PERHITUNGAN DIMENSI SALURAN

Diketahui : ETo : 5.93 mm/hari A = 48.79 ha


Kc : 1.1 mm/hari B = 58.36 ha
Repadi : 2.1 mm/hari C = 39.58 ha
Repalawija : 1.9 mm/hari D = 41.95 ha
WLR : 3 mm/hari E = 43.38 ha
NFR : 1.175 l/det/ha F = 56.49 ha
e : 0.65 G = 48.65 ha
C : 1 H = 50.25 ha
Kc : 70 I = 48.83 ha
m : 1 JKanan = 13.19 ha
Jkiri = 36.27 ha
Saluran Tersier : 0.80 K = 46.97 ha
Saluran Sekunder : 0.85 L = 48.07 ha
Saluran Primer : 0.90 M = 52.9 ha
N = 49.51 ha
O = 40.55 ha
ETC = ETo x Kc P = 50.92 ha
= 5.93 x 1.1 Q = 48.98 ha
= 6.523 mm/hari R = 48.02 ha
S = 47.79 ha
IRpadi = NFR TKanan = 24.86 ha
eTotal Tkiri = 24.94 ha
= 1.175 U = 48.42 ha
0.65
= 1.808 l/det

IRpalawija = ETC - REpalawija


eTotal
= 6.523 - 1.9
0.65
= 4.623
0.65
= 7.112 mm/hari → 7.112 = 0.823 l/det
8.64
Saluran Tersier

a) Dimensi T1 Dengan Luas 48.79 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 48.79
0.80
= 57.33
0.80
= 71.66 l/det → 0.072 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.26 m/det

F = Q
F
= 0.072
0.26
= 0.276 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.138
2
h = √0,13
8
= 0.371 m → b = 0.3713 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.26
= 0.072 / 0.26 70 x 0.194 2/3

√(1+1
0.371 + 2 x 0.371 ²) i½ = 0.26
= 0.276 0.878
0.371 + 1.05 i½ = 0.296
√0,296
= 0.276 i =
1.421 i = 0.544
= 0.194
Dimensi Saluran T1 :
A = 48.79 ha
Q = 0.072 m3/det
V = 0.260 m/det
h = 0.371 m
b = 0.371 m
i = 0.544
b) Dimensi T2 Dengan Luas 58.36 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 58.36
0.80
= 68.57
0.80
= 85.72 l/det → 0.086 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.09 ⁰′¹⁸²
= 0.42 x 0.64
= 0.269 m/det

F = Q
F
= 0.086
0.269
= 0.319 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.16
2
h = √0,16
= 0.399 m → b = 0.3995 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.269
= 0.086 / 0.269 70 x 0.209 2/3

√(1+1
0.399 + 2 x 0.399 ²) i½ = 0.269
= 0.319 1.016
0.399 + 1.13 i½ = 0.264
√0,264
= 0.319 i =
1.529 i = 0.514
= 0.209
Dimensi Saluran T1 :
A = 58.36 ha
Q = 0.086 m3/det
V = 0.269 m/det
h = 0.399 m
b = 0.399 m
i = 0.514
c) Dimensi T3 Dengan Luas 39.58 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 39.58
0.80
= 46.51
0.80
= 58.13 l/det → 0.058 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.25 m/det

F = Q
F
= 0.058
0.25
= 0.232 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.116
2
h = √0,12
= 0.341 m → b = 0.3408 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.25
= 0.058 / 0.25 70 x 0.178 2/3

√(1+1
0.341 + 2 x 0.341 ²) i½ = 0.25
= 0.232 0.74
0.341 + 0.964 i½ = 0.338
√0,338
= 0.232 i =
1.305 i = 0.582
= 0.178
Dimensi Saluran T1 :
A = 39.58 ha
Q = 0.058 m3/det
V = 0.250 m/det
h = 0.341 m
b = 0.341 m
i = 0.582
d) Dimensi T4 Dengan Luas 41.95 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 41.95
0.80
= 49.29
0.80
= 61.61 l/det → 0.062 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.253 m/det

