rs.17.74
Add 17.5 % OH and CP Rs.3.10
Total Rs.20.85
354 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5068.02
Filleting in any position and to any shape in cement mortar 1:4 including all mitres, stops, etc. section of fillet
exc 25 sqcm but not not exceeding 50 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0032 1.52
2 Ordinary portland cement. 1 Kg Rs. 4.60 1.147 5.2762
Rs.6.80
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.041 6.929
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.041 9.225
Rs.16.15
After rounding off: Rs.27.00 Total Amount of M and L Rs.22.95
Add 17.5 % OH and CP Rs.4.02
Total Rs.26.97

ITEM No. 5068.03


Filleting in any position and to any shape in cement lime mortar 1:4 including all mitres, stops, etc. Add if in
repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.008 1.352
Rs.1.35
After rounding off: Rs.1.60 Total Amount of M and L Rs.1.35
Add 17.5 % OH and CP Rs.0.24
Total Rs.1.59

ITEM No. 5069.01


Filleting in any position and to any shape in cement mortar 1:3 including all mitres, stops, etc. section of fillet
not exceeding 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 0.986 4.5356
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0021 0.9975
Rs.5.53
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.033 7.425
2 Mazdoor-man, 1 Day Rs. 169.00 0.033 5.577
Rs.13.00
Sundry
1 Sundry* 1 Re Rs. 9.00 0.025 0.225
Rs.0.23
After rounding off: Rs.22.00 Total Amount of M and L Rs.18.76
Add 17.5 % OH and CP Rs.3.28
Total Rs.22.04

355 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5069.02
Filleting in any position and to any shape in cement mortar 1:3 including all mitres, stops, etc. section of fillet
exc 25 sqcm but not not exceeding 50.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 1.479 6.8034
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0032 1.52
Rs.8.32
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.041 9.225
2 Mazdoor-man, 1 Day Rs. 169.00 0.041 6.929
Rs.16.15
Sundry
1 Sundry* 1 Re Rs. 9.00 0.025 0.225
Rs.0.23
After rounding off: Rs.29.00 Total Amount of M and L Rs.24.70
Add 17.5 % OH and CP Rs.4.32
Total Rs.29.03

ITEM No. 5069.03


Filleting in any position and to any shape in cement mortar 1:3 including all mitres, stops, etc. Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
Rs.2.70
After rounding off: Rs.3.20 Total Amount of M and L Rs.2.70
Add 17.5 % OH and CP Rs.0.47
Total Rs.3.18

ITEM No. 5070


Bedding and pointing timber door or window frames (chowkats) in cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.033 7.425
2 Mazdoor-man, 1 Day Rs. 169.00 0.033 5.577
Rs.13.00
Sundry
1 Sundries 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.17.00 Total Amount of M and L Rs.14.44
Add 17.5 % OH and CP Rs.2.53
Total Rs.16.97

356 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5071
Bedding and pointing timber door or window frames (except pressed steel frames ) in cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.023 5.175
2 Mazdoor-man, 1 Day Rs. 169.00 0.033 5.577
Rs.10.75
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.13.80 Total Amount of M and L Rs.11.79
Add 17.5 % OH and CP Rs.2.06
Total Rs.13.85

ITEM No. 5072.01


Fixing only gratings, soot doors, etc., including bedding and pointing in cement mortar 1:3 Area not exc. 400
sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 34.512 158.7552
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.0749 35.5775
Rs.194.33
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 3 675
2 Mazdoor-man, 1 Day Rs. 169.00 3 507
Rs.1,182.00
Sundry
1 Sundry* 1 Re Rs. 9.00 0.115 1.035
Rs.1.04
After rounding off: Rs.1,618.40 Total Amount of M and L Rs.1,377.37
Add 17.5 % OH and CP Rs.241.04
Total Rs.1,618.41

357 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5072.02
Fixing only gratings, soot doors, etc., including bedding and pointing in cement mortar 1:3 Area exc. 400 but
not exc. 1000 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.1177 55.9075
2 Ordinary portland cement. 1 Kg Rs. 4.60 54.23 249.458
Rs.305.37
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 4.5 760.5
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 4.5 1012.5
Rs.1,773.00
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.2,443.20 Total Amount of M and L Rs.2,079.36
Add 17.5 % OH and CP Rs.363.89
Total Rs.2,443.24

ITEM No. 5072.03


Fixing only gratings, soot doors, etc., including bedding and pointing in cement mortar 1:3 Area exc. 400 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.1819 86.4025
2 Ordinary portland cement. 1 Kg Rs. 4.60 83.815 385.549
Rs.471.95
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 6 1350
2 Mazdoor-man, 1 Day Rs. 169.00 6 1014
Rs.2,364.00
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.3,333.40 Total Amount of M and L Rs.2,836.94
Add 17.5 % OH and CP Rs.496.46
Total Rs.3,333.41

358 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5073.01
Fixing only gratings, soot doors, etc., including bedding and pointing in cement mortar 1:3 in repairs, including
cutting out old and removing to store Area not exc. 400 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.0749 35.5775
2 Ordinary portland cement. 1 Kg Rs. 4.60 34.512 158.7552
Rs.194.33
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 4 900
2 Mazdoor-man, 1 Day Rs. 169.00 4 676
Rs.1,576.00
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.2,081.30 Total Amount of M and L Rs.1,771.32
Add 17.5 % OH and CP Rs.309.98
Total Rs.2,081.30

ITEM No. 5073.02


Fixing only gratings, soot doors, etc., including bedding and pointing in cement mortar 1:3 in repairs, including
cutting out old and removing to store Area exc. 400 but not exc. 1000 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.1177 55.9075
2 Ordinary portland cement. 1 Kg Rs. 4.60 54.23 249.458
Rs.305.37
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 5.5 1237.5
2 Mazdoor-man, 1 Day Rs. 169.00 5.5 929.5
Rs.2,167.00
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.2,906.20 Total Amount of M and L Rs.2,473.36
Add 17.5 % OH and CP Rs.432.84
Total Rs.2,906.19

359 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5073.03
Fixing only gratings, soot doors, etc., including bedding and pointing in cement mortar 1:3 in repairs, including
cutting out old and removing to store Area exc. 1000 sq.cm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 83.815 385.549
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.1819 86.4025
Rs.471.95
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 7 1183
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 7 1575
Rs.2,758.00
Sundry
1 Sundry* 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.3,796.40 Total Amount of M and L Rs.3,230.94
Add 17.5 % OH and CP Rs.565.41
Total Rs.3,796.36

ITEM No. 5074.01


Firebrick work in liniings to fireplaces, flues, etc. (other than in chimney shafts), set, jointed and pointed in
fireclay Material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick 230x113x75, Fire 100 No. Rs. 1,900.00 4.944 9393.6
2 Fire clay mortar 1 Kg Rs. 6.00 134.2 805.2
Rs.10,198.80
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.441 74.529
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.765 397.125
3 Mazdoor-man, 1 Day Rs. 169.00 3.532 596.908
Rs.1,068.56
Sundry
1 Sundry* 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.13,241.50 Total Amount of M and L Rs.11,269.34
Add 17.5 % OH and CP Rs.1,972.13
Total Rs.13,241.48

360 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5074.02
Firebrick work in liniings to fireplaces, flues, etc. (other than in chimney shafts), set, jointed and pointed in
fireclay Except fire bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Fire clay mortar 1 Kg Rs. 6.00 134.2 805.2
Rs.805.20
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 1.765 397.125
2 Mazdoor-man, 1 Day Rs. 169.00 3.532 596.908
3 Bhisty including mussack 1 Day Rs. 169.00 0.441 74.529
Rs.1,068.56
Sundry
1 Sundry* 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.2,204.00 Total Amount of M and L Rs.1,875.74
Add 17.5 % OH and CP Rs.328.25
Total Rs.2,204.00

ITEM No. 5075.01


Firebrick work in liniings to chimney shafts, set, jointed and pointed in fireclay Material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Fire clay mortar 1 Kg Rs. 6.00 141.26 847.56
2 Brick 230x113x75, Fire 100 No. Rs. 1,900.00 4.297 8164.3
Rs.9,011.86
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 4.42 746.98
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 2.21 497.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.77 130.13
Rs.1,374.36
Sundry
1 Sundry* 1 Re Rs. 9.00 0.225 2.025
Rs.2.03
After rounding off: Rs.12,206.20 Total Amount of M and L Rs.10,388.25
Add 17.5 % OH and CP Rs.1,817.94
Total Rs.12,206.19

361 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5075.02
Firebrick work in liniings to chimney shafts, set, jointed and pointed in fireclay Except fire bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Fire clay mortar 1 Kg Rs. 6.00 141.26 847.56
Rs.847.56
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.77 130.13
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 2.21 497.25
3 Mazdoor-man, 1 Day Rs. 169.00 4.42 746.98
Rs.1,374.36
Sundry
1 Sundry* 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.2,613.10 Total Amount of M and L Rs.2,223.90
Add 17.5 % OH and CP Rs.389.18
Total Rs.2,613.08

ITEM No. 5076.01


Broken glass coping on top of walls emboded in Lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken glass 63 gauge 1 Kg Rs. 9.99 10 99.9
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.038 18.05
3 Lime unslakeds* 1 Kg Rs. 3.80 9.04 34.352
Rs.152.30
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.08 18
2 Mazdoor-man, 1 Day Rs. 169.00 0.16 27.04
Rs.45.04
Sundry
1 Sundry* 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.232.50 Total Amount of M and L Rs.197.84
Add 17.5 % OH and CP Rs.34.62
Total Rs.232.46

362 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5076.02
Broken glass coping on top of walls emboded in Cement mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken glass 63 gauge 1 Kg Rs. 9.99 10 99.9
2 Ordinary portland cement. 1 Kg Rs. 4.60 19.72 90.712
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.0428 20.33
Rs.210.94
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.08 18
2 Mazdoor-man, 1 Day Rs. 169.00 0.16 27.04
Rs.45.04
Sundry
1 Sundry* 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.301.40 Total Amount of M and L Rs.256.48
Add 17.5 % OH and CP Rs.44.88
Total Rs.301.36

ITEM No. 5076.03


Broken glass coping on top of walls emboded in Taking off and removing rubbish.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.109 18.421
Rs.18.42
Plant & Machiner
1 Coltar Boiler 900 to 1400 litres 1 Day Rs. 425.53 0.008 3.40424
Rs.3.40
After rounding off: Rs.25.60 Total Amount of M and L Rs.21.83
Add 17.5 % OH and CP Rs.3.82
Total Rs.25.64

ITEM No. 5077


Sweeping chimney flues of any section or length.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
Rs.21.13
After rounding off: Rs.24.80 Total Amount of M and L Rs.21.13
Add 17.5 % OH and CP Rs.3.70
Total Rs.24.82

363 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5078.01
Continuous brick edging ; with width equal to the depth of the brick, of sub-class 'B' bricks laid dry, on edge
With old size bricks (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.0042 9.03
Rs.9.03
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.004 0.9
2 Mazdoor-man, 1 Day Rs. 169.00 0.008 1.352
Rs.2.25
After rounding off: Rs.13.30 Total Amount of M and L Rs.11.28
Add 17.5 % OH and CP Rs.1.97
Total Rs.13.26

ITEM No. 5078.02


Continuous brick edging ; with width equal to the depth of the brick, of sub-class 'B' bricks laid dry, on edge
With modular bricks (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.005 10
Rs.10.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.004 0.9
2 Mazdoor-man, 1 Day Rs. 169.00 0.008 1.352
Rs.2.25
After rounding off: Rs.14.40 Total Amount of M and L Rs.12.25
Add 17.5 % OH and CP Rs.2.14
Total Rs.14.40

ITEM No. 5078.03


Continuous brick edging ; with width equal to the depth of the brick, of fly ash bricks laid dry, on edge With old
size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding bricks old size. 1000 No. Rs. 2,300.00 0.0042 9.66
Rs.9.66
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.004 0.9
2 Mazdoor-man, 1 Day Rs. 169.00 0.008 1.352
Rs.2.25
After rounding off: Rs.14.00 Total Amount of M and L Rs.11.91
Add 17.5 % OH and CP Rs.2.08
Total Rs.14.00

364 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5078.04
Continuous brick edging ; with width equal to the depth of the brick, of fly ash bricks laid dry, on edge With
modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.005 10.75
Rs.10.75
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.004 0.9
2 Mazdoor-man, 1 Day Rs. 169.00 0.008 1.352
Rs.2.25
After rounding off: Rs.15.30 Total Amount of M and L Rs.13.00
Add 17.5 % OH and CP Rs.2.28
Total Rs.15.28

ITEM No. 5079.01


Continuous brick edging ; with width equal to the depth of the brick laid on end vertically With old size bricks
(clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.009 19.35
Rs.19.35
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.008 1.8
2 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
Rs.4.50
After rounding off: Rs.28.00 Total Amount of M and L Rs.23.85
Add 17.5 % OH and CP Rs.4.17
Total Rs.28.03

ITEM No. 5079.02


Continuous brick edging ; with width equal to the depth of the brick laid on end vertically With modular bricks
(clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 0.01 20
Rs.20.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.008 1.8
Rs.4.50
After rounding off: Rs.28.80 Total Amount of M and L Rs.24.50
Add 17.5 % OH and CP Rs.4.29
Total Rs.28.79

365 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5079.03
Continuous brick edging ; with width equal to the depth of the brick laid on end vertically With old size bricks
(fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding bricks old size. 1000 No. Rs. 2,300.00 0.009 20.7
Rs.20.70
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.008 1.8
Rs.4.50
After rounding off: Rs.29.60 Total Amount of M and L Rs.25.20
Add 17.5 % OH and CP Rs.4.41
Total Rs.29.61

ITEM No. 5079.04


Continuous brick edging ; with width equal to the depth of the brick laid on end vertically With modular bricks
(fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding modular bricks 1000 No. Rs. 2,150.00 0.01 21.5
Rs.21.50
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.0079 1.7775
2 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
Rs.4.48
After rounding off: Rs.30.50 Total Amount of M and L Rs.25.98
Add 17.5 % OH and CP Rs.4.55
Total Rs.30.53

ITEM No. 5080.01


Continuous brick edging ; with width equal to the depth of the brick laid on end at the required angle With old
size bricks (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.006 12.9
Rs.12.90
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.008 1.8
2 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
Rs.4.50
After rounding off: Rs.20.40 Total Amount of M and L Rs.17.40
Add 17.5 % OH and CP Rs.3.05
Total Rs.20.45

366 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5080.03
Continuous brick edging ; with width equal to the depth of the brick laid on end at the required angle with old
size fly ash bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding bricks old size. 1000 No. Rs. 2,300.00 0.006 13.8
Rs.13.80
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.008 1.8
2 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
Rs.4.50
After rounding off: Rs.21.50 Total Amount of M and L Rs.18.30
Add 17.5 % OH and CP Rs.3.20
Total Rs.21.51

ITEM No. 5081.01


Continuous brick edging ; with width equal to the width of the bricks ; of whole sub - class 'B' bricks, laid dry on
end With old size bricks (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.014 30.1
Rs.30.10
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.015 3.375
2 Mazdoor-man, 1 Day Rs. 169.00 0.03 5.07
Rs.8.45
After rounding off: Rs.45.30 Total Amount of M and L Rs.38.55
Add 17.5 % OH and CP Rs.6.75
Total Rs.45.29

ITEM No. 5081.03


Continuous brick edging ; with width equal to the width of the bricks ; laid dry on end vertically With old size
bricks (fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash brick old size B-75 1000 No. Rs. 2,160.00 0.014 30.24
Rs.30.24
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.03 5.07
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.0145 3.2625
Rs.8.33
After rounding off: Rs.45.30 Total Amount of M and L Rs.38.57
Add 17.5 % OH and CP Rs.6.75
Total Rs.45.32

367 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5082.01
Continuous brick edging ; with width equal to the width of the bricks ; of whole sub - class 'B' bricks, laid on
end at the required angle With old size bricks (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.01 21.5
Rs.21.50
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.024 4.056
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.012 2.7
Rs.6.76
After rounding off: Rs.33.20 Total Amount of M and L Rs.28.26
Add 17.5 % OH and CP Rs.4.94
Total Rs.33.20

ITEM No. 5082.03


Continuous brick edging ; with width equal to the width of the bricks ; of whole sub - class 'B' bricks, laid on
end at the required angle With old size bricks (fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding bricks old size. 1000 No. Rs. 2,300.00 0.01 23
Rs.23.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.024 4.056
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.012 2.7
Rs.6.76
After rounding off: Rs.35.00 Total Amount of M and L Rs.29.76
Add 17.5 % OH and CP Rs.5.21
Total Rs.34.96

ITEM No. 5083.01


Continuous brick edging ; with width equal to the length of the bricks ;of whole burnt bricks, laid dry on edge
vertically With old size bricks (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.014 30.1
Rs.30.10
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.032 5.408
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.0158 3.555
Rs.8.96
After rounding off: Rs.45.90 Total Amount of M and L Rs.39.06
Add 17.5 % OH and CP Rs.6.84
Total Rs.45.90

368 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5083.03
Continuous brick edging ; with width equal to the length of the bricks ;of whole burnt bricks, laid dry on edge
vertically With old size bricks (fly ashbricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 0.014 32.2
Rs.32.20
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.016 3.6
2 Mazdoor-man, 1 Day Rs. 169.00 0.032 5.408
Rs.9.01
After rounding off: Rs.48.40 Total Amount of M and L Rs.41.21
Add 17.5 % OH and CP Rs.7.21
Total Rs.48.42

ITEM No. 5084.01


Continuous brick edging ; with width equal to the length of the bricks ;of whole burnt bricks, laid on edge at
the required angle With old size bricks (clay bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 0.01 21.5
Rs.21.50
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
Rs.11.26
After rounding off: Rs.38.50 Total Amount of M and L Rs.32.76
Add 17.5 % OH and CP Rs.5.73
Total Rs.38.49

ITEM No. 5084.03


Continuous brick edging ; with width equal to the length of the bricks ;of whole burnt bricks, laid on edge at
the required angle With old size bricks (fly ash bricks).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 burnt fly ash buiding bricks old size. 1000 No. Rs. 2,300.00 0.01 23
Rs.23.00
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
Rs.11.26
After rounding off: Rs.40.30 Total Amount of M and L Rs.34.26
Add 17.5 % OH and CP Rs.6.00
Total Rs.40.26

369 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5085.01
Brickwork with sewer bricks straight or curved on plan exc 6 m mean radius for manholes/septictank/ soakwell
etc. in sewer works in Cement mortor 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sewer bricks 1000 No. Rs. 3,384.00 0.408 1380.672
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
3 Ordinary portland cement. 1 Kg Rs. 4.60 95.84 440.864
Rs.1,938.39
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.9 202.5
2 Mazdoor-man, 1 Day Rs. 169.00 1.78 300.82
3 Bhisty including mussack 1 Day Rs. 169.00 0.2 33.8
Rs.537.12
Sundry
1 Sundry* 1 Re Rs. 9.00 3.29 29.61
Rs.29.61
After rounding off: Rs.2,943.50 Total Amount of M and L Rs.2,505.12
Add 17.5 % OH and CP Rs.438.40
Total Rs.2,943.51

ITEM No. 5085.02


Brickwork with sewer bricks straight or curved on plan exc 6 m mean radius for manholes/septictank/ soakwell
etc. in sewer works in cement mortar 1:4 but except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
2 Ordinary portland cement. 1 Kg Rs. 4.60 95.84 440.864
Rs.557.71
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.202 34.138
Rs.561.72
Sundry
1 Sundry* 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.1,321.20 Total Amount of M and L Rs.1,124.39
Add 17.5 % OH and CP Rs.196.77
Total Rs.1,321.16

370 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5085.03
Brickwork with sewer bricks straight or curved on plan exc 6 m mean radius for manholes/septictank/ soakwell
etc. in sewer works in Cement mortor 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 113.66 522.836
2 Sewer bricks 1000 No. Rs. 3,384.00 0.408 1380.672
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
Rs.2,020.36
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
Sundry
1 Sundry* 1 Re Rs. 9.00 3.29 29.61
Rs.29.61
After rounding off: Rs.3,069.10 Total Amount of M and L Rs.2,612.03
Add 17.5 % OH and CP Rs.457.11
Total Rs.3,069.14

ITEM No. 5085.04


Brickwork with sewer bricks straight or curved on plan exc 6 m mean radius for manholes/septictank/ soakwell
etc. in sewer works in Cement mortor 1:3. except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 113.66 522.836
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.246 116.85
Rs.639.69
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.941 211.725
2 Mazdoor-man, 1 Day Rs. 169.00 1.869 315.861
3 Bhisty including mussack 1 Day Rs. 169.00 0.204 34.476
Rs.562.06
Sundry
1 Sundries 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.1,417.90 Total Amount of M and L Rs.1,206.70
Add 17.5 % OH and CP Rs.211.17
Total Rs.1,417.87

371 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5086.01
Brickwork with sewer bricks straight or curved on plan n. exc 6 m mean radius for manholes/septictank/
soakwell etc. in sewer works in in cement mortor 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 0.254 120.65
2 Sewer bricks 1000 No. Rs. 3,384.00 0.418 1414.512
3 Ordinary portland cement. 1 Kg Rs. 4.60 97.24 447.304
Rs.1,982.47
Labour
1 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.96 216
2 Mazdoor-man, 1 Day Rs. 169.00 1.893 319.917
3 Bhisty including mussack 1 Day Rs. 169.00 0.212 35.828
Rs.571.75
Sundry
1 Sundry* 1 Re Rs. 9.00 2.87 25.83
Rs.25.83
After rounding off: Rs.3,031.50 Total Amount of M and L Rs.2,580.04
Add 17.5 % OH and CP Rs.451.51
Total Rs.3,031.55

ITEM No. 5086.02


Brickwork with sewer bricks straight or curved on plan n. exc 6 m mean radius for manholes/septictank/
soakwell etc. in sewer works in in cement mortor 1:4.except bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 97.24 447.304
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.254 120.65
Rs.567.95
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.212 35.828
2 Mazdoor-man, 1 Day Rs. 169.00 1.893 319.917
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.96 216
Rs.571.75
Sundry
1 Sundry* 1 Re Rs. 9.00 0.61 5.49
Rs.5.49
After rounding off: Rs.1,345.60 Total Amount of M and L Rs.1,145.19
Add 17.5 % OH and CP Rs.200.41
Total Rs.1,345.60

372 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5086.03
Brickwork with sewer bricks straight or curved on plan n. exc 6 m mean radius for manholes/septictank/
soakwell etc. in sewer works in in cement mortor 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 117.23 539.258
2 Sewer bricks 1000 No. Rs. 3,384.00 0.418 1414.512
3 Sand for masonary mortar 1 Cum Rs. 475.00 0.254 120.65
Rs.2,074.42
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.214 36.166
2 Mazdoor-man, 1 Day Rs. 169.00 1.893 319.917
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.96 216
Rs.572.08
Sundry
1 Sundry* 1 Re Rs. 9.00 2.87 25.83
Rs.25.83
After rounding off: Rs.3,140.00 Total Amount of M and L Rs.2,672.33
Add 17.5 % OH and CP Rs.467.66
Total Rs.3,139.99

ITEM No. 5086.04


Brickwork with sewer bricks curved on plan n. exc. 6m mean radius for man holes/ septictank/soak well etc. in
sewer works in cement mortar 1:3 excepr bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ordinary portland cement. 1 Kg Rs. 4.60 117.23 539.258
2 Sand for masonary mortar 1 Cum Rs. 475.00 0.254 120.65
Rs.659.91
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.893 319.917
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.96 216
3 Bhisty including mussack 1 Day Rs. 169.00 0.214 36.166
Rs.572.08
Sundry
1 Sundries 1 Re Rs. 9.00 0.61 5.49
Rs.5.49
After rounding off: Rs.1,454.00 Total Amount of M and L Rs.1,237.48
Add 17.5 % OH and CP Rs.216.56
Total Rs.1,454.04

373 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5087.01
Bricks ; common burnt clay building bricks ; sub-class 'A' designation 75 old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 brick -A des-75 1000 No. Rs. 2,250.00 1 2250
Rs.2,250.00
After rounding off: Rs.2,643.80 Total Amount of M and L Rs.2,250.00
Add 17.5 % OH and CP Rs.393.75
Total Rs.2,643.75

ITEM No. 5087.02


Bricks ; common burnt clay building bricks; sub-class 'A' designation 75 modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular A-75 1000 No. Rs. 2,100.00 1 2100
Rs.2,100.00
After rounding off: Rs.2,467.50 Total Amount of M and L Rs.2,100.00
Add 17.5 % OH and CP Rs.367.50
Total Rs.2,467.50

ITEM No. 5088.01


Bricks; common burnt clay buildig bricks, sub-class 'B' designation 75 old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old B-75 1000 No. Rs. 2,150.00 1 2150
Rs.2,150.00
After rounding off: Rs.2,526.20 Total Amount of M and L Rs.2,150.00
Add 17.5 % OH and CP Rs.376.25
Total Rs.2,526.25

ITEM No. 5088.02


Bricks; common burnt clay buildig bricks sub-class 'B' designation 75 modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Modular B-75 1000 No. Rs. 2,000.00 1 2000
Rs.2,000.00
After rounding off: Rs.2,350.00 Total Amount of M and L Rs.2,000.00
Add 17.5 % OH and CP Rs.350.00
Total Rs.2,350.00

ITEM No. 5089.01


Bricks titles ; common burnt clay building bricks ; sub-class 'A' designation 75 old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick tiles A-75 1000 No. Rs. 2,001.90 1 2001.9
Rs.2,001.90
After rounding off: Rs.2,352.20 Total Amount of M and L Rs.2,001.90
Add 17.5 % OH and CP Rs.350.33
Total Rs.2,352.23

374 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5089.02
Bricks titles ; common burnt clay building bricks ; sub-class 'A' designation 75 modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick tile Modular A-75 1000 No. Rs. 2,000.00 1 2000
Rs.2,000.00
After rounding off: Rs.2,350.00 Total Amount of M and L Rs.2,000.00
Add 17.5 % OH and CP Rs.350.00
Total Rs.2,350.00

ITEM No. 5090.01


Bricks titles ; common burnt clay building bricks ; sub-class 'B' designation 75 old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick tile B-75 1000 No. Rs. 2,000.00 1 2000
Rs.2,000.00
After rounding off: Rs.2,350.00 Total Amount of M and L Rs.2,000.00
Add 17.5 % OH and CP Rs.350.00
Total Rs.2,350.00

ITEM No. 5090.02


Bricks titles ; common burnt clay building bricks ; sub-class 'B' designation 75 modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick tile Modular B-75 1000 No. Rs. 1,900.00 1 1900
Rs.1,900.00
After rounding off: Rs.2,232.50 Total Amount of M and L Rs.1,900.00
Add 17.5 % OH and CP Rs.332.50
Total Rs.2,232.50

ITEM No. 5091.01


Purpose moulded bricks such as bullnosed, splayed, weathered and throated, etc. old size bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old Purpose made 1000 No. Rs. 2,275.00 1 2275
Rs.2,275.00
After rounding off: Rs.2,673.10 Total Amount of M and L Rs.2,275.00
Add 17.5 % OH and CP Rs.398.13
Total Rs.2,673.13

ITEM No. 5091.02


Purpose moulded bricks such as bullnosed, splayed, weathered and throated, etc. modular bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick modular 1000 No. Rs. 2,375.00 1 2375
brick modular purpose made
Rs.2,375.00
After rounding off: Rs.2,790.60 Total Amount of M and L Rs.2,375.00
Add 17.5 % OH and CP Rs.415.63
Total Rs.2,790.63

375 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5092.01
Burnt clay fly ash Old size building bricks designation 75(Kg/cm2).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick burnt fly ash buiding Old Size 1000 No. Rs. 2,300.00 1 2300
Rs.2,300.00
After rounding off: Rs.2,702.50 Total Amount of M and L Rs.2,300.00
Add 17.5 % OH and CP Rs.402.50
Total Rs.2,702.50

ITEM No. 5092.02


Burnt clay fly ash modular building bricks designation 75(Kg/cm2).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Burnt clayfly ash building bricks 75 kg/cm2* 1000 N Rs. 2,160.00 1 2160
Rs.2,160.00
After rounding off: Rs.2,538.00 Total Amount of M and L Rs.2,160.00
Add 17.5 % OH and CP Rs.378.00
Total Rs.2,538.00

ITEM No. 5093.01


Burnt clay fly ash old size building brick tiles designation 75 (Kg/cm2).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Burnt clay fly ash building bricks old size tiles 75 kg/cm2* 1000 N Rs. 2,160.00 1 2160
Rs.2,160.00
After rounding off: Rs.2,538.00 Total Amount of M and L Rs.2,160.00
Add 17.5 % OH and CP Rs.378.00
Total Rs.2,538.00

ITEM No. 5093.02


Burnt clay fly ash modular building brick tiles designation 75 (Kg/cm2).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Burnt clay fly ash building bricks tiles 75 kg/cm2 moduler* 1000 N Rs. 2,001.99 1 2001.99
Rs.2,001.99
After rounding off: Rs.2,352.30 Total Amount of M and L Rs.2,001.99
Add 17.5 % OH and CP Rs.350.35
Total Rs.2,352.34

ITEM No. 5094


Fire bricks, size 230x113x75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick 230x113x75, Fire 100 No. Rs. 1,900.00 1 1900
Rs.1,900.00
After rounding off: Rs.2,232.50 Total Amount of M and L Rs.1,900.00
Add 17.5 % OH and CP Rs.332.50
Total Rs.2,232.50

376 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5095
Fire bricks purpose moulded.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Fire Purpode 100 No. Rs. 2,100.00 1 2100
Rs.2,100.00
After rounding off: Rs.2,467.50 Total Amount of M and L Rs.2,100.00
Add 17.5 % OH and CP Rs.367.50
Total Rs.2,467.50

ITEM No. 5096


Facing bricks, class II, old seze bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Old Size Facing 100 No. Rs. 200.00 1 200
Rs.200.00
After rounding off: Rs.235.00 Total Amount of M and L Rs.200.00
Add 17.5 % OH and CP Rs.35.00
Total Rs.235.00

ITEM No. 5098


Acid resisting bricks, size 230x114x64 mm, class I.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brick Acid resistant class-I 100 No. Rs. 3,000.00 1 3000
Rs.3,000.00
After rounding off: Rs.3,525.00 Total Amount of M and L Rs.3,000.00
Add 17.5 % OH and CP Rs.525.00
Total Rs.3,525.00

ITEM No. 5099


Sewer bricks.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sewer bricks 1000 No. Rs. 3,384.00 0.1 338.4
Rs.338.40
After rounding off: Rs.397.60 Total Amount of M and L Rs.338.40
Add 17.5 % OH and CP Rs.59.22
Total Rs.397.62

ITEM No. 5100


Fire clay mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Fire clay mortar 1 Kg Rs. 6.00 1 6
Rs.6.00
After rounding off: Rs.7.00 Total Amount of M and L Rs.6.00
Add 17.5 % OH and CP Rs.1.05
Total Rs.7.05

377 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Brick Work
ITEM No. 5101
Chemical resistant mortar, resin type.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Chem res mortar Resign 1 Kg Rs. 40.00 1 40
Rs.40.00
After rounding off: Rs.47.00 Total Amount of M and L Rs.40.00
Add 17.5 % OH and CP Rs.7.00
Total Rs.47.00

ITEM No. 5102


Chemicl resistant mortar, sulphur type.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Chem Res mortar sulphar type 1 Kg Rs. 35.00 1 35
Rs.35.00
After rounding off: Rs.41.10 Total Amount of M and L Rs.35.00
Add 17.5 % OH and CP Rs.6.13
Total Rs.41.13

ITEM No. 5103


Glass, broken to 63 mm gauge.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Broken glass 63 gauge 1 Kg Rs. 9.99 1 9.99
Rs.9.99
After rounding off: Rs.11.70 Total Amount of M and L Rs.9.99
Add 17.5 % OH and CP Rs.1.75
Total Rs.11.74

ITEM No. 5104


Sand for masonry mortars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand for masonary mortar 1 Cum Rs. 475.00 1 475
Rs.475.00
After rounding off: Rs.558.10 Total Amount of M and L Rs.475.00
Add 17.5 % OH and CP Rs.83.13
Total Rs.558.13

378 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6001.01
Walling of random rubble, uncoursed, well bounded, laid dry in retaining walls, abutments and similar work.
With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.016 9.6
2 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.519.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.94 158.86
2 Mason (Stone mason) 1 Day Rs. 225.00 0.47 105.75
Rs.264.61
Sundry
1 Sundries 1 Re Rs. 9.00 0.6 5.4
Rs.5.40
After rounding off: Rs.927.80 Total Amount of M and L Rs.789.61
Add 17.5 % OH and CP Rs.138.18
Total Rs.927.79

ITEM No. 6001.02


Walling of random rubble, uncoursed, well bounded, laid dry in retaining walls, abutments and similar work,
but except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.47 105.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.94 158.86
Rs.264.61
Sundry
1 Sundries 1 Re Rs. 9.00 1.6 14.4
Rs.14.40
After rounding off: Rs.327.80 Total Amount of M and L Rs.279.01
Add 17.5 % OH and CP Rs.48.83
Total Rs.327.84

379 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6002.02
Walling of random bubble, uncoursed, well bonded and solidly hearted, built in lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
3 Lime mortar 1:4 excluding labour 1 Cum Rs. 1,255.28 0.3 376.584
Rs.982.58
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
2 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 1.02 9.18
Rs.9.18
After rounding off: Rs.1,669.30 Total Amount of M and L Rs.1,420.68
Add 17.5 % OH and CP Rs.248.62
Total Rs.1,669.29

ITEM No. 6002.03


Walling of random bubble, uncoursed, well bonded and solidly hearted, built in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.08 48
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
3 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.961.03
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
2 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
3 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,645.90 Total Amount of M and L Rs.1,400.74
Add 17.5 % OH and CP Rs.245.13
Total Rs.1,645.87

380 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6002.04
Walling of random bubble, uncoursed, well bonded and solidly hearted, built in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
2 Bond /through stones 1 Cum Rs. 600.00 0.16 96
3 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
Rs.1,035.48
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
2 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
3 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,733.40 Total Amount of M and L Rs.1,475.19
Add 17.5 % OH and CP Rs.258.16
Total Rs.1,733.35

ITEM No. 6003.01


Walling of random bubble, uncoursed, well bonded and solidly hearted, built in lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar 1:4 excluding labour 1 Cum Rs. 1,255.28 0.3 376.584
Rs.376.58
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
2 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
3 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.969.70 Total Amount of M and L Rs.825.30
Add 17.5 % OH and CP Rs.144.43
Total Rs.969.72

381 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6003.02
Walling of random bubble, uncoursed, well bonded and solidly hearted, built in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
Rs.403.03
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
2 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
3 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.1,000.80 Total Amount of M and L Rs.851.74
Add 17.5 % OH and CP Rs.149.06
Total Rs.1,000.80

ITEM No. 6003.03


Walling of random bubble, uncoursed, well bonded and solidly hearted, built in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
Rs.429.48
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
2 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
3 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.1,031.90 Total Amount of M and L Rs.878.19
Add 17.5 % OH and CP Rs.153.68
Total Rs.1,031.88

382 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6004.01
Walling of random rubble, uncoursed, well bonded and solidly hearted, built in cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
3 Cement Lime mortar (1:2:9 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.888.69
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
2 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,564.60 Total Amount of M and L Rs.1,331.56
Add 17.5 % OH and CP Rs.233.02
Total Rs.1,564.58

ITEM No. 6004.02


Walling of random rubble, uncoursed, well bonded and solidly hearted, built in cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
3 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
Rs.859.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
2 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
3 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,530.40 Total Amount of M and L Rs.1,302.46
Add 17.5 % OH and CP Rs.227.93
Total Rs.1,530.40

383 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6004.03
Walling of random rubble, uncoursed, well bonded and solidly hearted, built in cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
2 Bond /through stones 1 Cum Rs. 600.00 0.16 96
3 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.888.69
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
2 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,564.60 Total Amount of M and L Rs.1,331.56
Add 17.5 % OH and CP Rs.233.02
Total Rs.1,564.58

ITEM No. 6004.04


Walling of random rubble, uncoursed, well bonded and solidly hearted, built in cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar 1:8 excluding labour 1 Cum Rs. 1,421.42 0.3 426.426
2 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.1,032.43
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
2 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
3 Mason (Stone mason) 1 Day Rs. 225.00 0.812 182.7
Rs.483.18
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,797.20 Total Amount of M and L Rs.1,529.56
Add 17.5 % OH and CP Rs.267.67
Total Rs.1,797.23

384 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6004.05
Walling of random rubble, uncoursed, well bonded and solidly hearted, built in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
3 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
Rs.1,117.30
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.812 182.7
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
Rs.484.87
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,898.90 Total Amount of M and L Rs.1,616.12
Add 17.5 % OH and CP Rs.282.82
Total Rs.1,898.94

ITEM No. 6004.06


Walling of random rubble, uncoursed, well bonded and solidly hearted,built in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
3 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.1,294.12
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.812 182.7
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.484.87
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,106.70 Total Amount of M and L Rs.1,792.94
Add 17.5 % OH and CP Rs.313.76
Total Rs.2,106.70

385 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6005.01
Walling of random rubble, uncoursed, well bonded and except stone, built in cement mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:2:9 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.282.69
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
2 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
3 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.863.10 Total Amount of M and L Rs.734.56
Add 17.5 % OH and CP Rs.128.55
Total Rs.863.10

ITEM No. 6005.02


Walling of random rubble, uncoursed, well bonded and except stone, built in cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
Rs.253.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
2 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
3 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.828.90 Total Amount of M and L Rs.705.46
Add 17.5 % OH and CP Rs.123.46
Total Rs.828.92

386 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6005.03
Walling of random rubble, uncoursed, well bonded and except stone, built in cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.282.69
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.044 7.436
2 Mason (Stone mason) 1 Day Rs. 225.00 0.706 158.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.55 261.95
Rs.428.24
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.862.30 Total Amount of M and L Rs.733.88
Add 17.5 % OH and CP Rs.128.43
Total Rs.862.31

ITEM No. 6005.04


Walling of random rubble, uncoursed, well bonded and except stone, built in cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar 1:8 excluding labour 1 Cum Rs. 1,421.42 0.3 426.426
Rs.426.43
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
2 Mason (Stone mason) 1 Day Rs. 225.00 0.812 182.7
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.484.87
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,097.70 Total Amount of M and L Rs.934.25
Add 17.5 % OH and CP Rs.163.49
Total Rs.1,097.74

387 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6005.05
Walling of random rubble, uncoursed, well bonded and except stone, built in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
Rs.511.30
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Mason (Stone mason) 1 Day Rs. 225.00 0.812 182.7
Rs.484.87
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,197.50 Total Amount of M and L Rs.1,019.12
Add 17.5 % OH and CP Rs.178.35
Total Rs.1,197.46

ITEM No. 6005.06


Walling of random rubble, uncoursed, well bonded and except stone, built in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
Rs.688.12
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Mason (Stone mason) 1 Day Rs. 225.00 0.812 182.7
Rs.484.87
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,405.20 Total Amount of M and L Rs.1,195.94
Add 17.5 % OH and CP Rs.209.29
Total Rs.1,405.23

388 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6006.02
Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly in lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
2 Lime mortar 1:4 excluding labour 1 Cum Rs. 1,255.28 0.3 376.584
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.982.58
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,706.90 Total Amount of M and L Rs.1,452.69
Add 17.5 % OH and CP Rs.254.22
Total Rs.1,706.91

ITEM No. 6006.03


Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
2 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.1,009.03
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
3 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,738.00 Total Amount of M and L Rs.1,479.14
Add 17.5 % OH and CP Rs.258.85
Total Rs.1,737.98

389 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6006.04
Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
3 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.1,035.48
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,769.10 Total Amount of M and L Rs.1,505.58
Add 17.5 % OH and CP Rs.263.48
Total Rs.1,769.06

ITEM No. 6007.02


Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but except stone built in
lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar 1:4 excluding labour 1 Cum Rs. 1,255.28 0.3 376.584
Rs.376.58
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,005.40 Total Amount of M and L Rs.855.69
Add 17.5 % OH and CP Rs.149.75
Total Rs.1,005.43

390 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6007.03
Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly but except stone in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
Rs.403.03
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,036.50 Total Amount of M and L Rs.882.14
Add 17.5 % OH and CP Rs.154.37
Total Rs.1,036.51

ITEM No. 6007.04


Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly but except stone in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
Rs.429.48
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,067.60 Total Amount of M and L Rs.908.58
Add 17.5 % OH and CP Rs.159.00
Total Rs.1,067.59

391 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6008.01
Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted built in cement lime
mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Cement Lime mortar (1:2:9 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
3 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.888.69
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
2 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,596.60 Total Amount of M and L Rs.1,358.80
Add 17.5 % OH and CP Rs.237.79
Total Rs.1,596.59

ITEM No. 6008.02


Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but built in cement lime
mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
3 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.859.60
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,562.40 Total Amount of M and L Rs.1,329.71
Add 17.5 % OH and CP Rs.232.70
Total Rs.1,562.40

392 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6008.03
Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but built in cement lime
mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
2 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.888.69
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
3 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,596.60 Total Amount of M and L Rs.1,358.80
Add 17.5 % OH and CP Rs.237.79
Total Rs.1,596.59

ITEM No. 6008.04


Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but built in cement
mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Cement mortar 1:8 excluding labour 1 Cum Rs. 1,421.42 0.3 426.426
3 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.1,032.43
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Mason (Stone mason) 1 Day Rs. 225.00 0.893 200.925
Rs.503.10
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,820.60 Total Amount of M and L Rs.1,549.47
Add 17.5 % OH and CP Rs.271.16
Total Rs.1,820.63

393 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6008.05
Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but built in cement
mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
2 Bond /through stones 1 Cum Rs. 600.00 0.16 96
3 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.1,117.30
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.893 200.925
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
Rs.503.10
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,920.40 Total Amount of M and L Rs.1,634.34
Add 17.5 % OH and CP Rs.286.01
Total Rs.1,920.35

ITEM No. 6008.06


Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but built in cement mortar
1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
3 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.1,294.12
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.893 200.925
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.503.10
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,128.10 Total Amount of M and L Rs.1,811.16
Add 17.5 % OH and CP Rs.316.95
Total Rs.2,128.12

394 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6009.01
Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but except stone built in
cement lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:2:9 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.282.69
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
2 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.895.10 Total Amount of M and L Rs.761.80
Add 17.5 % OH and CP Rs.133.31
Total Rs.895.11

ITEM No. 6009.02


Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but but except stone built
in cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
Rs.253.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.55 261.95
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
Rs.455.14
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.859.70 Total Amount of M and L Rs.731.69
Add 17.5 % OH and CP Rs.128.05
Total Rs.859.74

395 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6009.03
Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but but except stone built
in cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.282.69
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.556 262.964
3 Mason (Stone mason) 1 Day Rs. 225.00 0.776 174.6
Rs.456.15
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.895.10 Total Amount of M and L Rs.761.80
Add 17.5 % OH and CP Rs.133.31
Total Rs.895.11

ITEM No. 6009.04


Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but except stone built in
cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar 1:8 excluding labour 1 Cum Rs. 1,421.42 0.3 426.426
Rs.426.43
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Mason (Stone mason) 1 Day Rs. 225.00 0.893 200.925
Rs.503.10
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,119.20 Total Amount of M and L Rs.952.47
Add 17.5 % OH and CP Rs.166.68
Total Rs.1,119.16

396 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6009.05
Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but except stone built in
cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
Rs.511.30
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.893 200.925
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.503.10
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,218.90 Total Amount of M and L Rs.1,037.34
Add 17.5 % OH and CP Rs.181.54
Total Rs.1,218.88

ITEM No. 6009.06


Walling of polygonal rubble, uncoursed, well bounded, bedded and solidly hearted but except stone built in
cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
Rs.688.12
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.893 200.925
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.503.10
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,426.60 Total Amount of M and L Rs.1,214.16
Add 17.5 % OH and CP Rs.212.48
Total Rs.1,426.64

397 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6010.01
Add to items 6002 to 6009 for random or polygonal rubble walling curved on plan to a mean radious not
exceeding 6 m With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for wailing 1 Cum Rs. 600.00 0.12 72
Rs.72.00
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.2 45
Rs.45.00
After rounding off: Rs.137.50 Total Amount of M and L Rs.117.00
Add 17.5 % OH and CP Rs.20.48
Total Rs.137.48

ITEM No. 6010.02


Add to items 0002 to 0009 for random or polygonal rubble walling curved on plan to a mean radious not
exceeding 6 m Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.2 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 6011.01


Extra over items 6001 to 6009 for random or polygonal rubble walling, brought up to courses With material
and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for wailing 1 Cum Rs. 600.00 0.05 30
Rs.30.00
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.177 39.825
2 Mazdoor-man, 1 Day Rs. 169.00 0.044 7.436
Rs.47.26
After rounding off: Rs.90.80 Total Amount of M and L Rs.77.26
Add 17.5 % OH and CP Rs.13.52
Total Rs.90.78

398 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6011.02
Extra over items 0001 to 0009 for random or polygonal rubble walling, brought up to courses Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.177 39.825
2 Mazdoor-man, 1 Day Rs. 169.00 0.044 7.436
Rs.47.26
After rounding off: Rs.55.50 Total Amount of M and L Rs.47.26
Add 17.5 % OH and CP Rs.8.27
Total Rs.55.53

ITEM No. 6012.01


Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted, built in in lime mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.1 467.5
3 Lime mortar 1:4 excluding labour 1 Cum Rs. 1,255.28 0.3 376.584
Rs.940.08
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 1.54 13.86
Rs.13.86
After rounding off: Rs.1,750.10 Total Amount of M and L Rs.1,489.41
Add 17.5 % OH and CP Rs.260.65
Total Rs.1,750.06

399 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6012.02
Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted, built in in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.1 467.5
Rs.966.53
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,781.20 Total Amount of M and L Rs.1,515.95
Add 17.5 % OH and CP Rs.265.29
Total Rs.1,781.24

ITEM No. 6012.03


Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted, built in in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.1 467.5
Rs.992.98
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,812.30 Total Amount of M and L Rs.1,542.40
Add 17.5 % OH and CP Rs.269.92
Total Rs.1,812.32

400 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6013.01
Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted,except stone built in in lime
mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar 1:4 excluding labour 1 Cum Rs. 1,255.28 0.3 376.584
Rs.376.58
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,098.60 Total Amount of M and L Rs.935.00
Add 17.5 % OH and CP Rs.163.63
Total Rs.1,098.63

ITEM No. 6013.02


Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted,except stone built in lime
mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
Rs.403.03
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,129.70 Total Amount of M and L Rs.961.45
Add 17.5 % OH and CP Rs.168.25
Total Rs.1,129.70

401 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6013.03
Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted,except stone built in lime
mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
Rs.429.48
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,160.80 Total Amount of M and L Rs.987.90
Add 17.5 % OH and CP Rs.172.88
Total Rs.1,160.78

ITEM No. 6014.01


Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted, built in in cement lime
mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for Wailing 1 Cum Rs. 425.00 1.1 467.5
2 Cement Lime mortar (1:2:9 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.846.19
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,639.80 Total Amount of M and L Rs.1,395.61
Add 17.5 % OH and CP Rs.244.23
Total Rs.1,639.84

402 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6014.02
Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted built in in cement lime
mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for Wailing 1 Cum Rs. 425.00 1.1 467.5
2 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.817.10
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,605.70 Total Amount of M and L Rs.1,366.52
Add 17.5 % OH and CP Rs.239.14
Total Rs.1,605.66

ITEM No. 6014.03


Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted, built in in cement lime
mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
2 Bond /through stones 1 Cum Rs. 600.00 0.16 96
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.1 467.5
Rs.846.19
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,639.80 Total Amount of M and L Rs.1,395.61
Add 17.5 % OH and CP Rs.244.23
Total Rs.1,639.84

403 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6014.04
Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted built in in cement mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Cement mortar 1:8 excluding labour 1 Cum Rs. 1,421.42 0.3 426.426
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.1 467.5
Rs.989.93
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.102 17.238
2 Mason (Stone mason) 1 Day Rs. 225.00 1.3 292.5
3 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
Rs.593.32
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,876.70 Total Amount of M and L Rs.1,597.20
Add 17.5 % OH and CP Rs.279.51
Total Rs.1,876.71

ITEM No. 6014.05


Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted, built in in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.1 467.5
Rs.1,074.80
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
2 Bhisty including mussack 1 Day Rs. 169.00 0.102 17.238
3 Mason (Stone mason) 1 Day Rs. 225.00 1.3 292.5
Rs.593.32
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,976.40 Total Amount of M and L Rs.1,682.07
Add 17.5 % OH and CP Rs.294.36
Total Rs.1,976.43

404 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6014.06
Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted built in in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.16 96
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.1 467.5
Rs.1,251.62
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.3 292.5
2 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
3 Bhisty including mussack 1 Day Rs. 169.00 0.102 17.238
Rs.593.32
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,184.20 Total Amount of M and L Rs.1,858.89
Add 17.5 % OH and CP Rs.325.31
Total Rs.2,184.19

ITEM No. 6015.01


Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted but except stone in cement
lime mortar 1:2:9.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:2:9 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.282.69
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
3 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.988.30 Total Amount of M and L Rs.841.11
Add 17.5 % OH and CP Rs.147.19
Total Rs.988.30

405 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6015.02
Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted but except stone in cement
lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
Rs.253.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.954.10 Total Amount of M and L Rs.812.02
Add 17.5 % OH and CP Rs.142.10
Total Rs.954.12

ITEM No. 6015.03


Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted but except stone in cement
lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.282.69
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.13 254.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.554 262.626
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.535.47
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.988.30 Total Amount of M and L Rs.841.11
Add 17.5 % OH and CP Rs.147.19
Total Rs.988.30

406 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6015.04
Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted but except stone in cement
mortar 1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar 1:8 excluding labour 1 Cum Rs. 1,421.42 0.3 426.426
Rs.426.43
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.102 17.238
2 Mason (Stone mason) 1 Day Rs. 225.00 1.3 292.5
3 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
Rs.593.32
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,225.20 Total Amount of M and L Rs.1,042.70
Add 17.5 % OH and CP Rs.182.47
Total Rs.1,225.17

ITEM No. 6015.05


Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted but except stone in cement
mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
Rs.511.30
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.3 292.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.102 17.238
3 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
Rs.593.32
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,324.90 Total Amount of M and L Rs.1,127.57
Add 17.5 % OH and CP Rs.197.32
Total Rs.1,324.89

407 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6015.06
Walling of squared rubble, uncoursed, well bounded, bedded and solidly hearted but except stone in cement
mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
Rs.688.12
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.102 17.238
2 Mason (Stone mason) 1 Day Rs. 225.00 1.3 292.5
3 Mazdoor-man, 1 Day Rs. 169.00 1.678 283.582
Rs.593.32
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,532.70 Total Amount of M and L Rs.1,304.39
Add 17.5 % OH and CP Rs.228.27
Total Rs.1,532.65

ITEM No. 6016.01


Extra over item 06012 to 06015 for squared rubble walling brought up to courses With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for wailing 1 Cum Rs. 600.00 0.05 30
Rs.30.00
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.177 39.825
2 Mazdoor-man, 1 Day Rs. 169.00 0.044 7.436
Rs.47.26
After rounding off: Rs.90.80 Total Amount of M and L Rs.77.26
Add 17.5 % OH and CP Rs.13.52
Total Rs.90.78

ITEM No. 6016.02


Extra over item item 06012 to 06015 for squared rubble walling brought up to courses Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.177 39.825
2 Mazdoor-man, 1 Day Rs. 169.00 0.044 7.436
Rs.47.26
After rounding off: Rs.55.50 Total Amount of M and L Rs.47.26
Add 17.5 % OH and CP Rs.8.27
Total Rs.55.53

408 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6017.01
Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, built in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.21 514.25
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.1,013.28
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.37 308.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.590.48
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,900.80 Total Amount of M and L Rs.1,617.71
Add 17.5 % OH and CP Rs.283.10
Total Rs.1,900.81

ITEM No. 6017.02


Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, built in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.21 514.25
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.1,039.73
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.37 308.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.590.48
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,931.90 Total Amount of M and L Rs.1,644.16
Add 17.5 % OH and CP Rs.287.73
Total Rs.1,931.89

409 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6017.03
Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, built in cement lime
mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.21 514.25
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.863.85
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
3 Mason (Stone mason) 1 Day Rs. 225.00 1.37 308.25
Rs.590.48
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,725.20 Total Amount of M and L Rs.1,468.28
Add 17.5 % OH and CP Rs.256.95
Total Rs.1,725.23

ITEM No. 6017.04


Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, built in cement lime
mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.21 514.25
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.892.94
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 1.37 308.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.590.48
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,759.40 Total Amount of M and L Rs.1,497.37
Add 17.5 % OH and CP Rs.262.04
Total Rs.1,759.41

410 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6017.05
Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, built in cement mortar
1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for Wailing 1 Cum Rs. 425.00 1.21 514.25
2 Bond /through stones 1 Cum Rs. 600.00 0.16 96
3 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
Rs.1,121.55
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.45 326.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
3 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
Rs.627.07
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,071.00 Total Amount of M and L Rs.1,762.57
Add 17.5 % OH and CP Rs.308.45
Total Rs.2,071.02

ITEM No. 6017.06


Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, built in cement mortar
1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.21 514.25
3 Bond /through stones 1 Cum Rs. 600.00 0.16 96
Rs.1,298.37
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.45 326.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
3 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
Rs.627.07
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,278.80 Total Amount of M and L Rs.1,939.39
Add 17.5 % OH and CP Rs.339.39
Total Rs.2,278.78

411 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6018.01
Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, but except stone in
lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime Mortar (1:3) (material and labour) 1 Cum Rs. 1,633.95 0.3 490.185
Rs.490.19
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 1.37 308.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.590.48
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,296.70 Total Amount of M and L Rs.1,103.62
Add 17.5 % OH and CP Rs.193.13
Total Rs.1,296.75

ITEM No. 6018.02


Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, but except stone in
lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
Rs.429.48
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
3 Mason (Stone mason) 1 Day Rs. 225.00 1.37 308.25
Rs.590.48
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,225.40 Total Amount of M and L Rs.1,042.91
Add 17.5 % OH and CP Rs.182.51
Total Rs.1,225.42

412 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6018.03
Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, but except stone in
cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
Rs.253.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
2 Mason (Stone mason) 1 Day Rs. 225.00 1.37 308.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.590.48
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,018.80 Total Amount of M and L Rs.867.03
Add 17.5 % OH and CP Rs.151.73
Total Rs.1,018.76

ITEM No. 6018.04


Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, but except stone in
cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.282.69
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.37 308.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.590.48
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,052.90 Total Amount of M and L Rs.896.12
Add 17.5 % OH and CP Rs.156.82
Total Rs.1,052.94

413 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6018.05
Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted,but except stone in
cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
Rs.511.30
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
2 Mason (Stone mason) 1 Day Rs. 225.00 1.45 326.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
Rs.627.07
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,364.50 Total Amount of M and L Rs.1,161.32
Add 17.5 % OH and CP Rs.203.23
Total Rs.1,364.55

ITEM No. 6018.06


Walling of squared rubble, regular coursed, well bounded, bedded and solidly hearted, but except stone in
cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
Rs.688.12
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
2 Mason (Stone mason) 1 Day Rs. 225.00 1.45 326.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
Rs.627.07
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,572.30 Total Amount of M and L Rs.1,338.14
Add 17.5 % OH and CP Rs.234.17
Total Rs.1,572.31

414 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6019.01
Block - in - course masonry well bounded, built in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for Wailing 1 Cum Rs. 425.00 1.333 566.525
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
Rs.969.56
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mason (Stone mason) 1 Day Rs. 225.00 2.106 473.85
Rs.756.08
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,044.00 Total Amount of M and L Rs.1,739.59
Add 17.5 % OH and CP Rs.304.43
Total Rs.2,044.01

ITEM No. 6019.02


Block - in - course masonry well bounded, built in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.333 566.525
Rs.996.01
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.106 473.85
2 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.756.08
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,075.10 Total Amount of M and L Rs.1,766.04
Add 17.5 % OH and CP Rs.309.06
Total Rs.2,075.09

415 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6019.03
Block - in - course masonry well bounded, built in cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.333 566.525
Rs.820.13
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.106 473.85
2 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
3 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
Rs.756.08
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,868.40 Total Amount of M and L Rs.1,590.16
Add 17.5 % OH and CP Rs.278.28
Total Rs.1,868.43

ITEM No. 6019.04


Block - in - course masonry well bounded, built in cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for Wailing 1 Cum Rs. 425.00 1.333 566.525
2 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.849.22
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 2.106 473.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.756.08
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.1,902.60 Total Amount of M and L Rs.1,619.25
Add 17.5 % OH and CP Rs.283.37
Total Rs.1,902.62

416 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6019.05
Block - in - course masonry well bounded, built in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.333 566.525
Rs.1,077.82
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
2 Mason (Stone mason) 1 Day Rs. 225.00 2.212 497.7
3 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
Rs.798.52
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,221.10 Total Amount of M and L Rs.1,890.29
Add 17.5 % OH and CP Rs.330.80
Total Rs.2,221.09

ITEM No. 6019.06


Block - in - course masonry well bounded, built in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for Wailing 1 Cum Rs. 425.00 1.333 566.525
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
Rs.1,254.64
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
2 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
3 Mason (Stone mason) 1 Day Rs. 225.00 2.212 497.7
Rs.798.52
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,428.90 Total Amount of M and L Rs.2,067.11
Add 17.5 % OH and CP Rs.361.74
Total Rs.2,428.86

417 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6020.01
Block - in - course masonry well bounded except stone in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
Rs.403.03
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
3 Mason (Stone mason) 1 Day Rs. 225.00 2.106 473.85
Rs.756.08
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,388.90 Total Amount of M and L Rs.1,182.06
Add 17.5 % OH and CP Rs.206.86
Total Rs.1,388.92

ITEM No. 6020.02


Block - in - course masonry well bounded but except stone in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
Rs.429.48
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 2.106 473.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.756.08
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,420.00 Total Amount of M and L Rs.1,208.51
Add 17.5 % OH and CP Rs.211.49
Total Rs.1,420.00

418 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6020.03
Block - in - course masonry well bounded but except stone in cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
Rs.253.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 2.106 473.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.756.08
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,213.30 Total Amount of M and L Rs.1,032.63
Add 17.5 % OH and CP Rs.180.71
Total Rs.1,213.34

ITEM No. 6020.04


Ditto, but except stone in cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.282.69
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 2.106 473.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.756.08
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,247.50 Total Amount of M and L Rs.1,061.72
Add 17.5 % OH and CP Rs.185.80
Total Rs.1,247.52

419 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6020.05
Block - in - course masonry well bounded but except stone in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
Rs.511.30
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
2 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
3 Mason (Stone mason) 1 Day Rs. 225.00 2.212 497.7
Rs.798.52
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,566.00 Total Amount of M and L Rs.1,332.77
Add 17.5 % OH and CP Rs.233.23
Total Rs.1,566.00

ITEM No. 6020.06


Block - in - course masonry well bounded but except stone in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
Rs.688.12
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
2 Mason (Stone mason) 1 Day Rs. 225.00 2.212 497.7
3 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
Rs.798.52
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,773.80 Total Amount of M and L Rs.1,509.59
Add 17.5 % OH and CP Rs.264.18
Total Rs.1,773.76

420 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6021.01
Ashlar masonry, plain well bounded, built in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for Wailing 1 Cum Rs. 425.00 1.5 637.5
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
3 Bond /through stones 1 Cum Rs. 600.00 0.03 18
Rs.1,058.53
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
2 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
3 Mason (Stone mason) 1 Day Rs. 225.00 3.706 833.85
Rs.1,116.08
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,571.60 Total Amount of M and L Rs.2,188.56
Add 17.5 % OH and CP Rs.383.00
Total Rs.2,571.56

ITEM No. 6021.02


Ashlar masonry, plain well bounded, built in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.03 18
2 Quarried stone for Wailing 1 Cum Rs. 425.00 1.5 637.5
3 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
Rs.1,084.98
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 3.706 833.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.1,116.08
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,602.60 Total Amount of M and L Rs.2,215.01
Add 17.5 % OH and CP Rs.387.63
Total Rs.2,602.64

421 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6021.03
Ashlar masonry, plain well bounded, built in cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.03 18
2 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.5 637.5
Rs.909.10
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 3.706 833.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.1,116.08
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,396.00 Total Amount of M and L Rs.2,039.13
Add 17.5 % OH and CP Rs.356.85
Total Rs.2,395.98

ITEM No. 6021.04


Ashlar masonry, plain well bounded, built in cement lime mortar 1:1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.03 18
2 Cement Lime mortar (1:1:6 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.5 637.5
Rs.938.19
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 3.706 833.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.1,116.08
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,430.20 Total Amount of M and L Rs.2,068.22
Add 17.5 % OH and CP Rs.361.94
Total Rs.2,430.16

422 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6021.05
Ashlar masonry, plain well bounded, built in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 0.03 18
2 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.5 637.5
Rs.1,166.80
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
2 Mason (Stone mason) 1 Day Rs. 225.00 3.812 857.7
3 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
Rs.1,158.52
Sundry
1 Sundries 1 Re Rs. 9.00 1.55 13.95
Rs.13.95
After rounding off: Rs.2,748.60 Total Amount of M and L Rs.2,339.27
Add 17.5 % OH and CP Rs.409.37
Total Rs.2,748.64

ITEM No. 6021.06


Ashlar masonry, plain well bounded, built in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
2 Bond /through stones 1 Cum Rs. 600.00 0.03 18
3 Quarried stone for Wailing 1 Cum Rs. 425.00 1.5 637.5
Rs.1,343.62
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
2 Mason (Stone mason) 1 Day Rs. 225.00 3.81 857.25
3 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
Rs.1,158.07
Sundry
1 Sundries 1 Re Rs. 9.00 1.546 13.914
Rs.13.91
After rounding off: Rs.2,955.80 Total Amount of M and L Rs.2,515.60
Add 17.5 % OH and CP Rs.440.23
Total Rs.2,955.83

423 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6022.01
Ashlar masonry, plain well bounded, but except stone in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.3 403.032
Rs.403.03
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 3.706 833.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.1,116.08
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,811.90 Total Amount of M and L Rs.1,542.06
Add 17.5 % OH and CP Rs.269.86
Total Rs.1,811.92

ITEM No. 6022.02


Ashlar masonry, plain well bounded, but except stone in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.3 429.48
Rs.429.48
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
3 Mason (Stone mason) 1 Day Rs. 225.00 3.706 833.85
Rs.1,116.08
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,843.00 Total Amount of M and L Rs.1,568.51
Add 17.5 % OH and CP Rs.274.49
Total Rs.1,843.00

424 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6022.03
Ashlar masonry, plain well bounded, but except stone in cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.3 253.602
Rs.253.60
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mason (Stone mason) 1 Day Rs. 225.00 3.706 833.85
3 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
Rs.1,116.08
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,636.30 Total Amount of M and L Rs.1,392.63
Add 17.5 % OH and CP Rs.243.71
Total Rs.1,636.34

ITEM No. 6022.04


Ashlar masonry, plain well bounded, but except stone in cement lime mortar
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:2:9 ) excluding labour 1 Cum Rs. 942.31 0.3 282.693
Rs.282.69
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.11 18.59
2 Mazdoor-man, 1 Day Rs. 169.00 1.56 263.64
3 Mason (Stone mason) 1 Day Rs. 225.00 3.706 833.85
Rs.1,116.08
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,670.50 Total Amount of M and L Rs.1,421.72
Add 17.5 % OH and CP Rs.248.80
Total Rs.1,670.52

425 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6022.05
Ashlar masonry, plain well bounded, but except stone in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.3 511.296
Rs.511.30
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
2 Mason (Stone mason) 1 Day Rs. 225.00 3.81 857.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
Rs.1,158.07
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.1,988.50 Total Amount of M and L Rs.1,692.32
Add 17.5 % OH and CP Rs.296.16
Total Rs.1,988.47

ITEM No. 6022.06


Ashlar masonry, plain well bounded, but except stone in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.3 688.116
Rs.688.12
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 3.81 857.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.1 16.9
3 Mazdoor-man, 1 Day Rs. 169.00 1.68 283.92
Rs.1,158.07
Sundry
1 Sundries 1 Re Rs. 9.00 2.55 22.95
Rs.22.95
After rounding off: Rs.2,196.20 Total Amount of M and L Rs.1,869.14
Add 17.5 % OH and CP Rs.327.10
Total Rs.2,196.23

426 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6023.01
Add to items 06012to 06015 and 06017, 06018 for squired rubble walling, uncoursed, brought to courses or
regular coursed; curved on plan to a mean radious not excedding 6 m With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Roughly squared rubble stones inc. bond stone 1 Cum Rs. 600.00 0.1 60
Rs.60.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
2 Mason (Stone mason) 1 Day Rs. 225.00 0.2 45
Rs.51.76
After rounding off: Rs.131.30 Total Amount of M and L Rs.111.76
Add 17.5 % OH and CP Rs.19.56
Total Rs.131.32

ITEM No. 6023.02


Add to items 06012to 06015 and 06017, 06018 for squired rubble walling, uncoursed, brought to courses or
regular coursed; curved on plan to a mean radious not excedding 6 m Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
2 Mason (Stone mason) 1 Day Rs. 225.00 0.2 45
Rs.51.76
After rounding off: Rs.60.80 Total Amount of M and L Rs.51.76
Add 17.5 % OH and CP Rs.9.06
Total Rs.60.82

ITEM No. 6025.01


Extra over stone walling fr hammer dressing to face stones and dressing of face beds and joints, as specified, of
random rubble walling, uncoursed or brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface not exceeding 40mm Lime or sand stone
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.22 49.5
Rs.49.50
After rounding off: Rs.58.20 Total Amount of M and L Rs.49.50
Add 17.5 % OH and CP Rs.8.66
Total Rs.58.16

427 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6025.02
Extra over stone walling fr hammer dressing to face stones and dressing of face beds and joints, as specified, of
random rubble walling, uncoursed or brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface not exceeding 20mm Lime or sand stone
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.34 76.5
Rs.76.50
After rounding off: Rs.89.90 Total Amount of M and L Rs.76.50
Add 17.5 % OH and CP Rs.13.39
Total Rs.89.89

ITEM No. 6025.03


Extra over stone walling fr hammer dressing to face stones and dressing of face beds and joints, as specified, of
random rubble walling, uncoursed or brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface not exceeding 40mm Granite or Trap stone
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.44 99
Rs.99.00
After rounding off: Rs.116.30 Total Amount of M and L Rs.99.00
Add 17.5 % OH and CP Rs.17.33
Total Rs.116.33

ITEM No. 6025.04


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of random rubble walling, uncoursed or brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface not exceeding 20mm Granite or Trap stone
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.64 144
Rs.144.00
After rounding off: Rs.169.20 Total Amount of M and L Rs.144.00
Add 17.5 % OH and CP Rs.25.20
Total Rs.169.20

ITEM No. 6026.01


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of polygonal rubble walling, uncoursed or brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface - Lime or sand stone n exc 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.24 54
Rs.54.00
After rounding off: Rs.63.40 Total Amount of M and L Rs.54.00
Add 17.5 % OH and CP Rs.9.45
Total Rs.63.45

428 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6026.02
Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of polygonal rubble walling, uncoursed or brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface - Lime or sand stone n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.37 83.25
Rs.83.25
After rounding off: Rs.97.80 Total Amount of M and L Rs.83.25
Add 17.5 % OH and CP Rs.14.57
Total Rs.97.82

ITEM No. 6026.03


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,,
of polygonal rubble walling, uncoursed or brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface - granite or trap n exc 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.48 108
Rs.108.00
After rounding off: Rs.126.90 Total Amount of M and L Rs.108.00
Add 17.5 % OH and CP Rs.18.90
Total Rs.126.90

ITEM No. 6026.04


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,,
of polygonal rubble walling, uncoursed or brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface - granite or trap n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.74 166.5
Rs.166.50
After rounding off: Rs.195.60 Total Amount of M and L Rs.166.50
Add 17.5 % OH and CP Rs.29.14
Total Rs.195.64

ITEM No. 6027.02


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,,
of squared rubble wlling, regular coursed, Secunderabad and Bangalore types Hammer dressing with max
depression on face from straight edge held against the dressed surface - Lime or sand stone n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.54 121.5
Rs.121.50
After rounding off: Rs.142.80 Total Amount of M and L Rs.121.50
Add 17.5 % OH and CP Rs.21.26
Total Rs.142.76

429 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6027.04
Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of squared rubble wlling, regular coursed, Secunderabad and Bangalore types Hammer dressing with max
depression on face from straight edge held against the dressed surface - granite or trap n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 1.08 243
Rs.243.00
After rounding off: Rs.285.50 Total Amount of M and L Rs.243.00
Add 17.5 % OH and CP Rs.42.53
Total Rs.285.53

ITEM No. 6028.01


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of squared rubble walling, encoursed and brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface - Lime or sand stone n exc 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.92 207
Rs.207.00
After rounding off: Rs.243.20 Total Amount of M and L Rs.207.00
Add 17.5 % OH and CP Rs.36.23
Total Rs.243.23

ITEM No. 6028.02


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of squared rubble walling, encoursed and brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface - Lime or sand stone n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 1.03 231.75
Rs.231.75
After rounding off: Rs.272.30 Total Amount of M and L Rs.231.75
Add 17.5 % OH and CP Rs.40.56
Total Rs.272.31

ITEM No. 6028.03


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of squared rubble walling, encoursed and brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface - granite or trap n exc 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 1.84 414
Rs.414.00
After rounding off: Rs.486.40 Total Amount of M and L Rs.414.00
Add 17.5 % OH and CP Rs.72.45
Total Rs.486.45

430 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6028.04
Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of squared rubble walling, encoursed and brought upto courses Hammer dressing with max depression on face
from straight edge held against the dressed surface - granite or trap n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 2.06 463.5
Rs.463.50
After rounding off: Rs.544.60 Total Amount of M and L Rs.463.50
Add 17.5 % OH and CP Rs.81.11
Total Rs.544.61

ITEM No. 6029.02


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of squared rubble masonry, regular coursed Hammer dressing with max depression on face from straight edge
held against the dressed surface - Lime or sand stone n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 1.1 247.5
Rs.247.50
After rounding off: Rs.290.80 Total Amount of M and L Rs.247.50
Add 17.5 % OH and CP Rs.43.31
Total Rs.290.81

ITEM No. 6029.04


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of squared rubble masonry, regular coursed Hammer dressing with max depression on face from straight edge
held against the dressed surface - granite or trap n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 2.2 495
Rs.495.00
After rounding off: Rs.581.60 Total Amount of M and L Rs.495.00
Add 17.5 % OH and CP Rs.86.63
Total Rs.581.63

431 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6030.02
Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified
of block - in -course masonry Hammer dressing with max depression on face from straight edge held against
the dressed surface - granite or trap n exc 40 mm.

Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of block - in -course masonry Hammer dressing with max depression on face from straight edge held against
the dressed surface - Lime or sand stone n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 2.25 506.25
Rs.506.25
After rounding off: Rs.594.80 Total Amount of M and L Rs.506.25
Add 17.5 % OH and CP Rs.88.59
Total Rs.594.84

ITEM No. 6030.04


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of block - in -course masonry Hammer dressing with max depression on face from straight edge held against
the dressed surface - granite or trap n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 4.5 1012.5
Rs.1,012.50
After rounding off: Rs.1,189.70 Total Amount of M and L Rs.1,012.50
Add 17.5 % OH and CP Rs.177.19
Total Rs.1,189.69

ITEM No. 6031.02


Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of ashlar masonry Hammer dressing with max depression on face from straight edge held against the dressed
surface - Lime or sand stone n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 2.1 472.5
Rs.472.50
After rounding off: Rs.555.20 Total Amount of M and L Rs.472.50
Add 17.5 % OH and CP Rs.82.69
Total Rs.555.19

432 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6031.04
Extra over stone walling f0r hammer dressing to face stones and dressing of face beds and joints, as specified,
of ashlar masonry Hammer dressing with max depression on face from straight edge held against the dressed
surface - granite or trap n exc 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 4.2 945
Rs.945.00
After rounding off: Rs.1,110.40 Total Amount of M and L Rs.945.00
Add 17.5 % OH and CP Rs.165.38
Total Rs.1,110.38

ITEM No. 6032.01


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to block -in - course masonry For face work finished lime or sandstone -
rock faced.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.225.00
After rounding off: Rs.264.40 Total Amount of M and L Rs.225.00
Add 17.5 % OH and CP Rs.39.38
Total Rs.264.38

ITEM No. 6032.02


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to block -in - course masonry For face work finished lime or sandstone -
punched dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.2 270
Rs.270.00
After rounding off: Rs.317.20 Total Amount of M and L Rs.270.00
Add 17.5 % OH and CP Rs.47.25
Total Rs.317.25

ITEM No. 6032.03


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to block -in - course masonry For face work finished lime or sandstone -
close picked dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.35 303.75
Rs.303.75
After rounding off: Rs.356.90 Total Amount of M and L Rs.303.75
Add 17.5 % OH and CP Rs.53.16
Total Rs.356.91

433 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6032.04
Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to block -in - course masonry For face work finished lime or sand stone -
fine tooled dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.5 337.5
Rs.337.50
After rounding off: Rs.396.60 Total Amount of M and L Rs.337.50
Add 17.5 % OH and CP Rs.59.06
Total Rs.396.56

ITEM No. 6032.05


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to block -in - course masonry For face work finished granite or trap-rock
faced.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.9999 449.9775
Rs.449.98
After rounding off: Rs.528.70 Total Amount of M and L Rs.449.98
Add 17.5 % OH and CP Rs.78.75
Total Rs.528.72

ITEM No. 6032.06


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to block -in - course masonry For face work finished granite or trap-
punched dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.4 540
Rs.540.00
After rounding off: Rs.634.50 Total Amount of M and L Rs.540.00
Add 17.5 % OH and CP Rs.94.50
Total Rs.634.50

ITEM No. 6032.07


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to block -in - course masonry For face work finished granite or trap-
close picked dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.7 607.5
Rs.607.50
After rounding off: Rs.713.80 Total Amount of M and L Rs.607.50
Add 17.5 % OH and CP Rs.106.31
Total Rs.713.81

434 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6032.08
Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to block -in - course masonry For face work finished granite or trap-fine
tooled dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 3 675
Rs.675.00
After rounding off: Rs.793.10 Total Amount of M and L Rs.675.00
Add 17.5 % OH and CP Rs.118.13
Total Rs.793.13

ITEM No. 6033.01


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to ashlar masonry For face work finished lime or sandstone - rock faced.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.8 180
Rs.180.00
After rounding off: Rs.211.50 Total Amount of M and L Rs.180.00
Add 17.5 % OH and CP Rs.31.50
Total Rs.211.50

ITEM No. 6033.02


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to ashlar masonry For face work finished lime or sandstone - punched
dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.225.00
After rounding off: Rs.264.40 Total Amount of M and L Rs.225.00
Add 17.5 % OH and CP Rs.39.38
Total Rs.264.38

ITEM No. 6033.03


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to ashlar masonry For face work finished lime or sandstone -close
picked dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.1 247.5
Rs.247.50
After rounding off: Rs.290.80 Total Amount of M and L Rs.247.50
Add 17.5 % OH and CP Rs.43.31
Total Rs.290.81

435 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6033.04
Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm;, to ashlar masonry For face work finished lime or sand stone -fine
tooled dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.3 292.5
Rs.292.50
After rounding off: Rs.343.70 Total Amount of M and L Rs.292.50
Add 17.5 % OH and CP Rs.51.19
Total Rs.343.69

ITEM No. 6033.05


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to ashlar masonry For face work finished granite or trap-rock faced.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.6 360
Rs.360.00
After rounding off: Rs.423.00 Total Amount of M and L Rs.360.00
Add 17.5 % OH and CP Rs.63.00
Total Rs.423.00

ITEM No. 6033.06


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm;, to ashlar masonry For face work finished granite or trap-punched
dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.9999 449.9775
Rs.449.98
After rounding off: Rs.528.70 Total Amount of M and L Rs.449.98
Add 17.5 % OH and CP Rs.78.75
Total Rs.528.72

ITEM No. 6033.07


Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to ashlar masonry For face work finished granite or trap-close picked
dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.2 495
Rs.495.00
After rounding off: Rs.581.60 Total Amount of M and L Rs.495.00
Add 17.5 % OH and CP Rs.86.63
Total Rs.581.63

436 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6033.08
Extra over hammer dressed facings; with maimum depression on face from straight edge held against the
dressed surface not exceeding 20 mm; to ashlar masonry For face work finished granite or trap-fine tooled
dressed face.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.6 585
Rs.585.00
After rounding off: Rs.687.40 Total Amount of M and L Rs.585.00
Add 17.5 % OH and CP Rs.102.38
Total Rs.687.38

ITEM No. 6034.01


Squared rubble walling, jodhpur type, laid dry, brought to course and well bonded With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
Rs.418.00
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.53 119.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
Rs.296.70
Sundry
1 Sundries 1 Re Rs. 9.00 0.58 5.22
Rs.5.22
After rounding off: Rs.845.90 Total Amount of M and L Rs.719.92
Add 17.5 % OH and CP Rs.125.99
Total Rs.845.91

ITEM No. 6034.02


Squared rubble walling, jodhpur type, laid dry, brought to course and well bonded Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Mason (Stone mason) 1 Day Rs. 225.00 0.53 119.25
Rs.296.70
Sundry
1 Sundries 1 Re Rs. 9.00 1.58 14.22
Rs.14.22
After rounding off: Rs.365.30 Total Amount of M and L Rs.310.92
Add 17.5 % OH and CP Rs.54.41
Total Rs.365.33

437 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6035.01
Squared runnle walling, jodhpur type, laid dry, brought upto courses, well bonded bedded and solidly hearted,
built in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.27 362.7288
2 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
Rs.780.73
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.87 195.75
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.388.41
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,386.40 Total Amount of M and L Rs.1,179.94
Add 17.5 % OH and CP Rs.206.49
Total Rs.1,386.43

ITEM No. 6035.02


Squared runnle walling, jodhpur type, laid dry, brought upto courses, well bonded bedded and solidly hearted,
built in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.27 386.532
2 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
Rs.804.53
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.87 195.75
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
Rs.388.41
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,414.40 Total Amount of M and L Rs.1,203.74
Add 17.5 % OH and CP Rs.210.65
Total Rs.1,414.40

438 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6035.03
Squared runnle walling, jodhpur type, laid dry, brought upto courses, well bonded bedded and solidly hearted,
built in cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.27 228.2418
2 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
Rs.646.24
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Mason (Stone mason) 1 Day Rs. 225.00 0.96 216
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.408.66
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,252.20 Total Amount of M and L Rs.1,065.70
Add 17.5 % OH and CP Rs.186.50
Total Rs.1,252.20

ITEM No. 6035.04


Squared runnle walling, jodhpur type, laid dry, brought upto courses, well bonded bedded and solidly hearted,
built in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
2 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.27 460.1664
Rs.878.17
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
2 Mason (Stone mason) 1 Day Rs. 225.00 0.96 216
3 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
Rs.408.66
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,524.70 Total Amount of M and L Rs.1,297.63
Add 17.5 % OH and CP Rs.227.08
Total Rs.1,524.71

439 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6035.05
Squared runnle walling, jodhpur type, laid dry, brought upto courses, well bonded bedded and solidly hearted,
built in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.27 619.3044
Rs.1,037.30
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Mason (Stone mason) 1 Day Rs. 225.00 0.96 216
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.408.66
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,711.70 Total Amount of M and L Rs.1,456.76
Add 17.5 % OH and CP Rs.254.93
Total Rs.1,711.70

ITEM No. 6036.01


Squared rubble walling jodhpur type brought up to coursed, well bonded, bedded and solidly hearted, built in
lime mortar 1:3 but except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.27 362.7288
Rs.362.73
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.87 195.75
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
Rs.388.41
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.905.90 Total Amount of M and L Rs.770.94
Add 17.5 % OH and CP Rs.134.91
Total Rs.905.85

440 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6036.02
Squared rubble walling jodhpur type brought up to coursed, well bonded, bedded and solidly hearted, built in
lime mortar 1:2 but except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.27 386.532
Rs.386.53
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Mason (Stone mason) 1 Day Rs. 225.00 0.87 195.75
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.388.41
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.933.80 Total Amount of M and L Rs.794.74
Add 17.5 % OH and CP Rs.139.08
Total Rs.933.82

ITEM No. 6036.03


Squared rubble walling jodhpur type brought up to coursed, well bonded, bedded and solidly hearted, built in
cement lime mortar 1:1:8 but except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.27 228.2418
Rs.228.24
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.96 216
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.408.66
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.771.60 Total Amount of M and L Rs.656.70
Add 17.5 % OH and CP Rs.114.92
Total Rs.771.62

441 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6036.04
Squared rubble walling jodhpur type brought up to coursed, well bonded, bedded and solidly hearted, built in
cement mortar 1:3 but except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.27 460.1664
Rs.460.17
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
2 Mason (Stone mason) 1 Day Rs. 225.00 0.96 216
3 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
Rs.408.66
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.1,044.10 Total Amount of M and L Rs.888.63
Add 17.5 % OH and CP Rs.155.51
Total Rs.1,044.14

ITEM No. 6036.05


Squared rubble walling jodhpur type brought up to coursed, well bonded, bedded and solidly hearted, built in
cement mortar 1:3 but except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.27 619.3044
2 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 0.2 76
Rs.695.30
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
3 Mason (Stone mason) 1 Day Rs. 225.00 0.96 216
Rs.408.66
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.1,320.40 Total Amount of M and L Rs.1,123.76
Add 17.5 % OH and CP Rs.196.66
Total Rs.1,320.42

442 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6037.01
Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, built in lime
mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.27 362.7288
2 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
Rs.780.73
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mason (Stone mason) 1 Day Rs. 225.00 1.05 236.25
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,434.00 Total Amount of M and L Rs.1,220.44
Add 17.5 % OH and CP Rs.213.58
Total Rs.1,434.02

ITEM No. 6037.02


Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, built in lime
mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
2 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.27 386.532
Rs.804.53
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.05 236.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,462.00 Total Amount of M and L Rs.1,244.24
Add 17.5 % OH and CP Rs.217.74
Total Rs.1,461.98

443 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6037.03
Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, built in cement
lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.27 228.2418
2 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
Rs.646.24
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
2 Mason (Stone mason) 1 Day Rs. 225.00 1.14 256.5
3 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
Rs.449.16
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,299.80 Total Amount of M and L Rs.1,106.20
Add 17.5 % OH and CP Rs.193.59
Total Rs.1,299.79

ITEM No. 6037.04


Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, built in cement
mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.27 460.1664
2 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
Rs.878.17
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mason (Stone mason) 1 Day Rs. 225.00 1.14 256.5
Rs.449.16
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,572.30 Total Amount of M and L Rs.1,338.13
Add 17.5 % OH and CP Rs.234.17
Total Rs.1,572.30

444 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6037.05
Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, built in cement
mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone for lintels, 1 Sqm Rs. 380.00 1.1 418
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.27 619.3044
Rs.1,037.30
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.14 256.5
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.449.16
Sundry
1 Sundries 1 Re Rs. 9.00 1.2 10.8
Rs.10.80
After rounding off: Rs.1,759.30 Total Amount of M and L Rs.1,497.26
Add 17.5 % OH and CP Rs.262.02
Total Rs.1,759.29

ITEM No. 6038.01


Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, but except
stone in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.27 362.7288
Rs.362.73
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.05 236.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.953.40 Total Amount of M and L Rs.811.44
Add 17.5 % OH and CP Rs.142.00
Total Rs.953.44

445 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6038.02
Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, but except
stone in lime mortar 1:2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.27 386.532
Rs.386.53
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
3 Mason (Stone mason) 1 Day Rs. 225.00 1.05 236.25
Rs.428.91
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.981.40 Total Amount of M and L Rs.835.24
Add 17.5 % OH and CP Rs.146.17
Total Rs.981.41

ITEM No. 6038.03


Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, but except
stone in cement lime mortar 1:1:8.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement Lime mortar (1:1:8 ) excluding labour 1 Cum Rs. 845.34 0.27 228.2418
Rs.228.24
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Mason (Stone mason) 1 Day Rs. 225.00 1.14 256.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.449.16
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.819.20 Total Amount of M and L Rs.697.20
Add 17.5 % OH and CP Rs.122.01
Total Rs.819.21

446 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6038.04
Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, but except
stone in cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.27 460.1664
Rs.460.17
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Mason (Stone mason) 1 Day Rs. 225.00 1.14 256.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.449.16
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.1,091.70 Total Amount of M and L Rs.929.13
Add 17.5 % OH and CP Rs.162.60
Total Rs.1,091.72

ITEM No. 6038.05


Squared rubble walling jodhpur type regular coursed, well bonded, bedded and solidly hearted, but except
stone in cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.27 619.3044
Rs.619.30
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.14 256.5
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
3 Bhisty including mussack 1 Day Rs. 169.00 0.09 15.21
Rs.449.16
Sundry
1 Sundries 1 Re Rs. 9.00 2.2 19.8
Rs.19.80
After rounding off: Rs.1,278.70 Total Amount of M and L Rs.1,088.26
Add 17.5 % OH and CP Rs.190.45
Total Rs.1,278.71

447 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6039.01
Add to items 6035 to 6038 for squared rubble walling jodhpur type brought to courses and regular coursed
curved on plan to a mean radius not exceeding 6 m. With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone chittar quarried 1 Cum Rs. 450.00 0.09 40.5
Rs.40.50
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
2 Mason (Stone mason) 1 Day Rs. 225.00 0.2 45
Rs.51.76
After rounding off: Rs.108.40 Total Amount of M and L Rs.92.26
Add 17.5 % OH and CP Rs.16.15
Total Rs.108.41

ITEM No. 6039.02


Add to items 6035 to 6038 for squared rubble walling jodhpur type brought to courses and regular coursed
curved on plan to a mean radius not exceeding 6 m. Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
2 Mason (Stone mason) 1 Day Rs. 225.00 0.2 45
Rs.51.76
After rounding off: Rs.60.80 Total Amount of M and L Rs.51.76
Add 17.5 % OH and CP Rs.9.06
Total Rs.60.82

ITEM No. 6040


Extra over items 6035 and 6036 for hammer dressing to face stones with maximum depression on face from a
straight edge not exceeding 20 mm and dresing face beds and joints as specified to squared rubble walling
jodhpur type, brought upto cou
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.3 67.5
Rs.67.50
After rounding off: Rs.79.30 Total Amount of M and L Rs.67.50
Add 17.5 % OH and CP Rs.11.81
Total Rs.79.31

ITEM No. 6041


Extra over items 6035 and 6036 for ditto to squared rubble walling, regular coursed, jodhpur type.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.45 101.25
Rs.101.25
After rounding off: Rs.119.00 Total Amount of M and L Rs.101.25
Add 17.5 % OH and CP Rs.17.72
Total Rs.118.97

448 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6042
External angles (for quoins and jambs ) in facing for walling of random rubble or polygonal rubble, uncoursed
or brought upto courses and squared rubble masonry, regular coursed, Secunderabad and Bangalors types.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.03 6.75
2 Stone dresser 1 Day Rs. 225.00 0.2 45
Rs.51.75
After rounding off: Rs.60.80 Total Amount of M and L Rs.51.75
Add 17.5 % OH and CP Rs.9.06
Total Rs.60.81

ITEM No. 6043


External angles (for quoins and jambs ) in facing for walling of squared rubble, uncoursed or brought upto
courses.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.26 58.5
2 Mason (Stone mason) 1 Day Rs. 225.00 0.03 6.75
Rs.65.25
After rounding off: Rs.76.70 Total Amount of M and L Rs.65.25
Add 17.5 % OH and CP Rs.11.42
Total Rs.76.67

ITEM No. 6044


External angles (for quoins and jambs ) in facing for walling of squared rubble, regular coursed.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.03 6.75
2 Stone dresser 1 Day Rs. 225.00 0.29 65.25
Rs.72.00
After rounding off: Rs.84.60 Total Amount of M and L Rs.72.00
Add 17.5 % OH and CP Rs.12.60
Total Rs.84.60

ITEM No. 6045


External angles (for quoins and jambs ) in facing for block - in - course walling.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.6 135
2 Mason (Stone mason) 1 Day Rs. 225.00 0.03 6.75
Rs.141.75
After rounding off: Rs.166.60 Total Amount of M and L Rs.141.75
Add 17.5 % OH and CP Rs.24.81
Total Rs.166.56

449 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6046
External angles (for quoins and jambs ) in facing for ashlar walling.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.82 184.5
2 Mason (Stone mason) 1 Day Rs. 225.00 0.03 6.75
Rs.191.25
After rounding off: Rs.224.70 Total Amount of M and L Rs.191.25
Add 17.5 % OH and CP Rs.33.47
Total Rs.224.72

ITEM No. 6047


External angles (for quoins and jambs ) in facing for squared rubble walling jodhpur type, brought upto courses.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.03 6.75
2 Stone dresser 1 Day Rs. 225.00 0.17 38.25
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 6048


External angles (for quoins and jambs ) in facing, regular coursed.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.03 6.75
2 Stone dresser 1 Day Rs. 225.00 0.19 42.75
Rs.49.50
After rounding off: Rs.58.20 Total Amount of M and L Rs.49.50
Add 17.5 % OH and CP Rs.8.66
Total Rs.58.16

ITEM No. 6049


Extra over random or polygonal rubble facings for arches with facework as on random rubble, but jointes
radiating dressed as specified including any rough cutting over and under arches.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.37 83.25
Rs.83.25
After rounding off: Rs.97.80 Total Amount of M and L Rs.83.25
Add 17.5 % OH and CP Rs.14.57
Total Rs.97.82

450 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6050
Extra over squared rubble facing for arches finished match the facings with beds and joints as specified (fair
cutting for skews and over and under arches to be measured separately.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 0.74 166.5
Rs.166.50
After rounding off: Rs.195.60 Total Amount of M and L Rs.166.50
Add 17.5 % OH and CP Rs.29.14
Total Rs.195.64

ITEM No. 6051


Extra over block - in - courses facing for arches finished match the facings with beds and joints as specified (fair
cutting for skews and over and under arches to be measured separately..
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 1.98 445.5
Rs.445.50
After rounding off: Rs.523.50 Total Amount of M and L Rs.445.50
Add 17.5 % OH and CP Rs.77.96
Total Rs.523.46

ITEM No. 6052


Extra over ashlar facings for arches finished match the facings with beds and joints as specified (fair cutting for
skews and over and under arches to be measured separately..
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone dresser 1 Day Rs. 225.00 1.85 416.25
Rs.416.25
After rounding off: Rs.489.10 Total Amount of M and L Rs.416.25
Add 17.5 % OH and CP Rs.72.84
Total Rs.489.09

ITEM No. 6053


Fair cutting (Straight or circular ) to facings of squared stone of any description except ashlar, 7.5 cm in depth
as for shtow backs or over and under arches, etc.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Quarried stone for wailing 1 Cum Rs. 600.00 0.007 4.2
Rs.4.20
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.15 33.75
Rs.33.75
After rounding off: Rs.44.60 Total Amount of M and L Rs.37.95
Add 17.5 % OH and CP Rs.6.64
Total Rs.44.59

451 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6054
Fair cutting (Straight or circular ) to facings of ashlar facings (any finish to face ) 7.5 cm in depthas for skew
backs or over and under arches, etc.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.50.20 Total Amount of M and L Rs.42.75
Add 17.5 % OH and CP Rs.7.48
Total Rs.50.23

ITEM No. 6055.01


Boulder filling dry, handpacked tightly, as in wire crate apron bunds 9Wire crate measured separately) With
materials and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boulders exc 15cm upto 30 cm dia 1 Cum Rs. 350.00 1.05 367.5
Rs.367.50
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.35 59.15
2 Mason (Stone mason) 1 Day Rs. 225.00 0.35 78.75
Rs.137.90
After rounding off: Rs.593.80 Total Amount of M and L Rs.505.40
Add 17.5 % OH and CP Rs.88.45
Total Rs.593.85

ITEM No. 6055.02


Boulder filling dry, handpacked tightly, as in wire crate apron bunds 9Wire crate measured separately) Except
boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.35 78.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.35 59.15
Rs.137.90
After rounding off: Rs.162.00 Total Amount of M and L Rs.137.90
Add 17.5 % OH and CP Rs.24.13
Total Rs.162.03

452 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6056.01
Ditto in vertical bunds with slopping face With materials and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boulders exc 15cm upto 30 cm dia 1 Cum Rs. 350.00 0.525 183.75
2 Boulders 7 to 15 cm dia 1 Cum Rs. 400.00 0.525 210
Rs.393.75
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
Rs.226.95
After rounding off: Rs.729.30 Total Amount of M and L Rs.620.70
Add 17.5 % OH and CP Rs.108.62
Total Rs.729.32

ITEM No. 6056.02


Ditto in vertical bunds with slopping face Except boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
Rs.226.95
After rounding off: Rs.266.70 Total Amount of M and L Rs.226.95
Add 17.5 % OH and CP Rs.39.72
Total Rs.266.67

ITEM No. 6057.01


Boulder pitching, laid dry, hand packed tightly With materials and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boulders 7 to 15 cm dia 1 Cum Rs. 400.00 0.525 210
2 Boulders exc 15cm upto 30 cm dia 1 Cum Rs. 350.00 0.525 183.75
Rs.393.75
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
2 Mason (Stone mason) 1 Day Rs. 225.00 0.35 78.75
Rs.256.20
Sundry
1 Sundries 1 Re Rs. 9.00 0.35 3.15
Rs.3.15
After rounding off: Rs.767.40 Total Amount of M and L Rs.653.10
Add 17.5 % OH and CP Rs.114.29
Total Rs.767.39

453 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6057.02
Boulder pitching, laid dry, hand packed tightly Except boulders.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.35 78.75
2 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
Rs.256.20
Sundry
1 Sundries 1 Re Rs. 9.00 0.35 3.15
Rs.3.15
After rounding off: Rs.304.70 Total Amount of M and L Rs.259.35
Add 17.5 % OH and CP Rs.45.39
Total Rs.304.74

ITEM No. 6058


Add to item 0068 if pitching is grouted with cement and sand mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.1 170.432
Rs.170.43
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.18 40.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
3 Bhisty including mussack 1 Day Rs. 169.00 0.35 59.15
Rs.136.83
After rounding off: Rs.361.00 Total Amount of M and L Rs.307.26
Add 17.5 % OH and CP Rs.53.77
Total Rs.361.03

ITEM No. 6059.01


Cutting openings through wallls for door, window and other opernings, etc. or cutting out defective masonry
for underpinning including providing, fixing and removing, shorting, cleaning and stacking stone and removing
surplus to store and rubbish of the premises old masonry wall bult in Mud Mortar
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.7 118.3
2 Mason (Stone mason) 1 Day Rs. 225.00 0.35 78.75
Rs.197.05
Sundry
1 Sundries 1 Re Rs. 9.00 2.9 26.1
Rs.26.10
After rounding off: Rs.262.20 Total Amount of M and L Rs.223.15
Add 17.5 % OH and CP Rs.39.05
Total Rs.262.20

454 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6059.02
Cutting openings through wallls for door, window and other opernings, etc. or cutting out defective masonry
for underpinning including providing, fixing and removing, shorting, cleaning and stacking stone and removing
surplus to store and rubbish of the premises old masonry wall bult in Lime Mortar
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.53 119.25
2 Mazdoor-man, 1 Day Rs. 169.00 1.06 179.14
Rs.298.39
Sundry
1 Sundries 1 Re Rs. 9.00 2.9 26.1
Rs.26.10
After rounding off: Rs.381.30 Total Amount of M and L Rs.324.49
Add 17.5 % OH and CP Rs.56.79
Total Rs.381.28

ITEM No. 6059.03


Cutting openings through wallls for door, window and other opernings, etc. or cutting out defective masonry
for underpinning including providing, fixing and removing, shorting, cleaning and stacking stone and removing
surplus to store and rubbish of the premises old masonry wall bult in Cement Mortar
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.7 157.5
2 Mazdoor-man, 1 Day Rs. 169.00 1.4 236.6
Rs.394.10
Sundry
1 Sundries 1 Re Rs. 9.00 2.9 26.1
Rs.26.10
After rounding off: Rs.493.70 Total Amount of M and L Rs.420.20
Add 17.5 % OH and CP Rs.73.54
Total Rs.493.74

455 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6060.01
Forming jambs, etc., to openings (to foregoing item ), with stone supplied by MES including cutting, toothings
and properly bonding into old work, including facing and pointing (if necessary ) to match existing work,
complet New work built in lime mortar
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.082 110.16208
Rs.110.16
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.514 86.866
2 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
3 Mason (Stone mason) 1 Day Rs. 225.00 0.49 110.25
Rs.198.81
Sundry
1 Sundries 1 Re Rs. 9.00 0.65 5.85
Rs.5.85
After rounding off: Rs.369.90 Total Amount of M and L Rs.314.82
Add 17.5 % OH and CP Rs.55.09
Total Rs.369.91

ITEM No. 6060.02


Forming jambs, etc., to openings (to foregoing item ), with stone supplied by MES including cutting, toothings
and properly bonding into old work, including facing and pointing (if necessary ) to match existing work,
complet New work built in Cement morta
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.082 139.75424
Rs.139.75
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.607 136.575
2 Bhisty including mussack 1 Day Rs. 169.00 0.025 4.225
3 Mazdoor-man, 1 Day Rs. 169.00 0.589 99.541
Rs.240.34
Sundry
1 Sundries 1 Re Rs. 9.00 0.65 5.85
Rs.5.85
After rounding off: Rs.453.50 Total Amount of M and L Rs.385.95
Add 17.5 % OH and CP Rs.67.54
Total Rs.453.49

456 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6060.03
Forming jambs, etc., to openings (to foregoing item ), with stone supplied by MES including cutting, toothings
and properly bonding into old work, including facing and pointing (if necessary ) to match existing work,
complet New work built in Cement morta
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.082 188.08504
Rs.188.09
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.025 4.225
2 Mazdoor-man, 1 Day Rs. 169.00 0.589 99.541
3 Mason (Stone mason) 1 Day Rs. 225.00 0.607 136.575
Rs.240.34
Sundry
1 Sundries 1 Re Rs. 9.00 0.65 5.85
Rs.5.85
After rounding off: Rs.510.30 Total Amount of M and L Rs.434.28
Add 17.5 % OH and CP Rs.76.00
Total Rs.510.27

ITEM No. 6061.01


Making good under sills (or over arches, lintels and bressummers) including alll pinning as necessary New work
built in lime mortar 1:3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.069 92.69736
Rs.92.70
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.337 75.825
2 Mazdoor-man, 1 Day Rs. 169.00 0.394 66.586
3 Bhisty including mussack 1 Day Rs. 169.00 0.01 1.69
Rs.144.10
Sundry
1 Sundries 1 Re Rs. 9.00 0.65 5.85
Rs.5.85
After rounding off: Rs.285.10 Total Amount of M and L Rs.242.65
Add 17.5 % OH and CP Rs.42.46
Total Rs.285.11

457 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6061.02
Making good under sills (or over arches, lintels and bressummers) including alll pinning as necessary New work
built in Cement mortar 1:6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.069 117.59808
Rs.117.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.429 72.501
2 Mason (Stone mason) 1 Day Rs. 225.00 0.364 81.9
3 Bhisty including mussack 1 Day Rs. 169.00 0.025 4.225
Rs.158.63
Sundry
1 Sundries 1 Re Rs. 9.00 0.65 5.85
Rs.5.85
After rounding off: Rs.331.40 Total Amount of M and L Rs.282.07
Add 17.5 % OH and CP Rs.49.36
Total Rs.331.44

ITEM No. 6061.03


Making good under sills (or over arches, lintels and bressummers) including alll pinning as necessary New work
built in Cement mortar 1:4.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.069 158.26668
Rs.158.27
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.429 72.501
2 Mason (Stone mason) 1 Day Rs. 225.00 0.364 81.9
3 Bhisty including mussack 1 Day Rs. 169.00 0.025 4.225
Rs.158.63
Sundry
1 Sundries 1 Re Rs. 9.00 0.65 5.85
Rs.5.85
After rounding off: Rs.379.20 Total Amount of M and L Rs.322.74
Add 17.5 % OH and CP Rs.56.48
Total Rs.379.22

458 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6062.01
Cutting into old masonry to form toothings for and boundings in new bricks or stone work including making
good in mud mortar Old masonry walls built in Mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mud mortar 1 Cum Rs. 100.00 0.026 2.6
Rs.2.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.115 19.435
2 Mason (Stone mason) 1 Day Rs. 225.00 0.23 51.75
Rs.71.19
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.87.20 Total Amount of M and L Rs.74.24
Add 17.5 % OH and CP Rs.12.99
Total Rs.87.23

ITEM No. 6062.02


Cutting into old masonry to form toothings for and boundings in new bricks or stone work including making
good in mud mortar Old masonry walls built in Line mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.026 34.92944
Rs.34.93
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.15 25.35
2 Mason (Stone mason) 1 Day Rs. 225.00 0.29 65.25
Rs.90.60
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.148.00 Total Amount of M and L Rs.125.98
Add 17.5 % OH and CP Rs.22.05
Total Rs.148.03

459 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6062.03
Cutting into old masonry to form toothings for and boundings in new bricks or stone work including making
good in mud mortar Old masonry walls built in Cement mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.026 44.31232
Rs.44.31
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.38 85.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.19 32.11
Rs.117.61
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.190.80 Total Amount of M and L Rs.162.37
Add 17.5 % OH and CP Rs.28.42
Total Rs.190.79

ITEM No. 6063.01


Cutting into old masonry to form toothings for and boundings in new bricks or stone work including making
good in lime or cment mortar of the same mix as for new walling Old masonry walls built in Mud mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.013 22.15616
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.013 17.46472
Rs.39.62
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.23 51.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.115 19.435
Rs.71.19
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.130.70 Total Amount of M and L Rs.111.26
Add 17.5 % OH and CP Rs.19.47
Total Rs.130.73

460 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6063.02
Cutting into old masonry to form toothings for and boundings in new bricks or stone work including making
good in lime or cement mortar of the same mix as for new walling Old masonry walls built in Line mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.013 22.15616
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.013 17.46472
Rs.39.62
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.29 65.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.15 25.35
Rs.90.60
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.153.50 Total Amount of M and L Rs.130.67
Add 17.5 % OH and CP Rs.22.87
Total Rs.153.54

ITEM No. 6063.03


Cutting into old masonry to form toothings for and boundings in new bricks or stone work including making
good in lime or cment mortar of the same mix as for new walling Old masonry walls built in Cement mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.013 22.15616
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.013 17.46472
Rs.39.62
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.19 32.11
2 Mason (Stone mason) 1 Day Rs. 225.00 0.38 85.5
Rs.117.61
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.185.30 Total Amount of M and L Rs.157.68
Add 17.5 % OH and CP Rs.27.59
Total Rs.185.28

ITEM No. 6064


Leavelling and preparing uncoursed random or polygonal rubble walls receive concrete band courses, brick
courses, bounding courses, etc.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.12 27
2 Mazdoor-man, 1 Day Rs. 169.00 0.07 11.83
Rs.38.83
After rounding off: Rs.45.60 Total Amount of M and L Rs.38.83
Add 17.5 % OH and CP Rs.6.80
Total Rs.45.63
461 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6065
Leavelling and preparing uncoursed squared squared rubble walls receive concrete band courses, brick
courses, bounding courses, etc.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.06 10.14
2 Mason (Stone mason) 1 Day Rs. 225.00 0.09 20.25
Rs.30.39
After rounding off: Rs.35.70 Total Amount of M and L Rs.30.39
Add 17.5 % OH and CP Rs.5.32
Total Rs.35.71

ITEM No. 6066.01


Stone in block, set in lime mortar 1:3 or cement mortar 1:6 (as directed) in Bands, string and plinth courses,
blocking courses, plain plasters, etc. Grainte or trap for straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
Rs.859.95
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.3 557.7
2 Mason (Stone mason) 1 Day Rs. 225.00 25.8 5805
Rs.6,362.70
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.8,497.20 Total Amount of M and L Rs.7,231.65
Add 17.5 % OH and CP Rs.1,265.54
Total Rs.8,497.19

ITEM No. 6066.02


Stone in block, set in lime mortar 1:3 or cement mortar 1:6 (as directed) in Bands, string and plinth courses,
blocking courses, plain plasters, etc. Grainte or trap for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
Rs.859.95
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.3 557.7
2 Mason (Stone mason) 1 Day Rs. 225.00 40.6 9135
Rs.9,692.70
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.12,409.90 Total Amount of M and L Rs.10,561.65
Add 17.5 % OH and CP Rs.1,848.29
Total Rs.12,409.94
462 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6066.03
Stone in block, set in lime mortar 1:3 or cement mortar 1:6 (as directed) in Bands, string and plinth courses,
blocking courses, plain plasters, etc. Lime or sand stone for Straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Lime or sand stone 1 Cum Rs. 550.00 1.075 591.25
Rs.806.20
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 14.85 3341.25
2 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
Rs.3,789.10
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.5,410.10 Total Amount of M and L Rs.4,604.30
Add 17.5 % OH and CP Rs.805.75
Total Rs.5,410.05

ITEM No. 6066.04


Stone in block, set in lime mortar 1:3 or cement mortar 1:6 (as directed) in Bands, string and plinth courses,
blocking courses, plain plasters, etc. Lime or sand stone for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime or sand stone 1 Cum Rs. 550.00 1.075 591.25
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
Rs.806.20
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
2 Mason (Stone mason) 1 Day Rs. 225.00 22.25 5006.25
Rs.5,454.10
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.7,366.40 Total Amount of M and L Rs.6,269.30
Add 17.5 % OH and CP Rs.1,097.13
Total Rs.7,366.43

463 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6067.01
Stone in block, set in lime mortar 1:3 or cement mortar 1:6 (as directed) in moulded ; also moulded and
westhered conrices and window cills (sunk, weathered, throated, grooved for tonge, including stopped ends,
stools and returned fair ends ) Grainte or trap for straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
Rs.859.95
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.4 574.6
2 Mason (Stone mason) 1 Day Rs. 225.00 40.25 9056.25
Rs.9,630.85
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.12,337.30 Total Amount of M and L Rs.10,499.80
Add 17.5 % OH and CP Rs.1,837.47
Total Rs.12,337.27

ITEM No. 6067.02


Stone in block, set in lime mortar 1:3 or cement mortar 1:6 (as directed) in moulded ; also moulded and
westhered conrices and window cills (sunk, weathered, throated, grooved for tonge, including stopped ends,
stools and returned fair ends ) Grainte or trap for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
Rs.859.95
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 65 14625
2 Mazdoor-man, 1 Day Rs. 169.00 3.4 574.6
Rs.15,199.60
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.18,880.50 Total Amount of M and L Rs.16,068.55
Add 17.5 % OH and CP Rs.2,812.00
Total Rs.18,880.55

464 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6067.03
Stone in block, set in lime mortar 1:3 or cement mortar 1:6 (as directed) in moulded ; also moulded and
westhered conrices and window cills (sunk, weathered, throated, grooved for tonge, including stopped ends,
stools and returned fair ends ) Lime or sand stone for circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime or sand stone 1 Cum Rs. 550.00 1.075 591.25
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
Rs.806.20
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
2 Mason (Stone mason) 1 Day Rs. 225.00 22.25 5006.25
Rs.5,454.10
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.7,366.40 Total Amount of M and L Rs.6,269.30
Add 17.5 % OH and CP Rs.1,097.13
Total Rs.7,366.43

ITEM No. 6067.04


.Stone in block, set in lime mortar 1:3 or cement mortar 1:6 (as directed) in moulded ; also moulded and
westhered conrices and window cills (sunk, weathered, throated, grooved for tonge, including stopped ends,
stools and returned fair ends ) Lime or sand stone for Straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Lime or sand stone 1 Cum Rs. 550.00 1.075 591.25
Rs.806.20
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
2 Mason (Stone mason) 1 Day Rs. 225.00 34.25 7706.25
Rs.8,154.10
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.10,538.90 Total Amount of M and L Rs.8,969.30
Add 17.5 % OH and CP Rs.1,569.63
Total Rs.10,538.93

465 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6068.01
Quions, jambs stones, door or window heads, plain corbels, door cills, plain steps, parallel copings with
throated edges, etc. Grainte or trap for straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
Rs.859.95
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.3 557.7
2 Mason (Stone mason) 1 Day Rs. 225.00 30 6750
Rs.7,307.70
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.9,607.60 Total Amount of M and L Rs.8,176.65
Add 17.5 % OH and CP Rs.1,430.91
Total Rs.9,607.56

ITEM No. 6068.02


Quions, jambs stones, door or window heads, plain corbels, door cills, plain steps, parallel copings with
throated edges, etc. Grainte or trap for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
Rs.859.95
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 50.15 11283.75
2 Mazdoor-man, 1 Day Rs. 169.00 3.3 557.7
Rs.11,841.45
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.14,934.70 Total Amount of M and L Rs.12,710.40
Add 17.5 % OH and CP Rs.2,224.32
Total Rs.14,934.72

466 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6068.03
Quions, jambs stones, door or window heads, plain corbels, door cills, plain steps, parallel copings with
throated edges, etc. Lime or sand stone for Straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Lime or sand stone 1 Cum Rs. 550.00 1.075 591.25
Rs.806.20
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
2 Mason (Stone mason) 1 Day Rs. 225.00 17.65 3971.25
Rs.4,419.10
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.6,150.30 Total Amount of M and L Rs.5,234.30
Add 17.5 % OH and CP Rs.916.00
Total Rs.6,150.30

ITEM No. 6068.04


Quions, jambs stones, door or window heads, plain corbels, door cills, plain steps, parallel copings with
throated edges, etc. Lime or sand stone for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Lime or sand stone 1 Cum Rs. 550.00 1 550
Rs.764.95
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
2 Mason (Stone mason) 1 Day Rs. 225.00 26.5 5962.5
Rs.6,410.35
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.8,441.60 Total Amount of M and L Rs.7,184.30
Add 17.5 % OH and CP Rs.1,257.25
Total Rs.8,441.55

467 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6069.01
Kneelers, each stones,key blocks, etc., with or without chamfered margins and feather edge or saddle - back
copings (with throated edges) Grainte or trap for straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
Rs.859.95
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 35.3 7942.5
2 Mazdoor-man, 1 Day Rs. 169.00 3.3 557.7
Rs.8,500.20
Sundry
1 Sundries 1 Re Rs. 9.00 0.995 8.955
Rs.8.96
After rounding off: Rs.11,008.70 Total Amount of M and L Rs.9,369.11
Add 17.5 % OH and CP Rs.1,639.59
Total Rs.11,008.70

ITEM No. 6069.02


Kneelers, each stones,key blocks, etc., with or without chamfered margins and feather edge or saddle - back
copings (with throated edges) Grainte or trap for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
Rs.859.95
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 55.8 12555
2 Mazdoor-man, 1 Day Rs. 169.00 3.3 557.7
Rs.13,112.70
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.16,428.40 Total Amount of M and L Rs.13,981.65
Add 17.5 % OH and CP Rs.2,446.79
Total Rs.16,428.44

468 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6069.03
Kneelers, each stones,key blocks, etc., with or without chamfered margins and feather edge or saddle - back
copings (with throated edges) Lime or sand stone for Straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Lime or sand stone 1 Cum Rs. 550.00 1.075 591.25
Rs.806.20
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
2 Mason (Stone mason) 1 Day Rs. 225.00 19.4 4365
Rs.4,812.85
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.6,613.00 Total Amount of M and L Rs.5,628.05
Add 17.5 % OH and CP Rs.984.91
Total Rs.6,612.96

ITEM No. 6069.04


Kneelers, each stones,key blocks, etc., with or without chamfered margins and feather edge or saddle - back
copings (with throated edges) Lime or sand stone for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Lime or sand stone 1 Cum Rs. 550.00 1.075 591.25
Rs.806.20
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
2 Mason (Stone mason) 1 Day Rs. 225.00 30 6750
Rs.7,197.85
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.9,415.30 Total Amount of M and L Rs.8,013.05
Add 17.5 % OH and CP Rs.1,402.28
Total Rs.9,415.33

469 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6070.01
Shafts or circular columns (swelled or diminished ) included moulded caps and base to columns Grainte or trap
for straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
Rs.859.95
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.3 557.7
2 Mason (Stone mason) 1 Day Rs. 225.00 49.8 11205
Rs.11,762.70
Sundry
1 Sundries 1 Re Rs. 9.00 0.99 8.91
Rs.8.91
After rounding off: Rs.14,842.10 Total Amount of M and L Rs.12,631.56
Add 17.5 % OH and CP Rs.2,210.52
Total Rs.14,842.08

ITEM No. 6070.02


Shafts or circular columns (swelled or diminished ) included moulded caps and base to columns Grainte or trap
for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1.075 645
Rs.859.95
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 74.9 16852.5
2 Mazdoor-man, 1 Day Rs. 169.00 3.3 557.7
Rs.17,410.20
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.21,478.00 Total Amount of M and L Rs.18,279.15
Add 17.5 % OH and CP Rs.3,198.85
Total Rs.21,478.00

470 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6070.03
Shafts or circular columns (swelled or diminished ) included moulded caps and base to columns Lime or sand
stone for Straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime or sand stone 1 Cum Rs. 550.00 1.075 591.25
2 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
Rs.806.20
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 25.1 5647.5
2 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
Rs.6,095.35
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.8,119.90 Total Amount of M and L Rs.6,910.55
Add 17.5 % OH and CP Rs.1,209.35
Total Rs.8,119.90

ITEM No. 6070.04


Shafts or circular columns (swelled or diminished ) included moulded caps and base to columns Lime or sand
stone for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
2 Lime or sand stone 1 Cum Rs. 550.00 1.075 591.25
Rs.806.20
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 39.6 8910
2 Mazdoor-man, 1 Day Rs. 169.00 2.65 447.85
Rs.9,357.85
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.11,953.30 Total Amount of M and L Rs.10,173.05
Add 17.5 % OH and CP Rs.1,780.28
Total Rs.11,953.33

ITEM No. 6072.01


Add to items 06066 to 06070 if face stones are close picked dressed Grainte or trap for straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.53 344.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.33 55.77
Rs.400.02
After rounding off: Rs.470.00 Total Amount of M and L Rs.400.02
Add 17.5 % OH and CP Rs.70.00
Total Rs.470.02

471 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6072.02
Add to items 06066 to 06070 if face stones are close picked dressed Grainte or trap for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.1699 488.2275
2 Mazdoor-man, 1 Day Rs. 169.00 0.66 111.54
Rs.599.77
After rounding off: Rs.704.70 Total Amount of M and L Rs.599.77
Add 17.5 % OH and CP Rs.104.96
Total Rs.704.73

ITEM No. 6072.03


Add to items 06066 to 06070 if face stones are close picked dressed Lime or sand stone for Straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.17 28.73
2 Mason (Stone mason) 1 Day Rs. 225.00 0.75 168.75
Rs.197.48
After rounding off: Rs.232.00 Total Amount of M and L Rs.197.48
Add 17.5 % OH and CP Rs.34.56
Total Rs.232.04

ITEM No. 6072.04


Add to items 06066 to 06070 if face stones are close picked dressed Lime or sand stone for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.33 55.77
2 Mason (Stone mason) 1 Day Rs. 225.00 1.085 244.125
Rs.299.90
After rounding off: Rs.352.40 Total Amount of M and L Rs.299.90
Add 17.5 % OH and CP Rs.52.48
Total Rs.352.38

ITEM No. 6073.01


Add to items 06066 to 06070 if face stones are fine tooled Grainte or trap for straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.6 360
2 Mazdoor-man, 1 Day Rs. 169.00 0.33 55.77
Rs.415.77
After rounding off: Rs.488.50 Total Amount of M and L Rs.415.77
Add 17.5 % OH and CP Rs.72.76
Total Rs.488.53

472 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6073.02
Add to items 06066 to 06070 if face stones are fine tooled Grainte or trap for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.34 526.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.66 111.54
Rs.638.04
After rounding off: Rs.749.70 Total Amount of M and L Rs.638.04
Add 17.5 % OH and CP Rs.111.66
Total Rs.749.70

ITEM No. 6073.03


Add to items 06066 to 06070 if face stones are fine tooled Lime or sand stone for Straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.33 55.77
2 Mason (Stone mason) 1 Day Rs. 225.00 0.8 180
Rs.235.77
After rounding off: Rs.277.00 Total Amount of M and L Rs.235.77
Add 17.5 % OH and CP Rs.41.26
Total Rs.277.03

ITEM No. 6073.04


Add to items 06066 to 06070 if face stones are fine tooled Lime or sand stone for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.17 263.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.66 111.54
Rs.374.79
After rounding off: Rs.440.40 Total Amount of M and L Rs.374.79
Add 17.5 % OH and CP Rs.65.59
Total Rs.440.38

ITEM No. 6074.01


Settings only dressed masonry, and descrition and in any position (excleusive of dressed stones but including
mortar ) Grainte or trap for straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
Rs.214.95
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 3 675
2 Mazdoor-man, 1 Day Rs. 169.00 4.4 743.6
Rs.1,418.60
After rounding off: Rs.1,919.40 Total Amount of M and L Rs.1,633.55
Add 17.5 % OH and CP Rs.285.87
Total Rs.1,919.42

473 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6074.02
Settings only dressed masonry, and descrition and in any position (excleusive of dressed stones but including
mortar ) Grainte or trap for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
Rs.214.95
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 3 675
2 Mazdoor-man, 1 Day Rs. 169.00 6.5 1098.5
Rs.1,773.50
After rounding off: Rs.2,336.40 Total Amount of M and L Rs.1,988.45
Add 17.5 % OH and CP Rs.347.98
Total Rs.2,336.43

ITEM No. 6074.03


Settings only dressed masonry, and descrition and in any position (excleusive of dressed stones but including
mortar ) Lime or sand stone for Straight work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
Rs.214.95
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.4 405.6
2 Mason (Stone mason) 1 Day Rs. 225.00 2.65 596.25
Rs.1,001.85
After rounding off: Rs.1,429.70 Total Amount of M and L Rs.1,216.80
Add 17.5 % OH and CP Rs.212.94
Total Rs.1,429.74

ITEM No. 6074.04


Settings only dressed masonry, and descrition and in any position (excleusive of dressed stones but including
mortar ) Lime or sand stone for Circular work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.16 214.9504
Rs.214.95
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.65 596.25
2 Mazdoor-man, 1 Day Rs. 169.00 3.4 574.6
Rs.1,170.85
After rounding off: Rs.1,628.30 Total Amount of M and L Rs.1,385.80
Add 17.5 % OH and CP Rs.242.52
Total Rs.1,628.32

474 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6075.01
Stone slab 25 mm to 35 mm thick dressed true and square, in one length not less than 60 cm and not
exceeding 120 cm in copings, window cills, chajjas, sunshades, etc., punched dressed on exposed faces and self
faced on the embedded unexposed beds and join
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.018 25.7688
2 stone slab 25mm to 35mm thick 1 Sqm Rs. 170.00 1.1 187
Rs.212.77
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.11 24.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
Rs.45.88
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.305.00 Total Amount of M and L Rs.259.54
Add 17.5 % OH and CP Rs.45.42
Total Rs.304.96

ITEM No. 6075.02


Stone slab 25 mm to 35 mm thick dressed true and square, in one length not less than 60 cm and not
exceeding 120 cm in copings, window cills, chajjas, sunshades, etc., punched dressed on exposed faces and self
faced on the embedded unexposed beds and join
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 stone slab 25mm to 35mm thick 1 Sqm Rs. 170.00 1.1 187
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.018 41.28696
Rs.228.29
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
2 Mason (Stone mason) 1 Day Rs. 225.00 0.11 24.75
Rs.45.88
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.323.20 Total Amount of M and L Rs.275.06
Add 17.5 % OH and CP Rs.48.14
Total Rs.323.20

475 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6075.03
Stone slab 25 mm to 35 mm thick dressed true and square, in one length not less than 60 cm and not
exceeding 120 cm in copings, window cills, chajjas, sunshades, etc., punched dressed on exposed faces and self
faced on the embedded unexposed beds and join
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:2 ) excluding labour 1 Cum Rs. 1,431.60 0.018 25.7688
Rs.25.77
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
2 Mason (Stone mason) 1 Day Rs. 225.00 0.11 24.75
Rs.45.88
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.85.20 Total Amount of M and L Rs.72.54
Add 17.5 % OH and CP Rs.12.70
Total Rs.85.24

