QUALITY CONTROL INSPECTION CHECKLIST

WCT - PACKAGE V204 – Trestle System


Project : Doc. no.
Projek Mass Rapid Transit Lembah Kelang – SSP LINE Rev. 00
Date 06/08/2018
Construction Process : SBG ERECTION (TYPICAL) Page
Span : Pier _______________ to Pier _______________ Date :_____________________
Name of LF: ______________________ Name of SE: ______________________

Item Description LF SE
1 1.- PRE-LOADING
a) Checking of Soil Capacity (Platform) according to requirements for Trestle and
Cranes
b) Drainage of platform is appropriate to drain the water in short time after heavy
rain avoiding pods and mud conditions
c) Trestle Foundation Slabs are in correctly position to erect SBG according to
Span Kinematics drawings.
d) Trestle Towers, Walls, Service Platforms and Accsess Ladders are assembled
according to the tolerances
e) 250t Span Jacks are positioned at both pier of the erection span in accordance
to the drawing for span jacks. See drawing SSP-H-WCTB-PKG4-OVPR-CNS-
VSO-043133
f) The platform to receive SBG loader must be well compacted.
g) Each SBG arrived to site in the required sequence and orientation (Indicate
Yes/No).
SBG#1:______, SBG#2:______, SBG#3:______, SBG#4:______, SBG#5:______,
SBG#6:______, SBG#7:______, SBG#8:______, SBG#9:______, SBG#10:______,
SBG#11:______, SBG#12:______, SBG#13:______.
h) Install lifting frame by using either winch or crane
i) Tie the SBG with four numbers of lifting bar (flogged tight).
j) Check the hight tension bar is not mechanically or heat damage. To check
100% of Lifting Bars for full span.
k) Spreader pins are well connect with the lifting frame
l) Connection pins between HB and LF are full inserted and placed split pin, for
each SBG

Reason for Failure/Re-inspection

HOLD POINT

ALLOWED to proceed with the next stage of work

Name/Signature of
Designation: Date:
Waiko International SB
LG Engineer Representative

Name/Signature of
Designation: Date:
Works Package Contractor
Engineer Representative (TWC)
CHECKLIST SIGNED OFF AND SPAN SPICIFIC KINEMATIC DRAWING ON SITE WITH SITE ENGINEER

Name/Signature of
Date:
Consultant Designation:
Supervisor Consultant
Representative
Please sign off where appropriate

Page 1 of 2
QUALITY CONTROL INSPECTION CHECKLIST
WCT - PACKAGE V204 – Trestle System
Project : Doc. no.
Projek Mass Rapid Transit Lembah Kelang – SSP LINE Rev. 00
Date 06/08/2018
Construction Process : SBG ERECTION (TYPICAL) Page
Span : Pier _______________ to Pier _______________ Date :_____________________
Name of LF: ______________________ Name of SE: ______________________

Item Description LF LE
2 1.- FINAL ALIGNMENT
a) Setting SBG#1 by using span jacks and cylinder at spreader beam to get the
correct alignment and position.
b) Match-fit SBG#1 and SBG#2 by control survey. Ensure the shear key are well
match.
c) Install top temporary stressing system (TSS) after joining of segment complete.
d) Raise the 250t span jacks until they touch the pier segment soffit.
e) Check the sledge plate gap under the span jacks to allow 20mm rebound during
load transfer.
f) After complete permanent stressing, transfer load of span to the pier by using
Span Jacks on the Pier Heads.
g) Screw Jacks on the Towers are disengaged (100% Load on the Span Jacks)

Reason for Failure/Re-inspection

HOLD POINT

ALLOWED to proceed with the next stage of work

Name/Signature of
Designation: Date:
Waiko International SB
LG Engineer Representative

Name/Signature of
Designation: Date:
Works Package Contractor
Engineer Representative (TWC)
CHECKLIST SIGNED OFF AND SPAN SPICIFIC KINEMATIC DRAWING ON SITE WITH LAUNCHING ENGINEER

Name/Signature of
Date:
Consultant Designation:
Supervisor Consultant
Representative
Please sign off where appropriate