09/21/201903:33:03

1 BANGUNAN PENGELAK LAU SIMEME

TIPE A : 100 m TIPE B : 200 m

ZONA 1 : 440 m

Keterangan : 100
1. Tipe A Medium Rock
2. Tipe B Soft Rock
3. Tipe C Medium - Soft Rock

a.
b.
c.
d.
e.

f.

Page 1 file:///conversion/tmp/scratch/438385693.xlsx
09/21/201903:33:03

TUNNEL EXCAVATION WITH DRILLING BLASTING METHOD - CYCLE TIME


Description unit Medium Soft Rock

Excavation Data
- Diameter m 8.00 'D' - Shape
- Face Area m2 63.84
- Drilling Holes bh 117
- Drilling Depth m 3.70
- Advance Excavation m 3.50
- Mucking Vol m3 234.61
- Working Time hr 24.00 2.00 2 Shift
- Main Equipment ns 1.00 2.00 2B Jumbo Driller
- Dynamite kg/m3 1.25 Soft-Medium Rock
- Shotcrete m2 20.56 0.15 m2 thickness
- Wire Mesh m2 20.56
- Steel Ribs @ 1.0m Ns 1.00 489.33 Kg/set (H125=23.8Kg/m)
- Rock Bolts @ 4.0m Ns 6.00
- Oprating Factor # 0.75

Cycle Time - Excavation


- Survey & Marking mnt 60.00
- Jumbo In mnt 20.00
- Drilling mnt 140.69 0.50 m'/mnt Drill speed
- Charging mnt 117.00 1.00 mnt/hole
- Jumbo Out mnt 25.00
- Blasting & Fume out mnt 20.00
- Mucking + Hauling mnt 45.00 DT + Wheel Loader

Supports:
- Shotcrete (include preparing) mnt 240.00 2 x 5cm
- Wire Mesh mnt 120.00 4 x 10 x 10 m2
- Rock Bolt mnt 60.00 dia 25mm
- Steel Ribs mnt 120.00
Services (Utility) mnt 60.00 blower, drainage, utility
Others mnt 60.00
Total Cycle Time mnt 1,087.69

Number of Blasting / Day # 0.99

Production / day m 3.48

Page 2 file:///conversion/tmp/scratch/438385693.xlsx
RENCANA BLASTING BULAN DESEMBER 2018
Kumulatif
Tanggal Pukul Kegiatan Kemajuan (m) Kemajuan (m)

Monday, December 03, 2018 13.00 17.00 Survey dan Breaker


17.00 19.00 Istirahat
19.00 22.00 Shotcrete 1st
22.00 24.00 Thread Bar Grouted
24.00 1.00 Istirahat
Tuesday, December 04, 2018 1.00 5.00 Steel Set
5.00 7.00 Istirahat
7.00 10.00 Shotcrete 2nd
10.00 13.00 Drilling Face
13.00 15.00 Charging
15.00 17.00 Blasting dan Mapping 2.5 12.5
17.00 19.00 Istirahat
19.00 24.00 Mucking
24.00 1.00 Istirahat
Wednesday, December 05, 2018 1.00 5.00 Survey dan Breaker
5.00 7.00 Istirahat
7.00 10.00 Shotcrete 1st
10.00 12.00 Thread Bar Grouted
12.00 13.00 Istirahat
13.00 17.00 Steel Set
17.00 19.00 Istirahat
19.00 20.00 Steel Set (lanjutan)
20.00 23.00 Shotcrete 2nd
23.00 24.00 Drilling Face
24.00 1.00 Istirahat
Thursday, December 06, 2018 1.00 3.00 Drilling Face (lanjutan)
3.00 5.00 Charging
5.00 7.00 Istirahat
7.00 9.00 Blasting dan Mapping 2.5 15
9.00 12.00 Mucking
12.00 13.00 Istirahat
13.00 15.00 Mucking (lanjutan)
15.00 17.00 Survey dan Breaker
17.00 19.00 Istirahat
19.00 21.00 Survey dan Breaker (lanjutan)
21.00 24.00 Shotcrete 1st
24.00 1.00 Istirahat
Friday, December 07, 2018 1.00 3.00 Thread Bar Grouted
3.00 5.00 Steel Set
5.00 7.00 Istirahat
7.00 10.00 Steel Set (lanjutan)
10.00 12.00 Shotcrete 2nd
12.00 13.00 Istirahat
13.00 14.00 Shotcrete 2nd (lanjutan)
14.00 17.00 Drilling face
17.00 19.00 Istirahat
19.00 21.00 Charging
21.00 23.00 Blasting dan Mapping 2.5 17.5
23.00 24.00 Mucking
24.00 1.00 Istirahat
Saturday, December 08, 2018 1.00 5.00 Mucking (lanjutan)
5.00 7.00 Istirahat
7.00 11.00 Survey dan Breaker
11.00 12.00 Shotcrete 1st
12.00 13.00 Istirahat
13.00 15.00 Shotcrete 1 st (lanjutan)
15.00 17.00 Thread Bar Grouted
17.00 19.00 Istirahat
19.00 24.00 Steel Set
24.00 1.00 Istirahat
Sunday, December 09, 2018 1.00 4.00 Shotcrete 2nd
4.00 5.00 Drilling Face
5.00 7.00 Istirahat
7.00 9.00 Drilling Face (lanjutan)
9.00 11.00 Charging
11.00 12.00 Blasting dan Mapping 2.5 20
12.00 13.00 Istirahat
13.00 14.00 Blasting dan Mapping (lanjutan)
Monday, December 10, 2018 3.5 23.5
Tuesday, December 11, 2018 3.5 27
Wednesday, December 12, 2018 3.5 30.5
Thursday, December 13, 2018 3.5 34
Friday, December 14, 2018 3.5 37.5
Saturday, December 15, 2018 3.5 41
Sunday, December 16, 2018 3.5 44.5
Monday, December 17, 2018 3.5 48
Tuesday, December 18, 2018 3.5 51.5
Wednesday, December 19, 2018 3.5 55
Thursday, December 20, 2018 3.5 58.5
Friday, December 21, 2018 3.5 62
Saturday, December 22, 2018 3.5 65.5
Sunday, December 23, 2018 3.5 69
Monday, December 24, 2018 3.5 72.5
Tuesday, December 25, 2018 Libur
Wednesday, December 26, 2018 3.5 76
Thursday, December 27, 2018 3.5 79.5
Friday, December 28, 2018 3.5 83
Saturday, December 29, 2018 3.5 86.5
Sunday, December 30, 2018 3.5 90
Time Keeper
- Hanesa Toni/Asep
- PP Prima Medan, 03 Desember 2018
Diketahui Diperiksa Diajukan