F = Q
F
= 0.062
0.253
= 0.244 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.122
2
h = √0,12
= 0.349 m → b = 0.349 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.253
= 0.062 / 0.253 70 x 0.182 2/3

√(1+1
0.349 + 2 x 0.349 ²) i½ = 0.253
= 0.244 0.776
0.349 + 0.987 i½ = 0.326
√0,326
= 0.244 i =
1.336 i = 0.571
= 0.182
Dimensi Saluran T4 :
A = 41.95 ha
Q = 0.062 m3/det
V = 0.253 m/det
h = 0.349 m
b = 0.349 m
i = 0.571
e) Dimensi T5 Dengan Luas 43.38 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 43.38
0.80
= 50.97
0.80
= 63.71 l/det → 0.064 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.61
= 0.254 m/det

F = Q
F
= 0.064
0.254
= 0.25 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.125
2
h = √0,13
= 0.354 m → b = 0.3538 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.254
= 0.064 / 0.254 70 x 0.185 2/3

√(1+1
0.354 + 2 x 0.354 ²) i½ = 0.254
= 0.25 0.797
0.354 + 1.001 i½ = 0.319
√0,319
= 0.25 i =
1.355 i = 0.565
= 0.185
Dimensi Saluran T5 :
A = 43.38 ha
Q = 0.064 m3/det
V = 0.254 m/det
h = 0.354 m
b = 0.354 m
i = 0.565
f) Dimensi T6 Dengan Luas 56.49 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 56.49
0.80
= 66.38
0.80
= 82.97 l/det → 0.083 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.08 ⁰′¹⁸²
= 0.42 x 0.64
= 0.267 m/det

F = Q
F
= 0.083
0.267
= 0.311 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.155
2
h = √0,16
= 0.394 m → b = 0.3942 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.267
= 0.083 / 0.267 70 x 0.206 2/3

√(1+1
0.394 + 2 x 0.394 ²) i½ = 0.267
= 0.311 0.989
0.394 + 1.115 i½ = 0.27
√0,27
= 0.311 i =
1.509 i = 0.519
= 0.206
Dimensi Saluran T6 :
A = 56.49 ha
Q = 0.083 m3/det
V = 0.267 m/det
h = 0.394 m
b = 0.394 m
i = 0.519
g) Dimensi T7 Dengan Luas 48.65 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 48.65
0.80
= 57.16
0.80
= 71.45 l/det → 0.071 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.26 m/det

F = Q
F
= 0.071
0.26
= 0.275 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.138
2
h = √0,14
= 0.371 m → b = 0.3708 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.26
= 0.071 / 0.26 70 x 0.194 2/3

√(1+1
0.371 + 2 x 0.371 ²) i½ = 0.26
= 0.275 0.876
0.371 + 1.049 i½ = 0.297
√0,297
= 0.275 i =
1.42 i = 0.545
= 0.194
Dimensi Saluran T7 :
A = 48.65 ha
Q = 0.071 m3/det
V = 0.260 m/det
h = 0.371 m
b = 0.371 m
i = 0.545
h) Dimensi T8 Dengan Luas 50.25 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 50.25
0.80
= 59.04
0.80
= 73.80 l/det → 0.074 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.261 m/det

F = Q
F
= 0.074
0.261
= 0.282 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.141
2
h = √0,14
= 0.376 m → b = 0.3758 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.261
= 0.074 / 0.261 70 x 0.196 2/3

√(1+1
0.376 + 2 x 0.376 ²) i½ = 0.261
= 0.282 0.899
0.376 + 1.063 i½ = 0.291
√0,291
= 0.282 i =
1.439 i = 0.539
= 0.196
Dimensi Saluran T8 :
A = 50.25 ha
Q = 0.074 m3/det
V = 0.261 m/det
h = 0.376 m
b = 0.376 m
i = 0.539
i) Dimensi T9 Dengan Luas 48.83 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 48.83
0.80
= 57.38
0.80
= 71.72 l/det → 0.072 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.26 m/det