ITEM No. 6075.04


Stone slab 25 mm to 35 mm thick dressed true and square, in one length not less than 60 cm and not
exceeding 120 cm in copings, window cills, chajjas, sunshades, etc., punched dressed on exposed faces and self
faced on the embedded unexposed beds and join
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.018 41.28696
Rs.41.29
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.125 21.125
2 Mason (Stone mason) 1 Day Rs. 225.00 0.11 24.75
Rs.45.88
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.103.50 Total Amount of M and L Rs.88.06
Add 17.5 % OH and CP Rs.15.41
Total Rs.103.47

476 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6076.02
Sand stone in sun - shades, chajjas, shelves, cills, landings,cover stones templates, etc. not exceeding 2 m in
length punched dressed on face and alond exposed edges self faced on other side and set and pointed in lime
mortar 1;2 or cement mortar 1:4 com
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.012 27.52464
2 Sand stone slab 5cm thick 1 Sqm Rs. 126.00 1.1 138.6
Rs.166.12
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.118 19.942
2 Mason (Stone mason) 1 Day Rs. 225.00 0.2 45
Rs.64.94
After rounding off: Rs.271.50 Total Amount of M and L Rs.231.07
Add 17.5 % OH and CP Rs.40.44
Total Rs.271.50

ITEM No. 6076.03


Sand stone in sun - shades, chajjas, shelves, cills, landings,cover stones templates, etc. not exceeding 2 m in
length punched dressed on face and alond exposed edges self faced on other side and set and pointed in lime
mortar 1;2 or cement mortar 1:4 com
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.012 27.52464
2 Sand stone slab 7.5cm thick 1 Sqm Rs. 157.60 1.1 173.36
Rs.200.88
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.118 19.942
2 Mason (Stone mason) 1 Day Rs. 225.00 0.207 46.575
Rs.66.52
After rounding off: Rs.314.20 Total Amount of M and L Rs.267.40
Add 17.5 % OH and CP Rs.46.80
Total Rs.314.20

477 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6076.04
Sand stone in sun - shades, chajjas, shelves, cills, landings,cover stones templates, etc. not exceeding 2 m in
length punched dressed on face and alond exposed edges self faced on other side and set and pointed in lime
mortar 1;2 or cement mortar 1:4 com
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Sand stone slab 10cm thick 1 Sqm Rs. 182.00 1.1 200.2
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.012 27.52464
Rs.227.72
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.215 48.375
2 Mazdoor-man, 1 Day Rs. 169.00 0.118 19.942
Rs.68.32
After rounding off: Rs.347.80 Total Amount of M and L Rs.296.04
Add 17.5 % OH and CP Rs.51.81
Total Rs.347.85

ITEM No. 6076.05


Sand stone in sun - shades, chajjas, shelves, cills, landings,cover stones templates, etc. not exceeding 2 m in
length punched dressed on face and alond exposed edges self faced on other side and set and pointed in lime
mortar 1;2 or cement mortar 1:4 com
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.012 27.52464
Rs.27.52
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.207 46.575
2 Mazdoor-man, 1 Day Rs. 169.00 0.118 19.942
Rs.66.52
After rounding off: Rs.110.50 Total Amount of M and L Rs.94.04
Add 17.5 % OH and CP Rs.16.46
Total Rs.110.50

ITEM No. 6077.02


Lime stone slabs in ditto, set and pointed in lime mortar 1:2 or cement mortar 1:4, complete Thickness of slab
5 cm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime stone slab 50 mm 1 Sqm Rs. 150.00 1.1 165
Rs.165.00
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.215 48.375
2 Mazdoor-man, 1 Day Rs. 169.00 0.118 19.942
Rs.68.32
After rounding off: Rs.274.10 Total Amount of M and L Rs.233.32
Add 17.5 % OH and CP Rs.40.83
Total Rs.274.15

478 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6078.01
Roughly squared stone lintels hammer dressed on face and soffits, hoisted, set and pointed in lime mortar 1:3
or cement mortar 1:6 complete, not exceeding 3 m in length With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone 2m not exceeding 4m length 1 Cum Rs. 450.00 1 450
2 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.012 20.45184
Rs.470.45
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.57 128.25
2 Mazdoor-man, 1 Day Rs. 169.00 4.52 763.88
Rs.892.13
After rounding off: Rs.1,601.00 Total Amount of M and L Rs.1,362.58
Add 17.5 % OH and CP Rs.238.45
Total Rs.1,601.03

ITEM No. 6078.02


Roughly squared stone lintels hammer dressed on face and soffits, hoisted, set and pointed in lime mortar 1:3
or cement mortar 1:6 complete, not exceeding 3 m in length Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.012 20.45184
Rs.20.45
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.57 128.25
2 Mazdoor-man, 1 Day Rs. 169.00 4.52 763.88
Rs.892.13
After rounding off: Rs.1,072.30 Total Amount of M and L Rs.912.58
Add 17.5 % OH and CP Rs.159.70
Total Rs.1,072.28

ITEM No. 6079.01


100 X 75mm, rebated, karoli stone chowkats with exposed faces close picked dressed, including 4 bolt holes
'per upright', erected in position and bedded and pointed in lime mortar 1:3 or cement mortar 1:6 (Bolts
measured separately). With material and lab
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Karoli stone 1 Cum Rs. 350.00 0.0075 2.625
Rs.2.63
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.011 1.859
2 Mason (Stone mason) 1 Day Rs. 225.00 0.82 184.5
Rs.186.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.224.20 Total Amount of M and L Rs.190.78
Add 17.5 % OH and CP Rs.33.39
Total Rs.224.17
479 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6079.02
100 X 75mm, rebated, karoli stone chowkats with exposed faces close picked dressed, including 4 bolt holes
'per upright', erected in position and bedded and pointed in lime mortar 1:3 or cement mortar 1:6 (Bolts
measured separately). Except stone chowkats
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.06 13.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.011 1.859
Rs.15.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.20.20 Total Amount of M and L Rs.17.16
Add 17.5 % OH and CP Rs.3.00
Total Rs.20.16

ITEM No. 6080.01


125 X 75mm, rebated, karoli stone chowkats with exposed faces close picked dressed, including 4 bolt holes
'per upright', erected in position and bedded and pointed in lime mortar 1:3 or cement mortar 1:6 (Bolts
measured separately).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Karoli stone 1 Cum Rs. 350.00 0.01 3.5
Rs.3.50
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.82 184.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.011 1.859
Rs.186.36
Sundry
1 Sundries 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.225.20 Total Amount of M and L Rs.191.66
Add 17.5 % OH and CP Rs.33.54
Total Rs.225.20

480 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6080.02
125 X 75mm, rebated, karoli stone chowkats with exposed faces close picked dressed, including 4 bolt holes
'per upright', erected in position and bedded and pointed in lime mortar 1:3 or cement mortar 1:6 (Bolts
measured separately). Except stone chowkats
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.067 15.075
2 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
Rs.18.46
Sundry
1 Sundries 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.23.80 Total Amount of M and L Rs.20.26
Add 17.5 % OH and CP Rs.3.54
Total Rs.23.80

ITEM No. 6081.01


Add to items 6079 and 6080 for additional rebates. With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.2 33.8
2 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
Rs.83.30
Sundry
1 Sundries 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.100.00 Total Amount of M and L Rs.85.10
Add 17.5 % OH and CP Rs.14.89
Total Rs.99.99

ITEM No. 6081.02


Add to items 6079 and 6080 for additional rebates. Except stone chowkats.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.071 15.975
2 Mazdoor-man, 1 Day Rs. 169.00 0.022 3.718
Rs.19.69
Sundry
1 Sundries 1 Re Rs. 9.00 0.195 1.755
Rs.1.76
After rounding off: Rs.25.20 Total Amount of M and L Rs.21.45
Add 17.5 % OH and CP Rs.3.75
Total Rs.25.20

481 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6082.01
Jodhpur stone roof slabs, self faced 7.5cm to 10cm thick, 25cm to 35cm wide, hoisted and set, jointed and
grouted in lime mortar 1:3 or cement mortar 1:6 complete. With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.01 13.4344
2 Jodhpur stone slab 7.5cm to 10cm thick 1 Sqm Rs. 350.00 1.05 367.5
Rs.380.93
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
2 Mason (Stone mason) 1 Day Rs. 225.00 0.16 36
Rs.145.85
After rounding off: Rs.619.00 Total Amount of M and L Rs.526.78
Add 17.5 % OH and CP Rs.92.19
Total Rs.618.97

ITEM No. 6082.02


Jodhpur stone roof slabs, self faced 7.5cm to 10cm thick, 25cm to 35cm wide, hoisted and set, jointed and
grouted in lime mortar 1:3 or cement mortar 1:6 complete. Except stone slabs.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.01 13.4344
Rs.13.43
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.16 36
2 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
Rs.145.85
After rounding off: Rs.187.20 Total Amount of M and L Rs.159.28
Add 17.5 % OH and CP Rs.27.87
Total Rs.187.16

ITEM No. 6083.01


Jodhpur stone roof slabs, self faced 7.5cm to 10cm thick, 25cm to 35cm wide, hoisted and set, jointed and
grouted in cement mortar 1:3 complete. With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone slab 7.5cm to 10cm thick 1 Sqm Rs. 350.00 1.05 367.5
Rs.367.50
Labour
1 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.01 28.0294
2 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
3 Mason (Stone mason) 1 Day Rs. 225.00 0.16 36
Rs.173.88
After rounding off: Rs.636.10 Total Amount of M and L Rs.541.38
Add 17.5 % OH and CP Rs.94.74
Total Rs.636.12

482 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6083.02
Jodhpur stone roof slabs, self faced 7.5cm to 10cm thick, 25cm to 35cm wide, hoisted and set, jointed and
grouted in cement mortar 1:3 complete. Except stone slabs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.01 28.0294
2 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
3 Mason (Stone mason) 1 Day Rs. 225.00 0.16 36
Rs.173.88
After rounding off: Rs.204.30 Total Amount of M and L Rs.173.88
Add 17.5 % OH and CP Rs.30.43
Total Rs.204.31

ITEM No. 6084.01


Jodhpur stone roof slabs, self faced 10cm to 12.5cm thick, 25cm to 35cm wide, hoisted and set, jointed and
grouted in lime mortar 1:3 or cement mortar 1:6 complete. With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.01 13.4344
2 Jodhpur slab 12.5cm thick* 1 Sqm Rs. 380.00 1.05 399
Rs.412.43
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
2 Mason (Stone mason) 1 Day Rs. 225.00 0.16 36
Rs.145.85
After rounding off: Rs.656.00 Total Amount of M and L Rs.558.28
Add 17.5 % OH and CP Rs.97.70
Total Rs.655.98

ITEM No. 6084.02


Jodhpur stone roof slabs, self faced 10cm to 12.5cm thick, 25cm to 35cm wide, hoisted and set, jointed and
grouted in lime mortar 1:3 or cement mortar 1:6 complete. Except sone slabs
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime mortar (1:3 ) excluding labour 1 Cum Rs. 1,343.44 0.01 13.4344
Rs.13.43
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.16 36
2 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
Rs.145.85
After rounding off: Rs.187.20 Total Amount of M and L Rs.159.28
Add 17.5 % OH and CP Rs.27.87
Total Rs.187.16

483 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6085.01
Jodhpur stone roof slabs, self faced 10cm to 12.5cm thick, 25cm to 35cm wide, hoisted and set, jointed and
grouted in cement mortar 1:3 complete. With material and labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur slab 12.5cm thick* 1 Sqm Rs. 380.00 1.05 399
Rs.399.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
2 Mason (Stone mason) 1 Day Rs. 225.00 0.16 36
3 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.01 28.0294
Rs.173.88
After rounding off: Rs.673.10 Total Amount of M and L Rs.572.88
Add 17.5 % OH and CP Rs.100.25
Total Rs.673.13

ITEM No. 6085.02


Jodhpur stone roof slabs, self faced 10cm to 12.5cm thick, 25cm to 35cm wide, hoisted and set, jointed and
grouted in cement mortar 1:3 complete.Except stone slabs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.65 109.85
2 Mason (Stone mason) 1 Day Rs. 225.00 0.16 36
3 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.01 28.0294
Rs.173.88
After rounding off: Rs.204.30 Total Amount of M and L Rs.173.88
Add 17.5 % OH and CP Rs.30.43
Total Rs.204.31

ITEM No. 6087.01


Mortices, retangular or dovetailed etc., for balusters, dowels lewis-bolts, newels. etc., exceeding 50 but not
exceeding 150 cubic centimeters and run with neat cement (100 Cu.cm). Materials and labour with granite or
trap.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.002 0.92
Rs.0.92
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
2 Mason (Stone mason) 1 Day Rs. 225.00 0.1 22.5
Rs.39.40
After rounding off: Rs.47.40 Total Amount of M and L Rs.40.32
Add 17.5 % OH and CP Rs.7.06
Total Rs.47.38

484 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6087.02
Mortices, retangular or dovetailed etc., for balusters, dowels lewis-bolts, newels. etc., exceeding 50 but not
exceeding 150 cubic centimeters and run with neat cement (100 Cu.cm). Materials and labour with lime or
sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.002 0.92
Rs.0.92
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
2 Mason (Stone mason) 1 Day Rs. 225.00 0.05 11.25
Rs.19.70
After rounding off: Rs.24.20 Total Amount of M and L Rs.20.62
Add 17.5 % OH and CP Rs.3.61
Total Rs.24.23

ITEM No. 6088.01


Mortices, retangular or dovetailed etc., for balusters, dowels lewis-bolts, newels. etc., not exceeding 50 cubic
centimeters and run with neat cement (100 Cu.cm). Materials and labour with granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Karoli stone 1 Cum Rs. 350.00 0.01 3.5
Rs.3.50
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.06 13.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.06 10.14
Rs.23.64
After rounding off: Rs.31.90 Total Amount of M and L Rs.27.14
Add 17.5 % OH and CP Rs.4.75
Total Rs.31.89

ITEM No. 6088.02


Mortices, retangular or dovetailed etc., for balusters, dowels lewis-bolts, newels. etc., not exceeding 50 cubic
centimeters and run with neat cement (100 Cu.cm). Materials and labour with lime or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.001 0.46
Rs.0.46
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.03 5.07
2 Mason (Stone mason) 1 Day Rs. 225.00 0.03 6.75
Rs.11.82
After rounding off: Rs.14.40 Total Amount of M and L Rs.12.28
Add 17.5 % OH and CP Rs.2.15
Total Rs.14.43

485 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6089.01
Hammer dressing with maximum depression from a straight edge held against the surface not exceeding
40mm dressing on Granite or trap stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.3 67.5
Rs.67.50
After rounding off: Rs.79.30 Total Amount of M and L Rs.67.50
Add 17.5 % OH and CP Rs.11.81
Total Rs.79.31

ITEM No. 6089.02


Hammer dressing with maximum depression from a straight edge held against the surface not exceeding
40mm dressing on Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.15 33.75
Rs.33.75
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.75
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.66

ITEM No. 6090.01


Hammer dressing with maximum depression from a straight edge held against the surface not exceeding
20mm dressing on Granite or trap stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.45 101.25
Rs.101.25
After rounding off: Rs.119.00 Total Amount of M and L Rs.101.25
Add 17.5 % OH and CP Rs.17.72
Total Rs.118.97

ITEM No. 6090.02


Hammer dressing with maximum depression from a straight edge held against the surface not exceeding
20mm dressing on Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.23 51.75
Rs.51.75
After rounding off: Rs.60.80 Total Amount of M and L Rs.51.75
Add 17.5 % OH and CP Rs.9.06
Total Rs.60.81

486 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6091.01
Hammer dressing with maximum depression from a straight edge held against the surface not exceeding 6mm
dressing on Granite or trap stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.86 193.5
Rs.193.50
After rounding off: Rs.227.40 Total Amount of M and L Rs.193.50
Add 17.5 % OH and CP Rs.33.86
Total Rs.227.36

ITEM No. 6091.02


Hammer dressing with maximum depression from a straight edge held against the surface not exceeding 6mm
dressing on Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.43 96.75
Rs.96.75
After rounding off: Rs.113.70 Total Amount of M and L Rs.96.75
Add 17.5 % OH and CP Rs.16.93
Total Rs.113.68

ITEM No. 6092.01


Rough tooled dressing on Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.225.00
After rounding off: Rs.264.40 Total Amount of M and L Rs.225.00
Add 17.5 % OH and CP Rs.39.38
Total Rs.264.38

ITEM No. 6092.02


Rough tooled dressing on Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.5 112.5
Rs.112.50
After rounding off: Rs.132.20 Total Amount of M and L Rs.112.50
Add 17.5 % OH and CP Rs.19.69
Total Rs.132.19

487 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6093.01
Punched dressing on Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.3 292.5
Rs.292.50
After rounding off: Rs.343.70 Total Amount of M and L Rs.292.50
Add 17.5 % OH and CP Rs.51.19
Total Rs.343.69

ITEM No. 6093.02


Punched dressing on Lime stone or Sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.65 146.25
Rs.146.25
After rounding off: Rs.171.80 Total Amount of M and L Rs.146.25
Add 17.5 % OH and CP Rs.25.59
Total Rs.171.84

ITEM No. 6094.01


Close picked dressing on Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 2.9 652.5
Rs.652.50
After rounding off: Rs.766.70 Total Amount of M and L Rs.652.50
Add 17.5 % OH and CP Rs.114.19
Total Rs.766.69

ITEM No. 6094.02


Close picked dressing on Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.45 326.25
Rs.326.25
After rounding off: Rs.383.30 Total Amount of M and L Rs.326.25
Add 17.5 % OH and CP Rs.57.09
Total Rs.383.34

ITEM No. 6095.01


Fine tooled dressing on Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 3 675
Rs.675.00
After rounding off: Rs.793.10 Total Amount of M and L Rs.675.00
Add 17.5 % OH and CP Rs.118.13
Total Rs.793.13

488 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6095.02
Fine tooled dressing on Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.5 337.5
Rs.337.50
After rounding off: Rs.396.60 Total Amount of M and L Rs.337.50
Add 17.5 % OH and CP Rs.59.06
Total Rs.396.56

ITEM No. 6096.01


Drafted margin, punched dressed, 25mm wide. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.29 65.25
Rs.65.25
After rounding off: Rs.76.70 Total Amount of M and L Rs.65.25
Add 17.5 % OH and CP Rs.11.42
Total Rs.76.67

ITEM No. 6096.02


Drafted margin, punched dressed, 25mm wide. Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.15 33.75
Rs.33.75
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.75
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.66

ITEM No. 6097.01


Grooves (square, hollowed or dovetailed), rebate in face work not exceeding 100mm in width or grith and
close picked dressed. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.735 165.375
Rs.165.38
After rounding off: Rs.194.30 Total Amount of M and L Rs.165.38
Add 17.5 % OH and CP Rs.28.94
Total Rs.194.32

489 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6097.02
Grooves (square, hollowed or dovetailed), rebate in face work not exceeding 100mm in width or grith and
close picked dressed. Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.368 82.8
Rs.82.80
After rounding off: Rs.97.30 Total Amount of M and L Rs.82.80
Add 17.5 % OH and CP Rs.14.49
Total Rs.97.29

ITEM No. 6098.01


Grooves for joints, tongues of chills, etc., throat ( or small weather groove) as for cills, drip courses, etc., and
rebates as for joints not exceeding 100mm in width or girth and close picked dressed. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.49 110.25
Rs.110.25
After rounding off: Rs.129.50 Total Amount of M and L Rs.110.25
Add 17.5 % OH and CP Rs.19.29
Total Rs.129.54

ITEM No. 6098.02


Grooves for joints, tongues of chills, etc., throat ( or small weather groove) as for cills, drip courses, etc., and
rebates as for joints not exceeding 100mm in width or girth and close picked dressed. Lime stone or sand
stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.245 55.125
Rs.55.13
After rounding off: Rs.64.80 Total Amount of M and L Rs.55.13
Add 17.5 % OH and CP Rs.9.65
Total Rs.64.77

ITEM No. 6099.01


Chamfer, splays or arris in face work not exceeding 15mm wide not exeeding 100mm in width or girth and
close picked dressed. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.245 55.125
Rs.55.13
After rounding off: Rs.64.80 Total Amount of M and L Rs.55.13
Add 17.5 % OH and CP Rs.9.65
Total Rs.64.77

490 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6099.02
Chamfer, splays or arris in face work not exceeding 15mm wide not exeeding 100mm in width or girth and
close picked dressed. Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.1219 27.4275
Rs.27.43
After rounding off: Rs.32.20 Total Amount of M and L Rs.27.43
Add 17.5 % OH and CP Rs.4.80
Total Rs.32.23

ITEM No. 6100.01


Chamfer, splays or arris in face work exceeding 15mm but not exceeding 50mm wide not exeeding 100mm in
width or girth and close picked dressed. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.59 132.75
Rs.132.75
After rounding off: Rs.156.00 Total Amount of M and L Rs.132.75
Add 17.5 % OH and CP Rs.23.23
Total Rs.155.98

ITEM No. 6100.02


Chamfer, splays or arris in face work exceeding 15mm but not exceeding 50mm wide not exeeding 100mm in
width or girth and close picked dressed. Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.294 66.15
Rs.66.15
After rounding off: Rs.77.70 Total Amount of M and L Rs.66.15
Add 17.5 % OH and CP Rs.11.58
Total Rs.77.73

ITEM No. 6101.01


Chamfer, splays or arris in face work exceeding 50mm but not exceeding 100mm dia not exeeding 100mm in
width or girth and close picked dressed. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.98 220.5
Rs.220.50
After rounding off: Rs.259.10 Total Amount of M and L Rs.220.50
Add 17.5 % OH and CP Rs.38.59
Total Rs.259.09

491 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6101.02
Chamfer, splays or arris in face work exceeding 50mm but not exceeding 100mm dia not exeeding 100mm in
width or girth and close picked dressed. Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.499 112.275
Rs.112.28
After rounding off: Rs.131.90 Total Amount of M and L Rs.112.28
Add 17.5 % OH and CP Rs.19.65
Total Rs.131.92

ITEM No. 6102.01


Drilling holes for bolts, pipes, etc. not exceeding 25mm dia not exceeding 100mm in width or grith and close
picked dressed per 10cm in depth. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.14 31.5
Rs.31.50
After rounding off: Rs.37.00 Total Amount of M and L Rs.31.50
Add 17.5 % OH and CP Rs.5.51
Total Rs.37.01

ITEM No. 6102.02


Drilling holes for bolts, pipes, etc. not exceeding 25mm dia not exceeding 100mm in width or grith and close
picked dressed per 10cm in depth. Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.07 15.75
Rs.15.75
After rounding off: Rs.18.50 Total Amount of M and L Rs.15.75
Add 17.5 % OH and CP Rs.2.76
Total Rs.18.51

ITEM No. 6103.01


Drilling holes for bolts, pipes, etc. exceeding 25mm but not exceeding 60mm dia not exceeding 100mm in
width or grith and close picked dressed per 10cm in depth. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.18 40.5
Rs.40.50
After rounding off: Rs.47.60 Total Amount of M and L Rs.40.50
Add 17.5 % OH and CP Rs.7.09
Total Rs.47.59

492 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6103.02
Drilling holes for bolts, pipes, etc. exceeding 25mm but not exceeding 60mm dia not exceeding 100mm in
width or grith and close picked dressed per 10cm in depth. Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.23.80 Total Amount of M and L Rs.20.25
Add 17.5 % OH and CP Rs.3.54
Total Rs.23.79

ITEM No. 6104.01


Drilling holes for bolts, pipes, etc. exceeding 60mm but not exceeding 100mm dia not exceeding 100mm in
width or grith and close picked dressed per 10cm in depth. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.22 49.5
Rs.49.50
After rounding off: Rs.58.20 Total Amount of M and L Rs.49.50
Add 17.5 % OH and CP Rs.8.66
Total Rs.58.16

ITEM No. 6104.02


Drilling holes for bolts, pipes, etc. exceeding 60mm but not exceeding 100mm dia not exceeding 100mm in
width or grith and close picked dressed per 10cm in depth. Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
After rounding off: Rs.29.10 Total Amount of M and L Rs.24.75
Add 17.5 % OH and CP Rs.4.33
Total Rs.29.08

ITEM No. 6105


Refastening and securing ends of balusters, newels, rag bolts, etc., let into stone and grouted in cement
mortar including recutting the mortices and regrouting in cement mortar.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.2 45
Rs.45.00
Sundry
1 Sundries 1 Re Rs. 9.00 0.08 0.72
Rs.0.72
After rounding off: Rs.53.70 Total Amount of M and L Rs.45.72
Add 17.5 % OH and CP Rs.8.00
Total Rs.53.72

493 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6106.01
Stone kerb of roughly squared stones of size 20cm x 30 cm, dressed so that the maximum depression from a
straight edge held against the dressed surface shall not exceed 6mm for top and exposed surfaces of sides and
20mm for the rest of surfaces jointed in
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 0.08 48
2 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.015 25.5648
Rs.73.56
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
2 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
3 Mason (Stone mason) 1 Day Rs. 225.00 1.21 272.25
Rs.300.98
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.441.70 Total Amount of M and L Rs.375.89
Add 17.5 % OH and CP Rs.65.78
Total Rs.441.68

ITEM No. 6106.02


Stone kerb of roughly squared stones of size 20cm x 30 cm, dressed so that the maximum depression from a
straight edge held against the dressed surface shall not exceed 6mm for top and exposed surfaces of sides and
20mm for the rest of surfaces jointed in
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.015 25.5648
Rs.25.56
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
2 Mason (Stone mason) 1 Day Rs. 225.00 0.12 27
3 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
Rs.55.73
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.97.10 Total Amount of M and L Rs.82.64
Add 17.5 % OH and CP Rs.14.46
Total Rs.97.11

494 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6106.03
Stone kerb of roughly squared stones of size 20cm x 30 cm, dressed so that the maximum depression from a
straight edge held against the dressed surface shall not exceed 6mm for top and exposed surfaces of sides and
20mm for the rest of surfaces jointed in
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.015 25.5648
2 Lime or sand stone 1 Cum Rs. 550.00 0.08 44
Rs.69.56
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
2 Mason (Stone mason) 1 Day Rs. 225.00 0.65 146.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
Rs.174.98
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.288.90 Total Amount of M and L Rs.245.89
Add 17.5 % OH and CP Rs.43.03
Total Rs.288.93

ITEM No. 6106.04


Stone kerb of roughly squared stones of size 20cm x 30 cm, dressed so that the maximum depression from a
straight edge held against the dressed surface shall not exceed 6mm for top and exposed surfaces of sides and
20mm for the rest of surfaces jointed in
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.015 25.5648
Rs.25.56
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
2 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
3 Mason (Stone mason) 1 Day Rs. 225.00 0.12 27
Rs.55.73
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.97.10 Total Amount of M and L Rs.82.64
Add 17.5 % OH and CP Rs.14.46
Total Rs.97.11

495 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6107.01
Stone kerb of roughly squared stones of size 15cm x 30 cm, dressed so that the maximum depression from a
straight edge held against the dressed surface shall not exceed 6mm for top and exposed surfaces of sides and
20mm for the rest of surfaces jointed in cement mortar 1:6 and struck flush. Granite or trap M & L
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.014 23.86048
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 0.06 36
Rs.59.86
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
2 Mason (Stone mason) 1 Day Rs. 225.00 1.084 243.9
3 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
Rs.258.27
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.375.40 Total Amount of M and L Rs.319.48
Add 17.5 % OH and CP Rs.55.91
Total Rs.375.38

ITEM No. 6107.02


Stone kerb of roughly squared stones of size 15cm x 30 cm, dressed so that the maximum depression from a
straight edge held against the dressed surface shall not exceed 6mm for top and exposed surfaces of sides and
20mm for the rest of surfaces jointed in cement mortar 1:6 and struck flush. Granite or trap Except dressed
stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.014 23.86048
Rs.23.86
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
2 Mason (Stone mason) 1 Day Rs. 225.00 0.045 10.125
3 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
Rs.24.49
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.58.40 Total Amount of M and L Rs.49.70
Add 17.5 % OH and CP Rs.8.70
Total Rs.58.40

496 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6107.03
Stone kerb of roughly squared stones of size 15cm x 30 cm, dressed so that the maximum depression from a
straight edge held against the dressed surface shall not exceed 6mm for top and exposed surfaces of sides and
20mm for the rest of surfaces jointed in cement mortar 1:6 and struck flush. Lime stone or sand stone.M & L
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.014 23.86048
2 Lime or sand stone 1 Cum Rs. 550.00 0.06 33
Rs.56.86
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
2 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
3 Mason (Stone mason) 1 Day Rs. 225.00 0.554 124.65
Rs.139.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.231.70 Total Amount of M and L Rs.197.23
Add 17.5 % OH and CP Rs.34.51
Total Rs.231.74

ITEM No. 6107.04


Stone kerb of roughly squared stones of size 15cm x 30 cm, dressed so that the maximum depression from a
straight edge held against the dressed surface shall not exceed 6mm for top and exposed surfaces of sides and
20mm for the rest of surfaces jointed in cement mortar 1:6 and struck flush,Lime stone or sand stone, Except
dressed stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.014 23.86048
Rs.23.86
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.045 10.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
3 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
Rs.24.49
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.58.40 Total Amount of M and L Rs.49.70
Add 17.5 % OH and CP Rs.8.70
Total Rs.58.40

497 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6108.01
Stone kerb of roughly squared stones of size 20cm x 30 cm, all surfaces hammer dressed so that the maximum
depression from a straight edge held against the dressed surface shall not exceed 20mm jointed in cement
mortar 1:6 and struck flush. Granite or trap M & L
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.015 25.5648
2 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 0.08 48
Rs.73.56
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
2 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
3 Mason (Stone mason) 1 Day Rs. 225.00 0.77 173.25
Rs.201.98
Sundry
1 Sundries 1 Re Rs. 9.00 0.145 1.305
Rs.1.31
After rounding off: Rs.325.30 Total Amount of M and L Rs.276.85
Add 17.5 % OH and CP Rs.48.45
Total Rs.325.30

ITEM No. 6108.02


Stone kerb of roughly squared stones of size 20cm x 30 cm, all surfaces hammer dressed so that the maximum
depression from a straight edge held against the dressed surface shall not exceed 20mm jointed in cement
mortar 1:6 and struck flush. Granite or trap Except dressed stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.015 25.5648
Rs.25.56
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
2 Mason (Stone mason) 1 Day Rs. 225.00 0.062 13.95
3 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
Rs.42.68
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.81.80 Total Amount of M and L Rs.69.59
Add 17.5 % OH and CP Rs.12.18
Total Rs.81.77

498 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6108.03
Stone kerb of roughly squared stones of size 20cm x 30 cm, all surfaces hammer dressed so that the maximum
depression from a straight edge held against the dressed surface shall not exceed 20mm jointed in cement
mortar 1:6 and struck flush. Lime stone or sand stone.M & L
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime or sand stone 1 Cum Rs. 550.00 0.08 44
2 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.015 25.5648
Rs.69.56
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
2 Mason (Stone mason) 1 Day Rs. 225.00 0.41 92.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
Rs.120.98
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.225.50 Total Amount of M and L Rs.191.89
Add 17.5 % OH and CP Rs.33.58
Total Rs.225.48

ITEM No. 6108.04


Stone kerb of roughly squared stones of size 20cm x 30 cm, all surfaces hammer dressed so that the maximum
depression from a straight edge held against the dressed surface shall not exceed 20mm jointed in cement
mortar 1:6 and struck flush. Lime stone or sand stone, Except dressed stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.015 25.5648
Rs.25.56
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.06 13.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
3 Bhisty including mussack 1 Day Rs. 169.00 0.07 11.83
Rs.42.23
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.81.20 Total Amount of M and L Rs.69.14
Add 17.5 % OH and CP Rs.12.10
Total Rs.81.25

499 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6109.01
Stone kerb of roughly squared stones of size 15 cm x 30 cm, all surfaces hammer dressed so that the maximum
depression from a straight edge held against the dressed surface shall not exceed 20mm jointed in cement
mortar 1:6 and struck flush.Granite or trap M & L
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 0.06 36
2 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.014 23.86048
Rs.59.86
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
2 Mason (Stone mason) 1 Day Rs. 225.00 0.634 142.65
3 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
Rs.157.02
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.256.40 Total Amount of M and L Rs.218.23
Add 17.5 % OH and CP Rs.38.19
Total Rs.256.41

ITEM No. 6109.02


Stone kerb of roughly squared stones of size 15 cm x 30 cm, all surfaces hammer dressed so that the maximum
depression from a straight edge held against the dressed surface shall not exceed 20mm jointed in cement
mortar 1:6 and struck flush. Granite or trap Except dressed stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.014 23.86048
Rs.23.86
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
2 Mason (Stone mason) 1 Day Rs. 225.00 0.334 75.15
3 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
Rs.89.52
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.134.80 Total Amount of M and L Rs.114.73
Add 17.5 % OH and CP Rs.20.08
Total Rs.134.80

500 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6109.03
Stone kerb of roughly squared stones of size 15 cm x 30 cm, all surfaces hammer dressed so that the maximum
depression from a straight edge held against the dressed surface shall not exceed 20mm jointed in cement
mortar 1:6 and struck flush. Lime stone or sand stone.M & L
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime or sand stone 1 Cum Rs. 550.00 0.06 33
2 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.014 23.86048
Rs.56.86
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
2 Mason (Stone mason) 1 Day Rs. 225.00 0.334 75.15
3 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
Rs.89.52
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.173.60 Total Amount of M and L Rs.147.73
Add 17.5 % OH and CP Rs.25.85
Total Rs.173.58

ITEM No. 6109.04


Stone kerb of roughly squared stones of size 15 cm x 30 cm, all surfaces hammer dressed so that the maximum
depression from a straight edge held against the dressed surface shall not exceed 20mm jointed in cement
mortar 1:6 and struck flush. Lime stone or sand stone, Except dressed stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.014 23.86048
Rs.23.86
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.334 75.15
2 Bhisty including mussack 1 Day Rs. 169.00 0.005 0.845
3 Mazdoor-man, 1 Day Rs. 169.00 0.08 13.52
Rs.89.52
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.134.80 Total Amount of M and L Rs.114.73
Add 17.5 % OH and CP Rs.20.08
Total Rs.134.80

501 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Scheduled Rate 2010
Stone Masonry
ITEM No. 6110.01
Dholpur stone with hammer dressed face work (with maximum depression from a straight edge held against
the dressed surface not exceeding 20mm), about 40mm high, 75mm deep in straight courses, laid and jointed
in cement and stone dust mortar 1:3, recess pointed(10mm x 20mm) with an admixtureof white cement and
Dholpur stonedust 1:1. Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:6) excluding labour 1 Cum Rs. 1,704.32 0.0224 38.176768
2 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
3 Dhoulpur stone slab 40mm 1 Sqm Rs. 200.00 1 200
Rs.258.88
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
2 Mason (Stone mason) 1 Day Rs. 225.00 2 450
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.555.63
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.978.20 Total Amount of M and L Rs.832.50
Add 17.5 % OH and CP Rs.145.69
Total Rs.978.19

ITEM No. 6110.02


Dholpur stone with hammer dressed face work (with maximum depression from a straight edge held against
the dressed surface not exceeding 20mm), about 40mm high, 75mm deep in straight courses, laid and jointed
in cement and stone dust mortar 1:3, racess pointed(10mm x 20mm) with an admixtureof white cement and
Dholpur stonedust 1:1. Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
Rs.20.70
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
2 Mason (Stone mason) 1 Day Rs. 225.00 2 450
3 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.0224 62.785856
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.618.41
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.772.10 Total Amount of M and L Rs.657.11
Add 17.5 % OH and CP Rs.114.99
Total Rs.772.11

502 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6111.01
40mm thick sand stone slabs, dressed close picked on exposed faces, set and jointed in cement and stone dust
mortar 1:3 and pointed in cement mixed with approved pigment to match. Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
2 Rough dressed sand stone slab 40mm thick 1 Sqm Rs. 110.00 1.1 121
Rs.141.70
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
2 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.0224 62.785856
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.449.66
Sundry
1 Sundries 1 Re Rs. 9.00 2.75 24.75
Rs.24.75
After rounding off: Rs.723.90 Total Amount of M and L Rs.616.11
Add 17.5 % OH and CP Rs.107.82
Total Rs.723.93

ITEM No. 6111.02


40mm thick sand stone slabs, dressed close picked on exposed faces, set and jointed in cement and stone dust
mortar 1:3 and pointed in cement mixed with approved pigment to match. Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
Rs.20.70
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.0224 62.785856
Rs.449.66
Sundry
1 Sundries 1 Re Rs. 9.00 2.75 24.75
Rs.24.75
After rounding off: Rs.581.80 Total Amount of M and L Rs.495.11
Add 17.5 % OH and CP Rs.86.64
Total Rs.581.76

503 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6112.01
40mm thick sand stone slabs polished, set and jointed in cement and stone dust mortar 1:3 and pointed in
cement mixed with approved pigment to match. Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rough dressed sand stone slab 40mm thick 1 Sqm Rs. 110.00 1.1 121
2 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
Rs.141.70
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
2 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
5 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.0224 62.785856
Rs.737.66
Sundry
1 Sundries 1 Re Rs. 9.00 2.75 24.75
Rs.24.75
After rounding off: Rs.1,062.30 Total Amount of M and L Rs.904.11
Add 17.5 % OH and CP Rs.158.22
Total Rs.1,062.33

ITEM No. 6112.02


40mm thick sand stone slabs polished, set and jointed in cement and stone dust mortar 1:3 and pointed in
cement mixed with approved pigment to match. Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
Rs.20.70
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
5 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.0224 62.785856
Rs.737.66
Sundry
1 Sundries 1 Re Rs. 9.00 2.75 24.75
Rs.24.75
After rounding off: Rs.920.20 Total Amount of M and L Rs.783.11
Add 17.5 % OH and CP Rs.137.04
Total Rs.920.16

504 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6113.01
40mm thick lime stone slabs/tiles polished, set and jointed in cement and stone dust mortar 1:3 and pointed in
cement mixed with approved pigment to match. Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
2 Lime stone slab 40mm thick 1 Sqm Rs. 140.00 1.1 154
Rs.174.70
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 1.53 13.77
Rs.13.77
After rounding off: Rs.1,014.40 Total Amount of M and L Rs.863.35
Add 17.5 % OH and CP Rs.151.09
Total Rs.1,014.43

ITEM No. 6113.02


40mm thick lime stone slabs/tiles polished, set and jointed in cement and stone dust mortar 1:3 and pointed in
cement mixed with approved pigment to match. Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
Rs.20.70
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
5 Cement motar (1:3) excluding labour 1 Cum Rs. 2,802.94 0.0224 62.785856
Rs.737.66
Sundry
1 Sundries 1 Re Rs. 9.00 2.75 24.75
Rs.24.75
After rounding off: Rs.920.20 Total Amount of M and L Rs.783.11
Add 17.5 % OH and CP Rs.137.04
Total Rs.920.16

505 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6114.01
Dholpur stone cladding 16-18mm thick gang saw cut with machine cut edges, uniform colour of each stone
size exceeding 0.5sqm area fixed with and including one numbers SS clamps (grade-202) of flat 30mm x 2mm,
150mm long made to shape in each slab ,making V grooveat top and bottom of stone and drilling hole for hold
fastener, polishing, rubbing & including silicon treatment.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 SS flat clalmps 30x2mm 1 No. Rs. 35.00 2 70
2 SS Expansion hold fast 1 No. Rs. 25.00 2 50
3 White Cement 1 Kg Rs. 12.00 1.25 15
4 Silicon treatment 1 Re Rs. 50.00 1 50
5 Dholpur stone slab 16-18mm thick gang saw size exc. 0.50 sqm 1 Sqm Rs. 410.00 1.25 512.5
Rs.697.50
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.9 202.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.9 152.1
Rs.354.60
Sundry
1 Sundries 1 Re Rs. 9.00 5.56 50.04
Rs.50.04
After rounding off: Rs.1,295.00 Total Amount of M and L Rs.1,102.14
Add 17.5 % OH and CP Rs.192.87
Total Rs.1,295.01

ITEM No. 6114.02


Dholpur stone cladding 25-30mm thick gang saw cut with machine cut edges, uniform colour of each stone
size exceeding 0.5sqm area fixed with and including two numbers SS clamps (grade-202) of flat 30mm x 2mm,
150mm long made to shape in each slab, making V grooveat top and bottom of stone and drilling hole for hold
fastener, polishing, rubbing & including silicon treatment.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Dholpur stone slab 25-30mm thick gang saw size exc. 0.50 sqm 1 Sqm Rs. 565.00 1.25 706.25
2 SS flat clalmps 30x2mm 1 No. Rs. 35.00 2 70
3 White Cement 1 Kg Rs. 12.00 1.25 15
4 Silicon treatment 1 Re Rs. 50.00 1 50
5 SS Expansion hold fast 1 No. Rs. 25.00 2 50
Rs.891.25
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.2 202.8
2 Mason (Stone mason) 1 Day Rs. 225.00 1.2 270
Rs.472.80
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.1,661.50 Total Amount of M and L Rs.1,414.05
Add 17.5 % OH and CP Rs.247.46
Total Rs.1,661.50

506 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6114.03
Dholpur stone cladding 16-18mm thick gang saw cut with machine cut edges, uniform colour of each stone
size exceeding 0.5sqm area fixed with and including two numbers SS clamps (grade-202) of flat 30mm x 2mm,
150mm long made to shape in each slab, making V grooveat top and bottom of stone and drilling hole for hold
fastener, polishing, rubbing & including silicon treatment. Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 SS flat clalmps 30x2mm 1 No. Rs. 35.00 2 70
2 SS Expansion hold fast 1 No. Rs. 25.00 2 50
3 White Cement 1 Kg Rs. 12.00 1.25 15
4 Silicon treatment 1 Re Rs. 50.00 1 50
Rs.185.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.9 152.1
2 Mason (Stone mason) 1 Day Rs. 225.00 0.9 202.5
Rs.354.60
Sundry
1 Sundries 1 Re Rs. 9.00 5.56 50.04
Rs.50.04
After rounding off: Rs.692.80 Total Amount of M and L Rs.589.64
Add 17.5 % OH and CP Rs.103.19
Total Rs.692.83

ITEM No. 6114.04


Dholpur stone cladding 25-30mm thick gang saw cut with machine cut edges, uniform colour of each stone
size exceeding 0.5sqm area fixed with and including two numbers SS clamps (grade-202) of flat 30mm x 2mm,
150mm long made to shape in each slab, making V grooveat top and bottom of stone and drilling hole for hold
fastener, polishing, rubbing & including silicon treatment. Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 1.25 15
2 SS Expansion hold fast 1 No. Rs. 25.00 2 50
3 SS flat clalmps 30x2mm 1 No. Rs. 35.00 2 70
4 Silicon treatment 1 Re Rs. 50.00 1 50
Rs.185.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1.2 202.8
2 Mason (Stone mason) 1 Day Rs. 225.00 1.2 270
Rs.472.80
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.831.70 Total Amount of M and L Rs.707.80
Add 17.5 % OH and CP Rs.123.86
Total Rs.831.66

507 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6115.01
Dholpur stone cladding 16-18mm thick gang saw cut with machine cut edges, uniform colour of each stone
size exceeding 0.25sqm and not exceeding.5sqm area fixed with and including one numbers SS clamps (grade-
202) of flat 30mm x 2mm, 150mm long made to shape in each slab,making V groove at top and bottom of
stone and drilling hole for hold fastener, polishing, rubbing &including silicon treatment .S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Dholpur stone slab 16-18mm thick gang saw size exc. 0.25 sqm and n. 1 Sqm Rs. 310.00 1.15 356.5
exc. 0.50sqm
2 SS Expansion hold fast 1 No. Rs. 25.00 4 100
3 SS flat clalmps 30x2mm 1 No. Rs. 35.00 4 140
4 White Cement 1 Kg Rs. 12.00 1.25 15
5 Silicon treatment 1 Re Rs. 50.00 1 50
Rs.661.50
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.75 168.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.75 126.75
Rs.295.50
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.1,183.20 Total Amount of M and L Rs.1,007.00
Add 17.5 % OH and CP Rs.176.22
Total Rs.1,183.22

508 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6115.02
Dholpur stone cladding 25-30mm thick gang saw cut with machine cut edges, uniform colour of each stone
size exceeding 0.25sqm and not exceeding.5sqm area fixed with and including one numbers SS clamps (grade-
202) of flat 30mm x 2mm, 150mm long made to shape in each slab,making V groove at top and bottom of
stone and drilling hole for hold fastener, polishing, rubbing &including silicon treatment .S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 1.25 15
2 Dholpur stone slab 25-30mm thick gang saw size exc. 0.25 sqm and n. 1 Sqm Rs. 400.00 1.15 460
exc. 0.50sqm
3 SS flat clalmps 30x2mm 1 No. Rs. 35.00 4 140
4 SS Expansion hold fast 1 No. Rs. 25.00 4 100
5 Silicon treatment 1 Re Rs. 50.00 1 50
Rs.765.00
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1 225
2 Mazdoor-man, 1 Day Rs. 169.00 1 169
Rs.394.00
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.1,420.60 Total Amount of M and L Rs.1,209.00
Add 17.5 % OH and CP Rs.211.57
Total Rs.1,420.57

ITEM No. 6115.03


Dholpur stone cladding 16-18mm thick gang saw cut with machine cut edges, uniform colour of each stone
size exceeding 0.25sqm and not exceeding.5sqm area fixed with and including one numbers SS clamps (grade-
202) of flat 30mm x 2mm, 150mm long made to shape in each slab,making V groove at top and bottom of
stone and drilling hole for hold fastener, polishing, rubbing &including silicon treatment . Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 SS Expansion hold fast 1 No. Rs. 25.00 4 100
2 Silicon treatment 1 Re Rs. 50.00 1 50
3 White Cement 1 Kg Rs. 12.00 1.25 15
4 SS flat clalmps 30x2mm 1 No. Rs. 35.00 4 140
Rs.305.00
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.75 168.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.75 126.75
Rs.295.50
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.764.30 Total Amount of M and L Rs.650.50
Add 17.5 % OH and CP Rs.113.84
Total Rs.764.33

509 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6115.04
Dholpur stone cladding 25-30mm thick gang saw cut with machine cut edges, uniform colour of each stone
size exceeding 0.25sqm and not exceeding.5sqm area fixed with and including two numbers SS clamps (grade-
202) of flat 30mm x 2mm, 150mm long made to shape in each slab,making V groove at top and bottom of
stone and drilling hole for hold fastener, polishing, rubbing &including silicon treatment . Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 SS flat clalmps 30x2mm 1 No. Rs. 35.00 4 140
2 Silicon treatment 1 Re Rs. 50.00 1 50
3 SS Expansion hold fast 1 No. Rs. 25.00 4 100
4 White Cement 1 Kg Rs. 12.00 1.25 15
Rs.305.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 1 169
2 Mason (Stone mason) 1 Day Rs. 225.00 1 225
Rs.394.00
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.880.10 Total Amount of M and L Rs.749.00
Add 17.5 % OH and CP Rs.131.07
Total Rs.880.07

ITEM No. 6116.01


Dholpur stone cladding 16-18mm thick gang saw cut with machine cut edges, uniform colour of each stone
size not exceeding 0.25sqm area fixed with and including, making V groove at top & bottom of stone and
drilling hole for hold fastner, polishing, rubbing &including silicon treatment .S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 1.25 15
2 Dholpur stone slab 16-18mm thick gang saw size n. exc. 0.25sqm 1 Sqm Rs. 225.00 1.15 258.75
3 SS Expansion hold fast 1 No. Rs. 25.00 4 100
4 Silicon treatment 1 Re Rs. 50.00 1 50
5 White Cement 1 Kg Rs. 12.00 0 0
Rs.423.75
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.6 135
2 Mazdoor-man, 1 Day Rs. 169.00 0.6 101.4
Rs.236.40
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.834.40 Total Amount of M and L Rs.710.15
Add 17.5 % OH and CP Rs.124.28
Total Rs.834.42

510 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6116.02
Dholpur stone cladding 25-30mm thick gang saw cut with machine cut edges, uniform colour of each stone
size not exceeding 0.25sqm area fixed with and including, making V groove at top & bottom of stone and
drilling hole for hold fastner, polishing, rubbing &including silicon treatment .S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Dholpur stone slab 25-30mm thick gang saw size n. exc. 0.25sqm 1 Sqm Rs. 275.00 1.15 316.25
2 White Cement 1 Kg Rs. 12.00 1.25 15
3 Silicon treatment 1 Re Rs. 50.00 1 50
4 SS Expansion hold fast 1 No. Rs. 25.00 4 100
Rs.481.25
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.8 180
2 Mazdoor-man, 1 Day Rs. 169.00 0.8 135.2
Rs.315.20
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.994.60 Total Amount of M and L Rs.846.45
Add 17.5 % OH and CP Rs.148.13
Total Rs.994.57

ITEM No. 6116.03


Dholpur stone cladding 16-18mm thick gang saw cut with machine cut edges, uniform colour of each stone
size not exceeding 0.25sqm area fixed with and including, making V groove at top & bottom of stone and
drilling hole for hold fastner, polishing, rubbing &including silicon treatment . Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Silicon treatment 1 Re Rs. 50.00 1 50
2 SS Expansion hold fast 1 No. Rs. 25.00 4 100
3 White Cement 1 Kg Rs. 12.00 1.25 15
Rs.165.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.6 101.4
2 Mason (Stone mason) 1 Day Rs. 225.00 0.6 135
Rs.236.40
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.530.40 Total Amount of M and L Rs.451.40
Add 17.5 % OH and CP Rs.78.99
Total Rs.530.39

511 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6116.04
Dholpur stone cladding 25-30mm thick gang saw cut with machine cut edges, uniform colour of each stone
size not exceeding 0.25sqm area fixed with and including, making V groove at top & bottom of stone and
drilling hole for hold fastner, polishing, rubbing &including silicon treatment . Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 1.25 15
2 Silicon treatment 1 Re Rs. 50.00 1 50
3 SS Expansion hold fast 1 No. Rs. 25.00 4 100
Rs.165.00
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.8 180
2 Mazdoor-man, 1 Day Rs. 169.00 0.8 135.2
Rs.315.20
Sundry
1 Sundries 1 Re Rs. 9.00 5.555 49.995
Rs.50.00
After rounding off: Rs.623.00 Total Amount of M and L Rs.530.20
Add 17.5 % OH and CP Rs.92.78
Total Rs.622.98

ITEM No. 6117.01


Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble
shade of following type. Makrana White. Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
2 Marble 18 to 20 mm thick makrana white Sqm Rs. 1,398.00 1.1 1537.8
3 Pigment 1 Kg Rs. 15.00 0.75 11.25
4 White Cement 1 Kg Rs. 12.00 3 36
5 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
Rs.1,637.86
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
2 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2.09 18.81
Rs.18.81
After rounding off: Rs.2,739.60 Total Amount of M and L Rs.2,331.55
Add 17.5 % OH and CP Rs.408.02
Total Rs.2,739.57

512 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6117.02
Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble
shade of following type. Makrana White . Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 3 36
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
4 ordinary portland cement 1 Per Qui Rs. 460.00 0.125 57.5
Rs.136.86
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.974.90 Total Amount of M and L Rs.829.74
Add 17.5 % OH and CP Rs.145.20
Total Rs.974.94

ITEM No. 6117.03


Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble
shade of following type. Abu plain. Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Marble 18mm to 20mm thick Abu Plain 1 Sqm Rs. 600.00 1.2 720
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
3 Pigment 1 Kg Rs. 15.00 0.75 11.25
4 White Cement 1 Kg Rs. 12.00 3 36
5 ordinary portland cement 1 Per Qui Rs. 460.00 0.125 57.5
Rs.856.86
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.1,820.90 Total Amount of M and L Rs.1,549.74
Add 17.5 % OH and CP Rs.271.20
Total Rs.1,820.94
513 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6117.04
Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble
shade of following type. Abu plain
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 White Cement 1 Kg Rs. 12.00 3 36
Rs.100.06
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.931.70 Total Amount of M and L Rs.792.94
Add 17.5 % OH and CP Rs.138.76
Total Rs.931.70

ITEM No. 6117.05


Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble
shade of following type. Makrana doogri. Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.095 43.7
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
3 Marble 18 to 20 mm thick makrana doogri Sqm Rs. 600.00 1.2 720
4 White Cement 1 Kg Rs. 12.00 3 36
5 Pigment 1 Kg Rs. 15.00 0.75 11.25
Rs.843.06
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.1,804.70 Total Amount of M and L Rs.1,535.94
Add 17.5 % OH and CP Rs.268.79
Total Rs.1,804.73
514 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6117.06
Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble
shade of following type. Makrana doogri with e
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
2 White Cement 1 Kg Rs. 12.00 3 36
3 Pigment 1 Kg Rs. 15.00 0.75 11.25
4 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
Rs.100.06
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.931.70 Total Amount of M and L Rs.792.94
Add 17.5 % OH and CP Rs.138.76
Total Rs.931.70

ITEM No. 6117.07


Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble
shade of following type. Makrana Adarga Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Marble 18 To 20mm makrana adanga Sqm Rs. 860.80 1.1 946.88
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 White Cement 1 Kg Rs. 12.00 3 36
5 Pigment 1 Kg Rs. 15.00 0.75 11.25
Rs.1,046.94
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.2,044.30 Total Amount of M and L Rs.1,739.82
Add 17.5 % OH and CP Rs.304.47
Total Rs.2,044.29
515 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6117.08
Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble
shade of following typeMakrana Adarga except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
2 White Cement 1 Kg Rs. 12.00 3 36
3 Pigment 1 Kg Rs. 15.00 0.75 11.25
4 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
Rs.100.06
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.931.70 Total Amount of M and L Rs.792.94
Add 17.5 % OH and CP Rs.138.76
Total Rs.931.70

ITEM No. 6118.01


Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with black
marble of following types. Bhaislana Zebra . Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Marble 18 To 20mm, black zebra bhainsalane 1 Sqm Rs. 1,076.00 1.1 1183.6
2 White Cement 1 Kg Rs. 12.00 3 36
3 Pigment 1 Kg Rs. 15.00 0.75 11.25
4 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
Rs.1,262.96
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.2,298.10 Total Amount of M and L Rs.1,955.84
Add 17.5 % OH and CP Rs.342.27
Total Rs.2,298.11

516 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6118.02
Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with black
marble of following types. Bhaislana Zebra exce
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
2 White Cement 1 Kg Rs. 12.00 3 36
3 Pigment 1 Kg Rs. 15.00 0.75 11.25
4 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
Rs.100.06
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.931.70 Total Amount of M and L Rs.792.94
Add 17.5 % OH and CP Rs.138.76
Total Rs.931.70

ITEM No. 6118.03


Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with black
marble of following types. Chitter Black . Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 3 36
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
3 Marble 18 To 20mm chittar black 1 Sqm Rs. 600.00 1.2 720
4 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
5 Pigment 1 Kg Rs. 15.00 0.75 11.25
Rs.820.06
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.1,777.70 Total Amount of M and L Rs.1,512.94
Add 17.5 % OH and CP Rs.264.76
Total Rs.1,777.70
517 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6118.04
Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with black
marble of following types. Chitter Black except
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Pigment 1 Kg Rs. 15.00 0.75 11.25
2 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 White Cement 1 Kg Rs. 12.00 3 36
Rs.100.06
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.931.70 Total Amount of M and L Rs.792.94
Add 17.5 % OH and CP Rs.138.76
Total Rs.931.70

ITEM No. 6118.05


Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with black
marble of following types. Abu Zebra . Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 White Cement 1 Kg Rs. 12.00 3 36
4 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
5 Marble 18 To 20mm Abu Zebra 1 Sqm Rs. 600.00 1.2 720
Rs.820.06
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 1.34 12.06
Rs.12.06
After rounding off: Rs.1,770.70 Total Amount of M and L Rs.1,507.00
Add 17.5 % OH and CP Rs.263.72
Total Rs.1,770.72
518 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6118.06
Marble work 25mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4) including
pointing in white cement (1:2) using marble dust with admixure of pigment to match with black marble of
following types. Abu zebra except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
2 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
3 Pigment 1 Kg Rs. 15.00 0.75 11.25
4 White Cement 1 Kg Rs. 12.00 3 36
Rs.100.06
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
2 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.931.70 Total Amount of M and L Rs.792.94
Add 17.5 % OH and CP Rs.138.76
Total Rs.931.70

ITEM No. 6119.01


Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble of
any shade other than white and black. Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
2 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
3 White Cement 1 Kg Rs. 12.00 3 36
4 Pigment 1 Kg Rs. 15.00 0.75 11.25
5 Marble 18 To 20mm any colour except black &white 1 Sqm Rs. 968.00 1.1 1064.8
Rs.1,164.86
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2.05 18.45
Rs.18.45
After rounding off: Rs.2,183.40 Total Amount of M and L Rs.1,858.19
Add 17.5 % OH and CP Rs.325.18
Total Rs.2,183.37
519 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6119.02
Marble work 18-20mm thick (table rubbed and polished) in steps, jambs, pillars window cills in cm (1:4)
including pointing in white cement (1:2) using marble dust with admixure of pigment to match with marble of
any shade other than white and black. Excep
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 3 36
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
Rs.100.06
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.931.70 Total Amount of M and L Rs.792.94
Add 17.5 % OH and CP Rs.138.76
Total Rs.931.70

ITEM No. 6120.01


Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Makrana
White . Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 3 36
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
5 Marble tile, makrana white 30X30cmX25cm thick makrana white 1 Sqm Rs. 1,398.80 1.1 1538.68
Rs.1,645.87
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.2,748.00 Total Amount of M and L Rs.2,338.75
Add 17.5 % OH and CP Rs.409.28
Total Rs.2,748.03
520 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6120.02
Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Makrana
White . Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 White Cement 1 Kg Rs. 12.00 3 36
4 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
Rs.107.19
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
2 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2.38 21.42
Rs.21.42
After rounding off: Rs.944.10 Total Amount of M and L Rs.803.49
Add 17.5 % OH and CP Rs.140.61
Total Rs.944.10

ITEM No. 6120.03


Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Abu
white . Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Pigment 1 Kg Rs. 15.00 0.75 11.25
2 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
3 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
4 White Cement 1 Kg Rs. 12.00 3 36
5 Marble tile white, 25mm thick Abu plain 1 Sqm Rs. 600.00 1.2 720
Rs.827.19
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
3 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.1,786.10 Total Amount of M and L Rs.1,520.07
Add 17.5 % OH and CP Rs.266.01
Total Rs.1,786.08
521 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6120.04
Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Abu
white . Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Pigment 1 Kg Rs. 15.00 0.75 11.25
2 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
3 White Cement 1 Kg Rs. 12.00 3 36
4 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
Rs.107.19
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 1.21 10.89
Rs.10.89
After rounding off: Rs.931.70 Total Amount of M and L Rs.792.96
Add 17.5 % OH and CP Rs.138.77
Total Rs.931.72

ITEM No. 6120.05


Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Abu
Pantha . Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
4 Marble tile white, 25mm thick Abu plain 1 Sqm Rs. 600.00 1.2 720
5 White Cement 1 Kg Rs. 12.00 3 36
Rs.827.19
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
3 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
4 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.1,786.10 Total Amount of M and L Rs.1,520.07
Add 17.5 % OH and CP Rs.266.01
Total Rs.1,786.08
522 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6120.06
Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Abu
Pantha . Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 3 36
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
Rs.107.19
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.940.10 Total Amount of M and L Rs.800.07
Add 17.5 % OH and CP Rs.140.01
Total Rs.940.08

ITEM No. 6120.07


Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Makrana
chak Doogri . Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 3 36
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
5 Marble 25mm makrana chak doogri 1 Sqm Rs. 600.00 1.2 720
Rs.827.19
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.1,786.10 Total Amount of M and L Rs.1,520.07
Add 17.5 % OH and CP Rs.266.01
Total Rs.1,786.08
523 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6120.08
Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Makrana
chak Doogri . Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
2 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
3 White Cement 1 Kg Rs. 12.00 3 36
4 Pigment 1 Kg Rs. 15.00 0.75 11.25
Rs.107.19
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.940.10 Total Amount of M and L Rs.800.07
Add 17.5 % OH and CP Rs.140.01
Total Rs.940.08

ITEM No. 6120.09


Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Makrana
Doogri Adanya . Material and Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 3 36
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
5 Marble 25mm th makrana adanga 1 Sqm Rs. 860.80 1.1 946.88
Rs.1,054.07
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.2,052.70 Total Amount of M and L Rs.1,746.95
Add 17.5 % OH and CP Rs.305.72
Total Rs.2,052.66
524 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6120.1
Marble work (table rubbed and polished) for wall lining (veneering to wall) 18-20mm thick in CM (1:3) and
pointing with white cement (1:2) using marble dust with admixure of pigment to match with shade of Makrana
Doogri Adanya . Except stone
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
2 White Cement 1 Kg Rs. 12.00 3 36
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 Pigment 1 Kg Rs. 15.00 0.75 11.25
Rs.107.19
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
2 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.940.10 Total Amount of M and L Rs.800.07
Add 17.5 % OH and CP Rs.140.01
Total Rs.940.08

ITEM No. 6121.01


Granite (of any type) work (table rubbed and polished) in steps, jambs, pillars, window-cill, cooking platforms
and like in cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of
pigment to match with shade of granite M & L 20 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
2 White Cement 1 Kg Rs. 12.00 3 36
3 Pigment 1 Kg Rs. 15.00 0.75 11.25
4 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
5 Granite stone - 20 mm thick machine cut and polished. 1 Sqm Rs. 1,500.00 1.1 1650
Rs.1,750.06
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
2 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
3 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
4 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 1.995 17.955
Rs.17.96
After rounding off: Rs.2,870.40 Total Amount of M and L Rs.2,442.89
Add 17.5 % OH and CP Rs.427.51
Total Rs.2,870.40
525 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6121.02
Granite (of any type) work (table rubbed and polished) in steps, jambs, pillars, window-cill, cooking platforms
and like in cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of
pigment to match with shade of granite M & L 25mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White Cement 1 Kg Rs. 12.00 3 36
2 Pigment 1 Kg Rs. 15.00 0.75 11.25
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 Granite stone - 25 mm thick machine cut and polished.* 1 Sqm Rs. 1,800.00 1.1 1980
5 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
Rs.2,080.06
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.3,258.20 Total Amount of M and L Rs.2,772.94
Add 17.5 % OH and CP Rs.485.26
Total Rs.3,258.20

ITEM No. 6121.03


Granite (of any type) work (table rubbed and polished) in steps, jambs, pillars, window-cill, cooking platforms
and like in cement mortar (1:4) including pointing in white cement (1:2) using marble dust with admixture of
pigment to match with shade of granite.Except stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:4) excluding labour 1 Cum Rs. 2,293.72 0.014 32.11208
2 White Cement 1 Kg Rs. 12.00 3 36
3 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
4 Pigment 1 Kg Rs. 15.00 0.75 11.25
Rs.100.06
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.931.70 Total Amount of M and L Rs.792.94
Add 17.5 % OH and CP Rs.138.76
Total Rs.931.70
526 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6122.01
Granite (of any type) work (table rubbed and polished) for wall lining (veneering to wall) 12mm th in cement
mortar (1:3) and pointing with white cement (1:2) using marble dust with admixture of pigment to match with
shade of granite M & L 20 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Granite tile 12 mm thick machine cut and polished 1 Sqm Rs. 1,291.20 1.1 1420.32
2 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
3 White Cement 1 Kg Rs. 12.00 3 36
4 Pigment 1 Kg Rs. 15.00 0.75 11.25
5 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
Rs.1,527.51
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
2 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
3 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
4 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 1.995 17.955
Rs.17.96
After rounding off: Rs.2,608.90 Total Amount of M and L Rs.2,220.34
Add 17.5 % OH and CP Rs.388.56
Total Rs.2,608.90

ITEM No. 6122.03


Granite (of any type) work (table rubbed and polished) for wall lining (veneering to wall) 12mm th in cement
mortar (1:3) and pointing with white cement (1:2) using marble dust with admixture of pigment to match with
shade of granite .Except stone
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cement mortar (1:3 ) excluding labour 1 Cum Rs. 2,802.94 0.014 39.24116
2 ordinary portland cement 1 Per Qui Rs. 460.00 0.045 20.7
3 Pigment 1 Kg Rs. 15.00 0.75 11.25
4 White Cement 1 Kg Rs. 12.00 3 36
Rs.107.19
Labour
1 Floor polisher (stone or terrazzo) 1 Day Rs. 192.00 1.5 288
2 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
3 Mason (Stone mason) 1 Day Rs. 225.00 1.25 281.25
4 Bhisty including mussack 1 Day Rs. 169.00 0.125 21.125
Rs.674.88
Sundry
1 Sundries 1 Re Rs. 9.00 2 18
Rs.18.00
After rounding off: Rs.940.10 Total Amount of M and L Rs.800.07
Add 17.5 % OH and CP Rs.140.01
Total Rs.940.08
527 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6123
Supply of rubbed stone from approved quarries for hand packing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rubble stones for hand packing 1 Cum Rs. 500.00 1 500
Rs.500.00
After rounding off: Rs.587.50 Total Amount of M and L Rs.500.00
Add 17.5 % OH and CP Rs.87.50
Total Rs.587.50

ITEM No. 6124


Supply of rubbed stone from approved quarries for random and polygonal rubble walling, excluding
bond/through stones.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 stones for random/polygonal wall 1 Cum Rs. 510.00 1 510
Rs.510.00
After rounding off: Rs.599.20 Total Amount of M and L Rs.510.00
Add 17.5 % OH and CP Rs.89.25
Total Rs.599.25

ITEM No. 6125


Supply of rubbed stone from approved quarries for bond/through stones as specified.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bond /through stones 1 Cum Rs. 600.00 1 600
Rs.600.00
After rounding off: Rs.705.00 Total Amount of M and L Rs.600.00
Add 17.5 % OH and CP Rs.105.00
Total Rs.705.00

ITEM No. 6126


Supply of rubbed stone from approved quarries for roughly squared rubble stone including bond/through
stones.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Roughly squared rubble stones inc. bond stone 1 Cum Rs. 600.00 1 600
Rs.600.00
After rounding off: Rs.705.00 Total Amount of M and L Rs.600.00
Add 17.5 % OH and CP Rs.105.00
Total Rs.705.00

528 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6127
Boulders 7cm to 15cm dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boulders 7 to 15 cm dia 1 Cum Rs. 400.00 1 400
Rs.400.00
After rounding off: Rs.470.00 Total Amount of M and L Rs.400.00
Add 17.5 % OH and CP Rs.70.00
Total Rs.470.00

ITEM No. 6128


Boulders exceeding 15cm and upto 30cm dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boulders exc 15cm upto 30 cm dia 1 Cum Rs. 350.00 1 350
Rs.350.00
After rounding off: Rs.411.20 Total Amount of M and L Rs.350.00
Add 17.5 % OH and CP Rs.61.25
Total Rs.411.25

ITEM No. 6129.01


Supply of material stone in block, roughly squared, for dressed stone work of the dimension ordered, quarry
scabbled, not exceeding 1m in length or 60 deci. cu.m in volume per block. Granite or trap.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Granite or Trap stone not exceeding 1m length 1 Cum Rs. 600.00 1 600
Rs.600.00
After rounding off: Rs.705.00 Total Amount of M and L Rs.600.00
Add 17.5 % OH and CP Rs.105.00
Total Rs.705.00

ITEM No. 6129.02


Supply of material stone in block, roughly squared, for dressed stone work of the dimension ordered, quarry
scabbled, not exceeding 1m in length or 60 deci. cu.m in volume per block. Lime stone or sand stone.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime or sand stone 1 Cum Rs. 550.00 1 550
Rs.550.00
After rounding off: Rs.646.20 Total Amount of M and L Rs.550.00
Add 17.5 % OH and CP Rs.96.25
Total Rs.646.25

529 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Stone Masonry
ITEM No. 6130.01
Supply of material stone in block, roughly squared, for dressed stone work of the dimension ordered, quarry
scabbled, not exceeding 1m but not exceeding 2m in length or exceeding 60 deci. cu.m but not exceeding 180
deci. cu.m in volume per block. Granited
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Granite or trap stone exceeding 1m not exceeding 2m length 1 Cum Rs. 620.00 1 620
Rs.620.00
After rounding off: Rs.728.50 Total Amount of M and L Rs.620.00
Add 17.5 % OH and CP Rs.108.50
Total Rs.728.50

ITEM No. 6130.02


Supply of material stone in block, roughly squared, for dressed stone work of the dimension ordered, quarry
scabbled, not exceeding 1m but not exceeding 2m in length or exceeding 60 deci. cu.m but not exceeding 180
deci. cu.m in volume per block. Lime sto
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lime or sand stone exceeding 1m not exceeding 2m length 1 Cum Rs. 500.00 1 500
Rs.500.00
After rounding off: Rs.587.50 Total Amount of M and L Rs.500.00
Add 17.5 % OH and CP Rs.87.50
Total Rs.587.50

ITEM No. 6131


Jodhpur stone for linteis, beams and roofs, self faced, 7.5 to 10cm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone slab 7.5cm to 10cm thick 1 Sqm Rs. 350.00 1 350
Rs.350.00
After rounding off: Rs.411.20 Total Amount of M and L Rs.350.00
Add 17.5 % OH and CP Rs.61.25
Total Rs.411.25

ITEM No. 6132


Jodhpur stone for linteis, beams and roofs, self faced, 10 to 12.5cm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Jodhpur stone for lintel 10 to 12.5 cm thick 1 Sqm Rs. 400.00 1 400
Rs.400.00
After rounding off: Rs.470.00 Total Amount of M and L Rs.400.00
Add 17.5 % OH and CP Rs.70.00
Total Rs.470.00

530 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7001
Shoring and strutting timbers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.1 1800
Rs.1,800.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.21 373.49
2 Carpenter, joiner 1 Day Rs. 225.00 2.21 497.25
Rs.870.74
Sundry
1 Sundries 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.3,145.50 Total Amount of M and L Rs.2,677.04
Add 17.5 % OH and CP Rs.468.48
Total Rs.3,145.52

ITEM No. 7002


Centering to brick, stone or concrete block arches of any shape, not exceeding 6 meters span.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.07 3.5
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.02 360
Rs.363.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.645 145.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.645 109.005
Rs.254.13
After rounding off: Rs.725.70 Total Amount of M and L Rs.617.63
Add 17.5 % OH and CP Rs.108.09
Total Rs.725.72

ITEM No. 7003


Centering to brick, stone or concrete block arches of any shape, not exceeding 6 meters but not exceeding
12m span.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.073 3.65
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.02 360
Rs.363.65
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.645 145.125
2 Mazdoor-man, 1 Day Rs. 169.00 0.645 109.005
Rs.254.13
After rounding off: Rs.725.90 Total Amount of M and L Rs.617.78
Add 17.5 % OH and CP Rs.108.11
Total Rs.725.89

531 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7004.01
Formwork to sides of concrete foundation, footings, bases of columns, raft and raft beams, sides and soffits (if
any) of foundation and plinth beams; and similar work; vertical or to batter Rough finished surface of concrete
flat.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.002 36
2 Nails of length 50mm 1 Kg Rs. 50.00 0.07 3.5
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.60.14
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.135 22.815
2 Carpenter, joiner 1 Day Rs. 225.00 0.135 30.375
Rs.53.19
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.134.20 Total Amount of M and L Rs.114.23
Add 17.5 % OH and CP Rs.19.99
Total Rs.134.22

ITEM No. 7004.02


Formwork to sides of concrete foundation, footings, bases of columns, raft and raft beams, sides and soffits (if
any) of foundation and plinth beams; and similar work; vertical or to batter Rough finished surface of concrete
curved.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.08 4
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.004 72
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.96.64
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.135 22.815
2 Carpenter, joiner 1 Day Rs. 225.00 0.135 30.375
Rs.53.19
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.177.10 Total Amount of M and L Rs.150.73
Add 17.5 % OH and CP Rs.26.38
Total Rs.177.11

532 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7004.03
Add for fair finished surfces to Formwork to sides of concrete foundation, footings, bases of columns, raft and
raft beams, sides and soffits (if any) of foundation and plinth beams; and similar work; vertical or to batter
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7005.01


Formwork to faces of walls, retaining walls, abutments, parapets and staircase railings and similar work
including attached pillasters, buttresses, etc.; and similar work; vertical or to batterRough finished surface of
concrete flat.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.08 4
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0029 52.2
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.76.84
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.2144 36.2336
Rs.92.48
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.200.00 Total Amount of M and L Rs.170.22
Add 17.5 % OH and CP Rs.29.79
Total Rs.200.01

533 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7005.02
Formwork to faces of walls, retaining walls, abutments, parapets and staircase railings and similar work
including attached pillasters, buttresses, etc.; and similar work; vertical or to batter Rough finished surface of
concrete curved.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.08 4
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0033 59.4
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.84.04
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.214 36.166
2 Carpenter, joiner 1 Day Rs. 225.00 0.269 60.525
Rs.96.69
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.213.40 Total Amount of M and L Rs.181.63
Add 17.5 % OH and CP Rs.31.79
Total Rs.213.42

ITEM No. 7005.03


Add for fair finished surfaces to Formwork to faces of walls, retaining walls, abutments, parapets and staircase
railings and similar work including attached pillasters, buttresses, etc.; and similar work; vertical or to batter
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

534 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7006.01
Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work not exceeding
200mm th (Horizontal or sloping) Rough finished surface of concrete flat.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.004 72
2 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.92.64
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.23 51.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.2 33.8
Rs.85.55
Sundry
1 Sundries 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.211.50 Total Amount of M and L Rs.179.99
Add 17.5 % OH and CP Rs.31.50
Total Rs.211.49

ITEM No. 7006.02


Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work not exceeding
200mm th (Horizontal or sloping) Rough finished surface of concrete curved.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0044 79.2
2 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.99.84
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.3 67.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.26 43.94
Rs.111.44
Sundry
1 Sundries 1 Re Rs. 9.00 0.4 3.6
Rs.3.60
After rounding off: Rs.252.50 Total Amount of M and L Rs.214.88
Add 17.5 % OH and CP Rs.37.60
Total Rs.252.48

ITEM No. 7006.03


Add for fair finished surfaces Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings
and similar work not exceeding 200mm th (Horizontal or sloping)
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00
535 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7007.01
Formwork to softfits of suspended slabs such as roof slabs, floor slabs, landings and similar work; exceeding
200mm thick Horizontal or slooping. Rough finished surface of concrete flat.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0052 93.6
2 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.114.24
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
Rs.93.43
Sundry
1 Sundries 1 Re Rs. 9.00 0.21 1.89
Rs.1.89
After rounding off: Rs.246.20 Total Amount of M and L Rs.209.56
Add 17.5 % OH and CP Rs.36.67
Total Rs.246.23

ITEM No. 7007.02


Formwork to softfits of suspended slabs such as roof slabs, floor slabs, landings and similar work; exceeding
200mm thick Horizontal or slooping. Rough finished surface of concrete curved.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0056 100.8
2 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.121.44
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.26 58.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.23 38.87
Rs.97.37
Sundry
1 Sundries 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.259.20 Total Amount of M and L Rs.220.61
Add 17.5 % OH and CP Rs.38.61
Total Rs.259.22

ITEM No. 7007.03


Add for fair finished surfaces Formwork to softfits of suspended slabs such as roof slabs, floor slabs, landings
and similar work; exceeding 200mm thick Horizontal or slooping.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00
536 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7008.01
Formwork to edges of concrete flats, breaks in floors, openings in concrete walls, floors and roofs and sides of
RCC/PCC bands in walls, horizontal or sloping, and similar work all exceeding 20cm wide. (Where RCC/PCC
band in walls; spanning and opening, the formwork soffit only shall be paid for under item 07010)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.083 4.15
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0032 57.6
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.82.39
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.18 30.42
Rs.86.67
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.199.70 Total Amount of M and L Rs.169.96
Add 17.5 % OH and CP Rs.29.74
Total Rs.199.70

ITEM No. 7008.02


Formwork to edges of concrete flats, breaks in floors, openings in concrete walls, floors and roofs and sides of
RCC/PCC bands in walls, horizontal or sloping, and similar work all exceeding 20cm wide. (Where RCC/PCC
band in walls; spanning and opening, the formwork soffit only shall be paid for under item 07010)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.084 4.2
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0036 64.8
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.89.64
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.27 60.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.19 32.11
Rs.92.86
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.215.50 Total Amount of M and L Rs.183.40
Add 17.5 % OH and CP Rs.32.10
Total Rs.215.50

537 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7008.03
Formwork to edges of concrete flats, breaks in floors, openings in concrete walls, floors and roofs and sides of
RCC/PCC bands in walls, horizontal or sloping, and similar work all exceeding 20cm wide. (Where RCC/PCC
band in walls, spanning and opening, the formwork soffit only shall be paid for under item 07010)
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
2 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7009.01


Formwork to chullah hoods, chajjas, weather shades, corbels, water troughs and similar items including edges.
Rough finished surface of concrete flat.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.16 7.2
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0046 82.8
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.110.64
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.27 60.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.27 45.63
Rs.106.38
Sundry
1 Sundries 1 Re Rs. 9.00 0.099 0.891
Rs.0.89
After rounding off: Rs.256.00 Total Amount of M and L Rs.217.91
Add 17.5 % OH and CP Rs.38.13
Total Rs.256.05

538 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7009.02
Formwork to chullah hoods, chajjas, weather shades, corbels, water troughs and similar items including edges.
Rough finished surface of concrete curved.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.17 8.5
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.005 90
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.119.14
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.31 69.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.31 52.39
Rs.122.14
Sundry
1 Sundries 1 Re Rs. 9.00 0.098 0.882
Rs.0.88
After rounding off: Rs.284.50 Total Amount of M and L Rs.242.16
Add 17.5 % OH and CP Rs.42.38
Total Rs.284.54

ITEM No. 7009.03


Formwork to chullah hoods, chajjas, weather shades, corbels, water troughs and similar items including edges.
Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

539 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7010.01
Formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels,
cantilivers, shelves including supports, overhangs, etc. also splays between floors and beams, etc. Rough
finished surface of concrete flat.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.1 5
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.004 72
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.97.64
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.191 42.975
2 Mazdoor-man, 1 Day Rs. 169.00 0.191 32.279
Rs.75.25
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.203.70 Total Amount of M and L Rs.173.34
Add 17.5 % OH and CP Rs.30.34
Total Rs.203.68

ITEM No. 7010.02


Formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels,
cantilivers, shelves including supports, overhangs, etc. also splays between floors and beams, etc. Rough
finished surface of concrete curved.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.1 5
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0044 79.2
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.104.84
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.229 51.525
2 Mazdoor-man, 1 Day Rs. 169.00 0.229 38.701
Rs.90.23
Sundry
1 Sundries 1 Re Rs. 9.00 0.159 1.431
Rs.1.43
After rounding off: Rs.230.90 Total Amount of M and L Rs.196.50
Add 17.5 % OH and CP Rs.34.39
Total Rs.230.88

540 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7010.03
Formwork to sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels,
cantilivers, shelves including supports, overhangs, etc. also splays between floors and beams, etc. Add for fair
finished surfces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7011.01


Formwork to staircases with sloping or stepped soffits including risers and stringers (exlcuding landing). Rough
finished surface of concrete flat.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.004 72
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.2 9
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.101.64
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.3 67.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.12 20.28
Rs.87.78
Sundry
1 Sundries 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.224.00 Total Amount of M and L Rs.190.68
Add 17.5 % OH and CP Rs.33.37
Total Rs.224.05

541 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7011.02
Formwork to staircases with sloping or stepped soffits including risers and stringers (exlcuding landing). Rough
finished surface of concrete curved.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.004 72
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.13 5.85
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.98.49
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.17 28.73
2 Carpenter, joiner 1 Day Rs. 225.00 0.36 81
Rs.109.73
Sundry
1 Sundries 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.245.80 Total Amount of M and L Rs.209.21
Add 17.5 % OH and CP Rs.36.61
Total Rs.245.82

ITEM No. 7011.03


Formwork to staircases with sloping or stepped soffits including risers and stringers (exlcuding landing). Add
for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7012.01


Formwork to sides and soffits of arches. Rough finished surface of concrete flat.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.11 5.5
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.01 180
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.206.14
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.19 32.11
Rs.74.86
After rounding off: Rs.330.20 Total Amount of M and L Rs.281.00
Add 17.5 % OH and CP Rs.49.18
Total Rs.330.18

542 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7012.02
Formwork to sides and soffits of arches. Rough finished surface of concrete curved.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.129 6.45
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.012 216
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.243.09
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.23 51.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.23 38.87
Rs.90.62
After rounding off: Rs.392.10 Total Amount of M and L Rs.333.71
Add 17.5 % OH and CP Rs.58.40
Total Rs.392.11

ITEM No. 7012.03


Formwork to sides and soffits of arches. Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7013.01


Formwork to fins, louvers, fascia and sunbreakers. Rough finished surface of concrete flat.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0032 57.6
2 Nails of length 50mm 1 Kg Rs. 50.00 0.079 3.95
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.82.19
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.35 78.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.35 59.15
Rs.137.90
After rounding off: Rs.258.60 Total Amount of M and L Rs.220.09
Add 17.5 % OH and CP Rs.38.52
Total Rs.258.61

543 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7013.02
Formwork to fins, louvers, fascia and sunbreakers. Rough finished surface of concrete curved.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.079 3.95
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0036 64.8
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.89.39
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.4 67.6
2 Carpenter, joiner 1 Day Rs. 225.00 0.4 90
Rs.157.60
After rounding off: Rs.290.20 Total Amount of M and L Rs.246.99
Add 17.5 % OH and CP Rs.43.22
Total Rs.290.21

ITEM No. 7013.03


Formwork to fins, louvers, fascia and sunbreakers. Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7014.01


Formwork to sides of pillars, posts, structs, piers, columns and stanchions. Rough finished surface of concrete
Square, rectangular or polygonal.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.11 5.5
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0036 64.8
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.90.94
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.29 49.01
2 Carpenter, joiner 1 Day Rs. 225.00 0.29 65.25
Rs.114.26
After rounding off: Rs.241.10 Total Amount of M and L Rs.205.20
Add 17.5 % OH and CP Rs.35.91
Total Rs.241.11

544 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7014.02
Formwork to sides of pillars, posts, structs, piers, columns and stanchions. Rough finished surface of concrete
circular on plan.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.19 9.5
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0052 93.6
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.123.74
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.37 83.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.37 62.53
Rs.145.78
After rounding off: Rs.316.70 Total Amount of M and L Rs.269.52
Add 17.5 % OH and CP Rs.47.17
Total Rs.316.69

ITEM No. 7014.03


Formwork to sides of pillars, posts, structs, piers, columns and stanchions. Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7015.01


Formwork to spiral staircase with sloping or stepped soffits, inlcuding risers and stringers (excluding landing).
Rough finished surface of concrete Square, rectangular or polygonal.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0058 104.4
2 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.11 33
Rs.137.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.232 52.2
2 Mazdoor-man, 1 Day Rs. 169.00 0.232 39.208
Rs.91.41
Sundry
1 Sundries 1 Re Rs. 9.00 0.42 3.78
Rs.3.78
After rounding off: Rs.273.30 Total Amount of M and L Rs.232.59
Add 17.5 % OH and CP Rs.40.70
Total Rs.273.29

545 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7015.02
Formwork to spiral staircase with sloping or stepped soffits, inlcuding risers and stringers (excluding landing).
Rough finished surface of concrete Circular on plan.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0062 111.6
2 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.11 33
Rs.144.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.252 56.7
2 Mazdoor-man, 1 Day Rs. 169.00 0.252 42.588
Rs.99.29
Sundry
1 Sundries 1 Re Rs. 9.00 0.52 4.68
Rs.4.68
After rounding off: Rs.292.10 Total Amount of M and L Rs.248.57
Add 17.5 % OH and CP Rs.43.50
Total Rs.292.07

ITEM No. 7015.03


Formwork to spiral staircase with sloping or stepped soffits, inlcuding risers and stringers (excluding landing).
Add for fair finished sufaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7016.01


Formwork to sides of chimneys and shafts, vertical or to batter. Rough finished surface of concrete Square,
rectangular or polygonal.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.084 3.78
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0028 50.4
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.74.82
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.2 33.8
Rs.90.05
After rounding off: Rs.193.70 Total Amount of M and L Rs.164.87
Add 17.5 % OH and CP Rs.28.85
Total Rs.193.72

546 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7016.02
Formwork to sides of chimneys and shafts, vertical or to batter. Rough finished surface of concrete Circular on
plan.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.092 4.14
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0032 57.6
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.82.38
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.28 63
2 Mazdoor-man, 1 Day Rs. 169.00 0.22 37.18
Rs.100.18
Sundry
1 Sundries 1 Re Rs. 9.00 0.098 0.882
Rs.0.88
After rounding off: Rs.215.50 Total Amount of M and L Rs.183.44
Add 17.5 % OH and CP Rs.32.10
Total Rs.215.54

ITEM No. 7016.03


Formwork to sides of chimneys and shafts, vertical or to batter. Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
2 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7017.01


Formwork to well steining and well curbs. Rough finished surface of concrete Square, rectangular or polygonal.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.092 4.14
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0032 57.6
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.82.38
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.188 42.3
2 Mazdoor-man, 1 Day Rs. 169.00 0.215 36.335
Rs.78.64
Sundry
1 Sundries 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.199.80 Total Amount of M and L Rs.170.02
Add 17.5 % OH and CP Rs.29.75
Total Rs.199.77
547 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7017.02
Formwork to well steining and well curbs. Rough finished surface of concrete Circular on plan.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.1 4.5
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0036 64.8
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.89.94
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.29 65.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.236 39.884
Rs.105.13
Sundry
1 Sundries 1 Re Rs. 9.00 0.098 0.882
Rs.0.88
After rounding off: Rs.230.20 Total Amount of M and L Rs.195.96
Add 17.5 % OH and CP Rs.34.29
Total Rs.230.25

ITEM No. 7017.03


Formwork to well steining and well curbs. Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
2 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7018.01


Formwork to sides and soffits of domes, vaults, shell roofs and arch ribs. Rough finished surface of concrete
curved in one plane.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0085 153
2 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.173.64
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.15 25.35
2 Carpenter, joiner 1 Day Rs. 225.00 0.15 33.75
Rs.59.10
Sundry
1 Sundries 1 Re Rs. 9.00 0.4 3.6
Rs.3.60
After rounding off: Rs.277.70 Total Amount of M and L Rs.236.34
Add 17.5 % OH and CP Rs.41.36
Total Rs.277.70

548 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7018.02
Formwork to sides and soffits of domes, vaults, shell roofs and arch ribs. Rough finished surface of concrete
curved in two planes.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.009 162
2 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.182.64
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.27 60.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.27 45.63
Rs.106.38
Sundry
1 Sundries 1 Re Rs. 9.00 0.79 7.11
Rs.7.11
After rounding off: Rs.348.00 Total Amount of M and L Rs.296.13
Add 17.5 % OH and CP Rs.51.82
Total Rs.347.95

ITEM No. 7018.03


Formwork to sides and soffits of domes, vaults, shell roofs and arch ribs. Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7019.01


Formwork to folded plates. Rough finished surface of concrete.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.08 3.6
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0034 61.2
3 Nails 50 to 80mm 1 Kg Rs. 45.00 0.08 3.6
4 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.89.04
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.162 36.45
2 Mazdoor-man, 1 Day Rs. 169.00 0.175 29.575
Rs.66.03
Sundry
1 Sundries 1 Re Rs. 9.00 0.09 0.81
Rs.0.81
After rounding off: Rs.183.20 Total Amount of M and L Rs.155.88
Add 17.5 % OH and CP Rs.27.28
Total Rs.183.15
549 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7019.02
Formwork to folded plates. Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

ITEM No. 7020.01


Formwork to cornices and mouldings of any shape in cross section and of any girth. Rough finished surfaces of
concrete.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.084 3.78
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0085 153
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0688 20.64
Rs.177.42
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.15 25.35
2 Carpenter, joiner 1 Day Rs. 225.00 0.15 33.75
Rs.59.10
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.279.00 Total Amount of M and L Rs.237.42
Add 17.5 % OH and CP Rs.41.55
Total Rs.278.97

ITEM No. 7020.02


Formwork to cornices and mouldings of any shape in cross section and of any girth. Add for fair finished
surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.21.28
After rounding off: Rs.25.00 Total Amount of M and L Rs.21.28
Add 17.5 % OH and CP Rs.3.72
Total Rs.25.00

550 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7021.01
Formwork to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in
concrete walls, floor and roofs not exceeding 20cm wide and sides of RCC/PCC bands in walls, horizontal or
slopping and similar work exceeding 10cm but n. exc.20 cm wide Rough finished surfaces of concrete.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.01 0.45
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.001 18
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0069 2.07
Rs.20.52
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
2 Mazdoor-man, 1 Day Rs. 169.00 0.03 5.07
Rs.14.07
Sundry
1 Sundries 1 Re Rs. 9.00 0.012 0.108
Rs.0.11
After rounding off: Rs.40.80 Total Amount of M and L Rs.34.70
Add 17.5 % OH and CP Rs.6.07
Total Rs.40.77

ITEM No. 7021.02


Formwork to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in
concrete walls, floor and roofs not exceeding 20cm wide and sides of RCC/PCC bands in walls, horizontal or
slopping and similar work exceeding 10cmbut n. exc.20 cm wide Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.007 1.183
2 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.2.76
After rounding off: Rs.3.20 Total Amount of M and L Rs.2.76
Add 17.5 % OH and CP Rs.0.48
Total Rs.3.24

551 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7022.01
Formwork to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in
concrete walls, floor and roofs not exceeding 20cm wide and sides of RCC/PCC bands in walls, horizontal or
slopping and similar work exceeding 5cmbut not exc.10 cm wide Rough finished surfaces of concrete.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.006 0.27
2 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0055 1.65
3 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.0002 3.6
Rs.5.52
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.025 4.225
2 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.10.98
Sundry
1 Sundries 1 Re Rs. 9.00 0.012 0.108
Rs.0.11
After rounding off: Rs.19.50 Total Amount of M and L Rs.16.60
Add 17.5 % OH and CP Rs.2.91
Total Rs.19.51

ITEM No. 7022.02


Formwork to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in
concrete walls, floor and roofs not exceeding 20cm wide and sides of RCC/PCC bands in walls, horizontal or
slopping and similar work exceeding 5cm not exc.10cm add for fair finished surface
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.006 1.35
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.006 1.152
Rs.2.50
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.50
Add 17.5 % OH and CP Rs.0.44
Total Rs.2.94

552 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7023.01
Formwork to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in
concrete walls, floor and roofs not exceeding 20cm wide and sides of RCC/PCC bands in walls, horizontal or
slopping and similar work but not exceed 5cm wide Rough finished surfaces of concrete.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.004 0.2
2 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.000545 9.81
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0055 1.65
Rs.11.66
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.005 0.845
2 Carpenter, joiner 1 Day Rs. 225.00 0.005 1.125
Rs.1.97
Sundry
1 Sundries 1 Re Rs. 9.00 0.008 0.072
Rs.0.07
After rounding off: Rs.16.10 Total Amount of M and L Rs.13.70
Add 17.5 % OH and CP Rs.2.40
Total Rs.16.10

ITEM No. 7023.02


Formwork to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in
concrete walls, floor and roofs not exceeding 20cm wide and sides of RCC/PCC bands in walls, horizontal or
slopping and similar work but not exceed 5cm Add for fair finished surface
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.004 0.768
2 Carpenter, joiner 1 Day Rs. 225.00 0.004 0.9
Rs.1.67
After rounding off: Rs.2.00 Total Amount of M and L Rs.1.67
Add 17.5 % OH and CP Rs.0.29
Total Rs.1.96

553 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7024.01
Formwork to small surfaces such as cantiliver ends, brackets, ends of steps, caps and bases of pilasters and the
columns and the like. Rough finished surfaces of concrete.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.00062 11.16
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.004 0.18
3 Timber boarding for shuttering 1 Sqm Rs. 300.00 0.0055 1.65
Rs.12.99
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.019 4.275
2 Mazdoor-man, 1 Day Rs. 169.00 0.019 3.211
Rs.7.49
Sundry
1 Sundries 1 Re Rs. 9.00 0.019 0.171
Rs.0.17
After rounding off: Rs.24.30 Total Amount of M and L Rs.20.65
Add 17.5 % OH and CP Rs.3.61
Total Rs.24.26

ITEM No. 7024.02


Formwork to small surfaces such as cantiliver ends, brackets, ends of steps, caps and bases of pilasters and the
columns and the like. Add for fair finished surfaces.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.006 1.35
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.006 1.152
Rs.2.50
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.50
Add 17.5 % OH and CP Rs.0.44
Total Rs.2.94

ITEM No. 7025


Extra on formwork for filleting to produce rebates to door frames etc including any stops, mitres.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.00089 16.02
Rs.16.02
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.008 1.8
2 Mazdoor-man, 1 Day Rs. 169.00 0.008 1.352
Rs.3.15
After rounding off: Rs.22.50 Total Amount of M and L Rs.19.17
Add 17.5 % OH and CP Rs.3.36
Total Rs.22.53

554 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7026
Extra on formwork for filleting to produce external or internal splayed, chamfered or bullnosed angle,
exceeding 25mm width.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 0.00097 17.46
Rs.17.46
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.008 1.8
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.008 1.536
Rs.3.34
After rounding off: Rs.24.40 Total Amount of M and L Rs.20.80
Add 17.5 % OH and CP Rs.3.64
Total Rs.24.44

ITEM No. 7027.01


Second class soft-wood in scantlings Timber fixed in clean sawn M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 1.05 23100
2 Nails 50 to 80mm 1 Kg Rs. 45.00 2.4 108
Rs.23,208.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.21 373.49
2 Carpenter, joiner 1 Day Rs. 225.00 2.21 497.25
Rs.870.74
After rounding off: Rs.28,292.50 Total Amount of M and L Rs.24,078.74
Add 17.5 % OH and CP Rs.4,213.78
Total Rs.28,292.52

ITEM No. 7027.02


Second class soft-wood in scantlings Timber fixed in clean sawn Except timbe
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 2.4 108
Rs.108.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 2.21 373.49
2 Carpenter, joiner 1 Day Rs. 225.00 2.21 497.25
Rs.870.74
After rounding off: Rs.1,150.00 Total Amount of M and L Rs.978.74
Add 17.5 % OH and CP Rs.171.28
Total Rs.1,150.02

555 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7027.03
Second class soft-wood in scantlings Timber fixed in wrought M & L
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 2.4 108
2 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 1.05 23100
Rs.23,208.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 4.42 994.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 4.42 848.64
Rs.1,843.14
After rounding off: Rs.29,435.10 Total Amount of M and L Rs.25,051.14
Add 17.5 % OH and CP Rs.4,383.95
Total Rs.29,435.09

ITEM No. 7027.04


Second class soft-wood in scantlings Timber fixed in wrought Except timber.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 2.4 108
Rs.108.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 4.42 994.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 4.42 848.64
Rs.1,843.14
After rounding off: Rs.2,292.60 Total Amount of M and L Rs.1,951.14
Add 17.5 % OH and CP Rs.341.45
Total Rs.2,292.59

ITEM No. 7027.05


Second class soft-wood in scantlings Timber framed &fixed in Clean sawn M&L
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 3 135
2 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 1.05 23100
Rs.23,235.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 4.42 994.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 4.42 848.64
Rs.1,843.14
After rounding off: Rs.29,466.80 Total Amount of M and L Rs.25,078.14
Add 17.5 % OH and CP Rs.4,388.67
Total Rs.29,466.81

556 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7027.06
Second class soft-wood in scantlings Timberframed& fixed in clean swan Except timber.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 3 135
Rs.135.00
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 4.42 848.64
2 Carpenter, joiner 1 Day Rs. 225.00 4.42 994.5
Rs.1,843.14
After rounding off: Rs.2,324.30 Total Amount of M and L Rs.1,978.14
Add 17.5 % OH and CP Rs.346.17
Total Rs.2,324.31

ITEM No. 7027.07


Second class soft-wood in scantlings Timber framed &fixed in wrought M& L
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 1.05 23100
2 Nails 50 to 80mm 1 Kg Rs. 45.00 3 135
Rs.23,235.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 6.63 1491.75
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 6.63 1272.96
Rs.2,764.71
After rounding off: Rs.30,549.70 Total Amount of M and L Rs.25,999.71
Add 17.5 % OH and CP Rs.4,549.95
Total Rs.30,549.66

ITEM No. 7027.08


Second class soft-wood in scantlings Timber framed & fixed in wrought Except timber.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 3 135
Rs.135.00
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 6.63 1272.96
2 Carpenter, joiner 1 Day Rs. 225.00 6.63 1491.75
Rs.2,764.71
After rounding off: Rs.3,407.20 Total Amount of M and L Rs.2,899.71
Add 17.5 % OH and CP Rs.507.45
Total Rs.3,407.16

557 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7028.01
Second class hard- wood in scantlings Timber fixed in class sawn M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 1.05 33600
2 Nails 50 to 80mm 1 Kg Rs. 45.00 2.4 108
Rs.33,708.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 3.31 744.75
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 3.31 635.52
Rs.1,380.27
After rounding off: Rs.41,228.70 Total Amount of M and L Rs.35,088.27
Add 17.5 % OH and CP Rs.6,140.45
Total Rs.41,228.72

ITEM No. 7028.02


Second class hard- wood in scantlings Timber fixed in class sawn Except timber.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 2.4 108
Rs.108.00
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 3.31 635.52
2 Carpenter, joiner 1 Day Rs. 225.00 3.31 744.75
Rs.1,380.27
After rounding off: Rs.1,748.70 Total Amount of M and L Rs.1,488.27
Add 17.5 % OH and CP Rs.260.45
Total Rs.1,748.72

ITEM No. 7028.03


Second class hard- wood in scantlings Timber fixed wrough M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 2.4 108
2 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 1.05 33600
Rs.33,708.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 6.62 1489.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 6.62 1271.04
Rs.2,760.54
After rounding off: Rs.42,850.50 Total Amount of M and L Rs.36,468.54
Add 17.5 % OH and CP Rs.6,381.99
Total Rs.42,850.53

558 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7028.04
Second class hard- wood in scantlings Timber fixed wrough Except timber.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 2.4 108
Rs.108.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 6.62 1489.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 6.62 1271.04
Rs.2,760.54
After rounding off: Rs.3,370.50 Total Amount of M and L Rs.2,868.54
Add 17.5 % OH and CP Rs.501.99
Total Rs.3,370.53

ITEM No. 7028.05


Second class hard- wood in scantlings Timber framed & fixed in clean swan M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 3 135
2 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 1.05 33600
Rs.33,735.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 6.62 1489.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 6.62 1271.04
Rs.2,760.54
After rounding off: Rs.42,882.30 Total Amount of M and L Rs.36,495.54
Add 17.5 % OH and CP Rs.6,386.72
Total Rs.42,882.26

ITEM No. 7028.06


Second class hard- wood in scantlings Timber framed & fixed in clean Except timber.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 3 135
Rs.135.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 6.62 1489.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 6.62 1271.04
Rs.2,760.54
After rounding off: Rs.3,402.30 Total Amount of M and L Rs.2,895.54
Add 17.5 % OH and CP Rs.506.72
Total Rs.3,402.26

559 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7028.07
Second class hard- wood in scantlings Timber framed & fixed wrough M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 3 135
2 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 1.05 33600
Rs.33,735.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 9.93 2234.25
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 9.93 1906.56
Rs.4,140.81
After rounding off: Rs.44,504.10 Total Amount of M and L Rs.37,875.81
Add 17.5 % OH and CP Rs.6,628.27
Total Rs.44,504.08

ITEM No. 7028.08


Second class hard- wood in scantlings Timber framed & fixed except timber.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 3 135
Rs.135.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 9.93 2234.25
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 9.93 1906.56
Rs.4,140.81
After rounding off: Rs.5,024.10 Total Amount of M and L Rs.4,275.81
Add 17.5 % OH and CP Rs.748.27
Total Rs.5,024.08

ITEM No. 7029


Add if in repairs, to replace old and decayed timber (including piecing, scarfing, etc, of old and new timbers if
required) and removing defective portions to store.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.02 640
2 Nails 50 to 80mm 1 Kg Rs. 45.00 1.2 54
Rs.694.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1.11 249.75
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 1.11 213.12
Rs.462.87
After rounding off: Rs.1,359.30 Total Amount of M and L Rs.1,156.87
Add 17.5 % OH and CP Rs.202.45
Total Rs.1,359.32

560 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7030
Add to 'except timber ' rates if old timber supplied by MES is used,in repairs, to replace old and decayed
timber (including piecing, scarfing, etc, of old and new timbers if required) and removing defective portions to
store.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 1.2 54
Rs.54.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1.11 249.75
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 1.11 213.12
Rs.462.87
After rounding off: Rs.607.30 Total Amount of M and L Rs.516.87
Add 17.5 % OH and CP Rs.90.45
Total Rs.607.32

ITEM No. 7031.01


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, M & L 2nd
class softwood sectional area not exc 3 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.0005 10.595
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.006 0.27
Rs.10.87
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.004 0.9
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.004 0.768
Rs.1.67
After rounding off: Rs.14.70 Total Amount of M and L Rs.12.53
Add 17.5 % OH and CP Rs.2.19
Total Rs.14.73

ITEM No. 7031.02


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, M & L 2nd
class softwood sectional area exc 3 & nexc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.011 0.495
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.0006 12.714
Rs.13.21
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.008 1.8
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.008 1.536
Rs.3.34
After rounding off: Rs.19.40 Total Amount of M and L Rs.16.55
Add 17.5 % OH and CP Rs.2.90
Total Rs.19.44

561 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7031.03
Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, M & L 2nd
class softwood sectional area exc 6 & nexc 13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.015 0.675
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.001 21.19
Rs.21.87
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.012 2.7
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.012 2.304
Rs.5.00
After rounding off: Rs.31.60 Total Amount of M and L Rs.26.87
Add 17.5 % OH and CP Rs.4.70
Total Rs.31.57

ITEM No. 7031.04


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, M & L 2nd
class softwood sectional area exc 13 & nexc 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.022 0.99
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.0015 31.785
Rs.32.78
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.018 4.05
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.018 3.456
Rs.7.51
After rounding off: Rs.47.30 Total Amount of M and L Rs.40.28
Add 17.5 % OH and CP Rs.7.05
Total Rs.47.33

ITEM No. 7031.05


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, M & L 2nd
class hardwood sectional area not exc 3 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.006 0.27
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0005 15.011
Rs.15.28
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.007 1.344
2 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.2.92
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.20
Add 17.5 % OH and CP Rs.3.19
Total Rs.21.39

562 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7031.06
Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, M & L 2nd
class hardwood sectional area exc 3 & nexc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.011 0.495
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0006 18.0132
Rs.18.51
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.012 2.7
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.012 2.304
Rs.5.00
After rounding off: Rs.27.60 Total Amount of M and L Rs.23.51
Add 17.5 % OH and CP Rs.4.11
Total Rs.27.63

ITEM No. 7031.07


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, M & L 2nd
class hardwood sectional area exc 6 & nexc 13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.015 0.675
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.001 30.022
Rs.30.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.019 4.275
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.019 3.648
Rs.7.92
After rounding off: Rs.45.40 Total Amount of M and L Rs.38.62
Add 17.5 % OH and CP Rs.6.76
Total Rs.45.38

ITEM No. 7031.08


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, M & L 2nd
class hardwood sectional area exc 13 & nexc 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.022 0.99
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0015 45.033
Rs.46.02
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.029 6.525
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.029 5.568
Rs.12.09
After rounding off: Rs.68.30 Total Amount of M and L Rs.58.12
Add 17.5 % OH and CP Rs.10.17
Total Rs.68.29

563 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7032.01
Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, but bullnosed
splayed, chamfered or rounded on one edge or face, M & L 2nd class softwood sectional area not exc 3 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.007 0.315
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.0005 10.595
Rs.10.91
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.01 1.92
Rs.4.17
After rounding off: Rs.17.70 Total Amount of M and L Rs.15.08
Add 17.5 % OH and CP Rs.2.64
Total Rs.17.72

ITEM No. 7032.02


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, but bullnosed
splayed, chamfered or rounded on one edge or face, M & L 2nd class softwood sectional area exc 3 & nexc 6
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.011 0.495
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.0006 12.714
Rs.13.21
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.016 3.072
Rs.6.67
After rounding off: Rs.23.40 Total Amount of M and L Rs.19.88
Add 17.5 % OH and CP Rs.3.48
Total Rs.23.36

ITEM No. 7032.03


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, but bullnosed
splayed, chamfered or rounded on one edge or face, M & L 2nd class softwood sectional area exc 6 & nexc 13
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.015 0.675
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.001 21.19
Rs.21.87
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.024 5.4
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.024 4.608
Rs.10.01
After rounding off: Rs.37.50 Total Amount of M and L Rs.31.87
Add 17.5 % OH and CP Rs.5.58
Total Rs.37.45
564 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7032.04
Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads but bullnosed
splayed, chamfered or rounded on one edge or face, M & L 2nd class softwood sectional area exc 13 & nexc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.022 0.99
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.0015 31.785
Rs.32.78
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.032 7.2
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.032 6.144
Rs.13.34
After rounding off: Rs.54.20 Total Amount of M and L Rs.46.12
Add 17.5 % OH and CP Rs.8.07
Total Rs.54.19

ITEM No. 7032.05


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads but bullnosed
splayed, chamfered or rounded on one edge or face, M & L 2nd class hardwood sectional area not exc 3 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.007 0.315
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0005 15.011
Rs.15.33
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.015 2.88
2 Carpenter, joiner 1 Day Rs. 225.00 0.015 3.375
Rs.6.26
After rounding off: Rs.25.40 Total Amount of M and L Rs.21.58
Add 17.5 % OH and CP Rs.3.78
Total Rs.25.36

ITEM No. 7032.06


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads but bullnosed
splayed, chamfered or rounded on one edge or face, M & L 2nd class hardwood sectional area exc 3 & nexc 6
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.011 0.495
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0006 18.0132
Rs.18.51
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.025 4.8
Rs.10.43
After rounding off: Rs.34.00 Total Amount of M and L Rs.28.93
Add 17.5 % OH and CP Rs.5.06
Total Rs.34.00
565 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7032.07
Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads, but bullnosed
splayed, chamfered or rounded on one edge or face, M & L 2nd class hardwood sectional area exc 6 & nexc 13
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.001 30.022
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.015 0.675
Rs.30.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.037 8.325
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.037 7.104
Rs.15.43
After rounding off: Rs.54.20 Total Amount of M and L Rs.46.13
Add 17.5 % OH and CP Rs.8.07
Total Rs.54.20

ITEM No. 7032.08


Plain fillets, square, rectangular or triangular in section, clean sawn, secured with nails or brads but bullnosed
splayed, chamfered or rounded on one edge or face, M & L 2nd class hardwood sectional area exc 13 & nexc
25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.022 0.99
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0015 45.033
Rs.46.02
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.058 13.05
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.058 11.136
Rs.24.19
After rounding off: Rs.82.50 Total Amount of M and L Rs.70.21
Add 17.5 % OH and CP Rs.12.29
Total Rs.82.50

ITEM No. 7033.01


Except batters, any of the foregoing 2nd class softwood sectional area not exc 3 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.006 0.27
Rs.0.27
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.004 0.9
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.004 0.768
Rs.1.67
After rounding off: Rs.2.30 Total Amount of M and L Rs.1.94
Add 17.5 % OH and CP Rs.0.34
Total Rs.2.28

566 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7033.02
Except batters, any of the foregoing 2nd class softwood sectional area exc 3 & nexc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.011 0.495
Rs.0.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.008 1.8
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.008 1.536
Rs.3.34
After rounding off: Rs.4.50 Total Amount of M and L Rs.3.83
Add 17.5 % OH and CP Rs.0.67
Total Rs.4.50

ITEM No. 7033.03


Except batters, any of the foregoing 2nd class softwood sectional area exc 6 & nexc 13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.015 0.675
Rs.0.68
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.012 2.7
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.012 2.304
Rs.5.00
After rounding off: Rs.6.70 Total Amount of M and L Rs.5.68
Add 17.5 % OH and CP Rs.0.99
Total Rs.6.67

ITEM No. 7033.04


Except batters, any of the foregoing 2nd class softwood sectional area exc 13 & nexc 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.022 0.99
Rs.0.99
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.018 4.05
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.018 3.456
Rs.7.51
After rounding off: Rs.10.00 Total Amount of M and L Rs.8.50
Add 17.5 % OH and CP Rs.1.49
Total Rs.9.98

567 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7033.05
Except batters, any of the foregoing 2nd class hardwood sectional area not exc 3 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.006 0.27
Rs.0.27
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.006 1.152
2 Carpenter, joiner 1 Day Rs. 225.00 0.006 1.35
Rs.2.50
After rounding off: Rs.3.30 Total Amount of M and L Rs.2.77
Add 17.5 % OH and CP Rs.0.49
Total Rs.3.26

ITEM No. 7033.06


Except batters, any of the foregoing Except batters, any of the foregoing 2nd class hardwood sectional area
exc 3 & nexc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.011 0.495
Rs.0.50
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.012 2.304
2 Carpenter, joiner 1 Day Rs. 225.00 0.012 2.7
Rs.5.00
After rounding off: Rs.6.50 Total Amount of M and L Rs.5.50
Add 17.5 % OH and CP Rs.0.96
Total Rs.6.46

ITEM No. 7033.07


Except batters, any of the foregoing 2nd class hardwood sectional area exc 6 & nexc 13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.015 0.675
Rs.0.68
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.019 4.275
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.019 3.648
Rs.7.92
After rounding off: Rs.10.10 Total Amount of M and L Rs.8.60
Add 17.5 % OH and CP Rs.1.50
Total Rs.10.10

568 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7033.08
Except batters, any of the foregoing 2nd class hardwood sectional area exc 13 & nexc 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.022 0.99
Rs.0.99
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.029 6.525
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.029 5.568
Rs.12.09
After rounding off: Rs.15.40 Total Amount of M and L Rs.13.08
Add 17.5 % OH and CP Rs.2.29
Total Rs.15.37

ITEM No. 7034.01


Add to Items 07031to 07033, if fixed with screws 2nd class softwood sectional area not exc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.047 2.35
Rs.2.35
After rounding off: Rs.2.80 Total Amount of M and L Rs.2.35
Add 17.5 % OH and CP Rs.0.41
Total Rs.2.76

ITEM No. 7034.02


Add to Items 07031to 07033 if fixed with screws 2nd class softwood sectional area exc 6 & nexc 13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.047 2.35
Rs.2.35
After rounding off: Rs.2.80 Total Amount of M and L Rs.2.35
Add 17.5 % OH and CP Rs.0.41
Total Rs.2.76

ITEM No. 7034.03


Add to Items 07031to 07033, if fixed with screws 2nd class softwood sectional area exc 13 & nexc 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.047 2.82
Rs.2.82
After rounding off: Rs.3.30 Total Amount of M and L Rs.2.82
Add 17.5 % OH and CP Rs.0.49
Total Rs.3.31

569 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7034.04
Add to Items 07031to 07033 if fixed with screws 2nd class hardwood sectional area not exc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.047 2.35
Rs.2.35
After rounding off: Rs.2.80 Total Amount of M and L Rs.2.35
Add 17.5 % OH and CP Rs.0.41
Total Rs.2.76

ITEM No. 7034.05


Add to Items 07031to 07033, if fixed with screws 2nd class hardwood sectional area exc 6 & nexc 13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.047 2.35
Rs.2.35
After rounding off: Rs.2.80 Total Amount of M and L Rs.2.35
Add 17.5 % OH and CP Rs.0.41
Total Rs.2.76

ITEM No. 7034.06


Add to Items 07031to 07033, if fixed with screws 2nd class hardwood sectional area exc 13 & nexc 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.047 2.82
Rs.2.82
After rounding off: Rs.3.30 Total Amount of M and L Rs.2.82
Add 17.5 % OH and CP Rs.0.49
Total Rs.3.31

ITEM No. 7035.01


Add to Items 07031to 07033, if fixed with screws , if wrought 2nd class softwood sectional area not exc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.006 1.35
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.006 1.152
Rs.2.50
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.50
Add 17.5 % OH and CP Rs.0.44
Total Rs.2.94

570 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7035.02
Add to Items 07031to 07033, if fixed with screws , if wrought 2nd class softwood sectional area exc 6 & nexc
13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.008 1.536
2 Carpenter, joiner 1 Day Rs. 225.00 0.008 1.8
Rs.3.34
After rounding off: Rs.3.90 Total Amount of M and L Rs.3.34
Add 17.5 % OH and CP Rs.0.58
Total Rs.3.92

ITEM No. 7035.03


Add to Items 07031to 07033, if fixed with screws if wrought 2nd class softwood sectional area exc 13 & nexc
25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.01 1.92
Rs.4.17
After rounding off: Rs.4.90 Total Amount of M and L Rs.4.17
Add 17.5 % OH and CP Rs.0.73
Total Rs.4.90

ITEM No. 7035.04


Add to Items 07031to 07033, if fixed with screws if wrought 2nd class hardwood sectional area not exc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.006 1.152
2 Carpenter, joiner 1 Day Rs. 225.00 0.006 1.35
Rs.2.50
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.50
Add 17.5 % OH and CP Rs.0.44
Total Rs.2.94

ITEM No. 7035.05


Add to Items 07031to 07033, if fixed with screws , if wrought 2nd class hardwood sectional area exc 6 & nexc
13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.008 1.536
2 Carpenter, joiner 1 Day Rs. 225.00 0.008 1.8
Rs.3.34
After rounding off: Rs.3.90 Total Amount of M and L Rs.3.34
Add 17.5 % OH and CP Rs.0.58
Total Rs.3.92

571 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7035.06
Add to Items 07031to 07033, if fixed with screws , if wrought 2nd class hardwood sectional area exc 13 & nexc
25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.01 1.92
Rs.4.17
After rounding off: Rs.4.90 Total Amount of M and L Rs.4.17
Add 17.5 % OH and CP Rs.0.73
Total Rs.4.90

ITEM No. 7036.01


Add to Items 07031to 07033, if fixed with screws , if in repairs or if refixed in old position 2nd class softwood
sectional area not exc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.003 0.576
Rs.1.25
After rounding off: Rs.1.50 Total Amount of M and L Rs.1.25
Add 17.5 % OH and CP Rs.0.22
Total Rs.1.47

ITEM No. 7036.02


Add to Items 07031to 07033, if fixed with screws , if in repairs or if refixed in old position 2nd class softwood
sectional area exc 6 & nexc 13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.004 0.768
2 Carpenter, joiner 1 Day Rs. 225.00 0.004 0.9
Rs.1.67
After rounding off: Rs.2.00 Total Amount of M and L Rs.1.67
Add 17.5 % OH and CP Rs.0.29
Total Rs.1.96

ITEM No. 7036.03


Add to Items 07031to 07033, if fixed with screws if in repairs or if refixed in old position 2nd class softwood
sectional area exc 13 & nexc 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.007 1.344
2 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.2.92
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.92
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.43

572 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7036.04
Add to Items 07031to 07033, if fixed with screws , if in repairs or if refixed in old position 2nd class hardwood
sectional area not exc 6 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.003 0.576
2 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.1.25
After rounding off: Rs.1.50 Total Amount of M and L Rs.1.25
Add 17.5 % OH and CP Rs.0.22
Total Rs.1.47

ITEM No. 7036.05


Add to Items 07031to 07033, if fixed with screws if in repairs or if refixed in old position 2nd class hardwood
sectional area exc 6 & nexc 13 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.004 0.768
2 Carpenter, joiner 1 Day Rs. 225.00 0.004 0.9
Rs.1.67
After rounding off: Rs.2.00 Total Amount of M and L Rs.1.67
Add 17.5 % OH and CP Rs.0.29
Total Rs.1.96

ITEM No. 7036.06


Add to Items 07031to 07033, if fixed with screws , if in repairs or if refixed in old position 2nd class hardwood
sectional area exc 13 & nexc 25 sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.007 1.344
2 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.2.92
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.92
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.43

573 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7037.01
Clean sawn battens at 15 cm centres Material & Labour softwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.049 2.205
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.007 148.33
Rs.150.54
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
2 Mazdoor-man, 1 Day Rs. 169.00 0.014 2.366
Rs.8.44
After rounding off: Rs.186.80 Total Amount of M and L Rs.158.98
Add 17.5 % OH and CP Rs.27.82
Total Rs.186.80

ITEM No. 7037.02


Clean sawn battens at 15 cm centres Material & Labour softwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.073 3.285
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.013 275.47
Rs.278.76
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
2 Mazdoor-man, 1 Day Rs. 169.00 0.014 2.366
Rs.8.44
After rounding off: Rs.337.50 Total Amount of M and L Rs.287.20
Add 17.5 % OH and CP Rs.50.26
Total Rs.337.46

ITEM No. 7037.03


Clean sawn battens at 15 cm centres Material & Labour hardwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.049 2.205
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0075 225.165
Rs.227.37
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
2 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
Rs.12.38
After rounding off: Rs.281.70 Total Amount of M and L Rs.239.75
Add 17.5 % OH and CP Rs.41.96
Total Rs.281.71

574 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7037.04
Clean sawn battens at 15 cm centres Material & Labour hardwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.073 3.285
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0135 405.297
Rs.408.58
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
2 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
Rs.12.38
After rounding off: Rs.494.60 Total Amount of M and L Rs.420.96
Add 17.5 % OH and CP Rs.73.67
Total Rs.494.63

ITEM No. 7037.05


Clean sawn battens at 15 cm centres Fixing only, any sectional area in softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.062 2.79
Rs.2.79
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.014 2.366
2 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.8.44
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.23
Add 17.5 % OH and CP Rs.1.97
Total Rs.13.20

ITEM No. 7037.06


Clean sawn battens at 15 cm centres Fixing only, any sectional area in hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.062 2.79
Rs.2.79
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
2 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
Rs.12.38
After rounding off: Rs.17.80 Total Amount of M and L Rs.15.17
Add 17.5 % OH and CP Rs.2.65
Total Rs.17.82

575 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7038.01
Clean sawn battens at 20 cm centres Material & Labour softwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length exceeding 50mm not exceeding 100mm 1 Kg Rs. 45.00 0.049 2.205
2 Batten clean sawn SC SW 1 Cum Rs. 21,189.00 0.005 105.945
Rs.108.15
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.0105 1.7745
Rs.6.27
After rounding off: Rs.134.40 Total Amount of M and L Rs.114.42
Add 17.5 % OH and CP Rs.20.02
Total Rs.134.45

ITEM No. 7038.02


Clean sawn battens at 20 cm centres Material & Labour softwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.061 2.745
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.01 211.9
Rs.214.65
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
2 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.6.19
After rounding off: Rs.259.50 Total Amount of M and L Rs.220.84
Add 17.5 % OH and CP Rs.38.65
Total Rs.259.48

ITEM No. 7038.03


Clean sawn battens at 20 cm centres Material & Labour hardwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.049 2.205
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0055 165.121
Rs.167.33
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.015 2.535
Rs.9.29
After rounding off: Rs.207.50 Total Amount of M and L Rs.176.61
Add 17.5 % OH and CP Rs.30.91
Total Rs.207.52

576 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7038.04
Clean sawn battens at 20 cm centres Material & Labour hardwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.061 2.745
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0105 315.231
Rs.317.98
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.015 2.535
Rs.9.29
After rounding off: Rs.384.50 Total Amount of M and L Rs.327.26
Add 17.5 % OH and CP Rs.57.27
Total Rs.384.53

ITEM No. 7038.05


Clean sawn battens at 20 cm centres Fixing only, any sectional area in softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.053 2.385
Rs.2.39
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
Rs.6.19
After rounding off: Rs.10.10 Total Amount of M and L Rs.8.58
Add 17.5 % OH and CP Rs.1.50
Total Rs.10.08

ITEM No. 7038.06


Clean sawn battens at 20 cm centres Fixing only, any sectional area in hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.053 2.544
Rs.2.54
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.015 2.535
2 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.9.29
After rounding off: Rs.13.90 Total Amount of M and L Rs.11.83
Add 17.5 % OH and CP Rs.2.07
Total Rs.13.90

577 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7039.01
Clean sawn battens at 25 cm centres Material & Labour softwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.029 1.305
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.004 84.76
Rs.86.07
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.009 1.521
2 Carpenter, joiner 1 Day Rs. 225.00 0.017 3.825
Rs.5.35
After rounding off: Rs.107.40 Total Amount of M and L Rs.91.41
Add 17.5 % OH and CP Rs.16.00
Total Rs.107.41

