1bangunan Pengelak Lau Simeme: Keterangan: 1. Tipe A 2. Tipe B 3. Tipe C
1bangunan Pengelak Lau Simeme: Keterangan: 1. Tipe A 2. Tipe B 3. Tipe C
ZONA 1 : 440 m
Keterangan : 100
1. Tipe A Medium Rock
2. Tipe B Soft Rock
3. Tipe C Medium - Soft Rock
a.
b.
c.
d.
e.
f.
Page 1 file:///conversion/tmp/scratch/438385693.xlsx
09/21/201903:33:03
Excavation Data
- Diameter m 8.00 'D' - Shape
- Face Area m2 63.84
- Drilling Holes bh 117
- Drilling Depth m 3.70
- Advance Excavation m 3.50
- Mucking Vol m3 234.61
- Working Time hr 24.00 2.00 2 Shift
- Main Equipment ns 1.00 2.00 2B Jumbo Driller
- Dynamite kg/m3 1.25 Soft-Medium Rock
- Shotcrete m2 20.56 0.15 m2 thickness
- Wire Mesh m2 20.56
- Steel Ribs @ 1.0m Ns 1.00 489.33 Kg/set (H125=23.8Kg/m)
- Rock Bolts @ 4.0m Ns 6.00
- Oprating Factor # 0.75
Supports:
- Shotcrete (include preparing) mnt 240.00 2 x 5cm
- Wire Mesh mnt 120.00 4 x 10 x 10 m2
- Rock Bolt mnt 60.00 dia 25mm
- Steel Ribs mnt 120.00
Services (Utility) mnt 60.00 blower, drainage, utility
Others mnt 60.00
Total Cycle Time mnt 1,087.69
Page 2 file:///conversion/tmp/scratch/438385693.xlsx
RENCANA BLASTING BULAN DESEMBER 2018
Kumulatif
Tanggal Pukul Kegiatan Kemajuan (m) Kemajuan (m)
Time Keeper
- Hanesa Toni/Asep
- PP Prima Medan, 04 Desember 2018