F = Q
F
= 0.072
0.26
= 0.276 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.138
2
h = √0,14
= 0.371 m → b = 0.3714 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.26
= 0.072 / 0.26 70 x 0.194 2/3

√(1+1
0.371 + 2 x 0.371 ²) i½ = 0.26
= 0.276 0.878
0.371 + 1.05 i½ = 0.296
√0,296
= 0.276 i =
1.422 i = 0.544
= 0.194
Dimensi Saluran T9 :
A = 48.83 ha
Q = 0.072 m3/det
V = 0.260 m/det
h = 0.371 m
b = 0.371 m
i = 0.544
j) Dimensi T10 Dengan Luas 13.19 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 13.19
0.80
= 15.5
0.80
= 19.37 l/det → 0.019 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.02 ⁰′¹⁸²
= 0.42 x 0.49
= 0.205 m/det

F = Q
F
= 0.019
0.205
= 0.095 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.047
2
h = √0,05
= 0.217 m → b = 0.2174 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.205
= 0.019 / 0.205 70 x 0.114 2/3

√(1+1
0.217 + 2 x 0.217 ²) i½ = 0.205
= 0.095 0.301
0.217 + 0.615 i½ = 0.681
√0,681
= 0.095 i =
0.832 i = 0.825
= 0.114
Dimensi Saluran T10 :
A = 13.19 ha
Q = 0.019 m3/det
V = 0.205 m/det
h = 0.217 m
b = 0.217 m
i = 0.825
k) Dimensi T11 Dengan Luas 36.27 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 36.27
0.80
= 42.62
0.80
= 53.27 l/det → 0.053 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.05 ⁰′¹⁸²
= 0.42 x 0.59
= 0.246 m/det

F = Q
F
= 0.053
0.246
= 0.216 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.108
2
h = √0,11
= 0.329 m → b = 0.3288 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.246
= 0.053 / 0.246 70 x 0.172 2/3

√(1+1
0.329 + 2 x 0.329 ²) i½ = 0.246
= 0.216 0.689
0.329 + 0.93 i½ = 0.358
√0,358
= 0.216 i =
1.259 i = 0.598
= 0.172
Dimensi Saluran T11 :
A = 36.27 ha
Q = 0.053 m3/det
V = 0.246 m/det
h = 0.329 m
b = 0.329 m
i = 0.598
l) Dimensi T12 Dengan Luas 46.97 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 46.97
0.80
= 55.19
0.80
= 68.99 l/det → 0.069 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.61
= 0.258 m/det

F = Q
F
= 0.069
0.258
= 0.267 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.134
2
h = √0,13
= 0.366 m → b = 0.3655 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.258
= 0.069 / 0.258 70 x 0.191 2/3

√(1+1
0.366 + 2 x 0.366 ²) i½ = 0.258
= 0.267 0.851
0.366 + 1.034 i½ = 0.303
√0,303
= 0.267 i =
1.399 i = 0.551
= 0.191
Dimensi Saluran T12 :
A = 46.97 ha
Q = 0.069 m3/det
V = 0.258 m/det
h = 0.366 m
b = 0.366 m
i = 0.551
m) Dimensi T13 Dengan Luas 48.07 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 48.07
0.80
= 56.48
0.80
= 70.60 l/det → 0.071 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.259 m/det

F = Q
F
= 0.071
0.259
= 0.272 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.136
2
h = √0,14
= 0.369 m → b = 0.369 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.259
= 0.071 / 0.259 70 x 0.193 2/3