ITEM No. 7039.02


Clean sawn battens at 25 cm centres Material & Labour softwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.008 169.52
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.049 2.205
Rs.171.73
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.017 3.825
2 Mazdoor-man, 1 Day Rs. 169.00 0.009 1.521
Rs.5.35
After rounding off: Rs.208.10 Total Amount of M and L Rs.177.07
Add 17.5 % OH and CP Rs.30.99
Total Rs.208.06

ITEM No. 7039.03


Clean sawn battens at 25 cm centres Material & Labour hardwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0045 135.099
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.029 1.305
Rs.136.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.026 5.85
2 Mazdoor-man, 1 Day Rs. 169.00 0.013 2.197
Rs.8.05
After rounding off: Rs.169.70 Total Amount of M and L Rs.144.45
Add 17.5 % OH and CP Rs.25.28
Total Rs.169.73

578 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7039.04
Clean sawn battens at 25 cm centres Material & Labour hardwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.049 2.205
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0085 255.187
Rs.257.39
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.013 2.197
2 Carpenter, joiner 1 Day Rs. 225.00 0.026 5.85
Rs.8.05
After rounding off: Rs.311.90 Total Amount of M and L Rs.265.44
Add 17.5 % OH and CP Rs.46.45
Total Rs.311.89

ITEM No. 7039.05


Clean sawn battens at 25 cm centres Fixing only, any sectional area in softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.036 1.62
Rs.1.62
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.017 3.825
2 Mazdoor-man, 1 Day Rs. 169.00 0.009 1.521
Rs.5.35
After rounding off: Rs.8.20 Total Amount of M and L Rs.6.97
Add 17.5 % OH and CP Rs.1.22
Total Rs.8.19

ITEM No. 7039.06


Clean sawn battens at 25 cm centres Fixing only, any sectional area in hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.036 1.62
Rs.1.62
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.026 5.85
2 Mazdoor-man, 1 Day Rs. 169.00 0.013 2.197
Rs.8.05
After rounding off: Rs.11.40 Total Amount of M and L Rs.9.67
Add 17.5 % OH and CP Rs.1.69
Total Rs.11.36

579 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7040.01
Clean sawn battens at 30 cm centres Material & Labour softwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.025 1.125
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.003 63.57
Rs.64.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.007 1.183
Rs.4.33
After rounding off: Rs.81.10 Total Amount of M and L Rs.69.03
Add 17.5 % OH and CP Rs.12.08
Total Rs.81.11

ITEM No. 7040.02


Clean sawn battens at 30 cm centres Material & Labour softwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.041 1.845
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.006 127.14
Rs.128.99
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.007 1.183
2 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.4.33
After rounding off: Rs.156.60 Total Amount of M and L Rs.133.32
Add 17.5 % OH and CP Rs.23.33
Total Rs.156.65

ITEM No. 7040.03


Clean sawn battens at 30 cm centres Material & Labour hardwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.025 1.125
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0035 105.077
Rs.106.20
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
2 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.6.19
After rounding off: Rs.132.10 Total Amount of M and L Rs.112.39
Add 17.5 % OH and CP Rs.19.67
Total Rs.132.06

580 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7040.04
Clean sawn battens at 30 cm centres Material & Labour hardwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0065 195.143
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.041 1.845
Rs.196.99
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
Rs.6.19
After rounding off: Rs.238.70 Total Amount of M and L Rs.203.18
Add 17.5 % OH and CP Rs.35.56
Total Rs.238.73

ITEM No. 7040.05


Clean sawn battens at 30 cm centres Fixing only, any sectional area in softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.03 1.35
Rs.1.35
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.007 1.183
Rs.4.33
After rounding off: Rs.6.70 Total Amount of M and L Rs.5.68
Add 17.5 % OH and CP Rs.0.99
Total Rs.6.68

ITEM No. 7040.06


Clean sawn battens at 30 cm centres Fixing only, any sectional area in hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.03 1.35
Rs.1.35
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
2 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.6.19
After rounding off: Rs.8.90 Total Amount of M and L Rs.7.54
Add 17.5 % OH and CP Rs.1.32
Total Rs.8.86

581 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7041.01
Clean sawn battens at 35 cm centres Material & Labour softwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.012 0.54
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.003 63.57
Rs.64.11
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.007 1.183
Rs.4.33
After rounding off: Rs.80.40 Total Amount of M and L Rs.68.44
Add 17.5 % OH and CP Rs.11.98
Total Rs.80.42

ITEM No. 7041.02


Clean sawn battens at 35 cm centres Material & Labour softwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.037 1.665
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.006 127.14
Rs.128.81
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
2 Mazdoor-man, 1 Day Rs. 169.00 0.007 1.183
Rs.4.33
After rounding off: Rs.156.40 Total Amount of M and L Rs.133.14
Add 17.5 % OH and CP Rs.23.30
Total Rs.156.44

ITEM No. 7041.03


Clean sawn battens at 35 cm centres Material & Labour hardwood 2nd class sectional area exc. 5 & n exc 15
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.012 0.54
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0035 105.077
Rs.105.62
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
Rs.6.19
After rounding off: Rs.131.40 Total Amount of M and L Rs.111.81
Add 17.5 % OH and CP Rs.19.57
Total Rs.131.37

582 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7041.04
Clean sawn battens at 35 cm centres Material & Labour hardwood 2nd class sectional area exc. 15 & n exc 25
sqcm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.037 1.665
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.0065 195.143
Rs.196.81
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
Rs.6.19
After rounding off: Rs.238.50 Total Amount of M and L Rs.203.00
Add 17.5 % OH and CP Rs.35.52
Total Rs.238.52

ITEM No. 7041.05


Clean sawn battens at 35 cm centres Fixing only, any sectional area in softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.025 1.125
Rs.1.13
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.007 1.183
2 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.4.33
After rounding off: Rs.6.40 Total Amount of M and L Rs.5.46
Add 17.5 % OH and CP Rs.0.96
Total Rs.6.41

ITEM No. 7041.06


Clean sawn battens at 35 cm centres Fixing only, any sectional area in hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.025 1.125
Rs.1.13
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
Rs.6.19
After rounding off: Rs.8.60 Total Amount of M and L Rs.7.32
Add 17.5 % OH and CP Rs.1.28
Total Rs.8.60

583 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7042.01
35 mm x 10 mm laths (fixed straight or diagonally ) in two way trellis work with 50 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M & L softwood
2nd class in clean sawn.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.008 169.52
2 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 0.017 374
Rs.543.52
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
Rs.19.70
After rounding off: Rs.661.80 Total Amount of M and L Rs.563.22
Add 17.5 % OH and CP Rs.98.56
Total Rs.661.78

ITEM No. 7042.02


35 mm x 10 mm laths (fixed straight or diagonally ) in two way trellis work with 50 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M & L softwood
2nd class in wrought.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 0.017 374
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.008 169.52
Rs.543.52
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
2 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
Rs.39.40
After rounding off: Rs.684.90 Total Amount of M and L Rs.582.92
Add 17.5 % OH and CP Rs.102.01
Total Rs.684.93

584 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7042.03
35 mm x 10 mm laths (fixed straight or diagonally ) in two way trellis work with 50 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M & L hardwood
2nd class in clean sawn.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.009 270.198
2 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.018 576
Rs.846.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
Rs.19.70
After rounding off: Rs.1,017.40 Total Amount of M and L Rs.865.90
Add 17.5 % OH and CP Rs.151.53
Total Rs.1,017.43

ITEM No. 7042.04


35 mm x 10 mm laths (fixed straight or diagonally ) in two way trellis work with 50 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M & L hardwood
2nd class in wrought.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.018 576
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.009 270.198
Rs.846.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
Rs.39.40
After rounding off: Rs.1,040.60 Total Amount of M and L Rs.885.60
Add 17.5 % OH and CP Rs.154.98
Total Rs.1,040.58

585 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7043.01
40 mm x 12 mm laths (fixed straight or diagonally ) in two way trellis work with 75 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M & L softwood
2nd class in clean sawn.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 0.018 396
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.009 190.71
Rs.586.71
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
2 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.19.70
After rounding off: Rs.712.50 Total Amount of M and L Rs.606.41
Add 17.5 % OH and CP Rs.106.12
Total Rs.712.53

ITEM No. 7043.02


40 mm x 12 mm laths (fixed straight or diagonally ) in two way trellis work with 75 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M & L softwood
2nd class in wrought.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.009 190.71
2 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 0.018 396
Rs.586.71
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
2 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
Rs.39.40
After rounding off: Rs.735.70 Total Amount of M and L Rs.626.11
Add 17.5 % OH and CP Rs.109.57
Total Rs.735.68

586 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7043.03
40 mm x 12 mm laths (fixed straight or diagonally ) in two way trellis work with 75 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M & L hardwood
2nd class in clean sawn.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.01 300.22
2 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.02 640
Rs.940.22
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
Rs.19.70
After rounding off: Rs.1,127.90 Total Amount of M and L Rs.959.92
Add 17.5 % OH and CP Rs.167.99
Total Rs.1,127.91

ITEM No. 7043.04


40 mm x 12 mm laths (fixed straight or diagonally ) in two way trellis work with 75 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M&L hardwood
2nd class in wrought.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.01 300.22
2 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.02 640
Rs.940.22
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
2 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
Rs.39.40
After rounding off: Rs.1,151.10 Total Amount of M and L Rs.979.62
Add 17.5 % OH and CP Rs.171.43
Total Rs.1,151.05

587 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7044.01
40 mm x 12 mm laths (fixed straight or diagonally ) in two way trellis work with 75 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed completeM & L softwood
2nd class in clean sawn.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.008 169.52
2 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 0.015 330
Rs.499.52
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
2 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.19.70
After rounding off: Rs.610.10 Total Amount of M and L Rs.519.22
Add 17.5 % OH and CP Rs.90.86
Total Rs.610.08

ITEM No. 7044.02


40 mm x 12 mm laths (fixed straight or diagonally ) in two way trellis work with 75 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M & L softwood
2nd class in wrought.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 0.015 330
2 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 0.008 169.52
Rs.499.52
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
Rs.39.40
After rounding off: Rs.633.20 Total Amount of M and L Rs.538.92
Add 17.5 % OH and CP Rs.94.31
Total Rs.633.23

588 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7044.03
40 mm x 12 mm laths (fixed straight or diagonally ) in two way trellis work with 75 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed complete M & L hardwood
2nd class in clean sawn.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.016 512
2 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.009 270.198
Rs.782.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
Rs.19.70
After rounding off: Rs.942.20 Total Amount of M and L Rs.801.90
Add 17.5 % OH and CP Rs.140.33
Total Rs.942.23

ITEM No. 7044.04


40 mm x 12 mm laths (fixed straight or diagonally ) in two way trellis work with 75 mm spaces in the clear,
including 75 mm x 50 mm fillet (notched to take ends of laths) all round and fixed completeM & L hardwood
2nd class in wrought.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 0.009 270.198
2 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.016 512
Rs.782.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.1 16.9
Rs.39.40
After rounding off: Rs.965.40 Total Amount of M and L Rs.821.60
Add 17.5 % OH and CP Rs.143.78
Total Rs.965.38

ITEM No. 7045.01


Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.146 7.008
2 Boading IInd cl. soft 15mm th 1 Sqm Rs. 315.00 1.05 330.75
Rs.337.76
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0306 6.885
Rs.6.89
After rounding off: Rs.405.00 Total Amount of M and L Rs.344.64
Add 17.5 % OH and CP Rs.60.31
Total Rs.404.96

589 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7045.02
Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.146 7.008
2 Boarding IInd cl soft 20mm th 1 Sqm Rs. 420.00 1.05 441
Rs.448.01
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.537.00 Total Amount of M and L Rs.457.01
Add 17.5 % OH and CP Rs.79.98
Total Rs.536.98

ITEM No. 7045.03


Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.252 12.096
2 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1.05 551.25
Rs.563.35
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.673.00 Total Amount of M and L Rs.572.80
Add 17.5 % OH and CP Rs.100.24
Total Rs.673.04

ITEM No. 7045.04


Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.309 14.832
2 Boarding IInd cl soft. 30mm th 1 Sqm Rs. 630.00 1.05 661.5
Rs.676.33
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0465 10.4625
Rs.10.46
After rounding off: Rs.807.00 Total Amount of M and L Rs.686.79
Add 17.5 % OH and CP Rs.120.19
Total Rs.806.98

590 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7045.05
Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.445 20.025
2 Boarding IInd cl soft 40mm th 1 Sqm Rs. 840.00 1.05 882
Rs.902.03
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.061 13.725
Rs.13.73
After rounding off: Rs.1,076.00 Total Amount of M and L Rs.915.75
Add 17.5 % OH and CP Rs.160.26
Total Rs.1,076.01

ITEM No. 7045.06


Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.142 6.816
2 Boarding llnd cl Hard wood 15mm 1 Kg Rs. 480.00 1.05 504
Rs.510.82
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.056 12.6
Rs.12.60
After rounding off: Rs.615.00 Total Amount of M and L Rs.523.42
Add 17.5 % OH and CP Rs.91.60
Total Rs.615.01

ITEM No. 7045.07


Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.146 7.008
2 Boarding IInd cl hardwood. 20mm th 1 Sqm Rs. 640.00 1.05 672
Rs.679.01
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.061 13.725
Rs.13.73
After rounding off: Rs.814.00 Total Amount of M and L Rs.692.73
Add 17.5 % OH and CP Rs.121.23
Total Rs.813.96

591 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7045.08
Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.252 12.096
2 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1.05 840
Rs.852.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.071 15.975
Rs.15.98
After rounding off: Rs.1,020.00 Total Amount of M and L Rs.868.07
Add 17.5 % OH and CP Rs.151.91
Total Rs.1,019.98

ITEM No. 7045.09


Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.302 13.59
2 Boarding IInd cl . Hard Wood 30mm th 1 Sqm Rs. 960.00 1.05 1008
Rs.1,021.59
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.078 17.55
Rs.17.55
After rounding off: Rs.1,221.00 Total Amount of M and L Rs.1,039.14
Add 17.5 % OH and CP Rs.181.85
Total Rs.1,220.99

ITEM No. 7045.1


Boarding, supplied & fixed with nails in any situation (except floorting and skirting ) in clean sawn with butt
joints Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding clean swan SC Hard wood 40 mm thick 1 Sqm Rs. 1,200.00 1.05 1260
2 Nails of length exceeding 50mm not exceeding 100mm 1 Kg Rs. 45.00 0.439 19.755
Rs.1,279.76
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0917 20.6325
Rs.20.63
After rounding off: Rs.1,528.00 Total Amount of M and L Rs.1,300.39
Add 17.5 % OH and CP Rs.227.57
Total Rs.1,527.96

592 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7046.01
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length exceeding 50mm not exceeding 100mm 1 Kg Rs. 45.00 0.153 6.885
2 Boading IInd cl. soft 15mm th 1 Sqm Rs. 315.00 1.05 330.75
Rs.337.64
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
2 Carpenter, joiner 1 Day Rs. 225.00 0.091 20.475
Rs.30.84
After rounding off: Rs.433.00 Total Amount of M and L Rs.368.48
Add 17.5 % OH and CP Rs.64.48
Total Rs.432.96

ITEM No. 7046.02


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.138 6.624
2 Boarding IInd cl soft 20mm th 1 Sqm Rs. 420.00 1.05 441
Rs.447.62
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.094 21.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.31.52
After rounding off: Rs.563.00 Total Amount of M and L Rs.479.14
Add 17.5 % OH and CP Rs.83.85
Total Rs.562.99

ITEM No. 7046.03


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.241 11.568
2 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1.05 551.25
Rs.562.82
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
2 Carpenter, joiner 1 Day Rs. 225.00 0.104 23.4
Rs.33.77
After rounding off: Rs.701.00 Total Amount of M and L Rs.596.59
Add 17.5 % OH and CP Rs.104.40
Total Rs.700.99

593 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7046.04
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft. 30mm th 1 Sqm Rs. 630.00 1.05 661.5
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.303 13.635
Rs.675.14
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.108 24.3
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.34.67
After rounding off: Rs.834.00 Total Amount of M and L Rs.709.80
Add 17.5 % OH and CP Rs.124.22
Total Rs.834.02

ITEM No. 7046.05


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.437 19.665
2 Boarding IInd cl soft 40mm th 1 Sqm Rs. 840.00 1.05 882
Rs.901.67
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.115 25.875
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.36.24
After rounding off: Rs.1,102.00 Total Amount of M and L Rs.937.91
Add 17.5 % OH and CP Rs.164.13
Total Rs.1,102.04

ITEM No. 7046.06


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.147 7.056
2 Boading IInd cl. Hard wood 15 mm 1 Sqm Rs. 480.00 1.05 504
15mm th
Rs.511.06
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
2 Carpenter, joiner 1 Day Rs. 225.00 0.137 30.825
Rs.46.38
After rounding off: Rs.655.00 Total Amount of M and L Rs.557.43
Add 17.5 % OH and CP Rs.97.55
Total Rs.654.98

594 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7046.07
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.153 7.344
2 Boarding IInd cl hardwood. 20mm th 1 Sqm Rs. 640.00 1.05 672
Rs.679.34
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.142 31.95
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.47.50
After rounding off: Rs.854.00 Total Amount of M and L Rs.726.85
Add 17.5 % OH and CP Rs.127.20
Total Rs.854.04

ITEM No. 7046.08


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1.05 840
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.238 10.71
Rs.850.71
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.152 34.2
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.49.75
After rounding off: Rs.1,058.00 Total Amount of M and L Rs.900.46
Add 17.5 % OH and CP Rs.157.58
Total Rs.1,058.04

ITEM No. 7046.09


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl . Hard Wood 30mm th 1 Sqm Rs. 960.00 1.05 1008
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.309 13.905
Rs.1,021.91
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
2 Carpenter, joiner 1 Day Rs. 225.00 0.159 35.775
Rs.51.33
After rounding off: Rs.1,261.00 Total Amount of M and L Rs.1,073.23
Add 17.5 % OH and CP Rs.187.82
Total Rs.1,261.05

595 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7046.1
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) in planed one side with butt
joints Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding clean swan SC Hard wood 40 mm thick 1 Sqm Rs. 1,200.00 1.05 1260
2 Nails of length exceeding 50mm not exceeding 100mm 1 Kg Rs. 45.00 0.43 19.35
Rs.1,279.35
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.172 38.7
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.54.25
After rounding off: Rs.1,567.00 Total Amount of M and L Rs.1,333.60
Add 17.5 % OH and CP Rs.233.38
Total Rs.1,566.98

ITEM No. 7047.01


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7047.02


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

596 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7047.03
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7047.04


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
2 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7047.05


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
2 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7047.06


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

597 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7047.07
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

ITEM No. 7047.08


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

ITEM No. 7047.09


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

ITEM No. 7047.1


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to list if planed both
side. Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
2 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

598 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7048.01
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated. Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.146 7.008
2 Boading IInd cl. soft 15mm th 1 Sqm Rs. 315.00 1.05 330.75
Rs.337.76
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.162 31.104
2 Carpenter, joiner 1 Day Rs. 225.00 0.199 44.775
Rs.75.88
After rounding off: Rs.486.00 Total Amount of M and L Rs.413.64
Add 17.5 % OH and CP Rs.72.39
Total Rs.486.02

ITEM No. 7048.02


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated. Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.14 6.72
2 Boarding IInd cl soft 20mm th 1 Sqm Rs. 420.00 1.05 441
Rs.447.72
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.202 45.45
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.162 31.104
Rs.76.55
After rounding off: Rs.616.00 Total Amount of M and L Rs.524.27
Add 17.5 % OH and CP Rs.91.75
Total Rs.616.02

ITEM No. 7048.03


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated. Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.239 11.472
2 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1.05 551.25
Rs.562.72
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.209 47.025
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.162 31.104
Rs.78.13
After rounding off: Rs.753.00 Total Amount of M and L Rs.640.85
Add 17.5 % OH and CP Rs.112.15
Total Rs.753.00

599 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7048.04
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated. Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.314 14.13
2 Boarding IInd cl soft. 30mm th 1 Sqm Rs. 630.00 1.05 661.5
Rs.675.63
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.214 48.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.162 31.104
Rs.79.25
After rounding off: Rs.887.00 Total Amount of M and L Rs.754.88
Add 17.5 % OH and CP Rs.132.10
Total Rs.886.99

ITEM No. 7048.05


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated. Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.154 6.93
2 Boarding IInd cl soft 40mm th 1 Sqm Rs. 840.00 1.05 882
Rs.888.93
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.162 31.104
2 Carpenter, joiner 1 Day Rs. 225.00 0.223 50.175
Rs.81.28
After rounding off: Rs.1,140.00 Total Amount of M and L Rs.970.21
Add 17.5 % OH and CP Rs.169.79
Total Rs.1,140.00

ITEM No. 7048.06


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated. Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.149 7.152
2 Boading IInd cl. Hard wood 15 mm 1 Sqm Rs. 480.00 1.05 504
15mm th
Rs.511.15
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.242 46.464
2 Carpenter, joiner 1 Day Rs. 225.00 0.298 67.05
Rs.113.51
After rounding off: Rs.734.00 Total Amount of M and L Rs.624.67
Add 17.5 % OH and CP Rs.109.32
Total Rs.733.98

600 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7048.07
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated. Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.154 7.392
2 Boarding IInd cl hardwood. 20mm th 1 Sqm Rs. 640.00 1.05 672
Rs.679.39
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.303 68.175
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.242 46.464
Rs.114.64
After rounding off: Rs.933.00 Total Amount of M and L Rs.794.03
Add 17.5 % OH and CP Rs.138.96
Total Rs.932.99

ITEM No. 7048.08


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated.Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.24 10.8
2 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1.05 840
Rs.850.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.313 70.425
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.242 46.464
Rs.116.89
After rounding off: Rs.1,137.00 Total Amount of M and L Rs.967.69
Add 17.5 % OH and CP Rs.169.35
Total Rs.1,137.03

ITEM No. 7048.09


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated.Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.311 13.995
2 Boarding IInd cl . Hard Wood 30mm th 1 Sqm Rs. 960.00 1.05 1008
Rs.1,022.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.316 71.1
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.242 46.464
Rs.117.56
After rounding off: Rs.1,339.00 Total Amount of M and L Rs.1,139.56
Add 17.5 % OH and CP Rs.199.42
Total Rs.1,338.98

601 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7048.1
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) planed one side and edges
tongued and grooved or rebated.Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plank clean swan second class hard wood 40 mm thick 1 Sqm Rs. 1,200.00 1.05 1260
2 Nails of length exceeding 50mm not exceeding 100mm 1 Kg Rs. 45.00 0.445 20.025
Rs.1,280.03
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.323 72.675
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.242 46.464
Rs.119.14
After rounding off: Rs.1,644.00 Total Amount of M and L Rs.1,399.16
Add 17.5 % OH and CP Rs.244.85
Total Rs.1,644.02

ITEM No. 7049.01


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
2 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7049.02


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

602 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7049.03
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7049.04


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
2 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7049.05


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7049.06


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
2 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

603 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7049.07
Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
2 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

ITEM No. 7049.08


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
2 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

ITEM No. 7049.09


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
2 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

ITEM No. 7049.1


Boarding, supplied & fixed with nails in any situation (except flooring and skirting ) Add to last if planed both
side. Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
2 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.33.78
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.78
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.69

604 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7050.01
Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Softwood 2nd class
thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.146 7.008
Rs.7.01
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.037 8.325
Rs.8.33
After rounding off: Rs.18.00 Total Amount of M and L Rs.15.33
Add 17.5 % OH and CP Rs.2.68
Total Rs.18.02

ITEM No. 7050.02


Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Softwood 2nd class
thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.147 7.056
Rs.7.06
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.18.90 Total Amount of M and L Rs.16.06
Add 17.5 % OH and CP Rs.2.81
Total Rs.18.87

ITEM No. 7050.03


Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Softwood 2nd class
thickness in 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.244 11.712
Rs.11.71
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.047 10.575
Rs.10.58
After rounding off: Rs.26.20 Total Amount of M and L Rs.22.29
Add 17.5 % OH and CP Rs.3.90
Total Rs.26.19

605 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7050.04
Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Softwood 2nd class
thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.309 13.905
Rs.13.91
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.052 11.7
Rs.11.70
After rounding off: Rs.30.10 Total Amount of M and L Rs.25.61
Add 17.5 % OH and CP Rs.4.48
Total Rs.30.09

ITEM No. 7050.05


Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Hardwood 2nd class
thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.439 19.755
Rs.19.76
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.061 13.725
Rs.13.73
After rounding off: Rs.39.30 Total Amount of M and L Rs.33.48
Add 17.5 % OH and CP Rs.5.86
Total Rs.39.34

ITEM No. 7050.06


Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Hardwood 2nd class
thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.146 7.008
Rs.7.01
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.056 12.6
Rs.12.60
After rounding off: Rs.23.00 Total Amount of M and L Rs.19.61
Add 17.5 % OH and CP Rs.3.43
Total Rs.23.04

606 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7050.07
Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Hardwood 2nd class
thickness in 20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.147 7.056
Rs.7.06
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.061 13.725
Rs.13.73
After rounding off: Rs.24.40 Total Amount of M and L Rs.20.78
Add 17.5 % OH and CP Rs.3.64
Total Rs.24.42

ITEM No. 7050.08


Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Hardwood 2nd class
thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.244 11.712
Rs.11.71
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.071 15.975
Rs.15.98
After rounding off: Rs.32.50 Total Amount of M and L Rs.27.69
Add 17.5 % OH and CP Rs.4.85
Total Rs.32.53

ITEM No. 7050.09


Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Hardwood 2nd class
thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.309 13.905
Rs.13.91
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.078 17.55
Rs.17.55
After rounding off: Rs.37.00 Total Amount of M and L Rs.31.46
Add 17.5 % OH and CP Rs.5.50
Total Rs.36.96

607 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7050.1
Fixing only clean sawn boarding.with nails in any situation (except flooring and skirting ) Hardwood 2nd class
thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length exceeding 50mm not exceeding 100mm 1 Kg Rs. 45.00 0.439 19.755
Rs.19.76
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.091 20.475
Rs.20.48
After rounding off: Rs.47.30 Total Amount of M and L Rs.40.23
Add 17.5 % OH and CP Rs.7.04
Total Rs.47.27

ITEM No. 7051.01


Fixing only boarding wrought on one or both sidefixed with nails in any situation (except flooring and skirting
). Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.146 7.008
Rs.7.01
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.037 8.325
Rs.8.33
After rounding off: Rs.18.00 Total Amount of M and L Rs.15.33
Add 17.5 % OH and CP Rs.2.68
Total Rs.18.02

ITEM No. 7051.02


Fixing only boarding wrought on one or both sidefixed with nails in any situation (except flooring and skirting
). Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.147 7.056
Rs.7.06
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.18.90 Total Amount of M and L Rs.16.06
Add 17.5 % OH and CP Rs.2.81
Total Rs.18.87

608 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7051.03
Fixing only boarding wrought on one or both sidefixed with nails in any situation (except flooring and skirting
). Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.244 11.712
Rs.11.71
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.047 10.575
Rs.10.58
After rounding off: Rs.26.20 Total Amount of M and L Rs.22.29
Add 17.5 % OH and CP Rs.3.90
Total Rs.26.19

ITEM No. 7051.04


Fixing only boarding wrought on one or both sidefixed with nails in any situation (except flooring and skirting
). Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.309 13.905
Rs.13.91
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.052 11.7
Rs.11.70
After rounding off: Rs.30.10 Total Amount of M and L Rs.25.61
Add 17.5 % OH and CP Rs.4.48
Total Rs.30.09

ITEM No. 7051.05


Fixing only boarding wrought on one or both sidefixed with nails in any situation (except flooring and skirting
). Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.439 19.755
Rs.19.76
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.061 13.725
Rs.13.73
After rounding off: Rs.39.30 Total Amount of M and L Rs.33.48
Add 17.5 % OH and CP Rs.5.86
Total Rs.39.34

609 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7051.06
Fixing only boardingwith nails in any situation (except flooring and skirting ) wrought on one or both side.
Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.146 7.008
Rs.7.01
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.056 12.6
Rs.12.60
After rounding off: Rs.23.00 Total Amount of M and L Rs.19.61
Add 17.5 % OH and CP Rs.3.43
Total Rs.23.04

ITEM No. 7051.07


Fixing only boardingwith nails in any situation (except flooring and skirting ) wrought on one or both side.
Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.147 7.056
Rs.7.06
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.061 13.725
Rs.13.73
After rounding off: Rs.24.40 Total Amount of M and L Rs.20.78
Add 17.5 % OH and CP Rs.3.64
Total Rs.24.42

ITEM No. 7051.08


Fixing only boardingwith nails in any situation (except flooring and skirting ) wrought on one or both side.
Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.244 11.712
Rs.11.71
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.071 15.975
Rs.15.98
After rounding off: Rs.32.50 Total Amount of M and L Rs.27.69
Add 17.5 % OH and CP Rs.4.85
Total Rs.32.53

610 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7051.09
Fixing only boardingwith nails in any situation (except flooring and skirting ) wrought on one or both side.
Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.309 13.905
Rs.13.91
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.078 17.55
Rs.17.55
After rounding off: Rs.37.00 Total Amount of M and L Rs.31.46
Add 17.5 % OH and CP Rs.5.50
Total Rs.36.96

ITEM No. 7051.1


Fixing only boardingwith nails in any situation (except flooring and skirting ) wrought on one or both side.
Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length exceeding 50mm not exceeding 100mm 1 Kg Rs. 45.00 0.439 19.755
Rs.19.76
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.091 20.475
Rs.20.48
After rounding off: Rs.47.30 Total Amount of M and L Rs.40.23
Add 17.5 % OH and CP Rs.7.04
Total Rs.47.27

ITEM No. 7052.01


Add to 07046 if joints are chamfered one side and the boarding is matched. Softwood 2nd class thickness in
15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boading IInd cl. soft 15mm th 1 Sqm Rs. 315.00 0.03 9.45
Rs.9.45
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.108 24.3
Rs.24.30
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.75
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.66

611 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7052.02
Add to 07046 if joints are chamfered one side and the boarding is matched. Softwood 2nd class thickness in
20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 20mm th 1 Sqm Rs. 420.00 0.03 12.6
Rs.12.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.108 24.3
Rs.24.30
After rounding off: Rs.43.40 Total Amount of M and L Rs.36.90
Add 17.5 % OH and CP Rs.6.46
Total Rs.43.36

ITEM No. 7052.03


Add to 07046 if joints are chamfered one side and the boarding is matched. Softwood 2nd class thickness in
25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 0.03 15.75
Rs.15.75
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.108 24.3
Rs.24.30
After rounding off: Rs.47.10 Total Amount of M and L Rs.40.05
Add 17.5 % OH and CP Rs.7.01
Total Rs.47.06

ITEM No. 7052.04


Add to 07046 if joints are chamfered one side and the boarding is matched. Softwood 2nd class thickness in
30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft. 30mm th 1 Sqm Rs. 630.00 0.03 18.9
Rs.18.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.108 24.3
Rs.24.30
After rounding off: Rs.50.80 Total Amount of M and L Rs.43.20
Add 17.5 % OH and CP Rs.7.56
Total Rs.50.76

612 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7052.05
Add to 07046 if joints are chamfered one side and the boarding is matched. Softwood 2nd class thickness in
40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 40mm th 1 Sqm Rs. 840.00 0.03 25.2
Rs.25.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.108 24.3
Rs.24.30
After rounding off: Rs.58.20 Total Amount of M and L Rs.49.50
Add 17.5 % OH and CP Rs.8.66
Total Rs.58.16

ITEM No. 7052.06


Add to 07046 if joints are chamfered one side and the boarding is matched. Hardwood 2nd class thickness in
15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding llnd cl Hard wood 15mm 1 Kg Rs. 480.00 0.03 14.4
Rs.14.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.161 36.225
Rs.36.23
After rounding off: Rs.59.50 Total Amount of M and L Rs.50.63
Add 17.5 % OH and CP Rs.8.86
Total Rs.59.48

ITEM No. 7052.07


Add to 07046 if joints are chamfered one side and the boarding is matched. Hardwood 2nd class thickness in
20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl hardwood. 20mm th 1 Sqm Rs. 640.00 0.03 19.2
Rs.19.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.161 36.225
Rs.36.23
After rounding off: Rs.65.10 Total Amount of M and L Rs.55.43
Add 17.5 % OH and CP Rs.9.70
Total Rs.65.12

613 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7052.08
Add to 07046 if joints are chamfered one side and the boarding is matched. Hardwood 2nd class thickness in
25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 0.03 24
Rs.24.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.161 36.225
Rs.36.23
After rounding off: Rs.70.80 Total Amount of M and L Rs.60.23
Add 17.5 % OH and CP Rs.10.54
Total Rs.70.76

ITEM No. 7052.09


Add to 07046 if joints are chamfered one side and the boarding is matched. Hardwood 2nd class thickness in
30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl . Hard Wood 30mm th 1 Sqm Rs. 960.00 0.03 28.8
Rs.28.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.161 36.225
Rs.36.23
After rounding off: Rs.76.40 Total Amount of M and L Rs.65.03
Add 17.5 % OH and CP Rs.11.38
Total Rs.76.40

ITEM No. 7052.1


Add to 07046 if joints are chamfered one side and the boarding is matched. Hardwood 2nd class thickness in
40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plank clean swan second class hard wood 40 mm thick 1 Sqm Rs. 1,200.00 0.03 36
Rs.36.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.161 36.225
Rs.36.23
After rounding off: Rs.84.90 Total Amount of M and L Rs.72.23
Add 17.5 % OH and CP Rs.12.64
Total Rs.84.86

614 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7052.11
Add to 07046 if joints are chamfered both sides and the boarding is matched. Softwood 2nd class thickness in
15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boading IInd cl. soft 15mm th 1 Sqm Rs. 315.00 0.03 9.45
Rs.9.45
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.175 39.375
Rs.39.38
After rounding off: Rs.57.40 Total Amount of M and L Rs.48.83
Add 17.5 % OH and CP Rs.8.54
Total Rs.57.37

ITEM No. 7052.12


Add to 07046 if joints are chamfered both sides and the boarding is matched. Softwood 2nd class thickness in
20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 20mm th 1 Sqm Rs. 420.00 0.03 12.6
Rs.12.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.175 39.375
Rs.39.38
After rounding off: Rs.61.10 Total Amount of M and L Rs.51.98
Add 17.5 % OH and CP Rs.9.10
Total Rs.61.07

ITEM No. 7052.13


Add to 07046 if joints are chamfered both sides and the boarding is matched. Softwood 2nd class thickness in
25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 0.03 15.75
Rs.15.75
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.175 39.375
Rs.39.38
After rounding off: Rs.64.80 Total Amount of M and L Rs.55.13
Add 17.5 % OH and CP Rs.9.65
Total Rs.64.77

615 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7052.14
Add to 07046 if joints are chamfered both sides and the boarding is matched. Softwood 2nd class thickness in
30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft. 30mm th 1 Sqm Rs. 630.00 0.03 18.9
Rs.18.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.175 39.375
Rs.39.38
After rounding off: Rs.68.50 Total Amount of M and L Rs.58.28
Add 17.5 % OH and CP Rs.10.20
Total Rs.68.47

ITEM No. 7052.15


Add to 07046 if joints are chamfered both sides and the boarding is matched. Softwood 2nd class thickness in
40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 40mm th 1 Sqm Rs. 840.00 0.03 25.2
Rs.25.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.175 39.375
Rs.39.38
After rounding off: Rs.75.90 Total Amount of M and L Rs.64.58
Add 17.5 % OH and CP Rs.11.30
Total Rs.75.88

ITEM No. 7052.16


Add to 07046 if joints are chamfered both sides and the boarding is matched. Softwood 2nd class thickness in
15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding llnd cl Hard wood 15mm 1 Kg Rs. 480.00 0.03 14.4
Rs.14.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.242 54.45
Rs.54.45
After rounding off: Rs.80.90 Total Amount of M and L Rs.68.85
Add 17.5 % OH and CP Rs.12.05
Total Rs.80.90

616 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7052.17
Add to 07046 if joints are chamfered both sides and the boarding is matched. Hardwood 2nd class thickness
in 40 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl hardwood. 20mm th 1 Sqm Rs. 640.00 0.03 19.2
Rs.19.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.242 54.45
Rs.54.45
After rounding off: Rs.86.50 Total Amount of M and L Rs.73.65
Add 17.5 % OH and CP Rs.12.89
Total Rs.86.54

ITEM No. 7052.18


Add to 07046 if joints are chamfered both sides and the boarding is matched. Hardwood 2nd class thickness
in 40 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 0.03 24
Rs.24.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.242 54.45
Rs.54.45
After rounding off: Rs.92.20 Total Amount of M and L Rs.78.45
Add 17.5 % OH and CP Rs.13.73
Total Rs.92.18

ITEM No. 7052.19


Add to 07046 if joints are chamfered both sides and the boarding is matched. Hardwood 2nd class thickness
in 40 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl . Hard Wood 30mm th 1 Sqm Rs. 960.00 0.03 28.8
Rs.28.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.242 54.45
Rs.54.45
After rounding off: Rs.97.80 Total Amount of M and L Rs.83.25
Add 17.5 % OH and CP Rs.14.57
Total Rs.97.82

617 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7052.2
Add to 07046 if joints are chamfered both sides and the boarding is matched. Hardwood 2nd class thickness
in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plank clean swan second class hard wood 40 mm thick 1 Sqm Rs. 1,200.00 0.03 36
Rs.36.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.242 54.45
Rs.54.45
After rounding off: Rs.106.30 Total Amount of M and L Rs.90.45
Add 17.5 % OH and CP Rs.15.83
Total Rs.106.28

ITEM No. 7053.01


Extra over boarding if fixed with screws Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.193 9.65
Rs.9.65
After rounding off: Rs.11.30 Total Amount of M and L Rs.9.65
Add 17.5 % OH and CP Rs.1.69
Total Rs.11.34

ITEM No. 7053.02


Extra over boarding if fixed with screws Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.193 9.65
Rs.9.65
After rounding off: Rs.11.30 Total Amount of M and L Rs.9.65
Add 17.5 % OH and CP Rs.1.69
Total Rs.11.34

ITEM No. 7053.03


Extra over boarding if fixed with screws Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.193 11.58
Rs.11.58
After rounding off: Rs.13.60 Total Amount of M and L Rs.11.58
Add 17.5 % OH and CP Rs.2.03
Total Rs.13.61

618 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7053.04
Extra over boarding if fixed with screws Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.193 11.58
Rs.11.58
After rounding off: Rs.13.60 Total Amount of M and L Rs.11.58
Add 17.5 % OH and CP Rs.2.03
Total Rs.13.61

ITEM No. 7053.05


Extra over boarding if fixed with screws Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.193 11.58
Rs.11.58
After rounding off: Rs.13.60 Total Amount of M and L Rs.11.58
Add 17.5 % OH and CP Rs.2.03
Total Rs.13.61

ITEM No. 7053.06


Extra over boarding if fixed with screws Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.193 9.65
Rs.9.65
After rounding off: Rs.11.30 Total Amount of M and L Rs.9.65
Add 17.5 % OH and CP Rs.1.69
Total Rs.11.34

ITEM No. 7053.07


Extra over boarding if fixed with screws Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.193 9.65
Rs.9.65
After rounding off: Rs.11.30 Total Amount of M and L Rs.9.65
Add 17.5 % OH and CP Rs.1.69
Total Rs.11.34

ITEM No. 7053.08


Extra over boarding if fixed with screws Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.193 9.65
Rs.9.65
After rounding off: Rs.11.30 Total Amount of M and L Rs.9.65
Add 17.5 % OH and CP Rs.1.69
Total Rs.11.34

619 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7053.09
Extra over boarding if fixed with screws Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.193 11.58
Rs.11.58
After rounding off: Rs.13.60 Total Amount of M and L Rs.11.58
Add 17.5 % OH and CP Rs.2.03
Total Rs.13.61

ITEM No. 7053.1


Extra over boarding if fixed with screws Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.193 11.58
Rs.11.58
After rounding off: Rs.13.60 Total Amount of M and L Rs.11.58
Add 17.5 % OH and CP Rs.2.03
Total Rs.13.61

ITEM No. 7054.01


Extra over boarding if fixed with ceilings Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.012 2.7
Rs.2.70
After rounding off: Rs.3.20 Total Amount of M and L Rs.2.70
Add 17.5 % OH and CP Rs.0.47
Total Rs.3.17

ITEM No. 7054.02


Extra over boarding if fixed with ceilings Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.013 2.925
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

ITEM No. 7054.03


Extra over boarding if fixed with ceilings Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

620 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7054.04
Extra over boarding if fixed with ceilings Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.017 3.825
Rs.3.83
After rounding off: Rs.4.50 Total Amount of M and L Rs.3.83
Add 17.5 % OH and CP Rs.0.67
Total Rs.4.49

ITEM No. 7054.05


Extra over boarding if fixed with ceilings Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.5.30 Total Amount of M and L Rs.4.50
Add 17.5 % OH and CP Rs.0.79
Total Rs.5.29

ITEM No. 7054.06


Extra over boarding if fixed with ceilings Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.019 4.275
Rs.4.28
After rounding off: Rs.5.00 Total Amount of M and L Rs.4.28
Add 17.5 % OH and CP Rs.0.75
Total Rs.5.02

ITEM No. 7054.07


Extra over boarding if fixed with ceilings Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.5.30 Total Amount of M and L Rs.4.50
Add 17.5 % OH and CP Rs.0.79
Total Rs.5.29

ITEM No. 7054.08


Extra over boarding if fixed with ceilings Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.024 5.4
Rs.5.40
After rounding off: Rs.6.30 Total Amount of M and L Rs.5.40
Add 17.5 % OH and CP Rs.0.95
Total Rs.6.35

621 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7054.09
Extra over boarding if fixed with ceilings Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.026 5.85
Rs.5.85
After rounding off: Rs.6.90 Total Amount of M and L Rs.5.85
Add 17.5 % OH and CP Rs.1.02
Total Rs.6.87

ITEM No. 7054.1


Extra over boarding if fixed with ceilings Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.8.20 Total Amount of M and L Rs.6.98
Add 17.5 % OH and CP Rs.1.22
Total Rs.8.20

ITEM No. 7055.01


Extra over boarding if framed or dovetailed Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.135 30.375
Rs.30.38
After rounding off: Rs.35.70 Total Amount of M and L Rs.30.38
Add 17.5 % OH and CP Rs.5.32
Total Rs.35.69

ITEM No. 7055.02


Extra over boarding if framed or dovetailed Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.141 31.725
Rs.31.73
After rounding off: Rs.37.30 Total Amount of M and L Rs.31.73
Add 17.5 % OH and CP Rs.5.55
Total Rs.37.28

ITEM No. 7055.03


Extra over boarding if framed or dovetailed Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.148 33.3
Rs.33.30
After rounding off: Rs.39.10 Total Amount of M and L Rs.33.30
Add 17.5 % OH and CP Rs.5.83
Total Rs.39.13

622 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7055.04
Extra over boarding if framed or dovetailed Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.152 34.2
Rs.34.20
After rounding off: Rs.40.20 Total Amount of M and L Rs.34.20
Add 17.5 % OH and CP Rs.5.99
Total Rs.40.19

ITEM No. 7055.05


Extra over boarding if framed or dovetailed Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.161 36.225
Rs.36.23
After rounding off: Rs.42.60 Total Amount of M and L Rs.36.23
Add 17.5 % OH and CP Rs.6.34
Total Rs.42.56

ITEM No. 7055.06


Extra over boarding if framed or dovetailed Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.202 45.45
Rs.45.45
After rounding off: Rs.53.40 Total Amount of M and L Rs.45.45
Add 17.5 % OH and CP Rs.7.95
Total Rs.53.40

ITEM No. 7055.07


Extra over boarding if framed or dovetailed Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.215 48.375
Rs.48.38
After rounding off: Rs.56.80 Total Amount of M and L Rs.48.38
Add 17.5 % OH and CP Rs.8.47
Total Rs.56.84

ITEM No. 7055.08


Extra over boarding if framed or dovetailed Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.222 49.95
Rs.49.95
After rounding off: Rs.58.70 Total Amount of M and L Rs.49.95
Add 17.5 % OH and CP Rs.8.74
Total Rs.58.69

623 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7055.09
Extra over boarding if framed or dovetailed Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.229 51.525
Rs.51.53
After rounding off: Rs.60.50 Total Amount of M and L Rs.51.53
Add 17.5 % OH and CP Rs.9.02
Total Rs.60.54

ITEM No. 7055.1


Extra over boarding if framed or dovetailed Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.242 54.45
Rs.54.45
After rounding off: Rs.64.00 Total Amount of M and L Rs.54.45
Add 17.5 % OH and CP Rs.9.53
Total Rs.63.98

ITEM No. 7056.01


Extra over boarding if fixed on curved surfaces Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.5.30 Total Amount of M and L Rs.4.50
Add 17.5 % OH and CP Rs.0.79
Total Rs.5.29

ITEM No. 7056.02


Extra over boarding if fixed on curved surfaces Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

ITEM No. 7056.03


Extra over boarding if fixed on curved surfaces Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

624 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7056.04
Extra over boarding if fixed on curved surfaces Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.033 7.425
Rs.7.43
After rounding off: Rs.8.70 Total Amount of M and L Rs.7.43
Add 17.5 % OH and CP Rs.1.30
Total Rs.8.72

ITEM No. 7056.05


Extra over boarding if fixed on curved surfaces Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.10.60 Total Amount of M and L Rs.9.00
Add 17.5 % OH and CP Rs.1.58
Total Rs.10.58

ITEM No. 7056.06


Extra over boarding if fixed on curved surfaces Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

ITEM No. 7056.07


Extra over boarding if fixed on curved surfaces Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.10.60 Total Amount of M and L Rs.9.00
Add 17.5 % OH and CP Rs.1.58
Total Rs.10.58

ITEM No. 7056.08


Extra over boarding if fixed on curved surfaces Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.045 10.125
Rs.10.13
After rounding off: Rs.11.90 Total Amount of M and L Rs.10.13
Add 17.5 % OH and CP Rs.1.77
Total Rs.11.90

625 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7056.09
Extra over boarding if fixed on curved surfaces Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.25
Add 17.5 % OH and CP Rs.1.97
Total Rs.13.22

ITEM No. 7056.1


Extra over boarding if fixedd on curved surfaces Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.15.90 Total Amount of M and L Rs.13.50
Add 17.5 % OH and CP Rs.2.36
Total Rs.15.86

ITEM No. 7057.01


Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.1.58
After rounding off: Rs.1.90 Total Amount of M and L Rs.1.58
Add 17.5 % OH and CP Rs.0.28
Total Rs.1.85

ITEM No. 7057.02


Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.008 1.8
Rs.1.80
After rounding off: Rs.2.10 Total Amount of M and L Rs.1.80
Add 17.5 % OH and CP Rs.0.32
Total Rs.2.12

626 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7057.03
Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 7057.04


Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.011 2.475
Rs.2.48
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.48
Add 17.5 % OH and CP Rs.0.43
Total Rs.2.91

ITEM No. 7057.05


Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.012 2.7
Rs.2.70
After rounding off: Rs.3.20 Total Amount of M and L Rs.2.70
Add 17.5 % OH and CP Rs.0.47
Total Rs.3.17

ITEM No. 7057.06


Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

627 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7057.07
Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.011 2.475
Rs.2.48
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.48
Add 17.5 % OH and CP Rs.0.43
Total Rs.2.91

ITEM No. 7057.08


Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.012 2.7
Rs.2.70
After rounding off: Rs.3.20 Total Amount of M and L Rs.2.70
Add 17.5 % OH and CP Rs.0.47
Total Rs.3.17

ITEM No. 7057.09


Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.013 2.925
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

ITEM No. 7057.1


Extra over boarding if fixed in shelves ; partitions and shelves of built - in - cupboards, almirahs, book cases,
toilet boxes ; racks, pelmets and similar work Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.3.15
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.15
Add 17.5 % OH and CP Rs.0.55
Total Rs.3.70

628 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7058.01
Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Softwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

ITEM No. 7058.02


Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Softwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.8.20 Total Amount of M and L Rs.6.98
Add 17.5 % OH and CP Rs.1.22
Total Rs.8.20

ITEM No. 7058.03


Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Softwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.036 8.1
Rs.8.10
After rounding off: Rs.9.50 Total Amount of M and L Rs.8.10
Add 17.5 % OH and CP Rs.1.42
Total Rs.9.52

ITEM No. 7058.04


Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Softwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.037 8.325
Rs.8.33
After rounding off: Rs.9.80 Total Amount of M and L Rs.8.33
Add 17.5 % OH and CP Rs.1.46
Total Rs.9.78

629 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7058.05
Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Softwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.10.60 Total Amount of M and L Rs.9.00
Add 17.5 % OH and CP Rs.1.58
Total Rs.10.58

ITEM No. 7058.06


Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Hardwood 2nd class thickness in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.034 7.65
Rs.7.65
After rounding off: Rs.9.00 Total Amount of M and L Rs.7.65
Add 17.5 % OH and CP Rs.1.34
Total Rs.8.99

ITEM No. 7058.07


Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Hardwood 2nd class thickness in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.10.60 Total Amount of M and L Rs.9.00
Add 17.5 % OH and CP Rs.1.58
Total Rs.10.58

ITEM No. 7058.08


Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Hardwood 2nd class thickness in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
Rs.12.15
After rounding off: Rs.14.30 Total Amount of M and L Rs.12.15
Add 17.5 % OH and CP Rs.2.13
Total Rs.14.28

630 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7058.09
Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Hardwood 2nd class thickness in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.061 13.725
Rs.13.73
After rounding off: Rs.16.10 Total Amount of M and L Rs.13.73
Add 17.5 % OH and CP Rs.2.40
Total Rs.16.13

ITEM No. 7058.1


Extra over boarding if in repairs to replace old and or decayed boarding in patches including cutting out old,
piecing, heading joints etc. Hardwood 2nd class thickness in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

ITEM No. 7059.01


Weather boarding, clean sawn, plain, 20 mm thick or feather edges 15 mm to 20 mm thick and fixed with 30
mm laps 2nd class softwood material & labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 20mm th 1 Sqm Rs. 420.00 1.3 546
2 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.098 4.704
Rs.550.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.067 15.075
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.034 6.528
Rs.21.60
After rounding off: Rs.672.50 Total Amount of M and L Rs.572.31
Add 17.5 % OH and CP Rs.100.15
Total Rs.672.46

631 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7059.02
Weather boarding, clean sawn, plain, 20 mm thick or feather edges 15 mm to 20 mm thick and fixed with 30
mm laps 2nd class softwood fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.098 4.704
Rs.4.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.067 15.075
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.034 6.528
Rs.21.60
After rounding off: Rs.30.90 Total Amount of M and L Rs.26.31
Add 17.5 % OH and CP Rs.4.60
Total Rs.30.91

ITEM No. 7059.03


Weather boarding, clean sawn, plain, 20 mm thick or feather edges 15 mm to 20 mm thick and fixed with 30
mm laps 2nd class hardwood material & labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl hardwood. 20mm th 1 Sqm Rs. 640.00 1.3 832
2 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.098 4.704
Rs.836.70
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.051 9.792
2 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
Rs.32.29
After rounding off: Rs.1,021.10 Total Amount of M and L Rs.869.00
Add 17.5 % OH and CP Rs.152.07
Total Rs.1,021.07

ITEM No. 7059.04


Weather boarding, clean sawn, plain, 20 mm thick or feather edges 15 mm to 20 mm thick and fixed with 30
mm laps 2nd class hardwood fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.098 4.704
Rs.4.70
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.051 9.792
2 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
Rs.32.29
After rounding off: Rs.43.50 Total Amount of M and L Rs.37.00
Add 17.5 % OH and CP Rs.6.47
Total Rs.43.47

632 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7060.01
Weather boarding, clean sawn, plain, thickness 20 mm to 25 mm and ribated on thick edge to give 20 mm lap
and fixed 2nd class softwood material & labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.098 4.704
2 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1.177 617.925
Rs.622.63
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.132 29.7
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.068 13.056
Rs.42.76
After rounding off: Rs.781.80 Total Amount of M and L Rs.665.39
Add 17.5 % OH and CP Rs.116.44
Total Rs.781.83

ITEM No. 7060.02


Weather boarding, clean sawn, plain, thickness 20 mm to 25 mm and ribated on thick edge to give 20 mm lap
and fixed 2nd class softwood fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.098 4.704
Rs.4.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.067 15.075
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.034 6.528
Rs.21.60
After rounding off: Rs.30.90 Total Amount of M and L Rs.26.31
Add 17.5 % OH and CP Rs.4.60
Total Rs.30.91

ITEM No. 7060.03


Weather boarding, clean sawn, plain, thickness 20 mm to 25 mm and ribated on thick edge to give 20 mm lap
and fixed 2nd class hardwood material & labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.098 4.704
2 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1.177 941.6
Rs.946.30
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.199 44.775
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.102 19.584
Rs.64.36
After rounding off: Rs.1,187.50 Total Amount of M and L Rs.1,010.66
Add 17.5 % OH and CP Rs.176.87
Total Rs.1,187.53

633 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7060.04
Weather boarding, clean sawn, plain, thickness 20 mm to 25 mm and ribated on thick edge to give 20 mm lap
and fixed 2nd class hardwood fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.098 4.704
Rs.4.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.051 9.792
Rs.32.29
After rounding off: Rs.43.50 Total Amount of M and L Rs.37.00
Add 17.5 % OH and CP Rs.6.47
Total Rs.43.47

ITEM No. 7061.01


Add to last, if wrought both sides and edges shot and chamfered (on exposed edges ) 2nd class softwood
material & labour.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.135 30.375
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.135 25.92
Rs.56.30
After rounding off: Rs.66.10 Total Amount of M and L Rs.56.30
Add 17.5 % OH and CP Rs.9.85
Total Rs.66.15

ITEM No. 7061.02


Add to last, if wrought both sides and edges shot and chamfered (on exposed edges ) 2nd class softwood fixing
only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.135 25.92
2 Carpenter, joiner 1 Day Rs. 225.00 0.135 30.375
Rs.56.30
After rounding off: Rs.66.10 Total Amount of M and L Rs.56.30
Add 17.5 % OH and CP Rs.9.85
Total Rs.66.15

634 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7061.03
Add to last, if wrought both sides and edges shot and chamfered (on exposed edges ) 2nd class hardwood
material & labour.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.202 38.784
2 Carpenter, joiner 1 Day Rs. 225.00 0.202 45.45
Rs.84.23
After rounding off: Rs.99.00 Total Amount of M and L Rs.84.23
Add 17.5 % OH and CP Rs.14.74
Total Rs.98.97

ITEM No. 7061.04


Add to last, if wrought both sides and edges shot and chamfered (on exposed edges ) 2nd class hardwood
fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.202 38.784
2 Carpenter, joiner 1 Day Rs. 225.00 0.202 45.45
Rs.84.23
After rounding off: Rs.99.00 Total Amount of M and L Rs.84.23
Add 17.5 % OH and CP Rs.14.74
Total Rs.98.97

ITEM No. 7062.01


Weather boarding, 25 mm thick, wrought both sides, V- jointed to give 20 mm lap and fixed 2nd class
softwood material & labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.098 4.41
2 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1.177 617.925
Rs.622.34
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.106 23.85
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.106 20.352
Rs.44.20
After rounding off: Rs.783.20 Total Amount of M and L Rs.666.54
Add 17.5 % OH and CP Rs.116.64
Total Rs.783.18

635 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7062.02
Weather boarding, 25 mm thick, wrought both sides, V- jointed to give 20 mm lap and fixed 2nd class
softwood fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.098 4.41
Rs.4.41
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.034 6.528
2 Carpenter, joiner 1 Day Rs. 225.00 0.067 15.075
Rs.21.60
After rounding off: Rs.30.60 Total Amount of M and L Rs.26.01
Add 17.5 % OH and CP Rs.4.55
Total Rs.30.57

ITEM No. 7062.03


Weather boarding, 25 mm thick, wrought both sides, V- jointed to give 20 mm lap and fixed 2nd class
hardwood material & labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1.177 941.6
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.098 4.41
Rs.946.01
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.242 54.45
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.161 30.912
Rs.85.36
After rounding off: Rs.1,211.90 Total Amount of M and L Rs.1,031.37
Add 17.5 % OH and CP Rs.180.49
Total Rs.1,211.86

ITEM No. 7062.04


Weather boarding, 25 mm thick, wrought both sides, V- jointed to give 20 mm lap and fixed 2nd class
hardwood fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.098 4.41
Rs.4.41
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.051 9.792
2 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
Rs.32.29
After rounding off: Rs.43.10 Total Amount of M and L Rs.36.70
Add 17.5 % OH and CP Rs.6.42
Total Rs.43.12

636 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7063.01
Weather boarding, 25 mm thick, wrought both sides rebated and hollow jointed 2nd class softwood material &
labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1.177 617.925
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.098 4.41
Rs.622.34
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.215 48.375
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.161 30.912
Rs.79.29
After rounding off: Rs.824.40 Total Amount of M and L Rs.701.62
Add 17.5 % OH and CP Rs.122.78
Total Rs.824.41

ITEM No. 7063.02


Weather boarding, 25 mm thick, wrought both sides rebated and hollow jointed 2nd class softwood fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.098 4.41
Rs.4.41
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.067 15.075
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.034 6.528
Rs.21.60
After rounding off: Rs.30.60 Total Amount of M and L Rs.26.01
Add 17.5 % OH and CP Rs.4.55
Total Rs.30.57

ITEM No. 7063.03


Weather boarding, 25 mm thick, wrought both sides rebated and hollow jointed 2nd class hardwood material
& labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1.177 941.6
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.098 4.41
Rs.946.01
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.242 46.464
2 Carpenter, joiner 1 Day Rs. 225.00 0.323 72.675
Rs.119.14
After rounding off: Rs.1,251.60 Total Amount of M and L Rs.1,065.15
Add 17.5 % OH and CP Rs.186.40
Total Rs.1,251.55

637 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7063.04
Weather boarding, 25 mm thick, wrought both sides rebated and hollow jointed 2nd class hardwood fixing
only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.098 4.41
Rs.4.41
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.051 9.792
Rs.32.29
After rounding off: Rs.43.10 Total Amount of M and L Rs.36.70
Add 17.5 % OH and CP Rs.6.42
Total Rs.43.12

ITEM No. 7064


Add to the foregoing, if in repairs to replace old or decayed boarding in patches, including cutting out old,
piecing, heading jointes etc, and removing dismantled boarding to store.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7065.01


Boarding in floors and skirting planed one side, with but jointes and fixed with nails supplied and fixed
Softwood 2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1.03 540.75
2 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.221 10.608
Rs.551.36
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.087 19.575
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.29.94
After rounding off: Rs.683.00 Total Amount of M and L Rs.581.30
Add 17.5 % OH and CP Rs.101.73
Total Rs.683.03

638 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7065.02
Boarding in floors and skirting planed one side, with but jointes and fixed with nails supplied and fixed
Softwood 2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft. 30mm th 1 Sqm Rs. 630.00 1.03 648.9
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.294 13.23
Rs.662.13
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.094 21.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.061 11.712
Rs.32.86
After rounding off: Rs.816.60 Total Amount of M and L Rs.694.99
Add 17.5 % OH and CP Rs.121.62
Total Rs.816.62

ITEM No. 7065.03


Boarding in floors and skirting planed one side, with but jointes and fixed with nails supplied and fixed
Softwood 2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 40mm th 1 Sqm Rs. 840.00 1.03 865.2
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.392 17.64
Rs.882.84
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1009 22.7025
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.067 12.864
Rs.35.57
After rounding off: Rs.1,079.10 Total Amount of M and L Rs.918.41
Add 17.5 % OH and CP Rs.160.72
Total Rs.1,079.13

ITEM No. 7065.04


Boarding in floors and skirting planed one side, with but jointes and fixed with nails supplied and fixed
Hardwood 2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.221 9.945
2 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1.03 824
Rs.833.95
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.131 29.475
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.45.03
After rounding off: Rs.1,032.80 Total Amount of M and L Rs.878.97
Add 17.5 % OH and CP Rs.153.82
Total Rs.1,032.79

639 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7065.05
Boarding in floors and skirting planed one side, with but jointes and fixed with nails supplied and fixed
Hardwood 2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.294 13.23
2 Boarding IInd cl . Hard Wood 30mm th 1 Sqm Rs. 960.00 1.03 988.8
Rs.1,002.03
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.141 31.725
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.091 17.472
Rs.49.20
After rounding off: Rs.1,235.20 Total Amount of M and L Rs.1,051.23
Add 17.5 % OH and CP Rs.183.96
Total Rs.1,235.19

ITEM No. 7065.06


Boarding in floors and skirting planed one side, with but jointes and fixed with nails supplied and fixed
Hardwood 2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding 2nd class Hard wood 40 mm thick Sqm Rs. 1,280.00 1.03 1318.4
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.392 17.64
Rs.1,336.04
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.152 34.2
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.101 19.392
Rs.53.59
After rounding off: Rs.1,632.80 Total Amount of M and L Rs.1,389.63
Add 17.5 % OH and CP Rs.243.19
Total Rs.1,632.82

ITEM No. 7066.01


Boarding in floors and skirting planed one side & edges tongued and grooved or rebated, and ditto Softwood
2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1.227 644.175
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.221 9.945
Rs.654.12
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.169 38.025
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.48.39
After rounding off: Rs.825.50 Total Amount of M and L Rs.702.51
Add 17.5 % OH and CP Rs.122.94
Total Rs.825.45

640 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7066.02
Boarding in floors and skirting planed one side & edges tongued and grooved or rebated, and ditto Softwood
2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft. 30mm th 1 Sqm Rs. 630.00 1.227 773.01
2 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.294 14.112
Rs.787.12
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.06 11.52
2 Carpenter, joiner 1 Day Rs. 225.00 0.175 39.375
Rs.50.90
After rounding off: Rs.984.70 Total Amount of M and L Rs.838.02
Add 17.5 % OH and CP Rs.146.65
Total Rs.984.67

ITEM No. 7066.03


Boarding in floors and skirting planed one side & edges tongued and grooved or rebated, and ditto Softwood
2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 40mm th 1 Sqm Rs. 840.00 1.227 1030.68
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.392 17.64
Rs.1,048.32
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.067 12.864
2 Carpenter, joiner 1 Day Rs. 225.00 0.181 40.725
Rs.53.59
After rounding off: Rs.1,294.70 Total Amount of M and L Rs.1,101.91
Add 17.5 % OH and CP Rs.192.83
Total Rs.1,294.74

ITEM No. 7066.04


Boarding in floors and skirting planed one side & edges tongued and grooved or rebated, and ditto Hardwood
2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.221 10.608
2 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1.227 981.6
Rs.992.21
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.252 56.7
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.72.25
After rounding off: Rs.1,250.70 Total Amount of M and L Rs.1,064.46
Add 17.5 % OH and CP Rs.186.28
Total Rs.1,250.74

641 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7066.05
Boarding in floors and skirting planed one side & edges tongued and grooved or rebated, and ditto Hardwood
2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.294 14.112
2 Boarding IInd cl . Hard Wood 30mm th 1 Sqm Rs. 960.00 1.227 1177.92
Rs.1,192.03
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.262 58.95
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.091 17.472
Rs.76.42
After rounding off: Rs.1,490.40 Total Amount of M and L Rs.1,268.45
Add 17.5 % OH and CP Rs.221.98
Total Rs.1,490.43

ITEM No. 7066.06


Boarding in floors and skirting planed one side & edges tongued and grooved or rebated, and ditto Hardwood
2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding 2nd class Hard wood 40 mm thick Sqm Rs. 1,280.00 1.227 1570.56
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.392 17.64
Rs.1,588.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.272 61.2
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.101 19.392
Rs.80.59
After rounding off: Rs.1,960.80 Total Amount of M and L Rs.1,668.79
Add 17.5 % OH and CP Rs.292.04
Total Rs.1,960.83

ITEM No. 7067.01


Boarding in floors and skirting laying only any of the foregoing Softwood 2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.22 10.56
Rs.10.56
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.034 6.528
Rs.6.53
After rounding off: Rs.20.10 Total Amount of M and L Rs.17.09
Add 17.5 % OH and CP Rs.2.99
Total Rs.20.08

642 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7067.02
Boarding in floors and skirting laying only any of the foregoing Softwood 2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.294 13.23
Rs.13.23
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.007 1.344
Rs.10.34
After rounding off: Rs.27.70 Total Amount of M and L Rs.23.57
Add 17.5 % OH and CP Rs.4.13
Total Rs.27.70

ITEM No. 7067.03


Boarding in floors and skirting laying only any of the foregoing Softwood 2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.392 17.64
Rs.17.64
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.046 10.35
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.014 2.688
Rs.13.04
After rounding off: Rs.36.00 Total Amount of M and L Rs.30.68
Add 17.5 % OH and CP Rs.5.37
Total Rs.36.05

ITEM No. 7067.04


Boarding in floors and skirting laying only any of the foregoing Hardwood 2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.222 10.656
Rs.10.66
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.051 11.475
Rs.11.48
After rounding off: Rs.26.00 Total Amount of M and L Rs.22.13
Add 17.5 % OH and CP Rs.3.87
Total Rs.26.00

643 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7067.05
Boarding in floors and skirting laying only any of the foregoing Hardwood 2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.294 14.112
Rs.14.11
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.01 1.92
Rs.15.42
After rounding off: Rs.34.70 Total Amount of M and L Rs.29.53
Add 17.5 % OH and CP Rs.5.17
Total Rs.34.70

ITEM No. 7067.06


Boarding in floors and skirting laying only any of the foregoing Hardwood 2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.392 17.64
Rs.17.64
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.069 15.525
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.021 4.032
Rs.19.56
After rounding off: Rs.43.70 Total Amount of M and L Rs.37.20
Add 17.5 % OH and CP Rs.6.51
Total Rs.43.71

ITEM No. 7068.01


Boarding in floors and skirting all as in item 0079 but secret nailed Softwood 2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1.227 644.175
2 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.221 10.608
Rs.654.78
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.188 42.3
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.081 15.552
Rs.57.85
After rounding off: Rs.837.30 Total Amount of M and L Rs.712.64
Add 17.5 % OH and CP Rs.124.71
Total Rs.837.35

644 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7068.02
Boarding in floors and skirting all as in item 0079 but secret nailed Softwood 2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.392 17.64
2 Boarding IInd cl soft. 30mm th 1 Sqm Rs. 630.00 1.227 773.01
Rs.790.65
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.084 16.128
2 Carpenter, joiner 1 Day Rs. 225.00 0.209 47.025
Rs.63.15
After rounding off: Rs.1,003.20 Total Amount of M and L Rs.853.80
Add 17.5 % OH and CP Rs.149.42
Total Rs.1,003.22

ITEM No. 7068.03


Boarding in floors and skirting all as in item 0079 but secret nailed Softwood 2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 40mm th 1 Sqm Rs. 840.00 1.227 1030.68
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.415 18.675
Rs.1,049.36
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.215 48.375
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.087 16.704
Rs.65.08
After rounding off: Rs.1,309.50 Total Amount of M and L Rs.1,114.43
Add 17.5 % OH and CP Rs.195.03
Total Rs.1,309.46

ITEM No. 7068.04


Boarding in floors and skirting all as in item 0079 but secret nailed Hardwood 2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1.227 981.6
2 Nails 50 to 80mm 1 Kg Rs. 45.00 0.319 14.355
Rs.995.96
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.121 23.232
2 Carpenter, joiner 1 Day Rs. 225.00 0.282 63.45
Rs.86.68
After rounding off: Rs.1,272.10 Total Amount of M and L Rs.1,082.64
Add 17.5 % OH and CP Rs.189.46
Total Rs.1,272.10

645 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7068.05
Boarding in floors and skirting all as in item 07067 but secret nailed Hardwood 2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.392 17.64
2 Boarding IInd cl . Hard Wood 30mm th 1 Sqm Rs. 960.00 1.227 1177.92
Rs.1,195.56
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.313 70.425
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.126 24.192
Rs.94.62
After rounding off: Rs.1,516.00 Total Amount of M and L Rs.1,290.18
Add 17.5 % OH and CP Rs.225.78
Total Rs.1,515.96

ITEM No. 7068.06


Boarding in floors and skirting all as in item 07067 but secret nailed Hardwood 2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.392 17.64
2 Boarding 2nd class Hard wood 40 mm thick Sqm Rs. 1,280.00 1.227 1570.56
Rs.1,588.20
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.113 21.696
2 Carpenter, joiner 1 Day Rs. 225.00 0.339 76.275
Rs.97.97
After rounding off: Rs.1,981.30 Total Amount of M and L Rs.1,686.17
Add 17.5 % OH and CP Rs.295.08
Total Rs.1,981.25

ITEM No. 7069.01


Boarding in floors and skirting laying only, ditto Softwood 2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.33 15.84
Rs.15.84
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.051 11.475
Rs.11.48
After rounding off: Rs.32.10 Total Amount of M and L Rs.27.32
Add 17.5 % OH and CP Rs.4.78
Total Rs.32.10

646 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7069.02
Boarding in floors and skirting laying only, ditto Softwood 2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.441 19.845
Rs.19.85
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.01 1.92
2 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.15.42
After rounding off: Rs.41.40 Total Amount of M and L Rs.35.27
Add 17.5 % OH and CP Rs.6.17
Total Rs.41.44

ITEM No. 7069.03


Boarding in floors and skirting laying only, ditto Softwood 2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.588 26.46
Rs.26.46
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.069 15.525
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.021 4.032
Rs.19.56
After rounding off: Rs.54.10 Total Amount of M and L Rs.46.02
Add 17.5 % OH and CP Rs.8.05
Total Rs.54.07

ITEM No. 7069.04


Boarding in floors and skirting laying only, ditto Hardwood 2nd class thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 0.33 15.84
Rs.15.84
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.076 17.1
Rs.17.10
After rounding off: Rs.38.70 Total Amount of M and L Rs.32.94
Add 17.5 % OH and CP Rs.5.76
Total Rs.38.70

647 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7069.05
Boarding in floors and skirting laying only, ditto Hardwood 2nd class thicknes in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.441 19.845
Rs.19.85
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.015 2.88
Rs.23.13
After rounding off: Rs.50.50 Total Amount of M and L Rs.42.98
Add 17.5 % OH and CP Rs.7.52
Total Rs.50.50

ITEM No. 7069.06


Boarding in floors and skirting laying only, ditto Hardwood 2nd class thicknes in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 0.588 26.46
Rs.26.46
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.032 6.144
2 Carpenter, joiner 1 Day Rs. 225.00 0.104 23.4
Rs.29.54
After rounding off: Rs.65.80 Total Amount of M and L Rs.56.00
Add 17.5 % OH and CP Rs.9.80
Total Rs.65.80

ITEM No. 7070.01


Boarding in floors and skirting laying add to items 07065 to 07067 if fixed with screws Softwood 2nd class
thicknes in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.221 13.26
Rs.13.26
After rounding off: Rs.15.60 Total Amount of M and L Rs.13.26
Add 17.5 % OH and CP Rs.2.32
Total Rs.15.58

ITEM No. 7070.02


Boarding in floors and skirting laying add to items 07065 to 07067 if fixed with screws Softwood 2nd class
thicknes in 30 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.221 13.26
Rs.13.26
After rounding off: Rs.15.60 Total Amount of M and L Rs.13.26
Add 17.5 % OH and CP Rs.2.32
Total Rs.15.58

648 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7070.03
Boarding in floors and skirting laying add to items 07065 to 07067 if fixed with screws Softwood 2nd class
thicknes in 40 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.221 13.26
Rs.13.26
After rounding off: Rs.15.60 Total Amount of M and L Rs.13.26
Add 17.5 % OH and CP Rs.2.32
Total Rs.15.58

ITEM No. 7070.04


Boarding in floors and skirting laying add to items 07065 to 07067 if fixed with screws Hardwood 2nd class
thicknes in 25 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.221 13.26
Rs.13.26
After rounding off: Rs.15.60 Total Amount of M and L Rs.13.26
Add 17.5 % OH and CP Rs.2.32
Total Rs.15.58

ITEM No. 7070.05


Boarding in floors and skirting laying add to items 07065 to 07067 if fixed with screws Hardwood 2nd class
thicknes in 30 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.221 13.26
Rs.13.26
After rounding off: Rs.15.60 Total Amount of M and L Rs.13.26
Add 17.5 % OH and CP Rs.2.32
Total Rs.15.58

ITEM No. 7070.06


Boarding in floors and skirting laying add to items 07065 to 07067 if fixed with screws Hardwood 2nd class
thicknes in 40mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.221 13.26
Rs.13.26
After rounding off: Rs.15.60 Total Amount of M and L Rs.13.26
Add 17.5 % OH and CP Rs.2.32
Total Rs.15.58

649 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7071
Add to items 07065 to 07069 for repair to existing floors in patches, including cutting out, piecing, heading
jointes etc.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.108 18.252
Rs.22.75
Sundry
1 Sundries 1 Re Rs. 9.00 0.5 4.5
Rs.4.50
After rounding off: Rs.32.00 Total Amount of M and L Rs.27.25
Add 17.5 % OH and CP Rs.4.77
Total Rs.32.02

ITEM No. 7072.01


Bally piles, hardwood, any class, 15cm mean dia, cut to lenghts required (n exc 9 cm ) and planted in position
ready for driving Material & Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bally pile 15 cm dia. Hardwood Runnin Rs. 55.00 1 55
Rs.55.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.019 4.275
2 Mazdoor-man, 1 Day Rs. 169.00 0.019 3.211
Rs.7.49
After rounding off: Rs.73.40 Total Amount of M and L Rs.62.49
Add 17.5 % OH and CP Rs.10.94
Total Rs.73.42

ITEM No. 7072.02


Bally piles, hardwood, any class, 15cm mean dia, cut to lenghts required (n exc 9 cm ) and planted in position
ready for driving Except timber.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bally pile 15 cm dia. Hardwood Runnin Rs. 55.00 0.01 0.55
Rs.0.55
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.019 4.275
2 Mazdoor-man, 1 Day Rs. 169.00 0.019 3.211
Rs.7.49
After rounding off: Rs.9.40 Total Amount of M and L Rs.8.04
Add 17.5 % OH and CP Rs.1.41
Total Rs.9.44

650 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7073.01
Bally piles, hardwood, any class, 20 cm mean dia, cut to lenghts required (n exc 9 cm ) and planted in position
ready for driving Material & Labour.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies HW 3 to 9 m type3 1 Runnin Rs. 70.00 1 70
Rs.70.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
2 Mazdoor-man, 1 Day Rs. 169.00 0.025 4.225
Rs.9.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.003 0.027
Rs.0.03
After rounding off: Rs.93.90 Total Amount of M and L Rs.79.88
Add 17.5 % OH and CP Rs.13.98
Total Rs.93.86

ITEM No. 7073.02


Bally piles, hardwood, any class, 20 cm mean dia, cut to lenghts required (n exc 9 cm ) and planted in position
ready for driving Except timber.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies HW 3 to 9 m type3 1 Runnin Rs. 70.00 0.01 0.7
Rs.0.70
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.025 4.225
2 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.9.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.003 0.027
Rs.0.03
After rounding off: Rs.12.40 Total Amount of M and L Rs.10.58
Add 17.5 % OH and CP Rs.1.85
Total Rs.12.43

651 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7074.01
Heading and pointing Bally piles 15 cm mean dia, including fixing, only rings, providing and fixing pile shoes,
cutting of heads after driving and taking off rings ; removing cur off portions to stone (per piles )Other than in
Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Shoe for piles 1 Kg Rs. 25.00 2 50
Rs.50.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.5 112.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.75 126.75
Rs.239.25
After rounding off: Rs.339.90 Total Amount of M and L Rs.289.25
Add 17.5 % OH and CP Rs.50.62
Total Rs.339.87

ITEM No. 7074.02


Heading and pointing Bally piles 15 cm mean dia, including fixing, only rings, providing and fixing pile shoes,
cutting of heads after driving and taking off rings ; removing cur off portions to stone (per piles ) In Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Shoe for piles 1 Kg Rs. 25.00 2 50
Rs.50.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.5 112.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.75 126.75
Rs.239.25
After rounding off: Rs.339.90 Total Amount of M and L Rs.289.25
Add 17.5 % OH and CP Rs.50.62
Total Rs.339.87

ITEM No. 7075.01


Heading and pointing Bally piles 20 cm mean dia, including fixing only rings, providing and fixing pile shoes,
cutting of heads after driving and taking off rings ; removing cur off portions to stone Other than in Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Shoe for piles 1 Kg Rs. 25.00 3 75
Rs.75.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.63 141.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.75 126.75
Rs.268.50
After rounding off: Rs.403.60 Total Amount of M and L Rs.343.50
Add 17.5 % OH and CP Rs.60.11
Total Rs.403.61

652 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7075.02
Heading and pointing Bally piles 20 cm mean dia, including fixing only rings, providing and fixing pile shoes,
cutting of heads after driving and taking off rings ; removing cur off portions to stone In Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Shoe for piles 1 Kg Rs. 25.00 3 75
Rs.75.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.63 141.75
2 Mazdoor-man, 1 Day Rs. 169.00 0.75 126.75
Rs.268.50
After rounding off: Rs.403.60 Total Amount of M and L Rs.343.50
Add 17.5 % OH and CP Rs.60.11
Total Rs.403.61

ITEM No. 7076.01


Deduct from foregoing items if pile shoes are not provided Other than in Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Shoe for piles 1 Kg Rs. 25.00 2.5 62.5
Rs.62.50
After rounding off: Rs.73.40 Total Amount of M and L Rs.62.50
Add 17.5 % OH and CP Rs.10.94
Total Rs.73.44

ITEM No. 7076.02


Deduct from foregoing items if pile shoes are not provided In Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Shoe for piles 1 Kg Rs. 25.00 2.5 62.5
Rs.62.50
After rounding off: Rs.73.40 Total Amount of M and L Rs.62.50
Add 17.5 % OH and CP Rs.10.94
Total Rs.73.44

ITEM No. 7077.01


Driving Bally piles 15 cm mean dia (portion in ground only to be measured ), n exc 6 m in depth Other than in
Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Sundry
1 Sundries 1 Re Rs. 9.00 2.822 25.398
Rs.25.40
After rounding off: Rs.29.80 Total Amount of M and L Rs.25.40
Add 17.5 % OH and CP Rs.4.44
Total Rs.29.84

653 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7077.02
Driving Bally piles 15 cm mean dia (portion in ground only to be measured ), n exc 6 m in depth In Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Sundry
1 Sundries 1 Re Rs. 9.00 2.822 25.398
Rs.25.40
After rounding off: Rs.29.80 Total Amount of M and L Rs.25.40
Add 17.5 % OH and CP Rs.4.44
Total Rs.29.84

ITEM No. 7078.01


Driving Bally piles 20 cm mean dia (portion in ground only to be measured ), n exc 6 m in depth In Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Sundry
1 Sundries 1 Re Rs. 9.00 3.822 34.398
Rs.34.40
After rounding off: Rs.40.40 Total Amount of M and L Rs.34.40
Add 17.5 % OH and CP Rs.6.02
Total Rs.40.42

ITEM No. 7078.02


Driving Bally piles 20 cm mean dia (portion in ground only to be measured ), n exc 6 m in depth In Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Sundry
1 Sundries 1 Re Rs. 9.00 3.822 34.398
Rs.34.40
After rounding off: Rs.40.40 Total Amount of M and L Rs.34.40
Add 17.5 % OH and CP Rs.6.02
Total Rs.40.42

ITEM No. 7079.01


Add to item 07077 for every additional one metre depth upto a total depth of 8 m Other than in Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Sundry
1 Sundries 1 Re Rs. 9.00 2.137 19.233
Rs.19.23
After rounding off: Rs.22.60 Total Amount of M and L Rs.19.23
Add 17.5 % OH and CP Rs.3.37
Total Rs.22.60

ITEM No. 7079.02


Add to item 07077 for every additional one metre depth upto a total depth of 8 m In Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Sundry
1 Sundries 1 Re Rs. 9.00 2.137 19.233
Rs.19.23
After rounding off: Rs.22.60 Total Amount of M and L Rs.19.23
Add 17.5 % OH and CP Rs.3.37
Total Rs.22.60

654 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7080.01
Add to item 07078 for every additional one metre depth upto a total depth of 8 m Other than in Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Sundry
1 Sundries 1 Re Rs. 9.00 3.137 28.233
Rs.28.23
After rounding off: Rs.33.20 Total Amount of M and L Rs.28.23
Add 17.5 % OH and CP Rs.4.94
Total Rs.33.17

ITEM No. 7080.02


Add to item 07077 for every additional one metre depth upto a total depth of 8 m In Tide work.
Particulars Size Unit SSR Qty Amount (SSR)
Sundry
1 Sundries 1 Re Rs. 9.00 3.137 28.233
Rs.28.23
After rounding off: Rs.33.20 Total Amount of M and L Rs.28.23
Add 17.5 % OH and CP Rs.4.94
Total Rs.33.17

ITEM No. 7081.01


Plugging to walls complete, for wood fillets, grounds, mulding, boarding, etc., at distance n exc 1 m. Brick walls.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.0001 3.2
Rs.3.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
2 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
3 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.033 7.425
Rs.13.73
After rounding off: Rs.19.90 Total Amount of M and L Rs.16.93
Add 17.5 % OH and CP Rs.2.96
Total Rs.19.89

655 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7081.02
Plugging to walls complete, for wood fillets, grounds, mulding, boarding, etc., at distance n exc 1 m. Cement
concrete or stone walls.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.0001 3.2
Rs.3.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.041 9.225
3 Mazdoor-man, 1 Day Rs. 169.00 0.025 4.225
Rs.17.05
After rounding off: Rs.23.80 Total Amount of M and L Rs.20.25
Add 17.5 % OH and CP Rs.3.54
Total Rs.23.79

ITEM No. 7081.03


Plugging to walls complete, for wood fillets, grounds, mulding, boarding, etc., at distance n exc 1 m. Add if any
repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
2 Carpenter, joiner 1 Day Rs. 225.00 0.006 1.35
Rs.4.05
After rounding off: Rs.4.80 Total Amount of M and L Rs.4.05
Add 17.5 % OH and CP Rs.0.71
Total Rs.4.76

ITEM No. 7082.01


Plugging to walls complete, for wood fillets, grounds, mulding, boarding, etc., at distance n exc 1 m. Brick
walls. for fittings, etc., or in detached work.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.0001 3.2
Rs.3.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.02 4.5
3 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
Rs.8.44
After rounding off: Rs.13.70 Total Amount of M and L Rs.11.64
Add 17.5 % OH and CP Rs.2.04
Total Rs.13.68

656 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7082.02
Plugging to walls complete, for wood fillets, grounds, mulding, boarding, etc., at distance n exc 1 m. For
fittings, etc., or in detached work Cement concrete or stone walls.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 0.0001 3.2
Rs.3.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.025 5.625
3 Mazdoor-man, 1 Day Rs. 169.00 0.015 2.535
Rs.10.41
After rounding off: Rs.16.00 Total Amount of M and L Rs.13.61
Add 17.5 % OH and CP Rs.2.38
Total Rs.15.99

ITEM No. 7082.03


Plugging to walls complete, for wood fillets, grounds, mulding, boarding, etc., at distance n exc 1 m for fittings,
etc., or in detached work Add if any repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
2 Bricklayer, pavior, floor or wall tiler 1 Day Rs. 225.00 0.01 2.25
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

ITEM No. 7083.01


Taking down roof trusses, coupled rafters or trussed beams Clear soan upto 4 meters.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
2 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.49.00
After rounding off: Rs.57.60 Total Amount of M and L Rs.49.00
Add 17.5 % OH and CP Rs.8.58
Total Rs.57.58

657 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7083.02
Taking down roof trusses, coupled rafters or trussed beams Clear soan above 4 meters & upto 8 meters.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mate 1 Day Rs. 169.00 0.03 5.07
2 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
3 Mazdoor-man, 1 Day Rs. 169.00 0.38 64.22
Rs.76.04
After rounding off: Rs.89.30 Total Amount of M and L Rs.76.04
Add 17.5 % OH and CP Rs.13.31
Total Rs.89.35

ITEM No. 7083.03


Taking down roof trusses, coupled rafters or trussed beams Clear soan above 4 meters & upto 12 meters.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
2 Mate 1 Day Rs. 169.00 0.06 10.14
3 Mazdoor-man, 1 Day Rs. 169.00 0.75 126.75
Rs.150.39
After rounding off: Rs.176.70 Total Amount of M and L Rs.150.39
Add 17.5 % OH and CP Rs.26.32
Total Rs.176.71

ITEM No. 7084.01


Taking down roof trusses, coupled rafters or trussed beams including taking trusses etc, as under for renewal
of anu defective members ( timber to be measured separately ) and reassembling Clear span upto 4 meters.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.28 63
2 Mazdoor-man, 1 Day Rs. 169.00 0.5 84.5
Rs.147.50
After rounding off: Rs.173.30 Total Amount of M and L Rs.147.50
Add 17.5 % OH and CP Rs.25.81
Total Rs.173.31

ITEM No. 7084.02


Taking down roof trusses, coupled rafters or trussed beams including taking trusses etc, as under for renewal
of anu defective members ( timber to be measured separately ) and reassembling Clear span above 4 meters &
upto 8 meters.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.5 112.5
2 Mate 1 Day Rs. 169.00 0.03 5.07
3 Mazdoor-man, 1 Day Rs. 169.00 0.88 148.72
Rs.266.29
After rounding off: Rs.312.90 Total Amount of M and L Rs.266.29
Add 17.5 % OH and CP Rs.46.60
Total Rs.312.89

658 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7084.03
Taking down roof trusses, coupled rafters or trussed beams including taking trusses etc, as under for renewal
of anu defective members ( timber to be measured separately ) and reassembling Clear span above 4 meters &
upto 12 meters.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.85 191.25
2 Mate 1 Day Rs. 169.00 0.0495 8.3655
3 Mazdoor-man, 1 Day Rs. 169.00 1.05 177.45
Rs.377.07
After rounding off: Rs.443.10 Total Amount of M and L Rs.377.07
Add 17.5 % OH and CP Rs.65.99
Total Rs.443.05

ITEM No. 7085.01


Housing and fixing trusses etc after repairs including tightening up wedges, cotters bolts etc. Clear soan upto 4
meters.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.38 64.22
Rs.75.47
After rounding off: Rs.88.70 Total Amount of M and L Rs.75.47
Add 17.5 % OH and CP Rs.13.21
Total Rs.88.68

ITEM No. 7085.02


Housing and fixing trusses etc after repairs including tightening up wedges, cotters bolts etc. Clear soan above
4 meters & upto 8 meters.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
2 Mate 1 Day Rs. 169.00 0.05 8.45
3 Mazdoor-man, 1 Day Rs. 169.00 0.6 101.4
Rs.121.10
After rounding off: Rs.142.30 Total Amount of M and L Rs.121.10
Add 17.5 % OH and CP Rs.21.19
Total Rs.142.29

659 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7085.03
Housing and fixing trusses etc after repairs including tightening up wedges, cotters bolts etc. Clear soan above
8 meters & upto 12 meters.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor-man, 1 Day Rs. 169.00 0.9 152.1
3 Mate 1 Day Rs. 169.00 0.09 15.21
Rs.189.81
After rounding off: Rs.223.00 Total Amount of M and L Rs.189.81
Add 17.5 % OH and CP Rs.33.22
Total Rs.223.03

ITEM No. 7086


Planing surfaces of softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.054 10.368
Rs.22.52
After rounding off: Rs.26.50 Total Amount of M and L Rs.22.52
Add 17.5 % OH and CP Rs.3.94
Total Rs.26.46

ITEM No. 7087.01


Scribing, Notching, Circular Cutting, etc.Labour only on softwood n exc 25 mm thick Scribing.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0489 11.0025
Rs.11.00
After rounding off: Rs.12.90 Total Amount of M and L Rs.11.00
Add 17.5 % OH and CP Rs.1.93
Total Rs.12.93

ITEM No. 7087.02


Scribing, Notching, Circular Cutting, etc.Labour only on softwood n exc 25 mm thick Notching exc 15 cm girth.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.066 14.85
Rs.14.85
After rounding off: Rs.17.40 Total Amount of M and L Rs.14.85
Add 17.5 % OH and CP Rs.2.60
Total Rs.17.45

660 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7087.03
Scribing, Notching, Circular Cutting, etc.Labour only on softwood n exc 25 mm thick Circular cutting.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.082 18.45
Rs.18.45
After rounding off: Rs.21.70 Total Amount of M and L Rs.18.45
Add 17.5 % OH and CP Rs.3.23
Total Rs.21.68

ITEM No. 7088.01


Scribing, Notching, Circular Cutting, etc.Labour only on softwood exc 25 mm but n exc 50 mm thick Scribing.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.074 16.65
Rs.16.65
After rounding off: Rs.19.60 Total Amount of M and L Rs.16.65
Add 17.5 % OH and CP Rs.2.91
Total Rs.19.56

ITEM No. 7088.02


Scribing, Notching, Circular Cutting, etc.Labour only on softwood exc 25 mm but n exc 50 mm thick Notching
exc 15 cm girth.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.115 25.875
Rs.25.88
After rounding off: Rs.30.40 Total Amount of M and L Rs.25.88
Add 17.5 % OH and CP Rs.4.53
Total Rs.30.40

ITEM No. 7088.03


Scribing, Notching, Circular Cutting, etc.Labour only on softwood exc 25 mm but n exc 50 mm thick Circular
cutting.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.132 29.7
Rs.29.70
After rounding off: Rs.34.90 Total Amount of M and L Rs.29.70
Add 17.5 % OH and CP Rs.5.20
Total Rs.34.90

661 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7089.01
Scribing, Notching, Circular Cutting, etc.Labour only on softwood exc 50 mm thick Scribing.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1.201 270.225
Rs.270.23
After rounding off: Rs.317.50 Total Amount of M and L Rs.270.23
Add 17.5 % OH and CP Rs.47.29
Total Rs.317.51

ITEM No. 7089.02


Scribing, Notching, Circular Cutting, etc.Labour only on softwood exc 50 mm thick Notching exc 15 cm girth.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1.291 290.475
Rs.290.48
After rounding off: Rs.341.30 Total Amount of M and L Rs.290.48
Add 17.5 % OH and CP Rs.50.83
Total Rs.341.31

ITEM No. 7089.03


Scribing, Notching, Circular Cutting, etc.Labour only on softwood exc 50 mm thick Circular cutting.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 2.15 483.75
Rs.483.75
After rounding off: Rs.568.40 Total Amount of M and L Rs.483.75
Add 17.5 % OH and CP Rs.84.66
Total Rs.568.41

ITEM No. 7090


Chamfers, splays, grooves, rebates, rounded angles, rounded nosings, tongued and grooved edges ( each
tongue and each groove measured ), etc, exc 3mm but n exc 75 mm girth on softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 7091


Bead, staff beads, flutes, reeds, exc 3mm but n exc 75 mm girth on softwood..
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.013 2.925
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

662 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7092
Mouldings n exc 75mm girth, on softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 7093


Mouldings exc 75 width or girth, on softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.134 30.15
Rs.30.15
After rounding off: Rs.35.40 Total Amount of M and L Rs.30.15
Add 17.5 % OH and CP Rs.5.28
Total Rs.35.43

ITEM No. 7094


Mouldings exc 75 but n exc 200 mm width or girth on softwood..
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.163 36.675
Rs.36.68
After rounding off: Rs.43.10 Total Amount of M and L Rs.36.68
Add 17.5 % OH and CP Rs.6.42
Total Rs.43.09

ITEM No. 7095


Mouldings exc 75 mm but not exc 200 mm girth on softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.208 46.8
Rs.46.80
After rounding off: Rs.55.00 Total Amount of M and L Rs.46.80
Add 17.5 % OH and CP Rs.8.19
Total Rs.54.99

ITEM No. 7096


Headings, cut (pointed or rounded ) and wrought to pales or palisades of fencing of softwood exc 25 mm (Per
100 Nos.).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 2.25 506.25
Rs.506.25
After rounding off: Rs.594.80 Total Amount of M and L Rs.506.25
Add 17.5 % OH and CP Rs.88.59
Total Rs.594.84

663 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7097
Headings, cut (pointed or rounded ) and wrought to pales or palisades of fencing of softwood, to posts
including mitred intersections where necessary exc 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 4.5 1012.5
Rs.1,012.50
After rounding off: Rs.1,189.70 Total Amount of M and L Rs.1,012.50
Add 17.5 % OH and CP Rs.177.19
Total Rs.1,189.69

ITEM No. 7098


Notches n exc 15 cm girth (n exc 25 mm thick ), cut in softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1.9999 449.9775
Rs.449.98
After rounding off: Rs.528.70 Total Amount of M and L Rs.449.98
Add 17.5 % OH and CP Rs.78.75
Total Rs.528.72

ITEM No. 7099


Notches not exc 15 cm girth (exc 25 mm and not exc 50 mm thick ) cut in softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 4 900
Rs.900.00
After rounding off: Rs.1,057.50 Total Amount of M and L Rs.900.00
Add 17.5 % OH and CP Rs.157.50
Total Rs.1,057.50

ITEM No. 7100.01


Holes round, drilled or cut in softwood Diameter or side not exc 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.5 112.5
Rs.112.50
After rounding off: Rs.132.20 Total Amount of M and L Rs.112.50
Add 17.5 % OH and CP Rs.19.69
Total Rs.132.19

ITEM No. 7100.02


Holes round, drilled or cut in softwood Diameter or side exc 15 mm & n exc 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1 225
Rs.225.00
After rounding off: Rs.264.40 Total Amount of M and L Rs.225.00
Add 17.5 % OH and CP Rs.39.38
Total Rs.264.38

664 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7100.03
Holes round, drilled or cut in softwoodDiameter or side exc 30 mm & n exc 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1.9999 449.9775
Rs.449.98
After rounding off: Rs.528.70 Total Amount of M and L Rs.449.98
Add 17.5 % OH and CP Rs.78.75
Total Rs.528.72

ITEM No. 7101.01


Holes square or rectangular drilled or cut in softwood Diameter or side not exc 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.667 150.075
Rs.150.08
After rounding off: Rs.176.30 Total Amount of M and L Rs.150.08
Add 17.5 % OH and CP Rs.26.26
Total Rs.176.34

ITEM No. 7101.02


Holes square or rectangular drilled or cut in softwood Diameter or side exc 15 mm & n exc 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 1.25 281.25
Rs.281.25
After rounding off: Rs.330.50 Total Amount of M and L Rs.281.25
Add 17.5 % OH and CP Rs.49.22
Total Rs.330.47

ITEM No. 7101.03


Holes square or rectangular drilled or cut in softwood Diameter or side exc 30 mm & n exc 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 2.5 562.5
Rs.562.50
After rounding off: Rs.660.90 Total Amount of M and L Rs.562.50
Add 17.5 % OH and CP Rs.98.44
Total Rs.660.94

665 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7102.01
Ballies, softwood, any class & fixed Type 3 Ballies S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies SW 3 to 9 m type 3 1 Runnin Rs. 35.00 1 35
Rs.35.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.008 1.8
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.008 1.536
Rs.3.34
Sundry
1 Sundries 1 Re Rs. 9.00 0.016 0.144
Rs.0.14
After rounding off: Rs.45.20 Total Amount of M and L Rs.38.48
Add 17.5 % OH and CP Rs.6.73
Total Rs.45.21

ITEM No. 7102.02


Ballies, softwood, any class & fixed Type 3 Ballies Except ballies.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.008 1.8
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.008 1.536
Rs.3.34
Sundry
1 Sundries 1 Re Rs. 9.00 0.016 0.144
Rs.0.14
After rounding off: Rs.4.10 Total Amount of M and L Rs.3.48
Add 17.5 % OH and CP Rs.0.61
Total Rs.4.09

ITEM No. 7102.03


Ballies, softwood, any class & fixed Type 2 Ballies S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies SW 3 to 9 m type 2* 1 Runnin Rs. 46.00 1 46
Rs.46.00
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.023 4.416
2 Carpenter, joiner 1 Day Rs. 225.00 0.023 5.175
Rs.9.59
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.66.40 Total Amount of M and L Rs.56.49
Add 17.5 % OH and CP Rs.9.89
Total Rs.66.38

666 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7102.04
Ballies, softwood, any class & fixed Type 2 Ballies Except ballies.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.023 5.175
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.023 4.416
Rs.9.59
Sundry
1 Sundries 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.12.30 Total Amount of M and L Rs.10.49
Add 17.5 % OH and CP Rs.1.84
Total Rs.12.33

ITEM No. 7102.05


Ballies, softwood, any class & fixed Type 1 Ballies S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies SW 3 to 9 m type 1* 1 Runnin Rs. 52.00 1 52
Rs.52.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.046 10.35
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.046 8.832
Rs.19.18
Sundry
1 Sundries 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.85.30 Total Amount of M and L Rs.72.62
Add 17.5 % OH and CP Rs.12.71
Total Rs.85.33

ITEM No. 7102.06


Ballies, softwood, any class & fixed Type 1 Ballies Except ballies.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.046 8.832
2 Carpenter, joiner 1 Day Rs. 225.00 0.046 10.35
Rs.19.18
Sundry
1 Sundries 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.24.20 Total Amount of M and L Rs.20.62
Add 17.5 % OH and CP Rs.3.61
Total Rs.24.23

667 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7103.01
Ballies, hardwood any class & fixed Type 3 Ballies S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies HW 3 to 9 m type3* 1 Runnin Rs. 50.00 1 50
Rs.50.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.01 1.92
Rs.4.17
Sundry
1 Sundries 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.65.30 Total Amount of M and L Rs.55.61
Add 17.5 % OH and CP Rs.9.73
Total Rs.65.34

ITEM No. 7103.02


Ballies, hardwood any class & fixed Type 3 Ballies Except ballies.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.01 1.92
Rs.4.17
Sundry
1 Sundries 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.6.60 Total Amount of M and L Rs.5.61
Add 17.5 % OH and CP Rs.0.98
Total Rs.6.59

ITEM No. 7103.03


Ballies, hardwood any class & fixed Type 2 Ballies S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies HW 3 to 9 m type 2* 1 Runnin Rs. 55.00 1 55
Rs.55.00
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.038 7.296
2 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.15.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.84.90 Total Amount of M and L Rs.72.29
Add 17.5 % OH and CP Rs.12.65
Total Rs.84.94

668 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7103.04
Ballies, hardwood any class & fixed Type 2 Ballies Except ballies.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.038 7.296
Rs.15.85
Sundry
1 Sundries 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.20.30 Total Amount of M and L Rs.17.29
Add 17.5 % OH and CP Rs.3.03
Total Rs.20.31

ITEM No. 7103.05


Ballies, hardwood any class & fixed Type 1 Ballies S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies HW 3 to 9 m type 1 1 Runnin Rs. 70.02 1 70.02
Rs.70.02
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.069 15.525
2 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.069 13.248
Rs.28.77
Sundry
1 Sundries 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.117.70 Total Amount of M and L Rs.100.14
Add 17.5 % OH and CP Rs.17.53
Total Rs.117.67

ITEM No. 7103.06


Ballies, hardwood any class & fixed Type 1 Ballies Except ballies.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow boy, Carpenter boy 1 Day Rs. 192.00 0.069 13.248
2 Carpenter, joiner 1 Day Rs. 225.00 0.069 15.525
Rs.28.77
Sundry
1 Sundries 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.35.50 Total Amount of M and L Rs.30.21
Add 17.5 % OH and CP Rs.5.29
Total Rs.35.50

669 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7104.01
Add to items 07102 to 07103, if in repairs to replace old and decayed ballies, including pieing and scarfing etc.
old and new balies (if required ), and removing old ballies to Stone Type 3 Ballies S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.5.30 Total Amount of M and L Rs.4.50
Add 17.5 % OH and CP Rs.0.79
Total Rs.5.29

ITEM No. 7104.02


Add to items 07102 to 07103, if in repairs to replace old and decayed ballies, including pieing and scarfing etc.
old and new balies (if required ), and removing old ballies to Stone Type 3 Ballies Except ballies.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 7104.03


Add to items 07102 to 07103, if in repairs to replace old and decayed ballies, including pieing and scarfing etc.
old and new balies (if required ), and removing old ballies to Stone Type 2 Ballies S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

ITEM No. 7104.04


Add to items 07102 to 07103, if in repairs to replace old and decayed ballies, including pieing and scarfing etc.
old and new balies (if required ), and removing old ballies to Stone Type 2 Ballies Except ballies.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02099 4.72275
Rs.4.72
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.72
Add 17.5 % OH and CP Rs.0.83
Total Rs.5.55

670 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7104.05
Add to items 07102 to 07103, if in repairs to replace old and decayed ballies, including pieing and scarfing etc.
old and new balies (if required ), and removing old ballies to Stone Type 1 Ballies S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.065 14.625
Rs.14.63
After rounding off: Rs.17.20 Total Amount of M and L Rs.14.63
Add 17.5 % OH and CP Rs.2.56
Total Rs.17.18

ITEM No. 7104.06


Add to items, 07102 to 07103 Holes round, drilled or cut in softwood, if in repairs to replace old and decayed
ballies, including pieing and scarfing etc. old and new balies (if required ), and removing old ballies to Stone
Type 1 Ballies Except ballies.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.041 9.225
Rs.9.23
After rounding off: Rs.10.80 Total Amount of M and L Rs.9.23
Add 17.5 % OH and CP Rs.1.61
Total Rs.10.84

ITEM No. 7105


Timber, clean in scantlings, boardings, etc, suitable fir strutting, shoring, centering, forawork and for other
temporary purposes.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling for strutting 1 Cum Rs. 18,000.00 1 18000
Rs.18,000.00
After rounding off: Rs.21,150.00 Total Amount of M and L Rs.18,000.00
Add 17.5 % OH and CP Rs.3,150.00
Total Rs.21,150.00

ITEM No. 7106.01


Timber in clean sawn scantlings 2nd class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber Scantling IInd Cl. soft wood 1 Cum Rs. 22,000.00 1 22000
Rs.22,000.00
After rounding off: Rs.25,850.00 Total Amount of M and L Rs.22,000.00
Add 17.5 % OH and CP Rs.3,850.00
Total Rs.25,850.00

671 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7106.02
Timber in clean sawn scantlings 2nd class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber scantling IInd cl Hard wood 1 Cum Rs. 32,000.00 1 32000
Rs.32,000.00
After rounding off: Rs.37,600.00 Total Amount of M and L Rs.32,000.00
Add 17.5 % OH and CP Rs.5,600.00
Total Rs.37,600.00

ITEM No. 7107.01


Timber in clean sawn battens or fillets 2nd class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl soft wood 1 Cum Rs. 21,190.00 1 21190
Rs.21,190.00
After rounding off: Rs.24,898.20 Total Amount of M and L Rs.21,190.00
Add 17.5 % OH and CP Rs.3,708.25
Total Rs.24,898.25

ITEM No. 7107.02


Timber in clean sawn battens or fillets 2nd class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Timber batten IInd cl Hard wood 1 Cum Rs. 30,022.00 1 30022
Rs.30,022.00
Sundry
1 Sundries 1 Re Rs. 9.00 0.001 0.009
Rs.0.01
After rounding off: Rs.35,275.90 Total Amount of M and L Rs.30,022.01
Add 17.5 % OH and CP Rs.5,253.85
Total Rs.35,275.86

ITEM No. 7108.01


2nd class softwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boading IInd cl. soft 15mm th 1 Sqm Rs. 315.00 1 315
Rs.315.00
After rounding off: Rs.370.10 Total Amount of M and L Rs.315.00
Add 17.5 % OH and CP Rs.55.13
Total Rs.370.13

672 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7108.02
2nd class softwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 20mm th 1 Sqm Rs. 420.00 1 420
Rs.420.00
After rounding off: Rs.493.50 Total Amount of M and L Rs.420.00
Add 17.5 % OH and CP Rs.73.50
Total Rs.493.50

ITEM No. 7108.03


2nd class softwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 25mm th, 1 Sqm Rs. 525.00 1 525
Rs.525.00
After rounding off: Rs.616.90 Total Amount of M and L Rs.525.00
Add 17.5 % OH and CP Rs.91.88
Total Rs.616.88

ITEM No. 7108.04


2nd class softwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft. 30mm th 1 Sqm Rs. 630.00 1 630
Rs.630.00
After rounding off: Rs.740.20 Total Amount of M and L Rs.630.00
Add 17.5 % OH and CP Rs.110.25
Total Rs.740.25

ITEM No. 7108.05


2nd class softwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl soft 40mm th 1 Sqm Rs. 840.00 1 840
Rs.840.00
After rounding off: Rs.987.00 Total Amount of M and L Rs.840.00
Add 17.5 % OH and CP Rs.147.00
Total Rs.987.00

ITEM No. 7109.01


2nd class hardwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 15 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding llnd cl Hard wood 15mm 1 Kg Rs. 480.00 1 480
Rs.480.00
After rounding off: Rs.564.00 Total Amount of M and L Rs.480.00
Add 17.5 % OH and CP Rs.84.00
Total Rs.564.00

673 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7109.02
2nd class hardwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl hardwood. 20mm th 1 Sqm Rs. 640.00 1 640
Rs.640.00
After rounding off: Rs.752.00 Total Amount of M and L Rs.640.00
Add 17.5 % OH and CP Rs.112.00
Total Rs.752.00

ITEM No. 7109.03


2nd class hardwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl. Hard wood.25mm th 1 Sqm Rs. 800.00 1 800
Rs.800.00
After rounding off: Rs.940.00 Total Amount of M and L Rs.800.00
Add 17.5 % OH and CP Rs.140.00
Total Rs.940.00

ITEM No. 7109.04


2nd class hardwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding IInd cl . Hard Wood 30mm th 1 Sqm Rs. 960.00 1 960
Rs.960.00
After rounding off: Rs.1,128.00 Total Amount of M and L Rs.960.00
Add 17.5 % OH and CP Rs.168.00
Total Rs.1,128.00

ITEM No. 7109.05


2nd class hardwood clean sawn boards or planks, any width n exc 25 cm Thickness of board in 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Boarding 2nd class Hard wood 40 mm thick Sqm Rs. 1,280.00 1 1280
Rs.1,280.00
After rounding off: Rs.1,504.00 Total Amount of M and L Rs.1,280.00
Add 17.5 % OH and CP Rs.224.00
Total Rs.1,504.00

ITEM No. 7110.01


Plain head, lost head, lath, mild steel wire nails, bright finished Length upto 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails n.exc. 50mm 1 Kg Rs. 48.00 1 48
Rs.48.00
After rounding off: Rs.56.40 Total Amount of M and L Rs.48.00
Add 17.5 % OH and CP Rs.8.40
Total Rs.56.40

674 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7110.02
Plain head, lost head, lath, mild steel wire nails, bright finished Length 50 mm but n exc 80 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 1 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 7110.03


Plain head, lost head, lath, mild steel wire nails, bright finished Length 80 mm but n exc 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails 50 to 80mm 1 Kg Rs. 45.00 1 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 7111


Plan pins n exc 25 mm long 1.00 mm to 1.60 mm dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Panel pins 25mm, dia 1 to 1.6mm 1 Kg Rs. 52.00 1 52
Rs.52.00
After rounding off: Rs.61.10 Total Amount of M and L Rs.52.00
Add 17.5 % OH and CP Rs.9.10
Total Rs.61.10

ITEM No. 7112


Clout, slate or felt and extra large felt nail, exc 25 mm in length.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Clout large flat nails 1 Kg Rs. 45.00 1 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 7113


Cut -lath nails (cut - tacks), 15 mm to 25 mm long and 1.8 to 2.00 mm in dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cut lath nails 25mm, 1.8 to 2mm dia 1 Kg Rs. 45.00 1 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

675 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7114
Ditto, but exc 25 mm & n exc 40 mm lenght and 2.00 to 2.40 mm in dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cut lath nail 25mm, 2 to 2,4mm dia 1 Kg Rs. 45.00 1 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 7115


Mild steel wood screws, bright finished, with slotted countersunk head, designation 4 to 10 (2.74 to 4.88 mm
nominal shank dial n exc 50 long (per 100 nos.).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws n.exc 50mm 100 No. Rs. 50.00 0.9999 49.995
Rs.50.00
After rounding off: Rs.58.70 Total Amount of M and L Rs.50.00
Add 17.5 % OH and CP Rs.8.75
Total Rs.58.74

ITEM No. 7116


Ditto, designation 12 to 14 (5.59 to 6.30 mm, ditto ) exc 50 mm but not exc 100 mm long.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screws 50 to 100mm 100 No. Rs. 60.00 0.9999 59.994
Rs.59.99
After rounding off: Rs.70.50 Total Amount of M and L Rs.59.99
Add 17.5 % OH and CP Rs.10.50
Total Rs.70.49

ITEM No. 7117


Glue.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Glue* 1 Kg Rs. 80.00 1 80
Rs.80.00
After rounding off: Rs.94.00 Total Amount of M and L Rs.80.00
Add 17.5 % OH and CP Rs.14.00
Total Rs.94.00

ITEM No. 7118.01


Staple (Steel wire), pointed, bright 15 mm to 25 mm long, 1.60 mm to 1.80 mm in dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stapple bright 15 to 25mm (Steel wire) 1 Kg Rs. 40.00 1 40
Rs.40.00
After rounding off: Rs.47.00 Total Amount of M and L Rs.40.00
Add 17.5 % OH and CP Rs.7.00
Total Rs.47.00

676 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7118.02
Staple (Steel wire), pointed bright 30 mm to 50 mm long, 1.80 mm to 2.50 mm in dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stapple bright 30 to 50mm 1 Kg Rs. 38.00 1 38
Rs.38.00
After rounding off: Rs.44.60 Total Amount of M and L Rs.38.00
Add 17.5 % OH and CP Rs.6.65
Total Rs.44.65

ITEM No. 7119.01


Staple (Steel wire), pointed, galvanised 15 mm to 25 mm long, 1.60 mm to 1.80 mm in dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stapple galvanised 15 to 25mm 1 Kg Rs. 45.00 1 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 7119.02


Staple (Steel wire), pointed, galvanised 30 mm to 50 mm long, 1.80 mm to 2.50 mm in dia.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stapple galvanised 30mm to 50mm Kg Rs. 43.00 1 43
Rs.43.00
After rounding off: Rs.50.50 Total Amount of M and L Rs.43.00
Add 17.5 % OH and CP Rs.7.53
Total Rs.50.53

ITEM No. 7120


Mild steel spikes, rose headed or dog spikes, 10 to 20 cm long.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Steel spikes 10 to 20 cm long 1 Kg Rs. 40.00 1 40
Rs.40.00
After rounding off: Rs.47.00 Total Amount of M and L Rs.40.00
Add 17.5 % OH and CP Rs.7.00
Total Rs.47.00

ITEM No. 7121.01


Ballies in lenghs from 3 to 9 m Softwood Ballies type 3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies SW 3 to 9 m type 3 1 Runnin Rs. 35.00 1 35
Rs.35.00
After rounding off: Rs.41.10 Total Amount of M and L Rs.35.00
Add 17.5 % OH and CP Rs.6.13
Total Rs.41.13

677 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Wood Work (Carpenter's Work)
ITEM No. 7121.02
Ballies in lenghs from 3 to 9 m Softwood Ballies type 2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies SW 3 to 9 m type 2* 1 Runnin Rs. 46.00 1 46
Rs.46.00
After rounding off: Rs.54.00 Total Amount of M and L Rs.46.00
Add 17.5 % OH and CP Rs.8.05
Total Rs.54.05

ITEM No. 7121.03


Ballies in lenghs from 3 to 9 m Softwood Ballies type 1.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies SW 3 to 9 m type 1* 1 Runnin Rs. 52.00 1 52
Rs.52.00
After rounding off: Rs.61.10 Total Amount of M and L Rs.52.00
Add 17.5 % OH and CP Rs.9.10
Total Rs.61.10

ITEM No. 7121.04


Ballies in lenghs from 3 to 9 m Hardwood Ballies type 3.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies HW 3 to 9 m type3* 1 Runnin Rs. 50.00 0.9999 49.995
Rs.50.00
After rounding off: Rs.58.70 Total Amount of M and L Rs.50.00
Add 17.5 % OH and CP Rs.8.75
Total Rs.58.74

ITEM No. 7121.05


Ballies in lenghs from 3 to 9 m Hardwood Ballies type 2.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies HW 3 to 9 m type 2* 1 Runnin Rs. 55.00 1 55
Rs.55.00
After rounding off: Rs.64.60 Total Amount of M and L Rs.55.00
Add 17.5 % OH and CP Rs.9.63
Total Rs.64.63

ITEM No. 7121.06


Ballies in lenghs from 3 to 9 m Hardwood Ballies type 1.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ballies HW 3 to 9 m type 1 1 Runnin Rs. 70.02 1 70.02
Rs.70.02
After rounding off: Rs.82.30 Total Amount of M and L Rs.70.02
Add 17.5 % OH and CP Rs.12.25
Total Rs.82.27

678 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8001.01
Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put
together with glue, pinned at joints, supplied and fixed 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 1.05 31716.3
Rs.31,716.30
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 21.16 4761
2 Belder 1 Kg Rs. 169.00 21.16 3576.04
Rs.8,337.04
Sundry
1 Sundry 1 Re Rs. 9.00 0.32 2.88
Rs.2.88
After rounding off: Rs.47,066.10 Total Amount of M and L Rs.40,056.22
Add 17.5 % OH and CP Rs.7,009.84
Total Rs.47,066.06

ITEM No. 8001.02


Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put
together with glue, pinned at joints, supplied and fixed 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 1.05 53521.65
Rs.53,521.65
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 31.74 7141.5
2 Belder 1 Kg Rs. 169.00 31.74 5364.06
Rs.12,505.56
Sundry
1 Sundry 1 Re Rs. 9.00 0.49 4.41
Rs.4.41
After rounding off: Rs.77,587.20 Total Amount of M and L Rs.66,031.62
Add 17.5 % OH and CP Rs.11,555.53
Total Rs.77,587.15

679 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8002.01
Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put
together with glue, pinned at joints,, but segmental, worked from the solid 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 1.5 45309
Rs.45,309.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 31.74 7141.5
2 Belder 1 Kg Rs. 169.00 31.74 5364.06
Rs.12,505.56
Sundry
1 Sundry 1 Re Rs. 9.00 0.49 4.41
Rs.4.41
After rounding off: Rs.67,937.30 Total Amount of M and L Rs.57,818.97
Add 17.5 % OH and CP Rs.10,118.32
Total Rs.67,937.29

ITEM No. 8002.02


Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put
together with glue, pinned at joints,, but segmental, worked from the solid 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 1.5 76459.5
Rs.76,459.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 47.62 10714.5
2 Belder 1 Kg Rs. 169.00 47.62 8047.78
Rs.18,762.28
Sundry
1 Sundry 1 Re Rs. 9.00 0.3 2.7
Rs.2.70
After rounding off: Rs.1,11,888.80 Total Amount of M and L Rs.95,224.48
Add 17.5 % OH and CP Rs.16,664.28
Total Rs.1,11,888.76

680 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8003.01
Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put
together with glue, pinned at joints,, but semi-circular, worked from the solid in tow or more sectors, dowelled
and keyed with double-headed hardwood keys. 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 2 60412
Rs.60,412.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 42.33 9524.25
2 Belder 1 Kg Rs. 169.00 42.33 7153.77
Rs.16,678.02
Sundry
1 Sundry 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.90,583.10 Total Amount of M and L Rs.77,092.00
Add 17.5 % OH and CP Rs.13,491.10
Total Rs.90,583.10

ITEM No. 8003.02


Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put
together with glue, pinned at joints,, but semi-circular, worked from the solid in tow or more sectors, dowelled
and keyed with double-headed hardwood keys.1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 2 101946
Rs.1,01,946.00
Labour
1 Belder 1 Kg Rs. 169.00 63.5 10731.5
2 Carpenter, joiner* 1 Day Rs. 225.00 63.5 14287.5
Rs.25,019.00
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.1,49,185.00 Total Amount of M and L Rs.1,26,965.99
Add 17.5 % OH and CP Rs.22,219.05
Total Rs.1,49,185.04

681 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8004.01
Transomes or mullions, straight, for solid frames of any description, wrought framed, double rebated on the
solid, rounded or chamfered (including weathering to transome, if required put together with glue,pinned at
joints), supplied and fixed 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 1.05 31716.3
Rs.31,716.30
Labour
1 Belder 1 Kg Rs. 169.00 26.455 4470.895
2 Carpenter, joiner* 1 Day Rs. 225.00 26.455 5952.375
Rs.10,423.27
Sundry
1 Sundry 1 Re Rs. 9.00 0.19 1.71
Rs.1.71
After rounding off: Rs.49,516.00 Total Amount of M and L Rs.42,141.28
Add 17.5 % OH and CP Rs.7,374.72
Total Rs.49,516.00

ITEM No. 8004.02


Transomes or mullions, straight, for solid frames of any description, wrought framed, double rebated on the
solid, rounded or chamfered (including weathering to transome, if required put together with glue,pinned at
joints), supplied and fixed 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 1.05 53521.65
Rs.53,521.65
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 39.065 8789.625
2 Belder 1 Kg Rs. 169.00 39.065 6601.985
Rs.15,391.61
Sundry
1 Sundry 1 Re Rs. 9.00 0.3 2.7
Rs.2.70
After rounding off: Rs.80,976.30 Total Amount of M and L Rs.68,915.96
Add 17.5 % OH and CP Rs.12,060.29
Total Rs.80,976.25

682 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8007.01
Glazed and skeleton shutters, open rebated and prepared to receiveglass, gauze, etc. (without sash bars),
edges of framing plain, chamferedor rounded, fitted with cut and mitred beads for securing glass, etc.;sizes of
members of shutters as specified in SSR Part I, Section 8, clause 8.24 (a); supplied and fitted to chowkats.
Supplied and fixed 1st class softwood.Thickness of shutter 25mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
2 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
3 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.54 448.2
Rs.516.83
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.53 119.25
2 Helper 1 Day Rs. 169.00 0.53 89.57
Rs.208.82
Sundry
1 Sundry 1 Re Rs. 9.00 1.07 9.63
Rs.9.63
After rounding off: Rs.864.00 Total Amount of M and L Rs.735.28
Add 17.5 % OH and CP Rs.128.67
Total Rs.863.96

ITEM No. 8007.02


Glazed and skeleton shutters, open rebated and prepared to receiveglass, gauze, etc. (without sash bars),
edges of framing plain, chamferedor rounded, fitted with cut and mitred beads for securing glass, etc.;sizes of
members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and
fixed 1st class softwood.Thickness of shutter 30 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
2 wood plank 1st class softwood 30mm thick 1 Sqm Rs. 1,000.00 0.54 540
3 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.608.63
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.53 119.25
2 Helper 1 Day Rs. 169.00 0.53 89.57
Rs.208.82
Sundry
1 Sundry 1 Re Rs. 9.00 1.08 9.72
Rs.9.72
After rounding off: Rs.971.90 Total Amount of M and L Rs.827.17
Add 17.5 % OH and CP Rs.144.76
Total Rs.971.93

683 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8007.03
Glazed and skeleton shutters, open rebated and prepared to receiveglass, gauze, etc. (without sash bars),
edges of framing plain, chamferedor rounded, fitted with cut and mitred beads for securing glass, etc.;sizes of
members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. supplied and
fixed 1st class softwood.Thickness of shutter 35 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
2 Wood plank 2nd class softwood 35mm thick 1 Cum Rs. 1,180.00 0.54 637.2
3 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.705.83
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.53 119.25
2 Helper 1 Day Rs. 169.00 0.53 89.57
Rs.208.82
Sundry
1 Sundry 1 Re Rs. 9.00 1.08 9.72
Rs.9.72
After rounding off: Rs.1,086.10 Total Amount of M and L Rs.924.37
Add 17.5 % OH and CP Rs.161.77
Total Rs.1,086.14

ITEM No. 8007.04


Glazed and skeleton shutters, open rebated and prepared to receiveglass, gauze, etc. (without sash bars),
edges of framing plain, chamferedor rounded, fitted with cut and mitred beads for securing glass, etc.;sizes of
members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. supplied and
fixed 1st class softwood.Except timber any thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.20.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.53 119.25
2 Helper 1 Day Rs. 169.00 0.53 89.57
Rs.208.82
Sundry
1 Sundry 1 Re Rs. 9.00 1.18 10.62
Rs.10.62
After rounding off: Rs.281.30 Total Amount of M and L Rs.239.44
Add 17.5 % OH and CP Rs.41.90
Total Rs.281.34

