CLIENT:

CONSULTANT:

MAIN CONTRACTOR:

DOCUMENT TITLE:

INSPECTION & TEST PLAN FOR EXCAVATION WORKS

DOCUMENT NO.:

Rev. Date Description Prep. Check Appr. GEIC


INSPECTION AND TEST PLAN FOR EXCAVATION WORKS.
Control
Control
Controlling Time & Frequency of Verifying/Requir Point
Item Test/Characteristic Acceptance Requirements Point
Document Testing/Inspection ed Document Consulta
Contractor
nt
1.0 Required Documents and Submittals
Prior to
Project Valid Permits and
1.1 Permit and Licenses Issued by authorized agency commencement of H H
Requirements Licenses
activity
Project Specs Approved by the Supervising
1.2 Construction Drawings Per Activity IFC Drawings H H
QCS 2014 Consultant
Project Specs Approved by the Supervising Engineer/Consult
1.3 Method Statement Per Activity H H
QCS 2014 Consultant ant Approval
Project Specs. Approved by the Supervising
1.4 Survey Per Activity Survey Report H H
QCS 2014 Consultant

Excavation.
2.0
IFC
Engineer/Consult
2.1 Setting Out Drawings/Approved Survey/Level Reports Prior to start excavation H H
ant Approval
Shop Drawings

IFC
Prior to start next Engineer/Consult
2.2 Excavation Drawings/Approved Survey/Level Reports H H
activity. ant Approval
Shop Drawings

Legend: H – Hold Point, IR to be issued; cannot proceed BC-1 without approving letter. Asphalt works shall not proceed during rain, sand storm, fog or when ambient temp is below 8⁰C
W - Witness point; WIR to be issued; can proceed if other party fails to attend
S – Surveillance
R – Documents to be submitted for review and acceptance.

Title: Inspection and Test Plan for Excavation Works Sheet : 2 of 3


Document No. Rev. 01 Date : 16TH Jan 2019
IFC
Prior to start next Engineer/Consult
2.3 Formation Levels Drawings/Approved Survey Reports H H
activity. ant Approval
Shop Drawings
Project Specs. Prior to start next Engineer/Consult
2.4 Compaction Field/ Lab Test Reports. H H
QCS 2014 activity. ant Approval

M.S for Dewatering. Engineer/Consult


2.5 Dewatering As per Approved M.S N/A H H
QCS 2014 ant Approval

DR: Document Review H: Hold Point S: Surveillance W:Wtiness

Title: Inspection & Test Plan for Excavation works Sheet 1 of 1

Legend: H – Hold Point, IR to be issued; cannot proceed BC-1 without approving letter. Asphalt works shall not proceed during rain, sand storm, fog or when ambient temp is below 8⁰C
W - Witness point; WIR to be issued; can proceed if other party fails to attend
S – Surveillance
R – Documents to be submitted for review and acceptance.

Title: Inspection and Test Plan for Excavation Works Sheet : 3 of 3


Document No. Rev. 01 Date : 16TH Jan 2019