√(1+1
0.369 + 2 x 0.369 ²) i½ = 0.259
= 0.272 0.867
0.369 + 1.044 i½ = 0.299
√0,299
= 0.272 i =
1.413 i = 0.547
= 0.193
Dimensi Saluran T13 :
A = 48.07 ha
Q = 0.071 m3/det
V = 0.259 m/det
h = 0.369 m
b = 0.369 m
i = 0.547
n) Dimensi T14 Dengan Luas 52.9 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 52.9
0.80
= 62.16
0.80
= 77.70 l/det → 0.078 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.08 ⁰′¹⁸²
= 0.42 x 0.63
= 0.264 m/det

F = Q
F
= 0.078
0.264
= 0.295 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.147
2
h = √0,15
= 0.384 m → b = 0.3837 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.264
= 0.078 / 0.264 70 x 0.2 2/3

√(1+1
0.384 + 2 x 0.384 ²) i½ = 0.264
= 0.295 0.938
0.384 + 1.085 i½ = 0.281
√0,281
= 0.295 i =
1.469 i = 0.53
= 0.2
Dimensi Saluran T14 :
A = 52.9 ha
Q = 0.078 m3/det
V = 0.264 m/det
h = 0.384 m
b = 0.384 m
i = 0.53
o) Dimensi T15 Dengan Luas 49.51 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 49.51
0.80
= 58.17
0.80
= 72.72 l/det → 0.073 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.261 m/det

F = Q
F
= 0.073
0.261
= 0.279 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.139
2
h = √0,14
= 0.373 m → b = 0.3735 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.261
= 0.073 / 0.261 70 x 0.195 2/3

√(1+1
0.373 + 2 x 0.373 ²) i½ = 0.261
= 0.279 0.888
0.373 + 1.056 i½ = 0.293
√0,293
= 0.279 i =
1.43 i = 0.542
= 0.195
Dimensi Saluran T15 :
A = 49.51 ha
Q = 0.073 m3/det
V = 0.261 m/det
h = 0.373 m
b = 0.373 m
i = 0.542
p) Dimensi T16 Dengan Luas 40.55 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 40.55
0.80
= 47.65
0.80
= 59.56 l/det → 0.060 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.251 m/det

F = Q
F
= 0.060
0.251
= 0.237 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.118
2
h = √0,12
= 0.344 m → b = 0.3442 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.251
= 0.060 / 0.251 70 x 0.18 2/3

√(1+1
0.344 + 2 x 0.344 ²) i½ = 0.251
= 0.237 0.754
0.344 + 0.974 i½ = 0.333
√0,333
= 0.237 i =
1.318 i = 0.577
= 0.18
Dimensi Saluran T16 :
A = 40.55 ha
Q = 0.060 m3/det
V = 0.251 m/det
h = 0.344 m
b = 0.344 m
i = 0.577
q) Dimensi T17 Dengan Luas 50.92 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 50.92
0.80
= 59.83
0.80
= 74.79 l/det → 0.075 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.262 m/det

F = Q
F
= 0.075
0.262
= 0.285 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.143
2
h = √0,14
= 0.378 m → b = 0.3778 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.262
= 0.075 / 0.262 70 x 0.197 2/3

√(1+1
0.378 + 2 x 0.378 ²) i½ = 0.262
= 0.285 0.909
0.378 + 1.069 i½ = 0.288
√0,288
= 0.285 i =
1.446 i = 0.537
= 0.197
Dimensi Saluran T17 :
A = 50.92 ha
Q = 0.075 m3/det
V = 0.262 m/det
h = 0.378 m
b = 0.378 m
i = 0.537
r) Dimensi T18 Dengan Luas 48.98 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 48.98
0.80
= 57.55
0.80
= 71.94 l/det → 0.072 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.26 m/det

F = Q
F
= 0.072
0.26
= 0.277 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.138
2
h = √0,14
= 0.372 m → b = 0.3718 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.26
= 0.072 / 0.26 70 x 0.194 2/3