684 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8007.05
Glazed and skeleton shutters, open rebated and prepared to receiveglass, gauze, etc. (without sash bars),
edges of framing plain, chamferedor rounded, fitted with cut and mitred beads for securing glass, etc.;sizes of
members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and
fixed 1st class hardwood.Thickness of shutter 25 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.0014 70
2 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
3 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.54 756
Rs.846.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.795 178.875
2 Helper 1 Day Rs. 169.00 0.795 134.355
Rs.313.23
Sundry
1 Sundry 1 Re Rs. 9.00 1.06 9.54
Rs.9.54
After rounding off: Rs.1,373.30 Total Amount of M and L Rs.1,168.77
Add 17.5 % OH and CP Rs.204.53
Total Rs.1,373.30

ITEM No. 8007.06


Glazed and skeleton shutters, open rebated and prepared to receiveglass, gauze, etc. (without sash bars),
edges of framing plain, chamferedor rounded, fitted with cut and mitred beads for securing glass, etc.;sizes of
members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. supplied and
fixed 1st class hardwood.Thickness of shutter 30 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.0014 70
2 wood plank 1st class hardwood 30mm thick 1 Sqm Rs. 1,680.00 0.54 907.2
3 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.997.20
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.795 178.875
2 Helper 1 Day Rs. 169.00 0.795 134.355
Rs.313.23
Sundry
1 Sundry 1 Re Rs. 9.00 1.05 9.45
Rs.9.45
After rounding off: Rs.1,550.90 Total Amount of M and L Rs.1,319.88
Add 17.5 % OH and CP Rs.230.98
Total Rs.1,550.86

685 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8007.07
Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc. (without sash bars),
edges of framing plain, chamferedor rounded, fitted with cut and mitred beads for securing glass, etc.;sizes of
members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and
fixed 1st class hardwood.Thickness of shutter 35 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
2 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.0014 70
3 wood plank 1st class hardwood 35mm thick 1 Sqm Rs. 1,960.00 0.54 1058.4
Rs.1,148.40
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.81 182.25
2 Helper 1 Day Rs. 169.00 0.81 136.89
Rs.319.14
Sundry
1 Sundry 1 Re Rs. 9.00 1.01 9.09
Rs.9.09
After rounding off: Rs.1,735.00 Total Amount of M and L Rs.1,476.63
Add 17.5 % OH and CP Rs.258.41
Total Rs.1,735.04

ITEM No. 8007.08


Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc. (without sash bars),
edges of framing plain, chamferedor rounded, fitted with cut and mitred beads for securing glass, etc.;sizes of
members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and
fixed 1st class hardwood.Except timber any thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.20.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.795 178.875
2 Helper 1 Day Rs. 169.00 0.795 134.355
Rs.313.23
Sundry
1 Sundry 1 Re Rs. 9.00 1.19 10.71
Rs.10.71
After rounding off: Rs.404.10 Total Amount of M and L Rs.343.94
Add 17.5 % OH and CP Rs.60.19
Total Rs.404.13

686 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8008.01
Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers fitted with cut and mitred beads
for securing glass, etc.;sizes of members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied
fitted to chowkars. Supplied and fixed. 1stclass softwood (thickness of shutter 25 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.54 448.2
2 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
3 Glazing bars 1st class soft wood 1 Cum Rs. 34,740.00 0.002 69.48
4 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
Rs.586.31
Labour
1 Helper 1 Day Rs. 169.00 0.69 116.61
2 Carpenter, joiner* 1 Day Rs. 225.00 0.69 155.25
Rs.271.86
Sundry
1 Sundry 1 Re Rs. 9.00 1.02 9.18
Rs.9.18
After rounding off: Rs.1,019.10 Total Amount of M and L Rs.867.35
Add 17.5 % OH and CP Rs.151.79
Total Rs.1,019.14

ITEM No. 8008.02


Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers fitted with cut and mitred beads
for securing glass, etc.;sizes of members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied
fitted to chowkars. Supplied and fixed. 1stclass softwood (thickness of shutter 30 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
2 wood plank 1st class softwood 30mm thick 1 Sqm Rs. 1,000.00 0.54 540
3 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
4 Glazing bars 1st class soft wood 1 Cum Rs. 34,740.00 0.002 69.48
Rs.678.11
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.69 155.25
2 Helper 1 Day Rs. 169.00 0.69 116.61
Rs.271.86
Sundry
1 Sundry 1 Re Rs. 9.00 1.02 9.18
Rs.9.18
After rounding off: Rs.1,127.00 Total Amount of M and L Rs.959.15
Add 17.5 % OH and CP Rs.167.85
Total Rs.1,127.00

687 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8008.03
Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers fitted with cut and mitred beads
for securing glass, etc.;sizes of members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied
fitted to chowkars. Supplied and fixed. 1stclass softwood (thickness of shutter 35 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 35mm thick Sqm Rs. 1,160.00 0.54 626.4
2 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
3 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
4 Glazing bars 1st class soft wood 1 Cum Rs. 34,740.00 0.002 69.48
Rs.764.51
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.69 155.25
2 Helper 1 Day Rs. 169.00 0.69 116.61
Rs.271.86
Sundry
1 Sundry 1 Re Rs. 9.00 0.97 8.73
Rs.8.73
After rounding off: Rs.1,228.00 Total Amount of M and L Rs.1,045.10
Add 17.5 % OH and CP Rs.182.89
Total Rs.1,227.99

ITEM No. 8008.04


Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers fitted with cut and mitred beads
for securing glass, etc.;sizes of members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied
fitted to chowkars. Supplied and fixed. 1stclass softwood shutter (except timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.20.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.69 155.25
2 Helper 1 Day Rs. 169.00 0.69 116.61
Rs.271.86
Sundry
1 Sundry 1 Re Rs. 9.00 1.12 10.08
Rs.10.08
After rounding off: Rs.354.80 Total Amount of M and L Rs.301.94
Add 17.5 % OH and CP Rs.52.84
Total Rs.354.78

688 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8008.05
Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers fitted with cut and mitred beads
for securing glass, etc.;sizes of members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied
fitted to chowkars. Supplied and fixed1stclass hardwood (thickness of shutter 25 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.0014 71.3622
2 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
3 Glazing bars 1st class Hardwood 1 Cum Rs. 50,000.00 0.002 100
4 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.54 756
Rs.947.36
Labour
1 Helper 1 Day Rs. 169.00 1.03 174.07
2 Carpenter, joiner* 1 Day Rs. 225.00 1.03 231.75
Rs.405.82
Sundry
1 Sundry 1 Re Rs. 9.00 1.04 9.36
Rs.9.36
After rounding off: Rs.1,601.00 Total Amount of M and L Rs.1,362.54
Add 17.5 % OH and CP Rs.238.44
Total Rs.1,600.99

ITEM No. 8008.06


Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers fitted with cut and mitred beads
for securing glass, etc.;sizes of members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied
fitted to chowkars. Supplied and fixeds. 1stclass hardwood (thickness of shutter 30 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 30mm thick 1 Sqm Rs. 1,680.00 0.54 907.2
2 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.0014 71.3622
3 Glazing bars 1st class Hardwood 1 Cum Rs. 50,000.00 0.002 100
4 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.1,098.56
Labour
1 Helper 1 Day Rs. 169.00 1.03 174.07
2 Carpenter, joiner* 1 Day Rs. 225.00 1.03 231.75
Rs.405.82
Sundry
1 Sundry 1 Re Rs. 9.00 1.041 9.369
Rs.9.37
After rounding off: Rs.1,778.70 Total Amount of M and L Rs.1,513.75
Add 17.5 % OH and CP Rs.264.91
Total Rs.1,778.66

689 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8008.07
Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers fitted with cut and mitred beads
for securing glass, etc.;sizes of members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied
fitted to chowkars. Supplied and fixed. 1stclass hardwood (thickness of shutter 35 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
2 wood plank 1st class hardwood 35mm thick 1 Sqm Rs. 1,960.00 0.54 1058.4
3 Glazing bars 1st class Hardwood 1 Cum Rs. 50,000.00 0.002 100
4 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.0014 71.3622
Rs.1,249.76
Labour
1 Helper 1 Day Rs. 169.00 1.03 174.07
2 Carpenter, joiner* 1 Day Rs. 225.00 1.03 231.75
Rs.405.82
Sundry
1 Sundry 1 Re Rs. 9.00 1.04 9.36
Rs.9.36
After rounding off: Rs.1,956.30 Total Amount of M and L Rs.1,664.94
Add 17.5 % OH and CP Rs.291.36
Total Rs.1,956.31

ITEM No. 8008.08


Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers fitted with cut and mitred beads
for securing glass, etc.;sizes of members of shutters as specified in SSR Part I,Section 8 clause 8.4(a) supplied
fitted to chowkars. Supplied and fixed. 1stclass softwood shutter (except timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.20.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.03 231.75
2 Helper 1 Day Rs. 169.00 1.03 174.07
Rs.405.82
Sundry
1 Sundry 1 Re Rs. 9.00 1.33 11.97
Rs.11.97
After rounding off: Rs.514.40 Total Amount of M and L Rs.437.79
Add 17.5 % OH and CP Rs.76.61
Total Rs.514.40

690 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8009.01
Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers,with edges of sash bars and
framing moulded fitted with cut and mitred beads for securing glass, etc.;sizes of members of shutters as
specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and fixed 1st class
softwood (thickness of shutter 25 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
2 Glazing bars 1st class soft wood 1 Cum Rs. 34,740.00 0.002 69.48
3 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.54 448.2
4 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.586.31
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.74 166.5
2 Helper 1 Day Rs. 169.00 0.74 125.06
Rs.291.56
Sundry
1 Sundry 1 Re Rs. 9.00 1.05 9.45
Rs.9.45
After rounding off: Rs.1,042.60 Total Amount of M and L Rs.887.32
Add 17.5 % OH and CP Rs.155.28
Total Rs.1,042.60

ITEM No. 8009.02


Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers,with edges of sash bars and
framing moulded fitted with cut and mitred beads for securing glass, etc.;sizes of members of shutters as
specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and fixed 1st class softwood
(thickness of shutter 30 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
2 wood plank 1st class softwood 30mm thick 1 Sqm Rs. 1,000.00 0.54 540
3 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
4 Glazing bars 1st class soft wood 1 Cum Rs. 34,740.00 0.002 69.48
Rs.678.11
Labour
1 Helper 1 Day Rs. 169.00 0.74 125.06
2 Carpenter, joiner* 1 Day Rs. 225.00 0.74 166.5
Rs.291.56
Sundry
1 Sundry 1 Re Rs. 9.00 1.05 9.45
Rs.9.45
After rounding off: Rs.1,150.50 Total Amount of M and L Rs.979.12
Add 17.5 % OH and CP Rs.171.35
Total Rs.1,150.47

691 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8009.03
Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers,with edges of sash bars and
framing moulded fitted with cut and mitred beads for securing glass, etc.;sizes of members of shutters as
specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and fixed 1st class softwood
(thickness of shutter 35 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Glazing bars 1st class soft wood 1 Cum Rs. 34,740.00 0.002 69.48
2 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
3 wood plank 1st class softwood 35mm thick Sqm Rs. 1,160.00 0.54 626.4
4 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.764.51
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.74 166.5
2 Helper 1 Day Rs. 169.00 0.74 125.06
Rs.291.56
Sundry
1 Sundry 1 Re Rs. 9.00 1.05 9.45
Rs.9.45
After rounding off: Rs.1,252.00 Total Amount of M and L Rs.1,065.52
Add 17.5 % OH and CP Rs.186.47
Total Rs.1,251.99

ITEM No. 8009.04


Glazed and skeleton shutters, open rebatsed and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers,with edges of sash bars and
framing moulded fitted with cut and mitred beads for securing glass, etc.;sizes of members of shutters as
specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and fixed 1st class softwood
shutter (except timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.20.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.74 166.5
2 Helper 1 Day Rs. 169.00 0.74 125.06
Rs.291.56
Sundry
1 Sundry 1 Re Rs. 9.00 1.152 10.368
Rs.10.37
After rounding off: Rs.378.30 Total Amount of M and L Rs.321.93
Add 17.5 % OH and CP Rs.56.34
Total Rs.378.27

692 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8009.05
Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers,with edges of sash bars and
framing moulded fitted with cut and mitred beads for securing glass, etc.;sizes of members of shutters as
specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and fixed 1st class
hardwood (thickness of shutter 25 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
2 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.0014 70
3 Glazing bars 1st class Hardwood 1 Cum Rs. 50,000.00 0.002 100
4 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.54 756
Rs.946.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.094 246.15
2 Helper 1 Day Rs. 169.00 1.094 184.886
Rs.431.04
Sundry
1 Sundry 1 Re Rs. 9.00 1.06 9.54
Rs.9.54
After rounding off: Rs.1,629.20 Total Amount of M and L Rs.1,386.58
Add 17.5 % OH and CP Rs.242.65
Total Rs.1,629.23

ITEM No. 8009.06


Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers,with edges of sash bars and
framing moulded fitted with cut and mitred beads for securing glass, etc.;sizes of members of shutters as
specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and fixed 1st class
hardwood(thickness of shutter 30 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Glazing bars 1st class Hardwood 1 Cum Rs. 50,000.00 0.002 100
2 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
3 wood plank 1st class hardwood 30mm thick 1 Sqm Rs. 1,680.00 0.54 907.2
4 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.0014 70
Rs.1,097.20
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.094 246.15
2 Helper 1 Day Rs. 169.00 1.094 184.886
Rs.431.04
Sundry
1 Sundry 1 Re Rs. 9.00 1.06 9.54
Rs.9.54
After rounding off: Rs.1,806.90 Total Amount of M and L Rs.1,537.78
Add 17.5 % OH and CP Rs.269.11
Total Rs.1,806.89

693 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8009.07
Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers,with edges of sash bars and
framing moulded fitted with cut and mitred beads for securing glass, etc.;sizes of members of shutters as
specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and fixed 1st class
hardwood (thickness of shutter 35 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.0014 70
2 wood plank 1st class hardwood 35mm thick 1 Sqm Rs. 1,960.00 0.54 1058.4
3 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
4 Glazing bars 1st class Hardwood 1 Cum Rs. 50,000.00 0.002 100
Rs.1,248.40
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.094 246.15
2 Helper 1 Day Rs. 169.00 1.094 184.886
Rs.431.04
Sundry
1 Sundry 1 Re Rs. 9.00 1.06 9.54
Rs.9.54
After rounding off: Rs.1,984.50 Total Amount of M and L Rs.1,688.98
Add 17.5 % OH and CP Rs.295.57
Total Rs.1,984.55

ITEM No. 8009.08


Glazed and skeleton shutters, open rebated and prepared to receive glass, gauze, etc divided into squares,
with plain,chamfered or rounded, mitred and rebated sash bars any numbers,with edges of sash bars and
framing moulded fitted with cut and mitred beads for securing glass, etc.;sizes of members of shutters as
specified in SSR Part I,Section 8 clause 8.4(a) supplied fitted to chowkars. Supplied and fixed 1st class
hardwood shutter (except timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
Rs.20.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.094 246.15
2 Helper 1 Day Rs. 169.00 1.094 184.886
Rs.431.04
Sundry
1 Sundry 1 Re Rs. 9.00 1.19 10.71
Rs.10.71
After rounding off: Rs.542.60 Total Amount of M and L Rs.461.75
Add 17.5 % OH and CP Rs.80.81
Total Rs.542.55

694 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8010.01
Deduct form items 08007 to 08009 above if windows,ventilators, etc. are provided with stiles and rails as
speified in SSR PartI,Section 8 clause 8.23 (b) 1st class softwood (thickness of shutter25mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.1 83
Rs.83.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.055 12.375
Rs.12.38
After rounding off: Rs.112.10 Total Amount of M and L Rs.95.38
Add 17.5 % OH and CP Rs.16.69
Total Rs.112.07

ITEM No. 8010.02


Deduct form items 08007 to 08009 above if windows,ventilators, etc. are provided with stiles and rails as
speified in SSR PartI,Section 8 clause 8.23 (b) 1st class softwood (thickness of shutter30mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 30mm thick 1 Sqm Rs. 1,000.00 0.1 100
Rs.100.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0551 12.3975
Rs.12.40
After rounding off: Rs.132.10 Total Amount of M and L Rs.112.40
Add 17.5 % OH and CP Rs.19.67
Total Rs.132.07

ITEM No. 8010.03


Deduct form items 08007 to 08009 above if windows,ventilators, etc. are provided with stiles and rails as
speified in SSR PartI,Section 8 clause 8.23 (b) 1st class softwood (thickness of shutter35mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 35mm thick Sqm Rs. 1,160.00 0.1 116
Rs.116.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0551 12.3975
Rs.12.40
After rounding off: Rs.150.90 Total Amount of M and L Rs.128.40
Add 17.5 % OH and CP Rs.22.47
Total Rs.150.87

695 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8010.04
Deduct form items 08007 to 08009 above if windows,ventilators, etc. are provided with stiles and rails as
speified in SSR PartI,Section 8 clause 8.23 (b) 1st class softwood shutter (except timberany thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0551 12.3975
Rs.12.40
After rounding off: Rs.14.60 Total Amount of M and L Rs.12.40
Add 17.5 % OH and CP Rs.2.17
Total Rs.14.57

ITEM No. 8010.05


Deduct form items 08007 to 08009 above if windows,ventilators, etc. are provided with stiles and rails as
speified in SSR Part I,Section 8 clause 8.23 (b) 1st class hardwood (thickness of shutter25mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.1 140
Rs.140.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0551 12.3975
Rs.12.40
After rounding off: Rs.179.10 Total Amount of M and L Rs.152.40
Add 17.5 % OH and CP Rs.26.67
Total Rs.179.07

ITEM No. 8010.06


Deduct form items 08007 to 08009 above if windows,ventilators, etc. are provided with stiles and rails as
speified in SSR PartI,Section 8 clause 8.23 (b) 1st class hardwood (thickness of shutter30mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 30mm thick 1 Sqm Rs. 1,680.00 0.1 168
Rs.168.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0551 12.3975
Rs.12.40
After rounding off: Rs.212.00 Total Amount of M and L Rs.180.40
Add 17.5 % OH and CP Rs.31.57
Total Rs.211.97

696 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8010.07
Deduct form items 08007 to 08009 above if windows,ventilators, etc. are provided with stiles and rails as
speified in SSR PartI,Section 8 clause 8.23 (b) 1st class hardwood (thickness of shutter35mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 35mm thick 1 Sqm Rs. 1,960.00 0.1 196
Rs.196.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0551 12.3975
Rs.12.40
After rounding off: Rs.244.90 Total Amount of M and L Rs.208.40
Add 17.5 % OH and CP Rs.36.47
Total Rs.244.87

ITEM No. 8011.04


Add to items 08007 to 08009 if prepared to slide horizontallyon beads including supplying and fixing beads 1st
class softwoodshutter (except timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0551 12.3975
Rs.12.40
After rounding off: Rs.14.60 Total Amount of M and L Rs.12.40
Add 17.5 % OH and CP Rs.2.17
Total Rs.14.57

ITEM No. 8011.08


Add to items 08007 to 08009 if prepared to slide horizontallyon beads including supplying and fixing beads 1st
class hardwoodshutter (except timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0685 15.4125
Rs.15.41
After rounding off: Rs.18.10 Total Amount of M and L Rs.15.41
Add 17.5 % OH and CP Rs.2.70
Total Rs.18.11

ITEM No. 8012.01


Deduct form 08007 if cut and mitred beads are not supplied and fitted for securing glass, etc. 1st class
softwood (Supplied and fixed ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.001 34.737
Rs.34.74
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1936 43.56
Rs.43.56
After rounding off: Rs.92.00 Total Amount of M and L Rs.78.30
Add 17.5 % OH and CP Rs.13.70
Total Rs.92.00

697 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8012.02
Deduct form 08007 if cut and mitred beads are not supplied andfitted for securing glass, etc. 1st class
softwood (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1208 27.18
Rs.27.18
After rounding off: Rs.31.90 Total Amount of M and L Rs.27.18
Add 17.5 % OH and CP Rs.4.76
Total Rs.31.94

ITEM No. 8012.03


Deduct form08007 if cut and mitred beads are not supplied andfitted for securing glass, etc. 1st class
hardwood (supplied and fixed ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.0014 70
Rs.70.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1985 44.6625
Rs.44.66
After rounding off: Rs.134.70 Total Amount of M and L Rs.114.66
Add 17.5 % OH and CP Rs.20.07
Total Rs.134.73

ITEM No. 8012.04


Deduct form 08007 if cut and mitred beads are not supplied andfitted for securing glass, etc. 1st class
hardwood (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1981 44.5725
Rs.44.57
After rounding off: Rs.52.40 Total Amount of M and L Rs.44.57
Add 17.5 % OH and CP Rs.7.80
Total Rs.52.37

ITEM No. 8013.01


Deduct fom items 08008 and 08009 if cut and mitred beads are not supplied and fitted for securing glass, etc.
1st classsoftwood (Supplied and fixed ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.0014 48.6318
Rs.48.63
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3307 74.4075
Rs.74.41
After rounding off: Rs.144.60 Total Amount of M and L Rs.123.04
Add 17.5 % OH and CP Rs.21.53
Total Rs.144.57

698 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8013.02
Deduct fom items 08008 and 08009 if cut and mitred beads are not supplied and fitted for securing glass, etc.
1st classsoftwood (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3307 74.4075
Rs.74.41
After rounding off: Rs.87.40 Total Amount of M and L Rs.74.41
Add 17.5 % OH and CP Rs.13.02
Total Rs.87.43

ITEM No. 8013.03


Deduct fom items 08008 and 08009 if cut and mitred beads are not supplied and fitted for securing glass, etc.
1st classhardwood (Supplied and fixed ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.0014 70
Rs.70.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.496 111.6
Rs.111.60
After rounding off: Rs.213.40 Total Amount of M and L Rs.181.60
Add 17.5 % OH and CP Rs.31.78
Total Rs.213.38

ITEM No. 8013.04


Deduct fom items 08008 and 08009 if cut and mitred beads are not supplied and fitted for securing glass, etc.
1st classhardwood (except timber ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.496 111.6
Rs.111.60
After rounding off: Rs.131.10 Total Amount of M and L Rs.111.60
Add 17.5 % OH and CP Rs.19.53
Total Rs.131.13

699 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8014.01
Framed, ledged, braced and battened shutters, supplied and fitted tochowkats 2nd class softwood (thickness
of shutter 40 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 2nd class softwood 40mm thick 1 Sqm Rs. 660.00 0.93 613.8
2 wood plank 2nd class softwood 20mm thick 1 Sqm Rs. 330.00 0.28 92.4
Rs.706.20
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.42 94.5
2 Helper 1 Day Rs. 169.00 0.42 70.98
Rs.165.48
Sundry
1 Sundry 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.1,025.80 Total Amount of M and L Rs.873.03
Add 17.5 % OH and CP Rs.152.78
Total Rs.1,025.81

ITEM No. 8014.02


Framed, ledged, braced and battened shutters, supplied and fitted tochowkats 2nd class softwood (thickness
of shutter 45 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 2nd class softwood 20mm thick 1 Sqm Rs. 330.00 0.28 92.4
2 wood plank 2nd class softwood 45mm thick 1 Sqm Rs. 750.00 0.93 697.5
Rs.789.90
Labour
1 Helper 1 Day Rs. 169.00 0.42 70.98
2 Carpenter, joiner* 1 Day Rs. 225.00 0.42 94.5
Rs.165.48
Sundry
1 Sundry 1 Re Rs. 9.00 0.148 1.332
Rs.1.33
After rounding off: Rs.1,124.10 Total Amount of M and L Rs.956.71
Add 17.5 % OH and CP Rs.167.42
Total Rs.1,124.14

700 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8014.03
Framed, ledged, braced and battened shutters, supplied and fitted tochowkats 2nd class softwood (except
timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.42 94.5
2 Helper 1 Day Rs. 169.00 0.42 70.98
Rs.165.48
Sundry
1 Sundry 1 Re Rs. 9.00 1.5 13.5
Rs.13.50
After rounding off: Rs.210.30 Total Amount of M and L Rs.178.98
Add 17.5 % OH and CP Rs.31.32
Total Rs.210.30

ITEM No. 8014.04


Framed, ledged, braced and battened shutters, supplied and fitted to chowkats 2nd class Hardwood (thickness
of shutter 40 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 2nd class hardwood 40mm thick 1 Sqm Rs. 1,330.00 0.93 1236.9
2 wood plank 2nd class hardwood15mm thick 1 Sqm Rs. 500.00 0.28 140
Rs.1,376.90
Labour
1 Helper 1 Day Rs. 169.00 0.63 106.47
2 Carpenter, joiner* 1 Day Rs. 225.00 0.63 141.75
Rs.248.22
Sundry
1 Sundry 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.1,911.80 Total Amount of M and L Rs.1,627.10
Add 17.5 % OH and CP Rs.284.74
Total Rs.1,911.84

701 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8014.05
Framed, ledged, braced and battened shutters, supplied and fitted tochowkats 2nd class Hardwood (thickness
of shutter 45 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 2nd class hardwood 20mm thick 1 Sqm Rs. 664.54 0.28 186.0712
2 wood plank 2nd class hardwood 45mm thick 1 Sqm Rs. 1,495.00 0.93 1390.35
Rs.1,576.42
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.63 141.75
2 Helper 1 Day Rs. 169.00 0.63 106.47
Rs.248.22
Sundry
1 Sundry 1 Re Rs. 9.00 0.6 5.4
Rs.5.40
After rounding off: Rs.2,150.30 Total Amount of M and L Rs.1,830.04
Add 17.5 % OH and CP Rs.320.26
Total Rs.2,150.30

ITEM No. 8014.06


Framed, ledged, braced and battened shutters, supplied and fitted tochowkats 2nd class softwood (except
timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.63 141.75
2 Helper 1 Day Rs. 169.00 0.63 106.47
Rs.248.22
Sundry
1 Sundry 1 Re Rs. 9.00 1.57 14.13
Rs.14.13
After rounding off: Rs.308.30 Total Amount of M and L Rs.262.35
Add 17.5 % OH and CP Rs.45.91
Total Rs.308.26

702 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8015.01
Plain, framed, panelled shutters (any number of panels ) with panels oftimber flat on both sides (feather edged
), or of veneered particle boardmedium density wood particle board with commercial face veneers;supplied
and fitted to chowkats 1st class softwood (thickness of shutter 25 mm )
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.3 30
2 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.55 456.5
3 wood plank 1st class softwood 12mm thick 1 Sqm Rs. 400.00 0.66 264
Rs.750.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.435 97.875
2 Helper 1 Day Rs. 169.00 0.435 73.515
Rs.171.39
Sundry
1 Sundry 1 Re Rs. 9.00 0.19 1.71
Rs.1.71
After rounding off: Rs.1,085.20 Total Amount of M and L Rs.923.60
Add 17.5 % OH and CP Rs.161.63
Total Rs.1,085.23

ITEM No. 8015.02


Plain, framed, panelled shutters (any number of panels ) with panels oftimber flat on both sides (feather edged
), or of veneered particle boardmedium density wood particle board with commercial face veneers;supplied
and fitted to chowkats 1st class softwood (thickness of shutter 30 mm )
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.3 30
2 wood plank 1st class softwood 30mm thick 1 Sqm Rs. 1,000.00 0.55 550
3 wood plank 1st class softwood 12mm thick 1 Sqm Rs. 400.00 0.66 264
Rs.844.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.435 97.875
2 Helper 1 Day Rs. 169.00 0.435 73.515
Rs.171.39
Sundry
1 Sundry 1 Re Rs. 9.00 0.18 1.62
Rs.1.62
After rounding off: Rs.1,195.00 Total Amount of M and L Rs.1,017.01
Add 17.5 % OH and CP Rs.177.98
Total Rs.1,194.99

703 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8015.03
Plain, framed, panelled shutters (any number of panels ) with panels oftimber flat on both sides (feather edged
), or of veneered particle boardmedium density wood particle board with commercial face veneers;supplied
and fitted to chowkats 1st class softwood(thickness of shutter 40 mm )
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 12mm thick 1 Sqm Rs. 400.00 0.66 264
2 wood plank 1st class softwood 40mm thick 1 Sqm Rs. 1,340.00 0.55 737
3 synthatic adhesive 1 Kg Rs. 100.00 0.3 30
Rs.1,031.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.435 97.875
2 Helper 1 Day Rs. 169.00 0.435 73.515
Rs.171.39
Sundry
1 Sundry 1 Re Rs. 9.00 0.19 1.71
Rs.1.71
After rounding off: Rs.1,414.80 Total Amount of M and L Rs.1,204.10
Add 17.5 % OH and CP Rs.210.72
Total Rs.1,414.82

ITEM No. 8015.04


Plain, framed, panelled shutters (any number of panels ) with panels oftimber flat on both sides (feather edged
), or of veneered particle boardmedium density wood particle board with commercial face veneers;supplied
and fitted to chowkats 1st class softwood (except timber any thickness )
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.3 30
Rs.30.00
Labour
1 Helper 1 Day Rs. 169.00 0.44 74.36
2 Carpenter, joiner* 1 Day Rs. 225.00 0.44 99
Rs.173.36
Sundry
1 Sundry 1 Re Rs. 9.00 0.23 2.07
Rs.2.07
After rounding off: Rs.241.40 Total Amount of M and L Rs.205.43
Add 17.5 % OH and CP Rs.35.95
Total Rs.241.38

704 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8015.05
Plain, framed, panelled shutters (any number of panels ) with panels oftimber flat on both sides (feather edged
), or of veneered particle boardmedium density wood particle board with commercial face veneers;supplied
and fitted to chowkats 1st class hardwood(thickness of shutter 25 mm )
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 12mm thick 1 Sqm Rs. 670.00 0.66 442.2
2 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.55 770
3 synthatic adhesive 1 Kg Rs. 100.00 0.3 30
Rs.1,242.20
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.66 148.5
2 Helper 1 Day Rs. 169.00 0.66 111.54
Rs.260.04
Sundry
1 Sundry 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.1,765.80 Total Amount of M and L Rs.1,502.78
Add 17.5 % OH and CP Rs.262.99
Total Rs.1,765.77

ITEM No. 8015.06


Plain, framed, panelled shutters (any number of panels ) with panels oftimber flat on both sides (feather edged
), or of veneered particle boardmedium density wood particle board with commercial face veneers;supplied
and fitted to chowkats 1st class hardwood(thickness of shutter 30 mm )
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 30mm thick 1 Sqm Rs. 1,680.00 0.55 924
2 wood plank 1st class hardwood 12mm thick 1 Sqm Rs. 670.00 0.66 442.2
3 synthatic adhesive 1 Kg Rs. 100.00 0.3 30
Rs.1,396.20
Labour
1 Helper 1 Day Rs. 169.00 0.66 111.54
2 Carpenter, joiner* 1 Day Rs. 225.00 0.66 148.5
Rs.260.04
Sundry
1 Sundry 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.1,946.80 Total Amount of M and L Rs.1,656.87
Add 17.5 % OH and CP Rs.289.95
Total Rs.1,946.82

705 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8015.07
Plain, framed, panelled shutters (any number of panels ) with panels oftimber flat on both sides (feather edged
), or of veneered particle boardmedium density wood particle board with commercial face veneers;supplied
and fitted to chowkats 1st class hardwood(thickness of shutter 40 mm )
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.3 30
2 wood plank 1st class hardwood 40mm thick 1 Sqm Rs. 2,240.00 0.55 1232
3 wood plank 1st class hardwood 12mm thick 1 Sqm Rs. 670.00 0.66 442.2
Rs.1,704.20
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.66 148.5
2 Helper 1 Day Rs. 169.00 0.66 111.54
Rs.260.04
Sundry
1 Sundry 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.2,308.70 Total Amount of M and L Rs.1,964.87
Add 17.5 % OH and CP Rs.343.85
Total Rs.2,308.72

ITEM No. 8015.08


Plain, framed, panelled shutters (any number of panels ) with panels oftimber flat on both sides (feather edged
), or of veneered particle boardmedium density wood particle board with commercial face veneers;supplied
and fitted to chowkats 1st class hardwood (except timber any thickness )
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.3 30
Rs.30.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.925 208.125
2 Helper 1 Day Rs. 169.00 0.925 156.325
Rs.364.45
Sundry
1 Sundry 1 Re Rs. 9.00 0.45 4.05
Rs.4.05
After rounding off: Rs.468.20 Total Amount of M and L Rs.398.50
Add 17.5 % OH and CP Rs.69.74
Total Rs.468.24

706 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8016.01
Add to item 8015 if framing is moulded on solid (for each side ) 1st class softwood (thickness of shutter 25 mm
).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1855 41.7375
Rs.41.74
After rounding off: Rs.49.00 Total Amount of M and L Rs.41.74
Add 17.5 % OH and CP Rs.7.30
Total Rs.49.04

ITEM No. 8016.02


Add to item 8015 if framing is moulded on solid (for each side ) 1st class softwood (thickness of shutter 30mm
).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1855 41.7375
Rs.41.74
After rounding off: Rs.49.00 Total Amount of M and L Rs.41.74
Add 17.5 % OH and CP Rs.7.30
Total Rs.49.04

ITEM No. 8016.03


Add to item 8015 if framing is moulded on solid (for each side ) 1st class softwood (thickness of shutter 40 mm
).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1855 41.7375
Rs.41.74
After rounding off: Rs.49.00 Total Amount of M and L Rs.41.74
Add 17.5 % OH and CP Rs.7.30
Total Rs.49.04

ITEM No. 8016.04


Add to item 8015 if framing is moulded on solid (for each side ) 1st class softwood shutter (except timber any
thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1855 41.7375
Rs.41.74
After rounding off: Rs.49.00 Total Amount of M and L Rs.41.74
Add 17.5 % OH and CP Rs.7.30
Total Rs.49.04

707 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8016.05
Add to item 8015 if framing is moulded on solid (for each side ) 1st class hardwood (thickness of shutter
25mm).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2775 62.4375
Rs.62.44
After rounding off: Rs.73.40 Total Amount of M and L Rs.62.44
Add 17.5 % OH and CP Rs.10.93
Total Rs.73.36

ITEM No. 8016.06


Add to item 8015 if framing is moulded on solid (for each side ) 1st class hardwood (thickness of shutter
30mm).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2775 62.4375
Rs.62.44
After rounding off: Rs.73.40 Total Amount of M and L Rs.62.44
Add 17.5 % OH and CP Rs.10.93
Total Rs.73.36

ITEM No. 8016.07


Add to item 8015 if framing is moulded on solid (for each side ) 1stclass hardwood (thickness of shutter 40 mm
).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2775 62.4375
Rs.62.44
After rounding off: Rs.73.40 Total Amount of M and L Rs.62.44
Add 17.5 % OH and CP Rs.10.93
Total Rs.73.36

ITEM No. 8016.08


Add to item 8015 if framing is moulded on solid (for each side ) 1st class hardwood shutter (except timber any
thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2775 62.4375
Rs.62.44
After rounding off: Rs.73.40 Total Amount of M and L Rs.62.44
Add 17.5 % OH and CP Rs.10.93
Total Rs.73.36

708 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8017.01
Add to item 8015 if moulded bead is provided and planted round the panels (for eachside ) 1st class softwood
(thickness of shutter 25 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.003 104.211
Rs.104.21
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1765 39.7125
Rs.39.71
After rounding off: Rs.169.10 Total Amount of M and L Rs.143.92
Add 17.5 % OH and CP Rs.25.19
Total Rs.169.11

ITEM No. 8017.02


Add to item 8015 if moulded bead is provided and planted round the panels (for eachside ) 1st class softwood
(thickness of shutter 30 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.003 104.211
Rs.104.21
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1765 39.7125
Rs.39.71
After rounding off: Rs.169.10 Total Amount of M and L Rs.143.92
Add 17.5 % OH and CP Rs.25.19
Total Rs.169.11

ITEM No. 8017.03


Add to item 8015 if moulded bead is provided and planted round the panels (for eachside ) 1st class softwood
(thickness of shutter 40 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.003 104.211
Rs.104.21
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1765 39.7125
Rs.39.71
After rounding off: Rs.169.10 Total Amount of M and L Rs.143.92
Add 17.5 % OH and CP Rs.25.19
Total Rs.169.11

709 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8017.04
Add to item 8015 if moulded bead is provided and planted round the panels (for eachside ) 1st class softwood
shutter (except timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1769 39.8025
Rs.39.80
After rounding off: Rs.46.80 Total Amount of M and L Rs.39.80
Add 17.5 % OH and CP Rs.6.97
Total Rs.46.77

ITEM No. 8017.05


Add to item 8015 if moulded bead is provided and planted round the panels (for eachside ) 1st class hardwood
(thickness of shutter 25 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.003 150
Rs.150.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
Rs.59.51
After rounding off: Rs.246.20 Total Amount of M and L Rs.209.51
Add 17.5 % OH and CP Rs.36.66
Total Rs.246.18

ITEM No. 8017.06


Add to item 8015 if moulded bead is provided and planted round the panels (for eachside ) 1st class hardwood
(thickness of shutter 30mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.003 150
Rs.150.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
Rs.59.51
After rounding off: Rs.246.20 Total Amount of M and L Rs.209.51
Add 17.5 % OH and CP Rs.36.66
Total Rs.246.18

710 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8017.07
Add to item 8015 if moulded bead is provided and planted round the panels (for eachside ) 1st class hardwood
(thickness of shutter 40 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.003 150
Rs.150.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
Rs.59.51
After rounding off: Rs.246.20 Total Amount of M and L Rs.209.51
Add 17.5 % OH and CP Rs.36.66
Total Rs.246.18

ITEM No. 8017.08


Add to item 8015 if moulded bead is provided and planted round the panels (for eachside ) 1st class hardwood
shutter (except timber any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
Rs.59.51
Sundry
1 Sundry 1 Re Rs. 9.00 0.02 0.18
Rs.0.18
After rounding off: Rs.70.10 Total Amount of M and L Rs.59.69
Add 17.5 % OH and CP Rs.10.45
Total Rs.70.14

ITEM No. 8018.01


Add to item 8015 if rebated bolection moulded bead is provided and planted roundthe panels (for each side )
1st class softwood (thickness of shutter 25mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.003 104.211
Rs.104.21
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3638 81.855
Rs.81.86
After rounding off: Rs.218.60 Total Amount of M and L Rs.186.07
Add 17.5 % OH and CP Rs.32.56
Total Rs.218.63

711 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8018.02
Add to item 8015 if rebated bolection moulded bead is provided and planted roundthe panels (for each side )
1st class softwood (thickness of shutter 30mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.003 104.211
Rs.104.21
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3638 81.855
Rs.81.86
After rounding off: Rs.218.60 Total Amount of M and L Rs.186.07
Add 17.5 % OH and CP Rs.32.56
Total Rs.218.63

ITEM No. 8018.03


Add to item 8015 if rebated bolection moulded bead is provided and planted roundthe panels (for each side )
1st class softwood (thickness of shutter 40mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood fillets 1 Cum Rs. 34,737.00 0.003 104.211
Rs.104.21
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3638 81.855
Rs.81.86
After rounding off: Rs.218.60 Total Amount of M and L Rs.186.07
Add 17.5 % OH and CP Rs.32.56
Total Rs.218.63

ITEM No. 8018.04


Add to item 8015 if rebated bolection moulded bead is provided and planted roundthe panels (for each side )
1st class softwood shutter (except timber anythickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3638 81.855
Rs.81.86
Sundry
1 Sundry 1 Re Rs. 9.00 0.01 0.09
Rs.0.09
After rounding off: Rs.96.30 Total Amount of M and L Rs.81.95
Add 17.5 % OH and CP Rs.14.34
Total Rs.96.29

712 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8018.05
Add to item 8015 if rebated bolection moulded bead is provided and planted roundthe panels (for each side )
1st class hardwood (thickness of shutter 25mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.003 150
Rs.150.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.5512 124.02
Rs.124.02
After rounding off: Rs.322.00 Total Amount of M and L Rs.274.02
Add 17.5 % OH and CP Rs.47.95
Total Rs.321.97

ITEM No. 8018.06


Add to item 8015 if rebated bolection moulded bead is provided and planted roundthe panels (for each side )
1st class hardwood (thickness of shutter30mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.003 150
Rs.150.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.5512 124.02
Rs.124.02
After rounding off: Rs.322.00 Total Amount of M and L Rs.274.02
Add 17.5 % OH and CP Rs.47.95
Total Rs.321.97

ITEM No. 8018.07


Add to item 8015 if rebated bolection moulded bead is provided and planted roundthe panels (for each side )
1st class hardwood (thickness of shutter 40mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.003 150
Rs.150.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.5512 124.02
Rs.124.02
After rounding off: Rs.322.00 Total Amount of M and L Rs.274.02
Add 17.5 % OH and CP Rs.47.95
Total Rs.321.97

713 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8018.08
Add to item 8015 if rebated bolection moulded bead is provided and planted roundthe panels (for each side )
1st class hardwood shutter (except timberany thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.5512 124.02
Rs.124.02
Sundry
1 Sundry 1 Re Rs. 9.00 0.01 0.09
Rs.0.09
After rounding off: Rs.145.80 Total Amount of M and L Rs.124.11
Add 17.5 % OH and CP Rs.21.72
Total Rs.145.83

ITEM No. 8020.01


Plain framed, panelled shutter (two panel ) with lock rail and panel of 9mm B.W.P. or 12 mm veneered particle
board with commercial veneeringon both faces. The size of rail and style as per IS : 1003 (Part-I), kilnseasoned
and chemically pressure treated 2nd class HW rail and style Thickness of shutters 35mm.Factort made shutter
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made shutter with 2 panels of 9mm BWP commercial ply or 1 Sqm Rs. 1,243.00 1 1243
12mm veneered particle board 35mm
Rs.1,243.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2647 59.5575
2 Mazdoor man 1 Day Rs. 169.00 0.2647 44.7343
Rs.104.29
After rounding off: Rs.1,583.10 Total Amount of M and L Rs.1,347.29
Add 17.5 % OH and CP Rs.235.78
Total Rs.1,583.07

ITEM No. 8020.02


Plain framed, panelled shutter (two panel ) with lock rail and panel of 9mm B.W.P. or 12 mm veneered particle
board with commercial veneeringon both faces. The size of rail and style as per IS : 1003 (Part-I), kilnseasoned
and chemically pressure treated 2nd class HW rail and style Thickness of shutters 40mm.Factort made shutter
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made shutter with 2 panels of 9mm BWP commercial ply or 1 Sqm Rs. 1,491.00 1 1491
12mm veneered particle board 40mm
Rs.1,491.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2646 59.535
2 Mazdoor man 1 Day Rs. 169.00 0.2646 44.7174
Rs.104.25
After rounding off: Rs.1,874.40 Total Amount of M and L Rs.1,595.25
Add 17.5 % OH and CP Rs.279.17
Total Rs.1,874.42

714 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8020.03
Plain framed, panelled shutter (two panel ) with lock rail and panel of 9mm B.W.P. or 12 mm veneered particle
board with commercial veneeringon both faces. The size of rail and style as per IS : 1003 (Part-I), kilnseasoned
and chemically pressure treated, 2nd class HW rail and style ,Fixing only any thickness .Factort made shutter
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.2646 44.7174
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
Rs.104.23
After rounding off: Rs.122.50 Total Amount of M and L Rs.104.23
Add 17.5 % OH and CP Rs.18.24
Total Rs.122.47

ITEM No. 8021.01


Plain framed, panelled shutter (one panel ) without lock rail and with one panel of 9mm B.W.P. or 12 mm
veneered particle board with commercial veneeringon both faces. The size of rail and style as per IS : 1003
(Part-I), kilnseasoned and chemically pressure treated 2nd class HW rail and style Thickness of shutters
35mm.Factort made shutter
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made shutter with 2 panels of 9mm BWP commercial ply or 1 Sqm Rs. 1,118.00 1 1118
12mm veneered particle board but without interlocking rail and with
one panel only 35mm thick
Rs.1,118.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
2 Mazdoor man 1 Day Rs. 169.00 0.2645 44.7005
Rs.104.21
After rounding off: Rs.1,436.10 Total Amount of M and L Rs.1,222.21
Add 17.5 % OH and CP Rs.213.89
Total Rs.1,436.10

ITEM No. 8021.02


Plain framed, panelled shutter (one panel ) without lock rail and with one panel of 9mm B.W.P. or 12 mm
veneered particle board with commercial veneeringon both faces. The size of rail and style as per IS : 1003
(Part-I), kilnseasoned and chemically pressure treateded 2nd class HW rail and style Thickness of shutters
40mm.Factort made shutter
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made shutter with 2 panels of 9mm BWP commercial ply or 1 Sqm Rs. 1,367.00 1 1367
12mm veneered particle board but without interlocking rail and with
one panel only 40mm thick
Rs.1,367.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
2 Mazdoor man 1 Day Rs. 169.00 0.2645 44.7005
Rs.104.21
After rounding off: Rs.1,728.70 Total Amount of M and L Rs.1,471.21
Add 17.5 % OH and CP Rs.257.46
Total Rs.1,728.68

715 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8021.03
Plain framed, panelled shutter (two panel ) with lock rail and with one panel of 9mm B.W.P. or 12 mm
veneered particle board with commercial veneeringon both faces. The size of rail and style as per IS : 1003
(Part-I), kilnseasoned and chemically pressure treateded 2nd class HW rail and style .Factort made shutter
,Fixing only any thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
2 Mazdoor man 1 Day Rs. 169.00 0.2645 44.7005
Rs.104.21
After rounding off: Rs.122.50 Total Amount of M and L Rs.104.21
Add 17.5 % OH and CP Rs.18.24
Total Rs.122.45

ITEM No. 8022.01


S & F flush shutters, solid core construction, with block board core andplaywood face pane commercial type on
both sides 25mm thick
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Flush shutter solid core construction with block board core and 1 Sqm Rs. 700.00 1 700
plywood face panel commercial type on both sides i.e. flush shutter
block BDN DEC - 25mm,
Rs.700.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
2 Mazdoor man 1 Day Rs. 169.00 0.2645 44.7005
Rs.104.21
After rounding off: Rs.945.00 Total Amount of M and L Rs.804.21
Add 17.5 % OH and CP Rs.140.74
Total Rs.944.95

ITEM No. 8022.02


S & F flush shutters, solid core construction, with block board core andplaywood face pane commercial type on
both sides Thickness of shutter 30mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Flush shutter solid core construction with block board core and 1 Sqm Rs. 770.00 1 770
plywood face panel commercial type on both sides i.e. flush shutter
block BDN DEC 30mm
Rs.770.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
2 Helper 1 Day Rs. 169.00 0.2645 44.7005
Rs.104.21
After rounding off: Rs.1,027.20 Total Amount of M and L Rs.874.21
Add 17.5 % OH and CP Rs.152.99
Total Rs.1,027.20

716 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8022.03
S & F flush shutters, solid core construction, with block board core andplaywood face pane commercial type on
both sides Thickness of shutter40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Flush shutter solid core construction with block board core and 1 Sqm Rs. 860.00 1 860
plywood face panel commercial type on both sides i.e. flush shutter
block BDN DEC 40mm
Rs.860.00
Labour
1 Helper 1 Day Rs. 169.00 0.2645 44.7005
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
Rs.104.21
After rounding off: Rs.1,133.00 Total Amount of M and L Rs.964.21
Add 17.5 % OH and CP Rs.168.74
Total Rs.1,132.95

ITEM No. 8022.04


S & F flush shutters, solid core construction, with block board core andplaywood face pane commercial type on
both sides fixing only any Thickness
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
2 Helper 1 Day Rs. 169.00 0.2645 44.7005
Rs.104.21
After rounding off: Rs.122.50 Total Amount of M and L Rs.104.21
Add 17.5 % OH and CP Rs.18.24
Total Rs.122.45

ITEM No. 8023.01


S & F flush shutters,with particle board core Thickness ofshutter 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Flush shutter solid core construction with particle board core i.e. 1 Sqm Rs. 710.00 1 710
Flush non DEC FCG BRO CR 25mm
Rs.710.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.3027 51.1563
2 Carpenter, joiner* 1 Day Rs. 225.00 0.3027 68.1075
Rs.119.26
After rounding off: Rs.974.40 Total Amount of M and L Rs.829.26
Add 17.5 % OH and CP Rs.145.12
Total Rs.974.38

717 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8023.02
S & F flush shutters, with particle board core Thickness ofshutter 30mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Flush shutter solid core construction with particle board core i.e. 1 Sqm Rs. 780.00 1 780
Flush non DEC FCG BRO CR 30mm
Rs.780.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.3027 51.1563
2 Carpenter, joiner* 1 Day Rs. 225.00 0.3027 68.1075
Rs.119.26
After rounding off: Rs.1,056.60 Total Amount of M and L Rs.899.26
Add 17.5 % OH and CP Rs.157.37
Total Rs.1,056.63

ITEM No. 8023.03


S & F flush shutters with particle board core Thickness ofshutter 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Flush shutter solid core construction with particle board core i.e. 1 Sqm Rs. 870.00 1 870
Flush non DEC FCG BRO CR 40mm
Rs.870.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.3203 54.1307
2 Carpenter, joiner* 1 Day Rs. 225.00 0.3203 72.0675
Rs.126.20
After rounding off: Rs.1,170.50 Total Amount of M and L Rs.996.20
Add 17.5 % OH and CP Rs.174.33
Total Rs.1,170.53

ITEM No. 8023.04


S & F flush shutters with particle board core Fixing only, anythickness.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
2 Helper 1 Day Rs. 169.00 0.2645 44.7005
Rs.104.21
After rounding off: Rs.122.50 Total Amount of M and L Rs.104.21
Add 17.5 % OH and CP Rs.18.24
Total Rs.122.45

718 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8024.01
Add to items 8022 and 8023 if one face is covered withdecorative face veneer with lipping / frame to match
Thickness of shutter 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for decoratative face veneer with lipping 1 Sqm Rs. 322.80 1 322.8
Rs.322.80
After rounding off: Rs.379.30 Total Amount of M and L Rs.322.80
Add 17.5 % OH and CP Rs.56.49
Total Rs.379.29

ITEM No. 8024.02


Add to items 8022 and 8023 if one face is covered withdecorative face veneer with lipping / frame to match
Thickness of shutter30mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for decoratative face veneer with lipping 1 Sqm Rs. 322.80 1 322.8
Rs.322.80
After rounding off: Rs.379.30 Total Amount of M and L Rs.322.80
Add 17.5 % OH and CP Rs.56.49
Total Rs.379.29

ITEM No. 8024.03


Add to items 8022 and 8023 if one face is covered withdecorative face veneer with lipping / frame to match
Thickness of shutter40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for decoratative face veneer with lipping 1 Sqm Rs. 322.80 1 322.8
Rs.322.80
After rounding off: Rs.379.30 Total Amount of M and L Rs.322.80
Add 17.5 % OH and CP Rs.56.49
Total Rs.379.29

ITEM No. 8025.01


Add to items 8022 and 8023 if both faces are covered with decorative face vener with lipping Thickness of
shutter 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for decoratative face veneer with lipping 1 Sqm Rs. 322.80 2 645.6
Rs.645.60
After rounding off: Rs.758.60 Total Amount of M and L Rs.645.60
Add 17.5 % OH and CP Rs.112.98
Total Rs.758.58

719 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8025.02
Add to items 8022 and 8023 if both faces are covered with decorative face vener with lipping Thickness of
shutter 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for decoratative face veneer with lipping 1 Sqm Rs. 322.80 2 645.6
Rs.645.60
After rounding off: Rs.758.60 Total Amount of M and L Rs.645.60
Add 17.5 % OH and CP Rs.112.98
Total Rs.758.58

ITEM No. 8025.03


Add to items 8022 and 8023 if both faces are covered with decorative face vener with lipping Thickness of
shutter 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra for decoratative face veneer with lipping 1 Sqm Rs. 322.80 2 645.6
Rs.645.60
After rounding off: Rs.758.60 Total Amount of M and L Rs.645.60
Add 17.5 % OH and CP Rs.112.98
Total Rs.758.58

ITEM No. 8029.01


Framed lourvred shutters with stiles and rails 100 to 120 mm wide andpanels filled with fixed louvres from 10
to 15mm thick, supplied and fittedto frames 1st class softwood thickness of shutter 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 30mm thick 1 Sqm Rs. 1,000.00 0.67 670
2 wood plank 1st class softwood 12mm thick 1 Sqm Rs. 400.00 0.67 268
Rs.938.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.6875 154.6875
2 Helper 1 Day Rs. 169.00 0.6875 116.1875
Rs.270.88
After rounding off: Rs.1,420.40 Total Amount of M and L Rs.1,208.88
Add 17.5 % OH and CP Rs.211.55
Total Rs.1,420.43

720 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8029.02
Framed lourvred shutters with stiles and rails 100 to 120 mm wide andpanels filled with fixed louvres from 10
to 15mm thick, supplied and fittedto frames 1st class softwood (thickness of shutter 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 12mm thick 1 Sqm Rs. 400.00 0.67 268
2 wood plank 1st class softwood 40mm thick 1 Sqm Rs. 1,340.00 0.67 897.8
Rs.1,165.80
Labour
1 Helper 1 Day Rs. 169.00 0.6708 113.3652
2 Carpenter, joiner* 1 Day Rs. 225.00 0.6708 150.93
Rs.264.30
After rounding off: Rs.1,680.40 Total Amount of M and L Rs.1,430.10
Add 17.5 % OH and CP Rs.250.27
Total Rs.1,680.36

ITEM No. 8029.03


Framed lourvred shutters with stiles and rails 100 to 120 mm wide andpanels filled with fixed louvres from 10
to 15mm thick, supplied and fittedto frames excepted timber any thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.6875 154.6875
2 Helper 1 Day Rs. 169.00 0.6875 116.1875
Rs.270.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.68 6.12
Rs.6.12
After rounding off: Rs.325.50 Total Amount of M and L Rs.277.00
Add 17.5 % OH and CP Rs.48.47
Total Rs.325.47

ITEM No. 8029.04


Framed lourvred shutters with stiles and rails 100 to 120 mm wide andpanels filled with fixed louvres from 10
to 15mm thick, supplied and fittedto frames 1st class hardwood (thickness of shutter 30 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 30mm thick 1 Sqm Rs. 1,680.00 0.67 1125.6
2 wood plank 1st class hardwood 12mm thick 1 Sqm Rs. 670.00 0.67 448.9
Rs.1,574.50
Labour
1 Helper 1 Day Rs. 169.00 1.0375 175.3375
2 Carpenter, joiner* 1 Day Rs. 225.00 1.0375 233.4375
Rs.408.78
After rounding off: Rs.2,330.30 Total Amount of M and L Rs.1,983.28
Add 17.5 % OH and CP Rs.347.07
Total Rs.2,330.35

721 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8029.05
Framed lourvred shutters with stiles and rails 100 to 120 mm wide andpanels filled with fixed louvres from 10
to 15mm thick, supplied and fittedto frames 1st class hardwood (thickness of shutter 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 40mm thick 1 Sqm Rs. 2,240.00 0.67 1500.8
2 wood plank 1st class hardwood 12mm thick 1 Sqm Rs. 670.00 0.67 448.9
Rs.1,949.70
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.0373 233.3925
2 Helper 1 Day Rs. 169.00 1.0373 175.3037
Rs.408.70
After rounding off: Rs.2,771.10 Total Amount of M and L Rs.2,358.40
Add 17.5 % OH and CP Rs.412.72
Total Rs.2,771.12

ITEM No. 8029.06


Framed lourvred shutters with stiles and rails 100 to 120 mm wide andpanels filled with fixed louvres from 10
to 15mm thick, supplied and fittedto frames except timber any thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.0373 233.3925
2 Helper 1 Day Rs. 169.00 1.0373 175.3037
Rs.408.70
Sundry
1 Sundry 1 Re Rs. 9.00 1 9
Rs.9.00
After rounding off: Rs.490.80 Total Amount of M and L Rs.417.70
Add 17.5 % OH and CP Rs.73.10
Total Rs.490.79

ITEM No. 8030.01


Louvred frames 80 to 100 mm wide with fixed louvres of 15 mm to 20 mmthick frame put together with glue,
pinned at joints, supplied and fixed 1stclass softwood (thickness of frames 50 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.04 1208.24
2 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.66 547.8
Rs.1,756.04
Labour
1 Helper 1 Day Rs. 169.00 0.5503 93.0007
2 Carpenter, joiner* 1 Day Rs. 225.00 0.5503 123.8175
Rs.216.82
After rounding off: Rs.2,318.10 Total Amount of M and L Rs.1,972.86
Add 17.5 % OH and CP Rs.345.25
Total Rs.2,318.11

722 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8030.02
Louvred frames 80 to 100 mm wide with fixed louvres of 15 mm to 20mm, thick frame put together with glue,
pinned at joints, supplied andfixed 1st class softwood (thickness of frames 75 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.66 547.8
2 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.06 1812.36
Rs.2,360.16
Labour
1 Helper 1 Day Rs. 169.00 0.5504 93.0176
2 Carpenter, joiner* 1 Day Rs. 225.00 0.5504 123.84
Rs.216.86
After rounding off: Rs.3,028.00 Total Amount of M and L Rs.2,577.02
Add 17.5 % OH and CP Rs.450.98
Total Rs.3,028.00

ITEM No. 8030.03


Louvred frames 80 to 100 mm wide with fixed louvres of 15 mm to 20mm, thick frame put together with glue,
pinned at joints, supplied andfixed 1st class softwood (thickness of frames 100 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.66 547.8
2 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.08 2416.48
Rs.2,964.28
Labour
1 Helper 1 Day Rs. 169.00 0.5504 93.0176
2 Carpenter, joiner* 1 Day Rs. 225.00 0.5504 123.84
Rs.216.86
After rounding off: Rs.3,737.80 Total Amount of M and L Rs.3,181.14
Add 17.5 % OH and CP Rs.556.70
Total Rs.3,737.84

ITEM No. 8030.04


Louvred frames 80 to 100 mm wide with fixed louvres of 15 mm to 20 mmthick frame put together with glue,
pinned at joints, supplied and fixed 1stclass hardwood (thickness of frames 50 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.04 2038.92
2 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.66 924
Rs.2,962.92
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.815 183.375
2 Helper 1 Day Rs. 169.00 0.815 137.735
Rs.321.11
After rounding off: Rs.3,858.70 Total Amount of M and L Rs.3,284.03
Add 17.5 % OH and CP Rs.574.71
Total Rs.3,858.74

723 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8030.05
Louvred frames 80 to 100 mm wide with fixed louvres of 15 mm to 20 mmthick frame put together with glue,
pinned at joints, supplied and fixed1st class hardwood (thickness of frames 75 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.66 924
2 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.06 3058.38
Rs.3,982.38
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.815 183.375
2 Helper 1 Day Rs. 169.00 0.815 137.735
Rs.321.11
After rounding off: Rs.5,056.60 Total Amount of M and L Rs.4,303.49
Add 17.5 % OH and CP Rs.753.11
Total Rs.5,056.60

ITEM No. 8030.06


Louvred frames 80 to 100 mm wide with fixed louvres of 15 mm to 20 mmthick, frame put together with glue,
pinned at joints, supplied and fixed1st class hardwood (thickness of frames 100 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.66 924
2 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.08 4077.84
Rs.5,001.84
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.8149 183.3525
2 Helper 1 Day Rs. 169.00 0.8149 137.7181
Rs.321.07
After rounding off: Rs.6,254.40 Total Amount of M and L Rs.5,322.91
Add 17.5 % OH and CP Rs.931.51
Total Rs.6,254.42

ITEM No. 8031.01


Moulding as in cornices, picture rails and the like 1st class ofsoftwood(sectional area n.exc 6 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.03 1.5
2 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.001 30.206
3 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.04 33.2
Rs.64.91
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1213 27.2925
Rs.27.29
After rounding off: Rs.108.30 Total Amount of M and L Rs.92.20
Add 17.5 % OH and CP Rs.16.13
Total Rs.108.33

724 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8031.02
Moulding as in cornices, picture rails and the like 1st class of softwood(sectional area 6 and n exc 13 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.001 30.206
2 Nails of length 50mm 1 Kg Rs. 50.00 0.03 1.5
3 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.08 66.4
Rs.98.11
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.132 29.7
Rs.29.70
After rounding off: Rs.150.20 Total Amount of M and L Rs.127.81
Add 17.5 % OH and CP Rs.22.37
Total Rs.150.17

ITEM No. 8031.03


Moulding as in cornices, picture rails and the like 1st class of softwood(sectional area 13 and n exc 25 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.001 30.206
2 Nails of length 50mm 1 Kg Rs. 50.00 0.045 2.25
3 wood plank 1st class softwood 25mm thick 1 Sqm Rs. 830.00 0.16 132.8
Rs.165.26
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1655 37.2375
Rs.37.24
After rounding off: Rs.237.90 Total Amount of M and L Rs.202.49
Add 17.5 % OH and CP Rs.35.44
Total Rs.237.93

ITEM No. 8031.04


Moulding as in cornices, picture rails and the like 1st class ofhardwood (sectional area n exc 6 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.04 56
2 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.001 50.973
3 Nails of length 50mm 1 Kg Rs. 50.00 0.03 1.5
Rs.108.47
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1764 39.69
Rs.39.69
After rounding off: Rs.174.10 Total Amount of M and L Rs.148.16
Add 17.5 % OH and CP Rs.25.93
Total Rs.174.09

725 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8031.05
Moulding as in cornices, picture rails and the like 1st class of hardwood(sectional area 6 and n exc 13 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.03 1.5
2 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.001 50.973
3 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.08 112
Rs.164.47
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1985 44.6625
Rs.44.66
After rounding off: Rs.245.70 Total Amount of M and L Rs.209.14
Add 17.5 % OH and CP Rs.36.60
Total Rs.245.73

ITEM No. 8031.06


Moulding as in cornices, picture rails and the like 1st class of hardwood(sectional area 13 and n exc 25 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.045 2.25
2 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.16 224
3 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.001 50.973
Rs.277.22
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2538 57.105
Rs.57.11
After rounding off: Rs.392.80 Total Amount of M and L Rs.334.33
Add 17.5 % OH and CP Rs.58.51
Total Rs.392.84

ITEM No. 8031.07


Moulding as in cornices, picture rails and the like 1st class of hardwood(sectional area 25 and n exc 50 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nails of length 50mm 1 Kg Rs. 50.00 0.07 3.5
2 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 0.25 350
3 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.001 50.973
Rs.404.47
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3308 74.43
Rs.74.43
After rounding off: Rs.562.70 Total Amount of M and L Rs.478.90
Add 17.5 % OH and CP Rs.83.81
Total Rs.562.71

726 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8032.01
Add to last if fixed with screws 1st class of softwood (sectional area nexc 6 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Long steel screw 60mm 1 100 No Rs. 55.00 0.1 5.5
Rs.5.50
After rounding off: Rs.6.50 Total Amount of M and L Rs.5.50
Add 17.5 % OH and CP Rs.0.96
Total Rs.6.46

ITEM No. 8032.02


Add to last if fixed with screws 1st class of softwood (sectional area 6.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Long steel screw 60mm 1 100 No Rs. 55.00 0.13 7.15
Rs.7.15
After rounding off: Rs.8.40 Total Amount of M and L Rs.7.15
Add 17.5 % OH and CP Rs.1.25
Total Rs.8.40

ITEM No. 8032.03


Add to last if fixed with screws 1st class of softwood (sectional area 13and n exc 25 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Long steel screw 60mm 1 100 No Rs. 55.00 0.23 12.65
Rs.12.65
After rounding off: Rs.14.90 Total Amount of M and L Rs.12.65
Add 17.5 % OH and CP Rs.2.21
Total Rs.14.86

ITEM No. 8032.04


Add to last if fixed with screws 1st class of hardwood (sectional area nexc 6 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Long steel screw 60mm 1 100 No Rs. 55.00 0.1 5.5
Rs.5.50
After rounding off: Rs.6.50 Total Amount of M and L Rs.5.50
Add 17.5 % OH and CP Rs.0.96
Total Rs.6.46

ITEM No. 8032.05


Add to last if fixed with screws 1st class of hardwood (sectional area 6and n exc 13 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Long steel screw 60mm 1 100 No Rs. 55.00 0.13 7.15
Rs.7.15
After rounding off: Rs.8.40 Total Amount of M and L Rs.7.15
Add 17.5 % OH and CP Rs.1.25
Total Rs.8.40

727 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8032.06
Add to last if fixed with screws 1st class of hardwood (sectional area 13and n exc 25 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Long steel screw 60mm 1 100 No Rs. 55.00 0.23 12.65
Rs.12.65
After rounding off: Rs.14.90 Total Amount of M and L Rs.12.65
Add 17.5 % OH and CP Rs.2.21
Total Rs.14.86

ITEM No. 8032.07


Add to last if fixed with screws 1st class of hardwood (sectional area 25and n exc 50 sqcm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Long steel screw 60mm 1 100 No Rs. 55.00 0.33 18.15
Rs.18.15
After rounding off: Rs.21.30 Total Amount of M and L Rs.18.15
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.33

ITEM No. 8033.01


Extra over timber supplied and fixed and fixed, for turner's work n exc 15mm dia Softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0208 4.68
Rs.4.68
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.68
Add 17.5 % OH and CP Rs.0.82
Total Rs.5.50

ITEM No. 8033.02


Extra over timber supplied and fixed, for turner's work n exc 15 mm dia Hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0315 7.0875
Rs.7.09
After rounding off: Rs.8.30 Total Amount of M and L Rs.7.09
Add 17.5 % OH and CP Rs.1.24
Total Rs.8.33

ITEM No. 8034.01


Extra over timber supplied and fixed, for turner's work n exc 15 mm andn exc 25 mm dia Softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.045 10.125
Rs.10.13
After rounding off: Rs.11.90 Total Amount of M and L Rs.10.13
Add 17.5 % OH and CP Rs.1.77
Total Rs.11.90

728 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8034.02
Extra over timber supplied and fixed, for turner's work n exc 15mm and n exc 25 mm dia Hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0663 14.9175
Rs.14.92
After rounding off: Rs.17.50 Total Amount of M and L Rs.14.92
Add 17.5 % OH and CP Rs.2.61
Total Rs.17.53

ITEM No. 8035.01


Extra over timber supplied and fixed, for turner's work n exc 25mm and n exc 50 mm dia Softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.194 43.65
Rs.43.65
After rounding off: Rs.51.30 Total Amount of M and L Rs.43.65
Add 17.5 % OH and CP Rs.7.64
Total Rs.51.29

ITEM No. 8035.02


Extra over timber supplied and fixed, for turner's work n exc 25mm and n exc 50 mm dia Hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2975 66.9375
Rs.66.94
After rounding off: Rs.78.70 Total Amount of M and L Rs.66.94
Add 17.5 % OH and CP Rs.11.71
Total Rs.78.65

ITEM No. 8036.01


Extra over timber supplied and fixed, for turner's work exc 50mm dia to be paid as (of girth or surface of
turned work ) Softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.7055 158.7375
Rs.158.74
After rounding off: Rs.186.50 Total Amount of M and L Rs.158.74
Add 17.5 % OH and CP Rs.27.78
Total Rs.186.52

729 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8036.02
Extra over timber supplied and fixed, for turner's work exc 50mm dia to be paid as (of girth or surface of
turned work ) Hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.1024 248.04
Rs.248.04
After rounding off: Rs.291.40 Total Amount of M and L Rs.248.04
Add 17.5 % OH and CP Rs.43.41
Total Rs.291.45

ITEM No. 8037.01


35 mm wrought treads with rounded nosings, with 20 mm wrought riserson tongued both edges, glued,
wedged and blocked complete 1stclass softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
2 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.04 1208.24
Rs.1,228.24
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.12 252
Rs.252.00
Sundry
1 Sundry 1 Re Rs. 9.00 0.66 5.94
Rs.5.94
After rounding off: Rs.1,746.30 Total Amount of M and L Rs.1,486.18
Add 17.5 % OH and CP Rs.260.08
Total Rs.1,746.26

ITEM No. 8037.02


35 mm wrought treads with rounded nosings, with 20 mm wrought riserson tongued both edges, glued,
wedged and blocked complete 1stclass hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
2 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.04 2038.92
Rs.2,058.92
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.73 389.25
Rs.389.25
Sundry
1 Sundry 1 Re Rs. 9.00 0.86 7.74
Rs.7.74
After rounding off: Rs.2,885.70 Total Amount of M and L Rs.2,455.91
Add 17.5 % OH and CP Rs.429.78
Total Rs.2,885.69

730 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8038.01
40 mm wrought treads with rounded nosings, with 25 mm wrought riserson tongued both edges, glued,
wedged and blocked complete 1stclass softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
2 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.05 1510.3
Rs.1,530.30
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.3 292.5
Rs.292.50
Sundry
1 Sundry 1 Re Rs. 9.00 0.59 5.31
Rs.5.31
After rounding off: Rs.2,148.00 Total Amount of M and L Rs.1,828.11
Add 17.5 % OH and CP Rs.319.92
Total Rs.2,148.03

ITEM No. 8038.02


40 mm wrought treads with rounded nosings, with 25 mm wrought riserson tongued both edges, glued,
wedged and blocked complete 1stclass hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 synthatic adhesive 1 Kg Rs. 100.00 0.2 20
2 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.051 2599.623
Rs.2,619.62
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.66 373.5
Rs.373.50
Sundry
1 Sundry 1 Re Rs. 9.00 1.08 9.72
Rs.9.72
After rounding off: Rs.3,528.30 Total Amount of M and L Rs.3,002.84
Add 17.5 % OH and CP Rs.525.50
Total Rs.3,528.34

731 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8039.01
Add to either of the foregoing, if in winders (measured net but bothtreads and risers included ) 1st class
softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.01 509.73
Rs.509.73
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.34 76.5
Rs.76.50
Sundry
1 Sundry 1 Re Rs. 9.00 0.76 6.84
Rs.6.84
After rounding off: Rs.696.90 Total Amount of M and L Rs.593.07
Add 17.5 % OH and CP Rs.103.79
Total Rs.696.86

ITEM No. 8039.02


Add to either of the foregoing, if in winders (measured net but bothtreads and risers included ) 1st class
hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.01 302.06
Rs.302.06
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.23 51.75
Rs.51.75
Sundry
1 Sundry 1 Re Rs. 9.00 0.43 3.87
Rs.3.87
After rounding off: Rs.420.30 Total Amount of M and L Rs.357.68
Add 17.5 % OH and CP Rs.62.59
Total Rs.420.27

ITEM No. 8040.01


Nosings (rounded ) 75 mm wide and 35 or 40 mm thick, fixed to edgesof landings to match stair treads,
rebated to suit thickness of flooring oras required, tongued and grooved to same, including returened ends.
1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.003 90.618
Rs.90.62
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2755 61.9875
Rs.61.99
After rounding off: Rs.179.30 Total Amount of M and L Rs.152.61
Add 17.5 % OH and CP Rs.26.71
Total Rs.179.31

732 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8040.02
Nosings (rounded ) 75 mm wide and 35 or 40 mm thick, fixed to edgesof landings to match stair treads,
rebated to suit thickness of flooring oras required, tongued and grooved to same, including returened ends.
1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.003 152.919
Rs.152.92
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.4189 94.2525
Rs.94.25
After rounding off: Rs.290.40 Total Amount of M and L Rs.247.17
Add 17.5 % OH and CP Rs.43.26
Total Rs.290.43

ITEM No. 8041.01


Bullnosed or quadrant end to bottom step. (The tread and riser to bemeasured net without the bullnosed or
quadrant end ). 1st classsoftwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 35mm thick Sqm Rs. 1,160.00 0.02 23.2
2 wood plank 1st class softwood 20mm thick 1 Sqm Rs. 700.00 0.07 49
Rs.72.20
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3028 68.13
Rs.68.13
After rounding off: Rs.164.90 Total Amount of M and L Rs.140.33
Add 17.5 % OH and CP Rs.24.56
Total Rs.164.89

ITEM No. 8041.02


Bullnosed or quadrant end to bottom step. (The tread and riser to bemeasured net without the bullnosed or
quadrant end ). 1st classhardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 20mm thick 1 Sqm Rs. 1,121.00 0.07 78.47
2 wood plank 1st class hardwood 35mm thick 1 Sqm Rs. 1,960.00 0.02 39.2
Rs.117.67
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3194 71.865
Rs.71.87
After rounding off: Rs.222.70 Total Amount of M and L Rs.189.54
Add 17.5 % OH and CP Rs.33.17
Total Rs.222.70

733 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8042.01
Projecting semicircular end to bottom step (the tread & riser to bemeasured net without projectting semi
circular end 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 20mm thick 1 Sqm Rs. 700.00 0.08 56
2 wood plank 1st class softwood 35mm thick Sqm Rs. 1,160.00 0.04 46.4
Rs.102.40
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.4048 91.08
Rs.91.08
After rounding off: Rs.227.30 Total Amount of M and L Rs.193.48
Add 17.5 % OH and CP Rs.33.86
Total Rs.227.34

ITEM No. 8042.02


Projecting semicircular end to bottom step (the tread & riser to bemeasured net without projectting semi
circular end 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 20mm thick 1 Sqm Rs. 1,121.00 0.08 89.68
2 wood plank 1st class hardwood 35mm thick 1 Sqm Rs. 1,960.00 0.04 78.4
Rs.168.08
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.628 141.3
Rs.141.30
After rounding off: Rs.363.50 Total Amount of M and L Rs.309.38
Add 17.5 % OH and CP Rs.54.14
Total Rs.363.52

ITEM No. 8043.01


Wall string 20 cm wide in straight lengths, wrought on side edges shot,housed for treads and risers, and fixed
complete, including plugging towalls 1st class softwood 40 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 40mm thick 1 Sqm Rs. 1,340.00 0.2 268
Rs.268.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.24 54
2 Mazdoor man 1 Day Rs. 169.00 0.1155 19.5195
Rs.73.52
After rounding off: Rs.401.30 Total Amount of M and L Rs.341.52
Add 17.5 % OH and CP Rs.59.77
Total Rs.401.29

734 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8043.02
Wall string 20 cm wide in straight lengths, wrought on side edges shot,housed for treads and risers, and fixed
complete, including plugging towalls 1st class softwood 50 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 50mm thick 1 Sqm Rs. 1,660.00 0.2 332
Rs.332.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3 67.5
2 Mazdoor man 1 Day Rs. 169.00 0.146 24.674
Rs.92.17
After rounding off: Rs.498.40 Total Amount of M and L Rs.424.17
Add 17.5 % OH and CP Rs.74.23
Total Rs.498.40

ITEM No. 8043.03


Wall string 20 cm wide in straight lengths, wrought on side edges shot,housed for treads and risers, and fixed
complete, including plugging towalls 1st class softwood 60 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 60mm thick Sqm Rs. 1,990.00 0.2 398
Rs.398.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.36 81
2 Mazdoor man 1 Day Rs. 169.00 0.175 29.575
Rs.110.58
After rounding off: Rs.597.60 Total Amount of M and L Rs.508.58
Add 17.5 % OH and CP Rs.89.00
Total Rs.597.58

ITEM No. 8043.04


Wall string 20 cm wide in straight lengths, wrought on side edges shot,housed for treads and risers, and fixed
complete, including plugging towalls 1st class hardwood 40 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 40mm thick 1 Sqm Rs. 2,240.00 0.2 448
Rs.448.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.1845 31.1805
2 Carpenter, joiner* 1 Day Rs. 225.00 0.37 83.25
Rs.114.43
After rounding off: Rs.660.90 Total Amount of M and L Rs.562.43
Add 17.5 % OH and CP Rs.98.43
Total Rs.660.86

735 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8043.05
Wall string 20 cm wide in straight lengths, wrought on side edges shot,housed for treads and risers, and fixed
complete, including plugging towalls 1st class hardwood 50 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 50mm thick 1 Sqm Rs. 2,800.00 0.2 560
Rs.560.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.418 94.05
2 Mazdoor man 1 Day Rs. 169.00 0.209 35.321
Rs.129.37
After rounding off: Rs.810.00 Total Amount of M and L Rs.689.37
Add 17.5 % OH and CP Rs.120.64
Total Rs.810.01

ITEM No. 8043.06


Wall string 20 cm wide in straight lengths, wrought on side edges shot,housed for treads and risers, and fixed
complete, including plugging towalls 1st class hardwood 60 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 60 mm thick 1 Sqm Rs. 3,360.00 0.2 672
Rs.672.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.529 119.025
2 Mazdoor man 1 Day Rs. 169.00 0.2645 44.7005
Rs.163.73
After rounding off: Rs.982.00 Total Amount of M and L Rs.835.73
Add 17.5 % OH and CP Rs.146.25
Total Rs.981.98

ITEM No. 8044.01


Outer strings 20 cm wide in straight lengths, wrought both sides, edgesshot, housed for treads and risers,
tenoned at ends to fit newal posts ornotched to landings, etc, and fixed complete 1st class softwood 40mm
thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 40mm thick 1 Sqm Rs. 1,340.00 0.2 268
Rs.268.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1814 40.815
2 Mazdoor man 1 Day Rs. 169.00 0.0907 15.3283
Rs.56.14
After rounding off: Rs.380.90 Total Amount of M and L Rs.324.14
Add 17.5 % OH and CP Rs.56.73
Total Rs.380.87

736 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8044.02
Outer strings 20 cm wide in straight lengths, wrought both sides, edgesshot, housed for treads and risers,
tenoned at ends to fit newal posts ornotched to landings, etc, and fixed complete 1st class softwood 50mm
thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 50mm thick 1 Sqm Rs. 1,660.00 0.2 332
Rs.332.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.125 21.125
2 Carpenter, joiner* 1 Day Rs. 225.00 0.25 56.25
Rs.77.38
After rounding off: Rs.481.00 Total Amount of M and L Rs.409.38
Add 17.5 % OH and CP Rs.71.64
Total Rs.481.02

ITEM No. 8044.03


Outer strings 20 cm wide in straight lengths, wrought both sides, edgesshot, housed for treads and risers,
tenoned at ends to fit newal posts ornotched to landings, etc, and fixed complete 1st class softwood 60mm
thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 60mm thick Sqm Rs. 1,990.00 0.2 398
Rs.398.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.1515 25.6035
2 Carpenter, joiner* 1 Day Rs. 225.00 0.304 68.4
Rs.94.00
After rounding off: Rs.578.10 Total Amount of M and L Rs.492.00
Add 17.5 % OH and CP Rs.86.10
Total Rs.578.10

ITEM No. 8044.04


Outer strings 20 cm wide in straight lengths, wrought both sides, edgesshot, housed for treads and risers,
tenoned at ends to fit newal posts ornotched to landings, etc, and fixed complete 1st class hardwood 40mm
thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 40mm thick 1 Sqm Rs. 2,240.00 0.2 448
Rs.448.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.157 26.533
2 Carpenter, joiner* 1 Day Rs. 225.00 0.314 70.65
Rs.97.18
After rounding off: Rs.640.60 Total Amount of M and L Rs.545.18
Add 17.5 % OH and CP Rs.95.41
Total Rs.640.59

737 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8044.05
Outer strings 20 cm wide in straight lengths, wrought both sides, edgesshot, housed for treads and risers,
tenoned at ends to fit newal posts ornotched to landings, etc, and fixed complete 1st class hardwood 50mm
thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 50mm thick 1 Sqm Rs. 2,800.00 0.2 560
Rs.560.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.2005 33.8845
2 Carpenter, joiner* 1 Day Rs. 225.00 0.4 90
Rs.123.88
After rounding off: Rs.803.60 Total Amount of M and L Rs.683.88
Add 17.5 % OH and CP Rs.119.68
Total Rs.803.56

ITEM No. 8044.06


Outer strings 20 cm wide in straight lengths, wrought both sides, edgesshot, housed for treads and risers,
tenoned at ends to fit newal posts ornotched to landings, etc, and fixed complete 1st class hardwood 60mm
thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 60 mm thick 1 Sqm Rs. 3,360.00 0.2 672
Rs.672.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.245 41.405
2 Carpenter, joiner* 1 Day Rs. 225.00 0.489 110.025
Rs.151.43
After rounding off: Rs.967.50 Total Amount of M and L Rs.823.43
Add 17.5 % OH and CP Rs.144.10
Total Rs.967.53

ITEM No. 8045.01


Add to items 08043 and 08044 for additional 25 mm in width 1st class softwood 40 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 40mm thick 1 Sqm Rs. 1,340.00 0.02 26.8
Rs.26.80
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.029 6.525
2 Mazdoor man 1 Day Rs. 169.00 0.0145 2.4505
Rs.8.98
After rounding off: Rs.42.00 Total Amount of M and L Rs.35.78
Add 17.5 % OH and CP Rs.6.26
Total Rs.42.04

738 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8045.02
Add to items 08043 and 08044 for additional 25 mm in width 1st class softwood 50 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 50mm thick 1 Sqm Rs. 1,660.00 0.02 33.2
Rs.33.20
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.036 8.1
2 Mazdoor man 1 Day Rs. 169.00 0.0185 3.1265
Rs.11.23
After rounding off: Rs.52.20 Total Amount of M and L Rs.44.43
Add 17.5 % OH and CP Rs.7.77
Total Rs.52.20

ITEM No. 8045.03


Add to items 08043 and 08044) for additional 25 mm in width 1st class softwood 60 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 60mm thick Sqm Rs. 1,990.00 0.02 39.8
Rs.39.80
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.0175 2.9575
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0355 7.9875
Rs.10.95
After rounding off: Rs.59.60 Total Amount of M and L Rs.50.75
Add 17.5 % OH and CP Rs.8.88
Total Rs.59.63

ITEM No. 8045.04


Add to items 08043 and 08044 for additional 25 mm in width 1st class hardwood 40 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 40mm thick 1 Sqm Rs. 2,240.00 0.02 44.8
Rs.44.80
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0346 7.785
2 Mazdoor man 1 Day Rs. 169.00 0.0173 2.9237
Rs.10.71
After rounding off: Rs.65.20 Total Amount of M and L Rs.55.51
Add 17.5 % OH and CP Rs.9.71
Total Rs.65.22

739 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8045.05
Add to items 08043 and 08044 for additional 25 mm in width 1st class hardwood 50 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 50mm thick 1 Sqm Rs. 2,800.00 0.02 56
Rs.56.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.023 3.887
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0455 10.2375
Rs.14.12
After rounding off: Rs.82.40 Total Amount of M and L Rs.70.12
Add 17.5 % OH and CP Rs.12.27
Total Rs.82.40

ITEM No. 8045.06


Add to items 08043 and 08044 for additional 25 mm in width 1st class hardwood 60 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class hardwood 60 mm thick 1 Sqm Rs. 3,360.00 0.02 67.2
Rs.67.20
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.053 11.925
2 Mazdoor man 1 Day Rs. 169.00 0.0265 4.4785
Rs.16.40
After rounding off: Rs.98.20 Total Amount of M and L Rs.83.60
Add 17.5 % OH and CP Rs.14.63
Total Rs.98.23

ITEM No. 8046.01


Hardrails rounded or shaped with splayed faces in straight lengths andfixed 1st class softwood 75mm x 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.005 151.03
Rs.151.03
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.075 12.675
2 Carpenter, joiner* 1 Day Rs. 225.00 0.15 33.75
Rs.46.43
After rounding off: Rs.232.00 Total Amount of M and L Rs.197.46
Add 17.5 % OH and CP Rs.34.55
Total Rs.232.01

740 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8046.02
Hardrails rounded or shaped with splayed faces in straight lengths andfixed 1st class softwood 100mm x 75
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.008 241.648
Rs.241.65
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.245 55.125
2 Mazdoor man 1 Day Rs. 169.00 0.1225 20.7025
Rs.75.83
After rounding off: Rs.373.00 Total Amount of M and L Rs.317.48
Add 17.5 % OH and CP Rs.55.56
Total Rs.373.03

ITEM No. 8046.03


Hardrails rounded or shaped with splayed faces in straight lengths andfixed 1st class hardwood 75mm x 60
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.005 254.865
Rs.254.87
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.1125 19.0125
2 Carpenter, joiner* 1 Day Rs. 225.00 0.225 50.625
Rs.69.64
After rounding off: Rs.381.30 Total Amount of M and L Rs.324.50
Add 17.5 % OH and CP Rs.56.79
Total Rs.381.29

ITEM No. 8046.04


Hardrails rounded or shaped with splayed faces in straight lengths andfixed 1st class hardwood 100mm x 75
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.008 407.784
Rs.407.78
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.185 31.265
2 Carpenter, joiner* 1 Day Rs. 225.00 0.37 83.25
Rs.114.52
After rounding off: Rs.613.70 Total Amount of M and L Rs.522.30
Add 17.5 % OH and CP Rs.91.40
Total Rs.613.70

741 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8047.01
Hardrails rounded or shaped with splayed faces in straight lengths andfixed 1st class but moulded 1st class
softwood 75mm x 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.005 151.03
Rs.151.03
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.34 76.5
2 Mazdoor man 1 Day Rs. 169.00 0.1705 28.8145
Rs.105.31
After rounding off: Rs.301.20 Total Amount of M and L Rs.256.34
Add 17.5 % OH and CP Rs.44.86
Total Rs.301.20

ITEM No. 8047.02


Hardrails rounded or shaped with splayed faces in straight lengths andfixed 1st class but moulded 1st class
softwood 100mm x 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.008 241.648
Rs.241.65
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.506 113.85
2 Mazdoor man 1 Day Rs. 169.00 0.2535 42.8415
Rs.156.69
After rounding off: Rs.468.00 Total Amount of M and L Rs.398.34
Add 17.5 % OH and CP Rs.69.71
Total Rs.468.05

ITEM No. 8047.03


Hardrails rounded or shaped with splayed faces in straight lengths andfixed 1st class, but moulded 1st class
hardwood 75mm x 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.005 254.865
Rs.254.87
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.6305 141.8625
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.194.25
After rounding off: Rs.527.70 Total Amount of M and L Rs.449.12
Add 17.5 % OH and CP Rs.78.60
Total Rs.527.71

742 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8047.04
Hardrails rounded or shaped with splayed faces in straight lengths andfixed 1st class, but moulded 1st class
hardwood 100mm x 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.008 407.784
Rs.407.78
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.74 166.5
2 Mazdoor man 1 Day Rs. 169.00 0.3506 59.2514
Rs.225.75
After rounding off: Rs.744.40 Total Amount of M and L Rs.633.54
Add 17.5 % OH and CP Rs.110.87
Total Rs.744.40

ITEM No. 8048.01


Add to forefoing items if sunk to receive iron core 1st class softwood 75mm x 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.088 19.8
Rs.19.80
After rounding off: Rs.23.30 Total Amount of M and L Rs.19.80
Add 17.5 % OH and CP Rs.3.47
Total Rs.23.27

ITEM No. 8048.02


Add to forefoing items if sunk to receive iron core 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.088 19.8
Rs.19.80
After rounding off: Rs.23.30 Total Amount of M and L Rs.19.80
Add 17.5 % OH and CP Rs.3.47
Total Rs.23.27

ITEM No. 8048.03


Add to forefoing items if sunk to receive iron core 1st class hardwood 75mm x 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1325 29.8125
Rs.29.81
After rounding off: Rs.35.00 Total Amount of M and L Rs.29.81
Add 17.5 % OH and CP Rs.5.22
Total Rs.35.03

743 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8048.04
Add to forefoing items if sunk to receive iron core 1st class hardwood 100mm x 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1325 29.8125
Rs.29.81
After rounding off: Rs.35.00 Total Amount of M and L Rs.29.81
Add 17.5 % OH and CP Rs.5.22
Total Rs.35.03

ITEM No. 8049.01


Caps (turned to match section of handrail and mitred in) includinghandrail screws and dowels (dia of cap twice
the width of handrail) 1stclass softwood 75mm x 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.001 30.206
Rs.30.21
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.4186 94.185
Rs.94.19
After rounding off: Rs.146.20 Total Amount of M and L Rs.124.39
Add 17.5 % OH and CP Rs.21.77
Total Rs.146.16

ITEM No. 8049.02


Caps (turned to match section of handrail and mitred in) includinghandrail screws and dowels (dia of cap twice
the width of handrail) 1stclass softwood 100mm x 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.003 90.618
Rs.90.62
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.5513 124.0425
Rs.124.04
After rounding off: Rs.252.20 Total Amount of M and L Rs.214.66
Add 17.5 % OH and CP Rs.37.57
Total Rs.252.23

744 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8049.03
Caps (turned to match section of handrail and mitred in) includinghandrail screws and dowels (dia of cap twice
the width of handrail) 1stclass hardwood 75mm x 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.001 50.973
Rs.50.97
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.6284 141.39
Rs.141.39
After rounding off: Rs.226.00 Total Amount of M and L Rs.192.36
Add 17.5 % OH and CP Rs.33.66
Total Rs.226.03

ITEM No. 8049.04


Caps (turned to match section of handrail and mitred in) includinghandrail screws and dowels (dia of cap twice
the width of handrail) 1stclass hardwood 100mm x 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.003 152.919
Rs.152.92
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.8265 185.9625
Rs.185.96
After rounding off: Rs.398.20 Total Amount of M and L Rs.338.88
Add 17.5 % OH and CP Rs.59.30
Total Rs.398.19

ITEM No. 8050.01


Scrolls to suit handrail rounded or shaped with splayed faces and fixed(dia or scroll three times width of
handrail) 1st class softwood 75mm x60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.002 60.412
Rs.60.41
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.8375 188.4375
Rs.188.44
After rounding off: Rs.292.40 Total Amount of M and L Rs.248.85
Add 17.5 % OH and CP Rs.43.55
Total Rs.292.40

745 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8050.02
Scrolls to suit handrail rounded or shaped with splayed faces and fixed(dia or scroll three times width of
handrail) 1st class softwood 100mmx 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.006 181.236
Rs.181.24
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.102 247.95
Rs.247.95
After rounding off: Rs.504.30 Total Amount of M and L Rs.429.19
Add 17.5 % OH and CP Rs.75.11
Total Rs.504.29

ITEM No. 8050.03


Scrolls to suit handrail rounded or shaped with splayed faces and fixed(dia or scroll three times width of
handrail) 1st class hardwood 75mmx 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.002 101.946
Rs.101.95
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.2565 282.7125
Rs.282.71
After rounding off: Rs.452.00 Total Amount of M and L Rs.384.66
Add 17.5 % OH and CP Rs.67.32
Total Rs.451.97

ITEM No. 8050.04


Scrolls to suit handrail rounded or shaped with splayed faces and fixed(dia or scroll three times width of
handrail) 1st class hardwood 100mmx 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.006 305.838
Rs.305.84
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.6535 372.0375
Rs.372.04
After rounding off: Rs.796.50 Total Amount of M and L Rs.677.88
Add 17.5 % OH and CP Rs.118.63
Total Rs.796.50

746 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8051.01
Scrolls to suit handrail rounded or shaped with splayed faces and fixed(dia or scroll three times width of
handrail) to suit moulded handrail and fixed (ditto) 1st class softwood 75mm x 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.002 60.412
Rs.60.41
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.9577 215.4825
Rs.215.48
After rounding off: Rs.324.20 Total Amount of M and L Rs.275.89
Add 17.5 % OH and CP Rs.48.28
Total Rs.324.18

ITEM No. 8051.02


Scrolls to suit handrail rounded or shaped with splayed faces and fixed(dia or scroll three times width of
handrail) to suit moulded handrail and fixed (ditto) 1st class softwood 100mm x 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.007 211.442
Rs.211.44
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.3779 310.0275
Rs.310.03
After rounding off: Rs.612.70 Total Amount of M and L Rs.521.47
Add 17.5 % OH and CP Rs.91.26
Total Rs.612.73

ITEM No. 8051.03


Scrolls to suit handrail rounded or shaped with splayed faces and fixed(dia or scroll three times width of
handrail) to suit moulded handrail and fixed (ditto) 1st class hardwood 75mm x 60 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.002 101.946
Rs.101.95
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.5654 352.215
Rs.352.22
After rounding off: Rs.533.60 Total Amount of M and L Rs.454.16
Add 17.5 % OH and CP Rs.79.48
Total Rs.533.64

747 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8051.04
Scrolls to suit handrail rounded or shaped with splayed faces and fixed(dia or scroll three times width of
handrail) to suit moulded handrail and fixed (ditto) 1st class hardwood 100mm x 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.007 356.811
Rs.356.81
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 2.0723 466.2675
Rs.466.27
After rounding off: Rs.967.10 Total Amount of M and L Rs.823.08
Add 17.5 % OH and CP Rs.144.04
Total Rs.967.12

ITEM No. 8052.01


Newel posts, wrought, with square, rounded, chamfered or stopchamfered edges, mortices for strings and
handrails, sectionnal areaexc 100 mm x 100 mm and fixed 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 1.1 33226.6
Rs.33,226.60
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 7.35 1653.75
2 Mazdoor man 1 Day Rs. 169.00 1 169
Rs.1,822.75
After rounding off: Rs.41,183.00 Total Amount of M and L Rs.35,049.35
Add 17.5 % OH and CP Rs.6,133.64
Total Rs.41,182.99

ITEM No. 8052.02


Newel posts, wrought, with Square, rounded, chamfered or stopchamfered edges, mortices for strings and
handrails, sectionnal areaexc 100 mm x 100 mm and fixed 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 1.1 56070.3
Rs.56,070.30
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 11.02 2479.5
2 Mazdoor-man, 1 Day Rs. 169.00 1.514 255.866
Rs.2,735.37
After rounding off: Rs.69,096.70 Total Amount of M and L Rs.58,805.67
Add 17.5 % OH and CP Rs.10,290.99
Total Rs.69,096.66

748 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8053.01
Newel posts, wrought, with square, rounded, chamfered or stopchamfered edges, mortices for strings and
handrails, but sectional area n exc 100 mm x 100 mm 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 1.1 33226.6
Rs.33,226.60
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 15 3375
2 Mazdoor-man, 1 Day Rs. 169.00 2.0418 345.0642
Rs.3,720.06
After rounding off: Rs.43,412.30 Total Amount of M and L Rs.36,946.66
Add 17.5 % OH and CP Rs.6,465.67
Total Rs.43,412.33

ITEM No. 8053.02


Newel posts, wrought, with square, rounded, chamfered or stopchamfered edges, mortices for strings and
handrails, but sectional area n exc 100 mm x 100 mm 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 1.1 56070.3
Rs.56,070.30
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 3.114 526.266
2 Carpenter, joiner* 1 Day Rs. 225.00 22.3 5017.5
Rs.5,543.77
After rounding off: Rs.72,396.50 Total Amount of M and L Rs.61,614.07
Add 17.5 % OH and CP Rs.10,782.46
Total Rs.72,396.53

ITEM No. 8054.01


Rounded and mitred ends to tops of newels 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2757 62.0325
Rs.62.03
After rounding off: Rs.72.90 Total Amount of M and L Rs.62.03
Add 17.5 % OH and CP Rs.10.86
Total Rs.72.89

ITEM No. 8054.02


Rounded and mitred ends to tops of newels 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.4187 94.2075
Rs.94.21
After rounding off: Rs.110.70 Total Amount of M and L Rs.94.21
Add 17.5 % OH and CP Rs.16.49
Total Rs.110.69

749 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8055.01
Weathered and mitred caps (with bed moulding under ) to tops of newelsand fixed 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.003 90.618
Rs.90.62
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.4188 94.23
Rs.94.23
After rounding off: Rs.217.20 Total Amount of M and L Rs.184.85
Add 17.5 % OH and CP Rs.32.35
Total Rs.217.20

ITEM No. 8055.02


Weathered and mitred caps (with bed moulding under ) to tops of newelsand fixed 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.003 152.919
Rs.152.92
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.6175 138.9375
Rs.138.94
After rounding off: Rs.342.90 Total Amount of M and L Rs.291.86
Add 17.5 % OH and CP Rs.51.07
Total Rs.342.93

ITEM No. 8056.01


Turned caps (or pendants) with bal ornament and fixed to tops or bottomsof newels (upto 100 mm x100 mm
in section ) with glued and dowelledjoint 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.002 60.412
Rs.60.41
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.551 123.975
Rs.123.98
After rounding off: Rs.216.70 Total Amount of M and L Rs.184.39
Add 17.5 % OH and CP Rs.32.27
Total Rs.216.65

750 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8056.02
Turned caps (or pendants) with bal ornament and fixed to tops or bottomsjoint 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.002 101.946
Rs.101.95
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.8265 185.9625
Rs.185.96
After rounding off: Rs.338.30 Total Amount of M and L Rs.287.91
Add 17.5 % OH and CP Rs.50.38
Total Rs.338.29

ITEM No. 8057.01


Turned caps (or pendants) with bal ornament and fixed to tops or bottomsof newels (upto 100 mm x100 mm
in section ) with glued and dowelledjoint fixed to newels exc 100 mm x 100 mm,but n exc 150 mm x 150 mm
in section 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.004 120.824
Rs.120.82
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.8265 185.9625
Rs.185.96
After rounding off: Rs.360.50 Total Amount of M and L Rs.306.79
Add 17.5 % OH and CP Rs.53.69
Total Rs.360.47

ITEM No. 8057.02


Turned caps (or pendants) with bal ornament and fixed to tops or bottomsof newels (upto 100 mm x100 mm
in section ) with glued and dowelledjoint fixed to newels exc 100 mm x 100 mm,but n exc 150 mm x 150 mm
in section 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.004 203.892
Rs.203.89
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 1.6535 372.0375
Rs.372.04
After rounding off: Rs.676.70 Total Amount of M and L Rs.575.93
Add 17.5 % OH and CP Rs.100.79
Total Rs.676.72

751 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8058.01
Balusters, square wrought and fixed, with ends housed (square or splay)to handrails and treads or strings. 1st
class softwood section n exc 25mm x 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.001 30.206
Rs.30.21
Labour
1 Bellow/Carpenterboy 1 Day Rs. 169.00 0.1165 19.6885
2 Carpenter, joiner* 1 Day Rs. 225.00 0.1165 26.2125
Rs.45.90
After rounding off: Rs.89.40 Total Amount of M and L Rs.76.11
Add 17.5 % OH and CP Rs.13.32
Total Rs.89.43

ITEM No. 8058.02


Balusters, square wrought and fixed, with ends housed (square or splay)to handrails and treads or strings. 1st
class softwood section n exc 40mm x 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.001 30.206
Rs.30.21
Labour
1 Bellow/Carpenterboy 1 Day Rs. 169.00 0.1376 23.2544
2 Carpenter, joiner* 1 Day Rs. 225.00 0.1376 30.96
Rs.54.21
After rounding off: Rs.99.20 Total Amount of M and L Rs.84.42
Add 17.5 % OH and CP Rs.14.77
Total Rs.99.19

ITEM No. 8058.03


Balusters, square wrought and fixed, with ends housed (square or splay)to handrails and treads or strings. 1st
class softwood section n exc 50mm x 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.002 60.412
Rs.60.41
Labour
1 Bellow/Carpenterboy 1 Day Rs. 169.00 0.233 39.377
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2327 52.3575
Rs.91.73
After rounding off: Rs.178.80 Total Amount of M and L Rs.152.15
Add 17.5 % OH and CP Rs.26.63
Total Rs.178.77

752 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8058.04
Balusters, square wrought and fixed, with ends housed (square or splay)to handrails and treads or strings. 1st
class hardwood section n exc 25mm x 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.001 50.973
Rs.50.97
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.169 38.025
2 Bellow/Carpenterboy 1 Day Rs. 169.00 0.17 28.73
Rs.66.76
After rounding off: Rs.138.30 Total Amount of M and L Rs.117.73
Add 17.5 % OH and CP Rs.20.60
Total Rs.138.33

ITEM No. 8058.05


Balusters, square wrought and fixed, with ends housed (square or splay)to handrails and treads or strings. 1st
class hardwood section n exc 40mm x 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.001 50.973
Rs.50.97
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2115 47.5875
2 Bellow/Carpenterboy 1 Day Rs. 169.00 0.2118 35.7942
Rs.83.38
After rounding off: Rs.157.90 Total Amount of M and L Rs.134.35
Add 17.5 % OH and CP Rs.23.51
Total Rs.157.87

ITEM No. 8058.06


Balusters, square wrought and fixed, with ends housed (square or splay)to handrails and treads or strings. 1st
class hardwood section n exc 50mm x 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.002 101.946
Rs.101.95
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.349 78.525
2 Bellow/Carpenterboy 1 Day Rs. 169.00 0.3495 59.0655
Rs.137.59
After rounding off: Rs.281.50 Total Amount of M and L Rs.239.54
Add 17.5 % OH and CP Rs.41.92
Total Rs.281.46

753 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8059.01
Draining board of 1st class hardwood, 25 mm thick, as described inSSR Part - 1 Section 8 clause 8,30 (area of
top of board only to bemeasured S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class Hardwood fillets 1 Cum Rs. 50,000.00 0.01131 565.5
2 wood plank 1st class hardwood 25mm thick 1 Sqm Rs. 1,400.00 1 1400
3 Plugging on walls 1 No. Rs. 45.00 2 90
Rs.2,055.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.5945 133.7625
Rs.133.76
After rounding off: Rs.2,572.40 Total Amount of M and L Rs.2,189.26
Add 17.5 % OH and CP Rs.383.12
Total Rs.2,572.38

ITEM No. 8059.02


Draining board of 1st class hardwood, 25 mm thick, as described inSSR Part - 1 Section 8 clause 8,30 (area of
top of board only to bemeasured Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plugging on walls 1 No. Rs. 45.00 2 90
Rs.90.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.5937 133.5825
Rs.133.58
After rounding off: Rs.262.70 Total Amount of M and L Rs.223.58
Add 17.5 % OH and CP Rs.39.13
Total Rs.262.71

ITEM No. 8059.03


Draining board of 1st class hardwood, 25 mm thick, as described inSSR Part - 1 Section 8 clause 8,30 (area of
top of board only to bemeasured Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.452 101.7
Rs.101.70
After rounding off: Rs.119.50 Total Amount of M and L Rs.101.70
Add 17.5 % OH and CP Rs.17.80
Total Rs.119.50

754 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8059.04
Draining board of 1st class hardwood, 25 mm thick, as described inSSR Part - 1 Section 8 clause 8,30 (area of
top of board only to bemeasured) Resecuring only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw steel 40m Long 100 No. Rs. 100.00 0.06 6
Rs.6.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.3085 69.4125
Rs.69.41
After rounding off: Rs.88.60 Total Amount of M and L Rs.75.41
Add 17.5 % OH and CP Rs.13.20
Total Rs.88.61

ITEM No. 8061.01


Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours ; articles n exc 200 cu.cm each S & F 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw steel 40m Long 100 No. Rs. 100.00 0.02 2
2 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.0003 9.0618
Rs.11.06
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0363 8.1675
Rs.8.17
After rounding off: Rs.22.60 Total Amount of M and L Rs.19.23
Add 17.5 % OH and CP Rs.3.37
Total Rs.22.59

ITEM No. 8061.02


Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours ; articles n exc 200 cu.cm each S & F 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw steel 40m Long 100 No. Rs. 100.00 0.02 2
2 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.0003 15.2919
Rs.17.29
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.055 12.375
Rs.12.38
After rounding off: Rs.34.90 Total Amount of M and L Rs.29.67
Add 17.5 % OH and CP Rs.5.19
Total Rs.34.86

755 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8061.03
Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours ; articles n exc 200 cu.cm each Fixing only softwood or hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw steel 40m Long 100 No. Rs. 100.00 0.02 2
Rs.2.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.022 4.95
Rs.4.95
After rounding off: Rs.8.20 Total Amount of M and L Rs.6.95
Add 17.5 % OH and CP Rs.1.22
Total Rs.8.17

ITEM No. 8061.04


Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours ; articles n exc 200 cu.cm each Add in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0055 1.2375
Rs.1.24
After rounding off: Rs.1.50 Total Amount of M and L Rs.1.24
Add 17.5 % OH and CP Rs.0.22
Total Rs.1.45

ITEM No. 8061.05


Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours ; articles n exc 200 cu.cm each Resecuring only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.011 2.475
Rs.2.48
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.48
Add 17.5 % OH and CP Rs.0.43
Total Rs.2.91

ITEM No. 8062.01


Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours exc 200 cu.cm and n exc 500 cu.cm. each S& F 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood 1st class softwood scantling 1 Cum Rs. 30,206.00 0.0006 18.1236
2 Screw steel 40m Long 100 No. Rs. 100.00 0.02 2
Rs.20.12
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.033 7.425
Rs.7.43
After rounding off: Rs.32.40 Total Amount of M and L Rs.27.55
Add 17.5 % OH and CP Rs.4.82
Total Rs.32.37
756 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8062.02
Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours ; exc 200 cu.cm and n exc 500 cu.cm. each S& F 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw steel 40m Long 100 No. Rs. 100.00 0.02 2
2 wood 1st class Hardwood scantling 1 Cum Rs. 50,973.00 0.0006 30.5838
Rs.32.58
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0552 12.42
Rs.12.42
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 8062.03


Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours ; exc 200 cu.cm and n exc 500 cu.cm. each Fixing only softwood or hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw steel 40m Long 100 No. Rs. 100.00 0.02 2
Rs.2.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.12.90 Total Amount of M and L Rs.11.00
Add 17.5 % OH and CP Rs.1.93
Total Rs.12.93

ITEM No. 8062.04


Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours exc 200 cu.cm and n exc 500 cu.cm. each Add in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.011 2.475
Rs.2.48
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.48
Add 17.5 % OH and CP Rs.0.43
Total Rs.2.91

ITEM No. 8062.05


Small fittings such as brackets of any type, latch and hinge blocks,shaped door and window stops and the like,
including all necessarylabours exc 200 cu.cm and n exc 500 cu.cm. each Resecuring only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.022 4.95
Rs.4.95
After rounding off: Rs.5.80 Total Amount of M and L Rs.4.95
Add 17.5 % OH and CP Rs.0.87
Total Rs.5.82
757 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8065.01
Wood turn - buckles 50 mm x 25 mm x 15 mm thick, cut to shape,fixed with screws S & F 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 LS Soft wood 1 st class 1 Re Rs. 15.00 0.1 1.5
Rs.1.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.011 2.475
Rs.2.48
After rounding off: Rs.4.70 Total Amount of M and L Rs.3.98
Add 17.5 % OH and CP Rs.0.70
Total Rs.4.67

ITEM No. 8065.02


Wood turn - buckles 50 mm x 25 mm x 15 mm thick, cut to shape,fixed with screws S & F 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 LS hard wood 1st class 1 Re Rs. 20.00 0.15 3
Rs.3.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.011 2.475
Rs.2.48
After rounding off: Rs.6.40 Total Amount of M and L Rs.5.48
Add 17.5 % OH and CP Rs.0.96
Total Rs.6.43

ITEM No. 8065.03


Wood turn - buckles 50 mm x 25 mm x 15 mm thick, cut to shape,fixed with screws Fixing only softwood or
hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw steel long 40mm(50) 1 100 No Rs. 50.00 0.01 0.5
Rs.0.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0025 0.5625
Rs.0.56
After rounding off: Rs.1.20 Total Amount of M and L Rs.1.06
Add 17.5 % OH and CP Rs.0.19
Total Rs.1.25

ITEM No. 8065.04


Wood turn - buckles 50 mm x 25 mm x 15 mm thick, cut to shape,fixed with screws Add in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0022 0.495
Rs.0.50
After rounding off: Rs.0.60 Total Amount of M and L Rs.0.50
Add 17.5 % OH and CP Rs.0.09
Total Rs.0.58

758 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8065.05
Wood turn - buckles 50 mm x 25 mm x 15 mm thick, cut to shape,fixed with screws Resecuring only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw steel long 40mm(50) 1 100 No Rs. 50.00 0.01 0.5
Rs.0.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.001 0.225
Rs.0.23
After rounding off: Rs.0.90 Total Amount of M and L Rs.0.73
Add 17.5 % OH and CP Rs.0.13
Total Rs.0.85

ITEM No. 8066.01


Boxes for toilet paper, size 200 mm 75 mm x 120 mm (inside ), out of15 mm thick detailed boarding with
rounded edges on top, raised backwith 15 mm dia holeS & F 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wood plank 1st class softwood 12mm thick 1 Sqm Rs. 400.00 0.08 32
2 Screw steel long 40mm(50) 1 100 No Rs. 50.00 0.01 0.5
Rs.32.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1765 39.7125
Rs.39.71
After rounding off: Rs.84.80 Total Amount of M and L Rs.72.21
Add 17.5 % OH and CP Rs.12.64
Total Rs.84.85

ITEM No. 8066.02


Boxes for toilet paper, size 200 mm 75 mm x 120 mm (inside ), out of15 mm thick detailed boarding with
rounded edges on top, raised backwith 15 mm dia hole and fixed S & F 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw steel long 40mm(50) 1 100 No Rs. 50.00 0.01 0.5
2 wood plank 1st class hardwood12mm thick swan 1 Sqm Rs. 670.00 0.08 53.6
Rs.54.10
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2608 58.68
Rs.58.68
After rounding off: Rs.132.50 Total Amount of M and L Rs.112.78
Add 17.5 % OH and CP Rs.19.74
Total Rs.132.52

759 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8066.03
Boxes for toilet paper, size 200 mm 75 mm x 120 mm (inside ), out of15 mm thick detailed boarding with
rounded edges on top, raised backwith 15 mm dia hole andFixing only softwood or hardwood..
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0442 9.945
Rs.9.95
After rounding off: Rs.11.70 Total Amount of M and L Rs.9.95
Add 17.5 % OH and CP Rs.1.74
Total Rs.11.69

ITEM No. 8066.04


Boxes for toilet paper, size 200 mm 75 mm x 120 mm (inside ), out of15 mm thick detailed boarding with
rounded edges on top, raised backwith 15 mm dia hole and fixed Add if in repair
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.011 2.475
Rs.2.48
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.48
Add 17.5 % OH and CP Rs.0.43
Total Rs.2.91

ITEM No. 8066.05


Boxes for toilet paper, size 200 mm 75 mm x 120 mm (inside ), out of15 mm thick detailed boarding with
rounded edges on top, raised backwith 15 mm dia hole and fixed Resecuring only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.011 2.475
Rs.2.48
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.48
Add 17.5 % OH and CP Rs.0.43
Total Rs.2.91

ITEM No. 8067.01


Cross tonguing including ploughing and gluing joints, n exc 50 mm thick( when not otherwise provided for ) S &
F 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.088 19.8
Rs.19.80
After rounding off: Rs.23.30 Total Amount of M and L Rs.19.80
Add 17.5 % OH and CP Rs.3.47
Total Rs.23.27

760 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8067.02
Cross tonguing including ploughing and gluing joints, n exc 50 mm thick( when not otherwise provided for ) S &
F 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1322 29.745
Rs.29.75
After rounding off: Rs.35.00 Total Amount of M and L Rs.29.75
Add 17.5 % OH and CP Rs.5.21
Total Rs.34.95

ITEM No. 8067.03


Cross tonguing including ploughing and gluing joints, n exc 50 mm thick( when not otherwise provided for )
Fixing only softwood or hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0442 9.945
Rs.9.95
After rounding off: Rs.11.70 Total Amount of M and L Rs.9.95
Add 17.5 % OH and CP Rs.1.74
Total Rs.11.69

ITEM No. 8068.01


Chowkats or frames exc 1.5 sq. m each Resecuring with out taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.132 29.7
Rs.29.70
Sundry
1 Sundry 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.36.00 Total Amount of M and L Rs.30.60
Add 17.5 % OH and CP Rs.5.36
Total Rs.35.96

ITEM No. 8068.02


Chowkats or frames exc 1.5 sq. m each Refixing in same opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.18 1.62
Rs.1.62
After rounding off: Rs.94.50 Total Amount of M and L Rs.80.42
Add 17.5 % OH and CP Rs.14.07
Total Rs.94.49

761 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8068.03
Chowkats or frames exc 1.5 sq. m each Refixing in other opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.346 77.85
2 Mazdoor man 1 Day Rs. 169.00 0.346 58.474
Rs.136.32
Sundry
1 Sundry 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.161.80 Total Amount of M and L Rs.137.67
Add 17.5 % OH and CP Rs.24.09
Total Rs.161.77

ITEM No. 8068.04


Chowkats or frames exc 1.5 sq. m each Taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.127 28.575
2 Mazdoor man 1 Day Rs. 169.00 0.127 21.463
Rs.50.04
After rounding off: Rs.58.80 Total Amount of M and L Rs.50.04
Add 17.5 % OH and CP Rs.8.76
Total Rs.58.79

ITEM No. 8068.05


Chowkats or frames exc 1.5 sq. m each Removing to or from Store.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.09 15.21
Rs.15.21
After rounding off: Rs.17.90 Total Amount of M and L Rs.15.21
Add 17.5 % OH and CP Rs.2.66
Total Rs.17.87

ITEM No. 8069.01


Chowkats or frames exc 1.5 sq. m each with shutters (without taking off shutters from the frames ) Resecuring
with out taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.209 47.025
Rs.47.03
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.56.40 Total Amount of M and L Rs.48.02
Add 17.5 % OH and CP Rs.8.40
Total Rs.56.42

762 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8069.02
Chowkats or frames exc 1.5 sq. m each with shutters (without taking off shutters from the frames ) Refixing in
same opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.265 59.625
2 Mazdoor man 1 Day Rs. 169.00 0.265 44.785
Rs.104.41
Sundry
1 Sundry 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.124.30 Total Amount of M and L Rs.105.76
Add 17.5 % OH and CP Rs.18.51
Total Rs.124.27

ITEM No. 8069.03


Chowkats or frames exc 1.5 sq. m each with shutters (without taking off shutters from the frames ) Refixing in
other opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.45 76.05
2 Carpenter, joiner* 1 Day Rs. 225.00 0.45 101.25
Rs.177.30
Sundry
1 Sundry 1 Re Rs. 9.00 0.23 2.07
Rs.2.07
After rounding off: Rs.210.80 Total Amount of M and L Rs.179.37
Add 17.5 % OH and CP Rs.31.39
Total Rs.210.76

ITEM No. 8069.04


Chowkats or frames exc 1.5 sq. m each but with shutters (without taking off shutters from the frames ) Taking
down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.201 45.225
2 Mazdoor man 1 Day Rs. 169.00 0.201 33.969
Rs.79.19
After rounding off: Rs.93.10 Total Amount of M and L Rs.79.19
Add 17.5 % OH and CP Rs.13.86
Total Rs.93.05

763 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8069.05
Chowkats or frames exc 1.5 sq. m each with shutters (without taking off shutters from the frames ) Removing
to or from Store.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.12 20.28
Rs.20.28
After rounding off: Rs.23.80 Total Amount of M and L Rs.20.28
Add 17.5 % OH and CP Rs.3.55
Total Rs.23.83

ITEM No. 8070.01


Add to item 08068 and 08069 for architraves, soffits, liniings, windowboards, etc. Resecuring with out taking
down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.066 14.85
Rs.14.85
Sundry
1 Sundry 1 Re Rs. 9.00 0.03 0.27
Rs.0.27
After rounding off: Rs.17.80 Total Amount of M and L Rs.15.12
Add 17.5 % OH and CP Rs.2.65
Total Rs.17.77

ITEM No. 8070.02


Add to item no 08068 and 08069for architraves, soffits, liniings, windowboards, etc. Refixing in same opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.074 12.506
2 Carpenter, joiner* 1 Day Rs. 225.00 0.12 27
Rs.39.51
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.47.60 Total Amount of M and L Rs.40.50
Add 17.5 % OH and CP Rs.7.09
Total Rs.47.58

764 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8070.03
Add to item no 0088 & 0089 for architraves, soffits, liniings, windowboards, etc. Refixing in other opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.09 15.21
2 Carpenter, joiner* 1 Day Rs. 225.00 0.22 49.5
Rs.64.71
Sundry
1 Sundry 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.77.10 Total Amount of M and L Rs.65.61
Add 17.5 % OH and CP Rs.11.48
Total Rs.77.09

ITEM No. 8070.04


Add to item no 08068 and 08069for architraves, soffits, liniings, windowboards, etc. Taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.063 14.175
2 Mazdoor man 1 Day Rs. 169.00 0.064 10.816
Rs.24.99
After rounding off: Rs.29.40 Total Amount of M and L Rs.24.99
Add 17.5 % OH and CP Rs.4.37
Total Rs.29.36

ITEM No. 8070.05


Add to item no 08068 and 08069 for architraves, soffits, liniings, windowboards, etc. Removing to or from
Store.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.06 10.14
Rs.10.14
After rounding off: Rs.11.90 Total Amount of M and L Rs.10.14
Add 17.5 % OH and CP Rs.1.77
Total Rs.11.91

ITEM No. 8071.01


Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each Resecuringwith out taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.165 37.125
Rs.37.13
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.44.80 Total Amount of M and L Rs.38.12
Add 17.5 % OH and CP Rs.6.67
Total Rs.44.79

765 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8071.02
Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each Refixing insame opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.255 57.375
2 Mazdoor man 1 Day Rs. 169.00 0.255 43.095
Rs.100.47
Sundry
1 Sundry 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.119.70 Total Amount of M and L Rs.101.91
Add 17.5 % OH and CP Rs.17.83
Total Rs.119.74

ITEM No. 8071.03


Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each Refixing inother opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.38 64.22
2 Carpenter, joiner* 1 Day Rs. 225.00 0.48 108
Rs.172.22
Sundry
1 Sundry 1 Re Rs. 9.00 0.25 2.25
Rs.2.25
After rounding off: Rs.205.00 Total Amount of M and L Rs.174.47
Add 17.5 % OH and CP Rs.30.53
Total Rs.205.00

ITEM No. 8071.04


Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each Taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.1585 26.7865
2 Carpenter, joiner* 1 Day Rs. 225.00 0.159 35.775
Rs.62.56
After rounding off: Rs.73.50 Total Amount of M and L Rs.62.56
Add 17.5 % OH and CP Rs.10.95
Total Rs.73.51

ITEM No. 8071.05


Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each Removing toor from Srore.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.12 20.28
Rs.20.28
After rounding off: Rs.23.80 Total Amount of M and L Rs.20.28
Add 17.5 % OH and CP Rs.3.55
Total Rs.23.83

766 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8072.01
Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each but with shutters (without taking off shuttersfrom the
frame ) Resecuring with out taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.265 59.625
Rs.59.63
Sundry
1 Sundry 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.71.30 Total Amount of M and L Rs.60.71
Add 17.5 % OH and CP Rs.10.62
Total Rs.71.33

ITEM No. 8072.02


Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each but with shutters (without taking off shuttersfrom the
frame ) Refixing in same opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.33 74.25
2 Mazdoor man 1 Day Rs. 169.00 0.33 55.77
Rs.130.02
Sundry
1 Sundry 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.154.00 Total Amount of M and L Rs.131.10
Add 17.5 % OH and CP Rs.22.94
Total Rs.154.04

ITEM No. 8072.03


Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each) but with shutters (without taking off shuttersfrom the
frame ) Refixing in other opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.45 76.05
2 Carpenter, joiner* 1 Day Rs. 225.00 0.64 144
Rs.220.05
Sundry
1 Sundry 1 Re Rs. 9.00 0.46 4.14
Rs.4.14
After rounding off: Rs.263.40 Total Amount of M and L Rs.224.19
Add 17.5 % OH and CP Rs.39.23
Total Rs.263.42

767 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8072.04
Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each but with shutters (without taking off shuttersfrom the
frame ) Taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.254 57.15
2 Mazdoor man 1 Day Rs. 169.00 0.254 42.926
Rs.100.08
After rounding off: Rs.117.60 Total Amount of M and L Rs.100.08
Add 17.5 % OH and CP Rs.17.51
Total Rs.117.59

ITEM No. 8072.05


Chowkats or frames exc 1.5 sq.m but n exc 4 sq.m each but with shutters (without taking off shuttersfrom the
frame ) Removing to or from Srore.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.15 25.35
Rs.25.35
After rounding off: Rs.29.80 Total Amount of M and L Rs.25.35
Add 17.5 % OH and CP Rs.4.44
Total Rs.29.79

ITEM No. 8073.01


Add to item no 080701 and 08072 for architraves, soffits, liniings, windowboards, etc. Resecuring with out
taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Sundry
1 Sundry 1 Re Rs. 9.00 0.08 0.72
Rs.0.72
After rounding off: Rs.29.90 Total Amount of M and L Rs.25.47
Add 17.5 % OH and CP Rs.4.46
Total Rs.29.93

768 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8073.02
Add to item no 080701 and 08072 for architraves, soffits, liniings, windowboards, etc. Refixing in same
opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.15 33.75
2 Mazdoor man 1 Day Rs. 169.00 0.1 16.9
Rs.50.65
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.60.70 Total Amount of M and L Rs.51.64
Add 17.5 % OH and CP Rs.9.04
Total Rs.60.68