PPK Team Leader SOM


Anthoni S Siahaan Herman Sutrisno Kristanto Agusnugroho Armin Nainggolan
RENCANA BLASTING BULAN DESEMBER 2018
Kumulatif
Tanggal Pukul Kegiatan Kemajuan (m) Kemajuan (m)

Tuesday, December 04, 2018 19.00 22.00 Shotcrete 1st


22.00 24.00 Thread Bar Grouting
24.00 1.00 Istirahat
Wednesday, December 05, 2018 1.00 5.00 Steel Set
5.00 7.00 Istirahat
7.00 10.00 Shotcrete 2nd
10.00 13.00 Drilling Face
13.00 15.00 Charging
15.00 17.00 Blasting dan Mapping 2.50 12.50
17.00 19.00 Istirahat
19.00 24.00 Mucking
24.00 1.00 Istirahat
Thursday, December 06, 2018 1.00 5.00 Survey dan Breaker
5.00 7.00 Istirahat
7.00 10.00 Shotcrete 1st
10.00 12.00 Thread Bar Grouting
12.00 13.00 Istirahat
13.00 17.00 Steel Set
17.00 19.00 Istirahat
19.00 20.00 Steel Set (lanjutan)
20.00 23.00 Shotcrete 2nd
23.00 24.00 Drilling Face
24.00 1.00 Istirahat
Friday, December 07, 2018 1.00 3.00 Drilling Face (lanjutan)
3.00 5.00 Charging
5.00 7.00 Istirahat
7.00 9.00 Blasting dan Mapping 2.50 15.00
9.00 12.00 Mucking
12.00 13.00 Istirahat
13.00 15.00 Mucking (lanjutan)
15.00 17.00 Survey dan Breaker
17.00 19.00 Istirahat
19.00 21.00 Survey dan Breaker (lanjutan)
21.00 24.00 Shotcrete 1st
24.00 1.00 Istirahat
Saturday, December 08, 2018 1.00 3.00 Thread Bar Grouted
3.00 5.00 Steel Set
5.00 7.00 Istirahat
7.00 10.00 Steel Set (lanjutan)
10.00 12.00 Shotcrete 2nd
12.00 13.00 Istirahat
13.00 14.00 Shotcrete 2nd (lanjutan)
14.00 17.00 Drilling face
17.00 19.00 Istirahat
19.00 21.00 Charging
21.00 23.00 Blasting dan Mapping 2.50 17.50
23.00 24.00 Mucking
24.00 1.00 Istirahat
Sunday, December 09, 2018 1.00 5.00 Mucking (lanjutan)
5.00 7.00 Istirahat
7.00 11.00 Survey dan Breaker
11.00 12.00 Shotcrete 1st
12.00 13.00 Istirahat
13.00 15.00 Shotcrete 1 st (lanjutan)
15.00 17.00 Thread Bar Grouted
17.00 19.00 Istirahat
19.00 24.00 Steel Set
24.00 1.00 Istirahat
Monday, December 10, 2018 1.00 4.00 Shotcrete 2nd
4.00 5.00 Drilling Face
5.00 7.00 Istirahat
7.00 9.00 Drilling Face (lanjutan)
9.00 11.00 Charging
11.00 12.00 Blasting dan Mapping
12.00 13.00 Istirahat
13.00 14.00 Blasting dan Mapping (lanjutan) 2.50 20.00
Tuesday, December 11, 2018 3.50 23.50
Wednesday, December 12, 2018 3.50 27.00
Thursday, December 13, 2018 3.50 30.50
Friday, December 14, 2018 3.50 34.00
Saturday, December 15, 2018 3.50 37.50
Sunday, December 16, 2018 3.50 41.00
Monday, December 17, 2018 3.50 44.50
Tuesday, December 18, 2018 3.50 48.00
Wednesday, December 19, 2018 3.50 51.50
Thursday, December 20, 2018 3.50 55.00
Friday, December 21, 2018 3.50 58.50
Saturday, December 22, 2018 3.50 62.00
Sunday, December 23, 2018 3.50 65.50
Monday, December 24, 2018 3.50 69.00
Tuesday, December 25, 2018 3.50 72.50
Wednesday, December 26, 2018 Libur
Thursday, December 27, 2018 3.50 76.00
Friday, December 28, 2018 3.50 79.50
Saturday, December 29, 2018 3.50 83.00
Sunday, December 30, 2018 3.50 86.50

Time Keeper
- Hanesa Toni/Asep
- PP Prima Medan, 04 Desember 2018
Diketahui Diperiksa Diajukan

PPK Team Leader SOM


Anthoni S Siahaan Herman Sutrisno Kristanto Agusnugroho