GET Job Rotation Quarterly Review

Name : Amit Kumar


Site : Prestige Song of the South
Cluster : Bangalore
Buddy : Mr. Sai Karthik
Brief Details about the Project

Project Name : Prestige Song Of the South

Client : Prestige Estates Pvt Ltd (PEPL)

Structural Consultant : EDRC L&T CHENNAI

Design Consultant : RSP Design Consultants Pvt Ltd

MEP Consultant : Design Tree

Duration : 42 Months ( 09 May, 2016 to 30 Sep, 2019)

Original Project Value : Rs 503.17 Crs

Total Built Up Area : 4.565 Mil. Sqft

Type of Project : Design & Build Lump Sum contract

Site Location : Akshayanagar, Bangalore


Progress on Job Rotation
Function Allotted Job Rotation Progress Status
to GET
Execution Formwork Quantity Finishes EHS QA/QC P&M Planning/
estimation Accounts
Example: Finishes
yet to yet to yet to
23.08.17 – 01.10.17 01.11.17 – 21.12.17 – 25-12-17-
undergo undergo undergo
30.09.17 –30-10-17 20-11-17 23-12-17 ongoing
rotation rotation rotation

Monthly Report
Submission status

GET Job Rotation Plan – (2017-18)

Function Allotted to GET Functions in which Job Rotation Required


(In Weeks)

Planning Quality Formwork EHS Execution Finishes MEP/QS/P


&M

No. of Weeks
6 4 4 4 4 4 2 (Each)
Significant Learnings in execution
1. Scope of work
2. Different processes involved in execution.

3. Study of drawings

➢ Architectural

➢ Layout and numeration details of slabs, beams and wall

➢ RC details of slab bottom and top bars(X,Y direction)

➢ RC details of wall.

4. Safe to start work.

5. Level checking of slab spot level using dumpy level.


Significant Learnings in execution

6. Pre concrete checking with quality engineers


I. Reinforcement checking

➢ Top and bottom bars

➢ Wall reinforcements

II. Shuttering checking

➢ Grid alignment

➢ Verticality/level check of formwork

III. Dimension checking

7. Post concrete checking with quality engineers

➢ Dimensions using laser measuring tape

➢ Level/verticality using laser levelling instrument

8. Concreting

9. Coordinating with site engineers, supervisors, P&M, MEP, safety.


Significant Learnings in formwork

1. Study of procedure for aluminum formwork setup.


2. Study of components name and their requirements.

3. Study of drawing(Scheme drawing).

4. Advantages and disadvantages of using aluminum formwork.

5. Types of formwork used at our site.

6. Checking of shuttering before concreting.


Significant Learnings in Quantity Estimation

1. Study of RC drawings – Diameter of bar, shape, spacing, development length, cover.


2. Calculation of rebar length for various bend shapes.

3. Preparation of BBS with mentor for beam and slab.

4. As per BBS, fabrication of rebar including cutting, bending and tagging at yard and placing at
site.
Significant Learnings – FINISHES
(Deputized to Prestige Lakeside Habitat for Finishes Training)

1. Study of Guide Book


2. Different tools used in finishing works

3. Pre construction planning

4. Comprehensive cycle time

5. Understanding block work masonry

6. Understanding gypsum plastering & cement plastering

7. Tile flooring & dadoing

8. Marble flooring

9. Understanding external cladding works

10. Podium, Terrace and toilet waterproofing works

11. Joinery fixing

12. Snagging and De-snagging

13. Productivity calculation for different activities.


WATER PROOFING
EXTERNAL CLADDING BLOCKWORK GYPSUM PLASTERING TILE DADOING
My Specific Contributions / Achievements at Site
My Specific Contributions

• Task completion such as concreting.

• Pre and post concrete checking.

• Slab spot level checking.

• Helping supervisors with proper study of drawings when required.

• Providing required materials in formwork.

• Daily monitoring of work progress.

• Taking safety measures and filling safe to start work.

• Snagging and De snagging of 2 Villas and 6 Flats at Prestige Lakeside Habitat.


Buddy
My Buddy – Mr. Sai Karthik

He is very supportive and never hesitates to help me solve my doubts. He is also very

supportive with the job rotation and motivates me to learn work of each department

with full interest.


Constraints / Concerns / Improvement Feedback
1. Constraints / Concerns :
▪ Unavailability of resources.

▪ Poor housekeeping.

▪ No definite working hours.


Feedback on Support
Staff members who supported me in my job rotation, on the job training ,
• Mr. K.RAVICHANDRAN (PROJECT HEAD)

• EXECUTION - Mr. GK SATISH, Mr. SAI KARTHIK, Mr. DILIP KUMAR, Mr. ARAVIND PRABHU

• FORMWORK - Mr. RAJAMAHENDRA VARMAN, Mr. RAJAPANDIAN

• QUANTITY ESTIMATION - Mr. BALAMURUGAN S., Mr. LAKSHMI, Mr. TAPAN

• FINISHES - Ar. S. VENKATESH


Thank You