ITEM No. 8073.03


Add to item no 080701 and 08072 for architraves, soffits, linings, windowboards, etc. Refixing in other opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.12 20.28
2 Carpenter, joiner* 1 Day Rs. 225.00 0.28 63
Rs.83.28
Sundry
1 Sundry 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.98.90 Total Amount of M and L Rs.84.18
Add 17.5 % OH and CP Rs.14.73
Total Rs.98.91

ITEM No. 8073.04


Add to item no 0091 & 0092 for architraves, soffits, liniings, windowboards, etc. Taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.0846 14.2974
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0846 19.035
Rs.33.33
After rounding off: Rs.39.20 Total Amount of M and L Rs.33.33
Add 17.5 % OH and CP Rs.5.83
Total Rs.39.17

769 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8073.05
Add to item no 080701 and 08072 for architraves, soffits, liniings, windowboards, etc. Removing to or from
Store.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.08 13.52
Rs.13.52
After rounding off: Rs.15.90 Total Amount of M and L Rs.13.52
Add 17.5 % OH and CP Rs.2.37
Total Rs.15.89

ITEM No. 8074.01


Shutters of any description n exc 1 sq.m each Resecuring or easing &adjusting, without taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0663 14.9175
Rs.14.92
After rounding off: Rs.17.50 Total Amount of M and L Rs.14.92
Add 17.5 % OH and CP Rs.2.61
Total Rs.17.53

ITEM No. 8074.02


Shutters of any description n exc 1 sq.m each Refixing in same opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.128 28.8
2 Mazdoor man 1 Day Rs. 169.00 0.066 11.154
Rs.39.95
After rounding off: Rs.46.90 Total Amount of M and L Rs.39.95
Add 17.5 % OH and CP Rs.6.99
Total Rs.46.95

ITEM No. 8074.03


Shutters of any description n exc 1 sq.m each Refixing in other opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.1325 22.3925
Rs.67.39
After rounding off: Rs.79.20 Total Amount of M and L Rs.67.39
Add 17.5 % OH and CP Rs.11.79
Total Rs.79.19

770 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8074.04
Shutters of any description n exc 1 sq.m each Taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0315 7.0875
2 Mazdoor man 1 Day Rs. 169.00 0.032 5.408
Rs.12.50
After rounding off: Rs.14.70 Total Amount of M and L Rs.12.50
Add 17.5 % OH and CP Rs.2.19
Total Rs.14.68

ITEM No. 8074.05


Shutters of any description n exc 1 sq.m each Removing to or fromSrore.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.12 20.28
Rs.20.28
After rounding off: Rs.23.80 Total Amount of M and L Rs.20.28
Add 17.5 % OH and CP Rs.3.55
Total Rs.23.83

ITEM No. 8075.01


Shutters of any description but exc 1 sq.m and n exc 2 sq. m each Resecuring or easing & adjusting, without
taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1325 29.8125
Rs.29.81
After rounding off: Rs.35.00 Total Amount of M and L Rs.29.81
Add 17.5 % OH and CP Rs.5.22
Total Rs.35.03

ITEM No. 8075.02


Shutters of any description but exc 1 sq.m and n exc 2 sq. m each Refixing in same opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.086 14.534
2 Carpenter, joiner* 1 Day Rs. 225.00 0.19 42.75
Rs.57.28
After rounding off: Rs.67.30 Total Amount of M and L Rs.57.28
Add 17.5 % OH and CP Rs.10.02
Total Rs.67.31

771 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8075.03
Shutters of any description exc 1 sq.m and n exc 2 sq. m each Refixing in other opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.3285 55.5165
2 Carpenter, joiner* 1 Day Rs. 225.00 0.328 73.8
Rs.129.32
After rounding off: Rs.151.90 Total Amount of M and L Rs.129.32
Add 17.5 % OH and CP Rs.22.63
Total Rs.151.95

ITEM No. 8075.04


Shutters of any description but exc 1 sq.m and n exc 2 sq. m each Taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.064 14.4
2 Mazdoor man 1 Day Rs. 169.00 0.063 10.647
Rs.25.05
After rounding off: Rs.29.40 Total Amount of M and L Rs.25.05
Add 17.5 % OH and CP Rs.4.38
Total Rs.29.43

ITEM No. 8075.05


Shutters of any description but exc 1 sq.m and n exc 2 sq. m each Removing to or from Store.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.19 32.11
Rs.32.11
After rounding off: Rs.37.70 Total Amount of M and L Rs.32.11
Add 17.5 % OH and CP Rs.5.62
Total Rs.37.73

ITEM No. 8076.01


Shutters of any description but exc 2 sq.m each Resecuring or easing &adjusting, without taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1762 39.645
Rs.39.65
After rounding off: Rs.46.60 Total Amount of M and L Rs.39.65
Add 17.5 % OH and CP Rs.6.94
Total Rs.46.58

772 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8076.02
Shutters of any description but exc 2 sq.m each Refixing in same opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.135 22.815
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2645 59.5125
Rs.82.33
After rounding off: Rs.96.70 Total Amount of M and L Rs.82.33
Add 17.5 % OH and CP Rs.14.41
Total Rs.96.73

ITEM No. 8076.03


Shutters of any description but exc 2 sq.m each Refixing in other opening.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.402 90.45
2 Mazdoor man 1 Day Rs. 169.00 0.4025 68.0225
Rs.158.47
After rounding off: Rs.186.20 Total Amount of M and L Rs.158.47
Add 17.5 % OH and CP Rs.27.73
Total Rs.186.21

ITEM No. 8076.04


Shutters of any description but exc 2 sq.m each Taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
2 Carpenter, joiner* 1 Day Rs. 225.00 0.108 24.3
Rs.42.55
After rounding off: Rs.50.00 Total Amount of M and L Rs.42.55
Add 17.5 % OH and CP Rs.7.45
Total Rs.50.00

ITEM No. 8076.05


As per item 871 (0095) but exc 2 sq.m each Removing to or fromStore.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.17 28.73
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0615 13.8375
Rs.42.57
After rounding off: Rs.50.00 Total Amount of M and L Rs.42.57
Add 17.5 % OH and CP Rs.7.45
Total Rs.50.02

773 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8077.04
Wall panelling and similar work Taking down.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0424 9.54
2 Mazdoor man 1 Day Rs. 169.00 0.0424 7.1656
Rs.16.71
After rounding off: Rs.19.60 Total Amount of M and L Rs.16.71
Add 17.5 % OH and CP Rs.2.92
Total Rs.19.63

ITEM No. 8077.05


Wall panelling and similar work Removing to or from Store.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.06 10.14
Rs.10.14
After rounding off: Rs.11.90 Total Amount of M and L Rs.10.14
Add 17.5 % OH and CP Rs.1.77
Total Rs.11.91

ITEM No. 8078.01


Pieces, small let in for making good where hinges, etc. have beenremoved form chowkats or frames, joinery
etc. including painting or oilingto match, if required 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.033 7.425
2 Painter (ordinary) 1 Day Rs. 192.00 0.013 2.496
Rs.9.92
Sundry
1 Sundry 1 Re Rs. 9.00 0.03 0.27
Rs.0.27
After rounding off: Rs.12.00 Total Amount of M and L Rs.10.19
Add 17.5 % OH and CP Rs.1.78
Total Rs.11.97

774 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8078.02
Pieces, small let in for making good where hinges, etc. have beenremoved form chowkats or frames, joinery
etc. including painting or oilingto match, if required 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.05 11.25
2 Painter (ordinary) 1 Day Rs. 192.00 0.013 2.496
Rs.13.75
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.20
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.68

ITEM No. 8079.01


Beads, straight (any size ) for glazed or gauzed joinery, renewed,including mitres etc., and removing old beads
store 1st class softwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 LS Soft wood 1 st class 1 Re Rs. 15.00 0.1 1.5
Rs.1.50
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.0255 4.3095
2 Carpenter, joiner* 1 Day Rs. 225.00 0.029 6.525
Rs.10.83
After rounding off: Rs.14.50 Total Amount of M and L Rs.12.33
Add 17.5 % OH and CP Rs.2.16
Total Rs.14.49

ITEM No. 8079.02


Beads, straight (any size ) for glazed or gauzed joinery, renewed,including mitres etc., and removing old beads
store 1st class hardwood.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 LS hard wood 1st class 1 Re Rs. 20.00 0.15 3
Rs.3.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.027 4.563
2 Carpenter, joiner* 1 Day Rs. 225.00 0.05 11.25
Rs.15.81
After rounding off: Rs.22.10 Total Amount of M and L Rs.18.81
Add 17.5 % OH and CP Rs.3.29
Total Rs.22.11

775 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8080
s
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made solid panel PVC door Shutters 1 Sqm Rs. 1,654.00 1 1654
Rs.1,654.00
Labour
1 Helper 1 Day Rs. 169.00 0.1795 30.3355
2 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
Rs.70.84
After rounding off: Rs.2,026.70 Total Amount of M and L Rs.1,724.84
Add 17.5 % OH and CP Rs.301.85
Total Rs.2,026.68

ITEM No. 8081


Factory made solid panel PVC door shutter30 mm thick (style) consisting of frame made out of M.S. tubes for
top & bottomrails. M.S. frame shall be covered with heat moulded wood grain printed PVC sheet PVC ‘C’
channel having a PVC sheet strip of 15 mm width stuck inside with solvent cement for stiles and plain colour
PVC sheets for top rail,lock rail & bottom rail on either side & as gap insert for top rail & bottom rail; Panelling
of wood grain printed PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with
suitable decorative PVC beading of 10mm x 10mm (90 ) ,and joined together with solvent cement, suppling &
fixing in the frame at site as per specification & drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made Printed solid panel PVC door shutter 1 Sqm Rs. 1,829.25 1 1829.25
Factory made solid panel PVC door Shutters
Rs.1,829.25
Labour
1 Helper 1 Day Rs. 169.00 0.18 30.42
2 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
Rs.70.92
After rounding off: Rs.2,232.70 Total Amount of M and L Rs.1,900.17
Add 17.5 % OH and CP Rs.332.53
Total Rs.2,232.70

776 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8082
All as per item no.8080 but Single Side Prelam PVC sheet used insteadof Plain colour sheet & and stile & rails
having one side feathered edgeand on other side 10mm 90* bent edge.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with single side prelam PVC sheet used instead of 1 Sqm Rs. 2,006.25 1 2006.25
Plain colour sheet & stile & rails having one side feathered edge and
on other side 10mm 900bent edge.
Rs.2,006.25
Labour
1 Helper 1 Day Rs. 169.00 0.1795 30.3355
2 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
Rs.70.84
After rounding off: Rs.2,440.60 Total Amount of M and L Rs.2,077.09
Add 17.5 % OH and CP Rs.363.49
Total Rs.2,440.58

ITEM No. 8083


All as per item no.8080 but both side Prelam PVC sheet used instead ofPlain colour sheet. Stile and rails
feathered at edges.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with both side Prelam PVC sheet used instead of 1 Sqm Rs. 2,083.50 1 2083.5
Plain colour sheet, Stile and rails feathered at edges
Rs.2,083.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.2,531.40 Total Amount of M and L Rs.2,154.42
Add 17.5 % OH and CP Rs.377.02
Total Rs.2,531.44

ITEM No. 8084


All as per item no8080 but fully glazed i.e. glass panes used in-stead of5mm PVC sheet panels.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with but fully glazed i.e. glass panes used instead 1 Sqm Rs. 1,560.00 1 1560
of 5mm PVC sheet panels
Rs.1,560.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.1,916.30 Total Amount of M and L Rs.1,630.92
Add 17.5 % OH and CP Rs.285.41
Total Rs.1,916.33

777 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8085
All as per item no.08080 but fully glazed i.e. glass panes used instead of5mm wood grain printed PVC sheet
panels.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with but fully glazed i.e. glass panes used instead 1 Sqm Rs. 1,634.25 1 1634.25
of 5mm wood grain printed PVC
Rs.1,634.25
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.1795 30.3355
Rs.70.84
After rounding off: Rs.2,003.50 Total Amount of M and L Rs.1,705.09
Add 17.5 % OH and CP Rs.298.39
Total Rs.2,003.48

ITEM No. 8086


All as per item no.08082 but fully glazed i.e. glass panes used instead of5mm Single Side Prelam PVC sheet
panels.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with fully glazed i.e. glass panes used instead of 1 Sqm Rs. 1,731.75 1 1731.75
5mm Single side Prelam PVC sheet panels
Rs.1,731.75
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.2,118.10 Total Amount of M and L Rs.1,802.67
Add 17.5 % OH and CP Rs.315.47
Total Rs.2,118.14

ITEM No. 8087


All as per item no.8080 but partly glazed i.e. upper panel will be glasspane fitted externally in the clear space &
lower panel will beplain col-our.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with but partly glazed i.e. upper panel will be glass 1 Sqm Rs. 1,745.25 1 1745.25
pane fitted externally in the clear space & lower panel will be plain
colour PVC sheet
Rs.1,745.25
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.2,134.00 Total Amount of M and L Rs.1,816.17
Add 17.5 % OH and CP Rs.317.83
Total Rs.2,134.00

778 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8088
All as per item no.08081 but partly glazed i.e. upper panel will be glasspanes fitted externally in the clear space
& lower panel will wood grainprinted PVC sheet panel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with PVC door shutter with PVC door shutter with 1 Sqm Rs. 1,857.00 1 1857
but partly glazed i.e. upper panel will be glass panes fitted externally
in the clear space & lower panel will wood grain printed PVC sheet
panel
Rs.1,857.00
Labour
1 Helper 1 Day Rs. 169.00 0.18 30.42
2 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
Rs.70.92
After rounding off: Rs.2,265.30 Total Amount of M and L Rs.1,927.92
Add 17.5 % OH and CP Rs.337.39
Total Rs.2,265.31

ITEM No. 8089


All as per item no.08082 but partly glazed i.e. upper panel will be glasspanes fitted externally in the clear space
& lower panel will be SingleSide Prelam PVC sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with but partly glazed i.e. upper panel will be glass 1 Sqm Rs. 1,949.00 1 1949
panes fitted externally in the clear space & lower panel will be Single
Side Prelam PVC sheet.
Rs.1,949.00
Labour
1 Helper 1 Day Rs. 169.00 0.18 30.42
2 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
Rs.70.92
After rounding off: Rs.2,373.40 Total Amount of M and L Rs.2,019.92
Add 17.5 % OH and CP Rs.353.49
Total Rs.2,373.41

779 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8090
All as per item no.08083 but partly glazed i.e. upper panel will be glasspanes fitted externally in the clear space
& lower panel will be Both SidePrelam PVC sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with partly glazed i.e. upper panel will be glass 1 Sqm Rs. 1,987.50 1 1987.5
panes fitted externally in the clear space & lower panel will be Both
Side Prelam PVC sheet.
Rs.1,987.50
Labour
1 Helper 1 Day Rs. 169.00 0.18 30.42
2 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
Rs.70.92
After rounding off: Rs.2,418.60 Total Amount of M and L Rs.2,058.42
Add 17.5 % OH and CP Rs.360.22
Total Rs.2,418.64

ITEM No. 8091


All as per item no.879 but wire gauzed i.e. panel will be of wire gauze inlieu of PVC sheet panel. The wire gauze
shall be wrapped on anadditional square 8mm M.S. Solid tube and this tube shall be welded toM.S. tubes. The
wire gauge shall be stretched to
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with wire gauzed i.e. panel will be of wire gauze in 1 Sqm Rs. 1,315.00 1 1315
lieu of PVC sheet panel. The wire gauzed shall be wrapped on an addl
square 8 mm M.S solid tube and this tube shall be welded to MS
tubes.
Rs.1,315.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.1795 30.3355
Rs.70.84
After rounding off: Rs.1,628.40 Total Amount of M and L Rs.1,385.84
Add 17.5 % OH and CP Rs.242.52
Total Rs.1,628.36

780 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8092
All as per item no.08081 but wire gauzed i.e. panel will be of wire gauzein lieu of wood grain printed PVC sheet
panel. The wire gauze shall bewrapped on an additional square 8mm M.S. Solid tube and this tube shallbe
welded to M.S. tubes. The wire gauge s
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with wire gauzed i.e. panel will be of wire gauze in 1 Sqm Rs. 1,369.00 1 1369
lieu of wood grain printed PVC sheet panel. The wire gauzed shall be
wrapped on an addl square 8 mm M.S solid tube and this tube shall
be welded to MS tubes
Rs.1,369.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.178 40.05
2 Helper 1 Day Rs. 169.00 0.1785 30.1665
Rs.70.22
After rounding off: Rs.1,691.10 Total Amount of M and L Rs.1,439.22
Add 17.5 % OH and CP Rs.251.86
Total Rs.1,691.08

ITEM No. 8093


All as per item no.08082 but wire gauzed i.e. panel will be of wire gauzein lieu of single side prelam PVC sheet
panel. The wire gauze shall bewrapped on an additional square 8mm M.S. Solid tube and this tube shallbe
welded to M.S. tubes. The wire gauge s
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with . wire gauzed i.e. panel will be of wire gauze in 1 Sqm Rs. 1,440.00 1 1440
lieu of single side prelim PVC sheet panel. The wire gauzed shall be
wrapped on an addl square 8 mm M.S solid tube and this tube shall
be welded to MS tubes
Rs.1,440.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.1,775.30 Total Amount of M and L Rs.1,510.92
Add 17.5 % OH and CP Rs.264.41
Total Rs.1,775.33

781 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8094
All as per item no.8080 but Fully Louvred i.e. PVC sheet panel shall belouvred..
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC door shutter with fully Louvred i.e. PVC sheet panel shall be 1 Sqm Rs. 1,719.75 1 1719.75
louvred.(Factory made fully louvred solid panel PVC door shutters.
Rs.1,719.75
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.2,104.00 Total Amount of M and L Rs.1,790.67
Add 17.5 % OH and CP Rs.313.37
Total Rs.2,104.04

ITEM No. 8095


Solid PVC Door Frame of size 50mm x 47mm made out of 5mm PVCsheet as reinforced with M.S. Square tube,
suppling & fixing in openingas per specification & drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solid PVC Door Frame of size 50mm x 47mm made out of 5mm PVC 1 Runnin Rs. 256.18 1 256.18
sheet as reinforced with MS Sqare tube, supplying & fixing in opening
as per specification & drawing
Rs.256.18
Labour
1 Helper 1 Day Rs. 169.00 0.074 12.506
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0742 16.695
Rs.29.20
After rounding off: Rs.335.30 Total Amount of M and L Rs.285.38
Add 17.5 % OH and CP Rs.49.94
Total Rs.335.32

ITEM No. 8096


All as per item no.08095 but wood grain printed PVC sheet used instead ofPlain colour sheet & edges will be
painted to match with printed sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solid PVC Door Frame of size 50mm x 47mm made out of 5mm but 1 Runnin Rs. 266.34 1 266.34
wood grain printed PVC sheet used instead of Plain colour sheet &
edges will be painted to match with printed sheet
Rs.266.34
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.074 16.65
2 Helper 1 Day Rs. 169.00 0.0745 12.5905
Rs.29.24
After rounding off: Rs.347.30 Total Amount of M and L Rs.295.58
Add 17.5 % OH and CP Rs.51.73
Total Rs.347.31

782 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8097
All as per item no.08095 but single side prelam PVC sheet used instead ofPlain colour sheet & edges will be
painted to match with prelam sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solid PVC Door Frame of size 50mm x 47mm made out of 5mm but 1 Runnin Rs. 282.89 1 282.89
single side prelam PVC sheet used instead of Plain colour sheet &
edges will be painted to match with prelam sheet
Rs.282.89
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.074 16.65
2 Helper 1 Day Rs. 169.00 0.074 12.506
Rs.29.16
After rounding off: Rs.366.70 Total Amount of M and L Rs.312.05
Add 17.5 % OH and CP Rs.54.61
Total Rs.366.65

ITEM No. 8098


Solid PVC Double door frame of size 50mm x 95mm made out of 5mmPVC sheet reinforced with M.S. tube,
suppling & fixing in opening as perspecification & drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solid PVC Double door frame of size 50mm x 95mm made out of 5mm 1 Runnin Rs. 311.60 1 311.6
PVC sheet reinforced with M.S. tube, suppling & fixing in opening as
per specification & drawing.
Rs.311.60
Labour
1 Helper 1 Day Rs. 169.00 0.074 12.506
2 Carpenter, joiner* 1 Day Rs. 225.00 0.074 16.65
Rs.29.16
After rounding off: Rs.400.40 Total Amount of M and L Rs.340.76
Add 17.5 % OH and CP Rs.59.63
Total Rs.400.39

ITEM No. 8099


All as per item no.08098 but wood grain printed PVC sheet used instead ofPlain colour sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solid PVC Double door frame of size 50mm x 95mm made out of 5mm 1 Runnin Rs. 360.80 1 360.8
PVC sheet reinforced with M.S. tube, suppling & fixing in opening as
per specification & drawing.wood grain printed PVC sheet used
instead of plain colour sheet
Rs.360.80
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.074 16.65
2 Helper 1 Day Rs. 169.00 0.074 12.506
Rs.29.16
After rounding off: Rs.458.20 Total Amount of M and L Rs.389.96
Add 17.5 % OH and CP Rs.68.24
Total Rs.458.20

783 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8100
All as per item no.08098 but single side prelam PVC sheet used instead ofPlain colour sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solid PVC Double door frame of size 50mm x 95mm made out of 5mm 1 Runnin Rs. 393.60 1 393.6
PVC sheet reinforced with M.S. tube, suppling & fixing in opening as
per specification & drawing. single side prelam PVC sheet used
instead of Plain colour sheet
Rs.393.60
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0741 16.6725
2 Helper 1 Day Rs. 169.00 0.0741 12.5229
Rs.29.20
After rounding off: Rs.496.80 Total Amount of M and L Rs.422.80
Add 17.5 % OH and CP Rs.73.99
Total Rs.496.78

ITEM No. 8101.01


Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick moulded PVC sheet onthe front face and 2 mmplain colour PVC sheet on back fase S&F in frame
at site as perspecification & drawing.M &L With Particle Board Core.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 M &L with wood Free EPS Factory made particle board core solid PVC 1 Sqm Rs. 1,989.75 1 1989.75
moulded door shutter (using 2mm moulded PVC sheet on one side
and 2mm plain PVC sheet on other side
Rs.1,989.75
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.2,421.30 Total Amount of M and L Rs.2,060.67
Add 17.5 % OH and CP Rs.360.62
Total Rs.2,421.29

784 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8101.02
Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick moulded PVC sheet onthe front face and 2 mmplain colour PVC sheet on back fase S&F in frame
at site as perspecification & drawing.M & L WITH WOOD FREE EPS.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made EPS core solid PVC moulded door shutter (using 2mm 1 Sqm Rs. 1,844.25 1 1844.25
moulded PVC sheet on one side and 2mm plain PVC sheet on other
side
Rs.1,844.25
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.2,250.30 Total Amount of M and L Rs.1,915.17
Add 17.5 % OH and CP Rs.335.15
Total Rs.2,250.32

ITEM No. 8102.01


Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick moulded Prelam PVC sheet on the front face and 2 mmplain colour PVC sheet on back fase S&F in
frame at site as perspecification & drawing, With particle board core.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made particle board core solid PVC moulded door shutter 1 Sqm Rs. 2,082.00 1 2082
(using 2mm moulded prelim PVC sheet on one side and 2mm plain
PVC sheet on other sideWith wood Free EPS
Rs.2,082.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.1795 30.3355
Rs.70.84
After rounding off: Rs.2,529.60 Total Amount of M and L Rs.2,152.84
Add 17.5 % OH and CP Rs.376.75
Total Rs.2,529.58

785 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8102.02
Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick moulded Prelam PVC sheet onthe front face and 2 mmplain colour PVC sheet on back fase S&F in
frame at site as perspecification & drawingM & L With Wood Free EPS.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made particle board core solid PVC moulded door shutter 1 Sqm Rs. 1,947.00 1 1947
(using 2mm moulded prelim PVC sheet on one side and 2mm plain
PVC sheet on other side) With particle board core
Rs.1,947.00
Labour
1 Helper 1 Day Rs. 169.00 0.1795 30.3355
2 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
Rs.70.84
After rounding off: Rs.2,371.00 Total Amount of M and L Rs.2,017.84
Add 17.5 % OH and CP Rs.353.12
Total Rs.2,370.96

ITEM No. 8103.01


Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick moulded Prelam PVC sheet on the front face and 2 mm prelam colour PVC sheet on back fase
S&F in frame at site as perspecification & drawingM & L With Particle Board Core.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made particle board core solid PVC moulded door shutter 1 Sqm Rs. 2,229.00 1 2229
(using 2mm moulded prelam PVC sheet on one side and 2mm prelim
PVC sheet on other side With Particle Board Core
Rs.2,229.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.2,702.40 Total Amount of M and L Rs.2,299.92
Add 17.5 % OH and CP Rs.402.49
Total Rs.2,702.41

786 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8103.02
Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick moulded Prelam PVC sheet onthe front face and 2 mm prelam colour PVC sheet on back fase
S&F in frame at site as perspecification & drawingM & L With Wood Free EPS.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made EPS core solid PVC moulded door shutter (using 2mm 1 Sqm Rs. 2,104.50 1 2104.5
moulded prelam PVC sheet on one side and 2mm prelam PVC sheet
on other side) With wood Free EPS
Rs.2,104.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.2,556.10 Total Amount of M and L Rs.2,175.42
Add 17.5 % OH and CP Rs.380.70
Total Rs.2,556.12

ITEM No. 8104.01


Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick 3D wood grain moulded Pr PVC sheet Polyurethane paintedonthe front face and 2 mm prelam
colour PVC sheet on back fase in frame at site as perspecification & drawing With Particle Board Core.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made particle board core solid PVC moulded door shutter 1 Sqm Rs. 2,080.50 1 2080.5
(using 2mm 3-D wood grain moulded PVC sheet on one side and 2mm
PVC sheet on other side) With particle Board Core
Rs.2,080.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.18 30.42
Rs.70.92
After rounding off: Rs.2,527.90 Total Amount of M and L Rs.2,151.42
Add 17.5 % OH and CP Rs.376.50
Total Rs.2,527.92

787 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8104.02
Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick 3D wood grain moulded Pr PVC sheet Polyurethane paintedonthe front face and 2 mm prelam
colour PVC sheet on back fase in frame at site as perspecification & drawing With Wood Free EPS.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made EPS core solid PVC moulded door shutter (using 2mm 3- 1 Sqm Rs. 1,974.75 1 1974.75
D wood grain moulded PVC sheet on one side and 2mm PVC sheet on
other side) With wood Free EPS
Rs.1,974.75
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
2 Helper 1 Day Rs. 169.00 0.1795 30.3355
Rs.70.84
After rounding off: Rs.2,403.60 Total Amount of M and L Rs.2,045.59
Add 17.5 % OH and CP Rs.357.98
Total Rs.2,403.56

ITEM No. 8105.01


Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick 3D wood grain moulded PVC sheet Polyurethane paintedonthe front face and 2 mm prelam PVC
sheet on back face in frame at site as perspecification & drawing With Particle Board Core.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made particle board core solid PVC moulded door shutter 1 Sqm Rs. 2,227.50 1 2227.5
(using 2mm 3-D wood grain moulded PVC sheet on one side & 2mm
prelim PVC sheet on other side) With particle Board Core
Rs.2,227.50
Labour
1 Helper 1 Day Rs. 169.00 0.18 30.42
2 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
Rs.70.92
After rounding off: Rs.2,700.60 Total Amount of M and L Rs.2,298.42
Add 17.5 % OH and CP Rs.402.22
Total Rs.2,700.64

788 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8105.02
Factory made solid PVC moulded door shutter 28 to 30 mm thick (stiles)with 2,4 or 6 raised panel design with
2 mm thick 3D wood grain moulded PVC sheet Polyurethane paintedonthe front face and 2 mm prelam PVC
sheet on back face in frame at site as perspecification & drawing With Wood Free EPS.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made EPS core solid PVC moulded door shutter (using 2mm 1 Sqm Rs. 2,104.50 1 2104.5
moulded prelam PVC sheet on one side and 2mm prelam PVC sheet
on other side) With wood Free EPS
Rs.2,104.50
Labour
1 Helper 1 Day Rs. 169.00 0.18 30.42
2 Carpenter, joiner* 1 Day Rs. 225.00 0.18 40.5
Rs.70.92
After rounding off: Rs.2,556.10 Total Amount of M and L Rs.2,175.42
Add 17.5 % OH and CP Rs.380.70
Total Rs.2,556.12

ITEM No. 8106.01


S & F Plain colour PVC sheet fixed or laid on to flush doors by using rubber based adhesive, supplying & fixing
at site as per specification . Thickness of Sheet in 1 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet 1mm thick plain colour 1 Sqm Rs. 150.64 1.05 158.172
2 Rubber based adhesive 1 Litre Rs. 180.00 0.3302 59.436
Rs.217.61
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.085 19.125
2 Helper 1 Day Rs. 169.00 0.0845 14.2805
Rs.33.41
After rounding off: Rs.294.90 Total Amount of M and L Rs.251.01
Add 17.5 % OH and CP Rs.43.93
Total Rs.294.94

ITEM No. 8106.02


S & F Plain colour PVC sheet fixed or laid on to flush doors by using rubber based adhesive, supplying & fixing
at site as per specification Thickness of Sheet in 1.5 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet 1.5mm thick plain colour 1 Sqm Rs. 193.68 1.05 203.364
2 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
Rs.262.76
Labour
1 Helper 1 Day Rs. 169.00 0.0845 14.2805
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0845 19.0125
Rs.33.29
After rounding off: Rs.347.90 Total Amount of M and L Rs.296.06
Add 17.5 % OH and CP Rs.51.81
Total Rs.347.87

789 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8106.03
S & F Plain colour PVC sheet fixed or laid on to flush doors by using rubber based adhesive, supplying & fixing
at site as per specification Thickness of Sheet in 2 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
2 PVC sheet 2 mm thick plain colour 1 Sqm Rs. 279.76 1.05 293.748
Rs.353.15
Labour
1 Helper 1 Day Rs. 169.00 0.0845 14.2805
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0845 19.0125
Rs.33.29
After rounding off: Rs.454.10 Total Amount of M and L Rs.386.44
Add 17.5 % OH and CP Rs.67.63
Total Rs.454.07

ITEM No. 8107.01


S & F Wood grain printed PVC sheet fixed or laid on to flush doors by using rubber based adhesive, supplying
& fixing at site as per specification Thickness of Sheet in 1 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet 1mm thick printed 1 Sqm Rs. 215.20 1.05 225.96
2 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
Rs.285.36
Labour
1 Helper 1 Day Rs. 169.00 0.0847 14.3143
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0847 19.0575
Rs.33.37
After rounding off: Rs.374.50 Total Amount of M and L Rs.318.73
Add 17.5 % OH and CP Rs.55.78
Total Rs.374.51

ITEM No. 8107.02


S & F Wood grain printed PVC sheet fixed or laid on to flush doors by using rubber based adhesive, supplying
& fixing at site as per specification,Thickness of Sheet in 1.5 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet 1.5 mm thick printed colour 1 Sqm Rs. 269.00 1.05 282.45
2 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
Rs.341.85
Labour
1 Helper 1 Day Rs. 169.00 0.0847 14.3143
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0847 19.0575
Rs.33.37
After rounding off: Rs.440.90 Total Amount of M and L Rs.375.22
Add 17.5 % OH and CP Rs.65.66
Total Rs.440.89

790 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8107.03
S & F Wood grain printed PVC sheet fixed or laid on to flush doors by using rubber based adhesive, supplying
& fixing at site as per specification, Thickness of Sheet in 2 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet 2 mm thick printed colour 1 Sqm Rs. 333.56 1.05 350.238
2 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
Rs.409.64
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0847 19.0575
2 Helper 1 Day Rs. 169.00 0.0847 14.3143
Rs.33.37
After rounding off: Rs.520.50 Total Amount of M and L Rs.443.01
Add 17.5 % OH and CP Rs.77.53
Total Rs.520.54

ITEM No. 8108.02


S & F Single side prelam PVC sheet fixed or laid on to flush doors by using rubber based adhesive, supplying &
fixing at site as per specification Thickness of Sheet in 1.5 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
2 PVC sheet 2 mm thick prelam 1 Sqm Rs. 441.16 1.05 463.218
Rs.522.62
Labour
1 Helper 1 Day Rs. 169.00 0.0847 14.3143
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0847 19.0575
Rs.33.37
After rounding off: Rs.653.30 Total Amount of M and L Rs.555.99
Add 17.5 % OH and CP Rs.97.30
Total Rs.653.29

ITEM No. 8109.02


S & F Single side prelam embosed by thermoforming PVC sheet fixed or laid on to flush doors by using rubber
based adhesive, supplying & fixing at site as per specification Thickness of Sheet in 1.5 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet 2 mm thick prelam embossed 1 Sqm Rs. 538.00 1.05 564.9
2 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
Rs.624.30
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0847 19.0575
2 Helper 1 Day Rs. 169.00 0.0847 14.3143
Rs.33.37
After rounding off: Rs.772.80 Total Amount of M and L Rs.657.67
Add 17.5 % OH and CP Rs.115.09
Total Rs.772.76

791 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8110.01
Add to items 08106 to 08109 if fixed in repairs to existing doors thickness of Sheet in 1 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1057 23.7825
2 Helper 1 Day Rs. 169.00 0.1058 17.8802
Rs.41.66
After rounding off: Rs.49.00 Total Amount of M and L Rs.41.66
Add 17.5 % OH and CP Rs.7.29
Total Rs.48.95

ITEM No. 8110.02


Add to items 08106 to 08109 if fixed in repairs to existing doors ,thickness of Sheet in 1.5 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1057 23.7825
2 Helper 1 Day Rs. 169.00 0.1058 17.8802
Rs.41.66
After rounding off: Rs.49.00 Total Amount of M and L Rs.41.66
Add 17.5 % OH and CP Rs.7.29
Total Rs.48.95

ITEM No. 8110.03


Add to items 08106 to 08109 if fixed in repairs to existing doors,Thickness of Sheet in 2 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1057 23.7825
2 Helper 1 Day Rs. 169.00 0.1058 17.8802
Rs.41.66
After rounding off: Rs.49.00 Total Amount of M and L Rs.41.66
Add 17.5 % OH and CP Rs.7.29
Total Rs.48.95

ITEM No. 8111.01


All as per item 08106 to 08109 but without the relevant PVC sheet Thickness of Sheet in 1 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
Rs.59.40
Labour
1 Helper 1 Day Rs. 169.00 0.0845 14.2805
2 Carpenter, joiner* 1 Day Rs. 225.00 0.085 19.125
Rs.33.41
After rounding off: Rs.109.00 Total Amount of M and L Rs.92.81
Add 17.5 % OH and CP Rs.16.24
Total Rs.109.05

792 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8111.02
All as per item 08106 to 08109 but without the relevant PVC sheet Thickness of Sheet in 1.5 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
Rs.59.40
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.085 19.125
2 Helper 1 Day Rs. 169.00 0.0845 14.2805
Rs.33.41
After rounding off: Rs.109.00 Total Amount of M and L Rs.92.81
Add 17.5 % OH and CP Rs.16.24
Total Rs.109.05

ITEM No. 8111.03


All as per item 08106 to 08109 but without the relevant PVC sheet Thickness of Sheet in 2 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rubber based adhesive 1 Litre Rs. 180.00 0.33 59.4
Rs.59.40
Labour
1 Helper 1 Day Rs. 169.00 0.0845 14.2805
2 Carpenter, joiner* 1 Day Rs. 225.00 0.085 19.125
Rs.33.41
After rounding off: Rs.109.00 Total Amount of M and L Rs.92.81
Add 17.5 % OH and CP Rs.16.24
Total Rs.109.05

ITEM No. 8112.01


Extra for PVC sheet in lipping in case of PVC sheet is heat bent as lipping on the edges of doors of thiness 1mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Helper 1 Day Rs. 169.00 0.1271 21.4799
2 Carpenter, joiner* 1 Day Rs. 225.00 0.1271 28.5975
Rs.50.08
After rounding off: Rs.58.80 Total Amount of M and L Rs.50.08
Add 17.5 % OH and CP Rs.8.76
Total Rs.58.84

793 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8112.02
Extra for PVC sheet in lipping in case of PVC sheet is heat bent as lipping on the edges of doors of thiness
1.5mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1271 28.5975
2 Helper 1 Day Rs. 169.00 0.1271 21.4799
Rs.50.08
After rounding off: Rs.58.80 Total Amount of M and L Rs.50.08
Add 17.5 % OH and CP Rs.8.76
Total Rs.58.84

ITEM No. 8112.03


Extra for PVC sheet in lipping in case of PVC sheet is heat bent as lipping on the edges of doors of thiness 2mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.1271 28.5975
2 Helper 1 Day Rs. 169.00 0.1271 21.4799
Rs.50.08
After rounding off: Rs.58.80 Total Amount of M and L Rs.50.08
Add 17.5 % OH and CP Rs.8.76
Total Rs.58.84

ITEM No. 8113


Solid PVC wall lining con-sisting of 5mm thick PVC sheet inclusive of solvent cement and fixing at site on PVC
frame as per specifications.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solvent cement adhesive 1 Litre Rs. 140.00 0.33 46.2
2 PVC sheet rubber based adhesive 5mm thick plain colour 1 Sqm Rs. 602.56 1.05 632.688
Rs.678.89
Labour
1 Helper 1 Day Rs. 169.00 0.752 127.088
2 Carpenter, joiner* 1 Day Rs. 225.00 0.751 168.975
Rs.296.06
After rounding off: Rs.1,145.60 Total Amount of M and L Rs.974.95
Add 17.5 % OH and CP Rs.170.62
Total Rs.1,145.57

794 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8114
Solid PVC wall lining con-sisting of 5mm thick wood grain printed PVC sheet inclusive of solvent cement and
fixing at site on PVC frame as per specifications.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solvent cement adhesive 1 Litre Rs. 140.00 0.0335 4.69
2 PVC sheet 5mm thick wood grain printed 1 Sqm Rs. 645.60 1.05 677.88
Rs.682.57
Labour
1 Helper 1 Day Rs. 169.00 0.2137 36.1153
2 Carpenter, joiner* 1 Day Rs. 225.00 0.21 47.25
Rs.83.37
After rounding off: Rs.900.00 Total Amount of M and L Rs.765.94
Add 17.5 % OH and CP Rs.134.04
Total Rs.899.97

ITEM No. 8115


Solid PVC wall lining con-sisting of 5mm thick single side prelam PVC sheet inclusive of solvent cement and
fixing at site on PVC frame as per specifications.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet 5mm thick single side prelam 1 Sqm Rs. 699.40 1.05 734.37
2 Solvent cement adhesive 1 Litre Rs. 140.00 0.033 4.62
Rs.738.99
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2117 47.6325
2 Helper 1 Day Rs. 169.00 0.2115 35.7435
Rs.83.38
After rounding off: Rs.966.30 Total Amount of M and L Rs.822.37
Add 17.5 % OH and CP Rs.143.91
Total Rs.966.28

ITEM No. 8116


All as per item No.08113 to 08113B but without the relevant PVC Sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solvent cement adhesive 1 Litre Rs. 140.00 0.033 4.62
Rs.4.62
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.213 47.925
2 Helper 1 Day Rs. 169.00 0.213 35.997
Rs.83.92
After rounding off: Rs.104.00 Total Amount of M and L Rs.88.54
Add 17.5 % OH and CP Rs.15.49
Total Rs.104.04

795 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8117
5mm thick PVC sheet fillet of width 25mm for wall paneling in-clusive offixing on to wall to make PVC Frame as
per specifi-cation and drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet filet of width 35mm 5mm thick 1 Sqm Rs. 466.00 0.036 16.776
Rs.16.78
Labour
1 Helper 1 Day Rs. 169.00 0.15 25.35
2 Carpenter, joiner* 1 Day Rs. 225.00 0.15 33.75
Rs.59.10
After rounding off: Rs.89.20 Total Amount of M and L Rs.75.88
Add 17.5 % OH and CP Rs.13.28
Total Rs.89.15

ITEM No. 8117.01


5mm thick PVC sheet fillet of width 25mm for wall paneling in-clusive offixing on to wall to make PVC Frame as
per specifi-cation and drawing, but without PVC sheet fillets.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.15 33.75
2 Helper 1 Day Rs. 169.00 0.15 25.35
Rs.59.10
After rounding off: Rs.69.40 Total Amount of M and L Rs.59.10
Add 17.5 % OH and CP Rs.10.34
Total Rs.69.44

ITEM No. 8118.01


S & F lnsulated PVC Wall Lining consisting of PVC Insulated Panels having expanded polystyrene (EPS) stuck to
2mm thick plain colour PVC sheet duly fitted into the wall as per specifications and drawing Thickness of
insulated PVC wall lining 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Insulated panel 25 mm thick using 2mm plain/printed PVC sheet & 23 1 Sqm Rs. 688.64 1.05 723.072
mm EPS
Rs.723.07
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2 45
2 Helper 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
After rounding off: Rs.942.20 Total Amount of M and L Rs.801.87
Add 17.5 % OH and CP Rs.140.33
Total Rs.942.20

796 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8118.02
S & F lnsulated PVC Wall Lining consisting of PVC Insulated Panels having expanded polystyrene (EPS) stuck to
2mm thick plain colour PVC sheet duly fitted into the wall as per specifications and drawing , Thickness of
insulated PVC wall lining 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Insulated panel 25 mm thick using 2mm plain/printed PVC sheet & 38 1 Sqm Rs. 731.68 1.05 768.264
mm EPS 40mm thick
Rs.768.26
Labour
1 Helper 1 Day Rs. 169.00 0.2 33.8
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2 45
Rs.78.80
After rounding off: Rs.995.30 Total Amount of M and L Rs.847.06
Add 17.5 % OH and CP Rs.148.24
Total Rs.995.30

ITEM No. 8119.01


S & F lnsulated PVC Wall Lining consisting of PVC Insulated Panels having expanded polystyrene (EPS) stuck to
2mm thick wood grain printed PVC sheet duly fitted into the wall as per specifications and drawing, Thickness
of insulated PVC wall lining 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Insulated panel 25 mm thick using 2mm plain/printed PVC sheet & 23 1 Sqm Rs. 688.64 1.05 723.072
mm EPS
Rs.723.07
Labour
1 Helper 1 Day Rs. 169.00 0.2116 35.7604
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2116 47.61
Rs.83.37
After rounding off: Rs.947.60 Total Amount of M and L Rs.806.44
Add 17.5 % OH and CP Rs.141.13
Total Rs.947.57

797 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8119.02
S & F lnsulated PVC Wall Lining consisting of PVC Insulated Panels having expanded polystyrene (EPS) stuck to
2mm thick wood grain printed PVC sheet duly fitted into the wall as per specifications and drawing, Thickness
of insulated PVC wall lining 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 I 1 Sqm Rs. 731.68 1.05 768.264
Insulated panel 40mm using 2mm plain/Printed PVC sheet & 38 mm
EPS
Rs.768.26
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2116 47.61
2 Helper 1 Day Rs. 169.00 0.2116 35.7604
Rs.83.37
After rounding off: Rs.1,000.70 Total Amount of M and L Rs.851.63
Add 17.5 % OH and CP Rs.149.04
Total Rs.1,000.67

ITEM No. 8120.01


S & F lnsulated PVC Wall Lining consisting of PVC Insulated Panels having expanded polystyrene (EPS) stuck to
2mm thick single side prelam PVC sheet duly fitted into the wall as per specifications and drawing, Thickness
of insulated PVC wall lining 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Insulated panel 25mm thick using 2mm single side prelam PVC sheet 1 Sqm Rs. 860.80 1.05 903.84
& 23mm EPS
Rs.903.84
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2116 47.61
2 Helper 1 Day Rs. 169.00 0.2116 35.7604
Rs.83.37
After rounding off: Rs.1,160.00 Total Amount of M and L Rs.987.21
Add 17.5 % OH and CP Rs.172.76
Total Rs.1,159.97

798 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8120.02
S & F lnsulated PVC Wall Lining consisting of PVC Insulated Panels having expanded polystyrene (EPS) stuck to
2mm thick single side prelam PVC sheet duly fitted into the wall as per specifications and drawing, Thickness
of insulated PVC wall lining 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Insulated panel 40mm thick using 2mm single side prelam PVC sheet 1 Sqm Rs. 903.84 1.05 949.032
& 38mm EPS
Rs.949.03
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2116 47.61
2 Helper 1 Day Rs. 169.00 0.2116 35.7604
Rs.83.37
After rounding off: Rs.1,213.10 Total Amount of M and L Rs.1,032.40
Add 17.5 % OH and CP Rs.180.67
Total Rs.1,213.07

ITEM No. 8121.01


All as per item 08118 to 08120 but without relevant PVC Insulated Panels , Thickness of insulated PVC wall
lining 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Helper 1 Day Rs. 169.00 0.2116 35.7604
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2116 47.61
Rs.83.37
After rounding off: Rs.98.00 Total Amount of M and L Rs.83.37
Add 17.5 % OH and CP Rs.14.59
Total Rs.97.96

ITEM No. 8121.02


All as per item 08118 to 08120 but without relevant PVC Insulated Panels , Thickness of insulated PVC wall
lining 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.187 42.075
2 Helper 1 Day Rs. 169.00 0.1875 31.6875
Rs.73.76
After rounding off: Rs.86.70 Total Amount of M and L Rs.73.76
Add 17.5 % OH and CP Rs.12.91
Total Rs.86.67

799 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8122
40mm thick solid PVC sandwich panel with 1mm plain PVC sheet on both side suitably fixed in MS angle frame
work as per specification & drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet of 75mm width 5mm prelam 1 Sqm Rs. 545.00 1.05 572.25
Rs.572.25
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.187 42.075
2 Helper 1 Day Rs. 169.00 0.1875 31.6875
Rs.73.76
After rounding off: Rs.759.10 Total Amount of M and L Rs.646.01
Add 17.5 % OH and CP Rs.113.05
Total Rs.759.06

ITEM No. 8123


40mm thick solid PVC sandwich panel with 1mm Printed PVC sheet on both side suitably fixed in MS angle
frame work as per specification & drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sandwitch panel 40mm thick using 1mm plain PVC sheet on both 1 Sqm Rs. 763.90 1.05 802.095
side & 38mm EPS
Rs.802.10
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2118 47.655
2 Helper 1 Day Rs. 169.00 0.2118 35.7942
Rs.83.45
After rounding off: Rs.1,040.50 Total Amount of M and L Rs.885.54
Add 17.5 % OH and CP Rs.154.97
Total Rs.1,040.51

ITEM No. 8124


40mm thick solid PVC sandwich panel with 2mm plain PVC sheet on both side suitably fixed in MS angle frame
work as per specification & drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sandwitch panel 40mm thick using 1mm printed PVC sheet on 1 Sqm Rs. 893.08 1.05 937.734
both side & 38mm EPS
Rs.937.73
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2118 47.655
2 Helper 1 Day Rs. 169.00 0.2115 35.7435
Rs.83.40
After rounding off: Rs.1,199.80 Total Amount of M and L Rs.1,021.13
Add 17.5 % OH and CP Rs.178.70
Total Rs.1,199.83

800 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8125
40mm thick solid PVC sandwich panel with 2mm Printed PVC sheet on both side suitably fixed in MS angle
frame work as per specification & drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Insulated panel 25 mm thick using 2mm plain/printed PVC sheet & 38 1 Sqm Rs. 731.68 1.05 768.264
mm EPS 40mm thick
Rs.768.26
Labour
1 Helper 1 Day Rs. 169.00 0.2116 35.7604
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2117 47.6325
Rs.83.39
After rounding off: Rs.1,000.70 Total Amount of M and L Rs.851.66
Add 17.5 % OH and CP Rs.149.04
Total Rs.1,000.70

ITEM No. 8126


40mm thick solid PVC sandwich panel with 2mm single side prelam PVC sheet on both side suitably fixed in
MS angle frame work as per specification & drawing.All as per item 891 but both side 2mm single side prelam
PVC sheet inlieu of 1 mm plain PVC sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Insulated panel 40mm using 2mm single side prelaim PVC sheet 1 Sqm Rs. 1,183.29 1.05 1242.4545
Rs.1,242.45
Labour
1 Helper 1 Day Rs. 169.00 0.2117 35.7773
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2117 47.6325
Rs.83.41
After rounding off: Rs.1,557.90 Total Amount of M and L Rs.1,325.86
Add 17.5 % OH and CP Rs.232.03
Total Rs.1,557.89

ITEM No. 8127


All as per item 08122 to 08126 but without relevant solid PVC sandwich panel .
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2117 47.6325
2 Helper 1 Day Rs. 169.00 0.2117 35.7773
Rs.83.41
After rounding off: Rs.98.00 Total Amount of M and L Rs.83.41
Add 17.5 % OH and CP Rs.14.60
Total Rs.98.01

801 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8128
S&F 5 mm thick plain colour PVC sheet in strips & channel feathered at theedges for fix on solid PVC wall lining,
insulated PVC wall lining and solidPVC particitions inclusive of solvent cement and fixing at site.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC Sheet of 75mm width 5mm plain colour 1 Sqm Rs. 466.00 1 466
Rs.466.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.9313 209.5425
2 Helper 1 Day Rs. 169.00 0.9313 157.3897
Rs.366.93
After rounding off: Rs.978.70 Total Amount of M and L Rs.832.93
Add 17.5 % OH and CP Rs.145.76
Total Rs.978.70

ITEM No. 8129


S&F 5 mm thick printed PVC sheet in strips & channel feathered at theedges for fix on solid PVC wall lining,
insulated PVC wall lining and solidPVC particitions inclusive of solvent cement and fixing at site.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet of 75mm width 5mm printed 1 Sqm Rs. 501.00 1 501
Rs.501.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.9312 209.52
2 Helper 1 Day Rs. 169.00 0.9312 157.3728
Rs.366.89
After rounding off: Rs.1,019.80 Total Amount of M and L Rs.867.89
Add 17.5 % OH and CP Rs.151.88
Total Rs.1,019.77

ITEM No. 8130


S&F 5 mm thick prelam PVC sheet in strips & channel feathered at theedges for fix on solid PVC wall lining,
insulated PVC wall lining and solidPVC particitions inclusive of solvent cement and fixing at site.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PVC sheet of 75mm width 5mm prelam 1 Sqm Rs. 545.00 1 545
Rs.545.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.931 209.475
2 Helper 1 Day Rs. 169.00 0.9315 157.4235
Rs.366.90
After rounding off: Rs.1,071.50 Total Amount of M and L Rs.911.90
Add 17.5 % OH and CP Rs.159.58
Total Rs.1,071.48

802 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8131
All as per item 08128 to 08128B but without the relevant PVC sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.9315 209.5875
2 Helper 1 Day Rs. 169.00 0.9315 157.4235
Rs.367.01
After rounding off: Rs.431.20 Total Amount of M and L Rs.367.01
Add 17.5 % OH and CP Rs.64.23
Total Rs.431.24

ITEM No. 8132.01


PVC insulation panels 10 mm thick with EPS stuck to 1 mm plain PVCsheet suitably placed in false ceiling grid
made of aluminium/GI/MS asper specification and drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anodised A1 angle 25x25mm(Heavy) 1 Runnin Rs. 32.00 1.1 35.2
2 Insulated panels10 mm having 1mm PVC sheet and 9mm EPS 1 Sqm Rs. 290.00 1 290
3 Screws and clips 100 No. Rs. 57.00 0.877 49.989
4 Anodised A1 P section 25 x 25mm (Heavy) 1 Runnin Rs. 57.00 2.75 156.75
Rs.531.94
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2435 54.7875
2 Helper 1 Day Rs. 169.00 0.2434 41.1346
Rs.95.92
After rounding off: Rs.737.70 Total Amount of M and L Rs.627.86
Add 17.5 % OH and CP Rs.109.88
Total Rs.737.74

ITEM No. 8132.02


PVC insulation panels 40 mm thick with EPS stuck to 1 mm plain PVCsheet suitably placed in false ceiling grid
made of aluminium/GI/MS asper specification and drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anodised A1 P section 25 x 25mm (Heavy) 1 Runnin Rs. 57.00 2.75 156.75
2 Anodised A1 angle 25x25mm(Heavy) 1 Runnin Rs. 32.00 1.1 35.2
3 Insulated panels 40mm having 1mm PVC sheet & 9mm EPS 1 Sqm Rs. 441.00 1 441
4 Screws and clips 100 No. Rs. 57.00 0.877 49.989
Rs.682.94
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2435 54.7875
2 Helper 1 Day Rs. 169.00 0.2435 41.1515
Rs.95.94
After rounding off: Rs.915.20 Total Amount of M and L Rs.778.88
Add 17.5 % OH and CP Rs.136.30
Total Rs.915.18

803 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8133.01
PVC insulation panels 10 mm thick with EPS stuck to 1 mm printed PVCsheet suitably placed in false ceiling grid
made of aluminium/GI/MS asper specification and drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Insulated panels 10mm having 1mm printed PVC sheet and 9mm EPS 1 Sqm Rs. 323.00 1 323
2 Anodised A1 angle 25x25mm(Heavy) 1 Runnin Rs. 32.00 1.1 35.2
3 Anodised A1 P section 25 x 25mm (Heavy) 1 Runnin Rs. 57.00 2.75 156.75
4 Screws and clips 100 No. Rs. 57.00 0.877 49.989
Rs.564.94
Labour
1 Helper 1 Day Rs. 169.00 0.2435 41.1515
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2435 54.7875
Rs.95.94
After rounding off: Rs.776.50 Total Amount of M and L Rs.660.88
Add 17.5 % OH and CP Rs.115.65
Total Rs.776.53

ITEM No. 8133.02


PVC insulation panels 40 mm thick with EPS stuck to 1 mm printed PVCsheet suitably placed in false ceiling grid
made of aluminium/GI/MS asper specification and drawing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Insulated panels 40 mm having 1mm printed PVC sheet and 9mm EPS 1 Sqm Rs. 489.00 1 489
2 Anodised A1 angle 25x25mm(Heavy) 1 Runnin Rs. 32.00 1.1 35.2
3 Anodised A1 P section 25 x 25mm (Heavy) 1 Runnin Rs. 57.00 2.75 156.75
4 Screws and clips 100 No. Rs. 57.00 0.878 50.046
Rs.731.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2435 54.7875
2 Helper 1 Day Rs. 169.00 0.2435 41.1515
Rs.95.94
After rounding off: Rs.971.60 Total Amount of M and L Rs.826.94
Add 17.5 % OH and CP Rs.144.71
Total Rs.971.65

ITEM No. 8134.01


All as per item 08132.01 and 08133.01 but without relevant PVC insulationpanel.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Helper 1 Day Rs. 169.00 0.2435 41.1515
2 Carpenter, joiner* 1 Day Rs. 225.00 0.2435 54.7875
Rs.95.94
After rounding off: Rs.112.70 Total Amount of M and L Rs.95.94
Add 17.5 % OH and CP Rs.16.79
Total Rs.112.73

804 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8134.02
All as per item 08132.02 and 08132A.02 but without relevant PVC insulationpanel.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.2435 54.7875
2 Helper 1 Day Rs. 169.00 0.2435 41.1515
Rs.95.94
After rounding off: Rs.112.70 Total Amount of M and L Rs.95.94
Add 17.5 % OH and CP Rs.16.79
Total Rs.112.73

ITEM No. 8135.01


52mm thick PVC Partition consisting of 12mm thick plain solid PVC plysheet reinforced with frame work made
from 40mm x 20mm MS tubes.In between two MS tubes, 5mm thick Plain heat moulded 'C channel ofsize
75mmx50mm with feathered edges shall be fixed on the floor, wall and ceiling. Plastic ply opanel shall be
inserted in the PVC 'C channel.The first & last MS tube should be errected such that it is inside a PVC 'C
channel, in between adjoining plastic panel, 5mm thick x75mm width plain PVC sheet feathered atedges shall
be stick on the front &back face using solvent cement complete.S &F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 52mm thick PVC Partition consisting of 12mm thick plain solid PVC 1 Sqm Rs. 1,002.55 1 1002.55
plastic plysheet complete
Rs.1,002.55
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0907 20.4075
2 Bellow/Carpenterboy 1 Day Rs. 169.00 0.0907 15.3283
Rs.35.74
After rounding off: Rs.1,220.00 Total Amount of M and L Rs.1,038.29
Add 17.5 % OH and CP Rs.181.70
Total Rs.1,219.99

ITEM No. 8135.02


52mm thick PVC Partition consisting of 12mm thick plain solid PVC plysheet reinforced with frame work made
from 40mm x 20mm MS tubes.In between two MS tubes, 5mm thick Plain heat moulded 'C channel ofsize
75mmx50mm with feathered edges shall be fixed on the floor, wall and ceiling. Plastic ply opanel shall be
inserted in the PVC 'C channel.The first & last MS tube should be errected such that it is inside a PVC 'C
channel, in between adjoining plastic panel, 5mm thick x75mm width plain PVC sheet feathered atedges shall
be stick on the front &back face using solvent cement complete.fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow/Carpenterboy 1 Day Rs. 169.00 0.0907 15.3283
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0907 20.4075
Rs.35.74
After rounding off: Rs.42.00 Total Amount of M and L Rs.35.74
Add 17.5 % OH and CP Rs.6.25
Total Rs.41.99

805 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8136.01
52mm thick PVC Partition consisting of 12mm thick plain solid PVC plysheet reinforced with frame work made
from 40mm x 20mm MS tubes.In between two MS tubes, 5mm thick Plain heat moulded 'C channel ofsize
75mmx50mm with feathered edges shall be fixed on the floor, wall and ceiling. Plastic ply opanel shall be
inserted in the PVC 'C channel.The first & last MS tube should be errected such that it is inside a PVC 'C
channel, in between adjoining plastic panel, 5mm thick x75mm width plain PVC sheet feathered atedges shall
be stick on the front &back face using solvent cement complete.S &F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 52mm thick PVC Partition consisting of 12mm thick printed solid PVC 1 Sqm Rs. 1,127.70 1 1127.7
plastic plysheet
Rs.1,127.70
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0907 20.4075
2 Bellow/Carpenterboy 1 Day Rs. 169.00 0.0907 15.3283
Rs.35.74
After rounding off: Rs.1,367.00 Total Amount of M and L Rs.1,163.44
Add 17.5 % OH and CP Rs.203.60
Total Rs.1,367.04

ITEM No. 8136.02


52mm thick PVC Partition consisting of 12mm thick both side printed solid PVC plysheet reinforced with frame
work made from 40mm x 20mm MS tubes.In between two MS tubes, 5mm thick both side printed heat
moulded 'C channel ofsize 75mmx50mm with feathered edges shall be fixed on the floor, wall and ceiling.
Plastic ply opanel shall be inserted in the PVC 'C channel.The first & last MS tube should be errected such that
it is inside a PVC 'C channel, in between adjoining plastic panel, 5mm thick x75mm width plain PVC sheet
feathered atedges shall be stick on the front &back face using solvent cement complete.fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow/Carpenterboy 1 Day Rs. 169.00 0.0907 15.3283
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0907 20.4075
Rs.35.74
After rounding off: Rs.42.00 Total Amount of M and L Rs.35.74
Add 17.5 % OH and CP Rs.6.25
Total Rs.41.99

806 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8137.01
52mm thick PVC Partition consisting of 12mm thick both side prelam PVC plastic plysheet reinforced with
frame work made from 40mm x 20mm MS tubes.In between two MS tubes, 5mm thick prelam heat moulded
'C channel ofsize 75mmx50mm with feathered edges shall be fixed on the floor, wall and ceiling. Plastic ply
opanel shall be inserted in the PVC 'C channel.The first & last MS tube should be errected such that it is inside
a PVC 'C channel, in between adjoining plastic panel, 5mm thick x75mm width plain PVC sheet feathered
atedges shall be stick on the front &back face using solvent cement complete.S &F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 52mm thick PVC Partition consisting of 12mm thick both side prelam 1 Sqm Rs. 1,218.70 1 1218.7
plastic plysheet
Rs.1,218.70
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.0907 20.4075
2 Bellow/Carpenterboy 1 Day Rs. 169.00 0.0907 15.3283
Rs.35.74
After rounding off: Rs.1,474.00 Total Amount of M and L Rs.1,254.44
Add 17.5 % OH and CP Rs.219.53
Total Rs.1,473.96

ITEM No. 8137.02


52mm thick PVC Partition consisting of 12mm thick both side prelam PVC plastic plysheet reinforced with
frame work made from 40mm x 20mm MS tubes.In between two MS tubes, 5mm thick prelam heat moulded
'C channel ofsize 75mmx50mm with feathered edges shall be fixed on the floor, wall and ceiling. Plastic ply
opanel shall be inserted in the PVC 'C channel.The first & last MS tube should be errected such that it is inside
a PVC 'C channel, in between adjoining plastic panel, 5mm thick x75mm width plain PVC sheet feathered
atedges shall be stick on the front &back face using solvent cement complete.Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bellow/Carpenterboy 1 Day Rs. 169.00 0.0907 15.3283
2 Carpenter, joiner* 1 Day Rs. 225.00 0.0907 20.4075
Rs.35.74
After rounding off: Rs.42.00 Total Amount of M and L Rs.35.74
Add 17.5 % OH and CP Rs.6.25
Total Rs.41.99

807 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8138
Solid PVC frame (Single Rebated) ofsize 60mm x 30mm made out of solidPVC foam with homogenous
finecellular structure having smooth outer integral skin with suitable metal stiffner and fixed with 100 x 8
sheet metal CSK screws complete all as specified and as shown on drawing (Note :- Door frame shall be water
proof, termite proof, elegant and should have excellent screws holding strength to fix hinges and hold doors
properly for a long life).S &F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Solid PVC frame (Single Rebated) of size 60mm x 30mm made out of 1 Runnin Rs. 415.00 1 415
solid PVC foam
Rs.415.00
Labour
1 Bellow/Carpenterboy 1 Day Rs. 169.00 0.09 15.21
2 Carpenter, joiner* 1 Day Rs. 225.00 0.09 20.25
Rs.35.46
Sundry
1 Sundry 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.529.90 Total Amount of M and L Rs.451.00
Add 17.5 % OH and CP Rs.78.93
Total Rs.529.93

ITEM No. 8139


Factory made soild PVC profiled panel door shutter 28mm thick with integral skin as frame & 3mm thick high
pressure compact laminate on both side of approved colour as infill, with 'C type Gl or 40 x 20 x19 of MSpipe
as stiffner & supplying & fixing in frame at site as per specifications & drawing.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Factory made soild PVC profiled panel door shutter 28mm thick with 1 Sqm Rs. 1,717.00 1 1717
integral skin as frame & 3mm thick high pressure compact laminate
Rs.1,717.00
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.08 18
2 Bellow/Carpenterboy 1 Day Rs. 169.00 0.08 13.52
Rs.31.52
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.2,055.70 Total Amount of M and L Rs.1,749.51
Add 17.5 % OH and CP Rs.306.16
Total Rs.2,055.67

808 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Joinery
ITEM No. 8140
Supply and fix 30mm thick single piece, coloured ABC (ACRYLONITRILE BRUTADINE STYRENE) coated, PUF filled
door shutters with PUF (Poly Urethane Foam) insulation of minimum density 40 Kg/Cum filled in between two
ABS sheets of thickness 1.2mm (min), border
covered with insitu pasted ABS strips of width equal to thickness of door shutters, 1.2mm thickness, reinforced
with two number 10mm CTD bars, preembedded with wooden blocks of suitable sizes for receiving hinges,
tower / sliding bolts, towel rails, handles etc, with/without embossed pattern.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 30mm thick single piece, coloured ABC (ACRYLONITRILE BRUTADINE 1 Sqm Rs. 1,509.50 1 1509.5
STYRENE) coated, PUF filled door shutters
Rs.1,509.50
Labour
1 Bellow/Carpenterboy 1 Day Rs. 169.00 0.08 13.52
2 Carpenter, joiner* 1 Day Rs. 225.00 0.08 18
Rs.31.52
Sundry
1 Sundry 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.1,811.80 Total Amount of M and L Rs.1,541.92
Add 17.5 % OH and CP Rs.269.84
Total Rs.1,811.76

ITEM No. 8141


Supply and fix 30mm thick single piece, coloured ABC (ACRYLONITRILE BRUTADINE STYRENE) coated, PUF filled
window shutters with PUF (Poly Urethane Foam) insulation of minimum density 40 Kg/Cum filled in between
two ABS sheets of thickness 1.2mm (min), border
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 30mm thick single piece, coloured ABC (ACRYLONITRILE BRUTADINE 1 Sqm Rs. 1,514.50 1 1514.5
STYRENE) coated, PUF filled window shutters
Rs.1,514.50
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.08 18
2 Bellow/Carpenterboy 1 Day Rs. 169.00 0.08 13.52
Rs.31.52
Sundry
1 Sundry 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.1,817.80 Total Amount of M and L Rs.1,547.10
Add 17.5 % OH and CP Rs.270.74
Total Rs.1,817.84

809 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9001.01
Mild steel barrel tower bolts, stove enamelled black with brightbolt and fixed length of bolt 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS barrel tower bolt stove enameled 75mm length 1 No. Rs. 6.20 1 6.2
Rs.9.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.18.70 Total Amount of M and L Rs.15.95
Add 17.5 % OH and CP Rs.2.79
Total Rs.18.74

ITEM No. 9001.02


Mild steel barrel tower bolts, stove enamelled black, with bright bolt and fixed Length of bolt 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS barrel tower bolt stove enamelled 100mm length 1 No. Rs. 9.05 1 9.05
Rs.12.05
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.8.55
After rounding off: Rs.24.20 Total Amount of M and L Rs.20.60
Add 17.5 % OH and CP Rs.3.61
Total Rs.24.21

ITEM No. 9001.03


Mild steel barrel tower bolts, stove enamelled black with brightbolt and fixed length of bolt 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS barrel tower bolt stove enameled 125mm length 1 No. Rs. 9.60 1 9.6
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.13.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0418 9.405
Rs.9.41
After rounding off: Rs.27.00 Total Amount of M and L Rs.23.01
Add 17.5 % OH and CP Rs.4.03
Total Rs.27.03

810 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9001.04
Mild steel barrel tower bolts, stove enamelled black with brightbolt and fixed length of bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS barrel tower bolt stove enameled 150mm length 1 No. Rs. 14.70 1 14.7
Rs.18.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0415 9.3375
Rs.9.34
After rounding off: Rs.32.90 Total Amount of M and L Rs.28.04
Add 17.5 % OH and CP Rs.4.91
Total Rs.32.94

ITEM No. 9001.05


Mild steel barrel tower bolts, stove enamelled black with brightbolt and fixed length of bolt 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS barrel tower bolt stove enameled 200mm length 1 No. Rs. 17.40 1 17.4
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.21.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.047 10.575
Rs.10.58
After rounding off: Rs.37.60 Total Amount of M and L Rs.31.98
Add 17.5 % OH and CP Rs.5.60
Total Rs.37.57

ITEM No. 9001.06


Mild steel barrel tower bolts, stove enamelled black with brightbolt and fixed length of bolt 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS barrel tower bolt stove enameled 300mm length 1 No. Rs. 20.65 1 20.65
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.24.65
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.42.20 Total Amount of M and L Rs.35.90
Add 17.5 % OH and CP Rs.6.28
Total Rs.42.18

811 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9002.01
Brass barrel tower bolts, with cast or sheet barrel rolled or cast bolt andfixed length of bolt 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Brass Tower Bolt 75mm length 1 No. Rs. 23.40 1 23.4
Rs.26.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.39.00 Total Amount of M and L Rs.33.15
Add 17.5 % OH and CP Rs.5.80
Total Rs.38.95

ITEM No. 9002.02


Brass barrel tower bolt with cast or sheet barrel rolled or cast bolt andfixed length of bolt 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Tower Bolt 100mm length 1 No. Rs. 36.10 1 36.1
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.39.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.8.55
After rounding off: Rs.56.00 Total Amount of M and L Rs.47.65
Add 17.5 % OH and CP Rs.8.34
Total Rs.55.99

ITEM No. 9002.03


Brass barrel tower bolt with cast or sheet barrel rolled or cast bolt andfixed length of bolt 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Brass Tower Bolt 125mm length 1 No. Rs. 43.90 1 43.9
Rs.47.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0418 9.405
Rs.9.41
After rounding off: Rs.67.30 Total Amount of M and L Rs.57.31
Add 17.5 % OH and CP Rs.10.03
Total Rs.67.33

812 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9002.04
Brass barrel tower bolt with cast or sheet barrel rolled or cast bolt andfixed length of bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Brass Tower Bolt 150mm length 1 No. Rs. 52.85 1 52.85
Rs.56.85
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.045 10.125
Rs.10.13
After rounding off: Rs.78.70 Total Amount of M and L Rs.66.98
Add 17.5 % OH and CP Rs.11.72
Total Rs.78.70

ITEM No. 9002.05


Brass barrel tower bolt with cast or sheet barrel rolled or cast bolt andfixed length of bolt 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Brass Tower Bolt 200mm length 1 No. Rs. 77.40 1 77.4
Rs.81.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.047 10.575
Rs.10.58
After rounding off: Rs.108.10 Total Amount of M and L Rs.91.98
Add 17.5 % OH and CP Rs.16.10
Total Rs.108.07

ITEM No. 9002.06


Brass barrel tower bolt with cast or sheet barrel rolled or cast bolt andfixed length of bolt 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Tower Bolt 300mm length 1 No. Rs. 97.60 1 97.6
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.101.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.132.60 Total Amount of M and L Rs.112.85
Add 17.5 % OH and CP Rs.19.75
Total Rs.132.60

813 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9003.01
Brass barrel tower bolt with barrel of extruded section Length of bolt 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Brass Tower bolt extruded section 75mm length 1 No. Rs. 26.10 1 26.1
Rs.29.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.42.10 Total Amount of M and L Rs.35.85
Add 17.5 % OH and CP Rs.6.27
Total Rs.42.12

ITEM No. 9003.02


Brass barrel tower bolt with barrel of extruded section Length of bolt 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Brass Tower bolt extruded section 100mm length 1 No. Rs. 36.75 1 36.75
Rs.39.75
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.8.55
After rounding off: Rs.56.80 Total Amount of M and L Rs.48.30
Add 17.5 % OH and CP Rs.8.45
Total Rs.56.75

ITEM No. 9003.03


Brass barrel tower bolt with barrel of extruded section Length of bolt 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Tower bolt extruded section 125mm length 1 No. Rs. 46.50 1 46.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.50.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0418 9.405
Rs.9.41
After rounding off: Rs.70.40 Total Amount of M and L Rs.59.91
Add 17.5 % OH and CP Rs.10.48
Total Rs.70.39

814 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9003.04
Brass barrel tower bolt with barrel of extruded section Length of bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Brass Tower bolt extruded section 150mm length 1 No. Rs. 60.00 1 60
Rs.64.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.045 10.125
Rs.10.13
After rounding off: Rs.87.10 Total Amount of M and L Rs.74.13
Add 17.5 % OH and CP Rs.12.97
Total Rs.87.10

ITEM No. 9003.05


Brass barrel tower bolt with barrel of extruded section Length of bolt 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Tower bolt extruded section 200mm length 1 No. Rs. 82.40 1 82.4
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.86.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.047 10.575
Rs.10.58
After rounding off: Rs.113.90 Total Amount of M and L Rs.96.98
Add 17.5 % OH and CP Rs.16.97
Total Rs.113.95

ITEM No. 9003.06


Brass barrel tower bolt with barrel of extruded section Length of bolt 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Brass Tower bolt extruded section 300mm length 1 No. Rs. 101.70 1 101.7
Rs.105.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.137.40 Total Amount of M and L Rs.116.95
Add 17.5 % OH and CP Rs.20.47
Total Rs.137.42

815 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9004.01
Aluminium, anodised, barrel tower bolts of extruded section and fixedlength of bolt 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt Barrel tower, Aluminium anodized 75mm 1 No. Rs. 9.70 1 9.7
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.12.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.22.90 Total Amount of M and L Rs.19.45
Add 17.5 % OH and CP Rs.3.40
Total Rs.22.85

ITEM No. 9004.02


Aluminium, anodised, barrel tower bolts of extruded section and fixedlength of bolt 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt Barrel tower, Aluminium anodized 100mm 1 No. Rs. 12.00 1 12
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.15.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.8.55
After rounding off: Rs.27.70 Total Amount of M and L Rs.23.55
Add 17.5 % OH and CP Rs.4.12
Total Rs.27.67

ITEM No. 9004.03


Aluminium, anodised, barrel tower bolts of extruded section and fixedlength of bolt 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt Barrel tower, Aluminium anodized 125mm 1 No. Rs. 15.50 1 15.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.19.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0418 9.405
Rs.9.41
After rounding off: Rs.34.00 Total Amount of M and L Rs.28.91
Add 17.5 % OH and CP Rs.5.06
Total Rs.33.96

816 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9004.04
Aluminium, anodised, barrel tower bolts of extruded section and fixedlength of bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Bolt Barrel tower, Aluminium anodized 150mm 1 No. Rs. 17.85 1 17.85
Rs.21.85
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.045 10.125
Rs.10.13
After rounding off: Rs.37.60 Total Amount of M and L Rs.31.98
Add 17.5 % OH and CP Rs.5.60
Total Rs.37.57

ITEM No. 9004.05


Aluminium, anodised, barrel tower bolts of extruded section and fixedlength of bolt 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Bolt Barrel tower, Aluminium anodized 200mm 1 No. Rs. 30.35 1 30.35
Rs.34.35
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.047 10.575
Rs.10.58
After rounding off: Rs.52.80 Total Amount of M and L Rs.44.93
Add 17.5 % OH and CP Rs.7.86
Total Rs.52.79

ITEM No. 9004.06


Aluminium, anodised, barrel tower bolts of extruded section and fixedlength of bolt 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Bolt Barrel tower, Aluminium anodized 300mm 1 No. Rs. 30.70 1 30.7
Rs.34.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.54.00 Total Amount of M and L Rs.45.95
Add 17.5 % OH and CP Rs.8.04
Total Rs.53.99

817 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9005.01
Mild steel, semi barrel tower bolt, open cover, with sheet pressed barrel, stove enamelled black with bright
bolts and fixed length of bolt 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS Semi Barrel tower bolt 75mm 1 No. Rs. 3.50 1 3.5
Rs.6.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.15.60 Total Amount of M and L Rs.13.25
Add 17.5 % OH and CP Rs.2.32
Total Rs.15.57

ITEM No. 9005.02


Mild steel, semi barrel tower bolt, open cover, with sheet pressed barrel, stove enamelled black with bright
bolts and fixed length of bolt 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS Semi Barrel tower bolt 100mm 1 No. Rs. 4.00 1 4
Rs.7.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.8.55
After rounding off: Rs.18.30 Total Amount of M and L Rs.15.55
Add 17.5 % OH and CP Rs.2.72
Total Rs.18.27

ITEM No. 9005.03


Mild steel, semi barrel tower bolt, open cover, with sheet pressed barrel, stove enamelled black with bright
bolts and fixed length of bolt 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Semi Barrel tower bolt 125mm 1 No. Rs. 5.15 1 5.15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.9.15
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0418 9.405
Rs.9.41
After rounding off: Rs.21.80 Total Amount of M and L Rs.18.56
Add 17.5 % OH and CP Rs.3.25
Total Rs.21.80

818 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9005.04
Mild steel, semi barrel tower bolt, open cover, with sheet pressed barrel, stove enamelled black with bright
bolts and fixed length of bolt 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS Semi Barrel tower bolt 150mm 1 No. Rs. 8.90 1 8.9
Rs.12.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.045 10.125
Rs.10.13
After rounding off: Rs.27.10 Total Amount of M and L Rs.23.03
Add 17.5 % OH and CP Rs.4.03
Total Rs.27.05

ITEM No. 9005.05


Mild steel, semi barrel tower bolt, open cover, with sheet pressed barrel, stove enamelled black with bright
bolts and fixed length of bolt 200 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Semi Barrel tower bolt 200mm 1 No. Rs. 13.00 1 13
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.17.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.047 10.575
Rs.10.58
After rounding off: Rs.32.40 Total Amount of M and L Rs.27.58
Add 17.5 % OH and CP Rs.4.83
Total Rs.32.40

ITEM No. 9005.06


Mild steel, semi barrel tower bolt, open cover, with sheet pressed barrel, stove enamelled black with bright
bolts and fixed length of bolt 300 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Semi Barrel tower bolt 300mm 1 No. Rs. 17.00 1 17
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.21.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.37.90 Total Amount of M and L Rs.32.25
Add 17.5 % OH and CP Rs.5.64
Total Rs.37.89

819 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9006.01
Mild steel, semi barrel tower bolt, riveted or spot welded type with pack plates with bright bolt and open
staple and fixed length of bolt 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS Semi Barrel tower bolt riv/welded 75mm 1 No. Rs. 2.70 1 2.7
Rs.5.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.14.60 Total Amount of M and L Rs.12.45
Add 17.5 % OH and CP Rs.2.18
Total Rs.14.63

ITEM No. 9006.02


Mild steel, semi tower bolt, riveted or spot welded type with pack plates,with bright bolt and open staple and
fixed length of bolt 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Semi Barrel tower bolt riv/welded 100mm 1 No. Rs. 2.75 1 2.75
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.5.75
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.8.55
After rounding off: Rs.16.80 Total Amount of M and L Rs.14.30
Add 17.5 % OH and CP Rs.2.50
Total Rs.16.80

ITEM No. 9006.03


Mild steel, semi tower bolt, riveted or spot welded type with pack plates,with bright bolt and open staple and
fixed length of bolt 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS Semi Barrel tower bolt riv/welded 125mm 1 No. Rs. 3.15 1 3.15
Rs.6.15
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0418 9.405
Rs.9.41
After rounding off: Rs.18.30 Total Amount of M and L Rs.15.56
Add 17.5 % OH and CP Rs.2.72
Total Rs.18.28

820 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9006.04
Mild steel, semi tower bolt, riveted or spot welded type with pack plates,with bright bolt and open staple and
fixed length of bolt 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS Semi Barrel tower bolt riv/welded 150mm 1 No. Rs. 3.20 1 3.2
Rs.7.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.045 10.125
Rs.10.13
After rounding off: Rs.20.40 Total Amount of M and L Rs.17.33
Add 17.5 % OH and CP Rs.3.03
Total Rs.20.36

ITEM No. 9006.05


Mild steel, semi barrel tower bolt, riveted or spot welded type with pack plates with bright bolt and open
staple and fixed length of bolt 200 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS Tower bolt barrel riv/welded 200 mm 1 No. Rs. 6.55 1 6.55
Rs.10.55
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.047 10.575
Rs.10.58
After rounding off: Rs.24.80 Total Amount of M and L Rs.21.13
Add 17.5 % OH and CP Rs.3.70
Total Rs.24.82

ITEM No. 9006.06


Mild steel, semi barrel tower bolt, riveted or spot welded type with pack plates with bright bolt and open
staple and fixed length of bolt 300 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Tower bolt barrel riv/welded 300 mm 1 No. Rs. 8.10 1 8.1
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.12.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.27.40 Total Amount of M and L Rs.23.35
Add 17.5 % OH and CP Rs.4.09
Total Rs.27.44

821 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9007.02
Brass flush, bolt, type 2 and fixed flush length of bolt 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Brass Flush Bolt 100mm length 1 No. Rs. 56.60 1 56.6
Rs.59.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.8.55
After rounding off: Rs.80.10 Total Amount of M and L Rs.68.15
Add 17.5 % OH and CP Rs.11.93
Total Rs.80.08

ITEM No. 9008.02


Aluminium flush bolt, type 2 anodised and fixed flush length of bolt 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Alu alloy flush bolt 100mm 1 No. Rs. 31.45 1 31.45
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.34.45
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.8.55
After rounding off: Rs.50.50 Total Amount of M and L Rs.43.00
Add 17.5 % OH and CP Rs.7.53
Total Rs.50.53

ITEM No. 9008.03


Aluminium flush bolt, type 2 anodised and fixed flush length of bolt 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Alu alloy flush bolt 125mm 1 No. Rs. 35.25 1 35.25
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.38.25
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0418 9.405
Rs.9.41
After rounding off: Rs.56.00 Total Amount of M and L Rs.47.66
Add 17.5 % OH and CP Rs.8.34
Total Rs.55.99

822 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9009.01
Fixing only of any of the foregoing items, length of bolt 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.11.50 Total Amount of M and L Rs.9.75
Add 17.5 % OH and CP Rs.1.71
Total Rs.11.46

ITEM No. 9009.02


Fixing only of any of the foregoing items, length of bolt 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.038 8.55
Rs.8.55
After rounding off: Rs.13.60 Total Amount of M and L Rs.11.55
Add 17.5 % OH and CP Rs.2.02
Total Rs.13.57

ITEM No. 9009.03


Fixing only of any of the foregoing items, length of bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0418 9.405
Rs.9.41
After rounding off: Rs.15.80 Total Amount of M and L Rs.13.41
Add 17.5 % OH and CP Rs.2.35
Total Rs.15.75

823 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9009.04
Fixing only of any of the foregoing items, length of bolt 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.045 10.125
Rs.10.13
After rounding off: Rs.16.60 Total Amount of M and L Rs.14.13
Add 17.5 % OH and CP Rs.2.47
Total Rs.16.60

ITEM No. 9009.05


Fixing only of any of the foregoing items, length of bolt 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.047 10.575
Rs.10.58
After rounding off: Rs.17.10 Total Amount of M and L Rs.14.58
Add 17.5 % OH and CP Rs.2.55
Total Rs.17.13

ITEM No. 9009.06


Fixing only of any of the foregoing items, length of bolt 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.17.90 Total Amount of M and L Rs.15.25
Add 17.5 % OH and CP Rs.2.67
Total Rs.17.92

ITEM No. 9010.01


Add to any of the foregoing items if fixed in repairs, length of bolt 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.3.15
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.15
Add 17.5 % OH and CP Rs.0.55
Total Rs.3.70

824 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9010.02
Add to any of the foregoing items if fixed in repairs, length of bolt 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.3.15
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.15
Add 17.5 % OH and CP Rs.0.55
Total Rs.3.70

ITEM No. 9010.03


Add to any of the foregoing items if fixed in repairs, length of bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.3.15
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.15
Add 17.5 % OH and CP Rs.0.55
Total Rs.3.70

ITEM No. 9010.04


Add to any of the foregoing items if fixed in repairs, length of bolt 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9010.05


Add to any of the foregoing items if fixed in repairs, length of bolt 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9010.06


Add to any of the foregoing items if fixed in repairs, length of bolt 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

825 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9011.01
Mild steel skelton tower bolts with steel sheet pressed plate and staple stove enamelled black, and mild steel
bright bolt and fixed Length of bolt.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Skele6 tower bolts 375mm length 1 No. Rs. 32.85 1 32.85
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.35.85
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.50.30 Total Amount of M and L Rs.42.83
Add 17.5 % OH and CP Rs.7.49
Total Rs.50.32

ITEM No. 9011.02


Mild steel skelton tower bolts with steel sheet pressed plate and staple stove enamelled black, and mild steel
bright bolt and fixed Length of bolt.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Skele6 tower bolts 450mm length 1 No. Rs. 32.50 1 32.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.37.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.55.20 Total Amount of M and L Rs.46.95
Add 17.5 % OH and CP Rs.8.22
Total Rs.55.17

ITEM No. 9011.03


Mild steel skelton tower bolts with steel sheet pressed plate and staple stove enamelled black, and mild steel
bright bolt and fixed Length of bolt.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 MS Skele6 tower bolts 600mm length 1 No. Rs. 45.20 1 45.2
Rs.50.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.70.10 Total Amount of M and L Rs.59.65
Add 17.5 % OH and CP Rs.10.44
Total Rs.70.09

826 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9012.01
Brass skeleton tower bolts with cast brass plate and staples and rolled ordrown brass bolt and fixed length of
bolt 375mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Brass POL skeleton tower bolt 375mm 1 No. Rs. 325.00 1 325
Rs.330.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0419 9.4275
Rs.9.43
After rounding off: Rs.398.80 Total Amount of M and L Rs.339.43
Add 17.5 % OH and CP Rs.59.40
Total Rs.398.83

ITEM No. 9012.02


Brass skeleton tower bolts with cast brass plate and staples and rolled ordrown brass bolt and fixed length of
bolt 450mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Brass POL skeleton tower bolt 450mm 1 No. Rs. 447.20 1 447.2
Rs.452.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.542.40 Total Amount of M and L Rs.461.65
Add 17.5 % OH and CP Rs.80.79
Total Rs.542.44

ITEM No. 9012.03


Brass skeleton tower bolts with cast brass plate and staples and rolled ordrown brass bolt and fixed length of
bolt 600mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Brass POL skeleton tower bolt 600mm 1 No. Rs. 699.70 1 699.7
Rs.704.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.839.10 Total Amount of M and L Rs.714.15
Add 17.5 % OH and CP Rs.124.98
Total Rs.839.13

827 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9013.01
Ditto as item No 09012 extruded section and rolled or drawn brass bolt andfixed length of bolt 375 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass tower bolt extruded SEC 375mm 1 No. Rs. 356.95 1 356.95
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.361.95
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.436.40 Total Amount of M and L Rs.371.40
Add 17.5 % OH and CP Rs.65.00
Total Rs.436.40

ITEM No. 9013.02


Ditto as item No 09012 extruded section and rolled or drawn brass bolt andfixed length of bolt 450 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Brass tower bolt extruded SEC 450mm 1 No. Rs. 497.50 1 497.5
Rs.502.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.601.50 Total Amount of M and L Rs.511.95
Add 17.5 % OH and CP Rs.89.59
Total Rs.601.54

ITEM No. 9013.03


Ditto as item No 09012 extruded section and rolled or drawn brass bolt andfixed length of bolt 600 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass tower bolt extruded SEC 600mm 1 No. Rs. 764.95 1 764.95
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.769.95
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.915.80 Total Amount of M and L Rs.779.40
Add 17.5 % OH and CP Rs.136.40
Total Rs.915.80

828 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9014.01
Aluminium anodised,m skelton tower bolts with plate,staples and bolt of extruded section and fixed length of
bolt 375 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt Skele6 Tower, Aluminium anodized 375mm 1 No. Rs. 80.00 1 80
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.85.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.111.00 Total Amount of M and L Rs.94.45
Add 17.5 % OH and CP Rs.16.53
Total Rs.110.98

ITEM No. 9014.02


Aluminium anodised,m skelton tower bolts with plate,staples and bolt of extruded section and fixed length of
bolt 450 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt Skele6 Tower, Aluminium anodized 450mm 1 No. Rs. 91.00 1 91
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.96.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.123.90 Total Amount of M and L Rs.105.45
Add 17.5 % OH and CP Rs.18.45
Total Rs.123.90

ITEM No. 9014.03


Aluminium anodised,m skelton tower bolts with plate,staples and bolt of extruded section and fixed length of
bolt 600 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt Skele6 Tower, Aluminium anodized 600mm 1 No. Rs. 110.00 1 110
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.15 7.5
Rs.117.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.149.20 Total Amount of M and L Rs.126.95
Add 17.5 % OH and CP Rs.22.22
Total Rs.149.17

829 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9015.01
Fixing only, items 09011 to 09014 length of bolt 375 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.5.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.17.00 Total Amount of M and L Rs.14.45
Add 17.5 % OH and CP Rs.2.53
Total Rs.16.98

ITEM No. 9015.02


Fixing only, items 09011 to 09014 ) length of bolt 450 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.5.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.17.00 Total Amount of M and L Rs.14.45
Add 17.5 % OH and CP Rs.2.53
Total Rs.16.98

ITEM No. 9015.03


Fixing only, items 09011 to 09014 length of bolt 600 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.5.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.042 9.45
Rs.9.45
After rounding off: Rs.17.00 Total Amount of M and L Rs.14.45
Add 17.5 % OH and CP Rs.2.53
Total Rs.16.98

ITEM No. 9016.01


Add to items 09011 to 09015 if fixed in repairs Length of bolt375 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.3.15
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.15
Add 17.5 % OH and CP Rs.0.55
Total Rs.3.70

830 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9016.02
Add to items 09011 to 09015 if fixed in repairs Length of bolt450 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.3.15
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.15
Add 17.5 % OH and CP Rs.0.55
Total Rs.3.70

ITEM No. 9016.03


Add to items 09011 to 09015 if fixed in repairs Length of bolt 600 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.3.15
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.15
Add 17.5 % OH and CP Rs.0.55
Total Rs.3.70

ITEM No. 9017.01


Mild steel sliding door bolts, plate type, stove enamelled black withbright bolt not less than 12mm dia with
and including a minimum of 6 bolts and nuts, four on bolt plate and two on staple plate and fixed .Length of
bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Nut bolts 1 No. Rs. 2.50 6 15
3 MS sliding door bolt 150mm 1 No. Rs. 45.00 1 45
Rs.65.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.89.60 Total Amount of M and L Rs.76.25
Add 17.5 % OH and CP Rs.13.34
Total Rs.89.59

831 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9017.02
Mild steel sliding door bolts, plate type, stove enamelled black withbright bolt not less than 12mm dia with
and including a minimum of 6 bolts and nuts, four on bolt plate and two on staple plate and fixed .Length of
bolt 200mm..
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 MS sliding Door bolt 200mm length 1 No. Rs. 55.00 1 55
3 Nut bolts 1 No. Rs. 2.50 6 15
Rs.75.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.101.30 Total Amount of M and L Rs.86.25
Add 17.5 % OH and CP Rs.15.09
Total Rs.101.34

ITEM No. 9017.03


Mild steel sliding door bolts, plate type, stove enamelled black withbright bolt not less than 12mm dia with
and including a minimum of 6 bolts and nuts, four on bolt plate and two on staple plate and fixed .Length of
bolt 250mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 MS sliding Door bolt 250mm length 1 No. Rs. 65.00 1 65
3 Nut bolts 1 No. Rs. 2.50 6 15
Rs.85.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.113.10 Total Amount of M and L Rs.96.25
Add 17.5 % OH and CP Rs.16.84
Total Rs.113.09

832 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9017.04
Mild steel sliding door bolts, plate type, stove enamelled black withbright bolt not less than 12mm dia with
and including a minimum of 6 bolts and nuts, four on bolt plate and two on staple plate and fixed .Length of
bolt 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 MS sliding Door bolt 300mm length 1 No. Rs. 120.00 1 120
3 Nut bolts 1 No. Rs. 2.50 6 15
Rs.140.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.177.70 Total Amount of M and L Rs.151.25
Add 17.5 % OH and CP Rs.26.47
Total Rs.177.72

ITEM No. 9017.05


Mild steel sliding door bolts, plate type, stove enamelled black withbright bolt not less than 12mm dia with
and including a minimum of6 bolts and nuts, four on bolt plate and two on staple plate and fixed .Length of
bolt 375mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS sliding Door bolt 375mm length 1 No. Rs. 135.00 1 135
2 Nut bolts 1 No. Rs. 2.50 6 15
3 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.14 7
Rs.157.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.054 12.15
Rs.12.15
After rounding off: Rs.198.80 Total Amount of M and L Rs.169.15
Add 17.5 % OH and CP Rs.29.60
Total Rs.198.75

ITEM No. 9018.01


Brass, sliding door bolt with sand or die -cast brass hasp, staple (bolt type ) and fixing bolt with rolled or down
brass and fixed.Length of bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass sliding Door bolt 150mm length 1 No. Rs. 280.00 1 280
2 Nut bolts 1 No. Rs. 2.50 6 15
3 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.300.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.365.70 Total Amount of M and L Rs.311.25
Add 17.5 % OH and CP Rs.54.47
Total Rs.365.72
833 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9018.02
Brass, sliding door bolt with sand or die -cast brass hasp, staple (bolt type ) and fixing bolt with rolled or down
brass and fixed.Length of bolt 200mm..
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Brass sliding Door bolt 200mm length 1 No. Rs. 300.00 1 300
3 Nut bolts 1 No. Rs. 2.50 6 15
Rs.320.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.389.20 Total Amount of M and L Rs.331.25
Add 17.5 % OH and CP Rs.57.97
Total Rs.389.22

ITEM No. 9018.03


Brass, sliding door bolt with sand or die -cast brass hasp, staple (bolt type ) and fixing bolt with rolled or down
brass.Length of bolt 250mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass sliding Door bolt 250mm length 1 No. Rs. 320.00 1 320
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
3 Nut bolts 1 No. Rs. 2.50 6 15
Rs.340.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.412.70 Total Amount of M and L Rs.351.25
Add 17.5 % OH and CP Rs.61.47
Total Rs.412.72

ITEM No. 9018.04


Brass, sliding door bolt with sand or die -cast brass hasp, staple (bolt type ) and fixing bolt with rolled or down
brass and fixed.Length of bolt 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Nut bolts 1 No. Rs. 2.50 6 15
3 Brass sliding Door bolt 300mm length 1 No. Rs. 380.00 1 380
Rs.400.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.483.20 Total Amount of M and L Rs.411.25
Add 17.5 % OH and CP Rs.71.97
Total Rs.483.22

834 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9018.05
Brass, sliding door bolt with sand or die -cast brass hasp, staple (bolt type ) and fixing bolt with rolled or down
brass and fixed.Length of bolt 375mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.14 7
2 Nut bolts 1 No. Rs. 2.50 6 15
3 Brass sliding Door bolt 375mm length 1 No. Rs. 410.00 1 410
Rs.432.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0653 14.6925
Rs.14.69
After rounding off: Rs.524.90 Total Amount of M and L Rs.446.69
Add 17.5 % OH and CP Rs.78.17
Total Rs.524.86

ITEM No. 9019.01


Aluminium alloy, anodised, sliding door bolt with hasp, staple (bolt type)and fixing clips of sheet, cast or
extruded sections and fixing bolts and fixing bolts and sliding bolts of extruded sections or cast-aluminium
alloy and fixed.Length of bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Bolt (Door) Aluminium and SOLD 150mm length 1 No. Rs. 65.00 1 65
3 Nut bolts 1 No. Rs. 2.50 6 15
Rs.85.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.113.10 Total Amount of M and L Rs.96.25
Add 17.5 % OH and CP Rs.16.84
Total Rs.113.09

ITEM No. 9019.02


Aluminium alloy, anodised, sliding door bolt with hasp, staple (bolt type)and fixing clips of sheet, cast or
extruded sections and fixing bolts and fixing bolts and sliding bolts of extruded sections or cast-aluminium
alloy and fixed.Length of bolt 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt (Door) Aluminium and SOLD 200mm length 1 No. Rs. 75.00 1 75
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
3 Nut bolts 1 No. Rs. 2.50 6 15
Rs.95.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.124.80 Total Amount of M and L Rs.106.25
Add 17.5 % OH and CP Rs.18.59
Total Rs.124.84
835 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9019.03
Aluminium alloy, anodised, sliding door bolt with hasp, staple (bolt type)and fixing clips of sheet, cast or
extruded sections and fixing bolts and fixing bolts and sliding bolts of extruded sections or cast-aluminium
alloy and fixed.Length of bolt 250 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nut bolts 1 No. Rs. 2.50 6 15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
3 Bolt (Door) Aluminium and SOLD 250mm length 1 No. Rs. 90.00 1 90
Rs.110.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.142.50 Total Amount of M and L Rs.121.25
Add 17.5 % OH and CP Rs.21.22
Total Rs.142.47

ITEM No. 9019.04


Aluminium alloy, anodised, sliding door bolt with hasp, staple (bolt type)and fixing clips of sheet, cast or
extruded sections and fixing bolts and fixing bolts and sliding bolts of extruded sections or cast-aluminium
alloy and fixed.Length of bolt 300 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt (Door) Aluminium and SOLD 350mm length 1 No. Rs. 110.00 1 110
2 Nut bolts 1 No. Rs. 2.50 6 15
3 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.130.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.166.00 Total Amount of M and L Rs.141.25
Add 17.5 % OH and CP Rs.24.72
Total Rs.165.97

836 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9019.05
Aluminium alloy, anodised, sliding door bolt with hasp, staple (bolt type)and fixing clips of sheet, cast or
extruded sections and fixing bolts and fixing bolts and sliding bolts of extruded sections or cast-aluminium
alloy and fixed.Length of bolt 375 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt (Door) Aluminium and SOLD 375mm length 1 No. Rs. 125.00 1 125
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.15 7.5
3 Nut bolts 1 No. Rs. 2.50 6 15
Rs.147.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.190.00 Total Amount of M and L Rs.161.68
Add 17.5 % OH and CP Rs.28.29
Total Rs.189.97

ITEM No. 9020.01


Fixing only, item 09017 to 09019 Length of bolt 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Nut bolts 1 No. Rs. 2.50 6 15
Rs.20.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.36.70 Total Amount of M and L Rs.31.25
Add 17.5 % OH and CP Rs.5.47
Total Rs.36.72

ITEM No. 9020.02


Fixing only, item 09017 to 09019 , Length of bolt 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Nut bolts 1 No. Rs. 2.50 6 15
Rs.20.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.36.70 Total Amount of M and L Rs.31.25
Add 17.5 % OH and CP Rs.5.47
Total Rs.36.72

837 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9020.03
Fixing only, item 09017 to 09019 , Length of bolt 250mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Nut bolts 1 No. Rs. 2.50 6 15
Rs.20.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.36.70 Total Amount of M and L Rs.31.25
Add 17.5 % OH and CP Rs.5.47
Total Rs.36.72

ITEM No. 9020.04


Fixing only, item 09017 to 09019 Length of bolt 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nut bolts 1 No. Rs. 2.50 6 15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.20.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.36.70 Total Amount of M and L Rs.31.25
Add 17.5 % OH and CP Rs.5.47
Total Rs.36.72

ITEM No. 9020.05


Fixing only, item 09017 to 09019 , Length of bolt 375mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Nut bolts 1 No. Rs. 2.50 6 15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.15 7.5
Rs.22.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.43.10 Total Amount of M and L Rs.36.68
Add 17.5 % OH and CP Rs.6.42
Total Rs.43.09

838 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9021.01
Add to item 09017 to 09020 , if fixed in repairs. Length of bolt 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9021.02


Add to item 09017 to 09020 , if fixed in repairs. Length of bolt 200 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9021.03


Add to item 09017 to 09020 ( 0017 to 0029 ), if fixed in repairs. Length of bolt 250 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9021.04


Add to item 09017 to 09020 , if fixed in repairs. Length of bolt 300 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9021.05


Add to item 09017 to 09020, if fixed in repairs. Length of bolt 375 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0208 4.68
Rs.4.68
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.68
Add 17.5 % OH and CP Rs.0.82
Total Rs.5.50

839 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9022.01
Steel locking bolts with mild steel electrogalvanised plateand bright bolt not lees than 10 mm dia 100 mm size
S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Steel Locking bolt with MS electro gavalanised plate and bright bolt 1 No. Rs. 35.00 1 35
not less than 10mm dia, 100*mm size
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.39.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.62.50 Total Amount of M and L Rs.53.18
Add 17.5 % OH and CP Rs.9.31
Total Rs.62.48

ITEM No. 9022.02


Steel locking bolts with mild steel electrogalvanised plateand bright bolt not lees than 10 mm dia 100 mm size
fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

ITEM No. 9022.03


Steel locking bolts with mild steel electrogalvanised plateand bright bolt not lees than 10 mm dia 100 mm size.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

840 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9023.01
Aluminium Locking bolts, anodised with bolt not less than 10 mm dia100 mm size.S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt Locking, Aluminium not less than 10mm dia, 100*mm length 1 No. Rs. 38.00 1 38
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.42.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.66.00 Total Amount of M and L Rs.56.18
Add 17.5 % OH and CP Rs.9.83
Total Rs.66.01

ITEM No. 9023.02


Aluminium Locking bolts, anodised with bolt not less than 10 mm dia100 mm size.Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

ITEM No. 9023.03


Aluminium Locking bolts, anodised with bolt not less than 10 mm dia100 mm size. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

841 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9024.01
Steel locking bolts 250 mm size S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Steel Locking bolt with MS electro gavalanised plate and bright bolt 1 No. Rs. 64.80 1 64.8
not less than 10mm dia, 250*mm size
Rs.68.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.97.50 Total Amount of M and L Rs.82.98
Add 17.5 % OH and CP Rs.14.52
Total Rs.97.50

ITEM No. 9024.02


Steel locking bolts 250 mm size fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

ITEM No. 9024.03


Steel locking bolts 250 mm size.Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

842 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9024.04
Aluminium Locking bolts, 250 mm size. S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Bolt Locking, Aluminium not less than 10mm dia, 250*mm length 1 No. Rs. 70.00 1 70
Rs.74.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.103.60 Total Amount of M and L Rs.88.18
Add 17.5 % OH and CP Rs.15.43
Total Rs.103.61

ITEM No. 9024.05


Aluminium Locking bolts, 250 mm size. Fixing only..
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

ITEM No. 9024.06


Aluminium Locking bolts, 250 mm size. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

ITEM No. 9025.01


Bolt-sockets (or thimbles) for letting into stone, brick work or concrete( tosuit round or square shoots)
incluidng cutting mortices and cementing in, complete.S&Fmild steel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt socket or thimble MS 1 No. Rs. 3.00 1 3
Rs.3.00
Labour
1 Stone mason(225) 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.20.20 Total Amount of M and L Rs.17.18
Add 17.5 % OH and CP Rs.3.01
Total Rs.20.18
843 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9025.02
Bolt-sockets (or thimbles) for letting into stone, brick work or concrete( tosuit round or square shoots)
incluidng cutting mortices and cementing in, complete .S&F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt socket or thimble BR 1 No. Rs. 9.00 1 9
Rs.9.00
Labour
1 Stone mason(225) 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.27.20 Total Amount of M and L Rs.23.18
Add 17.5 % OH and CP Rs.4.06
Total Rs.27.23

ITEM No. 9025.03


Bolt-sockets (or thimbles) for letting into stone, brick work or concrete( tosuit round or square shoots)
including cutting mortices and cementing in,complete .S&F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bolt socket or thimble ALN 1 No. Rs. 5.50 1 5.5
Rs.5.50
Labour
1 Stone mason(225) 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.23.10 Total Amount of M and L Rs.19.68
Add 17.5 % OH and CP Rs.3.44
Total Rs.23.12

ITEM No. 9025.04


Bolt-sockets (or thimbles) for letting into stone, brick work or concrete( tosuit round or square shoots)
including cutting mortices and cementing in,complete .Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone mason(225) 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

ITEM No. 9025.05


Bolt-sockets (or thimbles) for letting into stone, brick work or concrete( tosuit round or square shoots)
incluidng including cutting mortices and cementing in,complete .Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone mason(225) 1 Day Rs. 225.00 0.0209 4.7025
Rs.4.70
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.70
Add 17.5 % OH and CP Rs.0.82
Total Rs.5.53

844 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9026.01
Bolt staples for round or square bolts (plates for flush or other bolts) S&Fmild steel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
2 MS bolt stamples for Round /square bolt 1 No. Rs. 7.00 1 7
Rs.8.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.13.60 Total Amount of M and L Rs.11.60
Add 17.5 % OH and CP Rs.2.03
Total Rs.13.63

ITEM No. 9026.02


Bolt stamples for round or square bolts (plates for flush or other bolts)S&F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
2 Bolt staples Round/Square, BRASS Each Rs. 26.00 1 26
Rs.27.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.36.00 Total Amount of M and L Rs.30.60
Add 17.5 % OH and CP Rs.5.36
Total Rs.35.96

ITEM No. 9026.03


Bolt staples for round or square bolts (plates for flush or other bolts)S&F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
2 Bolt staples Round/Square, Aluminium 1 No. Rs. 18.00 1 18
Rs.19.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.26.60 Total Amount of M and L Rs.22.60
Add 17.5 % OH and CP Rs.3.96
Total Rs.26.56

845 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9026.04
Bolt staples for round or square bolts (plates for flush or other bolts)Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.1.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.5.40 Total Amount of M and L Rs.4.60
Add 17.5 % OH and CP Rs.0.81
Total Rs.5.41

ITEM No. 9026.05


Bolt stamples for round or square bolts (plates for flush or other bolts) Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.006 1.35
Rs.1.35
After rounding off: Rs.1.60 Total Amount of M and L Rs.1.35
Add 17.5 % OH and CP Rs.0.24
Total Rs.1.59

ITEM No. 9027.01


Butt hinges, heavy weight, cold rolled mild steel and fixed size of hinges 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 MS butt hinges heavy WT 25mm 1 No. Rs. 5.65 1 5.65
Rs.7.65
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.15.60 Total Amount of M and L Rs.13.28
Add 17.5 % OH and CP Rs.2.32
Total Rs.15.60

846 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9027.02
Butt hinges, heavy weight, cold rolled mild steel and fixed size of hinges 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS butt hinges heavy WT 40mm 1 No. Rs. 6.00 1 6
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.8.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.16.00 Total Amount of M and L Rs.13.63
Add 17.5 % OH and CP Rs.2.38
Total Rs.16.01

ITEM No. 9027.03


Butt hinges, heavy weight, cold rolled mild steel and fixed size of hinges 50mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS butt hinges heavy WT 50mm 1 No. Rs. 8.63 1 8.63
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.10.63
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.19.10 Total Amount of M and L Rs.16.26
Add 17.5 % OH and CP Rs.2.84
Total Rs.19.10

ITEM No. 9027.04


Butt hinges, heavy weight, cold rolled mild steel and fixed size of hinges 65mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS butt hinges heavy WT 65mm 1 No. Rs. 10.15 1 10.15
Rs.13.15
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.22.10 Total Amount of M and L Rs.18.78
Add 17.5 % OH and CP Rs.3.29
Total Rs.22.06

847 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9027.05
Butt hinges, heavy weight, cold rolled mild steel and fixed size of hinges 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS butt hinges heavy WT 75mm 1 No. Rs. 12.00 1 12
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.16.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.25.40 Total Amount of M and L Rs.21.63
Add 17.5 % OH and CP Rs.3.78
Total Rs.25.41

ITEM No. 9027.06


Butt hinges, heavy weight, cold rolled mild steel and fixed size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS butt hinges heavy WT 100mm 1 No. Rs. 15.00 1 15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.19.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.35.50 Total Amount of M and L Rs.30.25
Add 17.5 % OH and CP Rs.5.29
Total Rs.35.54

ITEM No. 9027.07


Butt hinges, heavy weight, cold rolled mild steel and fixed size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 MS butt hinges heavy WT 125mm 1 No. Rs. 20.00 1 20
Rs.25.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.42.60 Total Amount of M and L Rs.36.25
Add 17.5 % OH and CP Rs.6.34
Total Rs.42.59

848 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9028.01
Butt hinges, medium weight, cold rolled mild steel and fixed size of hinges 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 MS butt hinges MED WT 25mm 1 No. Rs. 4.49 1 4.49
Rs.6.49
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.14.20 Total Amount of M and L Rs.12.12
Add 17.5 % OH and CP Rs.2.12
Total Rs.14.24

ITEM No. 9028.02


Butt hinges, medium weight, cold rolled mild steel and fixed size of hinges 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS butt hinges MED WT 40mm 1 No. Rs. 5.50 1 5.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.7.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.15.40 Total Amount of M and L Rs.13.13
Add 17.5 % OH and CP Rs.2.30
Total Rs.15.42

ITEM No. 9028.03


Butt hinges, medium weight, cold rolled mild steel and fixed size of hinges 50mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS butt hinges MED WT 50mm 1 No. Rs. 6.10 1 6.1
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.8.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.16.10 Total Amount of M and L Rs.13.73
Add 17.5 % OH and CP Rs.2.40
Total Rs.16.13

849 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9028.04
Butt hinges, medium weight, cold rolled mild steel and fixed size of hinges 65mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS butt hinges MED WT 65mm 1 No. Rs. 8.63 1 8.63
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.11.63
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.20.30 Total Amount of M and L Rs.17.26
Add 17.5 % OH and CP Rs.3.02
Total Rs.20.27

ITEM No. 9028.05


Butt hinges, medium weight, cold rolled mild steel and fixed size of hinges 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS butt hinges MED WT 75mm 1 No. Rs. 10.55 1 10.55
Rs.14.55
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.23.70 Total Amount of M and L Rs.20.18
Add 17.5 % OH and CP Rs.3.53
Total Rs.23.71

ITEM No. 9028.06


Butt hinges, medium weight, cold rolled mild steel and fixed size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS butt hinges MED WT 100mm 1 No. Rs. 12.00 1 12
Rs.16.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.32.00 Total Amount of M and L Rs.27.25
Add 17.5 % OH and CP Rs.4.77
Total Rs.32.02

850 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9028.07
Butt hinges, medium weight, cold rolled mild steel and fixed size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 MS butt hinges MED WT 125mm 1 No. Rs. 16.00 1 16
Rs.21.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.37.90 Total Amount of M and L Rs.32.25
Add 17.5 % OH and CP Rs.5.64
Total Rs.37.89

ITEM No. 9029.01


Butt hinges, light weight, cold rolled mild steel and fixed size of hinges 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Butt Hinges light WT 25mm 1 No. Rs. 1.99 1 1.99
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.3.99
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.11.30 Total Amount of M and L Rs.9.62
Add 17.5 % OH and CP Rs.1.68
Total Rs.11.30

ITEM No. 9029.02


Butt hinges, light weight, cold rolled mild steel and fixed size of hinges 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Butt Hinges light WT 40mm 1 No. Rs. 4.50 1 4.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.6.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.14.20 Total Amount of M and L Rs.12.13
Add 17.5 % OH and CP Rs.2.12
Total Rs.14.25

851 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9029.03
Butt hinges, light weight, cold rolled mild steel and fixed size of hinges 50mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 MS Butt Hinges light WT 50mm 1 No. Rs. 5.98 1 5.98
Rs.7.98
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.16.00 Total Amount of M and L Rs.13.61
Add 17.5 % OH and CP Rs.2.38
Total Rs.15.99

ITEM No. 9029.04


Butt hinges, light weight, cold rolled mild steel and fixed size of hinges 65mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS Butt Hinges light WT 65mm 1 No. Rs. 6.55 1 6.55
Rs.9.55
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.17.80 Total Amount of M and L Rs.15.18
Add 17.5 % OH and CP Rs.2.66
Total Rs.17.83

ITEM No. 9029.05


Butt hinges, light weight, cold rolled mild steel and fixed size of hinges 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS Butt Hinges light WT 75mm 1 No. Rs. 9.50 1 9.5
Rs.13.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.22.50 Total Amount of M and L Rs.19.13
Add 17.5 % OH and CP Rs.3.35
Total Rs.22.47

852 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9029.06
Butt hinges, light weight, cold rolled mild steel and fixed size of hinges100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS Butt Hinges light WT 100mm 1 No. Rs. 10.00 1 10
Rs.14.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.29.70 Total Amount of M and L Rs.25.25
Add 17.5 % OH and CP Rs.4.42
Total Rs.29.67

ITEM No. 9029.07


Butt hinges, light weight, cold rolled mild steel and fixed size of hinges125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Butt Hinges light WT 125mm 1 No. Rs. 12.00 1 12
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.17.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.33.20 Total Amount of M and L Rs.28.25
Add 17.5 % OH and CP Rs.4.94
Total Rs.33.19

ITEM No. 9030.05


Butt hings, cast brass with mild steel hinge pin, bright polished and fixed type B - 11 size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 50.00 1 50
B11 size 100mm
Rs.54.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.80.10 Total Amount of M and L Rs.68.18
Add 17.5 % OH and CP Rs.11.93
Total Rs.80.11

853 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9030.06
Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed type B - 11 size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 60.00 1 60
B11 size 125mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.65.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.93.00 Total Amount of M and L Rs.79.18
Add 17.5 % OH and CP Rs.13.86
Total Rs.93.03

ITEM No. 9031.01


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed ) but type B - 12. Size of hinges
50mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, cast brass with mild steel hinge pin bright polished type B- 1 No. Rs. 54.00 1 54
12 size 50mm
Rs.58.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.84.80 Total Amount of M and L Rs.72.18
Add 17.5 % OH and CP Rs.12.63
Total Rs.84.81

ITEM No. 9031.02


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed but type B - 12. Size of hinges 65mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, cast brass with mild steel hinge pin bright polished type B- 1 No. Rs. 59.00 1 59
12 size 65mm
Rs.63.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.90.70 Total Amount of M and L Rs.77.18
Add 17.5 % OH and CP Rs.13.51
Total Rs.90.68

854 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9031.03
Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed ) but type B - 12. Size of hinges
75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished type B- 1 No. Rs. 63.00 1 63
12 size 75mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.67.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.95.40 Total Amount of M and L Rs.81.18
Add 17.5 % OH and CP Rs.14.21
Total Rs.95.38

ITEM No. 9031.04


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed but type B - 12. Size of hinges
100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 68.30 1 68.3
B12 size 100mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.72.30
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.101.60 Total Amount of M and L Rs.86.48
Add 17.5 % OH and CP Rs.15.13
Total Rs.101.61

ITEM No. 9031.05


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed ) but type B - 12. Size of hinges
125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, cast brass with mild steel hinge pin bright polished type B- 1 No. Rs. 75.00 1 75
12 size 125mm
Rs.79.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.109.50 Total Amount of M and L Rs.93.18
Add 17.5 % OH and CP Rs.16.31
Total Rs.109.48

855 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9032.01
Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed but type C-11 size of hinges 50mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 45.00 1 45
C11 size 50mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.48.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.69.60 Total Amount of M and L Rs.59.25
Add 17.5 % OH and CP Rs.10.37
Total Rs.69.62

ITEM No. 9032.02


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed but type C-11 size of hinges 65mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 49.00 1 49
C11 size 65mm
Rs.53.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.78.90 Total Amount of M and L Rs.67.18
Add 17.5 % OH and CP Rs.11.76
Total Rs.78.93

ITEM No. 9032.03


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed but type C-11 size of hinges 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 53.00 1 53
C11 size 75mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.57.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.83.60 Total Amount of M and L Rs.71.18
Add 17.5 % OH and CP Rs.12.46
Total Rs.83.63

856 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9032.04
Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed 1 but type C-11 size of hinges100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 57.00 1 57
C11size 100mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.61.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.88.30 Total Amount of M and L Rs.75.18
Add 17.5 % OH and CP Rs.13.16
Total Rs.88.33

ITEM No. 9032.05


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed 1 but type C-11 size of hinges
125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 61.00 1 61
C11size 125mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
Rs.66.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.94.20 Total Amount of M and L Rs.80.18
Add 17.5 % OH and CP Rs.14.03
Total Rs.94.21

ITEM No. 9033.04


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed but type C-12 size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 62.00 1 62
C12size 100mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.66.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.94.20 Total Amount of M and L Rs.80.18
Add 17.5 % OH and CP Rs.14.03
Total Rs.94.21

857 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9033.05
Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed but type C-12 size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Butt hinges, cast brass with mild steel hinge pin bright polished type 1 No. Rs. 68.00 1 68
C12size 125mm
Rs.73.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.102.40 Total Amount of M and L Rs.87.18
Add 17.5 % OH and CP Rs.15.26
Total Rs.102.43

ITEM No. 9034.05


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed but type C-21size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Butt Hinge cast brass with mild steel hinge pin bright polished type C- 1 No. Rs. 65.00 1 65
21 size125mm
Rs.70.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.98.90 Total Amount of M and L Rs.84.18
Add 17.5 % OH and CP Rs.14.73
Total Rs.98.91

ITEM No. 9035.02


Butt hinges, cast brass, with mild steel hinge pin, bright polished and fixed, typec C-22 65mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt Hinge cast brass C-22, 65mm 1 Each Rs. 62.00 1 62
Rs.66.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.94.20 Total Amount of M and L Rs.80.18
Add 17.5 % OH and CP Rs.14.03
Total Rs.94.21

858 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9035.04
Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed 1 but type B-22size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt Hinge cast brass C-22, 100mm 1 No. Rs. 42.00 1 42
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.46.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.70.70 Total Amount of M and L Rs.60.18
Add 17.5 % OH and CP Rs.10.53
Total Rs.70.71

ITEM No. 9036.04


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed but type C-23 size of hinges 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 62.00 1 62
type C-23 size 125mm
Rs.66.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.94.20 Total Amount of M and L Rs.80.18
Add 17.5 % OH and CP Rs.14.03
Total Rs.94.21

ITEM No. 9037.03


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed type D-11 but 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinge cast brass D-11, 75mm 1 No. Rs. 45.15 1 45.15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.49.15
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.74.40 Total Amount of M and L Rs.63.33
Add 17.5 % OH and CP Rs.11.08
Total Rs.74.41

859 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9037.04
Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed typeD-11 size of hinges 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass D-11, 100mm 1 No. Rs. 57.79 1 57.79
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.61.79
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.89.30 Total Amount of M and L Rs.75.97
Add 17.5 % OH and CP Rs.13.29
Total Rs.89.26

ITEM No. 9038.01


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed type E-11 size of hinges 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished typeE- 1 No. Rs. 23.94 1 23.94
11 size 50mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.25.94
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.38.40 Total Amount of M and L Rs.32.69
Add 17.5 % OH and CP Rs.5.72
Total Rs.38.41

ITEM No. 9038.03


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed type E-11 size of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, cast brass with mild steel hinge pin bright polished typeE- 1 No. Rs. 38.25 1 38.25
11 size 75mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.42.25
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.66.30 Total Amount of M and L Rs.56.43
Add 17.5 % OH and CP Rs.9.87
Total Rs.66.30

860 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Builder's Hardware
ITEM No. 9039.01
Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed type E-12 size of hinges 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Butt hinges, cast brass with mild steel hinge pin bright polished typeE- 1 No. Rs. 20.28 1 20.28
12 size 50mm
Rs.22.28
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.34.10 Total Amount of M and L Rs.29.03
Add 17.5 % OH and CP Rs.5.08
Total Rs.34.11

ITEM No. 9039.03


Butt hinges, cast brass with mild steel hinge pin, bright polished and fixed type E-12 size of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, cast brass with mild steel hinge pin bright polished typeE- 1 No. Rs. 30.48 1 30.48
12 size 75mm
Rs.34.48
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.53.70 Total Amount of M and L Rs.45.73
Add 17.5 % OH and CP Rs.8.00
Total Rs.53.73

ITEM No. 9040.04


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type B-11 size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 55.00 1 55
type B-11 size 100mm
Rs.59.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.86.00 Total Amount of M and L Rs.73.18
Add 17.5 % OH and CP Rs.12.81
Total Rs.85.98

861 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9040.05
Butt hinges, extruded brass with mild steel hinge pin bright polishedand fixed type B-11 size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 85.00 1 85
type B-11size125mm
Rs.90.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.122.40 Total Amount of M and L Rs.104.18
Add 17.5 % OH and CP Rs.18.23
Total Rs.122.41

ITEM No. 9041.03


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type B-12 size of hinges 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished Each Rs. 44.00 1 44
type B-12 size 75mm
Rs.48.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.69.60 Total Amount of M and L Rs.59.25
Add 17.5 % OH and CP Rs.10.37
Total Rs.69.62

ITEM No. 9041.04


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type B-12 size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 50.00 1 50
type B-12 size 100mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.54.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.80.10 Total Amount of M and L Rs.68.18
Add 17.5 % OH and CP Rs.11.93
Total Rs.80.11

862 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9041.05
Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type B-12 size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.1 5
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 77.00 1 77
B-12 125 mm

ass with mild steel hinge pin bright polished type B-12 size 125mm
Rs.82.00
Labour
863 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.113.00 Total Amount of M and L Rs.96.18
Add 17.5 % OH and CP Rs.16.83
Total Rs.113.01

ITEM No. 9042.03


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type C-11 size of hinges 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 45.00 1 45
type C-12 size 100 mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.49.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.74.20 Total Amount of M and L Rs.63.18
Add 17.5 % OH and CP Rs.11.06
Total Rs.74.23

ITEM No. 9042.04


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type C-11 size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 53.00 1 53
type C-11 size 100mm
Rs.57.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.83.60 Total Amount of M and L Rs.71.18
Add 17.5 % OH and CP Rs.12.46
Total Rs.83.63

ITEM No. 9042.05


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type C-11 size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 83.00 1 83
type C-11 size 125mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.87.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.118.90 Total Amount of M and L Rs.101.18
Add 17.5 % OH and CP Rs.17.71
Total Rs.118.88

864 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9043.04
Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type C-12 size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 50.00 1 50
type C-22 size 100 mm
Rs.54.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.80.10 Total Amount of M and L Rs.68.18
Add 17.5 % OH and CP Rs.11.93
Total Rs.80.11

ITEM No. 9043.05


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type C-12 size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 78.00 1 78
type C-12 size 125 mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.82.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.113.00 Total Amount of M and L Rs.96.18
Add 17.5 % OH and CP Rs.16.83
Total Rs.113.01

ITEM No. 9044.05


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type C-21 size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 65.00 1 65
type C-23 size 125mm
Rs.69.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.97.70 Total Amount of M and L Rs.83.18
Add 17.5 % OH and CP Rs.14.56
Total Rs.97.73

865 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9045.04
Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type C-22 size of hinges 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 51.93 1 51.93
type C-22 size 100mm
Rs.55.93
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.82.40 Total Amount of M and L Rs.70.11
Add 17.5 % OH and CP Rs.12.27
Total Rs.82.37

ITEM No. 9046.05


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type C-23 size of hinges 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 62.00 1 62
type C-23 size 125mm
Rs.66.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.94.20 Total Amount of M and L Rs.80.18
Add 17.5 % OH and CP Rs.14.03
Total Rs.94.21

ITEM No. 9047.03


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type D-11 size of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 45.90 1 45.9
type D-11 size 75mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.48.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.70.70 Total Amount of M and L Rs.60.15
Add 17.5 % OH and CP Rs.10.53
Total Rs.70.68

866 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9047.04
Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type D-11 size of hinges100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 55.20 1 55.2
type D-11 size 100mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.59.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.86.20 Total Amount of M and L Rs.73.38
Add 17.5 % OH and CP Rs.12.84
Total Rs.86.22

ITEM No. 9048.01


Ditto item No 0041 but type E-11 size of hinges 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 27.00 1 27
type E-11 size 75mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.29.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.42.00 Total Amount of M and L Rs.35.75
Add 17.5 % OH and CP Rs.6.26
Total Rs.42.01

ITEM No. 9048.02


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type E-11 size of hinges 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 40.00 1 40
type E-11 size 50mm
Rs.43.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.63.70 Total Amount of M and L Rs.54.25
Add 17.5 % OH and CP Rs.9.49
Total Rs.63.74

867 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9049.01
Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type E-12 size of hinges 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 21.73 1 21.73
type E-12 size 50mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.23.73
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.35.80 Total Amount of M and L Rs.30.48
Add 17.5 % OH and CP Rs.5.33
Total Rs.35.81

ITEM No. 9049.02


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type E-12 size of hinges 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished Each Rs. 26.95 1 26.95
type E-12 size 65mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.29.95
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.48.40 Total Amount of M and L Rs.41.20
Add 17.5 % OH and CP Rs.7.21
Total Rs.48.41

ITEM No. 9049.03


Butt hinges, extruded brass with mild steel hinge pin bright polished and fixed type E-12 size of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges, extruded, brass with mild steel hinge pin bright polished 1 No. Rs. 31.20 1 31.2
type E-12 size 75mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.34.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.53.40 Total Amount of M and L Rs.45.45
Add 17.5 % OH and CP Rs.7.95
Total Rs.53.40

868 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9050.04
Butt hinges, extruded aluminium alloy with galvanised mild steel hinge pin, anodised and fixed type.B-21, size
of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 50.00 1 50
anodized, type B-21 size 100mm
Rs.54.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.80.10 Total Amount of M and L Rs.68.18
Add 17.5 % OH and CP Rs.11.93
Total Rs.80.11

ITEM No. 9050.05


Butt hinges, extruded aluminium alloy with galvanised mild steel hinge pin, anodised and fixed type.B-21, size
of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 85.00 1 85
anodized, type B-12 size 125mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.89.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.121.20 Total Amount of M and L Rs.103.18
Add 17.5 % OH and CP Rs.18.06
Total Rs.121.23

ITEM No. 9052.03


Butt hinges, extruded aluminium alloy with galvanised mild steel hinge pin, anodised and fixed type C-21 size
of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 30.00 1 30
anodized, type C-21 size 75mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.33.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.52.00 Total Amount of M and L Rs.44.25
Add 17.5 % OH and CP Rs.7.74
Total Rs.51.99

869 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9052.04
Butt hinges, extruded aluminium alloy with galvanised mild steel hinge pin, anodised and fixed type C-21 size
of hinges 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 42.00 1 42
anodized, type C-22 size 100mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.46.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.70.70 Total Amount of M and L Rs.60.18
Add 17.5 % OH and CP Rs.10.53
Total Rs.70.71

ITEM No. 9052.05


Butt hinges, extruded aluminium alloy with galvanised mild steel hinge pin, anodised and fixed type C-21 size
of hinges 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 62.00 1 62
anodized, type C-22 size 125mm
Rs.66.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.94.20 Total Amount of M and L Rs.80.18
Add 17.5 % OH and CP Rs.14.03
Total Rs.94.21

ITEM No. 9053.03


Butt hinges, extruded aluminium alloy with galvanised mild steel hinge pin, anodised and fixed type C-22 size
of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 28.00 1 28
anodized, type C-22 size 75mm
Rs.31.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.49.60 Total Amount of M and L Rs.42.25
Add 17.5 % OH and CP Rs.7.39
Total Rs.49.64

870 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9054.03
Butt hinges, extruded aluminium alloy with galvanised mild steel hinge pin, anodised and fixed type C-22 size
of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 24.65 1 24.65
anodized, type D-22 size 75mm*
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.27.65
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.45.70 Total Amount of M and L Rs.38.90
Add 17.5 % OH and CP Rs.6.81
Total Rs.45.71

ITEM No. 9055.01


Butt hinges, extruded aluminium alloy with galvanised mild steel hinge pin, anodised and fixed type E-22 size
of hinges 50 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 15.49 1 15.49
anodized, type E-22 size 50mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.17.49
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.28.50 Total Amount of M and L Rs.24.24
Add 17.5 % OH and CP Rs.4.24
Total Rs.28.48

ITEM No. 9055.03


Butt hinges, extruded aluminium alloy with galvanised mild steel hinge pin, anodised and fixed type E-22 size
of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 22.17 1 22.17
anodized, type E-22 size 75mm
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.25.17
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.42.80 Total Amount of M and L Rs.36.42
Add 17.5 % OH and CP Rs.6.37
Total Rs.42.79

871 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9056.01
Fixing only but hinges size of hinges 50mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.10.30 Total Amount of M and L Rs.8.75
Add 17.5 % OH and CP Rs.1.53
Total Rs.10.28

ITEM No. 9056.02


Fixing only but hinges size of hinges 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.25
Add 17.5 % OH and CP Rs.2.49
Total Rs.16.74

ITEM No. 9056.03


Fixing only but hinges size of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.25
Add 17.5 % OH and CP Rs.2.49
Total Rs.16.74

872 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9056.04
Fixing only but hinges size of hinges 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

ITEM No. 9056.05


Fixing only but hinges size of hinges 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

ITEM No. 9056.15


Fixing only but hinges size of hinges 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.25
Add 17.5 % OH and CP Rs.2.49
Total Rs.16.74

ITEM No. 9057.01


Add if hinges are fixed repairs size of hinges 50mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

873 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9057.02
Add if hinges are fixed repairs size of hinges 65mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.25
Add 17.5 % OH and CP Rs.1.97
Total Rs.13.22

ITEM No. 9057.03


Add if hinges are fixed repairs size of hinges 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.25
Add 17.5 % OH and CP Rs.1.97
Total Rs.13.22

ITEM No. 9057.04


Add if hinges are fixed repairs size of hinges 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

ITEM No. 9057.05


Add if hinges are fixed repairs size of hinges 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

ITEM No. 9058.01


Add to foregoing items if brass/bronze hinger pin is provided in lieu of mildsteel hinge pin size of hinges 50mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Difference of rate between brass/bronze hinge pin and galvanized MS 1 No. Rs. 2.50 1 2.5
hingepin in butt hing for 50 mm
Rs.2.50
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.50
Add 17.5 % OH and CP Rs.0.44
Total Rs.2.94

874 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9058.02
Add to foregoing items if brass/bronze hinger pin is provided in lieu of mildsteel hinge pin size of hinges 65mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Difference of rate between brass/bronze hinge pin and galvanized MS 1 No. Rs. 4.00 1 4
hingepin in butt hing for 65 mm
Rs.4.00
After rounding off: Rs.4.70 Total Amount of M and L Rs.4.00
Add 17.5 % OH and CP Rs.0.70
Total Rs.4.70

ITEM No. 9058.03


Add to foregoing items if brass/bronze hinger pin is provided in lieu of mildsteel hinge pin size of hinges 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Difference of rate between brass/bronze hinge pin and galvanized MS 1 No. Rs. 5.00 1 5
hingepin in butt hing for 75 mm
Rs.5.00
After rounding off: Rs.5.90 Total Amount of M and L Rs.5.00
Add 17.5 % OH and CP Rs.0.88
Total Rs.5.88

ITEM No. 9058.04


Add to foregoing items if brass/bronze hinger pin is provided in lieu of mildsteel hinge pin size of hinges
100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Difference of rate between brass/bronze hinge pin and galvanized MS 1 No. Rs. 6.00 1 6
hingepin in butt hing for 100 mm
Rs.6.00
After rounding off: Rs.7.00 Total Amount of M and L Rs.6.00
Add 17.5 % OH and CP Rs.1.05
Total Rs.7.05

ITEM No. 9058.05


Add to foregoing items if brass/bronze hinger pin is provided in lieu of mildsteel hinge pin size of hinges
125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Difference of rate between brass/bronze hinge pin and galvanized MS 1 No. Rs. 7.00 1 7
hingepin in butt hing for 125 mm
Rs.7.00
After rounding off: Rs.8.20 Total Amount of M and L Rs.7.00
Add 17.5 % OH and CP Rs.1.23
Total Rs.8.23

875 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9059.01
Parliament hinges, mils steel cold rolled and fixed width of recessbetween flanges (when open) 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS PARLIAMENT HINGES 65mm 1 No. Rs. 30.80 1 30.8
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.34.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.54.10 Total Amount of M and L Rs.46.05
Add 17.5 % OH and CP Rs.8.06
Total Rs.54.11

ITEM No. 9059.02


Parliament hinges, mils steel cold rolled and fixed width of recessbetween flanges (when open) 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS PARLIAMENT HINGES 75mm 1 No. Rs. 35.00 1 35
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.39.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.59.00 Total Amount of M and L Rs.50.25
Add 17.5 % OH and CP Rs.8.79
Total Rs.59.04

ITEM No. 9059.03


Parliament hinges, mils steel cold rolled and fixed width of recessbetween flanges (when open) 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS PARLIAMENT HINGES 100mm 1 No. Rs. 43.50 1 43.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.47.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.69.00 Total Amount of M and L Rs.58.75
Add 17.5 % OH and CP Rs.10.28
Total Rs.69.03

876 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9059.04
Parliament hinges, mils steel cold rolled and fixed width of recessbetween flanges (when open) 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS PARLIAMENT HINGES 125mm 1 No. Rs. 51.00 1 51
Rs.55.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.77.80 Total Amount of M and L Rs.66.25
Add 17.5 % OH and CP Rs.11.59
Total Rs.77.84

ITEM No. 9059.05


Parliament hinges, mils steel cold rolled and fixed width of recessbetween flanges (when open) 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS PARLIAMENT HINGES 150mm 1 No. Rs. 72.00 1 72
Rs.76.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.102.50 Total Amount of M and L Rs.87.25
Add 17.5 % OH and CP Rs.15.27
Total Rs.102.52

ITEM No. 9060.01


Ditto item 0060 but cast brass, bright polished and fixed width of recessbetween flanges (when open) 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 PARLIAMENT HINGES OF CAST Brass 65mm 1 No. Rs. 102.19 1 102.19
Rs.106.19
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.138.00 Total Amount of M and L Rs.117.44
Add 17.5 % OH and CP Rs.20.55
Total Rs.137.99

877 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9060.02
Ditto item 0060 but cast brass, bright polished and fixed width of recessbetween flanges (when open) 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 PARLIAMENT HINGES OF CAST Brass 75mm 1 No. Rs. 110.00 1 110
Rs.114.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.147.20 Total Amount of M and L Rs.125.25
Add 17.5 % OH and CP Rs.21.92
Total Rs.147.17

ITEM No. 9060.03


Ditto item 0060 but cast brass, bright polished and fixed width of recessbetween flanges (when open) 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PARLIAMENT HINGES OF CAST Brass 100mm 1 No. Rs. 140.00 1 140
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.144.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.182.40 Total Amount of M and L Rs.155.25
Add 17.5 % OH and CP Rs.27.17
Total Rs.182.42

ITEM No. 9060.04


Ditto item 0060 but cast brass, bright polished and fixed width of recessbetween flanges (when open) 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 PARLIAMENT HINGES OF CAST Brass 125mm 1 No. Rs. 145.40 1 145.4
Rs.149.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.188.80 Total Amount of M and L Rs.160.65
Add 17.5 % OH and CP Rs.28.11
Total Rs.188.76

878 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9060.05
Ditto item 0060 but cast brass, bright polished and fixed width of recessbetween flanges (when open) 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 PARLIAMENT HINGES OF CAST Brass 150mm 1 No. Rs. 160.00 1 160
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.164.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.205.90 Total Amount of M and L Rs.175.25
Add 17.5 % OH and CP Rs.30.67
Total Rs.205.92

ITEM No. 9061.01


Ditto item 0060 but aluminium alloy anodised and fixed width of recess between flanges between flanges
(when open) 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Parliament hinges of ALU Alloy 65mm 1 No. Rs. 43.50 1 43.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.47.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.69.00 Total Amount of M and L Rs.58.75
Add 17.5 % OH and CP Rs.10.28
Total Rs.69.03

ITEM No. 9061.02


Ditto item 0060 but aluminium alloy anodised and fixed width of recess between flanges between flanges
(when open) 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Parliament hinges of ALU Alloy 75mm 1 No. Rs. 51.00 1 51
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.55.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.77.80 Total Amount of M and L Rs.66.25
Add 17.5 % OH and CP Rs.11.59
Total Rs.77.84

879 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9061.03
Ditto item 0060 but aluminium alloy anodised and fixed width of recess between flanges between flanges
(when open) 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Parliament hinges of ALU Alloy 100mm 1 No. Rs. 70.74 1 70.74
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.74.74
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.101.00 Total Amount of M and L Rs.85.99
Add 17.5 % OH and CP Rs.15.05
Total Rs.101.04

ITEM No. 9061.04


Ditto item 0060 but aluminium alloy anodised and fixed width of recess between flanges between flanges
(when open) 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Parliament hinges of ALU Alloy 125mm 1 No. Rs. 118.47 1 118.47
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.122.47
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.157.10 Total Amount of M and L Rs.133.72
Add 17.5 % OH and CP Rs.23.40
Total Rs.157.12

ITEM No. 9061.05


Ditto item 0060 but aluminium alloy anodised and fixed width of recess between flanges between flanges
(when open) 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Parliament hinges of ALU Alloy 150mm 1 No. Rs. 134.26 1 134.26
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.138.26
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0497 11.1825
Rs.11.18
After rounding off: Rs.175.60 Total Amount of M and L Rs.149.44
Add 17.5 % OH and CP Rs.26.15
Total Rs.175.59

880 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9062.01
Fixing only, items 09059 to 09060 width of recess between flanges (when open) 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.17.90 Total Amount of M and L Rs.15.25
Add 17.5 % OH and CP Rs.2.67
Total Rs.17.92

ITEM No. 9062.02


Fixing only, items 09059 to 09060 width of recess between flanges (when open) 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.17.90 Total Amount of M and L Rs.15.25
Add 17.5 % OH and CP Rs.2.67
Total Rs.17.92

ITEM No. 9062.03


Fixing only, items 09059 to 09060 width of recess between flanges (when open) 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.17.90 Total Amount of M and L Rs.15.25
Add 17.5 % OH and CP Rs.2.67
Total Rs.17.92

881 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9062.04
Fixing only, items 09059 to 09061 width of recess between flanges (when open) 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.17.90 Total Amount of M and L Rs.15.25
Add 17.5 % OH and CP Rs.2.67
Total Rs.17.92

ITEM No. 9062.05


Fixing only, items 09059 to 09061 width of recess between flanges (when open) 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.17.90 Total Amount of M and L Rs.15.25
Add 17.5 % OH and CP Rs.2.67
Total Rs.17.92

ITEM No. 9063.01


Add to, items 09059 to 09062 if fixed in repairs width of recess between flanges (when open) 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9063.02


Add to, items 09059 to 09062 if fixed in repairs width of recess between flanges (when open) 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

882 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9063.03
Add to, items 09059 to 09062 if fixed in repairs width of recess between flanges (when open) 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9063.04


Add to, items 09059 to 09062 ) if fixed in repairs width of recess between flanges (when open) 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9063.05


Add to, items 09059 to 09062 if fixed in repairs width of recess between flanges (when open) 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9064.01


Continuous (piano) hinges, mild steel, bright finish or electrogalvanisedwidth of flapa (when open) 30mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.3 15
2 MS PIANO WDT OF FLAP 30 mm(electro galavanised or bright finish) 1 Runnin Rs. 50.00 1 50
Rs.65.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
Rs.22.50
After rounding off: Rs.102.80 Total Amount of M and L Rs.87.50
Add 17.5 % OH and CP Rs.15.31
Total Rs.102.81

883 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9064.02
Continuous (piano) hinges, mild steel, bright finish or electrogalvanisedwidth of flapa (when open) 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.03 1.5
2 MS PIANO WDT OF FLAP 40 mm 1 Runnin Rs. 70.00 1 70
Rs.71.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.151 33.975
Rs.33.98
After rounding off: Rs.123.90 Total Amount of M and L Rs.105.48
Add 17.5 % OH and CP Rs.18.46
Total Rs.123.93

ITEM No. 9065.01


Ditto, item No 09064(0065) but of brass width of flap (when open) 30mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.26 13
2 BRASS PIANO WIDTH OF FLAP 30 mm 1 Runnin Rs. 110.00 1 110
Rs.123.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1 22.5
Rs.22.50
After rounding off: Rs.171.00 Total Amount of M and L Rs.145.50
Add 17.5 % OH and CP Rs.25.46
Total Rs.170.96

ITEM No. 9065.02


Ditto, item No 09064(0065) but of brass width of flap (when open) 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 BRASS PIANO WIDTH OF FLAP 40 mm 1 Runnin Rs. 140.00 1 140
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.03 1.5
Rs.141.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.151 33.975
Rs.33.98
After rounding off: Rs.206.20 Total Amount of M and L Rs.175.48
Add 17.5 % OH and CP Rs.30.71
Total Rs.206.18

884 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9066.01
Fixing only items 09064 and 09065 width of flap (when open) 30mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.03 1.5
Rs.1.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.151 33.975
Rs.33.98
After rounding off: Rs.41.70 Total Amount of M and L Rs.35.48
Add 17.5 % OH and CP Rs.6.21
Total Rs.41.68

ITEM No. 9066.02


Fixing only items 09064 and 09065 width of flap (when open) 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.03 1.5
Rs.1.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.151 33.975
Rs.33.98
After rounding off: Rs.41.70 Total Amount of M and L Rs.35.48
Add 17.5 % OH and CP Rs.6.21
Total Rs.41.68

ITEM No. 9067.01


Add to items 09064 to 09066, if fixed repairs width of flap(when open) 30mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.033 7.425
Rs.7.43
After rounding off: Rs.8.70 Total Amount of M and L Rs.7.43
Add 17.5 % OH and CP Rs.1.30
Total Rs.8.72

ITEM No. 9067.02


Add to items 09064 to 09066, if fixed repairs width of flap(when open) 40mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.033 7.425
Rs.7.43
After rounding off: Rs.8.70 Total Amount of M and L Rs.7.43
Add 17.5 % OH and CP Rs.1.30
Total Rs.8.72

885 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9068.01
Mild Steel tee hinges, stove enamelled black, medium type and fixed length 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS T HINGE MED 150mm medium 1 No. Rs. 22.22 1 22.22
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.07 3.5
Rs.25.72
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.43.40 Total Amount of M and L Rs.36.97
Add 17.5 % OH and CP Rs.6.47
Total Rs.43.44

ITEM No. 9068.02


Mild Steel tee hinges, stove enamelled black, medium type and fixed length 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS T HINGE MED 200mm 1 No. Rs. 30.00 1 30
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.07 3.5
Rs.33.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.52.60 Total Amount of M and L Rs.44.75
Add 17.5 % OH and CP Rs.7.83
Total Rs.52.58

ITEM No. 9068.03


Mild Steel tee hinges, stove enamelled black, medium type and fixed length 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS T HINGE MED 300mm 1 No. Rs. 38.20 1 38.2
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.42.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.63.40 Total Amount of M and L Rs.53.95
Add 17.5 % OH and CP Rs.9.44
Total Rs.63.39

886 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9069.01
Mild Steel tee hinges, stove enamelled black, heavy type and fixed length 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS T HINGE HEV 150mm length heavy 1 No. Rs. 32.23 1 32.23
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.07 3.5
Rs.35.73
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.55.20 Total Amount of M and L Rs.46.98
Add 17.5 % OH and CP Rs.8.22
Total Rs.55.20

ITEM No. 9069.02


Mild Steel tee hinges, stove enamelled black, heavy type and fixed length 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 MS T HINGE HEV 200mm length 1 No. Rs. 44.00 1 44
Rs.48.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.70.20 Total Amount of M and L Rs.59.75
Add 17.5 % OH and CP Rs.10.46
Total Rs.70.21

ITEM No. 9069.03


Mild Steel tee hinges, stove enamelled black, heavy type and fixed length 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 MS T HINGE HEV 300mm length 1 No. Rs. 60.00 1 60
Rs.64.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.89.00 Total Amount of M and L Rs.75.75
Add 17.5 % OH and CP Rs.13.26
Total Rs.89.01

887 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9070.01
Fixing only, items 09068 and 09069 Length 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.07 3.5
Rs.3.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.17.30 Total Amount of M and L Rs.14.75
Add 17.5 % OH and CP Rs.2.58
Total Rs.17.33

ITEM No. 9070.02


Fixing only, items 09068 and 09069 Length 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.07 3.5
Rs.3.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.17.30 Total Amount of M and L Rs.14.75
Add 17.5 % OH and CP Rs.2.58
Total Rs.17.33

ITEM No. 9070.03


Fixing only, items 09068 and 09069 Length 200mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.18.50 Total Amount of M and L Rs.15.75
Add 17.5 % OH and CP Rs.2.76
Total Rs.18.51

ITEM No. 9071.01


Add to items 09068 to 09070 (0070 to 0072) if fixed in repairs Length 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.017 3.825
Rs.3.83
After rounding off: Rs.4.50 Total Amount of M and L Rs.3.83
Add 17.5 % OH and CP Rs.0.67
Total Rs.4.49

888 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9071.02
Add to items 09068 to 09070 if fixed in repairs Length 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.017 3.825
Rs.3.83
After rounding off: Rs.4.50 Total Amount of M and L Rs.3.83
Add 17.5 % OH and CP Rs.0.67
Total Rs.4.49

ITEM No. 9071.03


Add to items 09068 to 09070 ) if fixed in repairs Length 300mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.017 3.825
Rs.3.83
After rounding off: Rs.4.50 Total Amount of M and L Rs.3.83
Add 17.5 % OH and CP Rs.0.67
Total Rs.4.49

ITEM No. 9072.01


Double action spring hionges, mild steel with steel wire spring, stoveenamelled, black S&F size of spring hinge
100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS DOUBLE ACTION SPRING HINGE 100mm 1 No. Rs. 111.96 1 111.96
Rs.115.96
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.152.90 Total Amount of M and L Rs.130.14
Add 17.5 % OH and CP Rs.22.77
Total Rs.152.91

ITEM No. 9072.02


Double action spring hionges, mild steel with steel wire spring, stoveenamelled, black S&F size of spring hinge
125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS DOUBLE ACTION SPRING HINGE 125mm 1 No. Rs. 142.20 1 142.2
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.146.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.188.40 Total Amount of M and L Rs.160.38
Add 17.5 % OH and CP Rs.28.07
Total Rs.188.44

889 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9072.03
Double action spring hionges, mild steel with steel wire spring, stoveenamelled, black S&F size of spring hinge
150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 MS DOUBLE ACTION SPRING HINGE 150mm 1 No. Rs. 157.81 1 157.81
Rs.161.81
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.206.80 Total Amount of M and L Rs.175.99
Add 17.5 % OH and CP Rs.30.80
Total Rs.206.78

ITEM No. 9072.04


Double action spring hionges, mild steel with steel wire spring, stoveenamelled, black fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

ITEM No. 9072.05


Double action spring hionges, mild steel with steel wire spring, stoveenamelled, black add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0208 4.68
Rs.4.68
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.68
Add 17.5 % OH and CP Rs.0.82
Total Rs.5.50

890 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9073.01
Ditto, item 09072 (0075) but brass, with phosphor bronze wire spring, bright polished S&F size ofspring hinge
100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Brass DOUBLE ACTION SPRING HINGE 100mm 1 No. Rs. 300.00 1 300
Rs.304.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.373.90 Total Amount of M and L Rs.318.18
Add 17.5 % OH and CP Rs.55.68
Total Rs.373.86

ITEM No. 9073.02


Ditto, item 09072 (0075) but brass, with phosphor bronze wire spring, bright polished S&F size of spring hinge
125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass DOUBLE ACTION SPRING HINGE 125mm 1 No. Rs. 340.00 1 340
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.344.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.420.90 Total Amount of M and L Rs.358.18
Add 17.5 % OH and CP Rs.62.68
Total Rs.420.86

ITEM No. 9073.03


Ditto, item 09072 (0075) but brass, with phosphor bronze wire spring, bright polished S&F size of spring hinge
150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass DOUBLE ACTION SPRING HINGE 150mm 1 No. Rs. 400.00 1 400
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.404.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.491.40 Total Amount of M and L Rs.418.18
Add 17.5 % OH and CP Rs.73.18
Total Rs.491.36

891 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9073.04
Ditto, item 09072 (0075) but brass, with phosphor bronze wire spring, bright polished fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

ITEM No. 9073.05


Ditto, item 09072 (0075) but brass, with phosphor bronze wire spring, bright polished, Add if fixed in repiars.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0208 4.68
Rs.4.68
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.68
Add 17.5 % OH and CP Rs.0.82
Total Rs.5.50

ITEM No. 9074.01


Blank hinge, mild steel stove enamelled, black for use alongwithmild steel double action spring hinges S&F size
of spring hinge 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 BLACK HINGE MS STOVE ENAMELLED BLACK 100 MM FOR USE ALONG 1 No. Rs. 92.00 1 92
WITH MS DOUBLE ACTION SPRING HINGE
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.96.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.129.50 Total Amount of M and L Rs.110.18
Add 17.5 % OH and CP Rs.19.28
Total Rs.129.46

892 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9074.02
Blank hinge, mild steel stove enamelled, black for use alongwithmild steel double action spring hinges S&F size
of spring hinge 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 BLACK HINGE MS STOVE ENAMELLED BLACK 125 MM FOR USE ALONG 1 No. Rs. 115.00 1 115
WITH MS DOUBLE ACTION SPRING HINGE
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.119.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.156.50 Total Amount of M and L Rs.133.18
Add 17.5 % OH and CP Rs.23.31
Total Rs.156.48

ITEM No. 9074.03


Blank hinge, mild steel stove enamelled, black for use alongwithmild steel double action spring hinges S&F size
of spring hinge 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 BLACK HINGE MS STOVE ENAMELLED BLACK 150 MM FOR USE ALONG 1 No. Rs. 138.00 1 138
WITH MS DOUBLE ACTION SPRING HINGE
Rs.142.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.183.50 Total Amount of M and L Rs.156.18
Add 17.5 % OH and CP Rs.27.33
Total Rs.183.51

ITEM No. 9074.04


Blank hinge, mild steel stove enamelled, black for use alongwithmild steel double action spring hinges fixing
only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

893 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9074.05
Blank hinge, mild steel stove enamelled, black for use alongwithmild steel double action spring hinges Add if
fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0241 5.4225
Rs.5.42
After rounding off: Rs.6.40 Total Amount of M and L Rs.5.42
Add 17.5 % OH and CP Rs.0.95
Total Rs.6.37

ITEM No. 9075.01


Blank hinge, brass bright polished for use alongwith brass double action spring hinges S&F size of spring hinge
100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Black hinge Brass bright polished 100mm for use alongwith Brass 1 No. Rs. 345.00 1 345
double action spring hinge
Rs.349.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.426.70 Total Amount of M and L Rs.363.18
Add 17.5 % OH and CP Rs.63.56
Total Rs.426.73

ITEM No. 9075.02


Blank hinge, brass bright polished for use alongwith brass double action spring hinges S&F size of spring hinge
125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Black hinge Brass bright polished 125mm for use alongwith Brass 1 No. Rs. 410.00 1 410
double action spring hinge
Rs.414.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.503.10 Total Amount of M and L Rs.428.18
Add 17.5 % OH and CP Rs.74.93
Total Rs.503.11

894 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9075.03
Blank hinge, brass bright polished for use alongwith brass double action spring hinges S&F size of spring hinge
150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 Black hinge Brass bright polished 150mm for use alongwith Brass 1 No. Rs. 475.00 1 475
double action spring hinge
Rs.479.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.579.50 Total Amount of M and L Rs.493.18
Add 17.5 % OH and CP Rs.86.31
Total Rs.579.48

ITEM No. 9075.04


Blank hinge, brass bright polished for use alongwith brass double action spring hinges fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.21.40 Total Amount of M and L Rs.18.18
Add 17.5 % OH and CP Rs.3.18
Total Rs.21.36

ITEM No. 9075.05


Blank hinge, brass bright polished for use alongwith brass double action spring hinges Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0241 5.4225
Rs.5.42
After rounding off: Rs.6.40 Total Amount of M and L Rs.5.42
Add 17.5 % OH and CP Rs.0.95
Total Rs.6.37

895 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9076.01
300mm, ordinary rat tail rod pattern springscluding roller and rollerplate complete. S&F mild steel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 MS spring hinge 300mm RAT TAIL 1 No. Rs. 65.00 1 65
Rs.67.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.95.40 Total Amount of M and L Rs.81.18
Add 17.5 % OH and CP Rs.14.21
Total Rs.95.38

ITEM No. 9076.02


300mm, ordinary rat tail rod pattern springscluding roller and rollerplate complete. S&F brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Brass spring hinge 300mm RAT TAIL 1 No. Rs. 125.00 1 125
Rs.127.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.165.90 Total Amount of M and L Rs.141.18
Add 17.5 % OH and CP Rs.24.71
Total Rs.165.88

ITEM No. 9076.03


300mm, ordinary rat tail rod pattern springscluding roller and rollerplate complete. Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.19.00 Total Amount of M and L Rs.16.18
Add 17.5 % OH and CP Rs.2.83
Total Rs.19.01

896 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9076.04
300mm, ordinary rat tail rod pattern springscluding roller and rollerplate complete. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0208 4.68
Rs.4.68
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.68
Add 17.5 % OH and CP Rs.0.82
Total Rs.5.50

ITEM No. 9077.01


375mm, ordinary rat tail rod pattern springscluding roller and rollerplate complete. S&F mild steel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 MS spring hinge 375mm RAT TAIL 1 No. Rs. 85.00 1 85
Rs.87.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.118.90 Total Amount of M and L Rs.101.18
Add 17.5 % OH and CP Rs.17.71
Total Rs.118.88

ITEM No. 9077.02


375mm, ordinary rat tail rod pattern springscluding roller and rollerplate complete. S&F brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass spring hinges 375mm RAT TAIL 1 No. Rs. 150.00 1 150
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.152.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.195.30 Total Amount of M and L Rs.166.18
Add 17.5 % OH and CP Rs.29.08
Total Rs.195.26

897 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9077.03
375mm, ordinary rat tail rod pattern springscluding roller and rollerplate complete. Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.19.00 Total Amount of M and L Rs.16.18
Add 17.5 % OH and CP Rs.2.83
Total Rs.19.01

ITEM No. 9077.04


375mm, ordinary rat tail rod pattern springscluding roller and rollerplate complete. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0208 4.68
Rs.4.68
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.68
Add 17.5 % OH and CP Rs.0.82
Total Rs.5.50

ITEM No. 9078.01


Add to items 9076 and 9077 if fixed to stone/concrete chowkats with flat iron 40x3mm size 75cm long with
necessary bolts, etc.mild steel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Flat iron holder for RWP 1 Kg Rs. 48.00 0.71 34.08
2 Lewis bolt not exceeding 15cm length 12mm dia 1 Kg Rs. 50.00 0.6 30
Rs.64.08
After rounding off: Rs.75.30 Total Amount of M and L Rs.64.08
Add 17.5 % OH and CP Rs.11.21
Total Rs.75.29

ITEM No. 9079.01


Cast iron or malleable cast iron handles, cast type, stone enamelled black and fixed size of handle 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI Handle Stove Enamelled 75mm 1 No. Rs. 17.00 1 17
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.19.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.27.90 Total Amount of M and L Rs.23.73
Add 17.5 % OH and CP Rs.4.15
Total Rs.27.88

898 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9079.02
Cost iron or malleable cast iron handles, cast type, stone enamelled black and fixed size of handle 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI Handle Stove Enamelled 100mm 1 No. Rs. 20.00 1 20
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.22.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.31.40 Total Amount of M and L Rs.26.73
Add 17.5 % OH and CP Rs.4.68
Total Rs.31.40

ITEM No. 9079.03


Cost iron or malleable cast iron handles, cast type, stone enamelled black and fixed size of handle 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 CI Handle Stove Enamelled 125mm 1 No. Rs. 22.00 1 22
Rs.24.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0209 4.7025
Rs.4.70
After rounding off: Rs.33.70 Total Amount of M and L Rs.28.70
Add 17.5 % OH and CP Rs.5.02
Total Rs.33.73

ITEM No. 9079.04


Cost iron or malleable cast iron handles, cast type, stone enamelled black and fixed size of handle 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 CI Handle stone Enamelled 150mm 1 No. Rs. 30.00 1 30
Rs.32.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0209 4.7025
Rs.4.70
After rounding off: Rs.43.10 Total Amount of M and L Rs.36.70
Add 17.5 % OH and CP Rs.6.42
Total Rs.43.13

899 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9080.01
Mild steel pressed handles, ovel type, stove enamelled black and fixed size of handle 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Pressed Handle Stove Enamelled 75mm 1 No. Rs. 11.00 1 11
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.13.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.20.80 Total Amount of M and L Rs.17.73
Add 17.5 % OH and CP Rs.3.10
Total Rs.20.83

ITEM No. 9080.02


Mild steel pressed handles, ovel type, stove enamelled black and fixed size of handle 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Pressed Handle Stove Enamelled 100mm 1 No. Rs. 12.00 1 12
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.14.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.22.00 Total Amount of M and L Rs.18.73
Add 17.5 % OH and CP Rs.3.28
Total Rs.22.00

ITEM No. 9080.03


Mild steel pressed handles, ovel type, stove enamelled black and fixed size of handle 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Pressed Handle Stove Enamelled 125mm 1 No. Rs. 13.00 1 13
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.15.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.23.20 Total Amount of M and L Rs.19.73
Add 17.5 % OH and CP Rs.3.45
Total Rs.23.18

900 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9080.04
Mild steel pressed handles, ovel type, stove enamelled black and fixed size of handle 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Pressed Handle Stove Enamelled 150mm 1 No. Rs. 15.00 1 15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.17.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.25.50 Total Amount of M and L Rs.21.73
Add 17.5 % OH and CP Rs.3.80
Total Rs.25.53

ITEM No. 9081.01


Brass handles, cast type, polished bright and fixed size ofhandle 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 CAST Brass Handle 75 mm 1 No. Rs. 33.00 1 33
Rs.35.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.46.70 Total Amount of M and L Rs.39.73
Add 17.5 % OH and CP Rs.6.95
Total Rs.46.68

ITEM No. 9081.02


Brass handles, cast type, polished bright and fixed size of.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CAST Brass Handle 100 mm 1 No. Rs. 45.00 1 45
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.47.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.60.80 Total Amount of M and L Rs.51.73
Add 17.5 % OH and CP Rs.9.05
Total Rs.60.78

901 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9081.03
Brass handles, cast type, polished bright and fixed size ofhandle 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CAST Brass Handle 125 mm 1 No. Rs. 53.00 1 53
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.55.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.70.20 Total Amount of M and L Rs.59.73
Add 17.5 % OH and CP Rs.10.45
Total Rs.70.18

ITEM No. 9081.04


Brass handles, cast type, polished bright and fixed size ofhandle 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 CAST Brass Handle 150 mm 1 No. Rs. 65.00 1 65
Rs.67.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.84.30 Total Amount of M and L Rs.71.73
Add 17.5 % OH and CP Rs.12.55
Total Rs.84.28

ITEM No. 9082.01


Extruted brass handles, fabricatd type polished and fixedsize of handle 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extruded Brass Handle Fabricated Type 75mm 1 No. Rs. 48.00 1 48
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.50.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.64.30 Total Amount of M and L Rs.54.73
Add 17.5 % OH and CP Rs.9.58
Total Rs.64.30

902 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9082.02
Extruted brass handles, fabricatd type polished and fixed,size of handle 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Extruded Brass Handle Fabricated Type 100mm 1 No. Rs. 55.00 1 55
Rs.57.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.72.50 Total Amount of M and L Rs.61.73
Add 17.5 % OH and CP Rs.10.80
Total Rs.72.53

ITEM No. 9082.03


Extruted brass handles, fabricatd type polished and fixed,size of handle 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extruded Brass Handle Fabricated Type 125mm 1 No. Rs. 65.00 1 65
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.67.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.84.30 Total Amount of M and L Rs.71.73
Add 17.5 % OH and CP Rs.12.55
Total Rs.84.28

ITEM No. 9082.04


Extruted brass handles, fabricatd type polished and fixed,size of handle 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extruded Brass Handle Fabricated Type 150mm 1 No. Rs. 75.00 1 75
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.77.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.96.00 Total Amount of M and L Rs.81.73
Add 17.5 % OH and CP Rs.14.30
Total Rs.96.03

903 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9083.01
Aluminium handles, cast type, anodised and fixed size of handle 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 CAST ALU Handle cast T 75mm 1 No. Rs. 16.00 1 16
Rs.18.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.26.70 Total Amount of M and L Rs.22.73
Add 17.5 % OH and CP Rs.3.98
Total Rs.26.70

ITEM No. 9083.02


Aluminium handles, cast type, anodised and fixed size ofhandle 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 CAST ALU Handle cast T 100mm 1 No. Rs. 17.99 1 17.99
Rs.19.99
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.29.00 Total Amount of M and L Rs.24.72
Add 17.5 % OH and CP Rs.4.33
Total Rs.29.04

ITEM No. 9083.03


Aluminium handles, cast type, anodised and fixed size of handle 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 CAST ALU Handle cast T 125mm 1 No. Rs. 22.00 1 22
Rs.24.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0209 4.7025
Rs.4.70
After rounding off: Rs.33.70 Total Amount of M and L Rs.28.70
Add 17.5 % OH and CP Rs.5.02
Total Rs.33.73

904 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9083.04
Aluminium handles, cast type, anodised and fixed size of handle 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CAST ALU Handle cast T 150mm 1 No. Rs. 25.00 1 25
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.27.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.37.30 Total Amount of M and L Rs.31.73
Add 17.5 % OH and CP Rs.5.55
Total Rs.37.28

ITEM No. 9084.01


Extruded aluminium alloy handles, fabricated type, anodisedand fixed size of handle 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extruded ALU Handle Fabricated Type 75mm 1 No. Rs. 17.00 1 17
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.19.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.27.90 Total Amount of M and L Rs.23.73
Add 17.5 % OH and CP Rs.4.15
Total Rs.27.88

ITEM No. 9084.02


Extruded aluminium alloy handles, fabricated type, anodisedand fixed size of handle 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extruded ALU Handle Fabricated Type 100mm 1 No. Rs. 28.00 1 28
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.30.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.40.80 Total Amount of M and L Rs.34.73
Add 17.5 % OH and CP Rs.6.08
Total Rs.40.80

905 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9084.03
Extruded aluminium alloy handles, fabricated type, anodisedand fixed size of handle 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extruded ALU Handle Fabricated Type 125mm 1 No. Rs. 29.00 1 29
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.31.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.42.00 Total Amount of M and L Rs.35.73
Add 17.5 % OH and CP Rs.6.25
Total Rs.41.98

ITEM No. 9084.04


Extruded aluminium alloy handles, fabricated type, anodisedand fixed size of handle 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Extruded ALU Handle Fabricated Type 150mm 1 No. Rs. 35.00 1 35
Rs.37.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.49.00 Total Amount of M and L Rs.41.73
Add 17.5 % OH and CP Rs.7.30
Total Rs.49.03

ITEM No. 9085.01


Fixing only items 9079 to 9084 size of handle 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.73
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.90

906 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9085.02
Fixing only items 9079 to 9084 size of handle 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.73
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.90

ITEM No. 9085.03


Fixing only items 9079 to 9084 size of handle 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.73
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.90

ITEM No. 9085.04


Fixing only items 9079 to 9084 size of handle 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.021 4.725
Rs.4.73
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.73
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.90

ITEM No. 9086.01


Add to items 09079 to 09084 if fixed in repairs Size of handle 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0067 1.5075
Rs.1.51
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.51
Add 17.5 % OH and CP Rs.0.26
Total Rs.1.77

907 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9086.02
Add to items 09079 to 09084) if fixed in repairs Size of handle 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0067 1.5075
Rs.1.51
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.51
Add 17.5 % OH and CP Rs.0.26
Total Rs.1.77

ITEM No. 9086.03


Add to items 09079 to 09084) if fixed in repairs Size of handle 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0067 1.5075
Rs.1.51
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.51
Add 17.5 % OH and CP Rs.0.26
Total Rs.1.77

ITEM No. 9086.04


Add to items 09079 to 09084 if fixed in repairs Size of handle 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0067 1.5075
Rs.1.51
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.51
Add 17.5 % OH and CP Rs.0.26
Total Rs.1.77

ITEM No. 9087.01


Rim latch with two levers, of mild steel body, stove enamelled finishedwith brass knob or lever handle and
fixed size of latch 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Latch RIM Stove enamelled 75mm two levers, brass knob or lever 1 No. Rs. 60.00 1 60
handle
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.64.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.99.60 Total Amount of M and L Rs.84.75
Add 17.5 % OH and CP Rs.14.83
Total Rs.99.58

908 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9087.02
Rim latch with two levers, of mild steel body, stove enamelled finishedwith brass knob or lever handle and
fixed size of latch 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 MS Latch RIM Stove enamelled 100mm two levers, brass knob or 1 No. Rs. 70.67 1 70.67
lever handle
Rs.75.17
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.112.10 Total Amount of M and L Rs.95.42
Add 17.5 % OH and CP Rs.16.70
Total Rs.112.12

ITEM No. 9087.03


Rim latch with two levers, of mild steel body, stove enamelled finishedwith brass knob or lever handle and
fixed size of latch 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 MS Latch RIM Stove enamelled 125mm two levers, brass knob or 1 No. Rs. 88.43 1 88.43
lever handle
Rs.92.93
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.133.00 Total Amount of M and L Rs.113.18
Add 17.5 % OH and CP Rs.19.81
Total Rs.132.99

ITEM No. 9087.04


Rim latch with two levers, of mild steel body, stove enamelled finishedwith brass knob or lever handle and
fixed size of latch 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 MS Latch RIM Stove enamelled 150mm two levers, brass knob or 1 No. Rs. 90.34 1 90.34
lever handle
Rs.94.84
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.135.20 Total Amount of M and L Rs.115.09
Add 17.5 % OH and CP Rs.20.14
Total Rs.135.23

909 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9088.01
Ditto, item No 09087 but of brass body, polished bright size of latch75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Brass Latch RIM 75mm 1 No. Rs. 152.33 1 152.33
Rs.156.83
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.208.10 Total Amount of M and L Rs.177.08
Add 17.5 % OH and CP Rs.30.99
Total Rs.208.07

ITEM No. 9088.02


Ditto, item No 09087 but of brass body, polished bright size of latch100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Latch RIM 100mm 1 No. Rs. 173.38 1 173.38
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.177.88
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.232.80 Total Amount of M and L Rs.198.13
Add 17.5 % OH and CP Rs.34.67
Total Rs.232.80

ITEM No. 9088.03


Ditto, item No 09087 but of brass body, polished bright size of latch125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Latch RIM 125mm 1 No. Rs. 204.88 1 204.88
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.209.38
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.269.80 Total Amount of M and L Rs.229.63
Add 17.5 % OH and CP Rs.40.19
Total Rs.269.82

910 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9088.04
Ditto, item No 09087 but of brass body, polished bright size of latch150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Latch RIM 150mm 1 No. Rs. 226.18 1 226.18
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.230.68
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.294.80 Total Amount of M and L Rs.250.93
Add 17.5 % OH and CP Rs.43.91
Total Rs.294.84

ITEM No. 9089.01


Ditto, item No 09087 ) but of aluminium alloy body, anodised size of latch 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Latch RIM ALU alloy 75mm 1 No. Rs. 78.00 1 78
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.82.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.120.70 Total Amount of M and L Rs.102.75
Add 17.5 % OH and CP Rs.17.98
Total Rs.120.73

ITEM No. 9089.02


Ditto, item No 09087 but of aluminium alloy body, anodised size of latch 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Latch RIM ALU alloy 100mm 1 No. Rs. 92.52 1 92.52
Rs.97.02
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.137.80 Total Amount of M and L Rs.117.27
Add 17.5 % OH and CP Rs.20.52
Total Rs.137.79

911 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9089.03
Ditto, item No 09087 but of aluminium alloy body, anodised size of latch 125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Latch RIM ALU alloy 125mm 1 No. Rs. 108.24 1 108.24
Rs.112.74
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.156.30 Total Amount of M and L Rs.132.99
Add 17.5 % OH and CP Rs.23.27
Total Rs.156.26

ITEM No. 9089.04


Ditto, item No 09087 (0096) but of aluminium alloy body, anodised size of latch 150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Latch RIM ALU alloy 150mm 1 No. Rs. 131.16 1 131.16
Rs.135.66
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.183.20 Total Amount of M and L Rs.155.91
Add 17.5 % OH and CP Rs.27.28
Total Rs.183.19

ITEM No. 9090.01


Fixing only, items 09087 to 09089 size of latch 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.29.10 Total Amount of M and L Rs.24.75
Add 17.5 % OH and CP Rs.4.33
Total Rs.29.08

912 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9090.02
Fixing only, items 09087 to 09089 size of latch 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.29.10 Total Amount of M and L Rs.24.75
Add 17.5 % OH and CP Rs.4.33
Total Rs.29.08

ITEM No. 9090.03


Fixing only, items 09087 to 09089 size of latch 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.29.10 Total Amount of M and L Rs.24.75
Add 17.5 % OH and CP Rs.4.33
Total Rs.29.08

ITEM No. 9090.04


Fixing only, items 09087 to 09089 size of latch 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.29.10 Total Amount of M and L Rs.24.75
Add 17.5 % OH and CP Rs.4.33
Total Rs.29.08

ITEM No. 9091.01


Add to items 09087 to 09090 if fixed in repairs size of latch75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

913 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9091.02
Add to items 09087 to 09090 if fixed in repairs size of latch100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

ITEM No. 9091.03


Add to items 09087 to 09090 if fixed in repairs size of latch125 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

ITEM No. 9091.04


Add to items 09087 to 09090 if fixed in repairs size of latch150 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

ITEM No. 9092.01


Mortice latch with tow levers (verticla type), mild steel body and fixed size of latch 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Latch mortice(verticle)L 65mm with screws 1 No. Rs. 117.00 1 117
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.121.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.166.60 Total Amount of M and L Rs.141.75
Add 17.5 % OH and CP Rs.24.81
Total Rs.166.56

914 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9092.02
Mortice latch with tow levers (verticla type), mild steel body and fixed size of latch 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Latch mortice(verticle))L 75mm with screws 1 No. Rs. 134.40 1 134.4
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.138.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.187.00 Total Amount of M and L Rs.159.15
Add 17.5 % OH and CP Rs.27.85
Total Rs.187.00

ITEM No. 9092.03


Mortice latch with tow levers (verticla type), mild steel body and fixed size of latch 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Latch mortice(verticle))L 100mm with screws 1 No. Rs. 163.40 1 163.4
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.167.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.221.10 Total Amount of M and L Rs.188.15
Add 17.5 % OH and CP Rs.32.93
Total Rs.221.08

ITEM No. 9093.01


Ditto item 0101 but of brass body size of latch 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Latch mortice(verticle))L 65mm with screws 1 No. Rs. 178.50 1 178.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.183.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.238.80 Total Amount of M and L Rs.203.25
Add 17.5 % OH and CP Rs.35.57
Total Rs.238.82

915 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9093.02
Ditto item 0101 but of brass body size of latch 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Latch mortice(verticle))L 75mm with screws 1 No. Rs. 222.02 1 222.02
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.226.52
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.290.00 Total Amount of M and L Rs.246.77
Add 17.5 % OH and CP Rs.43.18
Total Rs.289.95

ITEM No. 9093.03


Ditto item 0101 but of brass body size of latch 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Brass Latch mortice(verticle))L 100mm with screws 1 No. Rs. 275.74 1 275.74
Rs.280.24
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.353.10 Total Amount of M and L Rs.300.49
Add 17.5 % OH and CP Rs.52.59
Total Rs.353.08

ITEM No. 9094.01


Ditto item 09092(0101) but of aluminium, anodised body size of latch 65 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Latch mortice(verticle), Aluminium L 65mm 1 No. Rs. 142.50 1 142.5
Rs.147.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.196.50 Total Amount of M and L Rs.167.25
Add 17.5 % OH and CP Rs.29.27
Total Rs.196.52

916 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9094.02
Ditto item 09092(0101) but of aluminium, anodised body size of latch 75 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Latch mortice(verticle), Aluminium L 75mm 1 No. Rs. 165.00 1 165
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.169.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.223.00 Total Amount of M and L Rs.189.75
Add 17.5 % OH and CP Rs.33.21
Total Rs.222.96

ITEM No. 9094.03


Ditto item 09092(0101) but of aluminium, anodised body size of latch 100 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Latch mortice(verticle), Aluminium L 100mm 1 No. Rs. 184.60 1 184.6
Rs.189.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.246.00 Total Amount of M and L Rs.209.35
Add 17.5 % OH and CP Rs.36.64
Total Rs.245.99

ITEM No. 9095.01


Fixing only, items 09092 to 09094 size of latch 65mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.29.10 Total Amount of M and L Rs.24.75
Add 17.5 % OH and CP Rs.4.33
Total Rs.29.08

917 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9095.02
Fixing only, items 09092 to 09094 size of latch 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.29.10 Total Amount of M and L Rs.24.75
Add 17.5 % OH and CP Rs.4.33
Total Rs.29.08

ITEM No. 9095.03


Fixing only, items 09092 to 09094 size of latch 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.29.10 Total Amount of M and L Rs.24.75
Add 17.5 % OH and CP Rs.4.33
Total Rs.29.08

ITEM No. 9096.01


Add to items 09092 to 09095 if fixed in repairs size of latch 65mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

ITEM No. 9096.02


Add to items 09092 to 09095 if fixed in repairs size of latch 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

918 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9096.03
Add to items 09092 to 09095 if fixed in repairs size of latch 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.75
Add 17.5 % OH and CP Rs.1.18
Total Rs.7.93

ITEM No. 9097.01


Mortice lock, vertical type, size 100 mm and fixed mildsteel 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock mortice 100mm MS 2 lever 1 No. Rs. 138.00 1 138
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.142.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.217.70 Total Amount of M and L Rs.185.25
Add 17.5 % OH and CP Rs.32.42
Total Rs.217.67

ITEM No. 9097.02


Mortice lock, vertical type, size 100 mm and fixed mild steel 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock mortice 100mm MS 4 lever 1 No. Rs. 207.00 1 207
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.211.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.298.70 Total Amount of M and L Rs.254.25
Add 17.5 % OH and CP Rs.44.49
Total Rs.298.74

919 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9097.03
Mortice lock, vertical type, size 100 mm and fixed Brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock mortice BR100mm Brass 2 levers 1 No. Rs. 276.00 1 276
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.280.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.379.80 Total Amount of M and L Rs.323.25
Add 17.5 % OH and CP Rs.56.57
Total Rs.379.82

ITEM No. 9097.04


Mortice lock, vertical type, size 100 mm and fixed Brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock mortice 100mm Brass 4 lever 1 No. Rs. 414.00 1 414
Rs.418.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.542.00 Total Amount of M and L Rs.461.25
Add 17.5 % OH and CP Rs.80.72
Total Rs.541.97

ITEM No. 9097.07


Mortice lock, vertical type, size 100 mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.1889 42.5025
Rs.42.50
After rounding off: Rs.55.20 Total Amount of M and L Rs.47.00
Add 17.5 % OH and CP Rs.8.23
Total Rs.55.23

920 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9097.08
Mortice lock, vertical type, size 100 mm and fixed add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

ITEM No. 9098.01


Mortice lock, vertical type, size 65 mm and fixed mild steel 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock mortice 65mm MS 2 lever 1 No. Rs. 107.80 1 107.8
Rs.112.30
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.182.20 Total Amount of M and L Rs.155.05
Add 17.5 % OH and CP Rs.27.13
Total Rs.182.18

ITEM No. 9098.02


Mortice lock, vertical type, size 65 mm and fixed mild steel 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock mortice 65mm MS 4 lever 1 No. Rs. 142.80 1 142.8
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.147.30
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.223.30 Total Amount of M and L Rs.190.05
Add 17.5 % OH and CP Rs.33.26
Total Rs.223.31

921 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9098.03
Mortice lock, vertical type, size 65 mm and fixed brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock mortice Brass 65mm BR 2 lever 1 No. Rs. 198.90 1 198.9
Rs.203.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.289.20 Total Amount of M and L Rs.246.15
Add 17.5 % OH and CP Rs.43.08
Total Rs.289.23

ITEM No. 9098.04


Mortice lock, vertical type, size 65 mm and fixed brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock mortice Brass 65mm BR 4 lever 1 No. Rs. 221.40 1 221.4
Rs.225.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.315.70 Total Amount of M and L Rs.268.65
Add 17.5 % OH and CP Rs.47.01
Total Rs.315.66

ITEM No. 9098.07


Mortice lock, vertical type, size 65 mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.55.50 Total Amount of M and L Rs.47.25
Add 17.5 % OH and CP Rs.8.27
Total Rs.55.52

922 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9098.08
Mortice lock, vertical type, size 65 mm and fixed if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

ITEM No. 9099.01


Mortice lock, vertical type, size 75 mm and fixed mildsteel 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock mortice 75mm MS 2 lever 1 No. Rs. 120.40 1 120.4
Rs.124.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.197.00 Total Amount of M and L Rs.167.65
Add 17.5 % OH and CP Rs.29.34
Total Rs.196.99

ITEM No. 9099.02


Mortice lock, vertical type, size 75 mm and fixed mildsteel4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock mortice 75mm MS 4 lever 1 No. Rs. 148.40 1 148.4
Rs.152.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.229.90 Total Amount of M and L Rs.195.65
Add 17.5 % OH and CP Rs.34.24
Total Rs.229.89

923 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9099.03
Mortice lock, vertical type, size 75 mm and fixed Brass2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock mortice 75mm Brass 2 lever 1 No. Rs. 224.40 1 224.4
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.228.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.319.20 Total Amount of M and L Rs.271.65
Add 17.5 % OH and CP Rs.47.54
Total Rs.319.19

ITEM No. 9099.04


Mortice lock, vertical type, size 75 mm and fixed Brass4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock mortice 75mm Brass 4 lever 1 No. Rs. 266.90 1 266.9
Rs.271.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.369.10 Total Amount of M and L Rs.314.15
Add 17.5 % OH and CP Rs.54.98
Total Rs.369.13

ITEM No. 9099.06


Mortice lock, vertical type, size 75 mm and fixed Aluminium 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock mortice 100mm AL 4 lever 1 No. Rs. 183.00 1 183
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.187.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.270.50 Total Amount of M and L Rs.230.25
Add 17.5 % OH and CP Rs.40.29
Total Rs.270.54

924 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9099.07
Mortice lock, vertical type, size 75 mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.19 42.75
Rs.42.75
After rounding off: Rs.55.50 Total Amount of M and L Rs.47.25
Add 17.5 % OH and CP Rs.8.27
Total Rs.55.52

ITEM No. 9099.08


Mortice lock, vertical type, size 75 mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.063 14.175
Rs.14.18
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.18
Add 17.5 % OH and CP Rs.2.48
Total Rs.16.66

ITEM No. 9102.01


Mortice night latch, size 65mm and fixed Mildsteel 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Mortice night latch 65mm MS 2 lever 1 No. Rs. 68.60 1 68.6
Rs.70.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.93.50 Total Amount of M and L Rs.79.60
Add 17.5 % OH and CP Rs.13.93
Total Rs.93.53

925 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9102.02
Mortice night latch, size 65mm and fixed Mildsteel 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mortice night latch 65mm MS 4 lever 1 No. Rs. 75.60 1 75.6
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.77.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.101.80 Total Amount of M and L Rs.86.60
Add 17.5 % OH and CP Rs.15.16
Total Rs.101.76

ITEM No. 9102.03


Mortice night latch, size 65mm and fixed Brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mortice night latch 65mm Brass 2 lever 1 No. Rs. 112.20 1 112.2
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.114.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.144.80 Total Amount of M and L Rs.123.20
Add 17.5 % OH and CP Rs.21.56
Total Rs.144.76

ITEM No. 9102.04


Mortice night latch, size 65mm and fixed Brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mortice night latch 65mm Brass 4 lever 1 No. Rs. 127.50 1 127.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.129.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.162.70 Total Amount of M and L Rs.138.50
Add 17.5 % OH and CP Rs.24.24
Total Rs.162.74

926 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9102.07
Mortice night latch, size 65mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.12.90 Total Amount of M and L Rs.11.00
Add 17.5 % OH and CP Rs.1.93
Total Rs.12.93

ITEM No. 9102.08


Mortice night latch, size 65mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.013 2.925
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

ITEM No. 9103.01


Mortice night latch, size 75mm and fixed Mildsteel 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mortice night latch 75mm MS 2 lever 1 No. Rs. 114.71 1 114.71
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.116.71
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.147.70 Total Amount of M and L Rs.125.71
Add 17.5 % OH and CP Rs.22.00
Total Rs.147.71

927 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9103.02
Mortice night latch, size 75mm and fixed Mildsteel 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mortice night latch 75mm MS 4 lever 1 No. Rs. 133.11 1 133.11
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.135.11
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.169.30 Total Amount of M and L Rs.144.11
Add 17.5 % OH and CP Rs.25.22
Total Rs.169.33

ITEM No. 9103.03


Mortice night latch, size 75mm and fixed Brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Mortice night latch 75mm Brass 2 lever 1 No. Rs. 164.56 1 164.56
Rs.166.56
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.206.30 Total Amount of M and L Rs.175.56
Add 17.5 % OH and CP Rs.30.72
Total Rs.206.28

ITEM No. 9103.04


Mortice night latch, size 75mm and fixed Brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mortice night latch 75mm Brass 4 lever 1 No. Rs. 169.32 1 169.32
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.171.32
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.211.90 Total Amount of M and L Rs.180.32
Add 17.5 % OH and CP Rs.31.56
Total Rs.211.88

928 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9103.07
Mortice night latch, size 75mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.12.90 Total Amount of M and L Rs.11.00
Add 17.5 % OH and CP Rs.1.93
Total Rs.12.93

ITEM No. 9103.08


Mortice night latch, size 75mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.013 2.925
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

ITEM No. 9103.09


Mortice night latch, size 100mm and fixed Mildsteel 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Mortice night latch 100mm MS 2 lever 1 No. Rs. 126.00 1 126
Rs.128.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.161.00 Total Amount of M and L Rs.137.00
Add 17.5 % OH and CP Rs.23.98
Total Rs.160.98

929 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9103.1
Mortice night latch, size 100mm and fixed Mildsteel 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Mortice night latch 100mm MS 4 lever 1 No. Rs. 139.90 1 139.9
Rs.141.90
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.177.30 Total Amount of M and L Rs.150.90
Add 17.5 % OH and CP Rs.26.41
Total Rs.177.31

ITEM No. 9103.11


Mortice night latch, size 100mm and fixed Brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mortice night latch 100mm Brass 2 lever 1 No. Rs. 178.84 1 178.84
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.180.84
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.223.10 Total Amount of M and L Rs.189.84
Add 17.5 % OH and CP Rs.33.22
Total Rs.223.06

ITEM No. 9103.12


Mortice night latch, size 100mm and fixed Brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mortice night latch 100mm BR 4 lever 1 No. Rs. 219.98 1 219.98
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.221.98
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.271.40 Total Amount of M and L Rs.230.98
Add 17.5 % OH and CP Rs.40.42
Total Rs.271.40

930 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9103.14
Mortice night latch, size 100mm and fixed Aluminium 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Mortice night latch 100mm AL 4 lever 1 No. Rs. 172.00 1 172
Rs.174.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.215.00 Total Amount of M and L Rs.183.00
Add 17.5 % OH and CP Rs.32.03
Total Rs.215.03

ITEM No. 9103.15


Mortice night latch, size 100mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.12.90 Total Amount of M and L Rs.11.00
Add 17.5 % OH and CP Rs.1.93
Total Rs.12.93

ITEM No. 9103.16


Mortice night latch, size 100mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.013 2.925
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

931 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9104.03
Locks, cupboard, grade 1, size 50 mm and fixed brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock cup board 50mm Brass 2 lever 1 No. Rs. 68.00 1 68
Rs.72.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.95.80 Total Amount of M and L Rs.81.50
Add 17.5 % OH and CP Rs.14.26
Total Rs.95.76

ITEM No. 9104.04


Locks, cupboard, grade 1, size 50 mm and fixed brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock cup board 50mm Brass 4 lever 1 No. Rs. 77.12 1 77.12
Rs.81.62
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.106.50 Total Amount of M and L Rs.90.62
Add 17.5 % OH and CP Rs.15.86
Total Rs.106.48

ITEM No. 9104.05


Locks, cupboard, grade 1, size 50 mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.15.90 Total Amount of M and L Rs.13.50
Add 17.5 % OH and CP Rs.2.36
Total Rs.15.86

932 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9104.06
Locks, cupboard, grade 1, size 50 mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.10.60 Total Amount of M and L Rs.9.00
Add 17.5 % OH and CP Rs.1.58
Total Rs.10.58

ITEM No. 9105.03


Locks, cupboard, grade 1, size 65 mm and fixed brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock cup board 65mm Brass 2 lever 1 No. Rs. 78.20 1 78.2
Rs.82.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0401 9.0225
Rs.9.02
After rounding off: Rs.107.80 Total Amount of M and L Rs.91.72
Add 17.5 % OH and CP Rs.16.05
Total Rs.107.77

ITEM No. 9105.04


Locks, cupboard, grade 1, size 65 mm and fixed brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
2 Lock cup board 65mm Brass 4 lever 1 No. Rs. 85.00 1 85
Rs.89.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.115.70 Total Amount of M and L Rs.98.50
Add 17.5 % OH and CP Rs.17.24
Total Rs.115.74

933 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9105.07
Locks, cupboard, grade 1, size 65 mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.15.90 Total Amount of M and L Rs.13.50
Add 17.5 % OH and CP Rs.2.36
Total Rs.15.86

ITEM No. 9105.08


Locks, cupboard, grade 1, size 65 mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.10.60 Total Amount of M and L Rs.9.00
Add 17.5 % OH and CP Rs.1.58
Total Rs.10.58

ITEM No. 9106.04


Locks, cupboard, grade 1, size 75 mm and fixed brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock cup board 75mm Brass 4 lever 1 No. Rs. 84.20 1 84.2
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.88.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.114.80 Total Amount of M and L Rs.97.70
Add 17.5 % OH and CP Rs.17.10
Total Rs.114.80

ITEM No. 9106.07


Locks, cupboard, grade 1, size 75 mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.09 4.5
Rs.4.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.15.90 Total Amount of M and L Rs.13.50
Add 17.5 % OH and CP Rs.2.36
Total Rs.15.86

934 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9106.08
Locks, cupboard, grade 1, size 75 mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.10.60 Total Amount of M and L Rs.9.00
Add 17.5 % OH and CP Rs.1.58
Total Rs.10.58

ITEM No. 9107.03


Locks, drawer, grade 1, size 50 mm and fixed brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Lock drawer 50mm Brass 2 lever 1 No. Rs. 64.60 1 64.6
Rs.66.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.88.80 Total Amount of M and L Rs.75.60
Add 17.5 % OH and CP Rs.13.23
Total Rs.88.83

ITEM No. 9107.04


Locks, drawer, grade 1, size 50 mm and fixed brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock drawer 50mm Brass 4 lever 1 No. Rs. 72.55 1 72.55
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.74.55
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.98.20 Total Amount of M and L Rs.83.55
Add 17.5 % OH and CP Rs.14.62
Total Rs.98.17

935 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9107.07
Locks, drawer, grade 1, size 50 mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.12.90 Total Amount of M and L Rs.11.00
Add 17.5 % OH and CP Rs.1.93
Total Rs.12.93

ITEM No. 9107.08


Locks, drawer, grade 1, size 50 mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.013 2.925
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

ITEM No. 9108.03


Locks, drawer, grade 1, size 65 mm and fixed brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock drawer 65mm Brass 2 lever 1 No. Rs. 67.15 1 67.15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.69.15
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.91.80 Total Amount of M and L Rs.78.15
Add 17.5 % OH and CP Rs.13.68
Total Rs.91.83

936 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9108.04
Locks, drawer, grade 1, size 65 mm and fixed brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock drawer 65mm Brass 4 lever 1 No. Rs. 100.80 1 100.8
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.102.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.131.40 Total Amount of M and L Rs.111.80
Add 17.5 % OH and CP Rs.19.57
Total Rs.131.37

ITEM No. 9108.07


Locks, drawer, grade 1, size 65 mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.12.90 Total Amount of M and L Rs.11.00
Add 17.5 % OH and CP Rs.1.93
Total Rs.12.93

ITEM No. 9108.08


Locks, drawer, grade 1, size 65 mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.013 2.925
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

937 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9109.03
Locks, drawer, grade 1, size 75 mm and fixed brass 2 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Lock drawer 75mm Brass 2 lever 1 No. Rs. 71.40 1 71.4
Rs.73.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.96.80 Total Amount of M and L Rs.82.40
Add 17.5 % OH and CP Rs.14.42
Total Rs.96.82

ITEM No. 9109.04


Locks, drawer, grade 1, size 75 mm and fixed brass 4 levers.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lock drawer 75mm Brass 4 lever 1 No. Rs. 76.50 1 76.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.78.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.102.80 Total Amount of M and L Rs.87.50
Add 17.5 % OH and CP Rs.15.31
Total Rs.102.81

ITEM No. 9109.07


Locks, drawer, grade 1, size 75 mm and fixed Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.12.90 Total Amount of M and L Rs.11.00
Add 17.5 % OH and CP Rs.1.93
Total Rs.12.93

938 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9109.08
Locks, drawer, grade 1, size 75 mm and fixed Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.013 2.925
Rs.2.93
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.93
Add 17.5 % OH and CP Rs.0.51
Total Rs.3.44

ITEM No. 9110.01


Casement stays, size 300 mm, with hinged joint and two plates,with studs complete S & F Cast iron (malleable)
or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Casement/ Fastner stay 300mm size with hinged joint & two 1 No. Rs. 10.31 1 10.31
plates & studs
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.12.31
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.22.40 Total Amount of M and L Rs.19.06
Add 17.5 % OH and CP Rs.3.34
Total Rs.22.40

ITEM No. 9110.04


Casement stays, size 300 mm, with hinged joint and two plates,with studs complete Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.10.30 Total Amount of M and L Rs.8.75
Add 17.5 % OH and CP Rs.1.53
Total Rs.10.28

ITEM No. 9110.05


Casement stays, size 300 mm, with hinged joint and two plates,with studs complete Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

939 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9111.01
Casement stays, size 250 mm, with hinged joint and two plates,with studs complete S & F Cast iron (malleable)
or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Casement/ Fastner stay 250mm size 1 No. Rs. 9.37 1 9.37
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.11.37
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.21.30 Total Amount of M and L Rs.18.12
Add 17.5 % OH and CP Rs.3.17
Total Rs.21.29

ITEM No. 9111.04


Casement stays, size 250 mm, with hinged joint and two plates,with studs complete Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.03 6.75
Rs.6.75
After rounding off: Rs.10.30 Total Amount of M and L Rs.8.75
Add 17.5 % OH and CP Rs.1.53
Total Rs.10.28

ITEM No. 9111.05


Casement stays, size 250 mm, with hinged joint and two plates,with studs complete Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 9112.01


Add to items 0124 & 0125, if fixed to steel sashes, including drillingneceassary holes or welding S & F Cast iron
(malleable) or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.09 20.25
Rs.20.25
After rounding off: Rs.23.80 Total Amount of M and L Rs.20.25
Add 17.5 % OH and CP Rs.3.54
Total Rs.23.79

940 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9113.01
Screw eye 10 to 12 internal dia and fixed S&F cast iron (malleable) ormildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI eyes screw 10-12 mmD 1 No. Rs. 2.00 1 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.3.10 Total Amount of M and L Rs.2.68
Add 17.5 % OH and CP Rs.0.47
Total Rs.3.14

ITEM No. 9113.02


Screw eye 10 to 12 internal dia and fixed S&F cast brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cast brass eyes screws 10-12 mmD 1 No. Rs. 6.00 1 6
Rs.6.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.7.80 Total Amount of M and L Rs.6.68
Add 17.5 % OH and CP Rs.1.17
Total Rs.7.84

ITEM No. 9113.03


Screw eye 10 to 12 internal dia and fixed S&F aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Eyes screws, Aluminium 10-12mm D 1 No. Rs. 5.40 1 5.4
Rs.5.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

ITEM No. 9113.04


Screw eye 10 to 12 internal dia and fixed fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.0.80 Total Amount of M and L Rs.0.68
Add 17.5 % OH and CP Rs.0.12
Total Rs.0.79

941 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9113.05
Screw eye 10 to 12 internal dia and fixed add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.001 0.225
Rs.0.23
After rounding off: Rs.0.30 Total Amount of M and L Rs.0.23
Add 17.5 % OH and CP Rs.0.04
Total Rs.0.26

ITEM No. 9114.01


Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 30mmthickness and fixed S&F cast iron
(malleable) or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS Pivot socket for 30mm shutter plate size 25mm x 65mm 1 No. Rs. 8.50 1 8.5
Rs.11.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.29.40 Total Amount of M and L Rs.25.00
Add 17.5 % OH and CP Rs.4.38
Total Rs.29.38

ITEM No. 9114.02


Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 30mmthickness and fixed S&F cast brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Cast brass pivot for 30mm Shutter plate size 25mm x 65 mm 1 No. Rs. 58.00 1 58
Rs.61.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.87.50 Total Amount of M and L Rs.74.50
Add 17.5 % OH and CP Rs.13.04
Total Rs.87.54

942 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9114.03
Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 30mmthickness and fixed S&F
aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Pivot socket, Aluminium for 30mm shutter plate size 25mm x 65mm 1 No. Rs. 12.00 1 12
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.15.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.33.50 Total Amount of M and L Rs.28.50
Add 17.5 % OH and CP Rs.4.99
Total Rs.33.49

ITEM No. 9114.04


Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 30mmthickness and fixed fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.19.40 Total Amount of M and L Rs.16.50
Add 17.5 % OH and CP Rs.2.89
Total Rs.19.39

ITEM No. 9114.05


Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 30mmthickness and fixed add if fixed in
repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.5.30 Total Amount of M and L Rs.4.50
Add 17.5 % OH and CP Rs.0.79
Total Rs.5.29

943 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9115.01
Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 35mmthickness and fixed S&F cast iron
(malleable) or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 MS Pivot socket for 35mm shutter plate size 25mm x 65mm 1 No. Rs. 9.10 1 9.1
Rs.12.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.30.10 Total Amount of M and L Rs.25.60
Add 17.5 % OH and CP Rs.4.48
Total Rs.30.08

ITEM No. 9115.02


Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 35mmthickness and fixed S&F cast brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 pivot 35mm shutter Brass 1 No. Rs. 60.00 1 60
Rs.63.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.89.90 Total Amount of M and L Rs.76.50
Add 17.5 % OH and CP Rs.13.39
Total Rs.89.89

ITEM No. 9115.03


Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 35mmthickness and fixed S&F
aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 pivot 35mm shutter Aluminium 1 No. Rs. 13.00 1 13
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.16.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.34.70 Total Amount of M and L Rs.29.50
Add 17.5 % OH and CP Rs.5.16
Total Rs.34.66

944 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9115.04
Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 35mmthickness and fixed fixing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.19.40 Total Amount of M and L Rs.16.50
Add 17.5 % OH and CP Rs.2.89
Total Rs.19.39

ITEM No. 9115.05


.Fanlight pivot with plate size 25mmx65mm and suitable for shutter of 35mmthickness and fixed add if fixed in
repairs
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.5.30 Total Amount of M and L Rs.4.50
Add 17.5 % OH and CP Rs.0.79
Total Rs.5.29

ITEM No. 9116.01


Fanlight pivot with plate size 20mmx50mm and suitable for shutter of25mm thickness and fixed S&F cast iron
(malleable) or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 MS Pivot socket for 25mm shutter plate size 20mm x 50mm 1 No. Rs. 10.30 1 10.3
Rs.12.30
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0468 10.53
Rs.10.53
After rounding off: Rs.26.80 Total Amount of M and L Rs.22.83
Add 17.5 % OH and CP Rs.4.00
Total Rs.26.83

945 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9116.02
Fanlight pivot with plate size 20mmx50mm and suitable for shutter of25mm thickness and fixed S&F cast brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 BR pivot socket for 25 mm SH 1 No. Rs. 51.05 1 51.05
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.53.05
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0468 10.53
Rs.10.53
After rounding off: Rs.74.70 Total Amount of M and L Rs.63.58
Add 17.5 % OH and CP Rs.11.13
Total Rs.74.71

ITEM No. 9116.03


Fanlight pivot with plate size 20mmx50mm and suitable for shutter of25mm thickness and fixed S&F
aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Pivot socket, Aluminium for 25mm shutter plate size 20mm x 50mm 1 No. Rs. 10.50 1 10.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.13.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.31.70 Total Amount of M and L Rs.27.00
Add 17.5 % OH and CP Rs.4.73
Total Rs.31.73

ITEM No. 9116.04


Fanlight pivot with plate size 20mmx50mm and suitable for shutter of25mm thickness and fixed fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0468 10.53
Rs.10.53
After rounding off: Rs.14.70 Total Amount of M and L Rs.12.53
Add 17.5 % OH and CP Rs.2.19
Total Rs.14.72

946 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9116.05
Fanlight pivot with plate size 20mmx50mm and suitable for shutter of25mm thickness and fixed add if fixed in
repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.014 3.15
Rs.3.15
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.15
Add 17.5 % OH and CP Rs.0.55
Total Rs.3.70

ITEM No. 9117.01


Fanlight catch with 14mm catch and fixed cast iron (malleable) or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Fan light catch, cast iron/mild steel 14mm Each Rs. 8.25 1 8.25
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.006 0.3
Rs.8.55
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.10.80 Total Amount of M and L Rs.9.23
Add 17.5 % OH and CP Rs.1.61
Total Rs.10.84

ITEM No. 9117.02


Fanlight catch with 14 mm catch and fixed S&F cast brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cast brass fan light catch 14mm 1 No. Rs. 15.13 1 15.13
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.006 0.3
Rs.15.43
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.18.90 Total Amount of M and L Rs.16.11
Add 17.5 % OH and CP Rs.2.82
Total Rs.18.92

947 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9117.03
Fanlight catch with 14 mm catch and fixed S&F aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Fan light catch, Aluminium 14mm 1 No. Rs. 10.35 1 10.35
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.006 0.3
Rs.10.65
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.13.30 Total Amount of M and L Rs.11.33
Add 17.5 % OH and CP Rs.1.98
Total Rs.13.31

ITEM No. 9117.04


Fanlight catch with 14 mm catch and fixed fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.006 0.3
Rs.0.30
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.1.10 Total Amount of M and L Rs.0.98
Add 17.5 % OH and CP Rs.0.17
Total Rs.1.15

ITEM No. 9117.05


Fanlight catch with 14 mm catch and fixed add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.001 0.225
Rs.0.23
After rounding off: Rs.0.30 Total Amount of M and L Rs.0.23
Add 17.5 % OH and CP Rs.0.04
Total Rs.0.26

948 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9118.01
Drawer pulls, 3 screw plate with fixed dished pull ; 80 mm to 100 mmlong S & F cast iron or mild steel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI drawer pull 80-100mm L-4 SCR PL 3 screw plate 1 No. Rs. 16.50 1 16.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.18.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.27.00 Total Amount of M and L Rs.23.00
Add 17.5 % OH and CP Rs.4.03
Total Rs.27.03

ITEM No. 9118.02


Drawer pulls, 3 screw plate with fixed dished pull ; 80 mm to 100 mmlong S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.03 1.5
2 Brass drawer pull 80-100mm L-3 SCR PL 3 screw plate 1 No. Rs. 30.00 1 30
Rs.31.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.42.30 Total Amount of M and L Rs.36.00
Add 17.5 % OH and CP Rs.6.30
Total Rs.42.30

ITEM No. 9118.03


Drawer pulls, 3 screw plate with fixed dished pull ; 80 mm to 100 mmFixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.03 1.5
Rs.1.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.7.00 Total Amount of M and L Rs.6.00
Add 17.5 % OH and CP Rs.1.05
Total Rs.7.05

949 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9118.04
Drawer pulls, 3 screw plate with fixed dished pull ; 80 mm to 100 mmAdd if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0068 1.53
Rs.1.53
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.53
Add 17.5 % OH and CP Rs.0.27
Total Rs.1.80

ITEM No. 9119.01


Drawer pulls, 4 screw plate with fixed dished pull ; 80 mm to 100 mmlong S & F Cast iron or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 CI drawer pull 80-100mm L-4 SCR PL 4 screw plate 1 No. Rs. 21.96 1 21.96
Rs.23.96
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.33.40 Total Amount of M and L Rs.28.46
Add 17.5 % OH and CP Rs.4.98
Total Rs.33.44

ITEM No. 9119.02


Drawer pulls, 3 screw plate with fixed dished pull ; 80 mm to 100 mmlong S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Brass drawer pull 80-100mm L-43 SCR PL 4 screw plate 1 No. Rs. 36.00 1 36
Rs.38.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.49.90 Total Amount of M and L Rs.42.50
Add 17.5 % OH and CP Rs.7.44
Total Rs.49.94

950 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9119.03
Drawer pulls, 4 screw plate with fixed dished pull ; 80 mm to 100 mmFixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.7.60 Total Amount of M and L Rs.6.50
Add 17.5 % OH and CP Rs.1.14
Total Rs.7.64

ITEM No. 9119.04


Drawer pulls, 4 screw plate with fixed dished pull ; 80 mm to 100 mmAdd if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0068 1.53
Rs.1.53
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.53
Add 17.5 % OH and CP Rs.0.27
Total Rs.1.80

ITEM No. 9120.01


Drawer handles, projecting drop (50mm to 65mm) on screwed plateS & F Cast iron or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS/CI drawer handle projecting drop (50mm to 65mm,) on 4 screw 1 Each Rs. 20.00 1 20
plate
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.22.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.31.10 Total Amount of M and L Rs.26.50
Add 17.5 % OH and CP Rs.4.64
Total Rs.31.14

951 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9120.02
Drawer handles, projecting drop (50mm to 65mm) on screwed platelong S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass drawer handle projection drop (50 to 65mm,) on 4 screw plate 1 Each Rs. 35.00 1 35
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.37.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.48.80 Total Amount of M and L Rs.41.50
Add 17.5 % OH and CP Rs.7.26
Total Rs.48.76

ITEM No. 9120.03


Drawer handles, projecting drop (50mm to 65mm) on screwed plateFixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.7.60 Total Amount of M and L Rs.6.50
Add 17.5 % OH and CP Rs.1.14
Total Rs.7.64

ITEM No. 9120.04


Drawer handles, projecting drop (50mm to 65mm) on screwed plateAdd if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0068 1.53
Rs.1.53
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.53
Add 17.5 % OH and CP Rs.0.27
Total Rs.1.80

952 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9121.01
Drawer handles, projecting drop (40mm to 50mm) ring on screwed plateS & F Cast iron or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS/CI drawer handle projecting ring drop (40mm x 50,,) on 4 screw 1 No. Rs. 25.00 1 25
plate
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.27.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.37.00 Total Amount of M and L Rs.31.50
Add 17.5 % OH and CP Rs.5.51
Total Rs.37.01

ITEM No. 9121.02


Drawer handles, projecting drop (40mm to 50mm) ring on screwed platelong S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Brass drawer handle projecting ring drop (40mm x 50,,) on 4 screw 1 No. Rs. 46.00 1 46
plate
Rs.48.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.61.70 Total Amount of M and L Rs.52.50
Add 17.5 % OH and CP Rs.9.19
Total Rs.61.69

ITEM No. 9121.03


Drawer handles, projecting drop (40mm to 50mm) ring on screwed plateFixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.7.60 Total Amount of M and L Rs.6.50
Add 17.5 % OH and CP Rs.1.14
Total Rs.7.64

953 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9121.04
Drawer handles, projecting drop (40mm to 50mm) ring on screwed plateAdd if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0068 1.53
Rs.1.53
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.53
Add 17.5 % OH and CP Rs.0.27
Total Rs.1.80

ITEM No. 9122.01


Drawer handles, flush drop (65mm to 75mm grip) on 4 screw plateincluding letting in S & F Cast iron or
mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 MS/CI drawer handle flush drop 65 to 75 mm grip on 4 screw plate 1 No. Rs. 30.00 1 30
Rs.32.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.42.90 Total Amount of M and L Rs.36.50
Add 17.5 % OH and CP Rs.6.39
Total Rs.42.89

ITEM No. 9122.02


Drawer handles, flush drop (65mm to 75mm grip) on 4 screw plateincluding letting in S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Brass drawer handle flush drop 65 to 75 mm grip on 4 screw plate 1 No. Rs. 40.00 1 40
Rs.42.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.54.60 Total Amount of M and L Rs.46.50
Add 17.5 % OH and CP Rs.8.14
Total Rs.54.64

954 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9122.03
Drawer handles, flush drop (65mm to 75mm grip) on 4 screw plateincluding letting in Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.7.60 Total Amount of M and L Rs.6.50
Add 17.5 % OH and CP Rs.1.14
Total Rs.7.64

ITEM No. 9122.04


Drawer handles, flush drop (65mm to 75mm grip) on 4 screw plateincluding letting in Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0068 1.53
Rs.1.53
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.53
Add 17.5 % OH and CP Rs.0.27
Total Rs.1.80

ITEM No. 9123.01


Hat pegs, solid body, 125mm to 175 mm S & F Cast iron or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
2 Hat pegs MS/ CI 125mm to 175mm 1 No. Rs. 12.00 1 12
Rs.13.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.19.50 Total Amount of M and L Rs.16.60
Add 17.5 % OH and CP Rs.2.91
Total Rs.19.51

955 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9123.02
Hat pegs, solid body, 125mm to 175 mm S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass hat pegs solid body 125 to 175mm 1 No. Rs. 20.00 1 20
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.21.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.28.90 Total Amount of M and L Rs.24.60
Add 17.5 % OH and CP Rs.4.31
Total Rs.28.91

ITEM No. 9123.03


Hat pegs, solid body, 125mm to 175 mm S & F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
2 Hat pegs solid body, Aluminium 125 to 175 mm 1 No. Rs. 15.00 1 15
Rs.16.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.23.00 Total Amount of M and L Rs.19.60
Add 17.5 % OH and CP Rs.3.43
Total Rs.23.03

ITEM No. 9123.04


Hat pegs, solid body, 125mm to 175 mm Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.1.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.5.40 Total Amount of M and L Rs.4.60
Add 17.5 % OH and CP Rs.0.81
Total Rs.5.41

956 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9123.05
Hat pegs, solid body, 125mm to 175 mm Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9124.01


Hat and coat hooks, solid body, 175mm to 250mm S&F Cast iron or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hot & Coat hook 175 mm to 250mm CI 1 No. Rs. 13.50 1 13.5
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.14.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.21.30 Total Amount of M and L Rs.18.10
Add 17.5 % OH and CP Rs.3.17
Total Rs.21.27

ITEM No. 9124.02


Hat and coat hooks, solid body, 175mm to 250mm S&F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass hat & coat hooks 175 to 250mm 1 No. Rs. 21.07 1 21.07
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.22.07
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.30.20 Total Amount of M and L Rs.25.67
Add 17.5 % OH and CP Rs.4.49
Total Rs.30.16

957 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9124.03
Hat and coat hooks, solid body, 175mm to 250mm S&F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hat & coat hook, Aluminium 175 to 250mm 1 No. Rs. 16.00 1 16
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.17.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.024 5.4
Rs.5.40
After rounding off: Rs.26.30 Total Amount of M and L Rs.22.40
Add 17.5 % OH and CP Rs.3.92
Total Rs.26.32

ITEM No. 9124.04


Hat and coat hooks, solid body, 175mm to 250mm Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.1.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.5.40 Total Amount of M and L Rs.4.60
Add 17.5 % OH and CP Rs.0.81
Total Rs.5.41

ITEM No. 9124.05


Hat and coat hooks, solid body, 175mm to 250mm S & F Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

958 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9125.01
Wardrobe hooke (single) 50 mm to 60mm S & F Cast iron or mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS/CI Wodrobe hook 50-60mm 1 No. Rs. 8.00 1 8
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.9.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.14.80 Total Amount of M and L Rs.12.60
Add 17.5 % OH and CP Rs.2.21
Total Rs.14.81

ITEM No. 9125.02


Wardrobe hooke (single) 50 mm to 60mm S&F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass Wordrobe hook 50-60mm 1 No. Rs. 18.00 1 18
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.19.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.26.60 Total Amount of M and L Rs.22.60
Add 17.5 % OH and CP Rs.3.96
Total Rs.26.56

ITEM No. 9125.03


Wardrobe hooke (single) 50 mm to 60mm S&F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Aluminium Wordrobe hook 50-60mm 1 No. Rs. 14.00 1 14
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.15.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.036 8.1
Rs.8.10
After rounding off: Rs.27.10 Total Amount of M and L Rs.23.10
Add 17.5 % OH and CP Rs.4.04
Total Rs.27.14

959 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9125.04
Wardrobe hooke (single) 50 mm to 60mm Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.1.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.5.40 Total Amount of M and L Rs.4.60
Add 17.5 % OH and CP Rs.0.81
Total Rs.5.41

ITEM No. 9125.05


Wardrobe hooke (single) 50 mm to 60mm S & F Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.016 3.6
Rs.3.60
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.60
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.23

ITEM No. 9126.01


Gate and shutter, hooks and eyes 75mm size S & F Cast ironor mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS/CI gate & shutter hooks & eyes 75mm size (75mm MS wirehook 1 No. Rs. 4.50 1 4.5
type T-1)
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.6.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.10.30 Total Amount of M and L Rs.8.75
Add 17.5 % OH and CP Rs.1.53
Total Rs.10.28

960 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9126.02
Gate and shutter, hooks and eyes 75mm size S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass gate & shutter hooks & eyes 75mm size (ie. 75mm BR wirehook 1 No. Rs. 25.00 1 25
type T-1)
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.27.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.34.40 Total Amount of M and L Rs.29.25
Add 17.5 % OH and CP Rs.5.12
Total Rs.34.37

ITEM No. 9126.03


Gate and shutter, hooks and eyes 75mm size S&F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Gate & shutter hooks & eyes, Aluminium 75mm size (75mm MS 1 No. Rs. 15.80 1 15.8
wirehook type T-1)
Rs.17.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.23.60 Total Amount of M and L Rs.20.05
Add 17.5 % OH and CP Rs.3.51
Total Rs.23.56

ITEM No. 9126.04


Gate and shutter, hooks and eyes 75mm size S&F Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.5.00 Total Amount of M and L Rs.4.25
Add 17.5 % OH and CP Rs.0.74
Total Rs.4.99

961 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9126.05
Gate and shutter, hooks and eyes 75mm size S&F Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.0.80 Total Amount of M and L Rs.0.68
Add 17.5 % OH and CP Rs.0.12
Total Rs.0.79

ITEM No. 9127.01


Gate and shutter, hooks and eyes 100mm size S & F Cast ironor mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 MS/CI wirehook 100mm type T-1 1 No. Rs. 5.70 1 5.7
Rs.7.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.11.70 Total Amount of M and L Rs.9.95
Add 17.5 % OH and CP Rs.1.74
Total Rs.11.69

ITEM No. 9127.02


Gate and shutter, hooks and eyes 100mm size S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 100mm BR wire hook type T-1 1 No. Rs. 32.10 1 32.1
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.34.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.42.70 Total Amount of M and L Rs.36.35
Add 17.5 % OH and CP Rs.6.36
Total Rs.42.71

962 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9127.03
Gate and shutter, hooks and eyes 100mm size S&F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Hook eye, Aluminium 100mm plate type 1 No. Rs. 18.50 1 18.5
Rs.20.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.30.70 Total Amount of M and L Rs.26.13
Add 17.5 % OH and CP Rs.4.57
Total Rs.30.70

ITEM No. 9127.04


Gate and shutter, hooks and eyes 100mm size S&F Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.5.00 Total Amount of M and L Rs.4.25
Add 17.5 % OH and CP Rs.0.74
Total Rs.4.99

ITEM No. 9127.05


Gate and shutter, hooks and eyes 100mm size S&F Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.0.80 Total Amount of M and L Rs.0.68
Add 17.5 % OH and CP Rs.0.12
Total Rs.0.79

963 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9128.01
Gate and shutter, hooks and eyes 125mm size S & F Cast ironor mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wire hook type T-1 125mm MS 1 No. Rs. 6.70 1 6.7
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.8.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.12.90 Total Amount of M and L Rs.10.95
Add 17.5 % OH and CP Rs.1.92
Total Rs.12.87

ITEM No. 9128.02


Gate and shutter, hooks and eyes 125mm size S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wire hook type T-1 125mm brass 1 No. Rs. 35.75 1 35.75
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.37.75
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.47.00 Total Amount of M and L Rs.40.00
Add 17.5 % OH and CP Rs.7.00
Total Rs.47.00

ITEM No. 9128.03


Gate and shutter, hooks and eyes 125mm size S&F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hook eye, Aluminium 125mm plate type 1 No. Rs. 17.25 1 17.25
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.19.25
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.29.20 Total Amount of M and L Rs.24.88
Add 17.5 % OH and CP Rs.4.35
Total Rs.29.23

964 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9128.04
Gate and shutter, hooks and eyes 125mm size S&F Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.5.00 Total Amount of M and L Rs.4.25
Add 17.5 % OH and CP Rs.0.74
Total Rs.4.99

ITEM No. 9128.05


Gate and shutter, hooks and eyes 100mm size S&F Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.0.80 Total Amount of M and L Rs.0.68
Add 17.5 % OH and CP Rs.0.12
Total Rs.0.79

ITEM No. 9129.01


Gate and shutter, hooks and eyes 150mm size S & F Cast ironor mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 wire hook type T-1 150mm CI/MS 1 No. Rs. 7.00 1 7
Rs.9.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.25
Add 17.5 % OH and CP Rs.1.97
Total Rs.13.22

965 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 20100
Builder's Hardware
ITEM No. 9129.02
Gate and shutter, hooks and eyes 150mm size S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 wire hook type T-1 150mm brass 1 No. Rs. 37.00 1 37
Rs.39.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.48.50 Total Amount of M and L Rs.41.25
Add 17.5 % OH and CP Rs.7.22
Total Rs.48.47

ITEM No. 9129.03


Gate and shutter, hooks and eyes 150mm size S&F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hook eye, Aluminium 150mm plate type 1 No. Rs. 23.25 1 23.25
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.25.25
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.36.30 Total Amount of M and L Rs.30.88
Add 17.5 % OH and CP Rs.5.40
Total Rs.36.28

ITEM No. 9129.04


Gate and shutter, hooks and eyes 150mm size S&F Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.5.00 Total Amount of M and L Rs.4.25
Add 17.5 % OH and CP Rs.0.74
Total Rs.4.99

966 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9129.05
Gate and shutter, hooks and eyes 150mm size S&F Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.0.80 Total Amount of M and L Rs.0.68
Add 17.5 % OH and CP Rs.0.12
Total Rs.0.79

ITEM No. 9130.01


Gate and shutter, hooks and eyes 200mm size S & F Cast ironor mildsteel.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 wire hook type T-1 200mm CI/MS 1 No. Rs. 8.70 1 8.7
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.10.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.15.20 Total Amount of M and L Rs.12.95
Add 17.5 % OH and CP Rs.2.27
Total Rs.15.22

ITEM No. 9130.02


Gate and shutter, hooks and eyes 200mm size S & F Brass.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 wire hook type T-1 200mm brass 1 No. Rs. 40.00 1 40
Rs.42.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.52.00 Total Amount of M and L Rs.44.25
Add 17.5 % OH and CP Rs.7.74
Total Rs.51.99

967 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9130.03
Gate and shutter, hooks and eyes 200mm size S&F Aluminium.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hook eye, Aluminium 200 mm plate type 1 No. Rs. 27.00 1 27
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.29.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.025 5.625
Rs.5.63
After rounding off: Rs.40.70 Total Amount of M and L Rs.34.63
Add 17.5 % OH and CP Rs.6.06
Total Rs.40.68

ITEM No. 9130.04


Gate and shutter, hooks and eyes 200mm size S&F Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.5.00 Total Amount of M and L Rs.4.25
Add 17.5 % OH and CP Rs.0.74
Total Rs.4.99

ITEM No. 9130.05


Gate and shutter, hooks and eyes 200mm size S&F Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.0.80 Total Amount of M and L Rs.0.68
Add 17.5 % OH and CP Rs.0.12
Total Rs.0.79

ITEM No. 9131.01


40mm dia, cupboard knobs fixed with nut, screw and washer of mildsteel, bright finished .S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cub board knob iron 40mm D 1 No. Rs. 12.00 1 12
Rs.12.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.25
Add 17.5 % OH and CP Rs.2.49
Total Rs.16.74

968 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9131.02
40mm dia, cupboard knobs fixed with nut, screw and washer of mildsteel, bright finishedFixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 9131.03


40mm dia, cupboard knobs fixed with nut, screw and washer of mildsteel, bright finished. Add if fixed in
repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.0.80 Total Amount of M and L Rs.0.68
Add 17.5 % OH and CP Rs.0.12
Total Rs.0.79

ITEM No. 9132.01


40mm dia, cupboard knobs fixed with nut, screw and washer of Brasspolished S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cub board knob brass 40mm D 1 Each Rs. 30.00 1 30
Rs.30.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.37.90 Total Amount of M and L Rs.32.25
Add 17.5 % OH and CP Rs.5.64
Total Rs.37.89

ITEM No. 9132.02


40mm dia, cupboard knobs fixed with nut, screw and washer of Brasspolished Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

969 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9132.03
40mm dia, cupboard knobs fixed with nut, screw and washer of BrassPolished Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.0.80 Total Amount of M and L Rs.0.68
Add 17.5 % OH and CP Rs.0.12
Total Rs.0.79

ITEM No. 9134.01


50mm dia, polished, hardwood knobs fixed with screws S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cub board knob iron 50mm D 1 No. Rs. 35.00 1 35
Rs.35.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.43.80 Total Amount of M and L Rs.37.25
Add 17.5 % OH and CP Rs.6.52
Total Rs.43.77

ITEM No. 9134.02


50mm dia, polished, hardwood knobs fixed with screws Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 9134.03


50mm dia, polished, hardwood knobs fixed with screws Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.003 0.675
Rs.0.68
After rounding off: Rs.0.80 Total Amount of M and L Rs.0.68
Add 17.5 % OH and CP Rs.0.12
Total Rs.0.79

970 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9135.01
Hasp and staple, mild steel, wire type, stove enameled black, incudingbolt to hinge plate and fixed with screws
Size of hasp and staple 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple wire type stove enameled black 75mm MS 1 No. Rs. 12.35 1 12.35
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.16.35
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.27.40 Total Amount of M and L Rs.23.33
Add 17.5 % OH and CP Rs.4.08
Total Rs.27.41

ITEM No. 9135.02


Hasp and staple, mild steel, wire type, stove enameled black, incudingbolt to hinge plate and fixed with screws
Size of hasp and staple 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple wire type stove enameled black 100mm MS 1 No. Rs. 15.15 1 15.15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.19.15
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.30.70 Total Amount of M and L Rs.26.13
Add 17.5 % OH and CP Rs.4.57
Total Rs.30.70

ITEM No. 9135.03


Hasp and staple, mild steel, wire type, stove enameled black, incudingbolt to hinge plate and fixed with screws
Size of hasp and staple 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple wire type stove enameled black125mm MS 1 No. Rs. 16.85 1 16.85
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.20.85
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.32.70 Total Amount of M and L Rs.27.83
Add 17.5 % OH and CP Rs.4.87
Total Rs.32.69

971 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9135.04
Hasp and staple, mild steel, wire type, stove enameled black, incudingbolt to hinge plate and fixed with screws
Size of hasp and staple 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple wire type stove enameled black 150mm MS 1 No. Rs. 19.80 1 19.8
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.23.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.36.20 Total Amount of M and L Rs.30.78
Add 17.5 % OH and CP Rs.5.39
Total Rs.36.16

ITEM No. 9136.01


Hasp and staple, mild steel, safety type, stove enameled black, incudingbolt to hinge plate and fixed with
screws Size of hasp and staple 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple safety type 75mm MS 1 No. Rs. 8.80 1 8.8
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.12.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.23.20 Total Amount of M and L Rs.19.78
Add 17.5 % OH and CP Rs.3.46
Total Rs.23.24

ITEM No. 9136.02


Hasp and staple, mild steel, safety type, stove enameled black, incudingbolt to hinge plate and fixed with
screws Size of hasp and staple 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple safety type 100mm MS 1 No. Rs. 10.00 1 10
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.14.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.24.60 Total Amount of M and L Rs.20.98
Add 17.5 % OH and CP Rs.3.67
Total Rs.24.65

972 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9136.03
Hasp and staple, mild steel, safety type, stove enameled black, incudingbolt to hinge plate and fixed with
screws Size of hasp and staple 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple safety type 125mm M S Each Rs. 11.10 1 11.1
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.15.10
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.25.90 Total Amount of M and L Rs.22.08
Add 17.5 % OH and CP Rs.3.86
Total Rs.25.94

ITEM No. 9136.04


Hasp and staple, mild steel, safety type, stove enameled black, incudingbolt to hinge plate and fixed with
screws Size of hasp and staple 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple safety type 150mm MS 1 No. Rs. 15.00 1 15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.19.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.30.50 Total Amount of M and L Rs.25.98
Add 17.5 % OH and CP Rs.4.55
Total Rs.30.52

ITEM No. 9137.01


Hasp and staple, safety type, brass with mild steel hinge pin includingbolt to hinge plate and fixed with screws
Size of hasp and staple 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple safety type 75mm brass 1 No. Rs. 17.97 1 17.97
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.21.97
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.34.00 Total Amount of M and L Rs.28.95
Add 17.5 % OH and CP Rs.5.07
Total Rs.34.01

973 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9137.02
Hasp and staple, safety type, brass with mild steel hinge pin includingbolt to hinge plate and fixed with screws
Size of hasp and staple 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple safety type 100mm brass 1 No. Rs. 20.00 1 20
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.24.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.36.40 Total Amount of M and L Rs.30.98
Add 17.5 % OH and CP Rs.5.42
Total Rs.36.40

ITEM No. 9137.03


Hasp and staple, safety type, brass with mild steel hinge pin includingbolt to hinge plate and fixed with screws
Size of hasp and staple 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 hasp & staple safety type 125mm brass 1 No. Rs. 22.50 1 22.5
Rs.26.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.39.30 Total Amount of M and L Rs.33.48
Add 17.5 % OH and CP Rs.5.86
Total Rs.39.33

ITEM No. 9137.04


Hasp and staple, safety type, brass with mild steel hinge pin includingbolt to hinge plate and fixed with screws
Size of hasp and staple 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
2 hasp & staple safety type150mm brass 1 No. Rs. 30.00 1 30
Rs.34.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.48.10 Total Amount of M and L Rs.40.98
Add 17.5 % OH and CP Rs.7.17
Total Rs.48.15

974 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9138.01
Hasp and staple, safety type, brass with mild steel hinge pin includingbolt to hinge plate and fixed with screws
but of aluminium anodised.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hasp & staple safety type, Aluminium anodized 75mm 1 No. Rs. 12.98 1 12.98
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.16.98
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.28.10 Total Amount of M and L Rs.23.96
Add 17.5 % OH and CP Rs.4.19
Total Rs.28.15

ITEM No. 9138.02


Hasp and staple, safety type, brass with mild steel hinge pin includingbolt to hinge plate and fixed with screws
but of aluminium anodised.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple safety 100mm Alu Ano 1 No. Rs. 15.00 1 15
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.19.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.30.50 Total Amount of M and L Rs.25.98
Add 17.5 % OH and CP Rs.4.55
Total Rs.30.52

ITEM No. 9138.03


Hasp and staple, safety type, brass with mild steel hinge pin includingbolt to hinge plate and fixed with screws
but of aluminium anodised.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple safety 125mm Alu Ano 1 No. Rs. 16.74 1 16.74
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.20.74
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.32.60 Total Amount of M and L Rs.27.72
Add 17.5 % OH and CP Rs.4.85
Total Rs.32.57

975 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9138.04
Hasp and staple, safety type, brass with mild steel hinge pin includingbolt to hinge plate and fixed with screws
Size of hasp and staple 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 hasp & staple safety 150mm Alu Ano 1 No. Rs. 20.00 1 20
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.24.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.36.40 Total Amount of M and L Rs.30.98
Add 17.5 % OH and CP Rs.5.42
Total Rs.36.40

ITEM No. 9139.01


Fixing only of items 9137 and 9138 Size of hasp and staple 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.12.90 Total Amount of M and L Rs.10.98
Add 17.5 % OH and CP Rs.1.92
Total Rs.12.90

ITEM No. 9139.02


Fixing only of items 9137 and 9138 Size of hasp and staple 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.12.90 Total Amount of M and L Rs.10.98
Add 17.5 % OH and CP Rs.1.92
Total Rs.12.90

976 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9139.03
Fixing only of items 9137 and 9138 Size of hasp and staple 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.12.90 Total Amount of M and L Rs.10.98
Add 17.5 % OH and CP Rs.1.92
Total Rs.12.90

ITEM No. 9139.04


Fixing only of items 9137 and 9138 Size of hasp and staple 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.08 4
Rs.4.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.12.90 Total Amount of M and L Rs.10.98
Add 17.5 % OH and CP Rs.1.92
Total Rs.12.90

ITEM No. 9140.01


Add to items 9135 to 9139, if fixed in repairs Size of haspand staple 75mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 9140.02


Add to items 9135 to 9139, if fixed in repairs Size of haspand staple 100mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

977 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9140.03
Add to items 9135 to 9139, if fixed in repairs Size of haspand staple 125mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 9140.04


Add to items 9135 to 9139, if fixed in repairs Size of haspand staple 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 9141.01


Brass knobs 35-40mm dia 35-40mm dia brassknob S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass knob 35.40mm dia 1 No. Rs. 17.00 1 17
Rs.17.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.25.30 Total Amount of M and L Rs.21.50
Add 17.5 % OH and CP Rs.3.76
Total Rs.25.26

ITEM No. 9141.02


Brass knobs 35-40mm dia 35-40mm dia Fixing Only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.02 4.5
Rs.4.50
After rounding off: Rs.5.30 Total Amount of M and L Rs.4.50
Add 17.5 % OH and CP Rs.0.79
Total Rs.5.29

978 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9141.03
Brass knobs 35-40mm dia 35-40mm dia Flood in repair.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0069 1.5525
Rs.1.55
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.55
Add 17.5 % OH and CP Rs.0.27
Total Rs.1.82

ITEM No. 9142.01


Harrison rails mild steel, chromium plated with fixing brackets, stops, rollers etc. S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS cromium plated Harrison rails 1 Runnin Rs. 51.00 1 51
Rs.51.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.07 15.75
Rs.15.75
After rounding off: Rs.78.40 Total Amount of M and L Rs.66.75
Add 17.5 % OH and CP Rs.11.68
Total Rs.78.43

ITEM No. 9142.02


Harrison rails mild steel, chromium plated with fixing brackets, stops, rollers etc. Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.07 15.75
Rs.15.75
After rounding off: Rs.18.50 Total Amount of M and L Rs.15.75
Add 17.5 % OH and CP Rs.2.76
Total Rs.18.51

ITEM No. 9142.03


Harrison rails mild steel, chromium plated with fixing brackets, stops, rollers etc. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0068 1.53
Rs.1.53
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.53
Add 17.5 % OH and CP Rs.0.27
Total Rs.1.80

979 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9143.01
Ditto item 0162, but of anodised aluminium alloy S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Aluminium anodised Harrison rails 1 Each Rs. 69.35 1 69.35
Rs.69.35
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.07 15.75
Rs.15.75
After rounding off: Rs.100.00 Total Amount of M and L Rs.85.10
Add 17.5 % OH and CP Rs.14.89
Total Rs.99.99

ITEM No. 9143.02


Ditto item 0162, but of anodised aluminium alloy Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.07 15.75
Rs.15.75
After rounding off: Rs.18.50 Total Amount of M and L Rs.15.75
Add 17.5 % OH and CP Rs.2.76
Total Rs.18.51

ITEM No. 9143.03


Ditto item 0162, but of anodised aluminium alloy Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0068 1.53
Rs.1.53
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.53
Add 17.5 % OH and CP Rs.0.27
Total Rs.1.80

ITEM No. 9144.01


Finger plates 200mm to 300mm long and 80 to 100 mm wide fixed with brass chromium plated screws S & F
Transparent plastic sheet, 1mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 finger plate plastic sheet 1mm thick 300x100mm 1 No. Rs. 30.00 1 30
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.32.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0249 5.6025
Rs.5.60
After rounding off: Rs.44.20 Total Amount of M and L Rs.37.60
Add 17.5 % OH and CP Rs.6.58
Total Rs.44.18

980 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9144.02
Finger plates 200mm to 300mm long and 80 to 100 mm wide fixed with brass chromium plated screws S & F
Aluminium anodised, 1mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 finger plate 1mm thick 300x100mm Aluminium Anodised 1 No. Rs. 45.00 1 45
Rs.47.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0249 5.6025
Rs.5.60
After rounding off: Rs.61.80 Total Amount of M and L Rs.52.60
Add 17.5 % OH and CP Rs.9.21
Total Rs.61.81

ITEM No. 9144.03


Finger plates 200mm to 300mm long and 80 to 100 mm wide fixed with brass chromium plated screws Fixing
only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0249 5.6025
Rs.5.60
After rounding off: Rs.8.90 Total Amount of M and L Rs.7.60
Add 17.5 % OH and CP Rs.1.33
Total Rs.8.93

ITEM No. 9144.04


Finger plates 200mm to 300mm long and 80 to 100 mm wide fixed with brass chromium plated screws Add if
fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0068 1.53
Rs.1.53
After rounding off: Rs.1.80 Total Amount of M and L Rs.1.53
Add 17.5 % OH and CP Rs.0.27
Total Rs.1.80

981 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9145.01
Kicking plates, any size of galvanised iron sheet 1mm thick fixed with galvanised Screws S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI sheet kicking plate 1mm 1 Sqm Rs. 236.72 1 236.72
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.43 21.5
Rs.258.22
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.45 101.25
Rs.101.25
After rounding off: Rs.422.40 Total Amount of M and L Rs.359.47
Add 17.5 % OH and CP Rs.62.91
Total Rs.422.38

ITEM No. 9145.02


Kicking plates, any size of galvanised iron sheet 1mm thick fixed with galvanised Screws Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.43 21.5
Rs.21.50
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.45 101.25
Rs.101.25
After rounding off: Rs.144.20 Total Amount of M and L Rs.122.75
Add 17.5 % OH and CP Rs.21.48
Total Rs.144.23

ITEM No. 9145.03


Kicking plates, any size of galvanised iron sheet 1mm thick fixed with galvanised screws Add if fixed in repairs..
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.15 33.75
Rs.33.75
After rounding off: Rs.39.70 Total Amount of M and L Rs.33.75
Add 17.5 % OH and CP Rs.5.91
Total Rs.39.66

982 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9146.01
Tubular towel rail 20mm dia S & F Brass chromium plated.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Brass cromium plated tubular towel rail 20mm dia 1 Runnin Rs. 196.80 1 196.8
Rs.198.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.1.58
After rounding off: Rs.235.40 Total Amount of M and L Rs.200.38
Add 17.5 % OH and CP Rs.35.07
Total Rs.235.44

ITEM No. 9146.02


Tubular towel rail 20mm dia S & F Aluminium anodised.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Aluminium Anodised tubular towel rail 20mm dia 1 Runnin Rs. 98.40 1 98.4
Rs.100.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.1.58
After rounding off: Rs.119.80 Total Amount of M and L Rs.101.98
Add 17.5 % OH and CP Rs.17.85
Total Rs.119.82

ITEM No. 9146.03


Tubular towel rail 20mm dia Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.1.58
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.58
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.20

983 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9146.04
Tubular towel rail 20mm dia Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.002 0.45
Rs.0.45
After rounding off: Rs.0.50 Total Amount of M and L Rs.0.45
Add 17.5 % OH and CP Rs.0.08
Total Rs.0.53

ITEM No. 9147.01


Tubular towel rail 20mm dia D type, 60cm long between flanges S & F Brass chromium plated.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass cromium plated tubular towel rail 20mm dia D type 60cm long 1 Runnin Rs. 225.00 1 225
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.227.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.1.58
After rounding off: Rs.268.60 Total Amount of M and L Rs.228.58
Add 17.5 % OH and CP Rs.40.00
Total Rs.268.58

ITEM No. 9147.02


Tubular towel rail 20mm dia D type, 60cm long between flanges S & F Aluminium anodised.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Aluminium anodised tubular towel rail 20mm dia D type 60cm long 1 Runnin Rs. 150.00 1 150
Rs.152.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.1.58
After rounding off: Rs.180.50 Total Amount of M and L Rs.153.58
Add 17.5 % OH and CP Rs.26.88
Total Rs.180.45

984 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9147.03
Tubular towel rail 20mm dia D type, 60cm long between flanges Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
Rs.2.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.007 1.575
Rs.1.58
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.58
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.20

ITEM No. 9147.04


Tubular towel rail 20mm dia D type, 60cm long between flanges Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.002 0.45
Rs.0.45
After rounding off: Rs.0.50 Total Amount of M and L Rs.0.45
Add 17.5 % OH and CP Rs.0.08
Total Rs.0.53

ITEM No. 9148.01


Brackets for item 0166 S & F Brass chromium plated.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
2 Brass cromium plated Bracket for tubular towel rail 1 No. Rs. 149.95 1 149.95
Rs.150.95
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.185.60 Total Amount of M and L Rs.157.93
Add 17.5 % OH and CP Rs.27.64
Total Rs.185.56

985 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9148.02
Brackets for item 0166 S & F Aluminium anodised.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
2 Alu bracket for TWL rail 20mm dia 1 Pair Rs. 55.00 1 55
Rs.56.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.74.00 Total Amount of M and L Rs.62.98
Add 17.5 % OH and CP Rs.11.02
Total Rs.74.00

ITEM No. 9148.03


Brackets for item 0166 Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.02 1
Rs.1.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.031 6.975
Rs.6.98
After rounding off: Rs.9.40 Total Amount of M and L Rs.7.98
Add 17.5 % OH and CP Rs.1.40
Total Rs.9.37

ITEM No. 9148.04


Brackets for item 0166 Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.006 1.35
Rs.1.35
After rounding off: Rs.1.60 Total Amount of M and L Rs.1.35
Add 17.5 % OH and CP Rs.0.24
Total Rs.1.59

986 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9149.01
Floor door stopper of aluminium alloy body and tongue, anodised, with hard drawn steel spring, fixed in floor
Overall length of cover plate 140mm.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Floor door stopper Aluminium Alloy 1 No. Rs. 18.00 1 18
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.21.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.37.90 Total Amount of M and L Rs.32.25
Add 17.5 % OH and CP Rs.5.64
Total Rs.37.89

ITEM No. 9149.02


Floor door stopper of aluminium alloy body and tongue, anodised, with hard drawn steel spring, fixed in floor
Overall length of cover plate 150mm.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 floor door stopper 150mm Alu 1 No. Rs. 22.00 1 22
Rs.25.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.42.60 Total Amount of M and L Rs.36.25
Add 17.5 % OH and CP Rs.6.34
Total Rs.42.59

ITEM No. 9150.01


Floor door stopper of brass body and tongue with hard drawn steel spring, fixed in floor Overall length of cover
plate 140mm.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 floor door stopper 140mm Brass 1 No. Rs. 28.00 1 28
Rs.31.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.49.60 Total Amount of M and L Rs.42.25
Add 17.5 % OH and CP Rs.7.39
Total Rs.49.64

987 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9150.02
Floor door stopper of brass body and tongue with hard drawn steelspring, fixed in floor Overall length of cover
plate 150mm.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 floor door stopper 150mm Brass 1 No. Rs. 40.00 1 40
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.43.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.63.70 Total Amount of M and L Rs.54.25
Add 17.5 % OH and CP Rs.9.49
Total Rs.63.74

ITEM No. 9151.01


Fixing only of items 9149 and 9150 Overall length of cover plate 140mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.25
Add 17.5 % OH and CP Rs.2.49
Total Rs.16.74

ITEM No. 9151.02


Fixing only of items 9149 and 9150 Overall length of cover plate 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.05 11.25
Rs.11.25
After rounding off: Rs.16.70 Total Amount of M and L Rs.14.25
Add 17.5 % OH and CP Rs.2.49
Total Rs.16.74

ITEM No. 9152.01


Add to items 9149,9150 and 9151, if fixed in repairs Overall length ofcover plate 140mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64
988 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9152.02
Add to items 9149,9150 and 9151,, if fixed in repairs Overall length ofcover plate 150mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.01 2.25
Rs.2.25
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.25
Add 17.5 % OH and CP Rs.0.39
Total Rs.2.64

ITEM No. 9153


Ball catch with 8mm dia steel ball, and brass body and striking plate including letting in and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.04 2
2 Spring catch cup ball type 8mm steel ball & brass body 1 No. Rs. 18.00 1 18
Rs.20.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.04 9
Rs.9.00
After rounding off: Rs.34.10 Total Amount of M and L Rs.29.00
Add 17.5 % OH and CP Rs.5.08
Total Rs.34.08

ITEM No. 9154.01


Door closer hydraulically regulated, designation No 3, universal typesuitable for door shutters of weight
between 61 to 80 kg and fixed S & F.Cast iron body.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Door closer hydraulically regulated designation No 3 CI body 1 No. Rs. 370.00 1 370
Rs.373.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.454.10 Total Amount of M and L Rs.386.50
Add 17.5 % OH and CP Rs.67.64
Total Rs.454.14

989 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9154.02
Door closer hydraulically regulated, designation No 3, universal typesuitable for door shutters of weight
between 61 to 80 kg and fixed.Aluminium (Diecast) body
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Door closer hydraulically regulated designation No 3 Aluminium die 1 No. Rs. 600.00 1 600
cast body
Rs.603.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.724.40 Total Amount of M and L Rs.616.50
Add 17.5 % OH and CP Rs.107.89
Total Rs.724.39

ITEM No. 9154.03


Door closer hydraulically regulated, designation No 3, universal typesuitable for door shutters of weight
between 61 to 80 kg and fixed.Aluminium (extruded section) body
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Door closer hydraulically regulated designation No 3 Aluminium 1 No. Rs. 700.00 1 700
body
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.703.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.841.90 Total Amount of M and L Rs.716.50
Add 17.5 % OH and CP Rs.125.39
Total Rs.841.89

ITEM No. 9154.04


Door closer hydraulically regulated, designation No 3, universal typesuitable for door shutters of weight
between 61 to 80 kg and fixed.Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.19.40 Total Amount of M and L Rs.16.50
Add 17.5 % OH and CP Rs.2.89
Total Rs.19.39

990 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9154.05
Door closer hydraulically regulated, designation No 3, universal typesuitable for door shutters of weight
between 61 to 80 kg and fixed.Addif fixed in repair.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.15.90 Total Amount of M and L Rs.13.50
Add 17.5 % OH and CP Rs.2.36
Total Rs.15.86

ITEM No. 9155.01


Door closer hydraulically regulated, designation No 2, universal typesuitable for door shutters of weight
between 36 to 60 kg and fixed S & F.Cast iron body.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Door closer hydraulically regulated designation No 2 CI body 1 No. Rs. 320.00 1 320
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.323.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.395.40 Total Amount of M and L Rs.336.50
Add 17.5 % OH and CP Rs.58.89
Total Rs.395.39

ITEM No. 9155.02


Door closer hydraulically regulated, designation No 2, universal typesuitable for door shutters of weight
between 36 to 60 kg and fixed.Aluminium (Diecast) body,S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Door closer hydraulically regulated designation No 2 Aluminium die 1 No. Rs. 500.00 1 500
cast body
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.503.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.606.90 Total Amount of M and L Rs.516.50
Add 17.5 % OH and CP Rs.90.39
Total Rs.606.89

991 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9155.03
Door closer hydraulically regulated, designation No 2, universal typesuitable for door shutters of weight
between 36 to 60 kg and fixed.Aluminium (extruded section) body,S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Door closer hydraulically regulated designation No 2 Aluminum 1 No. Rs. 600.00 1 600
body
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.603.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.724.40 Total Amount of M and L Rs.616.50
Add 17.5 % OH and CP Rs.107.89
Total Rs.724.39

ITEM No. 9155.04


Door closer hydraulically regulated, designation No 2, universal typesuitable for door shutters of weight
between 36 to 60 kg and fixed.Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.19.40 Total Amount of M and L Rs.16.50
Add 17.5 % OH and CP Rs.2.89
Total Rs.19.39

ITEM No. 9155.05


Door closer hydraulically regulated, designation No 2, universal typesuitable for door shutters of weight
between 36 to 60 kg and fixed. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.15.90 Total Amount of M and L Rs.13.50
Add 17.5 % OH and CP Rs.2.36
Total Rs.15.86

992 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9156.01
Door closer hydraulically regulated, designation No 1, universal typeCast iron body.S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Door closer hydraulically regulated, designation No 1, universal type 1 No. Rs. 280.00 1 280
cast iron body
Rs.283.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.348.40 Total Amount of M and L Rs.296.50
Add 17.5 % OH and CP Rs.51.89
Total Rs.348.39

ITEM No. 9156.02


Door closer hydraulically regulated, designation No 1, universal typeAluminium (Die cast) body.S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Door closer hydraulically regulated, designation No 1, universal type Each Rs. 400.00 1 400
Aiuminum die cast body
2 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.403.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.489.40 Total Amount of M and L Rs.416.50
Add 17.5 % OH and CP Rs.72.89
Total Rs.489.39

ITEM No. 9156.03


Door closer hydraulically regulated, designation No 1, universal typeExtruded al.S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
2 Door closer hydraulically regulated, designation No 1, universal type Each Rs. 500.00 1 500
aluminium (extruded section) body
Rs.503.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.606.90 Total Amount of M and L Rs.516.50
Add 17.5 % OH and CP Rs.90.39
Total Rs.606.89

993 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9156.04
Door closer hydraulically regulated, designation No 1, universal type Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS wood Screws not exceeding 50mm length 100 No. Rs. 50.00 0.06 3
Rs.3.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.19.40 Total Amount of M and L Rs.16.50
Add 17.5 % OH and CP Rs.2.89
Total Rs.19.39

ITEM No. 9156.05


Door closer hydraulically regulated, designation No 1, universal type Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.06 13.5
Rs.13.50
After rounding off: Rs.15.90 Total Amount of M and L Rs.13.50
Add 17.5 % OH and CP Rs.2.36
Total Rs.15.86

ITEM No. 9157.01


Galvanised mild steel wire cloth, 0.63mm nominal dia of wire and averagewidth of aperture 1.40mm and fixed
with tinned tacks, or galvanised wire staples.S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI wire cloth 0.63mm dia wire width or aperture 1.4mm 1 Sqm Rs. 161.00 1.05 169.05
Rs.169.05
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.235.10 Total Amount of M and L Rs.200.10
Add 17.5 % OH and CP Rs.35.02
Total Rs.235.12

994 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9157.02
Galvanised mild steel wire cloth, 0.63mm nominal dia of wire and averagewidth of aperture 1.40mm and fixed
with tinned tacks, or galvanised wire staples.Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.36.50 Total Amount of M and L Rs.31.05
Add 17.5 % OH and CP Rs.5.43
Total Rs.36.48

ITEM No. 9157.03


Galvanised mild steel wire cloth, 0.63mm nominal dia of wire and averagewidth of aperture 1.40mm and fixed
with tinned tacks, or galvanised wire staples. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.037 8.325
Rs.8.33
After rounding off: Rs.9.80 Total Amount of M and L Rs.8.33
Add 17.5 % OH and CP Rs.1.46
Total Rs.9.78

ITEM No. 9158.01


Galvanised mild steel wire cloth, 0.56mm nominal dia of wire and averagewidth of aperture 1.18mm and fixed
with tinned tacks, or galvanised wire staples.S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI wire cloth 0.56mm dia wire width or aperture 1.18mm 1 Sqm Rs. 145.00 1.05 152.25
Rs.152.25
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.215.40 Total Amount of M and L Rs.183.30
Add 17.5 % OH and CP Rs.32.08
Total Rs.215.38

995 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9158.02
Galvanised mild steel wire cloth, 0.56mm nominal dia of wire and averagewidth of aperture 1.18mm and fixed
with tinned tacks, or galvanised wire staples. Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.36.50 Total Amount of M and L Rs.31.05
Add 17.5 % OH and CP Rs.5.43
Total Rs.36.48

ITEM No. 9158.03


Galvanised mild steel wire cloth, 0.56mm nominal dia of wire and averagewidth of aperture 1.18mm and fixed
with tinned tacks, or galvanised wire staples. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.037 8.325
Rs.8.33
After rounding off: Rs.9.80 Total Amount of M and L Rs.8.33
Add 17.5 % OH and CP Rs.1.46
Total Rs.9.78

ITEM No. 9159.01


Galvanised mild steel wire cloth, 0.56mm nominal dia of wire and averagewidth of aperture 1.00 mm and fixed
with tinned tacks, or galvanised wire staples. S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI wire cloth 0.56mm dia width of aperture 1.00mm 1 Sqm Rs. 165.00 1.05 173.25
Rs.173.25
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.699 6.291
Rs.6.29
After rounding off: Rs.240.00 Total Amount of M and L Rs.204.29
Add 17.5 % OH and CP Rs.35.75
Total Rs.240.04

996 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9159.02
Galvanised mild steel wire cloth, 0.56mm nominal dia of wire and averagewidth of aperture 1.00 mm and fixed
with tinned tacks, or galvanised wire staples. Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.36.50 Total Amount of M and L Rs.31.05
Add 17.5 % OH and CP Rs.5.43
Total Rs.36.48

ITEM No. 9159.03


Galvanised mild steel wire cloth, 0.56mm nominal dia of wire and averagewidth of aperture 1.00 mm and fixed
with tinned tacks, or galvanised wire staples. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.037 8.325
Rs.8.33
After rounding off: Rs.9.80 Total Amount of M and L Rs.8.33
Add 17.5 % OH and CP Rs.1.46
Total Rs.9.78

ITEM No. 9160.01


Wire netting of galvanised steel wire 1.40mm dia fixed with tinned tacks orwire staples S & F size of mesh
12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.4mm dia size or mesh 12mm 1 Sqm Rs. 134.00 1.1 147.4
Rs.147.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.202.00 Total Amount of M and L Rs.171.93
Add 17.5 % OH and CP Rs.30.09
Total Rs.202.01

997 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9160.02
Wire netting of galvanised steel wire 1.40mm dia fixed with tinned tacks orwire staples S & F size of mesh
20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.4mm dia size or mesh 20mm 1 Sqm Rs. 121.99 1.1 134.189
Rs.134.19
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.186.50 Total Amount of M and L Rs.158.71
Add 17.5 % OH and CP Rs.27.77
Total Rs.186.49

ITEM No. 9160.03


Wire netting of galvanised steel wire 1.40mm dia fixed with tinned tacks orwire staples S & F size of mesh 25
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.4mm dia size or mesh 25mm 1 Sqm Rs. 112.00 1.1 123.2
Rs.123.20
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.173.60 Total Amount of M and L Rs.147.73
Add 17.5 % OH and CP Rs.25.85
Total Rs.173.58

ITEM No. 9160.04


Wire netting of galvanised steel wire 1.40mm dia fixed with tinned tacks orwire staples Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.28.80 Total Amount of M and L Rs.24.53
Add 17.5 % OH and CP Rs.4.29
Total Rs.28.82

998 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9160.05
Wire netting of galvanised steel wire 1.40mm dia fixed with tinned tacks orwire staples Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

ITEM No. 9161.01


Wire netting of galvanised steel wire 1.23mm dia fixed with tinned tacks orwire staples S & F size of mesh
12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.23mm dia size or mesh 12mm 1 Sqm Rs. 126.00 1.1 138.6
Rs.138.60
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0809 18.2025
Rs.18.20
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.191.60 Total Amount of M and L Rs.163.10
Add 17.5 % OH and CP Rs.28.54
Total Rs.191.65

ITEM No. 9161.02


Wire netting of galvanised steel wire 1.23mm dia fixed with tinned tacks orwire staples S & F size of mesh
20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.23mm dia size or mesh 20mm 1 Sqm Rs. 113.99 1.1 125.389
Rs.125.39
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.0811 18.2475
Rs.18.25
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.176.20 Total Amount of M and L Rs.149.94
Add 17.5 % OH and CP Rs.26.24
Total Rs.176.18

999 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9161.03
Wire netting of galvanised steel wire 1.23mm dia fixed with tinned tacks orwire staples S & F size of mesh
25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.23mm dia size or mesh 25mm 1 Sqm Rs. 105.99 1.1 116.589
Rs.116.59
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.165.80 Total Amount of M and L Rs.141.11
Add 17.5 % OH and CP Rs.24.69
Total Rs.165.81

ITEM No. 9161.04


Wire netting of galvanised steel wire 1.23mm dia fixed with tinned tacks orwire staples Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.28.80 Total Amount of M and L Rs.24.53
Add 17.5 % OH and CP Rs.4.29
Total Rs.28.82

ITEM No. 9161.05


Wire netting of galvanised steel wire 1.23mm dia fixed with tinned tacks orwire staples Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

1000 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9162.01
Wire netting of galvanised steel wire 0.91mm dia fixed with tinned tacks orwire staples S & F size of mesh 12
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.91mm dia size of mesh 12mm 1 Sqm Rs. 97.99 1.1 107.789
Rs.107.79
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.155.50 Total Amount of M and L Rs.132.31
Add 17.5 % OH and CP Rs.23.15
Total Rs.155.47

ITEM No. 9162.02


Wire netting of galvanised steel wire 0.91mm dia fixed with tinned tacks orwire staples S & F size of mesh
20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.91mm dia size or mesh 20mm 1 Sqm Rs. 89.99 1.1 98.989
Rs.98.99
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.145.10 Total Amount of M and L Rs.123.51
Add 17.5 % OH and CP Rs.21.61
Total Rs.145.13

1001 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9162.03
Wire netting of galvanised steel wire 0.91mm dia fixed with tinned tacks orwire staples S & F size of mesh 25
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.91mm dia size or mesh 25mm 1 Sqm Rs. 78.00 1.1 85.8
Rs.85.80
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.129.60 Total Amount of M and L Rs.110.33
Add 17.5 % OH and CP Rs.19.31
Total Rs.129.63

ITEM No. 9162.04


Wire netting of galvanised steel wire 0.91mm dia fixed with tinned tacks orwire staples Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.28.80 Total Amount of M and L Rs.24.53
Add 17.5 % OH and CP Rs.4.29
Total Rs.28.82

ITEM No. 9162.05


Wire netting of galvanised steel wire 0.91mm dia fixed with tinned tacks orwire staples Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

1002 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9163.01
Wire netting of galvanised steel wire 0.71mm dia fixed with tinned tacks orwire staples S & F size of mesh 12
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.71mm dia size or mesh 12mm 1 Sqm Rs. 87.00 1.1 95.7
Rs.95.70
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.141.30 Total Amount of M and L Rs.120.23
Add 17.5 % OH and CP Rs.21.04
Total Rs.141.26

ITEM No. 9163.02


Wire netting of galvanised steel wire 0.71mm dia fixed with tinned tacks orwire staples S & F size of mesh
20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.71mm dia size or mesh 20mm 1 Sqm Rs. 80.00 1.05 84
Rs.84.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.127.50 Total Amount of M and L Rs.108.53
Add 17.5 % OH and CP Rs.18.99
Total Rs.127.52

1003 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9163.03
Wire netting of galvanised steel wire 0.71mm dia fixed with tinned tacks orwire staples S & F size of mesh 25
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.71mm dia size or mesh 25mm 1 Sqm Rs. 65.99 1.1 72.589
Rs.72.59
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.114.10 Total Amount of M and L Rs.97.11
Add 17.5 % OH and CP Rs.16.99
Total Rs.114.11

ITEM No. 9163.04


Wire netting of galvanised steel wire 0.71mm dia fixed with tinned tacks orwire staples Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.28.80 Total Amount of M and L Rs.24.53
Add 17.5 % OH and CP Rs.4.29
Total Rs.28.82

ITEM No. 9163.05


Wire netting of galvanised steel wire 0.71mm dia fixed with tinned tacks orwire staples Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

1004 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9164.01
Wire netting of stainless steel wire 1.40mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire 1.4mm dia size or mesh 12mm 1 Sqm Rs. 170.00 1.1 187
Rs.187.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.248.50 Total Amount of M and L Rs.211.53
Add 17.5 % OH and CP Rs.37.02
Total Rs.248.54

ITEM No. 9164.02


Wire netting of stainless steel wire 1.40mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire 1.4mm dia size or mesh 20mm 1 Sqm Rs. 160.00 1.1 176
Rs.176.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.235.60 Total Amount of M and L Rs.200.53
Add 17.5 % OH and CP Rs.35.09
Total Rs.235.62

1005 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9164.03
Wire netting of stainless steel wire 1.40mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire 1.4mm dia size or mesh 25mm 1 Sqm Rs. 150.00 1.1 165
Rs.165.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.222.70 Total Amount of M and L Rs.189.53
Add 17.5 % OH and CP Rs.33.17
Total Rs.222.69

ITEM No. 9164.04


Wire netting of stainless steel wire 1.4 mm dia fixed with tinned tacks of stainless steelwire staples Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.28.80 Total Amount of M and L Rs.24.53
Add 17.5 % OH and CP Rs.4.29
Total Rs.28.82

ITEM No. 9164.05


Wire netting of stainless steel wire 1.4 mm dia fixed with tinned tacks of stainless steelwire staples Add if fixed
in repair.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

1006 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9165.01
Wire netting of stainless steel wire 1.23mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire 1.23mm dia size or mesh 12mm 1 Sqm Rs. 160.00 1.1 176
Rs.176.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.235.60 Total Amount of M and L Rs.200.53
Add 17.5 % OH and CP Rs.35.09
Total Rs.235.62

ITEM No. 9165.02


Wire netting of stainless steel wire 1.23mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire 1.23mm dia size or mesh 20mm 1 Sqm Rs. 150.00 1.1 165
Rs.165.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.222.70 Total Amount of M and L Rs.189.53
Add 17.5 % OH and CP Rs.33.17
Total Rs.222.69

1007 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9165.03
Wire netting of stainless steel wire 1.23mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire 1.23mm dia size or mesh 25mm 1 Sqm Rs. 140.00 1.1 154
Rs.154.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.209.80 Total Amount of M and L Rs.178.53
Add 17.5 % OH and CP Rs.31.24
Total Rs.209.77

ITEM No. 9165.04


Wire netting of stainless steel wire 1.23 mm dia fixed with tinned tacks of stainless steelwire staples Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.28.80 Total Amount of M and L Rs.24.53
Add 17.5 % OH and CP Rs.4.29
Total Rs.28.82

ITEM No. 9165.05


Wire netting of stainless steel wire 1.23 mm dia fixed with tinned tacks of stainless steelwire staples Add if
fixed in repair.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

1008 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9166.01
Wire netting of stainless steel wire 0.91mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire 0.91mm dia size or mesh 12mm 1 Sqm Rs. 150.00 1.1 165
Rs.165.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.222.70 Total Amount of M and L Rs.189.53
Add 17.5 % OH and CP Rs.33.17
Total Rs.222.69

ITEM No. 9166.02


Wire netting of stainless steel wire 0.91mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire0 .91mm dia size or mesh 20mm 1 Sqm Rs. 140.00 1.1 154
Rs.154.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.209.80 Total Amount of M and L Rs.178.53
Add 17.5 % OH and CP Rs.31.24
Total Rs.209.77

1009 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9166.03
Wire netting of stainless steel wire 0.91mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire0 .91mm dia size or mesh 25 mm 1 Sqm Rs. 130.00 1.1 143
Rs.143.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.196.80 Total Amount of M and L Rs.167.53
Add 17.5 % OH and CP Rs.29.32
Total Rs.196.84

ITEM No. 9166.04


Wire netting of stainless steel wire0 .91 mm dia fixed with tinned tacks of stainless steelwire staples Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.28.80 Total Amount of M and L Rs.24.53
Add 17.5 % OH and CP Rs.4.29
Total Rs.28.82

ITEM No. 9166.05


Wire netting of stainless steel wire 0.91 mm dia fixed with tinned tacks of stainless steelwire staples Add if
fixed in repair.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

1010 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9167.01
Wire netting of stainless steel wire 0.71mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire0 .71mm dia size or mesh12 mm 1 Sqm Rs. 140.00 1.1 154
Rs.154.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.209.80 Total Amount of M and L Rs.178.53
Add 17.5 % OH and CP Rs.31.24
Total Rs.209.77

ITEM No. 9167.02


Wire netting of stainless steel wire 0.71mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire0 .71mm dia size or mesh20 mm 1 Sqm Rs. 124.00 1.1 136.4
Rs.136.40
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.71 6.39
Rs.6.39
After rounding off: Rs.189.20 Total Amount of M and L Rs.161.02
Add 17.5 % OH and CP Rs.28.18
Total Rs.189.19

1011 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9167.03
Wire netting of stainless steel wire 0.71mm dia fixed with tinned tacks of stainless steelwire staples S & F size
of mesh25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting stainless steel wire0 .71mm dia size or mesh 25 mm 1 Sqm Rs. 120.00 1.1 132
Rs.132.00
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.183.90 Total Amount of M and L Rs.156.53
Add 17.5 % OH and CP Rs.27.39
Total Rs.183.92

ITEM No. 9167.04


Wire netting of stainless steel wire 0.71 mm dia fixed with tinned tacks of stainless steelwire staples Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.081 18.225
Rs.18.23
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.28.80 Total Amount of M and L Rs.24.53
Add 17.5 % OH and CP Rs.4.29
Total Rs.28.82

ITEM No. 9167.05


Wire netting of stainless steel wire .071 mm dia fixed with tinned tacks of stainless steelwire staples Add if
fixed in repair.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.027 6.075
Rs.6.08
After rounding off: Rs.7.10 Total Amount of M and L Rs.6.08
Add 17.5 % OH and CP Rs.1.06
Total Rs.7.14

1012 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9168.01
S&F Aluminium Wire Cloth 0.45mm dia of wire and average width of aperture 1.40mm and fixed with
aluminium wire staples.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Aluminium wire cloth 0.45 mm dia or wire & avg aperature 1.4mm 1 Sqm Rs. 484.20 1.05 508.41
Rs.508.41
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.633.90 Total Amount of M and L Rs.539.46
Add 17.5 % OH and CP Rs.94.41
Total Rs.633.87

ITEM No. 9168.02


Aluminium Wire Cloth 0.45mm dia of wire and average width of aperture 1.40mm and fixed with aluminium
wire staples.Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.36.50 Total Amount of M and L Rs.31.05
Add 17.5 % OH and CP Rs.5.43
Total Rs.36.48

ITEM No. 9168.03


Aluminium Wire Cloth 0.45mm dia of wire and average width of aperture 1.40mm and fixed with aluminium
wire staples.Add if fixed in repair.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.037 8.325
Rs.8.33
After rounding off: Rs.9.80 Total Amount of M and L Rs.8.33
Add 17.5 % OH and CP Rs.1.46
Total Rs.9.78

1013 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9169.01
S&F Stainless Steel Wire Cloth 0.36mm dia of wire and average width of aperture 1.40mm and fixed with
stainless steel wire staples
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Stainless steel wirecloth 0.36mm dia or wire & avg & avg aperture 1 Sqm Rs. 322.80 1.05 338.94
1.4mm
Rs.338.94
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.434.70 Total Amount of M and L Rs.369.99
Add 17.5 % OH and CP Rs.64.75
Total Rs.434.74

ITEM No. 9169.02


Fixing only Stainless Steel Wire Cloth 0.36mm dia of wire and average width of aperture 1.40mm and fixed
with stainless steel wire staples .
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.11 24.75
Rs.24.75
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.7 6.3
Rs.6.30
After rounding off: Rs.36.50 Total Amount of M and L Rs.31.05
Add 17.5 % OH and CP Rs.5.43
Total Rs.36.48

ITEM No. 9169.03


Add if fixed in repairsStainless Steel Wire Cloth 0.36mm dia of wire and average width of aperture 1.40mm and
fixed with stainless steel wire staples .
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner 1 Day Rs. 225.00 0.037 8.325
Rs.8.33
After rounding off: Rs.9.80 Total Amount of M and L Rs.8.33
Add 17.5 % OH and CP Rs.1.46
Total Rs.9.78

1014 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9170
Double action floor spring hydraulically regulated made up of minimum 1.25 mm thick aluminium alloy sheet
foundation box, main body with stainless steel cover, governing pivot made of brass, other parts made of mild
steel heavy duty and fixed M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Floor spring heavy duty, Aluminium body 1 No. Rs. 1,600.00 1 1600
Rs.1,600.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.05 11.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.05 8.45
Rs.19.70
After rounding off: Rs.1,903.10 Total Amount of M and L Rs.1,619.70
Add 17.5 % OH and CP Rs.283.45
Total Rs.1,903.15

ITEM No. 9171


Galvanised steel wire cloth, 0.63 mm nominal dia of wire and averagewidth of aperture 1.40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI wire cloth 0.63mm dia wire width or aperture 1.4mm 1 Sqm Rs. 161.00 1 161
Rs.161.00
After rounding off: Rs.189.20 Total Amount of M and L Rs.161.00
Add 17.5 % OH and CP Rs.28.18
Total Rs.189.18

ITEM No. 9172


Galvanised steel wire cloth, 0.56 mm nominal dia of wire and averagewidth of aperture 1.18 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI wire cloth 0.56mm dia wire width or aperture 1.18mm 1 Sqm Rs. 145.00 1 145
Rs.145.00
After rounding off: Rs.170.40 Total Amount of M and L Rs.145.00
Add 17.5 % OH and CP Rs.25.38
Total Rs.170.38

ITEM No. 9173


Galvanised steel wire cloth, 0.56 mm nominal dia of wire and averagewidth of aperture 1.00 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI wire cloth 0.56mm dia width of aperture 1.00mm 1 Sqm Rs. 165.00 1 165
Rs.165.00
After rounding off: Rs.193.90 Total Amount of M and L Rs.165.00
Add 17.5 % OH and CP Rs.28.88
Total Rs.193.88

1015 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9174.01
Wire netting of galvanised steel wire, 1.40mm dia size of mesh 12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.4mm dia size or mesh 12mm 1 Sqm Rs. 134.00 1 134
Rs.134.00
After rounding off: Rs.157.40 Total Amount of M and L Rs.134.00
Add 17.5 % OH and CP Rs.23.45
Total Rs.157.45

ITEM No. 9174.02


Wire netting of galvanised steel wire, 1.40mm dia size of mesh 20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.4mm dia size or mesh 20mm 1 Sqm Rs. 121.99 1 121.99
Rs.121.99
After rounding off: Rs.143.30 Total Amount of M and L Rs.121.99
Add 17.5 % OH and CP Rs.21.35
Total Rs.143.34

ITEM No. 9174.03


Wire netting of galvanised steel wire, 1.40mm dia size of mesh 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.4mm dia size or mesh 25mm 1 Sqm Rs. 112.00 1 112
Rs.112.00
After rounding off: Rs.131.60 Total Amount of M and L Rs.112.00
Add 17.5 % OH and CP Rs.19.60
Total Rs.131.60

ITEM No. 9175.01


Wire netting of galvanised steel wire, 1.23mm dia size of mesh 12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.23mm dia size or mesh 12mm 1 Sqm Rs. 126.00 1 126
Rs.126.00
After rounding off: Rs.148.00 Total Amount of M and L Rs.126.00
Add 17.5 % OH and CP Rs.22.05
Total Rs.148.05

ITEM No. 9175.02


Wire netting of galvanised steel wire, 1.23mm dia size of mesh 12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.23mm dia size or mesh 20mm 1 Sqm Rs. 113.99 1 113.99
Rs.113.99
After rounding off: Rs.133.90 Total Amount of M and L Rs.113.99
Add 17.5 % OH and CP Rs.19.95
Total Rs.133.94

1016 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9175.03
Wire netting of galvanised steel wire, 1.23mm dia size of mesh 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 1.23mm dia size or mesh 25mm 1 Sqm Rs. 105.99 1 105.99
Rs.105.99
After rounding off: Rs.124.50 Total Amount of M and L Rs.105.99
Add 17.5 % OH and CP Rs.18.55
Total Rs.124.54

ITEM No. 9176.01


Wire netting of galvanised steel wire, 0.91mm dia size of mesh 12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.91mm dia size of mesh 12mm 1 Sqm Rs. 97.99 1 97.99
Rs.97.99
After rounding off: Rs.115.10 Total Amount of M and L Rs.97.99
Add 17.5 % OH and CP Rs.17.15
Total Rs.115.14

ITEM No. 9176.02


Wire netting of galvanised steel wire, 0.91mm dia size of mesh 20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.91mm dia size or mesh 20mm 1 Sqm Rs. 89.99 1 89.99
Rs.89.99
After rounding off: Rs.105.70 Total Amount of M and L Rs.89.99
Add 17.5 % OH and CP Rs.15.75
Total Rs.105.74

ITEM No. 9176.03


Wire netting of galvanised steel wire, 0.91mm dia size of mesh 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.91mm dia size or mesh 25mm 1 Sqm Rs. 78.00 1 78
Rs.78.00
After rounding off: Rs.91.60 Total Amount of M and L Rs.78.00
Add 17.5 % OH and CP Rs.13.65
Total Rs.91.65

ITEM No. 9177.01


Wire netting of galvanised steel wire, 0.71mm dia size of mesh 12mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.71mm dia size or mesh 12mm 1 Sqm Rs. 87.00 1 87
Rs.87.00
After rounding off: Rs.102.20 Total Amount of M and L Rs.87.00
Add 17.5 % OH and CP Rs.15.23
Total Rs.102.23

1017 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Builder's Hardware
ITEM No. 9177.02
Wire netting of galvanised steel wire, 0.71mm dia size of mesh 20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.71mm dia size or mesh 20mm 1 Sqm Rs. 80.00 1 80
Rs.80.00
After rounding off: Rs.94.00 Total Amount of M and L Rs.80.00
Add 17.5 % OH and CP Rs.14.00
Total Rs.94.00

ITEM No. 9177.03


Wire netting of galvanised steel wire, 0.71mm dia soze of mesh 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire netting galvanized steel wire 0.71mm dia size or mesh 25mm 1 Sqm Rs. 65.99 1 65.99
Rs.65.99
After rounding off: Rs.77.50 Total Amount of M and L Rs.65.99
Add 17.5 % OH and CP Rs.11.55
Total Rs.77.54

1018 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10001.01
Cast iron work grade FG 150, unmachined, in brackets, gully traps, gratings, railing, frames, manhole covers,
fire and soot doors, dampers, stop valve boxes, gate stops, parts of ranges, balusters and similar articles S & F
articles not exc. 5 kg each.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI, Gde 150 for casting 1 Kg Rs. 42.22 1.1 46.442
Rs.46.44
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.039 6.591
2 Bhisty including mussack 1 Day Rs. 169.00 0.039 6.591
Rs.13.18
Sundry
1 Sundries 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.70.70 Total Amount of M and L Rs.60.16
Add 17.5 % OH and CP Rs.10.53
Total Rs.70.69

ITEM No. 10001.02


Cast iron work grade FG 150, unmachined, in brackets, gully traps, gratings, railing, frames, manhole covers,
fire and soot doors, dampers, stop valve boxes, gate stops, parts of ranges, balusters and similar articles not
exc. 5 kg each (supplied only).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI, Gde 150 for casting 1 Kg Rs. 42.22 1.1 46.442
Rs.46.44
After rounding off: Rs.54.60 Total Amount of M and L Rs.46.44
Add 17.5 % OH and CP Rs.8.13
Total Rs.54.57

ITEM No. 10001.03


Cast iron work grade FG 150, unmachined, in brackets, gully traps, gratings, railing, frames, manhole covers,
fire and soot doors, dampers, stop valve boxes, gate stops, parts of ranges, balusters and similar articles S & F
articles exc. 5 kg each.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI, Gde 150 for casting 1 Kg Rs. 42.22 1.1 46.442
Rs.46.44
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.031 5.239
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.031 5.952
Rs.11.19
Sundry
1 Sundries 1 Re Rs. 9.00 0.055 0.495
Rs.0.50
After rounding off: Rs.68.30 Total Amount of M and L Rs.58.13
Add 17.5 % OH and CP Rs.10.17
Total Rs.68.30

1019 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10001.04
Cast iron work grade FG 150, unmachined, in brackets, gully traps, gratings, railing, frames, manhole covers,
fire and soot doors, dampers, stop valve boxes, gate stops, parts of ranges, balusters and similar articles exc. 5
kg each (supplied only).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI, Gde 150 for casting 1 Kg Rs. 42.22 1.1 46.442
Rs.46.44
After rounding off: Rs.54.60 Total Amount of M and L Rs.46.44
Add 17.5 % OH and CP Rs.8.13
Total Rs.54.57

ITEM No. 10002.01


Cast iron works grade FG 150, machined, in pulleys and similar articles S & F articles not exec. 5 kg each.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI, Gde 150 for casting 1 Kg Rs. 42.22 1.1 46.442
Rs.46.44
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.036 6.084
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.036 6.912
Rs.13.00
Sundry
1 Sundries 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.70.40 Total Amount of M and L Rs.59.89
Add 17.5 % OH and CP Rs.10.48
Total Rs.70.37

ITEM No. 10002.02


Cast iron works grade FG 150, machined, in pulleys and similar articles Articles not exc. 5 kg each (supplied
only).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI, Gde 150 for casting 1 Kg Rs. 42.22 1.1 46.442
Rs.46.44
Sundry
1 Sundry 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.56.00 Total Amount of M and L Rs.47.70
Add 17.5 % OH and CP Rs.8.35
Total Rs.56.05

1020 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10002.03
Cast iron works grade FG 150, machined, in pulleys and similar articles S & F articles exc. 5 kg each.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI, Gde 150 for casting 1 Kg Rs. 42.22 1.1 46.442
Rs.46.44
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.031 5.239
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.031 5.952
Rs.11.19
Sundry
1 Sundry 1 Re Rs. 9.00 0.02 0.18
Rs.0.18
After rounding off: Rs.67.90 Total Amount of M and L Rs.57.81
Add 17.5 % OH and CP Rs.10.12
Total Rs.67.93

ITEM No. 10002.04


Cast iron works grade FG 150, machined, in pulleys and similar articles Articles exc. 5 kg each (supplied only).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI, Gde 150 for casting 1 Kg Rs. 42.22 1.1 46.442
Rs.46.44
Sundry
1 Sundry 1 Re Rs. 9.00 0.01 0.09
Rs.0.09
After rounding off: Rs.54.70 Total Amount of M and L Rs.46.53
Add 17.5 % OH and CP Rs.8.14
Total Rs.54.68

1021 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10003.01
Chimney bars (straight or camber ) ; bearing bars ; tongues or water bars for window frames ; window guard
bars, plain, let in and fixed independently in wooden frames, L or T section supports for shelves etc, and similar
articles, conforming to Fe -290 Gde E-165.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar Fe -290 ( Gde-E-165 ) 1 Kg Rs. 48.00 1.05 50.4
Rs.50.40
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.005 0.845
2 Hammermen 1 Day Rs. 192.00 0.011 2.112
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.011 2.112
4 Stone mason 1 Day Rs. 225.00 0.005 1.125
Rs.6.19
Sundry
1 Sundry 1 Re Rs. 9.00 0.3 2.7
Rs.2.70
After rounding off: Rs.69.70 Total Amount of M and L Rs.59.29
Add 17.5 % OH and CP Rs.10.38
Total Rs.69.67

ITEM No. 10003.02


Chimney bars (straight or camber ) ; bearing bars ; tongues or water bars for window frames ; window guard
bars, plain, let in and fixed independently in wooden frames, L or T section supports for shelves etc, and similar
articles, conforming to Fe -290 Gde E-165.Fabrication only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.011 2.112
2 Hammermen 1 Day Rs. 192.00 0.011 2.112
Rs.4.22
Sundry
1 Sundry 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.5.40 Total Amount of M and L Rs.4.58
Add 17.5 % OH and CP Rs.0.80
Total Rs.5.39

1022 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10003.03
Chimney bars (straight or camber ) ; bearing bars ; tongues or water bars for window frames ; window guard
bars, plain, let in and fixed independently in wooden frames, L or T section supports for shelves etc, and similar
articles, conforming to Fe -290 Gde E-165.Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.005 0.845
2 Stone mason(225) 1 Day Rs. 225.00 0.005 1.125
Rs.1.97
Sundry
1 Sundry 1 Re Rs. 9.00 0.065 0.585
Rs.0.59
After rounding off: Rs.3.00 Total Amount of M and L Rs.2.56
Add 17.5 % OH and CP Rs.0.45
Total Rs.3.00

ITEM No. 10004.01


Hand rails, half round or other stock section or core for wooden hand - rail straight portion, drilled and
countersunk for balusters running bars, for doors, balusters, nosing to steps including embeding in concrete
and screwing etc; wind ties for roof including securing bolts;posts and struts in fencing including cutting tops
to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.)
including all necessary drilling, bolting or riveting, etc., and similar work conforming to Fe-290 Gde E-165.
Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar Fe -290 ( Gde-E-165 ) 1 Kg Rs. 48.00 1.05 50.4
Rs.50.40
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
Rs.8.45
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.70.30 Total Amount of M and L Rs.59.84
Add 17.5 % OH and CP Rs.10.47
Total Rs.70.31

1023 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10004.02
Hand rails, half round or other stock section or core for wooden hand - rail straight portion, drilled and
countersunk for balusters running bars, for doors, balusters, nosing to steps including embeding in concrete
and screwing etc; wind ties for roof including securing bolts;posts and struts in fencing including cutting tops
to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.)
including all necessary drilling, bolting or riveting, etc., and similar work conforming to Fe-290 Gde E-165
Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.011 2.112
2 Hammermen 1 Day Rs. 192.00 0.011 2.112
Rs.4.22
Sundry
1 Sundry 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.5.70 Total Amount of M and L Rs.4.85
Add 17.5 % OH and CP Rs.0.85
Total Rs.5.70

ITEM No. 10004.03


Hand rails, half round or other stock section or core for wooden hand - rail straight portion, drilled and
countersunk for balusters running bars, for doors, balusters, nosing to steps including embeding in concrete
and screwing etc; wind ties for roof including securing bolts;posts and struts in fencing including cutting tops
to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.)
including all necessary drilling, bolting or riveting, etc., and similar work conforming to Fe-290 Gde E-
165..Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.011 2.112
2 Hammermen 1 Day Rs. 192.00 0.011 2.112
Rs.4.22
Sundry
1 Sundry 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.5.40 Total Amount of M and L Rs.4.58
Add 17.5 % OH and CP Rs.0.80
Total Rs.5.39

1024 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10006.01
Extra only on item no 10004 for curved or ramped portions of hand rails to required shape or figure (curved,
ramped or scroll portions only measured ) Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.016 3.072
2 Hammermen 1 Day Rs. 192.00 0.016 3.072
Rs.6.14
Sundry
1 Sundry 1 Re Rs. 9.00 0.13 1.17
Rs.1.17
After rounding off: Rs.8.60 Total Amount of M and L Rs.7.31
Add 17.5 % OH and CP Rs.1.28
Total Rs.8.59

ITEM No. 10006.02


Extra only on item no 10004for curved or ramped portions of hand rails to required shape or figure (curved,
ramped or scroll portions only measured ) Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.016 3.072
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.016 3.072
Rs.6.14
Sundry
1 Sundry 1 Re Rs. 9.00 0.13 1.17
Rs.1.17
After rounding off: Rs.8.60 Total Amount of M and L Rs.7.31
Add 17.5 % OH and CP Rs.1.28
Total Rs.8.59

1025 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10007.01
Framed work such as grills, gratings, etc, with ends of bars shouldered and / or riveted, or forged into spikes ;
framed guard bars ; barred iron doors ; ladders; framed balusters; walkways ; railings ; framework of water
tanks and similar work conforming to Fe-290 Gde E-165. Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar Fe -290 ( Gde-E-165 ) 1 Kg Rs. 48.00 1.05 50.4
Rs.50.40
Labour
1 Stone mason(225) 1 Day Rs. 225.00 0.005 1.125
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.054 10.368
3 Hammermen 1 Day Rs. 192.00 0.054 10.368
4 Mazdoor man 1 Day Rs. 169.00 0.0055 0.9295
Rs.22.79
Sundry
1 Sundry 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.87.10 Total Amount of M and L Rs.74.09
Add 17.5 % OH and CP Rs.12.97
Total Rs.87.06

ITEM No. 10007.02


Framed work such as grills, gratings, etc, with ends of bars shouldered and / or riveted, or forged into spikes ;
framed guard bars ; barred iron doors ; ladders; framed balusters; walkways ; railings ; framework of water
tanks and similar work conforming to Fe-290 Gde E-165. Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.04 7.68
2 Hammermen 1 Day Rs. 192.00 0.04 7.68
Rs.15.36
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.19.20 Total Amount of M and L Rs.16.35
Add 17.5 % OH and CP Rs.2.86
Total Rs.19.21

1026 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10007.03
Framed work such as grills, gratings, etc, with ends of bars shouldered and / or riveted, or forged into spikes ;
framed guard bars ; barred iron doors ; ladders; framed balusters; walkways ; railings ; framework of water
tanks and similar work conforming to Fe-290 Gde E-165..Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.014 2.688
2 Stone mason(225) 1 Day Rs. 225.00 0.005 1.125
3 Mazdoor man 1 Day Rs. 169.00 0.0055 0.9295
4 Blacksmith/Tin smith 1 Day Rs. 192.00 0.014 2.688
Rs.7.43
After rounding off: Rs.8.70 Total Amount of M and L Rs.7.43
Add 17.5 % OH and CP Rs.1.30
Total Rs.8.73

ITEM No. 10008.01


Extra only over item no 10007 for portions framed and hung as gates, including pintle hinges, stops, hand-
made sliding bolts, etc. Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0206 3.9552
2 Hammermen 1 Day Rs. 192.00 0.0206 3.9552
Rs.7.91
After rounding off: Rs.9.30 Total Amount of M and L Rs.7.91
Add 17.5 % OH and CP Rs.1.38
Total Rs.9.29

ITEM No. 10008.02


Extra only over item no 10007 for portions framed and hung as gates, including pintle hinges, stops, hand-
made sliding bolts, etc. Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0206 3.9552
2 Hammermen 1 Day Rs. 192.00 0.0206 3.9552
Rs.7.91
After rounding off: Rs.9.30 Total Amount of M and L Rs.7.91
Add 17.5 % OH and CP Rs.1.38
Total Rs.9.29

1027 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10009.01
Add to item 10007 for ornamental and intricate design Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.027 5.184
2 Hammermen 1 Day Rs. 192.00 0.027 5.184
Rs.10.37
Sundry
1 Sundry 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.12.60 Total Amount of M and L Rs.10.73
Add 17.5 % OH and CP Rs.1.88
Total Rs.12.61

ITEM No. 10009.02


Add to item 10007 for ornamental and intricate design Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.027 5.184
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.027 5.184
Rs.10.37
Sundry
1 Sundry 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.12.60 Total Amount of M and L Rs.10.73
Add 17.5 % OH and CP Rs.1.88
Total Rs.12.61

ITEM No. 10010.01


Frames brackets of angles or tees with web and flanges cut to shape, drilled and countersunk for screw,
including beding and welding angles, as necessary, gusset plates, rivetin, etc, not exceeding 10 kg each
bracket. Conforming to Fe -290 ( Gde-E-165 ) (Brackets
over 10 kg each to be measured under 'Structural Steel') Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam che Fe-330 1 Kg Rs. 35.00 1.05 36.75
Rs.36.75
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.04 9
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.047 9.024
3 Mazdoor-man, 1 Day Rs. 169.00 0.04 6.76
4 Hammermen 1 Day Rs. 192.00 0.047 9.024
Rs.33.81
Sundry
1 Sundry 1 Re Rs. 9.00 0.21 1.89
Rs.1.89
After rounding off: Rs.85.10 Total Amount of M and L Rs.72.45
Add 17.5 % OH and CP Rs.12.68
Total Rs.85.13
1028 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10010.02
Frames brackets of angles or tees with web and flanges cut to shape, drilled and countersunk for screw,
including beding and welding angles, as necessary, gusset plates, rivetin, etc, not exceeding 10 kg each
bracket. Conforming to Fe -290 ( Gde-E-165 ) (Brackets
over 10 kg each to be measured under 'Structural Steel') Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.033 6.336
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.033 6.336
Rs.12.67
Sundry
1 Sundry 1 Re Rs. 9.00 0.09 0.81
Rs.0.81
After rounding off: Rs.15.80 Total Amount of M and L Rs.13.48
Add 17.5 % OH and CP Rs.2.36
Total Rs.15.84

ITEM No. 10010.03


Frames brackets of angles or tees with web and flanges cut to shape, drilled and countersunk for screw,
including beding and welding angles, as necessary, gusset plates, rivetin, etc, not exceeding 10 kg each
bracket. Conforming to Fe -290 ( Gde-E-165 ) ((Brackets
over 10 kg each to be measured under 'Structural Steel') Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.014 2.688
2 Hammermen 1 Day Rs. 192.00 0.014 2.688
Rs.5.38
Sundry
1 Sundry 1 Re Rs. 9.00 0.03 0.27
Rs.0.27
After rounding off: Rs.6.60 Total Amount of M and L Rs.5.65
Add 17.5 % OH and CP Rs.0.99
Total Rs.6.63

1029 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10011.01
Tie bars with screwed ends, nuts, washers and mild steel plates for walls, chimneys, roofs arches, etc. king rods
and straining bolts conforming to Fe -290 ( Gde-E-165 ) Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe -290 ( Gde-E-165 ) 1 Kg Rs. 35.00 1.05 36.75
Rs.36.75
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.017 3.264
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.011 2.112
3 Hammermen 1 Day Rs. 192.00 0.011 2.112
4 Mazdoor man 1 Day Rs. 169.00 0.006 1.014
Rs.8.50
Sundry
1 Sundry 1 Re Rs. 9.00 0.29 2.61
Rs.2.61
After rounding off: Rs.56.20 Total Amount of M and L Rs.47.86
Add 17.5 % OH and CP Rs.8.38
Total Rs.56.24

ITEM No. 10011.02


Tie bars with screwed ends, nuts, washers and mild steel plates for walls, chimneys, roofs arches, etc. king rods
and straining bolts conforming to Fe -290 ( Gde-E-165 ) Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.011 2.112
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.011 2.112
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.011 2.112
Rs.6.34
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.8.00 Total Amount of M and L Rs.6.79
Add 17.5 % OH and CP Rs.1.19
Total Rs.7.97

1030 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10011.03
Tie bars with screwed ends, nuts, washers and mild steel plates for walls, chimneys, roofs arches, etc. king rods
and straining bolts conforming to Fe -290 ( Gde-E-165 ) Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.006 1.014
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.006 1.152
Rs.2.17
Sundry
1 Sundry 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.3.60 Total Amount of M and L Rs.3.07
Add 17.5 % OH and CP Rs.0.54
Total Rs.3.60

ITEM No. 10012.01


Bands, straps, supports or stays for rainwater, ventilating pipes, including bolts, if required ; hooks (stay),
heavy, for large gates ; hook and pintle hinges ; large hasps and staples ; chains ; hand made slinding bolts;
clamps ; hold fasts ; wall ties hooks forhanging fans; plain angle cleats for securing purlins to wood trusses or
rafters; knee piece inserts; two way and three way straps, plate washers and similar small articles conforming
to Fe-290 Gde-E-165 Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar Fe -290 ( Gde-E-165 ) 1 Kg Rs. 48.00 1.05 50.4
Rs.50.40
Labour
1 Stone mason 1 Day Rs. 225.00 0.017 3.825
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.055 10.56
3 Hammermen 1 Day Rs. 192.00 0.055 10.56
4 Mazdoor man 1 Day Rs. 169.00 0.017 2.873
Rs.27.82
After rounding off: Rs.91.90 Total Amount of M and L Rs.78.22
Add 17.5 % OH and CP Rs.13.69
Total Rs.91.91

ITEM No. 10012.02


Bands, straps, supports or stays for rainwater, ventilating pipes, including bolts, if required ; hooks (stay),
heavy, for large gates ; hook and pintle hinges ; large hasps and staples ; chains ; hand made slinding bolts;
clamps ; hold fasts ; wall ties hooks forhanging fans; plain angle cleats for securing purlins to wood trusses or
rafters; knee piece inserts; two way and three way straps, plate washers and similar small articles conforming
to Fe-290 Gde-E-165 Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.0532 10.2144
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0532 10.2144
Rs.20.43
After rounding off: Rs.24.00 Total Amount of M and L Rs.20.43
Add 17.5 % OH and CP Rs.3.58
Total Rs.24.00
1031 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10012.03
Bands, straps, supports or stays for rainwater, ventilating pipes, including bolts, if required ; hooks (stay),
heavy, for large gates ; hook and pintle hinges ; large hasps and staples ; chains ; hand made slinding bolts;
clamps ; hold fasts ; wall ties hooks forhanging fans; plain angle cleats for securing purlins to wood trusses or
rafters; knee piece inserts; two way and three way straps, plate washers and similar small articles conforming
to Fe-290 Gde-E-165 Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mason (Stone mason) 1 Day Rs. 225.00 0.017 3.825
2 Mazdoor man 1 Day Rs. 169.00 0.017 2.873
Rs.6.70
Sundry
1 Sundry 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.8.30 Total Amount of M and L Rs.7.06
Add 17.5 % OH and CP Rs.1.24
Total Rs.8.29

ITEM No. 10013.01


Extra over item 10012, where straps etc. have screwed, ends including keys, cotters, wedges, etc. for timber
trusses and similar work conforming to Fe -290 ( Gde-E-165 ) Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.006 1.152
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.006 1.152
3 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.022 4.224
Rs.6.53
Sundry
1 Sundry 1 Re Rs. 9.00 0.12 1.08
Rs.1.08
After rounding off: Rs.8.90 Total Amount of M and L Rs.7.61
Add 17.5 % OH and CP Rs.1.33
Total Rs.8.94

ITEM No. 10013.02


Extra over item 10012, where straps etc. have screwed, ends including keys, cotters, wedges, etc. for timber
trusses and similar work conforming to Fe -290 ( Gde-E-165 ) Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.006 1.152
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.006 1.152
3 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.0213 4.0896
Rs.6.39
After rounding off: Rs.7.50 Total Amount of M and L Rs.6.39
Add 17.5 % OH and CP Rs.1.12
Total Rs.7.51

1032 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10014.01
Purpose made butt hinges conforming to Fe -290 ( Gde-E-165 ) suitable for fixing to stone / concrete door and
window frames (Fixing only shall be mesured separately ) Supplied & Fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar Fe -290 ( Gde-E-165 ) 1 Kg Rs. 48.00 1.05 50.4
Rs.50.40
Labour
1 Hammermen 1 Day Rs. 192.00 0.055 10.56
2 Mazdoor man 1 Day Rs. 169.00 0.0165 2.7885
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.055 10.56
4 Stone mason(225) 1 Day Rs. 225.00 0.017 3.825
Rs.27.73
After rounding off: Rs.91.80 Total Amount of M and L Rs.78.13
Add 17.5 % OH and CP Rs.13.67
Total Rs.91.81

ITEM No. 10014.02


Purpose made butt hinges conforming to Fe -290 ( Gde-E-165 ) suitable for fixing to stone / concrete door and
window frames (Fixing only shall be mesured separately ) Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.054 10.368
2 Hammermen 1 Day Rs. 192.00 0.054 10.368
Rs.20.74
After rounding off: Rs.24.40 Total Amount of M and L Rs.20.74
Add 17.5 % OH and CP Rs.3.63
Total Rs.24.36

ITEM No. 10015.01


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut, not
exceeding 5 cm long.Supplied and fixed (diameter of neck 5 to 10 mm)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.127 6.096
2 Screw bolt n.exc. 5cm length & 5-10mm dia 1 Kg Rs. 55.00 1 55
Rs.61.10
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.05 8.45
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.05 9.6
Rs.18.05
After rounding off: Rs.93.00 Total Amount of M and L Rs.79.15
Add 17.5 % OH and CP Rs.13.85
Total Rs.93.00

1033 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10015.02
Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut, not
exceeding 5 cm long.Supplied and fixed (diameter of neck 11 to 15 mm)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.1 4.8
2 Screw bolt not exceeding 5cm length 11-15mm dia 1 Kg Rs. 54.00 1 54
Rs.58.80
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.047 9.024
2 Mazdoor man 1 Day Rs. 169.00 0.047 7.943
Rs.16.97
After rounding off: Rs.89.00 Total Amount of M and L Rs.75.77
Add 17.5 % OH and CP Rs.13.26
Total Rs.89.03

ITEM No. 10015.03


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut, not
exceeding 5 cm long.Supplied and fixed (diameter of neck 16 to 20 mm)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.088 4.224
2 Screw bolt not exceeding 5cm length 16-20mm dia 1 Kg Rs. 53.00 1 53
Rs.57.22
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.023 4.416
2 Mazdoor man 1 Day Rs. 169.00 0.023 3.887
Rs.8.30
After rounding off: Rs.77.00 Total Amount of M and L Rs.65.53
Add 17.5 % OH and CP Rs.11.47
Total Rs.76.99

ITEM No. 10015.04


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut, not
exceeding 5 cm long.Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.04 7.68
2 Mazdoor man 1 Day Rs. 169.00 0.04 6.76
Rs.14.44
After rounding off: Rs.17.00 Total Amount of M and L Rs.14.44
Add 17.5 % OH and CP Rs.2.53
Total Rs.16.97

1034 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10015.05
Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut, not
exceeding 5 cm long.Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.011 2.112
Rs.3.97
After rounding off: Rs.4.70 Total Amount of M and L Rs.3.97
Add 17.5 % OH and CP Rs.0.69
Total Rs.4.67

ITEM No. 10016.01


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 5cm but not exceeding 10 cm long Supplied and fixed (diameter of shank 5 mm to 10 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.14 6.72
2 Screw bolt n.exc. 5cm length & 5-10mm dia 1 Kg Rs. 55.00 1 55
Rs.61.72
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.04 6.76
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.04 7.68
Rs.14.44
After rounding off: Rs.89.50 Total Amount of M and L Rs.76.16
Add 17.5 % OH and CP Rs.13.33
Total Rs.89.49

ITEM No. 10016.02


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 5cm but not exceeding 10 cm long Supplied and fixed (diameter of shank 11 mm to 15 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw bolt not exceeding 5cm length 11-15mm dia 1 Kg Rs. 54.00 1 54
2 Washer steel 1 Kg Rs. 48.00 0.08 3.84
Rs.57.84
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
Rs.10.83
After rounding off: Rs.80.70 Total Amount of M and L Rs.68.67
Add 17.5 % OH and CP Rs.12.02
Total Rs.80.69

1035 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10016.03
Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 5cm but not exceeding 10 cm long Supplied and fixed (diameter of shank 16 mm to 20 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.07 3.36
2 Screw bolt not exceeding 5cm length 11-15mm dia 1 Kg Rs. 54.00 1 54
Rs.57.36
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.02 3.84
Rs.7.22
After rounding off: Rs.75.90 Total Amount of M and L Rs.64.58
Add 17.5 % OH and CP Rs.11.30
Total Rs.75.88

ITEM No. 10016.04


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 5cm but not exceeding 10 cm long Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
Rs.10.83
After rounding off: Rs.12.70 Total Amount of M and L Rs.10.83
Add 17.5 % OH and CP Rs.1.90
Total Rs.12.73

ITEM No. 10016.05


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 5cm but not exceeding 10 cm long Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.011 2.112
Rs.3.97
After rounding off: Rs.4.70 Total Amount of M and L Rs.3.97
Add 17.5 % OH and CP Rs.0.69
Total Rs.4.67

1036 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10017.01
Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 10cm but not exceeding 15 cm long Supplied and fixed (diameter of shank 5 mm to 10 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.1 4.8
2 Screw bolt n.exc. 5cm length & 5-10mm dia 1 Kg Rs. 55.00 1 55
Rs.59.80
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.04 7.68
2 Mazdoor man 1 Day Rs. 169.00 0.04 6.76
Rs.14.44
After rounding off: Rs.87.20 Total Amount of M and L Rs.74.24
Add 17.5 % OH and CP Rs.12.99
Total Rs.87.23

ITEM No. 10017.02


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 10cm but not exceeding 15 cm long Supplied and fixed (diameter of shank 11 mm to 15 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.05 2.4
2 Screw bolt not exceeding 5cm length 11-15mm dia 1 Kg Rs. 54.00 1 54
Rs.56.40
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
Rs.10.83
After rounding off: Rs.79.00 Total Amount of M and L Rs.67.23
Add 17.5 % OH and CP Rs.11.77
Total Rs.79.00

1037 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10017.03
Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 10cm but not exceeding 15 cm long Supplied and fixed (diameter of shank 16 mm to 20 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.04 1.92
2 Screw bolt not exceeding 5cm length 16-20mm dia 1 Kg Rs. 53.00 1 53
Rs.54.92
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.7.22
After rounding off: Rs.73.00 Total Amount of M and L Rs.62.14
Add 17.5 % OH and CP Rs.10.87
Total Rs.73.01

ITEM No. 10017.04


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 10cm but not exceeding 15 cm long Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.04 6.76
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.04 7.68
Rs.14.44
After rounding off: Rs.17.00 Total Amount of M and L Rs.14.44
Add 17.5 % OH and CP Rs.2.53
Total Rs.16.97

ITEM No. 10017.05


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 10cm but not exceeding 11 cm long Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.013 2.496
2 Mazdoor man 1 Day Rs. 169.00 0.013 2.197
Rs.4.69
After rounding off: Rs.5.50 Total Amount of M and L Rs.4.69
Add 17.5 % OH and CP Rs.0.82
Total Rs.5.51

1038 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10018.01
Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 15cm and n exc 22.5 cm long Supplied and fixed (diameter of shank 5 mm to 10 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.05 2.4
2 Screw bolt not exceeding 5cm length 16-20mm dia 1 Kg Rs. 53.00 1 53
Rs.55.40
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.0351 6.7392
2 Mazdoor man 1 Day Rs. 169.00 0.035 5.915
Rs.12.65
After rounding off: Rs.80.00 Total Amount of M and L Rs.68.05
Add 17.5 % OH and CP Rs.11.91
Total Rs.79.96

ITEM No. 10018.02


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 15cm and n exc 22.5 cm long Supplied and fixed (diameter of shank 11 mm to 15 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw BT exe. 15 not exe 22.5cm,11-15mm dia 1 Kg Rs. 53.00 1 53
2 Washer steel 1 Kg Rs. 48.00 0.05 2.4
Rs.55.40
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
Rs.10.83
After rounding off: Rs.77.80 Total Amount of M and L Rs.66.23
Add 17.5 % OH and CP Rs.11.59
Total Rs.77.82

1039 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10018.03
Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 15cm and n exc 22.5 cm long Supplied and fixed (diameter of shank 16 mm to 20 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.03 1.44
2 Screw BT exe. 15 not exe 22.5cm,11-15mm dia 1 Kg Rs. 53.00 1 53
Rs.54.44
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.015 2.535
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.015 2.88
Rs.5.42
After rounding off: Rs.70.30 Total Amount of M and L Rs.59.86
Add 17.5 % OH and CP Rs.10.47
Total Rs.70.33

ITEM No. 10018.04


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 15cm but not exceeding 22.5 cm long Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.02 3.84
Rs.7.22
After rounding off: Rs.8.50 Total Amount of M and L Rs.7.22
Add 17.5 % OH and CP Rs.1.26
Total Rs.8.48

ITEM No. 10018.05


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 15cm but not exceeding 22.5 cm long Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
Rs.3.61
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.61
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.24

1040 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10019.01
Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 22.5cm and n exc 30 cm long Supplied and fixed (diameter of shank 5 mm to 10 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.05 2.4
2 Screw bolt exe. 22.5 cm length not exec 30 cm 5-10 mm dia 1 Kg Rs. 53.00 1 53
Rs.55.40
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.033 6.336
2 Mason (Stone mason) 1 Day Rs. 225.00 0.0325 7.3125
Rs.13.65
After rounding off: Rs.81.10 Total Amount of M and L Rs.69.05
Add 17.5 % OH and CP Rs.12.08
Total Rs.81.13

ITEM No. 10019.02


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nutlength of bolt
exc 22.5cm and n exc 30 cm long Supplied and fixed (diameter of shank 11 mm to 15 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Screw bolt exe. 22.5 cm length not exec 30 cm 5-10 mm dia 1 Kg Rs. 53.00 1 53
2 Washer steel 1 Kg Rs. 48.00 0.03 1.44
Rs.54.44
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
Rs.10.83
After rounding off: Rs.76.70 Total Amount of M and L Rs.65.27
Add 17.5 % OH and CP Rs.11.42
Total Rs.76.69

1041 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10019.03
Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 22.5cm and n exc 30 cm long Supplied and fixed (diameter of shank 16 mm to 20 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Washer steel 1 Kg Rs. 48.00 0.02 0.96
2 Screw bolt exe.22.5 cm length not exe 30cm,16-20mm dia 1 Kg Rs. 50.00 1 50
Rs.50.96
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.0145 2.784
2 Mazdoor man 1 Day Rs. 169.00 0.0145 2.4505
Rs.5.23
After rounding off: Rs.66.00 Total Amount of M and L Rs.56.19
Add 17.5 % OH and CP Rs.9.83
Total Rs.66.03

ITEM No. 10019.04


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 22.5cm but not exceeding 30 cm long Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.7.22
After rounding off: Rs.8.50 Total Amount of M and L Rs.7.22
Add 17.5 % OH and CP Rs.1.26
Total Rs.8.48

ITEM No. 10019.05


Mild steel screw bolts (machine made ) with hexagonal or square heads at one end and screwed the other, or
screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut length of
bolt exc 22.5m but not exceeding 30 cm long Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.006 1.014
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.0061 1.1712
Rs.2.19
After rounding off: Rs.2.60 Total Amount of M and L Rs.2.19
Add 17.5 % OH and CP Rs.0.38
Total Rs.2.57

1042 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10020.01
Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, not exceeding 15 cm long Supplied and fixed (diameter of neck 12 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lewis bolt not exceeding 15cm length 12mm dia 1 Kg Rs. 50.00 1 50
Rs.50.00
Labour
1 Hammermen 1 Day Rs. 192.00 0.04 7.68
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.04 7.68
Rs.15.36
After rounding off: Rs.76.80 Total Amount of M and L Rs.65.36
Add 17.5 % OH and CP Rs.11.44
Total Rs.76.80

ITEM No. 10020.02


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, not exceeding 15 cm long Supplied and fixed (diameter of neck 20 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lewis bolt not exe15cm length 20mm dia 1 Kg Rs. 50.00 1 50
Rs.50.00
Labour
1 Hammermen 1 Day Rs. 192.00 0.03 5.76
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
Rs.11.52
After rounding off: Rs.72.30 Total Amount of M and L Rs.61.52
Add 17.5 % OH and CP Rs.10.77
Total Rs.72.29

ITEM No. 10020.03


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, not exceeding 15 cm long Supplied and fixed (diameter of neck 25 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lewis bolt not exe 15cm length 25mm dia 1 Kg Rs. 50.00 1 50
Rs.50.00
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.02 3.84
2 Hammermen 1 Day Rs. 192.00 0.02 3.84
Rs.7.68
After rounding off: Rs.67.80 Total Amount of M and L Rs.57.68
Add 17.5 % OH and CP Rs.10.09
Total Rs.67.77

1043 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10020.04
Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, not exceeding 15 cm long Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.03 5.76
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
Rs.11.52
After rounding off: Rs.13.50 Total Amount of M and L Rs.11.52
Add 17.5 % OH and CP Rs.2.02
Total Rs.13.54

ITEM No. 10020.05


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, not exceeding 15 cm long Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Hammermen 1 Day Rs. 192.00 0.01 1.92
Rs.3.84
After rounding off: Rs.4.50 Total Amount of M and L Rs.3.84
Add 17.5 % OH and CP Rs.0.67
Total Rs.4.51

ITEM No. 10021.01


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 15 cm and n exc 30 cm long Supplied and fixed (diameter of neck 12
mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lewis bolt exe 15cm not exe 30cm length 12mm dia 1 Kg Rs. 50.00 1 50
Rs.50.00
Labour
1 Hammermen 1 Day Rs. 192.00 0.04 7.68
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.04 7.68
Rs.15.36
After rounding off: Rs.76.80 Total Amount of M and L Rs.65.36
Add 17.5 % OH and CP Rs.11.44
Total Rs.76.80

1044 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10021.02
Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 15 cm and n exc 30 cm long Supplied and fixed (diameter of neck 20
mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lewis bolt exe 15cm not exe 30cm length 12mm dia 1 Kg Rs. 50.00 1 50
Rs.50.00
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
2 Hammermen 1 Day Rs. 192.00 0.03 5.76
Rs.11.52
After rounding off: Rs.72.30 Total Amount of M and L Rs.61.52
Add 17.5 % OH and CP Rs.10.77
Total Rs.72.29

ITEM No. 10021.03


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 15 cm and n exc 30 cm long Supplied and fixed (diameter of neck 25
mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lewis bolt exe 15cm not exe 30cm length 25mm dia 1 Kg Rs. 50.00 1 50
Rs.50.00
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.02 3.84
2 Hammermen 1 Day Rs. 192.00 0.02 3.84
Rs.7.68
After rounding off: Rs.67.80 Total Amount of M and L Rs.57.68
Add 17.5 % OH and CP Rs.10.09
Total Rs.67.77

ITEM No. 10021.04


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 15 cm and n exc 30 cm long Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.03 5.76
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
Rs.11.52
After rounding off: Rs.13.50 Total Amount of M and L Rs.11.52
Add 17.5 % OH and CP Rs.2.02
Total Rs.13.54

1045 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10021.05
Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 15 cm and n exc 30 cm long Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Hammermen 1 Day Rs. 192.00 0.01 1.92
Rs.3.84
After rounding off: Rs.4.50 Total Amount of M and L Rs.3.84
Add 17.5 % OH and CP Rs.0.67
Total Rs.4.51

ITEM No. 10022.01


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 30 cm long Supplied and fixed (diameter of neck 12 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lewis bolt exe 30 cm length,12mm dia 1 Kg Rs. 50.00 1 50
Rs.50.00
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.035 6.72
2 Hammermen 1 Day Rs. 192.00 0.035 6.72
Rs.13.44
After rounding off: Rs.74.50 Total Amount of M and L Rs.63.44
Add 17.5 % OH and CP Rs.11.10
Total Rs.74.54

ITEM No. 10022.02


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 30 cm long Supplied and fixed (diameter of neck 20 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lewis bolt exe 30 cm length,12mm dia 1 Kg Rs. 50.00 1 50
Rs.50.00
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
2 Hammermen 1 Day Rs. 192.00 0.03 5.76
Rs.11.52
After rounding off: Rs.72.30 Total Amount of M and L Rs.61.52
Add 17.5 % OH and CP Rs.10.77
Total Rs.72.29

1046 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10022.03
Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 30 cm long Supplied and fixed (diameter of neck 25 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Lewis bolt exe 30 cm length,25mm dia 1 Kg Rs. 50.00 1 50
Rs.50.00
Labour
1 Hammermen 1 Day Rs. 192.00 0.014 2.688
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.014 2.688
Rs.5.38
After rounding off: Rs.65.10 Total Amount of M and L Rs.55.38
Add 17.5 % OH and CP Rs.9.69
Total Rs.65.07

ITEM No. 10022.04


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 30 cm long Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.023 4.416
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.023 4.416
Rs.8.83
After rounding off: Rs.10.40 Total Amount of M and L Rs.8.83
Add 17.5 % OH and CP Rs.1.55
Total Rs.10.38

ITEM No. 10022.05


Mild steel rag or lewise bolts, screwed one end, with hexagonal or square nuts and washers, the end enlarged
and jagged or lewised, length of bolt exc 30 cm long Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.008 1.536
2 Hammermen 1 Day Rs. 192.00 0.008 1.536
Rs.3.07
After rounding off: Rs.3.60 Total Amount of M and L Rs.3.07
Add 17.5 % OH and CP Rs.0.54
Total Rs.3.61

1047 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10023.01
Mild steel bolts, purpose made, with hexangonal or square head one end and screwed the other, or screwed
both ends ; each screwed end to be fitted with washers and one hexangonal or square nut, exceeding 30 cm
long S & F( diameter of neck not exceeding 12 mm)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar ST-42, Fe-410-0 or Fe-310-0 1 Kg Rs. 40.00 1 40
Rs.40.00
Labour
1 Hammermen 1 Day Rs. 192.00 0.055 10.56
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.044 8.448
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.055 10.56
4 Mazdoor man 1 Day Rs. 169.00 0.0505 8.5345
Rs.38.10
After rounding off: Rs.91.80 Total Amount of M and L Rs.78.10
Add 17.5 % OH and CP Rs.13.67
Total Rs.91.77

ITEM No. 10023.02


Mild steel bolts, purpose made, with hexangonal or square head one end and screwed the other, or screwed
both ends ; each screwed end to be fitted with washers and one hexangonal or square nut, exceeding 30 cm
long S & F( diameter of neck exceeding 12 mm n exc.20mm)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar ST-42, Fe-410-0 or Fe-310-0 1 Kg Rs. 40.00 1 40
Rs.40.00
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.03 5.76
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
3 Hammermen 1 Day Rs. 192.00 0.05 9.6
4 Blacksmith/Tin smith 1 Day Rs. 192.00 0.05 9.6
Rs.30.03
Sundry
1 Sundry 1 Re Rs. 9.00 0.26 2.34
Rs.2.34
After rounding off: Rs.85.00 Total Amount of M and L Rs.72.37
Add 17.5 % OH and CP Rs.12.66
Total Rs.85.03

1048 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10023.03
Mild steel bolts, purpose made, with hexangonal or square head one end and screwed the other, or screwed
both ends ; each screwed end to be fitted with washers and one hexangonal or square nut, exceeding 30 cm
long S & F( diameter of neck exceeding 20 mm n exc.25mm)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar ST-42, Fe-410-0 or Fe-310-0 1 Kg Rs. 40.00 1 40
Rs.40.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
2 Hammermen 1 Day Rs. 192.00 0.031 5.952
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.031 5.952
4 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.02 3.84
Rs.19.12
Sundry
1 Sundry 1 Re Rs. 9.00 0.35 3.15
Rs.3.15
After rounding off: Rs.73.20 Total Amount of M and L Rs.62.27
Add 17.5 % OH and CP Rs.10.90
Total Rs.73.17

ITEM No. 10023.04


Mild steel bolts, purpose made, with hexangonal or square head one end and screwed the other, or screwed
both ends ; each screwed end to be fitted with washers and one hexangonal or square nut, exceeding 30 cm
long Fabrication only ( diameter of neck not exc.12mm) )
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0516 9.9072
2 Hammermen 1 Day Rs. 192.00 0.0516 9.9072
Rs.19.81
After rounding off: Rs.23.30 Total Amount of M and L Rs.19.81
Add 17.5 % OH and CP Rs.3.47
Total Rs.23.28

ITEM No. 10023.05


Mild steel bolts, purpose made, with hexangonal or square head one end and screwed the other, or screwed
both ends ; each screwed end to be fitted with washers and one hexangonal or square nut, exceeding 30 cm
long Fabrication only ( diameter of neck exce 12 mm n exc.20mm)
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.047 9.024
2 Hammermen 1 Day Rs. 192.00 0.047 9.024
Rs.18.05
After rounding off: Rs.21.20 Total Amount of M and L Rs.18.05
Add 17.5 % OH and CP Rs.3.16
Total Rs.21.21

1049 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10023.06
Mild steel bolts, purpose made, with hexangonal or square head one end and screwed the other, or screwed
both ends ; each screwed end to be fitted with washers and one hexangonal or square nut, exceeding 30 cm
long Fabrication only ( diameter of neck exce 20 mm n exc.25 mm)
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.031 5.952
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.031 5.952
Rs.11.90
After rounding off: Rs.14.00 Total Amount of M and L Rs.11.90
Add 17.5 % OH and CP Rs.2.08
Total Rs.13.99

ITEM No. 10023.07


Mild steel bolts, purpose made, with hexangonal or square head one end and screwed the other, or screwed
both ends ; each screwed end to be fitted with washers and one hexangonal or square nut, exceeding 30 cm
long Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.031 5.952
2 Mazdoor man 1 Day Rs. 169.00 0.031 5.239
Rs.11.19
After rounding off: Rs.13.10 Total Amount of M and L Rs.11.19
Add 17.5 % OH and CP Rs.1.96
Total Rs.13.15

ITEM No. 10023.08


Mild steel bolts, purpose made, with hexangonal or square head one end and screwed the other, or screwed
both ends ; each screwed end to be fitted with washers and one hexangonal or square nut, exceeding 30 cm
long Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
Rs.1.86
After rounding off: Rs.2.20 Total Amount of M and L Rs.1.86
Add 17.5 % OH and CP Rs.0.33
Total Rs.2.18

1050 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10024.01
Flue pipes of mild steel sheet, black, in suitable lengths as approved by the E.I.C fixed to walls S & F ( diameter
of pipe 100 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 3.8 152
Rs.152.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.047 7.943
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.096 18.432
Rs.26.38
After rounding off: Rs.209.60 Total Amount of M and L Rs.178.38
Add 17.5 % OH and CP Rs.31.22
Total Rs.209.59

ITEM No. 10024.02


Flue pipes of mild steel sheet, black, in suitable lengths as approved by the E.I.C fixed to walls S & F ( diameter
of pipe 150 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 6.6 264
Rs.264.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.047 7.943
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.1275 24.48
Rs.32.42
After rounding off: Rs.348.30 Total Amount of M and L Rs.296.42
Add 17.5 % OH and CP Rs.51.87
Total Rs.348.30

ITEM No. 10024.03


Flue pipes of mild steel sheet, black, in suitable lengths as approved by the E.I.C fixed to walls S & F ( diameter
of pipe 200 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 8.5 340
Rs.340.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.05 8.45
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.175 33.6
Rs.42.05
After rounding off: Rs.448.90 Total Amount of M and L Rs.382.05
Add 17.5 % OH and CP Rs.66.86
Total Rs.448.91

1051 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10024.04
Flue pipes of mild steel sheet, black, in suitable lengths as approved by the E.I.C fixed to walls S & F ( diameter
of pipe 250 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 13 520
Rs.520.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.04 6.76
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.222 42.624
Rs.49.38
After rounding off: Rs.669.00 Total Amount of M and L Rs.569.38
Add 17.5 % OH and CP Rs.99.64
Total Rs.669.03

ITEM No. 10024.05


Flue pipes of mild steel sheet, black, in suitable lengths as approved by the E.I.C fixed to walls Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.033 5.577
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.033 6.336
Rs.11.91
Sundry
1 Sundry 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.14.70 Total Amount of M and L Rs.12.54
Add 17.5 % OH and CP Rs.2.20
Total Rs.14.74

ITEM No. 10024.06


Flue pipes of mild steel sheet, black, in suitable lengths as approved by the E.I.C fixed to walls Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.011 2.112
Rs.3.97
Sundry
1 Sundry 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.5.10 Total Amount of M and L Rs.4.33
Add 17.5 % OH and CP Rs.0.76
Total Rs.5.09

1052 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10025.01
Bends or elbows ( square or raking ) with sliding soot door complete of mild steel sheet, blank S & F ( diameter
of pipe 100 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bend elbow of st sheet, 100mm dia 1 No. Rs. 73.51 1 73.51
Rs.73.51
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.018 3.042
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.018 3.456
Rs.6.50
After rounding off: Rs.94.00 Total Amount of M and L Rs.80.01
Add 17.5 % OH and CP Rs.14.00
Total Rs.94.01

ITEM No. 10025.02


Bends or elbows ( square or raking ) with sliding soot door complete of mild steel sheet, blank S & F ( diameter
of pipe 150 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bend elbow of st sheet, 150mm dia 1 No. Rs. 123.51 1 123.51
Rs.123.51
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.018 3.456
2 Mazdoor-man, 1 Day Rs. 169.00 0.018 3.042
Rs.6.50
After rounding off: Rs.152.80 Total Amount of M and L Rs.130.01
Add 17.5 % OH and CP Rs.22.75
Total Rs.152.76

ITEM No. 10025.03


Bends or elbows ( square or raking ) with sliding soot door complete of mild steel sheet, blank S & F ( diameter
of pipe 200 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bend elbow of st sheet, 200mm dia 1 No. Rs. 173.50 1 173.5
Rs.173.50
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.018 3.456
2 Mazdoor-man, 1 Day Rs. 169.00 0.018 3.042
Rs.6.50
After rounding off: Rs.211.50 Total Amount of M and L Rs.180.00
Add 17.5 % OH and CP Rs.31.50
Total Rs.211.50

1053 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10025.04
Bends or elbows ( square or raking ) with sliding soot door complete of mild steel sheet, blank S & F ( diameter
of pipe 250 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Bend elbow of st sheet, 250mm dia 1 No. Rs. 223.51 1 223.51
Rs.223.51
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.018 3.456
2 Mazdoor-man, 1 Day Rs. 169.00 0.018 3.042
Rs.6.50
After rounding off: Rs.270.30 Total Amount of M and L Rs.230.01
Add 17.5 % OH and CP Rs.40.25
Total Rs.270.26

ITEM No. 10025.05


Bends or elbows ( square or raking ) with sliding soot door complete of mild steel sheet, blank Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.016 2.704
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.016 3.072
Rs.5.78
After rounding off: Rs.6.80 Total Amount of M and L Rs.5.78
Add 17.5 % OH and CP Rs.1.01
Total Rs.6.79

ITEM No. 10025.06


Bends or elbows ( square or raking ) with sliding soot door complete of mild steel sheet, blank Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.0065 1.0985
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0065 1.248
Rs.2.35
After rounding off: Rs.2.80 Total Amount of M and L Rs.2.35
Add 17.5 % OH and CP Rs.0.41
Total Rs.2.76

1054 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10026.01
Cowls ( with 3 stays), riveted to and including 15 cm length flue pipe, of mild steel sheet black S & F ( diameter
of pipe 100 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cowl of Bk steel sheet 100mm dia 1 No. Rs. 56.75 1 56.75
Rs.56.75
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.009 1.728
2 Mazdoor-man, 1 Day Rs. 169.00 0.009 1.521
Rs.3.25
After rounding off: Rs.70.50 Total Amount of M and L Rs.60.00
Add 17.5 % OH and CP Rs.10.50
Total Rs.70.50

ITEM No. 10026.02


Cowls ( with 3 stays), riveted to and including 15 cm length flue pipe, of mild steel sheet black S & F ( diameter
of pipe 150 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cowl of Bk steel sheet 150mm dia 1 No. Rs. 81.75 1 81.75
Rs.81.75
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.009 1.521
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.009 1.728
Rs.3.25
After rounding off: Rs.99.90 Total Amount of M and L Rs.85.00
Add 17.5 % OH and CP Rs.14.87
Total Rs.99.87

ITEM No. 10026.03


Cowls ( with 3 stays), riveted to and including 15 cm length flue pipe, of mild steel sheet black S & F ( diameter
of pipe 200 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cowl of Bk steel sheet 200mm dia 1 No. Rs. 106.75 1 106.75
Rs.106.75
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.009 1.728
2 Mazdoor-man, 1 Day Rs. 169.00 0.009 1.521
Rs.3.25
After rounding off: Rs.129.20 Total Amount of M and L Rs.110.00
Add 17.5 % OH and CP Rs.19.25
Total Rs.129.25

1055 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10026.04
Cowls ( with 3 stays), riveted to and including 15 cm length flue pipe, of mild steel sheet black S & F ( diameter
of pipe 250 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cowl of Bk steel sheet 250mm dia 1 No. Rs. 136.75 1 136.75
Rs.136.75
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.009 1.728
2 Mazdoor-man, 1 Day Rs. 169.00 0.009 1.521
Rs.3.25
After rounding off: Rs.164.50 Total Amount of M and L Rs.140.00
Add 17.5 % OH and CP Rs.24.50
Total Rs.164.50

ITEM No. 10026.05


Cowls ( with 3 stays), riveted to and including 15 cm length flue pipe, of mild steel sheet black Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0085 1.632
2 Mazdoor man 1 Day Rs. 169.00 0.0085 1.4365
Rs.3.07
After rounding off: Rs.3.60 Total Amount of M and L Rs.3.07
Add 17.5 % OH and CP Rs.0.54
Total Rs.3.61

ITEM No. 10026.06


Cowls ( with 3 stays), riveted to and including 15 cm length flue pipe, of mild steel sheet black Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.003 0.576
2 Mazdoor man 1 Day Rs. 169.00 0.003 0.507
Rs.1.08
After rounding off: Rs.1.30 Total Amount of M and L Rs.1.08
Add 17.5 % OH and CP Rs.0.19
Total Rs.1.27

1056 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10027.01
Elbows canister with soot door, of fule pipes of mild steel sheet black S & F ( diameter of pipe 100 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Elbow conister 100mm dia 1 No. Rs. 90.25 1 90.25
Rs.90.25
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.027 4.563
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.027 5.184
Rs.9.75
After rounding off: Rs.117.50 Total Amount of M and L Rs.100.00
Add 17.5 % OH and CP Rs.17.50
Total Rs.117.50

ITEM No. 10027.02


Elbows canister with soot door, of fule pipes of mild steel sheet black S & F ( diameter of pipe 150 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Elbow conister 150mm dia 1 No. Rs. 150.25 1 150.25
Rs.150.25
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.027 4.563
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.027 5.184
Rs.9.75
After rounding off: Rs.188.00 Total Amount of M and L Rs.160.00
Add 17.5 % OH and CP Rs.28.00
Total Rs.188.00

ITEM No. 10027.03


Elbows canister with soot door, of fule pipes of mild steel sheet black S & F ( diameter of pipe 200 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Elbow conister 200mm dia 1 No. Rs. 190.25 1 190.25
Rs.190.25
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.027 4.563
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.027 5.184
Rs.9.75
After rounding off: Rs.235.00 Total Amount of M and L Rs.200.00
Add 17.5 % OH and CP Rs.35.00
Total Rs.235.00

1057 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10027.04
Elbows canister with soot door, of fule pipes of mild steel sheet black S & F ( diameter of pipe 250 mm ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Elbow conister 250mm dia 1 No. Rs. 280.25 1 280.25
Rs.280.25
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.027 5.184
2 Mazdoor-man, 1 Day Rs. 169.00 0.027 4.563
Rs.9.75
After rounding off: Rs.340.70 Total Amount of M and L Rs.290.00
Add 17.5 % OH and CP Rs.50.75
Total Rs.340.75

ITEM No. 10027.05


Elbows canister with soot door, of fule pipes of mild steel sheet black Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0215 4.128
2 Mazdoor man 1 Day Rs. 169.00 0.0215 3.6335
Rs.7.76
After rounding off: Rs.9.10 Total Amount of M and L Rs.7.76
Add 17.5 % OH and CP Rs.1.36
Total Rs.9.12

ITEM No. 10027.06


Elbows canister with soot door, of fule pipes of mild steel sheet black Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.007 1.183
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.007 1.344
Rs.2.53
After rounding off: Rs.3.00 Total Amount of M and L Rs.2.53
Add 17.5 % OH and CP Rs.0.44
Total Rs.2.97

1058 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10028.01
Roof plates with sleeve pieces riveted or welded thereto and similar roof and ceiling connections S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.99 1.03 43.2497
quality "B"
Rs.43.25
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.06 11.52
2 Mazdoor man 1 Day Rs. 169.00 0.06 10.14
Rs.21.66
Sundry
1 Sundry 1 Re Rs. 9.00 0.03 0.27
Rs.0.27
After rounding off: Rs.76.60 Total Amount of M and L Rs.65.18
Add 17.5 % OH and CP Rs.11.41
Total Rs.76.59

ITEM No. 10028.02


Roof plates with sleeve pieces riveted or welded thereto and similar roof and ceiling connections Fabrication
only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.043 8.256
2 Mazdoor man 1 Day Rs. 169.00 0.043 7.267
Rs.15.52
Sundry
1 Sundry 1 Re Rs. 9.00 0.02 0.18
Rs.0.18
After rounding off: Rs.18.50 Total Amount of M and L Rs.15.70
Add 17.5 % OH and CP Rs.2.75
Total Rs.18.45

ITEM No. 10028.03


Roof plates with sleeve pieces riveted or welded thereto and similar roof and ceiling connections Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.021 3.549
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.021 4.032
Rs.7.58
Sundry
1 Sundry 1 Re Rs. 9.00 0.08 0.72
Rs.0.72
After rounding off: Rs.9.80 Total Amount of M and L Rs.8.30
Add 17.5 % OH and CP Rs.1.45
Total Rs.9.75

1059 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10028.04
Roof plates with sleeve pieces riveted or welded thereto and similar roof and ceiling connections Add if in
repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.0065 1.0985
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0065 1.248
Rs.2.35
After rounding off: Rs.2.80 Total Amount of M and L Rs.2.35
Add 17.5 % OH and CP Rs.0.41
Total Rs.2.76

ITEM No. 10029.01


Mild steel, plain, black sheet in wall cladding, steel gates and similar work cut to size, holes punched ; including
headed screws, clout nails or rivets and fixed to wood or steel framing with plain 40 mm lap joints with riveted
welded seams, including bending or turning up, mitred angles, etc. as required.Thickness of sheet 0.63 mm S
& F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 6 240
Rs.240.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.08 13.52
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.08 15.36
Rs.28.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.53 4.77
Rs.4.77
After rounding off: Rs.321.50 Total Amount of M and L Rs.273.65
Add 17.5 % OH and CP Rs.47.89
Total Rs.321.54

1060 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10029.02
Mild steel, plain, black sheet in wall cladding, steel gates and similar work cut to size, holes punched ; including
headed screws, clout nails or rivets and fixed to wood or steel framing with plain 40 mm lap joints with riveted
welded seams, including bending or turning up, mitred angles, etc. as required.Thickness of sheet 0.80 mm S
& F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 7 280
Rs.280.00
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.08 15.36
2 Mazdoor man 1 Day Rs. 169.00 0.08 13.52
Rs.28.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.53 4.77
Rs.4.77
After rounding off: Rs.368.50 Total Amount of M and L Rs.313.65
Add 17.5 % OH and CP Rs.54.89
Total Rs.368.54

ITEM No. 10029.03


Mild steel, plain, black sheet in wall cladding, steel gates and similar work cut to size, holes punched ; including
headed screws, clout nails or rivets and fixed to wood or steel framing with plain 40 mm lap joints with riveted
welded seams, including bending or turning up, mitred angles, etc. as required.Thickness of sheet 1.00 mm S
& F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 9 360
Rs.360.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.08 13.52
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.08 15.36
Rs.28.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.53 4.77
Rs.4.77
After rounding off: Rs.462.50 Total Amount of M and L Rs.393.65
Add 17.5 % OH and CP Rs.68.89
Total Rs.462.54

1061 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10029.04
Mild steel, plain, black sheet in wall cladding, steel gates and similar work cut to size, holes punched ; including
headed screws, clout nails or rivets and fixed to wood or steel framing with plain 40 mm lap joints with riveted
welded seams, including bending or turning up, mitred angles, etc. as required.Thickness of sheet 1.25 mm S
& F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 11 440
Rs.440.00
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.08 15.36
2 Mazdoor man 1 Day Rs. 169.00 0.08 13.52
Rs.28.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.53 4.77
Rs.4.77
After rounding off: Rs.556.50 Total Amount of M and L Rs.473.65
Add 17.5 % OH and CP Rs.82.89
Total Rs.556.54

ITEM No. 10029.05


Mild steel, plain, black sheet in wall cladding, steel gates and similar work cut to size, holes punched ; including
headed screws, clout nails or rivets and fixed to wood or steel framing with plain 40 mm lap joints with riveted
welded seams, including bending or turning up, mitred angles, etc. as required.Thickness of sheet 1.6 mm S
& F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 14 560
Rs.560.00
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.08 15.36
2 Mazdoor man 1 Day Rs. 169.00 0.08 13.52
Rs.28.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.53 4.77
Rs.4.77
After rounding off: Rs.697.50 Total Amount of M and L Rs.593.65
Add 17.5 % OH and CP Rs.103.89
Total Rs.697.54

1062 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10029.06
Mild steel, plain, black sheet in wall cladding, steel gates and similar work cut to size, holes punched ; including
headed screws, clout nails or rivets and fixed to wood or steel framing with plain 40 mm lap joints with riveted
welded seams, including bending or turning up, mitred angles, etc. as required.Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.025 4.8
2 Mazdoor man 1 Day Rs. 169.00 0.0255 4.3095
Rs.9.11
After rounding off: Rs.10.70 Total Amount of M and L Rs.9.11
Add 17.5 % OH and CP Rs.1.59
Total Rs.10.70

ITEM No. 10029.07


Mild steel, plain, black sheet in wall cladding, steel gates and similar work cut to size, holes punched ; including
headed screws, clout nails or rivets and fixed to wood or steel framing with plain 40 mm lap joints with riveted
welded seams, including bending or turning up, mitred angles, etc. as required. Except sheet
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.08 15.36
2 Mazdoor man 1 Day Rs. 169.00 0.08 13.52
Rs.28.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.59 5.31
Rs.5.31
After rounding off: Rs.40.20 Total Amount of M and L Rs.34.19
Add 17.5 % OH and CP Rs.5.98
Total Rs.40.17

ITEM No. 10030.01


Mild steel, plain, black sheet in hearths ; covering to door shutters; covering to door chowkets ( frames ) ;
chullah hood ; water tanks ;water troughs ; ducts; urinal troughs and funnels, etc. cut to size, edges beaded if
directed, holes punched ; including round headed screws, clout nails or rivets and fixed to wood or steel
members, etc., with plain 40 mm lap joints or welded/ riveted seams including bending, turning up, mitred
angles, stopped ends, outlets, etc. as required Thickness of sheet .63 mm S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 6 240
Rs.240.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.25 42.25
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.25 48
Rs.90.25
Sundry
1 Sundry 1 Re Rs. 9.00 0.09 0.81
Rs.0.81
After rounding off: Rs.389.00 Total Amount of M and L Rs.331.06
Add 17.5 % OH and CP Rs.57.94
Total Rs.389.00

1063 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10030.02
Mild steel, plain, black sheet in hearths ; covering to door shutters; covering to door chowkets ( frames ) ;
chullah hood ; water tanks ;water troughs ; ducts; urinal troughs and funnels, etc. cut to size, edges beaded if
directed, holes punched ; including round headed screws, clout nails or rivets and fixed to wood or steel
members, etc., with plain 40 mm lap joints or welded/ riveted seams including bending, turning up, mitred
angles, stopped ends, outlets, etc. as required Thickness of sheet 0.8 mm S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 7 280
Rs.280.00
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.25 48
2 Mazdoor man 1 Day Rs. 169.00 0.25 42.25
Rs.90.25
Sundry
1 Sundry 1 Re Rs. 9.00 0.09 0.81
Rs.0.81
After rounding off: Rs.436.00 Total Amount of M and L Rs.371.06
Add 17.5 % OH and CP Rs.64.94
Total Rs.436.00

ITEM No. 10030.03


Mild steel, plain, black sheet in hearths ; covering to door shutters; covering to door chowkets ( frames ) ;
chullah hood ; water tanks ;water troughs ; ducts; urinal troughs and funnels, etc. cut to size, edges beaded if
directed, holes punched ; including round headed screws, clout nails or rivets and fixed to wood or steel
members, etc., with plain 40 mm lap joints or welded/ riveted seams including bending, turning up, mitred
angles, stopped ends, outlets, etc. as required Thickness of sheet 1.00 mm S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 9 360
Rs.360.00
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.25 48
2 Mazdoor man 1 Day Rs. 169.00 0.25 42.25
Rs.90.25
Sundry
1 Sundry 1 Re Rs. 9.00 0.09 0.81
Rs.0.81
After rounding off: Rs.530.00 Total Amount of M and L Rs.451.06
Add 17.5 % OH and CP Rs.78.94
Total Rs.530.00

1064 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10030.04
Mild steel, plain, black sheet in hearths ; covering to door shutters; covering to door chowkets ( frames ) ;
chullah hood ; water tanks ;water troughs ; ducts; urinal troughs and funnels, etc. cut to size, edges beaded if
directed, holes punched ; including round headed screws, clout nails or rivets and fixed to wood or steel
members, etc., with plain 40 mm lap joints or welded/ riveted seams including bending, turning up, mitred
angles, stopped ends, outlets, etc. as required Thickness of sheet 1.25 mm S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 11 440
Rs.440.00
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.25 48
2 Mazdoor man 1 Day Rs. 169.00 0.25 42.25
Rs.90.25
Sundry
1 Sundry 1 Re Rs. 9.00 0.09 0.81
Rs.0.81
After rounding off: Rs.624.00 Total Amount of M and L Rs.531.06
Add 17.5 % OH and CP Rs.92.94
Total Rs.624.00

ITEM No. 10030.05


Mild steel, plain, black sheet in hearths ; covering to door shutters; covering to door chowkets ( frames ) ;
chullah hood ; water tanks ;water troughs ; ducts; urinal troughs and funnels, etc. cut to size, edges beaded if
directed, holes punched ; including round headed screws, clout nails or rivets and fixed to wood or steel
members, etc., with plain 40 mm lap joints or welded/ riveted seams including bending, turning up, mitred
angles, stopped ends, outlets, etc. as required Thickness of sheet 1.6 mm S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 14 560
Rs.560.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.25 42.25
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.25 48
Rs.90.25
Sundry
1 Sundry 1 Re Rs. 9.00 0.09 0.81
Rs.0.81
After rounding off: Rs.765.00 Total Amount of M and L Rs.651.06
Add 17.5 % OH and CP Rs.113.94
Total Rs.765.00

1065 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10030.06
Mild steel, plain, black sheet in hearths ; covering to door shutters; covering to door chowkets ( frames ) ;
chullah hood ; water tanks ;water troughs ; ducts; urinal troughs and funnels, etc. cut to size, edges beaded if
directed, holes punched ; including round headed screws, clout nails or rivets and fixed to wood or steel
members, etc., with plain 40 mm lap joints or welded/ riveted seams including bending, turning up, mitred
angles, stopped ends, outlets, etc. as required Add if fixed in repairs..
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.0777 13.1313
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0777 14.9184
Rs.28.05
After rounding off: Rs.33.00 Total Amount of M and L Rs.28.05
Add 17.5 % OH and CP Rs.4.91
Total Rs.32.96

ITEM No. 10030.07


Mild steel, plain, black sheet in hearths ; covering to door shutters; covering to door chowkets ( frames ) ;
chullah hood ; water tanks ;water troughs ; ducts; urinal troughs and funnels, etc. cut to size, edges beaded if
directed, holes punched ; including round headed screws, clout nails or rivets and fixed to wood or steel
members, etc., with plain 40 mm lap joints or welded/ riveted seams including bending, turning up, mitred
angles, stopped ends, outlets, etc. as required Except sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Bhisty including mussack 1 Day Rs. 169.00 0.25 42.25
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.25 48
Rs.90.25
Sundry
1 Sundry 1 Re Rs. 9.00 1.04 9.36
Rs.9.36
After rounding off: Rs.117.00 Total Amount of M and L Rs.99.61
Add 17.5 % OH and CP Rs.17.43
Total Rs.117.04

ITEM No. 10031.01


Add to item 10029 and 10030 if corrugated steel sheets are used S & F 0.63mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 0.78 31.2
Rs.31.20
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.023 4.416
2 Mazdoor man 1 Day Rs. 169.00 0.023 3.887
Rs.8.30
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.46.90 Total Amount of M and L Rs.39.95
Add 17.5 % OH and CP Rs.6.99
Total Rs.46.94

1066 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10031.02
Add to item 10029 and 10030 if corrugated steel sheets are used S & F 0.80mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 0.91 36.4
Rs.36.40
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.023 4.416
2 Mazdoor man 1 Day Rs. 169.00 0.023 3.887
Rs.8.30
Sundry
1 Sundry 1 Re Rs. 9.00 0.049 0.441
Rs.0.44
After rounding off: Rs.53.00 Total Amount of M and L Rs.45.14
Add 17.5 % OH and CP Rs.7.90
Total Rs.53.04

ITEM No. 10031.03


Add to item 10029 and 10030 if corrugated steel sheets are used S & F 1.00mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 1.17 46.8
Rs.46.80
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.023 3.887
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.023 4.416
Rs.8.30
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.65.30 Total Amount of M and L Rs.55.55
Add 17.5 % OH and CP Rs.9.72
Total Rs.65.27

1067 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10031.04
Add to item 10029 and 10030 if corrugated steel sheets are used S & F 1.25mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 1.41 56.4
Rs.56.40
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.023 4.416
2 Mazdoor man 1 Day Rs. 169.00 0.023 3.887
Rs.8.30
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.76.60 Total Amount of M and L Rs.65.15
Add 17.5 % OH and CP Rs.11.40
Total Rs.76.55

ITEM No. 10031.05


Add to item 10029 and 10030 if corrugated steel sheets are used S & F 1.60mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 1.82 72.8
Rs.72.80
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.023 4.416
2 Mazdoor-man, 1 Day Rs. 169.00 0.023 3.887
Rs.8.30
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.95.80 Total Amount of M and L Rs.81.55
Add 17.5 % OH and CP Rs.14.27
Total Rs.95.82

ITEM No. 10031.06


Add to item 10029 and 10030 if corrugated steel sheets are used Add if in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.008 1.352
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.009 1.728
Rs.3.08
After rounding off: Rs.3.60 Total Amount of M and L Rs.3.08
Add 17.5 % OH and CP Rs.0.54
Total Rs.3.62

1068 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10031.07
Add to item 10029 and 10030 if corrugated steel sheets are used Except sheeting.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.023 4.416
2 Mazdoor-man, 1 Day Rs. 169.00 0.023 3.887
Rs.8.30
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.10.30 Total Amount of M and L Rs.8.75
Add 17.5 % OH and CP Rs.1.53
Total Rs.10.28

ITEM No. 10032


Raking or circular cutting ; cutting holes for pipes, notching, etc. including waste on plain sheeting ( any
thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.075 14.4
2 Mazdoor man 1 Day Rs. 169.00 0.075 12.675
Rs.27.08
After rounding off: Rs.31.80 Total Amount of M and L Rs.27.08
Add 17.5 % OH and CP Rs.4.74
Total Rs.31.81

ITEM No. 10033


Raking or circular cutting ; cutting holes for pipes, notching, etc. including waste on on corrugated sheeting (
any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0842 16.1664
2 Mazdoor man 1 Day Rs. 169.00 0.0842 14.2298
Rs.30.40
After rounding off: Rs.35.70 Total Amount of M and L Rs.30.40
Add 17.5 % OH and CP Rs.5.32
Total Rs.35.72

1069 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10034.01
Mild steel bars 10 mm dia and over, cut to length, bent to shape required including cracking, bending spirally
for hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips Round bars Gde I quality conforming I.S 432 ( Part -I).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS BAR for reinf Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 ) 1 Kg Rs. 34.50 1.05 36.225
2 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.02 0.96
Rs.37.19
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
Rs.3.61
After rounding off: Rs.47.90 Total Amount of M and L Rs.40.80
Add 17.5 % OH and CP Rs.7.14
Total Rs.47.93

ITEM No. 10034.02


Mild steel bars 10 mm dia and over, cut to length, bent to shape required including cracking, bending spirally
for hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips Round bars Gde Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 )..
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.02 0.96
2 MS BAR for reinf Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 ) 1 Kg Rs. 34.50 1.05 36.225
Rs.37.19
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
Rs.3.61
After rounding off: Rs.47.90 Total Amount of M and L Rs.40.80
Add 17.5 % OH and CP Rs.7.14
Total Rs.47.93

1070 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10034.03
Mild steel bars 10 mm dia and over, cut to length, bent to shape required including cracking, bending spirally
for hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips TMTbars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.02 0.96
2 Deformed twisted ST BARS 1 Kg Rs. 34.50 1.05 36.225
Rs.37.19
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
Rs.3.61
After rounding off: Rs.47.90 Total Amount of M and L Rs.40.80
Add 17.5 % OH and CP Rs.7.14
Total Rs.47.93

ITEM No. 10034.04


Mild steel bars 10 mm dia and over, cut to length, bent to shape required including cracking, bending spirally
for hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips TMT bars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 TMT bars 1 Kg Rs. 35.00 1.05 36.75
2 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.02 0.96
Rs.37.71
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
Rs.3.61
After rounding off: Rs.48.60 Total Amount of M and L Rs.41.32
Add 17.5 % OH and CP Rs.7.23
Total Rs.48.55

ITEM No. 10034.05


Mild steel bars 10 mm dia and over, cut to length, bent to shape required including cracking, bending spirally
for hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips Except steel bars
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.02 0.96
Rs.0.96
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
Rs.3.61
After rounding off: Rs.5.40 Total Amount of M and L Rs.4.57
Add 17.5 % OH and CP Rs.0.80
Total Rs.5.37
1071 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10035.01
Mild steel bars 6mm to 8mm dia , cut to length, bent to shape required including cracking, bending spirally for
hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips Round bars Gde I quality conforming I.S 432 ( Part -I).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.03 1.44
2 MS BAR for reinf Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 ) 1 Kg Rs. 34.50 1.05 36.225
Rs.37.67
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
Rs.3.61
After rounding off: Rs.48.50 Total Amount of M and L Rs.41.28
Add 17.5 % OH and CP Rs.7.22
Total Rs.48.50

ITEM No. 10035.02


Mild steel bars 6mm to 8mm dia , cut to length, bent to shape required including cracking, bending spirally for
hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips Round bars Gde Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 )..
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS BAR for reinf Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 ) 1 Kg Rs. 34.50 1.05 36.225
2 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.03 1.44
Rs.37.67
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
Rs.3.61
After rounding off: Rs.48.50 Total Amount of M and L Rs.41.28
Add 17.5 % OH and CP Rs.7.22
Total Rs.48.50

1072 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10035.03
Mild steel bars 6mm to 8mm dia , cut to length, bent to shape required including cracking, bending spirally for
hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips Deformed or twisted bars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Deformed twisted ST BARS 1 Kg Rs. 34.50 1.05 36.225
2 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.03 1.44
Rs.37.67
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
Rs.3.61
After rounding off: Rs.48.50 Total Amount of M and L Rs.41.28
Add 17.5 % OH and CP Rs.7.22
Total Rs.48.50

ITEM No. 10035.04


Mild steel bars 6mm to 8mm dia , cut to length, bent to shape required including cracking, bending spirally for
hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips TMT bars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.03 1.44
2 TMT bars 1 Kg Rs. 35.00 1.05 36.75
Rs.38.19
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
Rs.3.61
After rounding off: Rs.49.10 Total Amount of M and L Rs.41.80
Add 17.5 % OH and CP Rs.7.32
Total Rs.49.12

ITEM No. 10035.05


Mild steel bars 6mm to 8mm dia , cut to length, bent to shape required including cracking, bending spirally for
hooping for columns, hookig ends and binding with mild steel wire (annealed) not less than 0.9 mm dia or
securing with clips Except steel bars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.03 1.44
Rs.1.44
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
Rs.3.61
After rounding off: Rs.5.90 Total Amount of M and L Rs.5.05
Add 17.5 % OH and CP Rs.0.88
Total Rs.5.93
1073 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10036.01
Mild steel bars 5mm dia and over upto and including 10 mm dia in stirrups, spacers and binders Round bars
Gde I quality conforming I.S 432 ( Part -I).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS BAR for reinf Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 ) 1 Kg Rs. 34.50 1.05 36.225
2 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.04 1.92
Rs.38.15
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
Rs.3.61
After rounding off: Rs.49.10 Total Amount of M and L Rs.41.76
Add 17.5 % OH and CP Rs.7.31
Total Rs.49.06

ITEM No. 10036.02


Mild steel bars 5mm dia and over upto and including 10 mm dia in stirrups, spacers and binders Round bars
Gde Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS BAR for reinf Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 ) 1 Kg Rs. 34.50 1.05 36.225
2 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.04 1.92
Rs.38.15
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
Rs.3.61
After rounding off: Rs.49.10 Total Amount of M and L Rs.41.76
Add 17.5 % OH and CP Rs.7.31
Total Rs.49.06

ITEM No. 10036.03


Mild steel bars 5mm dia and over upto and including 10 mm dia in stirrups, spacers and binders Deformed or
twisted bars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Deformed twisted ST BARS 1 Kg Rs. 34.50 1.05 36.225
2 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.04 1.92
Rs.38.15
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
Rs.3.61
After rounding off: Rs.49.10 Total Amount of M and L Rs.41.76
Add 17.5 % OH and CP Rs.7.31
Total Rs.49.06

1074 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10036.04
Mild steel bars 5mm dia and over upto and including 10 mm dia in stirrups, spacers and binders TMT bars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.04 1.92
2 TMT bars 1 Kg Rs. 35.00 1.05 36.75
Rs.38.67
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor-man, 1 Day Rs. 169.00 0.01 1.69
Rs.3.61
After rounding off: Rs.49.70 Total Amount of M and L Rs.42.28
Add 17.5 % OH and CP Rs.7.40
Total Rs.49.68

ITEM No. 10036.05


Mild steel bars 5mm dia and over upto and including 10 mm dia in stirrups, spacers and binders Except steel
bars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 0.04 1.92
Rs.1.92
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.01 1.92
Rs.3.61
After rounding off: Rs.6.50 Total Amount of M and L Rs.5.53
Add 17.5 % OH and CP Rs.0.97
Total Rs.6.50

ITEM No. 10037.01


Hard drawn steel wire fabric cut to lengths, bent to shape required and tying with and including mild steel wire
(annealed ) not less than 0.9 mm in dia supplied and fixed in reinforcement Weight not exceeding 4 kg per
square metre.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hard Dr St wire Fab Re not exc. 45 1 Kg Rs. 45.00 1.05 47.25
Rs.47.25
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.02 3.84
Rs.7.22
After rounding off: Rs.64.00 Total Amount of M and L Rs.54.47
Add 17.5 % OH and CP Rs.9.53
Total Rs.64.00

1075 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10037.02
Hard drawn steel wire fabric cut to lengths, bent to shape required and tying with and including mild steel wire
(annealed ) not less than 0.9 mm in dia supplied and fixed in reinforcement Weight exceeding 4 kg per square
metre.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hard Dr St wire Fab Re exc. 45 1 Kg Rs. 44.00 1.05 46.2
Rs.46.20
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.027 4.563
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.027 5.184
Rs.9.75
After rounding off: Rs.65.70 Total Amount of M and L Rs.55.95
Add 17.5 % OH and CP Rs.9.79
Total Rs.65.74

ITEM No. 10038.01


Hard drawn steel wire fabric cut to lengths, bent to shape required and tying with and including mild steel wire
(annealed ) not less than 0.9 mm in dia supplied and fixed in reinforcement Weight but fixing only Weight not
exceeding 4 kg per square metre.fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.02 3.84
Rs.7.22
After rounding off: Rs.8.50 Total Amount of M and L Rs.7.22
Add 17.5 % OH and CP Rs.1.26
Total Rs.8.48

ITEM No. 10038.02


Hard drawn steel wire fabric cut to lengths, bent to shape required and tying with and including mild steel wire
(annealed ) not less than 0.9 mm in dia supplied and fixed in reinforcement Weight) but fixing only Weight
exceeding 4 kg per square metre.Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.027 5.184
2 Mazdoor-man, 1 Day Rs. 169.00 0.027 4.563
Rs.9.75
After rounding off: Rs.11.50 Total Amount of M and L Rs.9.75
Add 17.5 % OH and CP Rs.1.71
Total Rs.11.45

1076 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10039.01
joints, channel,angle,or tee sections, fixed independently, without connecting plates, etc.(cut to ordinary
lengths i.e. within 20 mm of the length indicated ) S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1.05 37.8
Rs.37.80
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.007 1.344
2 Mazdoor-man, 1 Day Rs. 169.00 0.015 2.535
Rs.3.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.49.50 Total Amount of M and L Rs.42.13
Add 17.5 % OH and CP Rs.7.37
Total Rs.49.50

ITEM No. 10039.02


joints, channel,angle,or tee sections, fixed independently, without connecting plates, etc.(cut to ordinary
lengths i.e. within 20 mm of the length indicated ) S & F rolled mild steel Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe -290 ( Gde-E-165 ) 1 Kg Rs. 35.00 1.05 36.75
Rs.36.75
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.007 1.344
2 Mazdoor man 1 Day Rs. 169.00 0.015 2.535
Rs.3.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.045 0.405
Rs.0.41
After rounding off: Rs.48.20 Total Amount of M and L Rs.41.03
Add 17.5 % OH and CP Rs.7.18
Total Rs.48.21

1077 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10039.03
joints, channel,angle,or tee sections, fixed independently, without connecting plates, etc.(cut to ordinary
lengths i.e. within 20 mm of the length indicated ) S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam ch Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 37.00 1.05 38.85
Rs.38.85
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.007 1.344
2 Mazdoor man 1 Day Rs. 169.00 0.015 2.535
Rs.3.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.50.70 Total Amount of M and L Rs.43.18
Add 17.5 % OH and CP Rs.7.56
Total Rs.50.74

ITEM No. 10039.04


joints, channel,angle,or tee sections, fixed independently, without connecting plates, etc.(cut to ordinary
lengths i.e. within 20 mm of the length indicated ) Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0025 0.48
2 Mazdoor man 1 Day Rs. 169.00 0.002 0.338
Rs.0.82
After rounding off: Rs.1.00 Total Amount of M and L Rs.0.82
Add 17.5 % OH and CP Rs.0.14
Total Rs.0.96

ITEM No. 10039.05


joints, channel,angle,or tee sections, fixed independently, without connecting plates, etc.(cut to ordinary
lengths i.e. within 20 mm of the length indicated ) Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.004 0.768
2 Mazdoor man 1 Day Rs. 169.00 0.0125 2.1125
Rs.2.88
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.88
Add 17.5 % OH and CP Rs.0.50
Total Rs.3.38

1078 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10040.01
Rolled sections as in main and cross beams ; hip and jack rafters; purlins where connected to common rafters
and running rails and guides for sliding doors ; fixed with angle cleats or other connecting plates S & F rolled
mild steel Fe - 410-W (Gde-E-250)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1.05 37.8
Rs.37.80
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.015 2.88
3 Hammermen 1 Day Rs. 192.00 0.015 2.88
Rs.9.48
Sundry
1 Sundry 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.56.20 Total Amount of M and L Rs.47.82
Add 17.5 % OH and CP Rs.8.37
Total Rs.56.19

ITEM No. 10040.02


Rolled sections as in main and cross beams ; hip and jack rafters; purlins where connected to common rafters
and running rails and guides for sliding doors ; fixed with angle cleats or other connecting plates S & F rolled
mild steel Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe -290 ( Gde-E-165 ) 1 Kg Rs. 35.00 1.05 36.75
Rs.36.75
Labour
1 Hammermen 1 Day Rs. 192.00 0.015 2.88
2 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.015 2.88
Rs.9.48
Sundry
1 Sundry 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.55.00 Total Amount of M and L Rs.46.77
Add 17.5 % OH and CP Rs.8.18
Total Rs.54.95

1079 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10040.03
Rolled sections as in main and cross beams ; hip and jack rafters; purlins where connected to common rafters
and running rails and guides for sliding doors ; fixed with angle cleats or other connecting plates S & F rolled
mild steel Fe - 410-W (Gde-E-250)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam ch Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 37.00 1.05 38.85
Rs.38.85
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.015 2.88
2 Hammermen 1 Day Rs. 192.00 0.015 2.88
3 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
Rs.9.48
Sundry
1 Sundry 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.57.40 Total Amount of M and L Rs.48.87
Add 17.5 % OH and CP Rs.8.55
Total Rs.57.42

ITEM No. 10040.04


Rolled sections as in main and cross beams ; hip and jack rafters; purlins where connected to common rafters
and running rails and guides for sliding doors ; fixed with angle cleats or other connecting plates Fabrication
only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.008 1.536
2 Hammermen 1 Day Rs. 192.00 0.007 1.344
Rs.2.88
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.88
Add 17.5 % OH and CP Rs.0.50
Total Rs.3.38

ITEM No. 10040.05


Rolled sections as in main and cross beams ; hip and jack rafters; purlins where connected to common rafters
and running rails and guides for sliding doors ; fixed with angle cleats or other connecting plates Erection and
fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.021 3.549
2 Hammermen 1 Day Rs. 192.00 0.007 1.344
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.007 1.344
Rs.6.24
After rounding off: Rs.7.30 Total Amount of M and L Rs.6.24
Add 17.5 % OH and CP Rs.1.09
Total Rs.7.33

1080 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10041.01
Plate girder or single stanchions, built up of one beam or channel section with flang plates, caps, bases, splices
angle brackets, cleats and other connections S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1.05 37.8
Rs.37.80
Labour
1 Hammermen 1 Day Rs. 192.00 0.01 1.92
2 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.02 3.84
Rs.9.48
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.56.10 Total Amount of M and L Rs.47.73
Add 17.5 % OH and CP Rs.8.35
Total Rs.56.08

ITEM No. 10041.02


Plate girder or single stanchions, built up of one beam or channel section with flang plates, caps, bases, splices
angle brackets, cleats and other connections S & F rolled mild steel GDE Fe -290 ( Gde-E-165 ).S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe -290 ( Gde-E-165 ) 1 Kg Rs. 35.00 1.05 36.75
Rs.36.75
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.02 3.84
2 Hammermen 1 Day Rs. 192.00 0.01 1.92
3 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
Rs.9.48
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.54.80 Total Amount of M and L Rs.46.68
Add 17.5 % OH and CP Rs.8.17
Total Rs.54.85

1081 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10041.03
Plate girder or single stanchions, built up of one beam or channel section with flang plates, caps, bases, splices
angle brackets, cleats and other connections S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "B".S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam ch Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 37.00 1.05 38.85
Rs.38.85
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.02 3.84
2 Hammermen 1 Day Rs. 192.00 0.01 1.92
3 Mazdoor-man, 1 Day Rs. 169.00 0.022 3.718
Rs.9.48
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.57.30 Total Amount of M and L Rs.48.78
Add 17.5 % OH and CP Rs.8.54
Total Rs.57.31

ITEM No. 10041.04


Plate girder or single stanchions, built up of one beam or channel section with flang plates, caps, bases, splices
angle brackets, cleats and other connections Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.008 1.536
2 Hammermen 1 Day Rs. 192.00 0.007 1.344
Rs.2.88
After rounding off: Rs.3.40 Total Amount of M and L Rs.2.88
Add 17.5 % OH and CP Rs.0.50
Total Rs.3.38

ITEM No. 10041.05


Plate girder or single stanchions, built up of one beam or channel section with flang plates, caps, bases, splices
angle brackets, cleats and other connections Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.006 1.152
2 Mazdoor man 1 Day Rs. 169.00 0.0215 3.6335
Rs.4.79
After rounding off: Rs.5.60 Total Amount of M and L Rs.4.79
Add 17.5 % OH and CP Rs.0.84
Total Rs.5.62

1082 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10042.01
Compound girders and stanchions, lattice girders, aerial masts, staging for water tanks and the like including
caps, bases, splices etc. built up from two or more beam or channel sections or angles with plates, including all
lattice bars, stiffeners, gusst plates, etc. S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1.05 37.8
2 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.00 0.05 2.05
quality "A"
Rs.39.85
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.025 4.8
3 Hammermen 1 Day Rs. 192.00 0.022 4.224
Rs.10.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.23 2.07
Rs.2.07
After rounding off: Rs.62.00 Total Amount of M and L Rs.52.80
Add 17.5 % OH and CP Rs.9.24
Total Rs.62.04

ITEM No. 10042.02


Compound girders and stanchions, lattice girders, aerial masts, staging for water tanks and the like including
caps, bases, splices etc. built up from two or more beam or channel sections or angles with plates, including all
lattice bars, stiffeners, gusset plates,S & F rolled mild steel Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.99 0.05 2.0995
quality "B"
2 STR ST RLD SEC beam cha Fe -290 ( Gde-E-165 ) 1 Kg Rs. 35.00 1.05 36.75
Rs.38.85
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.025 4.8
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
3 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
Rs.10.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.60.80 Total Amount of M and L Rs.51.71
Add 17.5 % OH and CP Rs.9.05
Total Rs.60.76

1083 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10042.03
Compound girders and stanchions, lattice girders, aerial masts, staging for water tanks and the like including
caps, bases, splices etc. built up from two or more beam or channel sections or angles with plates, including all
lattice bars, stiffeners, gusset plates, S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.99 0.05 2.0995
quality "B"
2 STR ST RLD SEC beam ch Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 37.00 1.05 38.85
Rs.40.95
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.025 4.8
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
3 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
Rs.10.88
Sundry
1 Sundry 1 Re Rs. 9.00 0.23 2.07
Rs.2.07
After rounding off: Rs.63.30 Total Amount of M and L Rs.53.90
Add 17.5 % OH and CP Rs.9.43
Total Rs.63.34

ITEM No. 10042.04


Compound girders and stanchions, lattice girders, aerial masts, staging for water tanks and the like including
caps, bases, splices etc. built up from two or more beam or channel sections or angles with plates, including all
lattice bars, stiffeners, gusset plates,Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
Rs.8.45
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.11.10 Total Amount of M and L Rs.9.44
Add 17.5 % OH and CP Rs.1.65
Total Rs.11.09

1084 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10042.05
Compound girders and stanchions, lattice girders, aerial masts, staging for water tanks and the like including
caps, bases, splices etc. built up from two or more beam or channel sections or angles with plates, including all
lattice bars, stiffeners, gusset plates,Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.003 0.576
2 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
Rs.2.44
Sundry
1 Sundry 1 Re Rs. 9.00 0.13 1.17
Rs.1.17
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.61
Add 17.5 % OH and CP Rs.0.63
Total Rs.4.24

ITEM No. 10043.01


Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes,
without any attachment S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.00 1.02 41.82
quality "A"
Rs.41.82
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.008 1.536
3 Hammermen 1 Day Rs. 192.00 0.004 0.768
Rs.5.68
Sundry
1 Sundry 1 Re Rs. 9.00 0.03 0.27
Rs.0.27
After rounding off: Rs.56.10 Total Amount of M and L Rs.47.77
Add 17.5 % OH and CP Rs.8.36
Total Rs.56.13

1085 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10043.02
Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes,
without any attachment S & F rolled mild steel Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.99 1.02 42.8298
quality "B"
Rs.42.83
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.008 1.536
2 Hammermen 1 Day Rs. 192.00 0.004 0.768
3 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.5.68
Sundry
1 Sundry 1 Re Rs. 9.00 0.01 0.09
Rs.0.09
After rounding off: Rs.57.10 Total Amount of M and L Rs.48.60
Add 17.5 % OH and CP Rs.8.51
Total Rs.57.11

ITEM No. 10043.03


Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes,
without any attachment S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.99 1.02 42.8298
quality "B"
Rs.42.83
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.009 1.728
2 Mazdoor man 1 Day Rs. 169.00 0.021 3.549
3 Hammermen 1 Day Rs. 192.00 0.004 0.768
Rs.6.05
Sundry
1 Sundry 1 Re Rs. 9.00 0.01 0.09
Rs.0.09
After rounding off: Rs.57.50 Total Amount of M and L Rs.48.96
Add 17.5 % OH and CP Rs.8.57
Total Rs.57.53

1086 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10043.04
Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes,
without any attachment Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.004 0.768
2 Hammermen 1 Day Rs. 192.00 0.004 0.768
3 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
Rs.3.40
Sundry
1 Sundry 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.4.40 Total Amount of M and L Rs.3.76
Add 17.5 % OH and CP Rs.0.66
Total Rs.4.41

ITEM No. 10043.05


Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes,
without any attachment Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.005 0.96
2 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
Rs.2.82
Sundry
1 Sundry 1 Re Rs. 9.00 0.04 0.36
Rs.0.36
After rounding off: Rs.3.70 Total Amount of M and L Rs.3.18
Add 17.5 % OH and CP Rs.0.56
Total Rs.3.74

1087 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10044.01
Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes, with
rivefted, bolted or welded attachment S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.00 1.05 43.05
quality "A"
Rs.43.05
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.012 2.304
2 Hammermen 1 Day Rs. 192.00 0.024 4.608
3 Mazdoor man 1 Day Rs. 169.00 0.06 10.14
Rs.17.05
Sundry
1 Sundry 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.71.30 Total Amount of M and L Rs.60.64
Add 17.5 % OH and CP Rs.10.61
Total Rs.71.25

ITEM No. 10044.02


Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes, with
rivefted, bolted or welded attachment S & F rolled mild steel Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS Plate PL or Chequed Over 5mm thick Fe-290 (Gde-E-250) Quality 1 Kg Rs. 40.00 1.05 42
Rs.42.00
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.011 2.112
2 Mazdoor man 1 Day Rs. 169.00 0.06 10.14
3 Hammermen 1 Day Rs. 192.00 0.024 4.608
Rs.16.86
Sundry
1 Sundry 1 Re Rs. 9.00 0.08 0.72
Rs.0.72
After rounding off: Rs.70.00 Total Amount of M and L Rs.59.58
Add 17.5 % OH and CP Rs.10.43
Total Rs.70.01

1088 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10044.03
Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes, with
rivefted, bolted or welded attachment S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.99 1.05 44.0895
quality "B"
Rs.44.09
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.011 2.112
2 Mazdoor man 1 Day Rs. 169.00 0.06 10.14
3 Hammermen 1 Day Rs. 192.00 0.024 4.608
Rs.16.86
Sundry
1 Sundry 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.72.40 Total Amount of M and L Rs.61.58
Add 17.5 % OH and CP Rs.10.78
Total Rs.72.36

ITEM No. 10044.04


Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes, with
rivefted, bolted or welded attachment Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.007 1.344
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
3 Hammermen 1 Day Rs. 192.00 0.024 4.608
Rs.11.02
Sundry
1 Sundry 1 Re Rs. 9.00 0.03 0.27
Rs.0.27
After rounding off: Rs.13.30 Total Amount of M and L Rs.11.29
Add 17.5 % OH and CP Rs.1.98
Total Rs.13.27

1089 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10044.05
Plates ( Plain or chequered ) channels, square cut or notched (ordinary and counter sunk ) forming holes, with
rivefted, bolted or welded attachment Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.004 0.768
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
Rs.5.84
Sundry
1 Sundry 1 Re Rs. 9.00 0.03 0.27
Rs.0.27
After rounding off: Rs.7.20 Total Amount of M and L Rs.6.11
Add 17.5 % OH and CP Rs.1.07
Total Rs.7.18

ITEM No. 10045.01


Rolled sections as in framing for cladding, flazing and the like fixed with angle cleats and connecting plates, etc.
S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1.05 37.8
Rs.37.80
Labour
1 Hammermen 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.02 3.84
Rs.9.54
Sundry
1 Sundry 1 Re Rs. 9.00 0.02 0.18
Rs.0.18
After rounding off: Rs.55.80 Total Amount of M and L Rs.47.52
Add 17.5 % OH and CP Rs.8.32
Total Rs.55.83

1090 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10045.02
Rolled sections as in framing for cladding, flazing and the like fixed with angle cleats and connecting plates, etc.
S & F rolled mild steel Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe -290 ( Gde-E-165 ) 1 Kg Rs. 35.00 1.05 36.75
Rs.36.75
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.02 3.84
2 Hammermen 1 Day Rs. 192.00 0.02 3.84
3 Mazdoor-man, 1 Day Rs. 169.00 0.011 1.859
Rs.9.54
Sundry
1 Sundry 1 Re Rs. 9.00 0.015 0.135
Rs.0.14
After rounding off: Rs.54.50 Total Amount of M and L Rs.46.42
Add 17.5 % OH and CP Rs.8.12
Total Rs.54.55

ITEM No. 10045.03


Rolled sections as in framing for cladding, flazing and the like fixed with angle cleats and connecting plates, etc.
S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam ch Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 37.00 1.05 38.85
Rs.38.85
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.02 3.84
2 Hammermen 1 Day Rs. 192.00 0.02 3.84
3 Mazdoor man 1 Day Rs. 169.00 0.0105 1.7745
Rs.9.45
Sundry
1 Sundry 1 Re Rs. 9.00 0.02 0.18
Rs.0.18
After rounding off: Rs.57.00 Total Amount of M and L Rs.48.48
Add 17.5 % OH and CP Rs.8.48
Total Rs.56.97

1091 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10045.04
Rolled sections as in framing for cladding, flazing and the like fixed with angle cleats and connecting plates, etc.
Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.014 2.688
2 Hammermen 1 Day Rs. 192.00 0.014 2.688
Rs.5.38
Sundry
1 Sundry 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.7.00 Total Amount of M and L Rs.5.92
Add 17.5 % OH and CP Rs.1.04
Total Rs.6.95

ITEM No. 10045.05


Rolled sections as in framing for cladding, flazing and the like fixed with angle cleats and connecting plates, etc.
Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.006 1.152
2 Mazdoor man 1 Day Rs. 169.00 0.011 1.859
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.006 1.152
Rs.4.16
Sundry
1 Sundry 1 Re Rs. 9.00 0.11 0.99
Rs.0.99
After rounding off: Rs.6.10 Total Amount of M and L Rs.5.15
Add 17.5 % OH and CP Rs.0.90
Total Rs.6.05

1092 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10046.01
Roof trusses (framed ), trussed purlins, crane gantries, rails and fastenings and heavy bracket framing (Beam,
tee, angle,channel or flat sections) including distance pices,cleats etc. S & F rolled mild steel Fe - 410-W (Gde-E-
250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1.05 37.8
Rs.37.80
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
3 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
4 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.008 1.536
Rs.13.70
Sundry
1 Sundry 1 Re Rs. 9.00 0.21 1.89
Rs.1.89
After rounding off: Rs.62.70 Total Amount of M and L Rs.53.39
Add 17.5 % OH and CP Rs.9.34
Total Rs.62.74

ITEM No. 10046.02


Roof trusses (framed ), trussed purlins, crane gantries, rails and fastenings and heavy bracket framing (Beam,
tee, angle,channel or flat sections) including distance pices,cleats etc. S & F rolled mild steel Fe -290 ( Gde-E-
165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe -290 ( Gde-E-165 ) 1 Kg Rs. 35.00 1.05 36.75
Rs.36.75
Labour
1 Hammermen 1 Day Rs. 192.00 0.022 4.224
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
3 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.008 1.536
4 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
Rs.13.70
Sundry
1 Sundry 1 Re Rs. 9.00 0.21 1.89
Rs.1.89
After rounding off: Rs.61.50 Total Amount of M and L Rs.52.34
Add 17.5 % OH and CP Rs.9.16
Total Rs.61.50

1093 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10046.03
Roof trusses (framed ), trussed purlins, crane gantries, rails and fastenings and heavy bracket framing (Beam,
tee, angle,channel or flat sections) including distance pices,cleats etc. S & F rolled mild steel Fe - 410-W (Gde-E-
250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam ch Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 37.00 1.05 38.85
Rs.38.85
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
2 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.008 1.536
3 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
4 Hammermen 1 Day Rs. 192.00 0.022 4.224
Rs.13.70
Sundry
1 Sundry 1 Re Rs. 9.00 0.21 1.89
Rs.1.89
After rounding off: Rs.64.00 Total Amount of M and L Rs.54.44
Add 17.5 % OH and CP Rs.9.53
Total Rs.63.97

ITEM No. 10046.04


Roof trusses (framed ), trussed purlins, crane gantries, rails and fastenings and heavy bracket framing (Beam,
tee, angle,channel or flat sections) including distance pices,cleats etc. Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
Rs.8.45
Sundry
1 Sundry 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.10.70 Total Amount of M and L Rs.9.08
Add 17.5 % OH and CP Rs.1.59
Total Rs.10.67

1094 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10046.05
Roof trusses (framed ), trussed purlins, crane gantries, rails and fastenings and heavy bracket framing (Beam,
tee, angle,channel or flat sections) including distance pices,cleats etc. Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.008 1.536
2 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
Rs.5.25
Sundry
1 Sundry 1 Re Rs. 9.00 0.16 1.44
Rs.1.44
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.69
Add 17.5 % OH and CP Rs.1.17
Total Rs.7.87

ITEM No. 10047.01


Stairs (framed ) including stringers, treades, landing balusters, head rails etc. including cleats, brackets, etc.
complete. S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1.05 37.8
Rs.37.80
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.039 7.488
2 Hammermen 1 Day Rs. 192.00 0.033 6.336
3 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
Rs.17.54
Sundry
1 Sundry 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.66.80 Total Amount of M and L Rs.56.87
Add 17.5 % OH and CP Rs.9.95
Total Rs.66.82

1095 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10047.02
Stairs (framed ) including stringers, treades, landing balusters, head rails etc. including cleats, brackets, etc.
complete. S & F rolled mild steel Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe -290 ( Gde-E-165 ) 1 Kg Rs. 35.00 1.05 36.75
Rs.36.75
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.039 7.488
2 Hammermen 1 Day Rs. 192.00 0.033 6.336
3 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
Rs.17.54
Sundry
1 Sundry 1 Re Rs. 9.00 0.17 1.53
Rs.1.53
After rounding off: Rs.65.60 Total Amount of M and L Rs.55.82
Add 17.5 % OH and CP Rs.9.77
Total Rs.65.59

ITEM No. 10047.03


Stairs (framed ) including stringers, treades, landing balusters, head rails etc. including cleats, brackets, etc.
complete. S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam ch Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 37.00 1.05 38.85
Rs.38.85
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.034 6.528
2 Hammermen 1 Day Rs. 192.00 0.033 6.336
3 Mason (Stone mason) 1 Day Rs. 225.00 0.022 4.95
Rs.17.81
Sundry
1 Sundry 1 Re Rs. 9.00 0.13 1.17
Rs.1.17
After rounding off: Rs.68.00 Total Amount of M and L Rs.57.83
Add 17.5 % OH and CP Rs.10.12
Total Rs.67.95

1096 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10047.04
Stairs (framed ) including stringers, treades, landing balusters, head rails etc. including cleats, brackets, etc.
complete. Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.0315 6.048
2 Hammermen 1 Day Rs. 192.00 0.0315 6.048
Rs.12.10
Sundry
1 Sundry 1 Re Rs. 9.00 0.065 0.585
Rs.0.59
After rounding off: Rs.14.90 Total Amount of M and L Rs.12.68
Add 17.5 % OH and CP Rs.2.22
Total Rs.14.90

ITEM No. 10047.05


Stairs (framed ) including stringers, treades, landing balusters, head rails etc. including cleats, brackets, etc.
complete. Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.022 3.718
2 Blacksmith/Tin smith 1 Day Rs. 192.00 0.006 1.152
Rs.4.87
Sundry
1 Sundry 1 Re Rs. 9.00 0.08 0.72
Rs.0.72
After rounding off: Rs.6.60 Total Amount of M and L Rs.5.59
Add 17.5 % OH and CP Rs.0.98
Total Rs.6.57

1097 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10048.01
Framed work as in doors or gates of angle or other section with gusset plates rails, braces etc. complete,
drilled for fixing or steel sheeting or other covering. doors, etc. to be prepared for hanging or sliding with and
including either hooke and hinges or steel hanging
door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also
fastening and fixing complete S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1.05 37.8
Rs.37.80
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
3 Mazdoor-man, 1 Day Rs. 169.00 0.017 2.873
Rs.11.32
Sundry
1 Sundry 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.59.20 Total Amount of M and L Rs.50.38
Add 17.5 % OH and CP Rs.8.82
Total Rs.59.20

ITEM No. 10048.02


Framed work as in doors or gates of angle or other section with gusset plates rails, braces etc. complete,
drilled for fixing or steel sheeting or other covering. doors, etc. to be prepared for hanging or sliding with and
including either hooke and hinges or steel hanging
door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also
fastening and fixing complete S & F rolled mild steel Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe -290 ( Gde-E-165 ) 1 Kg Rs. 35.00 1.05 36.75
Rs.36.75
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
3 Mazdoor man 1 Day Rs. 169.00 0.017 2.873
Rs.11.32
Sundry
1 Sundry 1 Re Rs. 9.00 0.14 1.26
Rs.1.26
After rounding off: Rs.58.00 Total Amount of M and L Rs.49.33
Add 17.5 % OH and CP Rs.8.63
Total Rs.57.96

1098 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10048.03
Framed work as in doors or gates of angle or other section with gusset plates rails, braces etc. complete,
drilled for fixing or steel sheeting or other covering. doors, etc. to be prepared for hanging or sliding with and
including either hooke and hinges or steel hanging
door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also
fastening and fixing complete S & F rolled mild steel Fe - 410-W (Gde-E-250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam ch Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 37.00 1.05 38.85
Rs.38.85
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
3 Mazdoor-man, 1 Day Rs. 169.00 0.017 2.873
Rs.11.32
Sundry
1 Sundry 1 Re Rs. 9.00 0.145 1.305
Rs.1.31
After rounding off: Rs.60.50 Total Amount of M and L Rs.51.48
Add 17.5 % OH and CP Rs.9.01
Total Rs.60.48

ITEM No. 10048.04


Framed work as in doors or gates of angle or other section with gusset plates rails, braces etc. complete,
drilled for fixing or steel sheeting or other covering. doors, etc. to be prepared for hanging or sliding with and
including either hooke and hinges or steel hanging
door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also
fastening and fixing complete Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.016 3.072
2 Hammermen 1 Day Rs. 192.00 0.016 3.072
Rs.6.14
Sundry
1 Sundry 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.7.70 Total Amount of M and L Rs.6.59
Add 17.5 % OH and CP Rs.1.15
Total Rs.7.75

1099 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10048.05
Framed work as in doors or gates of angle or other section with gusset plates rails, braces etc. complete,
drilled for fixing or steel sheeting or other covering. doors, etc. to be prepared for hanging or sliding with and
including either hooke and hinges or steel hanging
door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also
fastening and fixing complete fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.005 0.96
2 Mazdoor man 1 Day Rs. 169.00 0.015 2.535
Rs.3.50
Sundry
1 Sundry 1 Re Rs. 9.00 0.09 0.81
Rs.0.81
After rounding off: Rs.5.10 Total Amount of M and L Rs.4.31
Add 17.5 % OH and CP Rs.0.75
Total Rs.5.06

ITEM No. 10049.01


Steel work in tublar trusses including special shaped washer etc. complete using ERW or induction butt welded
tubes confirming to I.S. 0011-1979 grade St-240 S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Erw Induction butt weld M.S.Tube Black conforming to IS 1161-1979 1 Kg Rs. 54.00 1 54
grade Ist 240
Rs.54.00
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.025 4.8
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
3 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
Rs.14.09
Sundry
1 Sundry 1 Re Rs. 9.00 0.13 1.17
Rs.1.17
After rounding off: Rs.81.40 Total Amount of M and L Rs.69.26
Add 17.5 % OH and CP Rs.12.12
Total Rs.81.39

1100 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10049.02
Steel work in tublar trusses including special shaped washer etc. complete using ERW or induction butt welded
tubes confirming to I.S. 0011-1979 grade St-240 Fabrication only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.022 4.224
2 Hammermen 1 Day Rs. 192.00 0.022 4.224
Rs.8.45
Sundry
1 Sundry 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.10.70 Total Amount of M and L Rs.9.08
Add 17.5 % OH and CP Rs.1.59
Total Rs.10.67

ITEM No. 10049.03


Steel work in tublar trusses including special shaped washer etc. complete using ERW or induction butt welded
tubes confirming to I.S. 0011-1979 grade St-240 Erection and fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/Tin smith 1 Day Rs. 192.00 0.005 0.96
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
Rs.6.03
Sundry
1 Sundry 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.7.70 Total Amount of M and L Rs.6.57
Add 17.5 % OH and CP Rs.1.15
Total Rs.7.72

ITEM No. 10050.01


Add to any of the foregoing items if structural steel is painted one shop coat of sinc chromate primer paint (
including preparation of surface) at contractors's workshop before fabrication M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Primer for steel - red oxide 1 Litre Rs. 75.00 0.003 0.225
Rs.0.23
Sundry
1 Sundry 1 Re Rs. 9.00 0.03 0.27
Rs.0.27
After rounding off: Rs.0.60 Total Amount of M and L Rs.0.50
Add 17.5 % OH and CP Rs.0.09
Total Rs.0.58

1101 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10050.02
Add to any of the foregoing items if structural steel is painted one shop coat of sinc chromate primer paint (
including preparation of surface) at contractors's workshop before fabrication except paint.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Painter (ordinary) 1 Day Rs. 192.00 0.0005 0.096
Rs.0.10
After rounding off: Rs.0.10 Total Amount of M and L Rs.0.10
Add 17.5 % OH and CP Rs.0.02
Total Rs.0.11

ITEM No. 10051.01


Expanded metal, cut to length, bent to shape required and typing with and including annealed mild steel wire
not less than 0.9mm dia or fixing with galvanised steel staples supplied and fixed to wood or steel members
weight per square metre not exc.4 kg S &F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Expanded Metal not exceeding 4/SQM 1 Kg Rs. 45.00 1.05 47.25
Rs.47.25
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.06 13.5
2 Mazdoor man 1 Day Rs. 169.00 0.1 16.9
Rs.30.40
Sundry
1 Sundry 1 Re Rs. 9.00 0.21 1.89
Rs.1.89
After rounding off: Rs.93.50 Total Amount of M and L Rs.79.54
Add 17.5 % OH and CP Rs.13.92
Total Rs.93.46

ITEM No. 10051.02


Expanded metal, cut to length, bent to shape required and typing with and including annealed mild steel wire
not less than 0.9mm dia or fixing with galvanised steel staples supplied and fixed to wood or steel members
weight per square metre exc.4 kg S &F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Expanded Metal exceeding 4/SQM 1 Kg Rs. 44.00 1.05 46.2
Rs.46.20
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.07 15.75
2 Mazdoor man 1 Day Rs. 169.00 0.1 16.9
Rs.32.65
Sundry
1 Sundry 1 Re Rs. 9.00 0.23 2.07
Rs.2.07
After rounding off: Rs.95.10 Total Amount of M and L Rs.80.92
Add 17.5 % OH and CP Rs.14.16
Total Rs.95.08

1102 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10052.01
Expanded metal, cut to length, bent to shape required and typing with and including annealed mild steel wire
not less than 0.9mm dia or fixing with galvanised steel staples supplied and fixed to wood or steel members
weight per square metre not exc.4 kg .Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
2 Carpenter, joiner* 1 Day Rs. 225.00 0.06 13.5
Rs.15.19
Sundry
1 Sundry 1 Re Rs. 9.00 0.21 1.89
Rs.1.89
After rounding off: Rs.20.10 Total Amount of M and L Rs.17.08
Add 17.5 % OH and CP Rs.2.99
Total Rs.20.07

ITEM No. 10052.02


Expanded metal, cut to length, bent to shape required and typing with and including annealed mild steel wire
not less than 0.9mm dia or fixing with galvanised steel staples supplied and fixed to wood or steel members
weight per square metre exc.4 kg .Fixing only
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.07 15.75
2 Mazdoor man 1 Day Rs. 169.00 0.01 1.69
Rs.17.44
Sundry
1 Sundry 1 Re Rs. 9.00 0.24 2.16
Rs.2.16
After rounding off: Rs.23.00 Total Amount of M and L Rs.19.60
Add 17.5 % OH and CP Rs.3.43
Total Rs.23.03

ITEM No. 10053.01


Welded steel wire fabric supplied and fixed complete to wood or steel members Weight not exceeding 4 Kg
per square metre.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Welded ST wire fab not exceeding 4Kg 1 Kg Rs. 46.00 1.05 48.3
Rs.48.30
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.075 16.875
2 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
Rs.35.13
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.100.10 Total Amount of M and L Rs.85.23
Add 17.5 % OH and CP Rs.14.91
Total Rs.100.14

1103 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10053.02
Welded steel wire fabric supplied and fixed complete to wood or steel members Weight exceeding 4 Kg per
square metre.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Welded ST wire fab exceeding 4Kg 1 Kg Rs. 45.00 1.05 47.25
Rs.47.25
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.118 26.55
2 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
Rs.44.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.110.50 Total Amount of M and L Rs.94.03
Add 17.5 % OH and CP Rs.16.46
Total Rs.110.49

ITEM No. 10054.01


Welded steel wire fabric supplied and fixed complete to wood or steel members, fixing only Weight not
exceeding 4 Kg per square metre.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.075 16.875
2 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
Rs.35.13
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.43.40 Total Amount of M and L Rs.36.93
Add 17.5 % OH and CP Rs.6.46
Total Rs.43.39

ITEM No. 10054.02


Welded steel wire fabric supplied and fixed complete to wood or steel members, fixing only Weight exceeding
4 Kg per square metre.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Carpenter, joiner* 1 Day Rs. 225.00 0.118 26.55
2 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
Rs.44.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.22 1.98
Rs.1.98
After rounding off: Rs.55.00 Total Amount of M and L Rs.46.78
Add 17.5 % OH and CP Rs.8.19
Total Rs.54.97

1104 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10055.01
4 mm dia galvanised steel wire, 150 x 100mm mesh, made up into mattresses or cages, lapped, wired and laid
in position, including closing after filling Supplied & fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire mattresser 4mm GI 150x100mm 1 Sqm Rs. 125.00 1.05 131.25
Rs.131.25
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.054 10.368
2 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
Rs.28.62
Sundry
1 Sundry 1 Re Rs. 9.00 0.34 3.06
Rs.3.06
After rounding off: Rs.191.40 Total Amount of M and L Rs.162.93
Add 17.5 % OH and CP Rs.28.51
Total Rs.191.44

ITEM No. 10055.02


4 mm dia galvanised steel wire, 150 x 100mm mesh, made up into mattresses or cages, lapped, wired and laid
in position, including closing after filling Except steel wire mesh.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.054 10.368
2 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
Rs.28.62
Sundry
1 Sundry 1 Re Rs. 9.00 0.34 3.06
Rs.3.06
After rounding off: Rs.37.20 Total Amount of M and L Rs.31.68
Add 17.5 % OH and CP Rs.5.54
Total Rs.37.22

1105 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10056.01
4 mm dia galvanised steel wire, 225 x 150mm mesh, made up into mattresses or cages, lapped, wired and laid
in position, including closing after filling Supplied & fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Wire mattresser 4mm GI 225x150mm 1 Sqm Rs. 115.00 1.05 120.75
Rs.120.75
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.04 7.68
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.21.37
Sundry
1 Sundry 1 Re Rs. 9.00 0.33 2.97
Rs.2.97
After rounding off: Rs.170.50 Total Amount of M and L Rs.145.09
Add 17.5 % OH and CP Rs.25.39
Total Rs.170.48

ITEM No. 10056.02


4 mm dia galvanised steel wire, 225 x 150mm mesh, made up into mattresses or cages, lapped, wired and laid
in position, including closing after filling Except steel wire mesh.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.04 7.68
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.21.37
Sundry
1 Sundry 1 Re Rs. 9.00 0.33 2.97
Rs.2.97
After rounding off: Rs.28.60 Total Amount of M and L Rs.24.34
Add 17.5 % OH and CP Rs.4.26
Total Rs.28.60

ITEM No. 10057


fixing only chain link fencing including line wires, any mesh, size and type to any of standards, rails straining
bolts, etc. including provision of binding wire.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.0185 3.552
Rs.3.55
After rounding off: Rs.4.20 Total Amount of M and L Rs.3.55
Add 17.5 % OH and CP Rs.0.62
Total Rs.4.17

1106 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10058.01
Plain mild steel wire, galvanised class 3, in fencing including straining and fixing to wood, concrete or steel
standards posts and / or to straining bolts, including securing with and provision of galvanised iron tying wire
galvanised iron staples or steel pins, etc. as directed(each line of wire to be measured) Dia of wire 2.50 mm.S
&F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 2.50mm dia 1 Kg Rs. 53.00 4 212
Rs.212.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.343.80 Total Amount of M and L Rs.292.60
Add 17.5 % OH and CP Rs.51.21
Total Rs.343.81

ITEM No. 10058.02


Plain mild steel wire, galvanised class 3, in fencing including straining and fixing to wood, concrete or steel
standards posts and / or to straining bolts, including securing with and provision of galvanised iron tying wire
galvanised iron staples or steel pins, etc. as directed(each line of wire to be measured) Dia of wire 3.15 mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 3.15mm dia 1 Kg Rs. 53.00 6.4 339.2
Rs.339.20
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
2 Mazdoor-man, 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.493.30 Total Amount of M and L Rs.419.80
Add 17.5 % OH and CP Rs.73.47
Total Rs.493.27

1107 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10058.03
Plain mild steel wire, galvanised class 3, in fencing including straining and fixing to wood, concrete or steel
standards posts and / or to straining bolts, including securing with and provision of galvanised iron tying wire
galvanised iron staples or steel pins, etc. as directed(each line of wire to be measured) Dia of wire 4.0 mm.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 4.00mm dia 1 Kg Rs. 53.00 10.36 549.08
Rs.549.08
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.739.90 Total Amount of M and L Rs.629.68
Add 17.5 % OH and CP Rs.110.19
Total Rs.739.87

ITEM No. 10058.04


Plain mild steel wire, galvanised class 3, in fencing including straining and fixing to wood, concrete or steel
standards posts and / or to straining bolts, including securing with and provision of galvanised iron tying wire
galvanised iron staples or steel pins, etc. as directed(each line of wire to be measured) Except wire.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.94.70 Total Amount of M and L Rs.80.60
Add 17.5 % OH and CP Rs.14.11
Total Rs.94.71

1108 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10058.05
Plain mild steel wire, galvanised class 3, in fencing including straining and fixing to wood, concrete or steel
standards posts and / or to straining bolts, including securing with and provision of galvanised iron tying wire
galvanised iron staples or steel pins, etc. as directed(each line of wire to be measured) Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor man 1 Day Rs. 169.00 0.1 16.9
Rs.39.40
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.48.40 Total Amount of M and L Rs.41.20
Add 17.5 % OH and CP Rs.7.21
Total Rs.48.41

ITEM No. 10058.06


Plain mild steel wire, galvanised class 3, in fencing including straining and fixing to wood, concrete or steel
standards posts and / or to straining bolts, including securing with and provision of galvanised iron tying wire
galvanised iron staples or steel pins, etc. as directed(each line of wire to be measured) Restraining and
resecuring including making goods staples etc.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor man 1 Day Rs. 169.00 0.15 25.35
Rs.47.85
Sundry
1 Sundry 1 Re Rs. 9.00 0.13 1.17
Rs.1.17
After rounding off: Rs.57.60 Total Amount of M and L Rs.49.02
Add 17.5 % OH and CP Rs.8.58
Total Rs.57.60

1109 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10059.01
Plain mild steel wire, galvanised class 3 in detached work such as for mosquito nets and fixing to straining
bolts, hooks, eyes, etc. Dia of wire 2.50mm.S &F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 2.50mm dia 1 Kg Rs. 53.00 4 212
Rs.212.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.343.80 Total Amount of M and L Rs.292.60
Add 17.5 % OH and CP Rs.51.21
Total Rs.343.81

ITEM No. 10059.02


Plain mild steel wire, galvanised class 3 in detached work such as for mosquito nets and fixing to straining
bolts, hooks, eyes, etc. Dia of wire 3.15mm.S &F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 3.15mm dia 1 Kg Rs. 53.00 6.4 339.2
Rs.339.20
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.493.30 Total Amount of M and L Rs.419.80
Add 17.5 % OH and CP Rs.73.47
Total Rs.493.27

1110 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10059.03
Plain mild steel wire, galvanised class 3 in detached work such as for mosquito nets and fixing to straining
bolts, hooks, eyes, etc. Dia of wire 4.00mm.S &F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 4.00mm dia 1 Kg Rs. 53.00 10.36 549.08
Rs.549.08
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.739.90 Total Amount of M and L Rs.629.68
Add 17.5 % OH and CP Rs.110.19
Total Rs.739.87

ITEM No. 10059.04


Plain mild steel wire, galvanised class 3 in detached work such as for mosquito nets and fixing to straining
bolts, hooks, eyes, etc. Except wire.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.94.70 Total Amount of M and L Rs.80.60
Add 17.5 % OH and CP Rs.14.11
Total Rs.94.71

ITEM No. 10059.05


Plain mild steel wire, galvanised class 3 in detached work such as for mosquito nets and fixing to straining
bolts, hooks, eyes, etc. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor man 1 Day Rs. 169.00 0.1 16.9
Rs.39.40
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.48.40 Total Amount of M and L Rs.41.20
Add 17.5 % OH and CP Rs.7.21
Total Rs.48.41

1111 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10059.06
Plain mild steel wire, galvanised class 3 in detached work such as for mosquito nets and fixing to straining
bolts, hooks, eyes, etc. Restraining and resecuring including making goods staples etc.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor man 1 Day Rs. 169.00 0.15 25.35
Rs.47.85
Sundry
1 Sundry 1 Re Rs. 9.00 0.13 1.17
Rs.1.17
After rounding off: Rs.57.60 Total Amount of M and L Rs.49.02
Add 17.5 % OH and CP Rs.8.58
Total Rs.57.60

ITEM No. 10060.01


Galvanised, 2 strand, steel barbed wire, barbed with 2.24 mm dia barbs at 75mm spacing and straining and
fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of
galvanised mild steel wire, staples or steelpins, etc. as directed (each line wire to be measured) S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Galved Steel barbed wire to st. 2.24 mm dia barbed 75mm spacing 1 Kg Rs. 53.00 10.6 561.8
Rs.561.80
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.3 57.6
2 Mazdoor man 1 Day Rs. 169.00 0.4 67.6
Rs.125.20
Sundry
1 Sundry 1 Re Rs. 9.00 0.26 2.34
Rs.2.34
After rounding off: Rs.810.00 Total Amount of M and L Rs.689.34
Add 17.5 % OH and CP Rs.120.63
Total Rs.809.97

ITEM No. 10060.02


Galvanised, 2 strand, steel barbed wire, barbed with 2.24 mm dia barbs at 75mm spacing and straining and
fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of
galvanised mild steel wire, staples or steelpins, etc. as directed (each line wire to be measured) Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.3 57.6
2 Mazdoor man 1 Day Rs. 169.00 0.4 67.6
Rs.125.20
Sundry
1 Sundry 1 Re Rs. 9.00 0.27 2.43
Rs.2.43
After rounding off: Rs.150.00 Total Amount of M and L Rs.127.63
Add 17.5 % OH and CP Rs.22.34
Total Rs.149.97

1112 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10060.03
Galvanised, 2 strand, steel barbed wire, barbed with 2.24 mm dia barbs at 75mm spacing and straining and
fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of
galvanised mild steel wire, staples or steelpins, etc. as directed (each line wire to be measured) Add if fixed in
repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.155 29.76
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.63.56
Sundry
1 Sundry 1 Re Rs. 9.00 0.23 2.07
Rs.2.07
After rounding off: Rs.77.10 Total Amount of M and L Rs.65.63
Add 17.5 % OH and CP Rs.11.49
Total Rs.77.12

ITEM No. 10060.04


Galvanised, 2 strand, steel barbed wire, barbed with 2.24 mm dia barbs at 75mm spacing and straining and
fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of
galvanised mild steel wire, staples or steelpins, etc. as directed (each line wire to be measured) Restraining
and resecuring including making goods staples etc.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.154 34.65
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.68.45
Sundry
1 Sundry 1 Re Rs. 9.00 0.23 2.07
Rs.2.07
After rounding off: Rs.82.90 Total Amount of M and L Rs.70.52
Add 17.5 % OH and CP Rs.12.34
Total Rs.82.86

1113 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10061.01
Galvanised, 2 strand, steel barbed wire, barbed with 2.24 mm dia barbs at 75mm spacing and straining and
fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of
galvanised mild steel wire, staples or steelpins, etc in wire entanglements aprons barriers, gates, etc. S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Galved Steel barbed wire to st. 2.24 mm dia barbed 75mm spacing 1 Kg Rs. 53.00 10.6 561.8
Rs.561.80
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.4 67.6
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.4 90
Rs.157.60
Sundry
1 Sundry 1 Re Rs. 9.00 0.66 5.94
Rs.5.94
After rounding off: Rs.852.30 Total Amount of M and L Rs.725.34
Add 17.5 % OH and CP Rs.126.93
Total Rs.852.27

ITEM No. 10061.02


Galvanised, 2 strand, steel barbed wire, barbed with 2.24 mm dia barbs at 75mm spacing and straining and
fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of
galvanised mild steel wire, staples or steelpins, etc in wire entanglements aprons barriers, gates, etc. Fixing
only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.4 90
2 Mazdoor man 1 Day Rs. 169.00 0.4 67.6
Rs.157.60
Sundry
1 Sundry 1 Re Rs. 9.00 0.66 5.94
Rs.5.94
After rounding off: Rs.192.20 Total Amount of M and L Rs.163.54
Add 17.5 % OH and CP Rs.28.62
Total Rs.192.16

ITEM No. 10061.03


Galvanised, 2 strand, steel barbed wire, barbed with 2.24 mm dia barbs with 2mm dia barbs at 75mm spacing
and straining and fixing to any type of standard rails straining bolts, including, securing or tying at crossings
with and provision of galvanised mild steel wire, staples or steelpins, etc in wire entanglements aprons
barriers, gates, etc. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
After rounding off: Rs.92.60 Total Amount of M and L Rs.78.80
Add 17.5 % OH and CP Rs.13.79
Total Rs.92.59

1114 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10061.04
Galvanised, 2 strand, steel barbed wire, barbed with 2.24 mm dia barbs with 2mm dia barbs at 75mm spacing
and straining and fixing to any type of standard rails straining bolts, including, securing or tying at crossings
with and provision of galvanised mild steel wire, staples or steelpins, etc in wire entanglements aprons
barriers, gates, etc. Restraining and resecuring including making goods staples etc.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
Sundry
1 Sundry 1 Re Rs. 9.00 0.53 4.77
Rs.4.77
After rounding off: Rs.98.20 Total Amount of M and L Rs.83.57
Add 17.5 % OH and CP Rs.14.62
Total Rs.98.19

ITEM No. 10062.01


Fixing wire entaglements and aprons with loose, two strand galvanised steel barbed wire, barbed with 2.24mm
barbs with 2mm dia barbs at 75mm spacings. S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Galved Steel barbed wire to st. 2.24 mm dia barbed 75mm spacing 1 Kg Rs. 53.00 1 53
Rs.53.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.017 3.825
2 Mazdoor man 1 Day Rs. 169.00 0.017 2.873
Rs.6.70
After rounding off: Rs.70.10 Total Amount of M and L Rs.59.70
Add 17.5 % OH and CP Rs.10.45
Total Rs.70.15

ITEM No. 10062.02


Fixing wire entaglements and aprons with loose, two strand galvanised steel barbed wire, barbed with 2.24mm
barbs with 2mm dia barbs at 75mm spacings. Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.017 3.825
2 Mazdoor man 1 Day Rs. 169.00 0.017 2.873
Rs.6.70
After rounding off: Rs.7.90 Total Amount of M and L Rs.6.70
Add 17.5 % OH and CP Rs.1.17
Total Rs.7.87

1115 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10062.03
Fixing wire entaglements and aprons with loose, two strand galvanised steel barbed wire, barbed with 2.24mm
barbs with 2mm dia barbs at 75mm spacings. Add if fixed in repairs.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.069 15.525
2 Mazdoor man 1 Day Rs. 169.00 0.069 11.661
Rs.27.19
After rounding off: Rs.31.90 Total Amount of M and L Rs.27.19
Add 17.5 % OH and CP Rs.4.76
Total Rs.31.94

ITEM No. 10063.01


Collapsible steel gates, top hung, consisting of channel pickets, pivoted flat bars, top and bottom runners,
brass handles etc. as specified, eracted in position and securing runners with holdfasts and brackets, complete
Supplied & fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Collasable Steel Gates 1 Sqm Rs. 1,830.00 1 1830
Rs.1,830.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 1 169
Rs.225.25
After rounding off: Rs.2,414.90 Total Amount of M and L Rs.2,055.25
Add 17.5 % OH and CP Rs.359.67
Total Rs.2,414.92

ITEM No. 10063.02


Collapsible steel gates, top hung, consisting of channel pickets, pivoted flat bars, top and bottom runners,
brass handles etc. as specified, eracted in position and securing runners with holdfasts and brackets, complete
Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 1 169
Rs.225.25
After rounding off: Rs.264.70 Total Amount of M and L Rs.225.25
Add 17.5 % OH and CP Rs.39.42
Total Rs.264.67

1116 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10064.01
Steel rolling shutters, without ball bearing, as specified including top cover, anchoring rod, hasp and staple and
one shop coat of primer ; eracted in position as indicated, complete ; push pull or manual type Supplied and
fixed ( thickness of laths 1.00 mm)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rolling shutter manually 1mm laths ST 1 Sqm Rs. 1,700.00 1 1700
Rs.1,700.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 0.75 126.75
Rs.183.00
After rounding off: Rs.2,212.50 Total Amount of M and L Rs.1,883.00
Add 17.5 % OH and CP Rs.329.53
Total Rs.2,212.53

ITEM No. 10064.02


Steel rolling shutters, without ball bearing, as specified including top cover, anchoring rod, hasp and staple and
one shop coat of primer ; eracted in position as indicated, complete ; push pull or manual type Supplied and
fixed ( thickness of laths 1.25 mm)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rolling shutter manually 1.25mm laths ST 1 Sqm Rs. 1,840.00 1 1840
Rs.1,840.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 0.75 126.75
Rs.183.00
After rounding off: Rs.2,377.00 Total Amount of M and L Rs.2,023.00
Add 17.5 % OH and CP Rs.354.03
Total Rs.2,377.03

ITEM No. 10064.03


Steel rolling shutters, without ball bearing, as specified including top cover, anchoring rod, hasp and staple and
one shop coat of primer ; eracted in position as indicated, complete ; push pull or manual type Fixing only any
thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor-man, 1 Day Rs. 169.00 0.75 126.75
Rs.183.00
After rounding off: Rs.215.00 Total Amount of M and L Rs.183.00
Add 17.5 % OH and CP Rs.32.03
Total Rs.215.03

1117 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10065.01
Steel rolling shutters, without ball bearing, as specified including top cover, anchoring rod, hasp and staple and
one shop coat of primer ; eracted in position as indicated, complete ; gear operated type with bevel gear box
and crank handle Supplied and fixed ( thickness of laths 1.00 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST Rolling shutter Gear type 1mm leth 1 Sqm Rs. 1,820.00 1 1820
Rs.1,820.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 0.75 126.75
Rs.183.00
After rounding off: Rs.2,353.50 Total Amount of M and L Rs.2,003.00
Add 17.5 % OH and CP Rs.350.53
Total Rs.2,353.53

ITEM No. 10065.02


Steel rolling shutters, without ball bearing, as specified including top cover, anchoring rod, hasp and staple and
one shop coat of primer ; eracted in position as indicated, complete ; gear operated type with bevel gear box
and crank handle Supplied and fixed ( thickness of laths 1.25 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST Rolling shutter Gear type 1.25mm leth 1 Sqm Rs. 2,100.00 1 2100
Rs.2,100.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 0.75 126.75
Rs.183.00
After rounding off: Rs.2,682.50 Total Amount of M and L Rs.2,283.00
Add 17.5 % OH and CP Rs.399.53
Total Rs.2,682.53

ITEM No. 10065.03


Steel rolling shutters, without ball bearing, as specified including top cover, anchoring rod, hasp and staple and
one shop coat of primer ; eracted in position as indicated, complete ; gear operated type with bevel gear box
and crank handle Fixing only any thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 0.75 126.75
Rs.183.00
After rounding off: Rs.215.00 Total Amount of M and L Rs.183.00
Add 17.5 % OH and CP Rs.32.03
Total Rs.215.03

1118 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10066.01
Steel rolling shutters, without ball bearing, as specified including top cover, anchoring rod, hasp and staple and
one shop coat of primer ; eracted in position as indicated, complete ; gear operated type with chain wheel and
hand chain Supplied and fixed ( thickness of laths 1.00 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Steel rolling shutter, chain operated type 1 mm thick lath 1 Sqm Rs. 2,290.00 1 2290
Rs.2,290.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 0.75 126.75
Rs.183.00
After rounding off: Rs.2,905.80 Total Amount of M and L Rs.2,473.00
Add 17.5 % OH and CP Rs.432.78
Total Rs.2,905.78

ITEM No. 10066.02


Steel rolling shutters, without ball bearing, as specified including top cover, anchoring rod, hasp and staple and
one shop coat of primer ; eracted in position as indicated, complete ; gear operated type with chain wheel and
hand chain Supplied and fixed ( thickness of laths 1.25 mm).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Steel rolling shutter, chain operated type 1.25 mm thick lath 1 Sqm Rs. 2,590.00 1 2590
Rs.2,590.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 0.75 126.75
Rs.183.00
After rounding off: Rs.3,258.30 Total Amount of M and L Rs.2,773.00
Add 17.5 % OH and CP Rs.485.28
Total Rs.3,258.28

ITEM No. 10066.03


Steel rolling shutters, without ball bearing, as specified including top cover, anchoring rod, hasp and staple and
one shop coat of primer ; eracted in position as indicated, complete ; gear operated type with chain wheel and
hand chain Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
2 Mazdoor man 1 Day Rs. 169.00 0.75 126.75
Rs.183.00
After rounding off: Rs.215.00 Total Amount of M and L Rs.183.00
Add 17.5 % OH and CP Rs.32.03
Total Rs.215.03

1119 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10067
Safety lever locks mild steel with 4 levers for rolling shutters.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Safety lever locks mild steel with 4 lever for rolling shutter 1 No. Rs. 350.00 1 350
Rs.350.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.1 19.2
2 Mazdoor man 1 Day Rs. 169.00 0.15 25.35
Rs.44.55
After rounding off: Rs.463.60 Total Amount of M and L Rs.394.55
Add 17.5 % OH and CP Rs.69.05
Total Rs.463.60

ITEM No. 10068


Ball bearing for rolling shutters.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Ball bearing for rolling shutter 1 No. Rs. 300.00 1 300
Rs.300.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.1 19.2
Rs.53.00
After rounding off: Rs.414.80 Total Amount of M and L Rs.353.00
Add 17.5 % OH and CP Rs.61.78
Total Rs.414.78

ITEM No. 10069


Extra for wicket door including a 4 lever mild steel safety lock, lockable from both inside and outside (areaof
wicket does to ne only measured ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Extra material for wicket gate including 4 lever mild steel safty lock, 1 Sqm Rs. 1,500.00 1 1500
lockable from inside and outside rolling shutter
Rs.1,500.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.25 48
2 Mazdoor man 1 Day Rs. 169.00 0.75 126.75
Rs.174.75
After rounding off: Rs.1,967.80 Total Amount of M and L Rs.1,674.75
Add 17.5 % OH and CP Rs.293.08
Total Rs.1,967.83

1120 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10070.01
Steel windows or ventilators, fixed type, with glazing bars Supplied and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST window ventilater fixed type with BR 1 Sqm Rs. 1,080.00 1 1080
Rs.1,080.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.12 23.04
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.56.84
After rounding off: Rs.1,335.80 Total Amount of M and L Rs.1,136.84
Add 17.5 % OH and CP Rs.198.95
Total Rs.1,335.79

ITEM No. 10070.02


Steel windows or ventilators, fixed type, with glazing bars Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.12 23.04
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.56.84
After rounding off: Rs.66.80 Total Amount of M and L Rs.56.84
Add 17.5 % OH and CP Rs.9.95
Total Rs.66.79

ITEM No. 10071.01


Steel windows with side hung shutters including projecting type hinges with steel handle, and steel peg stay,
complete with glazing bars, dovetalied or welded Supplied and fixed
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST window with side hung with bar 1 Sqm Rs. 1,380.00 1 1380
Rs.1,380.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.125 24
Rs.57.80
After rounding off: Rs.1,689.40 Total Amount of M and L Rs.1,437.80
Add 17.5 % OH and CP Rs.251.62
Total Rs.1,689.42

1121 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10071.02
Steel windows with side hung shutters including projecting type hinges with steel handle, and steel peg stay,
complete with glazing bars, dovetalied or welded Supplied and fixed
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.125 24
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.57.80
After rounding off: Rs.67.90 Total Amount of M and L Rs.57.80
Add 17.5 % OH and CP Rs.10.12
Total Rs.67.92

ITEM No. 10072.01


.Steel windows with side hung shutters including projecting type hinges with steel handle, and steel peg stay,
complete with dovetalied or welded but without glazing bars Supplied and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST window with side hung without bar 1 Sqm Rs. 1,190.00 1 1190
Rs.1,190.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.125 24
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.57.80
After rounding off: Rs.1,466.20 Total Amount of M and L Rs.1,247.80
Add 17.5 % OH and CP Rs.218.37
Total Rs.1,466.17

ITEM No. 10072.02


Steel windows with side hung shutters including projecting type hinges with steel handle, and steel peg stay,
complete with glazing bars, dovetalied or welded Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.125 24
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.57.80
After rounding off: Rs.67.90 Total Amount of M and L Rs.57.80
Add 17.5 % OH and CP Rs.10.12
Total Rs.67.92

1122 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10073.01
Steels door including projecting type hinges, steel handle, complete, with glazing bars, dovetailed or welded
Supplied and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Door with accesaroies ST 1 Sqm Rs. 1,500.00 1 1500
Rs.1,500.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
Sundry
1 Sundries 1 Re Rs. 9.00 3.33 29.97
Rs.29.97
After rounding off: Rs.1,884.10 Total Amount of M and L Rs.1,603.48
Add 17.5 % OH and CP Rs.280.61
Total Rs.1,884.09

ITEM No. 10073.02


Steels door including projecting type hinges, steel handle, complete, with glazing bars, dovetailed or welded
Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.86.40 Total Amount of M and L Rs.73.51
Add 17.5 % OH and CP Rs.12.86
Total Rs.86.37

ITEM No. 10074.01


Steel ventilators with centre hung shutter including two pairs of brass cup pivots, catch spring and pulley
wheel, complete Supplied and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST ventelatter center hung shutter 1 Sqm Rs. 1,220.00 1 1220
Rs.1,220.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.1,519.90 Total Amount of M and L Rs.1,293.51
Add 17.5 % OH and CP Rs.226.36
Total Rs.1,519.87

1123 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10074.02
Steel ventilators with centre hung shutter including two pairs of brass cup pivots, catch spring and pulley
wheel, complete Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.86.40 Total Amount of M and L Rs.73.51
Add 17.5 % OH and CP Rs.12.86
Total Rs.86.37

ITEM No. 10075.01


Steel ventilator with top hung shutter including hinges steel peg stay, complete Supplied and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST ventilator top hung type shutter 1 Sqm Rs. 1,190.00 1 1190
Rs.1,190.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.1,484.60 Total Amount of M and L Rs.1,263.51
Add 17.5 % OH and CP Rs.221.11
Total Rs.1,484.62

ITEM No. 10075.02


Steel ventilator with top hung shutter including hinges steel peg stay, complete Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.86.40 Total Amount of M and L Rs.73.51
Add 17.5 % OH and CP Rs.12.86
Total Rs.86.37

1124 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10076.01
Steel windows for industrial buildings, fixed type, with glazing bars Supplied and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST window fixed type ird type 1 Sqm Rs. 1,040.00 1 1040
Rs.1,040.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
Rs.73.51
After rounding off: Rs.1,308.40 Total Amount of M and L Rs.1,113.51
Add 17.5 % OH and CP Rs.194.86
Total Rs.1,308.37

ITEM No. 10076.02


Steel windows for industrial buildings, fixed type, with glazing bars Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.86.40 Total Amount of M and L Rs.73.51
Add 17.5 % OH and CP Rs.12.86
Total Rs.86.37

ITEM No. 10077.01


Steel windows for industrial buildings, with centre hung shutters including brass pivots, catch spring and pulley
wheel complete Supplied and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST window central hung type 1 Sqm Rs. 1,150.00 1 1150
Rs.1,150.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.1,437.60 Total Amount of M and L Rs.1,223.51
Add 17.5 % OH and CP Rs.214.11
Total Rs.1,437.62

1125 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10077.02
Steel windows for industrial buildings, with centre hung shutters including brass pivots, catch spring and pulley
wheel complete Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.86.40 Total Amount of M and L Rs.73.51
Add 17.5 % OH and CP Rs.12.86
Total Rs.86.37

ITEM No. 10078.01


Steel windows for industrial buildings, with bottom hung or top hang shutters including hinges, steel side arms
or peg stays complete Supplied and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST window top or bottom hung type for ind bldg 1 Sqm Rs. 1,190.00 1 1190
Rs.1,190.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.1,484.60 Total Amount of M and L Rs.1,263.51
Add 17.5 % OH and CP Rs.221.11
Total Rs.1,484.62

ITEM No. 10078.02


Steel windows for industrial buildings, with bottom hung or top hang shutters including hinges, steel side arms
or peg stays complete Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.11 21.12
2 Mazdoor man 1 Day Rs. 169.00 0.31 52.39
Rs.73.51
After rounding off: Rs.86.40 Total Amount of M and L Rs.73.51
Add 17.5 % OH and CP Rs.12.86
Total Rs.86.37

ITEM No. 10079


Extra over steel doors, windows and ventilators if brass handles are provide in lieu of steel handles.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Brass handles in lieu of steel handles for steel doors, windows and 1 Sqm Rs. 60.00 1 60
ventilatoras
Rs.60.00
After rounding off: Rs.70.50 Total Amount of M and L Rs.60.00
Add 17.5 % OH and CP Rs.10.50
Total Rs.70.50

1126 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10080
Extra over steel doors, windows and ventilators if aluminium handles are provide in lieu of steel handles.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Aluminum handdle in lieu of steel handles for steel door, widow and 1 Sqm Rs. 20.00 1 20
ventilatoras
Rs.20.00
After rounding off: Rs.23.50 Total Amount of M and L Rs.20.00
Add 17.5 % OH and CP Rs.3.50
Total Rs.23.50

ITEM No. 10081


Ditto, if chromium plate steel han-dles are provided in lieu of steel handles.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Cromium Plated Steel Handle in lieu of Steel Handle 1 Sqm Rs. 20.00 1 20
Rs.20.00
After rounding off: Rs.23.50 Total Amount of M and L Rs.20.00
Add 17.5 % OH and CP Rs.3.50
Total Rs.23.50

ITEM No. 10082.01


Pressed steel frames for doors with one or more rebates including necessary fixing lugs, hinges, lock strike
plate etc. complete, as specified, supplied and fixed size of frame 105x60mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST frame F door 105mm width 1 Runnin Rs. 195.00 1 195
Rs.195.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.05 9.6
2 Mazdoor man 1 Day Rs. 169.00 0.05 8.45
Rs.18.05
After rounding off: Rs.250.30 Total Amount of M and L Rs.213.05
Add 17.5 % OH and CP Rs.37.28
Total Rs.250.33

ITEM No. 10082.02


Pressed steel frames for doors with one or more rebates including necessary fixing lugs, hinges, lock strike
plate etc. complete, as specified, supplied and fixed size of frame 125x60mm
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST frame F door 125mm width 1 Runnin Rs. 225.00 1 225
Rs.225.00
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.05 9.6
2 Mazdoor man 1 Day Rs. 169.00 0.05 8.45
Rs.18.05
After rounding off: Rs.285.60 Total Amount of M and L Rs.243.05
Add 17.5 % OH and CP Rs.42.53
Total Rs.285.58

1127 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10082.03
Pressed steel frames for doors with one or more rebates including necessary fixing lugs, hinges, lock strike
plate etc. complete, as specified, supplied and fixed size of frame 165x60mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 ST frame F door 165mm width 1 Runnin Rs. 260.00 1 260
Rs.260.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.05 8.45
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.05 9.6
Rs.18.05
After rounding off: Rs.326.70 Total Amount of M and L Rs.278.05
Add 17.5 % OH and CP Rs.48.66
Total Rs.326.71

ITEM No. 10083.01


Pressed steel frames for doors with one or more rebates including necessary fixing lugs, hinges, lock strike
plate etc. complete, as specified, supplied and fixed size of frame 105x60mm,but fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.05 9.6
2 Mazdoor man 1 Day Rs. 169.00 0.05 8.45
Rs.18.05
After rounding off: Rs.21.20 Total Amount of M and L Rs.18.05
Add 17.5 % OH and CP Rs.3.16
Total Rs.21.21

ITEM No. 10083.02


Pressed steel frames for doors with one or more rebates including necessary fixing lugs, hinges, lock strike
plate etc. complete, as specified, supplied and fixed size of frame 125x60mm,but fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.05 9.6
2 Mazdoor man 1 Day Rs. 169.00 0.05 8.45
Rs.18.05
After rounding off: Rs.21.20 Total Amount of M and L Rs.18.05
Add 17.5 % OH and CP Rs.3.16
Total Rs.21.21

1128 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10083.03
Pressed steel frames for doors with one or more rebates including necessary fixing lugs, hinges, lock strike
plate etc. complete, as specified, supplied and fixed size of frame 165x60mm,but fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.05 9.6
2 Mazdoor man 1 Day Rs. 169.00 0.05 8.45
Rs.18.05
After rounding off: Rs.21.20 Total Amount of M and L Rs.18.05
Add 17.5 % OH and CP Rs.3.16
Total Rs.21.21

ITEM No. 10084.01


Running wlding in repairs Thickness of metal to be welded not exceeding 6mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.052 9.984
Rs.9.98
Sundry
1 Sundry 1 Re Rs. 9.00 0.25 2.25
Rs.2.25
After rounding off: Rs.14.40 Total Amount of M and L Rs.12.23
Add 17.5 % OH and CP Rs.2.14
Total Rs.14.37

ITEM No. 10084.02


Running wlding in repairs Thickness of metal to be welded exceeding 6mm but not exceeding 9mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.1 19.2
Rs.19.20
Sundry
1 Sundry 1 Re Rs. 9.00 0.25 2.25
Rs.2.25
After rounding off: Rs.25.20 Total Amount of M and L Rs.21.45
Add 17.5 % OH and CP Rs.3.75
Total Rs.25.20

ITEM No. 10084.03


Running wlding in repairs Thickness of metal to be welded exceeding 9mm but not exceeding 20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.2 38.4
Rs.38.40
Sundry
1 Sundry 1 Re Rs. 9.00 0.41 3.69
Rs.3.69
After rounding off: Rs.49.50 Total Amount of M and L Rs.42.09
Add 17.5 % OH and CP Rs.7.37
Total Rs.49.46
1129 by Narender Saigal (Director Contracts)
Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10084.04
Running wlding in repairs Thickness of metal to be welded exceeding 20mm but not exceeding 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.25 48
Rs.48.00
Sundry
1 Sundry 1 Re Rs. 9.00 0.55 4.95
Rs.4.95
After rounding off: Rs.62.20 Total Amount of M and L Rs.52.95
Add 17.5 % OH and CP Rs.9.27
Total Rs.62.22

ITEM No. 10085.01


Welding in repairs not exceeding 2.5cm in length Thickness of metal to be welded not exceeding 6mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.01 1.92
Rs.1.92
Sundry
1 Sundry 1 Re Rs. 9.00 0.06 0.54
Rs.0.54
After rounding off: Rs.2.90 Total Amount of M and L Rs.2.46
Add 17.5 % OH and CP Rs.0.43
Total Rs.2.89

ITEM No. 10085.02


Welding in repairs not exceeding 2.5cm in length Thickness of metal to be welded exceeding 6mm but not
exceeding 9mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.01 1.92
Rs.1.92
Sundry
1 Sundry 1 Re Rs. 9.00 0.07 0.63
Rs.0.63
After rounding off: Rs.3.00 Total Amount of M and L Rs.2.55
Add 17.5 % OH and CP Rs.0.45
Total Rs.3.00

1130 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10085.03
Welding in repairs not exceeding 2.5cm in length Thickness of metal to be welded exceeding 9mm but not
exceeding 20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.03 5.76
Rs.5.76
Sundry
1 Sundry 1 Re Rs. 9.00 0.149 1.341
Rs.1.34
After rounding off: Rs.8.30 Total Amount of M and L Rs.7.10
Add 17.5 % OH and CP Rs.1.24
Total Rs.8.34

ITEM No. 10085.04


Welding in repairs not exceeding 2.5cm in length Thickness of metal to be welded exceeding 20mm but not
exceeding 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.05 9.6
Rs.9.60
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.13.40 Total Amount of M and L Rs.11.40
Add 17.5 % OH and CP Rs.2.00
Total Rs.13.40

ITEM No. 10086.01


Welding in repairs exceeding 2.5cm but not exceeding 5.cm in length Thickness of metal to be welded not
exceeding 6mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.01 1.92
Rs.1.92
Sundry
1 Sundry 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.3.80 Total Amount of M and L Rs.3.27
Add 17.5 % OH and CP Rs.0.57
Total Rs.3.84

1131 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10086.02
Welding in repairs exceeding 2.5cm but not exceeding 5.cm in length Thickness of metal to be welded
exceeding 6mm but not exceeding 9mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.02 3.84
Rs.3.84
Sundry
1 Sundry 1 Re Rs. 9.00 0.2 1.8
Rs.1.80
After rounding off: Rs.6.60 Total Amount of M and L Rs.5.64
Add 17.5 % OH and CP Rs.0.99
Total Rs.6.63

ITEM No. 10086.03


Welding in repairs exceeding 2.5cm but not exceeding 5.cm in length Thickness of metal to be welded
exceeding 9mm but not exceeding 20mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.03 5.76
Rs.5.76
Sundry
1 Sundry 1 Re Rs. 9.00 0.4 3.6
Rs.3.60
After rounding off: Rs.11.00 Total Amount of M and L Rs.9.36
Add 17.5 % OH and CP Rs.1.64
Total Rs.11.00

ITEM No. 10086.04


Welding in repairs exceeding 2.5cm but not exceeding 5.cm in length Thickness of metal to be welded
exceeding 20mm but not exceeding 25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.04 7.68
Rs.7.68
Sundry
1 Sundry 1 Re Rs. 9.00 0.6 5.4
Rs.5.40
After rounding off: Rs.15.40 Total Amount of M and L Rs.13.08
Add 17.5 % OH and CP Rs.2.29
Total Rs.15.37

1132 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10087.01
Anodised aluminium frame for doors, windows, ventilators with one or more rebates including joining cleat for
fixing etc. complete all as specified Supplied and fixed.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anodised Aluminium frames for doors dully fabricated 1 Kg Rs. 155.00 1 155
Rs.155.00
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.05 11.25
2 Mazdoor man 1 Day Rs. 169.00 0.11 18.59
3 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.06 11.52
Rs.41.36
Sundry
1 Sundry 1 Re Rs. 9.00 0.26 2.34
Rs.2.34
After rounding off: Rs.233.50 Total Amount of M and L Rs.198.70
Add 17.5 % OH and CP Rs.34.77
Total Rs.233.47

ITEM No. 10087.02


Anodised aluminium frame for doors, windows, ventilators with one or more rebates including joining cleat for
fixing etc. complete all as specified Fixing only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.06 11.52
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.05 11.25
3 Mazdoor man 1 Day Rs. 169.00 0.11 18.59
Rs.41.36
Sundry
1 Sundry 1 Re Rs. 9.00 0.269 2.421
Rs.2.42
After rounding off: Rs.51.40 Total Amount of M and L Rs.43.78
Add 17.5 % OH and CP Rs.7.66
Total Rs.51.44

ITEM No. 10088.01


Add extra for powder coating to item 10088(minimum thickness of powder coating 50 micron)
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Difference between powder coating and anodised aluminum section Kg Rs. 13.60 1 13.6
Rs.13.60
After rounding off: Rs.16.00 Total Amount of M and L Rs.13.60
Add 17.5 % OH and CP Rs.2.38
Total Rs.15.98

1133 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10089.01
Anodised aluminium door shutters, aluminium section weighing not less than 0.55kg/m including necessary
joining cleats, glazing clips, rubber/neoprene packing, handles 2 No's in each door, hinges, anodised aluminium
snap beading, screws etc. complete all
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Rubber packing 1 Rs. 10.00 8 80
2 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 50.00 1.5 75
anodized, type B-21 size 100mm
3 CAST ALU Handle cast T 125mm 1 No. Rs. 22.00 1 22
4 Anodised aluminium section for door 1 Kg Rs. 160.00 2.51 401.6
5 Aluminium snap beading Rs. 15.00 8 120
Rs.698.60
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.27 45.63
2 Stone mason(225) 1 Day Rs. 225.00 0.27 60.75
3 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.5 112.5
Rs.218.88
Sundry
1 Sundries 1 Re Rs. 9.00 0.62 5.58
Rs.5.58
After rounding off: Rs.1,084.60 Total Amount of M and L Rs.923.06
Add 17.5 % OH and CP Rs.161.54
Total Rs.1,084.60

ITEM No. 10089.02


Anodised aluminium door shutters, aluminium section weighing not less than 0.55kg/m including necessary
joining cleats, glazing clips, rubber/neoprene packing, handles 2 No's in each door, hinges, anodised aluminium
snap beading, screws etc. complete all
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.15 25.35
2 Mason (Stone mason) 1 Day Rs. 225.00 0.05 11.25
3 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
Rs.81.60
After rounding off: Rs.95.90 Total Amount of M and L Rs.81.60
Add 17.5 % OH and CP Rs.14.28
Total Rs.95.88

1134 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10090.01
Anodised aluminium window and ventilator shutters, fixed type without sash bar, aluminium section weighing
0.55kg/m including necessary joining cleats, glazing clips, rubber packing, anodised aluminium snap beading,
screws etc. complete all as specified.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anodised aluminium section for door 1 Kg Rs. 160.00 2.51 401.6
2 Rubber packing 1 Rs. 10.00 8 80
3 Aluminium snap beading Rs. 15.00 8 120
Rs.601.60
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.57 128.25
2 Mason (Stone mason) 1 Day Rs. 225.00 0.25 56.25
3 Mazdoor-man, 1 Day Rs. 169.00 0.25 42.25
Rs.226.75
Sundry
1 Sundries 1 Re Rs. 9.00 0.61 5.49
Rs.5.49
After rounding off: Rs.979.80 Total Amount of M and L Rs.833.84
Add 17.5 % OH and CP Rs.145.92
Total Rs.979.76

ITEM No. 10090.02


Anodised aluminium window and ventilator shutters, fixed type without sash bar, aluminium section weighing
0.55kg/m including necessary joining cleats, glazing clips, rubber packing, anodised aluminium snap beading,
screws etc. complete all as specified.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Stone mason(225) 1 Day Rs. 225.00 0.105 23.625
2 Mazdoor man 1 Day Rs. 169.00 0.15 25.35
3 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
Rs.93.98
After rounding off: Rs.110.40 Total Amount of M and L Rs.93.98
Add 17.5 % OH and CP Rs.16.45
Total Rs.110.42

1135 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10091.01
Anodised aluminium window and ventilator shutters, side hung type without sash bars, aluminium sections
weighing 0.55kg/m including necessary joining cleats, glazing clips, bubber packing, anodised aluminium snap
beading, screws anodised aluminium fitting
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anodised aluminium section for door 1 Kg Rs. 160.00 2.51 401.6
2 Aluminium snap beading Rs. 15.00 8 120
3 Butt hinges extruded aluminium alloy with galvanized MS hinge pin 1 No. Rs. 50.00 0.5 25
anodized, type B-21 size 100mm
4 CAST ALU Handle cast T 125mm 1 No. Rs. 22.00 2.77 60.94
5 Rubber packing 1 Rs. 10.00 8 80
Rs.687.54
Labour
1 Stone mason(225) 1 Day Rs. 225.00 0.28 63
2 Mazdoor-man, 1 Day Rs. 169.00 0.3 50.7
3 Fitter (Stractural or pipe) 1 Day Rs. 192.00 0.69 132.48
Rs.246.18
Sundry
1 Sundries 1 Re Rs. 9.00 0.32 2.88
Rs.2.88
After rounding off: Rs.1,100.50 Total Amount of M and L Rs.936.60
Add 17.5 % OH and CP Rs.163.91
Total Rs.1,100.51

ITEM No. 10091.02


Anodised aluminium window and ventilator shutters, side hung type without sash bars, aluminium sections
weighing 0.55kg/m including necessary joining cleats, glazing clips, bubber packing, anodised aluminium snap
beading, screws anodised aluminium fitting
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.15 25.35
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
3 Stone mason(225) 1 Day Rs. 225.00 0.105 23.625
Rs.93.98
After rounding off: Rs.110.40 Total Amount of M and L Rs.93.98
Add 17.5 % OH and CP Rs.16.45
Total Rs.110.42

ITEM No. 10092


Add extra for powder coating to item no. 10089 to10091for powder coating of any colour (Thickness or
powder coating not less than 50 micron).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Difference between powder coating and anodised aluminum section Kg Rs. 13.60 1.93 26.248
Rs.26.25
After rounding off: Rs.30.80 Total Amount of M and L Rs.26.25
Add 17.5 % OH and CP Rs.4.59
Total Rs.30.84

1136 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10093.01
Anodised aluminium snap grid frame work for false ceiling all as specified Supplied and fixed size of grid 605 x
605 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Anodised Aluminium section for snap grid 1 Day Rs. 155.00 1.1 170.5
2 MS flat, round and square bar Fe-330 1 Kg Rs. 35.00 0.2 7
Rs.177.50
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.1 16.9
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.1 22.5
Rs.39.40
Sundry
1 Sundry 1 Re Rs. 9.00 0.67 6.03
Rs.6.03
After rounding off: Rs.261.90 Total Amount of M and L Rs.222.93
Add 17.5 % OH and CP Rs.39.01
Total Rs.261.94

ITEM No. 10093.02


Anodised aluminium snap grid frame work for false ceiling all as specified Fixing only size of grid 605 x 605 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.1 22.5
2 Mazdoor man 1 Day Rs. 169.00 0.1 16.9
Rs.39.40
Sundry
1 Sundry 1 Re Rs. 9.00 0.66 5.94
Rs.5.94
After rounding off: Rs.53.30 Total Amount of M and L Rs.45.34
Add 17.5 % OH and CP Rs.7.93
Total Rs.53.27

1137 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10094.01
GI frame work for seamless ceiling comprising of GI perimeter channnel 0.55 mm thick with two unequal
flanges of 20 and 30 mmand web of 27 mm fixed to surrounding wall using nylon sleeves and screws at 450
mm centre to centre,intermediate channel 0.9 mm thick having two equal flanges of 15 mm each and web of
45 mm suspended fromsoffit at approx 900 mm centre to centre with Gl cleat and steel expansion fasteners
with and including ceiling section (not exc 1.2 m length) of 0.55 mm thickness having kurled web of 50 mm and
flange of 26 mm each with lips of 10.5 mm fixed to the intermediate channel with connecting clips across the
intermediate channel at 457 mm centre to centre.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Intermediate chanel GI 0.9mm thick web of 45mm flanges of 15mm 1 Kg Rs. 70.00 0.3 21
each
2 Perimeter channel GI 0.55mm th 27 mm web flanges of 20 and 30mm 1 Kg Rs. 70.00 0.1 7
3 Connecting clip 1 No. Rs. 3.00 1.5 4.5
4 Rawl plug 1 No. Rs. 1.00 1 1
5 Soffit cleat GI 1 Kg Rs. 70.00 0.2 14
6 Ceiling section GI 0.55mm th. Web 50mm flange of 26mm 1 Kg Rs. 70.00 0.7 49
7 Ceiling angle GI 1 Kg Rs. 70.00 0.1 7
Rs.103.50
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.25 42.25
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.25 56.25
Rs.98.50
After rounding off: Rs.237.40 Total Amount of M and L Rs.202.00
Add 17.5 % OH and CP Rs.35.35
Total Rs.237.35

ITEM No. 10095.01


Hangers 6 mm dia. G.I. (upto 1200mm length) adjusting level fixed to roof slabs by means of ceiling cleats
made out of G.I. flat 40x3mm size 60mm long and expansion hold fasteners 12.5 mm dia. 40mm long complete
as per direction of Engineer -in-charge.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Dash fastener 12.5mm dia 40mm long 1 No. Rs. 20.00 1 20
2 Hanger 6mm dia GI adjustable 1 No. Rs. 25.00 1 25
3 GI flat 40x3mm 60mm long 1 Kg Rs. 70.00 0.06 4.2
Rs.49.20
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.03 6.75
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
Rs.11.82
After rounding off: Rs.71.70 Total Amount of M and L Rs.61.02
Add 17.5 % OH and CP Rs.10.68
Total Rs.71.70

1138 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10096.01
Holes drilled upto 12 mm dia (and countersunk, if required ) Depth of hole exceeding 3 but no exceeding 12
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.087 19.575
2 Mazdoor man 1 Day Rs. 169.00 0.087 14.703
Rs.34.28
After rounding off: Rs.40.30 Total Amount of M and L Rs.34.28
Add 17.5 % OH and CP Rs.6.00
Total Rs.40.28

ITEM No. 10096.02


Holes drilled upto 12 mm dia (and countersunk, if required ) Depth of hole exceeding 12 but no exceeding 25
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.2 45
2 Mazdoor man 1 Day Rs. 169.00 0.2 33.8
Rs.78.80
After rounding off: Rs.92.60 Total Amount of M and L Rs.78.80
Add 17.5 % OH and CP Rs.13.79
Total Rs.92.59

ITEM No. 10096.03


Holes drilled upto 12 mm dia (and countersunk, if required ) Depth of hole exceeding 25 but no exceeding 40
mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.3 50.7
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.3 67.5
Rs.118.20
After rounding off: Rs.138.90 Total Amount of M and L Rs.118.20
Add 17.5 % OH and CP Rs.20.69
Total Rs.138.89

ITEM No. 10097.01


Holes drilled exc 12 mm & n exc 25mm dia (and countersunk, if required ) Depth of hole exceeding 3 but no
exceeding 12 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.14 31.5
2 Mazdoor man 1 Day Rs. 169.00 0.14 23.66
Rs.55.16
After rounding off: Rs.64.80 Total Amount of M and L Rs.55.16
Add 17.5 % OH and CP Rs.9.65
Total Rs.64.81

1139 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10097.02
Holes drilled exc 12 mm & n exc 25mm dia (and countersunk, if required ) Depth of hole exceeding 12 but no
exceeding 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.325 73.125
2 Mazdoor man 1 Day Rs. 169.00 0.325 54.925
Rs.128.05
After rounding off: Rs.150.50 Total Amount of M and L Rs.128.05
Add 17.5 % OH and CP Rs.22.41
Total Rs.150.46

ITEM No. 10097.03


Holes drilled exc 12 mm & n exc 25mm dia (and countersunk, if required ) Depth of hole exceeding 25 but no
exceeding 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.5 84.5
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.5 112.5
Rs.197.00
After rounding off: Rs.231.50 Total Amount of M and L Rs.197.00
Add 17.5 % OH and CP Rs.34.48
Total Rs.231.48

ITEM No. 10098.01


Holes drilled exc 25 mm & n exc 40mm dia (and countersunk, if required ) Depth of hole exceeding 3 but no
exceeding 12 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.23 38.87
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.23 51.75
Rs.90.62
After rounding off: Rs.106.50 Total Amount of M and L Rs.90.62
Add 17.5 % OH and CP Rs.15.86
Total Rs.106.48

ITEM No. 10098.02


Holes drilled exc 25 mm & n exc 40mm dia (and countersunk, if required ) Depth of hole exceeding 12 but no
exceeding 25 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.5 84.5
2 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.5 112.5
Rs.197.00
After rounding off: Rs.231.50 Total Amount of M and L Rs.197.00
Add 17.5 % OH and CP Rs.34.48
Total Rs.231.48

1140 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10098.03
Holes drilled exc 25 mm & n exc 40mm dia (and countersunk, if required ) Depth of hole exceeding 20 but no
exceeding 40 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Fitter (Sturctural or pipe)225 1 Day Rs. 225.00 0.8 180
2 Mazdoor man 1 Day Rs. 169.00 0.8 135.2
Rs.315.20
After rounding off: Rs.370.40 Total Amount of M and L Rs.315.20
Add 17.5 % OH and CP Rs.55.16
Total Rs.370.36

ITEM No. 10100


Holes for nails or screws, hand punched through iron or mild steel (0.63 to 1.60 mm thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.02 3.84
Rs.3.84
After rounding off: Rs.4.50 Total Amount of M and L Rs.3.84
Add 17.5 % OH and CP Rs.0.67
Total Rs.4.51

ITEM No. 10101


Holes for rivets or bolts through iron or mild steel not exceeding 6mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.063 12.096
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.063 12.096
Rs.24.19
After rounding off: Rs.28.40 Total Amount of M and L Rs.24.19
Add 17.5 % OH and CP Rs.4.23
Total Rs.28.43

ITEM No. 10102


Add to last if holes reamered.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.02 3.84
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.02 3.84
Rs.7.68
After rounding off: Rs.9.00 Total Amount of M and L Rs.7.68
Add 17.5 % OH and CP Rs.1.34
Total Rs.9.02

1141 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10103.01
Straight, raking or circular cutting on iron or steel, as in straight or splay cuts, notches, rounded angles,etc.
(length or girth of cutting exceeding 75mm)Width of cut upto 10mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.21 40.32
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.41 78.72
Rs.119.04
After rounding off: Rs.139.90 Total Amount of M and L Rs.119.04
Add 17.5 % OH and CP Rs.20.83
Total Rs.139.87

ITEM No. 10103.02


Straight, raking or circular cutting on iron or steel, as in straight or splay cuts, notches, rounded angles,etc.
(length or girth of cutting exceeding 75mm)Width of cut exceeding 10mm but not exceeding 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.41 78.72
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.81 155.52
Rs.234.24
After rounding off: Rs.275.20 Total Amount of M and L Rs.234.24
Add 17.5 % OH and CP Rs.40.99
Total Rs.275.23

ITEM No. 10104.01


Straight, raking, or circular cutting on iron or steel, as in straight or splay cuts, notches, rounded angles, etc. (
length or girth of cutting n exc 75mm ) Width of cut upto 10mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Hammermen 1 Day Rs. 192.00 0.02 3.84
2 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.04 7.68
Rs.11.52
After rounding off: Rs.13.50 Total Amount of M and L Rs.11.52
Add 17.5 % OH and CP Rs.2.02
Total Rs.13.54

ITEM No. 10104.02


Straight, raking, or circular cutting on iron or steel, as in straight or splay cuts, notches, rounded angles, etc. (
length or girth of cutting n exc 75mm ) Width of cut exceeding 10mm but not exceeding 20 mm.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 0.08 15.36
2 Hammermen 1 Day Rs. 192.00 0.04 7.68
Rs.23.04
After rounding off: Rs.27.10 Total Amount of M and L Rs.23.04
Add 17.5 % OH and CP Rs.4.03
Total Rs.27.07

1142 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10105
Fitting in repairs, any of the following parts of grates, ranges etc. supplied by M.D. including drilling out old
bolts or set screws, if required Set or front bars ; bottom grating ; pairs or iron fire cheeks ; outer door ;
furnace door ; sets of bulls eeyes with seatings; damper rods; soot doors; smoke boxes; register plates; falling
doors; and any other standard component of grates or ranges used for cooking
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith/tinsmith(192) 1 Day Rs. 192.00 1.5 288
2 Mazdoor man 1 Day Rs. 169.00 1.5 253.5
Rs.541.50
After rounding off: Rs.636.30 Total Amount of M and L Rs.541.50
Add 17.5 % OH and CP Rs.94.76
Total Rs.636.26

ITEM No. 10106


Cast iron, grade FG- 150 suitable for casting.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 CI, Gde 150 for casting 1 Kg Rs. 42.22 1 42.22
Rs.42.22
After rounding off: Rs.49.60 Total Amount of M and L Rs.42.22
Add 17.5 % OH and CP Rs.7.39
Total Rs.49.61

ITEM No. 10107.01


Mild steel in flat, round or square bars, in available length Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS in flat, round or square bar Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1 36
Rs.36.00
After rounding off: Rs.42.30 Total Amount of M and L Rs.36.00
Add 17.5 % OH and CP Rs.6.30
Total Rs.42.30

ITEM No. 10107.02


Mild steel in flat, round or square bars, in available length Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar Fe-330 1 Kg Rs. 35.00 1 35
Rs.35.00
After rounding off: Rs.41.10 Total Amount of M and L Rs.35.00
Add 17.5 % OH and CP Rs.6.13
Total Rs.41.13

1143 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10107.03
Mild steel in flat, round or square bars, in available length Fe - 410-W (Gde-E-250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS flat, round and square bar Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 36.00 1 36
Rs.36.00
After rounding off: Rs.42.30 Total Amount of M and L Rs.36.00
Add 17.5 % OH and CP Rs.6.30
Total Rs.42.30

ITEM No. 10108.01


Structural steel, rolled section such as joist, beam, channel, angle, tee, in available lengths Fe - 410-W (Gde-E-
250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam cha Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 36.00 1 36
Rs.36.00
After rounding off: Rs.42.30 Total Amount of M and L Rs.36.00
Add 17.5 % OH and CP Rs.6.30
Total Rs.42.30

ITEM No. 10108.02


Structural steel, rolled section such as joist, beam, channel, angle, tee, in available lengths Fe -290 ( Gde-E-165
).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam che Fe-330 1 Kg Rs. 35.00 1 35
Rs.35.00
After rounding off: Rs.41.10 Total Amount of M and L Rs.35.00
Add 17.5 % OH and CP Rs.6.13
Total Rs.41.13

ITEM No. 10108.03


Structural steel, rolled section such as joist, beam, channel, angle, tee, in available lengths Fe - 410-W (Gde-E-
250) quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 STR ST RLD SEC beam ch Fe - 410-W (Gde-E-250) quality "B" 1 Kg Rs. 37.00 0.9993 36.9741
Rs.36.97
After rounding off: Rs.43.40 Total Amount of M and L Rs.36.97
Add 17.5 % OH and CP Rs.6.47
Total Rs.43.44

1144 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10109.01
Mild steel plates, plain or chequered, 5mm thick or over in thickness in available sizes Fe - 410-W (Gde-E-250)
quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.00 1 41
quality "A"
Rs.41.00
After rounding off: Rs.48.20 Total Amount of M and L Rs.41.00
Add 17.5 % OH and CP Rs.7.18
Total Rs.48.18

ITEM No. 10109.02


Mild steel plates, plain or chequered, 5mm thick or over in thickness in available sizes Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 290 (Gde-E-165) 1 Kg Rs. 41.99 1 41.99
Rs.41.99
After rounding off: Rs.49.30 Total Amount of M and L Rs.41.99
Add 17.5 % OH and CP Rs.7.35
Total Rs.49.34

ITEM No. 10109.03


Mild steel plates, plain or chequered, 5mm thick or over in thickness in available sizes Fe - 410-W (Gde-E-250)
quality "B".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS plate PL or chequed over 5mm thick Fe - 410-W (Gde-E-250) 1 Kg Rs. 41.99 1 41.99
quality "B"
Rs.41.99
After rounding off: Rs.49.30 Total Amount of M and L Rs.41.99
Add 17.5 % OH and CP Rs.7.35
Total Rs.49.34

ITEM No. 10110.01


Bars for reinforcement in available lengths Mild steel round bars Fe - 410-W (Gde-E-250) quality "A".
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Mild steel round bars Fe - 410-W (Gde-E-250) quality "A" 1 Kg Rs. 34.50 1 34.5
Rs.34.50
After rounding off: Rs.40.50 Total Amount of M and L Rs.34.50
Add 17.5 % OH and CP Rs.6.04
Total Rs.40.54

1145 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10110.02
Bars for reinforcement in available lengths Mild steel round bars Fe -290 ( Gde-E-165 ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS BAR for reinf Fe - 410-W (Gde-E-250) or Fe -290 ( Gde-E-165 ) 1 Kg Rs. 34.50 1 34.5
Rs.34.50
After rounding off: Rs.40.50 Total Amount of M and L Rs.34.50
Add 17.5 % OH and CP Rs.6.04
Total Rs.40.54

ITEM No. 10110.03


Bars for reinforcement in available lengths Mild steel round bars IS-432 Gde 1.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 MS BAR for reinf Fe - 410-W (Gde-E-250)quality"B" 1 Kg Rs. 34.50 1 34.5
Rs.34.50
After rounding off: Rs.40.50 Total Amount of M and L Rs.34.50
Add 17.5 % OH and CP Rs.6.04
Total Rs.40.54

ITEM No. 10110.04


Bars for reinforcement in available lengths Deformed or twisted steel bars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Deformed twisted ST BARS 1 Kg Rs. 34.50 1 34.5
Rs.34.50
After rounding off: Rs.40.50 Total Amount of M and L Rs.34.50
Add 17.5 % OH and CP Rs.6.04
Total Rs.40.54

ITEM No. 10110.05


Bars for reinforcement in available lengths TMT bars.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 TMT bars 1 Kg Rs. 35.00 1 35
Rs.35.00
After rounding off: Rs.41.10 Total Amount of M and L Rs.35.00
Add 17.5 % OH and CP Rs.6.13
Total Rs.41.13

ITEM No. 10111


Plain or corrugated steel sheets, any thickness in available sizes, black.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 1 40
Rs.40.00
After rounding off: Rs.47.00 Total Amount of M and L Rs.40.00
Add 17.5 % OH and CP Rs.7.00
Total Rs.47.00

1146 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10112
Plain or corrugated steel sheets, any thickness in available sizes, but galvanised with grade of zinc coating 275,
0.63mm to 1mm thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GAL steel plain or corrugated 1 Kg Rs. 43.00 1 43
Rs.43.00
After rounding off: Rs.50.50 Total Amount of M and L Rs.43.00
Add 17.5 % OH and CP Rs.7.53
Total Rs.50.53

ITEM No. 10113


Plain or corrugated steel sheets, any thickness in available sizes, , but galvanised with grade of zinc coating
350, 0.63mm to 1mm thickness.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GAL steel plain or corrugated with zinc coating 1 Kg Rs. 46.00 1 46
Rs.46.00
After rounding off: Rs.54.00 Total Amount of M and L Rs.46.00
Add 17.5 % OH and CP Rs.8.05
Total Rs.54.05

ITEM No. 10114.01


Mild steel soft drawn binding or typing wire, annealed Diameter 0.90mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 1 48
Rs.48.00
After rounding off: Rs.56.40 Total Amount of M and L Rs.48.00
Add 17.5 % OH and CP Rs.8.40
Total Rs.56.40

ITEM No. 10114.02


Mild steel soft drawn binding or typing wire, annealed Diameter 1.00mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Binding wire 0.9/1.00mm dia 1 Kg Rs. 48.00 1 48
Rs.48.00
After rounding off: Rs.56.40 Total Amount of M and L Rs.48.00
Add 17.5 % OH and CP Rs.8.40
Total Rs.56.40

1147 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10115.01
Galvanised mild steel plain wire Diameter 0.90mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 0.9mm dia 1 Kg Rs. 54.00 1 54
Rs.54.00
After rounding off: Rs.63.40 Total Amount of M and L Rs.54.00
Add 17.5 % OH and CP Rs.9.45
Total Rs.63.45

ITEM No. 10115.02


Galvanised mild steel plain wire Diameter 1.25mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 1.25mm dia 1 Kg Rs. 53.00 1 53
Rs.53.00
After rounding off: Rs.62.30 Total Amount of M and L Rs.53.00
Add 17.5 % OH and CP Rs.9.28
Total Rs.62.28

ITEM No. 10115.03


Galvanised mild steel plain wire Diameter 1.60mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 1.60mm dia 1 Kg Rs. 53.00 1 53
Rs.53.00
After rounding off: Rs.62.30 Total Amount of M and L Rs.53.00
Add 17.5 % OH and CP Rs.9.28
Total Rs.62.28

ITEM No. 10115.04


Galvanised mild steel plain wire Diameter 2.00mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 2.00mm dia 1 Kg Rs. 53.00 1 53
Rs.53.00
After rounding off: Rs.62.30 Total Amount of M and L Rs.53.00
Add 17.5 % OH and CP Rs.9.28
Total Rs.62.28

ITEM No. 10115.05


Galvanised mild steel plain wire Diameter 2.50mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 2.50mm dia 1 Kg Rs. 53.00 1 53
Rs.53.00
After rounding off: Rs.62.30 Total Amount of M and L Rs.53.00
Add 17.5 % OH and CP Rs.9.28
Total Rs.62.28

1148 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10115.06
Galvanised mild steel plain wire Diameter 3.15mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 3.15mm dia 1 Kg Rs. 53.00 1 53
Rs.53.00
After rounding off: Rs.62.30 Total Amount of M and L Rs.53.00
Add 17.5 % OH and CP Rs.9.28
Total Rs.62.28

ITEM No. 10115.07


Galvanised mild steel plain wire Diameter 4.00mm.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 galvd MS wire 4.00mm dia 1 Kg Rs. 53.00 1 53
Rs.53.00
After rounding off: Rs.62.30 Total Amount of M and L Rs.53.00
Add 17.5 % OH and CP Rs.9.28
Total Rs.62.28

ITEM No. 10116.01


Expanded metal in available size Weight per square metre not exceeding 4 kg.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Expanded Metal not exceeding 4/SQM 1 Kg Rs. 45.00 1 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 10116.02


Expanded metal in available size Weight per square metre exceeding 4 kg.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Expanded Metal exceeding 4/SQM 1 Kg Rs. 44.00 1 44
Rs.44.00
After rounding off: Rs.51.70 Total Amount of M and L Rs.44.00
Add 17.5 % OH and CP Rs.7.70
Total Rs.51.70

ITEM No. 10117.01


Hard drawn steel wire fabric in available size Weight per square metre not exceeding 4 kg.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hard DR ST wire fab re not exc. 4Kg 1 Kg Rs. 45.00 1 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

1149 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10117.02
Hard drawn steel wire fabric in available size Weight per square metre exceeding 4 kg.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Hard DR ST wire fab re exc. 4Kg 1 Kg Rs. 44.00 1 44
Rs.44.00
After rounding off: Rs.51.70 Total Amount of M and L Rs.44.00
Add 17.5 % OH and CP Rs.7.70
Total Rs.51.70

ITEM No. 10118.01


Welded steel wire fabric Weight per square metre not exceeding 4 kg.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Welded ST wire fab not exceeding 4Kg 1 Kg Rs. 46.00 1 46
Rs.46.00
After rounding off: Rs.54.00 Total Amount of M and L Rs.46.00
Add 17.5 % OH and CP Rs.8.05
Total Rs.54.05

ITEM No. 10118.02


Welded steel wire fabric Weight per square metre exceeding 4 kg.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Welded ST wire fab exceeding 4Kg 1 Kg Rs. 45.00 1 45
Rs.45.00
After rounding off: Rs.52.90 Total Amount of M and L Rs.45.00
Add 17.5 % OH and CP Rs.7.88
Total Rs.52.88

ITEM No. 10119


Chain link M.S. galvanised fencing, any size or type.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Chain link M.S galvanised fencing, any size or type 1 Kg Rs. 57.00 1 57
Rs.57.00
After rounding off: Rs.67.00 Total Amount of M and L Rs.57.00
Add 17.5 % OH and CP Rs.9.98
Total Rs.66.98

ITEM No. 10120


Barbed wire, galvanised, 2 standard, 2.24 mm dia barbed at 75 mm spacing.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Galved Steel barbed wire to st. 2.24 mm dia barbed 75mm spacing 1 Kg Rs. 53.00 1 53
Rs.53.00
After rounding off: Rs.62.30 Total Amount of M and L Rs.53.00
Add 17.5 % OH and CP Rs.9.28
Total Rs.62.28

1150 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Steel ,Aluminium and Iron Work
ITEM No. 10121
ERW or Induction butt weld M.S. tube black conforming to IS 1661-1979 grade Yst 240.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Erw Induction butt weld M.S.Tube Black conforming to IS 1161-1979 1 Kg Rs. 54.00 1.001 54.054
grade Ist 240
Rs.54.05
After rounding off: Rs.63.50 Total Amount of M and L Rs.54.05
Add 17.5 % OH and CP Rs.9.46
Total Rs.63.51

1151 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11001.01
Black coorugated mild steel sheeting with two corrugation side lap, fixed with coach screws and washer in roof
walls etc, S & F 0.63mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Corrugated or plain steel sheet black 0.63 mm thick 1 Kg Rs. 40.00 6.472 258.88
2 GI screw 6 mm dia 65 to 75 mm long 100 No. Rs. 60.00 0.02 1.2
3 Embossed curved GI washer 100 No. Rs. 70.00 0.02 1.4
Rs.261.48
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.08 15.36
2 Mazdoor man 1 Day Rs. 169.00 0.079 13.351
Rs.28.71
After rounding off: Rs.341.00 Total Amount of M and L Rs.290.19
Add 17.5 % OH and CP Rs.50.78
Total Rs.340.97

ITEM No. 11001.02


Black coorugated mild steel sheeting with two corrugation side lap, fixed with coach screws and washer in roof
walls etc, S & F 0.80mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Embossed curved GI washer 100 No. Rs. 70.00 0.02 1.4
2 GI screw 6 mm dia 65 to 75 mm long 100 No. Rs. 60.00 0.02 1.2
3 Corrugated or plain steel sheet black 0.80 mm thick 1 Kg Rs. 40.00 8.024 320.96
Rs.323.56
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.414.50 Total Amount of M and L Rs.352.80
Add 17.5 % OH and CP Rs.61.74
Total Rs.414.54

1152 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11001.03
Black coorugated mild steel sheeting with two corrugation side lap, fixed with coach screws and washer in roof
walls etc, Except sheeting (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Embossed curved GI washer 100 No. Rs. 70.00 0.02 1.4
2 GI screw 6 mm dia 65 to 75 mm long 100 No. Rs. 60.00 0.02 1.2
Rs.2.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.37.40 Total Amount of M and L Rs.31.84
Add 17.5 % OH and CP Rs.5.57
Total Rs.37.41

ITEM No. 11001.04


Black coorugated mild steel sheeting with two corrugation side lap, fixed with coach screws and washer in roof
walls etc, Labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.34.40 Total Amount of M and L Rs.29.24
Add 17.5 % OH and CP Rs.5.12
Total Rs.34.36

ITEM No. 11002.01


Galvanised, corrugated mild steel sheeting with two corrugation side lap, fixed with coach screws and washers,
in roofs, walls etc, with grade of zinc coating 275, 0.63 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI screw 6 mm dia 65 to 75 mm long 100 No. Rs. 60.00 0.02 1.2
2 Galvanized corrugated mild steel sheet with grade of zinc coating 275, 1 Kg Rs. 43.00 7.022 301.946
0.63 mm to 1.00mm thick
3 Embossed curved GI washer 100 No. Rs. 70.00 0.02 1.4
Rs.304.55
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
Rs.29.24
After rounding off: Rs.392.20 Total Amount of M and L Rs.333.79
Add 17.5 % OH and CP Rs.58.41
Total Rs.392.20

1153 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11002.02
Galvanised, corrugated mild steel sheeting with two corrugation side lap, fixed with coach screws and washers,
in roofs, walls etc, with grade of zinc coating 275,- 0.80 mm thick.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Embossed curved GI washer 100 No. Rs. 70.00 0.02 1.4
2 GI screw 6 mm dia 65 to 75 mm long 100 No. Rs. 60.00 0.02 1.2
3 Galvanized corrugated mild steel sheet with grade of zinc 1 Kg Rs. 43.00 8.399 361.157
coating275,0.80mm to 1.00mm th
Rs.363.76
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.461.80 Total Amount of M and L Rs.393.00
Add 17.5 % OH and CP Rs.68.77
Total Rs.461.77

ITEM No. 11002.03


Galvanised, corrugated mild steel sheeting with two corrugation side lap, fixed with coach screws and washers,
in roofs, walls etc, with grade of zinc coating 275,except sheeting (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI screw 6 mm dia 65 to 75 mm long 100 No. Rs. 60.00 0.02 1.2
2 Embossed curved GI washer 100 No. Rs. 70.00 0.02 1.4
Rs.2.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.37.40 Total Amount of M and L Rs.31.84
Add 17.5 % OH and CP Rs.5.57
Total Rs.37.41

ITEM No. 11002.04


Galvanised, corrugated mild steel sheeting with two corrugation side lap, fixed with coach screws and washers,
in roofs, walls etc, with grade of zinc coating 275, labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
Rs.29.24
After rounding off: Rs.34.40 Total Amount of M and L Rs.29.24
Add 17.5 % OH and CP Rs.5.12
Total Rs.34.36

1154 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11003.01
Add to item 11001&11002 if fixed with L-type or J-type or cranked hook bolts in lieu of screws for 0.63mm
thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 L' or 'J' hook GI bolt 8 mm dia 125 to 200 mm long 100 No. Rs. 400.00 0.01 4
Rs.4.00
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.7.22
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.22
Add 17.5 % OH and CP Rs.1.96
Total Rs.13.18

ITEM No. 11003.02


Add to item 11001&11002 if fixed with L-type or J-type or cranked hook bolts in lieu of screws for 0.80mm
thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 L' or 'J' hook GI bolt 8 mm dia 125 to 200 mm long 100 No. Rs. 400.00 0.01 4
Rs.4.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
Rs.7.22
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.22
Add 17.5 % OH and CP Rs.1.96
Total Rs.13.18

ITEM No. 11003.03


Add to item 11001&11002 if fixed with L-type or J-type or cranked hook bolts in lieu of screws Except sheeting
(any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 L' or 'J' hook GI bolt 8 mm dia 125 to 200 mm long 100 No. Rs. 400.00 0.01 4
Rs.4.00
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.7.22
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.22
Add 17.5 % OH and CP Rs.1.96
Total Rs.13.18

1155 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11003.04
Add to item 11001&11002 if fixed with L-type or J-type or cranked hook bolts in lieu of screws, Labour only
(any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.7.22
After rounding off: Rs.8.50 Total Amount of M and L Rs.7.22
Add 17.5 % OH and CP Rs.1.26
Total Rs.8.48

ITEM No. 11004.01


Add to item 11001&11002 if bent to a curve (of any radius) 0.63mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.068 13.056
2 Mazdoor man 1 Day Rs. 169.00 0.068 11.492
Rs.24.55
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.45 4.05
Rs.4.05
After rounding off: Rs.33.60 Total Amount of M and L Rs.28.60
Add 17.5 % OH and CP Rs.5.00
Total Rs.33.60

ITEM No. 11004.02


Add to item 11001&11002 if bent to a curve (of any radius) 0.80mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.074 14.208
2 Mazdoor man 1 Day Rs. 169.00 0.074 12.506
Rs.26.71
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.45 4.05
Rs.4.05
After rounding off: Rs.36.10 Total Amount of M and L Rs.30.76
Add 17.5 % OH and CP Rs.5.38
Total Rs.36.15

1156 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11004.03
Add to item 11001&11002 if bent to a curve (of any radius) Except sheeting (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.071 13.632
2 Mazdoor man 1 Day Rs. 169.00 0.071 11.999
Rs.25.63
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.45 4.05
Rs.4.05
After rounding off: Rs.34.90 Total Amount of M and L Rs.29.68
Add 17.5 % OH and CP Rs.5.19
Total Rs.34.88

ITEM No. 11005.01


Add to mild steel sheeting any thickness if the side laps are riveted or bolted at 20cm centres, M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Embossed curved GI washer 100 No. Rs. 70.00 0.07 4.9
Rs.4.90
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.7.22
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.15.80 Total Amount of M and L Rs.13.47
Add 17.5 % OH and CP Rs.2.36
Total Rs.15.83

ITEM No. 11005.02


Add to mild steel sheeting any thickness if the side laps are riveted or bolted at 20cm centres, Labour only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.03 5.76
2 Mazdoor man 1 Day Rs. 169.00 0.03 5.07
Rs.10.83
After rounding off: Rs.12.70 Total Amount of M and L Rs.10.83
Add 17.5 % OH and CP Rs.1.90
Total Rs.12.73

1157 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11006.01
Add to mild steel sheeting any thickness if the endlaps are riveted or bolted at each corrugation, M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Embossed curved GI washer 100 No. Rs. 70.00 0.19 13.3
Rs.13.30
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.06 11.52
2 Mazdoor man 1 Day Rs. 169.00 0.06 10.14
Rs.21.66
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.42.70 Total Amount of M and L Rs.36.31
Add 17.5 % OH and CP Rs.6.35
Total Rs.42.66

ITEM No. 11006.02


Add to mild steel sheeting any thickness if the endlaps are riveted or bolted at each corrugation, Labour only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.09 17.28
2 Mazdoor man 1 Day Rs. 169.00 0.09 15.21
Rs.32.49
After rounding off: Rs.38.20 Total Amount of M and L Rs.32.49
Add 17.5 % OH and CP Rs.5.69
Total Rs.38.18

ITEM No. 11007.01


Aluminium corrugated sheeting 0.56mm thick alloy 31000 H4 STUCCO Embossed finish with two corrugation
side lap fixed with coach screw and aluminium washer in roof and wall etc with end laps stitched with 25x6mm
GI bolts @20cm apart, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 Aluminium corrugated sheeting alloy 31000 H4 STUCCO embossed 1 Sqm Rs. 245.00 1.1 269.5
finish 0.56 mm thick
Rs.274.10
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
3 Aluminium washer 1 100 No Rs. 50.00 0.02 1
Rs.30.24
After rounding off: Rs.357.60 Total Amount of M and L Rs.304.34
Add 17.5 % OH and CP Rs.53.26
Total Rs.357.60

1158 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11007.02
Aluminium corrugated sheeting 0.71mm thick alloy 31000 H4 STUCCO Embossed finish with two corrugation
side lap fixed with coach screw and aluminium washer in roof and wall etc with end laps stitched with 25x6mm
GI bolts @20cm apart, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 Aluminium corrugated sheeting alloy 31000 H4 STUCCO embossed 1 Sqm Rs. 310.00 1.1 341
finish but 0.71 mm thick
Rs.345.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
3 Aluminium washer 1 100 No Rs. 50.00 0.02 1
Rs.30.24
After rounding off: Rs.441.60 Total Amount of M and L Rs.375.84
Add 17.5 % OH and CP Rs.65.77
Total Rs.441.61

ITEM No. 11007.03


Aluminium corrugated sheeting alloy 31000 H4 STUCCO Embossed finish with two corrugation side lap fixed
with coach screw and aluminium washer in roof and wall etc with end laps stitched with 25x6mm GI bolts
@20cm apart, Except sheeting (any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.4.60
Labour
1 Aluminium washer 1 100 No Rs. 50.00 0.02 1
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
3 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.30.24
After rounding off: Rs.40.90 Total Amount of M and L Rs.34.84
Add 17.5 % OH and CP Rs.6.10
Total Rs.40.94

ITEM No. 11007.04


Aluminium corrugated sheeting alloy 31000 H4 STUCCO Embossed finish with two corrugation side lap fixed
with coach screw and aluminium washer in roof and wall etc with end laps stitched with 25x6mm GI bolts
@20cm apart, Labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.34.40 Total Amount of M and L Rs.29.24
Add 17.5 % OH and CP Rs.5.12
Total Rs.34.36

1159 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11008.01
Add to itme 11007 if fixed with L-type or J-type or cranked hook bolts in lieu of screws for 0.56mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 L' or 'J' hook GI bolt 8 mm dia 125 to 200 mm long 100 No. Rs. 400.00 0.01 4
Rs.4.00
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
Rs.7.22
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.22
Add 17.5 % OH and CP Rs.1.96
Total Rs.13.18

ITEM No. 11008.02


Add to itme 11007 if fixed with L-type or J-type or cranked hook bolts in lieu of screws for 0.71mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 L' or 'J' hook GI bolt 8 mm dia 125 to 200 mm long 100 No. Rs. 400.00 0.01 4
Rs.4.00
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.7.22
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.22
Add 17.5 % OH and CP Rs.1.96
Total Rs.13.18

ITEM No. 11008.03


Add to itme 11007 if fixed with L-type or J-type or cranked hook bolts in lieu of screws for 0.71mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
Rs.7.22
After rounding off: Rs.8.50 Total Amount of M and L Rs.7.22
Add 17.5 % OH and CP Rs.1.26
Total Rs.8.48

1160 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11008.04
Add to itme 11007 if fixed with L-type or J-type or cranked hook bolts in lieu of screws, Labour only (any
thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 L' or 'J' hook GI bolt 8 mm dia 125 to 200 mm long 100 No. Rs. 400.00 0.01 4
Rs.4.00
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.7.22
After rounding off: Rs.13.20 Total Amount of M and L Rs.11.22
Add 17.5 % OH and CP Rs.1.96
Total Rs.13.18

ITEM No. 11009.01


Fibre glass reinforced translucent corrugated sheeting with two corrugation side lap fixed with coach screw
and washer in roof walls 2mm thickness, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Embossed curved GI washer 100 No. Rs. 70.00 0.02 1.4
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
3 Fibre glass reinforced translucent corrugated sheeting 2 mm thick 1 Sqm Rs. 600.00 1.1 660
Rs.666.00
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.162 31.104
2 Mazdoor man 1 Day Rs. 169.00 0.162 27.378
Rs.58.48
After rounding off: Rs.851.30 Total Amount of M and L Rs.724.48
Add 17.5 % OH and CP Rs.126.78
Total Rs.851.27

ITEM No. 11009.02


Fibre glass reinforced translucent corrugated sheeting with two corrugation side lap fixed with coach screw
and washer in roof walls except sheeting (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Embossed curved GI washer 100 No. Rs. 70.00 0.02 1.4
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.6.00
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.162 31.104
2 Mazdoor man 1 Day Rs. 169.00 0.162 27.378
Rs.58.48
After rounding off: Rs.75.80 Total Amount of M and L Rs.64.48
Add 17.5 % OH and CP Rs.11.28
Total Rs.75.77

1161 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11009.03
Fibre glass reinforced translucent corrugated sheeting with two corrugation side lap fixed with coach screw
and washer in roof walls labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.162 27.378
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.162 31.104
Rs.58.48
After rounding off: Rs.68.70 Total Amount of M and L Rs.58.48
Add 17.5 % OH and CP Rs.10.23
Total Rs.68.72

ITEM No. 11010.01


Add to 11009 if fixed with L- type or J- type or cranked hook bolts in lieu of screw, S&F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 L' or 'J' hook GI bolt 8 mm dia 125 to 200 mm long 100 No. Rs. 400.00 0.02 8
Rs.8.00
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
2 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
Rs.7.22
After rounding off: Rs.17.90 Total Amount of M and L Rs.15.22
Add 17.5 % OH and CP Rs.2.66
Total Rs.17.88

ITEM No. 11010.02


Add to 11009 if fixed with L- type or J- type or cranked hook bolts in lieu of screw,except sheeting (any
thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 L' or 'J' hook GI bolt 8 mm dia 125 to 200 mm long 100 No. Rs. 400.00 0.02 8
Rs.8.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.02 3.38
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
Rs.7.22
After rounding off: Rs.17.90 Total Amount of M and L Rs.15.22
Add 17.5 % OH and CP Rs.2.66
Total Rs.17.88

1162 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11010.03
Add to 11009 if fixed with L- type or J- type or cranked hook bolts in lieu of screw, labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.02 3.38
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.02 3.84
Rs.7.22
After rounding off: Rs.8.50 Total Amount of M and L Rs.7.22
Add 17.5 % OH and CP Rs.1.26
Total Rs.8.48

ITEM No. 11011.01


Plain, black, mild steel sheeting 0.63mm thick in ridges, hips, valley gutters, drip and straight flashing (length
and girth as fixed), S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 White lead 1 Kg Rs. 200.00 0.05 10
3 Plain sheet black 0.63 mm thick 1 Kg Rs. 40.00 5.292 211.68
Rs.226.28
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.300.80 Total Amount of M and L Rs.255.97
Add 17.5 % OH and CP Rs.44.79
Total Rs.300.77

1163 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11011.02
Plain, black, mild steel sheeting 0.80mm thick in ridges, hips, valley gutters, drip and straight flashing (length
and girth as fixed), S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 White lead 1 Kg Rs. 200.00 0.05 10
3 Plain sheet black - 0.80 mm thick 1 Kg Rs. 40.00 6.796 271.84
Rs.286.44
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.371.50 Total Amount of M and L Rs.316.13
Add 17.5 % OH and CP Rs.55.32
Total Rs.371.45

ITEM No. 11011.03


Plain, black, mild steel sheeting 1.00mm thick in ridges, hips, valley gutters, drip and straight flashing (length
and girth as fixed), S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain sheet black 1.00 mm thick 1 Kg Rs. 40.00 8.424 336.96
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
3 White lead 1 Kg Rs. 200.00 0.05 10
Rs.351.56
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.089 15.041
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.089 17.088
Rs.32.13
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.451.40 Total Amount of M and L Rs.384.14
Add 17.5 % OH and CP Rs.67.22
Total Rs.451.36

1164 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11011.04
Plain, black, mild steel sheeting 1.25mm thick in ridges, hips, valley gutters, drip and straight flashing (length
and girth as fixed), S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 Plain sheet black 1.25 mm thick 1 Kg Rs. 40.00 10.524 420.96
3 White lead 1 Kg Rs. 200.00 0.05 10
Rs.435.56
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.089 15.041
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.089 17.088
Rs.32.13
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.550.10 Total Amount of M and L Rs.468.14
Add 17.5 % OH and CP Rs.81.92
Total Rs.550.06

ITEM No. 11011.05


Plain, black, mild steel sheeting in ridges, hips, valley gutters, drip and straight flashing (length and girth as
fixed), Except sheeting (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.14.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.085 16.32
2 Mazdoor man 1 Day Rs. 169.00 0.085 14.365
Rs.30.69
After rounding off: Rs.53.20 Total Amount of M and L Rs.45.29
Add 17.5 % OH and CP Rs.7.92
Total Rs.53.21

ITEM No. 11011.06


Plain, black, mild steel sheeting in ridges, hips, valley gutters, drip and straight flashing (length and girth as
fixed), Labour only (any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.0849 16.3008
2 Mazdoor man 1 Day Rs. 169.00 0.085 14.365
Rs.30.67
After rounding off: Rs.36.00 Total Amount of M and L Rs.30.67
Add 17.5 % OH and CP Rs.5.37
Total Rs.36.03

1165 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11012.01
Plain, galvanised, mild steel sheeting 0.63mm thick in ridges, hips, valley gutters, drip and straight flashing
(length and girth as fixed), with grade of zinc coating 275, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 Galvanized corrugated mild steel sheet with grade of zinc coating 275, 1 Kg Rs. 43.00 5.842 251.206
0.63 mm to 1.00mm thick
3 White lead 1 Kg Rs. 200.00 0.05 10
Rs.265.81
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.346.70 Total Amount of M and L Rs.295.05
Add 17.5 % OH and CP Rs.51.63
Total Rs.346.68

ITEM No. 11012.02


Plain, galvanised, mild steel sheeting 0.63mm thick in ridges, hips, valley gutters, drip and straight flashing
(length and girth as fixed), with grade of zinc coating 0.80 mm thick S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
3 Galvanized corrugated mild steel sheet with grade of zinc coating 275, 1 Kg Rs. 43.00 7.171 308.353
0.63 mm to 1.00mm thick
Rs.322.95
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.413.80 Total Amount of M and L Rs.352.19
Add 17.5 % OH and CP Rs.61.63
Total Rs.413.83

1166 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11012.03
Plain, galvanised, mild steel sheeting 0.63mm thick in ridges, hips, valley gutters, drip and straight flashing
(length and girth as fixed), with grade of zinc coating, 1.00 mm thick S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 Galvanized corrugated mild steel sheet with grade of zinc coating 275, 1 Kg Rs. 43.00 8.799 378.357
0.63 mm to 1.00mm thick
3 White lead 1 Kg Rs. 200.00 0.05 10
Rs.392.96
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
Rs.29.24
After rounding off: Rs.496.10 Total Amount of M and L Rs.422.20
Add 17.5 % OH and CP Rs.73.88
Total Rs.496.08

ITEM No. 11012.05


Plain, galvanised, mild steel sheeting 0.63mm thick in ridges, hips, valley gutters, drip and straight flashing
(length and girth as fixed), with grade of zinc coating, except sheeting (any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.14.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.085 16.32
2 Mazdoor man 1 Day Rs. 169.00 0.085 14.365
Rs.30.69
After rounding off: Rs.53.20 Total Amount of M and L Rs.45.29
Add 17.5 % OH and CP Rs.7.92
Total Rs.53.21

ITEM No. 11012.06


Plain, galvanised, mild steel sheeting 0.63mm thick in ridges, hips, valley gutters, drip and straight flashing
(length and girth as fixed), with grade of zinc coating, Labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.0845 14.2805
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.085 16.32
Rs.30.60
After rounding off: Rs.36.00 Total Amount of M and L Rs.30.60
Add 17.5 % OH and CP Rs.5.36
Total Rs.35.96

1167 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11013.01
Plain, black, mild steel sheeting 0.63mm thick in stepped flashing (measured as the minimum rectangle from
which the pieces can be cut, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 White lead 1 Kg Rs. 200.00 0.05 10
3 Plain sheet black 0.63 mm thick 1 Kg Rs. 40.00 5.292 211.68
Rs.226.28
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.162 31.104
2 Mazdoor man 1 Day Rs. 169.00 0.162 27.378
Rs.58.48
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.335.10 Total Amount of M and L Rs.285.21
Add 17.5 % OH and CP Rs.49.91
Total Rs.335.12

ITEM No. 11013.02


Plain, black, mild steel sheeting 0.80mm thick in stepped flashing (measured as the minimum rectangle from
which the pieces can be cut, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain sheet black - 0.80 mm thick 1 Kg Rs. 40.00 6.796 271.84
2 White lead 1 Kg Rs. 200.00 0.05 10
3 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.286.44
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.162 31.104
2 Mazdoor man 1 Day Rs. 169.00 0.162 27.378
Rs.58.48
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.405.80 Total Amount of M and L Rs.345.37
Add 17.5 % OH and CP Rs.60.44
Total Rs.405.81

1168 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11013.03
Plain, black, mild steel sheeting 1.00mm thick in stepped flashing (measured as the minimum rectangle from
which the pieces can be cut, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain sheet black 1.00 mm thick 1 Kg Rs. 40.00 8.424 336.96
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
3 White lead 1 Kg Rs. 200.00 0.05 10
Rs.351.56
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.178 34.176
2 Mazdoor man 1 Day Rs. 169.00 0.178 30.082
Rs.64.26
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.489.10 Total Amount of M and L Rs.416.27
Add 17.5 % OH and CP Rs.72.85
Total Rs.489.11

ITEM No. 11013.04


Plain, black, mild steel sheeting 1.25mm thick in stepped flashing (measured as the minimum rectangle from
which the pieces can be cut, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 Plain sheet black 1.25 mm thick 1 Kg Rs. 40.00 10.524 420.96
3 White lead 1 Kg Rs. 200.00 0.05 10
Rs.435.56
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.178 30.082
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.178 34.176
Rs.64.26
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.587.80 Total Amount of M and L Rs.500.27
Add 17.5 % OH and CP Rs.87.55
Total Rs.587.81

1169 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11013.05
Plain, black, mild steel sheeting in stepped flashing (measured as the minimum rectangle from which the
pieces can be cut, Except sheeting (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
2 White lead 1 Kg Rs. 200.00 0.05 10
Rs.14.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.17 32.64
2 Mazdoor man 1 Day Rs. 169.00 0.17 28.73
Rs.61.37
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.89.80 Total Amount of M and L Rs.76.42
Add 17.5 % OH and CP Rs.13.37
Total Rs.89.79

ITEM No. 11013.06


Plain, black, mild steel sheeting in stepped flashing (measured as the minimum rectangle from which the
pieces can be cut, Labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.17 32.64
2 Mazdoor man 1 Day Rs. 169.00 0.17 28.73
Rs.61.37
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.72.60 Total Amount of M and L Rs.61.82
Add 17.5 % OH and CP Rs.10.82
Total Rs.72.64

1170 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11014.01
Plain, galvanised, mild steel sheeting in stepped flashing (measured as the minimum rectangle from which the
pieces can be cut) with grade of zinc coating 275, 0.63 mm thick, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
3 Galvanized corrugated mild steel sheet with grade of zinc coating 275, 1 Kg Rs. 43.00 5.667 243.681
0.63 mm to 1.00mm thick
Rs.258.28
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.162 31.104
2 Mazdoor man 1 Day Rs. 169.00 0.162 27.378
Rs.58.48
After rounding off: Rs.372.20 Total Amount of M and L Rs.316.76
Add 17.5 % OH and CP Rs.55.43
Total Rs.372.20

ITEM No. 11014.02


Plain, galvanised, mild steel sheeting in stepped flashing (measured as the minimum rectangle from which the
pieces can be cut) with grade of zinc coating 275, 0.80 mm thick, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
3 Galvanized corrugated mild steel sheet with grade of zinc coating 275, 1 Kg Rs. 43.00 7.171 308.353
0.63 mm to 1.00mm thick
Rs.322.95
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.162 27.378
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.162 31.104
Rs.58.48
After rounding off: Rs.448.20 Total Amount of M and L Rs.381.44
Add 17.5 % OH and CP Rs.66.75
Total Rs.448.19

1171 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11014.03
Plain, galvanised, mild steel sheeting in stepped flashing (measured as the minimum rectangle from which the
pieces can be cut) with grade of zinc coating 275, 1.00 mm thick, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Galvanized corrugated mild steel sheet with grade of zinc coating 275, 1 Kg Rs. 43.00 8.799 378.357
0.63 mm to 1.00mm thick
2 White lead 1 Kg Rs. 200.00 0.05 10
3 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.392.96
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.162 31.104
2 Mazdoor man 1 Day Rs. 169.00 0.162 27.378
Rs.58.48
After rounding off: Rs.530.40 Total Amount of M and L Rs.451.44
Add 17.5 % OH and CP Rs.79.00
Total Rs.530.44

ITEM No. 11014.05


Plain, galvanised, mild steel sheeting in stepped flashing (measured as the minimum rectangle from which the
pieces can be cut) with grade of zinc coating 275, Except sheeting(any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.14.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.17 32.64
2 Mazdoor man 1 Day Rs. 169.00 0.17 28.73
Rs.61.37
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.89.80 Total Amount of M and L Rs.76.42
Add 17.5 % OH and CP Rs.13.37
Total Rs.89.79

1172 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11014.06
Plain, galvanised, mild steel sheeting in stepped flashing (measured as the minimum rectangle from which the
pieces can be cut) with grade of zinc coating 275, Labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.17 28.73
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.17 32.64
Rs.61.37
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.72.60 Total Amount of M and L Rs.61.82
Add 17.5 % OH and CP Rs.10.82
Total Rs.72.64

ITEM No. 11015.01


Add to item 11011 to11014 if welded or soldered joints are provided for 0.63mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 0.658 26.32
Rs.26.32
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.054 10.368
2 Mazdoor man 1 Day Rs. 169.00 0.054 9.126
Rs.19.49
After rounding off: Rs.53.80 Total Amount of M and L Rs.45.81
Add 17.5 % OH and CP Rs.8.02
Total Rs.53.83

ITEM No. 11015.02


Add to item 11011 to11014 if welded or soldered joints are provided for 0.80mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 0.927 37.08
Rs.37.08
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.054 10.368
2 Mazdoor man 1 Day Rs. 169.00 0.054 9.126
Rs.19.49
After rounding off: Rs.66.50 Total Amount of M and L Rs.56.57
Add 17.5 % OH and CP Rs.9.90
Total Rs.66.47

1173 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11015.03
Add to item 11011 to11014 if welded or soldered joints are provided for 1.00mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 1.157 46.28
Rs.46.28
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.054 9.126
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.054 10.368
Rs.19.49
After rounding off: Rs.77.30 Total Amount of M and L Rs.65.77
Add 17.5 % OH and CP Rs.11.51
Total Rs.77.28

ITEM No. 11015.04


Add to item 11011 to11014 if welded or soldered joints are provided for 1.25mm thick sheet.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Plain or corrugated steel sheet black 1 Kg Rs. 40.00 1.507 60.28
Rs.60.28
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.054 10.368
2 Mazdoor man 1 Day Rs. 169.00 0.054 9.126
Rs.19.49
After rounding off: Rs.93.70 Total Amount of M and L Rs.79.77
Add 17.5 % OH and CP Rs.13.96
Total Rs.93.73

ITEM No. 11015.05


Add to item 11011 to11014 if welded or soldered joints are provided, Except sheeting (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.054 10.368
2 Mazdoor man 1 Day Rs. 169.00 0.054 9.126
Rs.19.49
After rounding off: Rs.22.90 Total Amount of M and L Rs.19.49
Add 17.5 % OH and CP Rs.3.41
Total Rs.22.91

ITEM No. 11015.06


Add to item 11011 to11014 if welded or soldered joints are provided, Labour only (any thickness ).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.054 10.368
2 Mazdoor-man, 1 Day Rs. 169.00 0.054 9.126
Rs.19.49
After rounding off: Rs.22.90 Total Amount of M and L Rs.19.49
Add 17.5 % OH and CP Rs.3.41
Total Rs.22.91

1174 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11015.11
Plain aluminium sheeting 0.56mm thick alloy 31000 H4 in ridges hips valley gutter drip and straight flushing
(length and girth as fixed), S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
3 Aluminium corrugated sheeting alloy 31000 H4 STUCCO embossed 1 Sqm Rs. 230.00 1 230
finish but plain sheeting 0.56mm thick
Rs.244.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.322.30 Total Amount of M and L Rs.274.29
Add 17.5 % OH and CP Rs.48.00
Total Rs.322.29

ITEM No. 11015.12


Plain aluminium sheeting 0.71mm thick alloy 31000 H4 in ridges hips valley gutter drip and straight flushing
(length and girth as fixed), S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Aluminium corrugated sheeting alloy 31000 H4 STUCCO embossed 1 Sqm Rs. 310.00 1 310
finish but 0.71 mm thick
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
3 White lead 1 Kg Rs. 200.00 0.05 10
Rs.324.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.416.30 Total Amount of M and L Rs.354.29
Add 17.5 % OH and CP Rs.62.00
Total Rs.416.29

1175 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11015.13
Plain aluminium sheeting alloy 31000 H4 in ridges hips valley gutter drip and straight flushing (length and girth
as fixed), Except sheeting (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.14.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.52.00 Total Amount of M and L Rs.44.29
Add 17.5 % OH and CP Rs.7.75
Total Rs.52.04

ITEM No. 11015.14


Plain aluminium sheeting alloy 31000 H4 in ridges hips valley gutter drip and straight flushing (length and girth
as fixed), Labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.082 15.744
2 Mazdoor man 1 Day Rs. 169.00 0.082 13.858
Rs.29.60
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.1 0.9
Rs.0.90
After rounding off: Rs.35.80 Total Amount of M and L Rs.30.50
Add 17.5 % OH and CP Rs.5.34
Total Rs.35.84

1176 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11016.01
Plain aluminium sheeting 0.56mm thick alloy 31000 H4 in stepped flashing (measured as the minimum
rectangle from which the pieces can be cut, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
3 Aluminium corrugated sheeting alloy 31000 H4 STUCCO embossed 1 Sqm Rs. 230.00 1 230
finish but plain sheeting 0.56mm thick
Rs.244.60
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.162 27.378
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.162 31.104
Rs.58.48
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.356.70 Total Amount of M and L Rs.303.53
Add 17.5 % OH and CP Rs.53.12
Total Rs.356.65

ITEM No. 11016.02


Plain aluminium sheeting 0.71mm thick alloy 31000 H4 in stepped flashing (measured as the minimum
rectangle from which the pieces can be cut, S & F.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.01 2
2 Aluminium corrugated sheeting alloy 31000 H4 STUCCO embossed 1 Sqm Rs. 310.00 1 310
finish but 0.71 mm thick
3 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.316.60
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.155 26.195
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.16 30.72
Rs.56.92
After rounding off: Rs.438.90 Total Amount of M and L Rs.373.52
Add 17.5 % OH and CP Rs.65.37
Total Rs.438.88

1177 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11016.03
Plain aluminium sheeting alloy 31000 H4 in stepped flashing (measured as the minimum rectangle from which
the pieces can be cut, Except sheeting (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 White lead 1 Kg Rs. 200.00 0.05 10
2 GI Coach screw 6 mm dia 65 to 75 mm long 100 No. Rs. 230.00 0.02 4.6
Rs.14.60
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.17 28.73
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.17 32.64
Rs.61.37
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.89.80 Total Amount of M and L Rs.76.42
Add 17.5 % OH and CP Rs.13.37
Total Rs.89.79

ITEM No. 11016.04


Plain aluminium sheeting alloy 31000 H4 in stepped flashing (measured as the minimum rectangle from which
the pieces can be cut, labour only (any thickness).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.17 28.73
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.17 32.64
Rs.61.37
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.05 0.45
Rs.0.45
After rounding off: Rs.72.60 Total Amount of M and L Rs.61.82
Add 17.5 % OH and CP Rs.10.82
Total Rs.72.64

1178 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11017.01
Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of any colour
having tensile strength of 550 Mpa as in roof covering/ cladding to wall, fixed with self tapping screws as
specified.S & F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Self tapping screw No. Rs. 5.00 4 20
2 Prepainted galvalume aluminium zink GI based corrugated steel sheet Sqm Rs. 455.00 1.1 500.5
.5mm thick of any colour
Rs.520.50
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.0811 15.5712
2 Mazdoor-man, 1 Day Rs. 169.00 0.081 13.689
Rs.29.26
After rounding off: Rs.646.00 Total Amount of M and L Rs.549.76
Add 17.5 % OH and CP Rs.96.21
Total Rs.645.97

ITEM No. 11017.02


Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of any colour
having tensile strength of 550 Mpa as in roof covering/ cladding to wall, fixed with self tapping screws as
specified (except sheet).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Self tapping screw No. Rs. 5.00 4 20
Rs.20.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.081 13.689
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
Rs.29.24
After rounding off: Rs.57.90 Total Amount of M and L Rs.49.24
Add 17.5 % OH and CP Rs.8.62
Total Rs.57.86

ITEM No. 11017.03


Pre- painted galvalume aluminum zinc coating GI based corrugated steel sheet 0.50mm thick of any colour
having tensile strength of 550 Mpa as in roof covering/ cladding to wall, fixed with self tapping screws as
specified (labour only).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.081 13.689
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
Rs.29.24
After rounding off: Rs.34.40 Total Amount of M and L Rs.29.24
Add 17.5 % OH and CP Rs.5.12
Total Rs.34.36

1179 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11018.01
Pre- painted galvalume aluminum zinc coating GI based plain steel sheet 0.50mm thick of any colour having
tensile strength of 550 Mpa as in roof covering/ cladding to wall, fixed with self tapping screws as specified.S &
F
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Prepainted galvalume aluminium zink GI based plain steel sheet Sqm Rs. 350.00 1.1 385
.5mm thick of any colour
2 Self tapping screw No. Rs. 5.00 4 20
Rs.405.00
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor-man, 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.510.20 Total Amount of M and L Rs.434.24
Add 17.5 % OH and CP Rs.75.99
Total Rs.510.23

ITEM No. 11018.02


Pre- painted galvalume aluminum zinc coating GI based plain steel sheet 0.50mm thick of any colour having
tensile strength of 550 Mpa as in roof covering/ cladding to wall, fixed with self tapping screws as specified.
(except sheet).
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 Self tapping screw No. Rs. 5.00 4 20
Rs.20.00
Labour
1 Mazdoor-man, 1 Day Rs. 169.00 0.081 13.689
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
Rs.29.24
After rounding off: Rs.57.90 Total Amount of M and L Rs.49.24
Add 17.5 % OH and CP Rs.8.62
Total Rs.57.86

ITEM No. 11018.03


Pre- painted galvalume aluminum zinc coating GI based plain steel sheet 0.50mm thick of any colour having
tensile strength of 550 Mpa as in roof covering/ cladding to wall, fixed with self tapping screws as specified.
(labour only).
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor-man, 1 Day Rs. 169.00 0.081 13.689
Rs.29.24
After rounding off: Rs.34.40 Total Amount of M and L Rs.29.24
Add 17.5 % OH and CP Rs.5.12
Total Rs.34.36

1180 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11019.01
6mm thick asbestos cement corrugated or semi -corrugated sheets in roof wall etc fixed with coach screws, M
& L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 8 mm dia 50 to 100 mm long 100 No. Rs. 250.00 0.01 2.5
2 GI round flat washer 100 No. Rs. 60.00 0.01 0.6
3 Imprl ASB for bolt 1 100 No Rs. 49.99 0.01 0.4999
4 AC corrugated sheet 6 mm thick 1 Sqm Rs. 148.00 1.115 165.02
Rs.168.62
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.068 13.056
Rs.31.31
After rounding off: Rs.234.90 Total Amount of M and L Rs.199.93
Add 17.5 % OH and CP Rs.34.99
Total Rs.234.92

ITEM No. 11019.02


6mm thick asbestos cement corrugated or semi -corrugated sheets in roof wall etc fixed with coach screws,
Except sheets.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI Coach screw 8 mm dia 50 to 100 mm long 100 No. Rs. 250.00 0.01 2.5
2 Imprl ASB for bolt 1 100 No Rs. 49.99 0.01 0.4999
3 GI round flat washer 100 No. Rs. 60.00 0.01 0.6
Rs.3.60
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.067 12.864
Rs.31.12
After rounding off: Rs.40.80 Total Amount of M and L Rs.34.72
Add 17.5 % OH and CP Rs.6.08
Total Rs.40.79

1181 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11019.03
6mm thick asbestos cement corrugated or semi -corrugated sheets in roof wall etc fixed with coach screws,
Laboaur only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.068 13.056
Rs.31.31
Plant & Machiner
1 Sundry(9) 1 Re Rs. 9.00 0.15 1.35
Rs.1.35
After rounding off: Rs.38.40 Total Amount of M and L Rs.32.66
Add 17.5 % OH and CP Rs.5.72
Total Rs.38.37

ITEM No. 11019.04


6mm thick asbestos cement corrugated or semi -corrugated sheets in roof wall etc fixed with L-type or J-type
or cranked hook bolts, M & L.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 AC corrugated sheet 6 mm thick 1 Sqm Rs. 148.00 1.115 165.02
2 Hook bolt 8x125 to 200mm 100 No. Rs. 350.00 0.01 3.5
3 Imprl ASB for bolt 1 100 No Rs. 49.99 0.01 0.4999
4 GI round flat washer 100 No. Rs. 60.00 0.01 0.6
Rs.169.62
Labour
1 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
2 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
Rs.33.80
After rounding off: Rs.239.00 Total Amount of M and L Rs.203.42
Add 17.5 % OH and CP Rs.35.60
Total Rs.239.02

1182 by Narender Saigal (Director Contracts)


Military Engineer Services, India
Standard Schedule Rate 2010
Roof Covering
ITEM No. 11019.05
6mm thick asbestos cement corrugated or semi -corrugated sheets in roof wall etc fixed with L-type or J-type
or cranked hook bolts, Except sheets.
Particulars Size Unit SSR Qty Amount (SSR)
Material
1 GI round flat washer 100 No. Rs. 60.00 0.01 0.6
2 Imprl ASB for bolt 1 100 No Rs. 49.99 0.01 0.4999
3 Hook bolt 8x125 to 200mm 100 No. Rs. 350.00 0.01 3.5
Rs.4.60
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
Rs.33.80
After rounding off: Rs.45.10 Total Amount of M and L Rs.38.40
Add 17.5 % OH and CP Rs.6.72
Total Rs.45.12

ITEM No. 11019.06


6mm thick asbestos cement corrugated or semi -corrugated sheets in roof wall etc fixed with L-type or J-type
or cranked hook bolts, Labour only.
Particulars Size Unit SSR Qty Amount (SSR)
Labour
1 Blacksmith, tinsmith 1 Day Rs. 192.00 0.081 15.552
2 Mazdoor man 1 Day Rs. 169.00 0.108 18.252
Rs.33.80
Plant & Machiner
1 Sundry(9