√(1+1
0.372 + 2 x 0.372 ²) i½ = 0.26
= 0.277 0.88
0.372 + 1.052 i½ = 0.295
√0,295
= 0.277 i =
1.424 i = 0.544
= 0.194
Dimensi Saluran T18 :
A = 48.98 ha
Q = 0.072 m3/det
V = 0.260 m/det
h = 0.372 m
b = 0.372 m
i = 0.544
s) Dimensi T19 Dengan Luas 48.02 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 48.02
0.80
= 56.42
0.80
= 70.53 l/det → 0.071 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.259 m/det

F = Q
F
= 0.071
0.259
= 0.272 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.136
2
h = √0,14
= 0.369 m → b = 0.3688 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.259
= 0.071 / 0.259 70 x 0.193 2/3

√(1+1
0.369 + 2 x 0.369 ²) i½ = 0.259
= 0.272 0.866
0.369 + 1.043 i½ = 0.299
√(█(0,2
= 0.272 i = 99@))
1.412 i = 0.547
= 0.193
Dimensi Saluran T19 :
A = 48.02 ha
Q = 0.071 m3/det
V = 0.259 m/det
h = 0.369 m
b = 0.369 m
i = 0.547
t) Dimensi T20 Dengan Luas 47.79 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 47.79
0.80
= 56.15
0.80
= 70.19 l/det → 0.070 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.259 m/det

F = Q
F
= 0.070
0.259
= 0.271 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.136
2
h = √0,14
= 0.368 m → b = 0.3681 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.259
= 0.070 / 0.259 70 x 0.192 2/3

√(1+1
0.368 + 2 x 0.368 ²) i½ = 0.259
= 0.271 0.863
0.368 + 1.041 i½ = 0.3
√0,3
= 0.271 i =
1.409 i = 0.548
= 0.192
Dimensi Saluran T20 :
A = 47.79 ha
Q = 0.070 m3/det
V = 0.259 m/det
h = 0.368 m
b = 0.368 m
i = 0.548
u) Dimensi T21 Dengan Luas 24.86 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 24.86
0.80
= 29.21
0.80
= 36.51 l/det → 0.0365 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.04 ⁰′¹⁸²
= 0.42 x 0.55
= 0.23 m/det

F = Q
F
= 0.037
0.23
= 0.159 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.0794
2
h = √0,07
9
= 0.282 m → b = 0.2818 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.23
= 0.037 / 0.2299 70 x 0.147 2/3

√(1+1
0.282 + 2 x 0.282 ²) i½ = 0.23
= 0.159 0.506
0.282 + 0.797 i½ = 0.455
√0,455
= 0.159 i =
1.079 i = 0.674
= 0.147
Dimensi Saluran T21 :
A = 24.86 ha
Q = 0.037 m3/det
V = 0.230 m/det
h = 0.282 m
b = 0.282 m
i = 0.674
v) Dimensi T22 Dengan Luas 24.94 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 24.94
0.80
= 29.3
0.80
= 36.63 l/det → 0.037 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.04 ⁰′¹⁸²
= 0.42 x 0.55
= 0.23 m/det

F = Q
F
= 0.037
0.23
= 0.159 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.08
2
h = √0,08
= 0.282 m → b = 0.2821 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.23
= 0.037 / 0.23 70 x 0.147 2/3

√(1+1
0.282 + 2 x 0.282 ²) i½ = 0.23
= 0.159 0.507
0.282 + 0.798 i½ = 0.454
√0,454
= 0.159 i =
1.08 i = 0.674
= 0.147
Dimensi Saluran T22 :
A = 24.94 ha
Q = 0.037 m3/det
V = 0.230 m/det
h = 0.282 m
b = 0.282 m
i = 0.674
w) Dimensi T23 Dengan Luas 48.42 ha

Q = C x NFR x A
eT
= 1 x 1.175 x 48.42
0.80
= 56.89
0.80
= 71.12 l/det → 0.071 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.26 m/det

F = Q
F
= 0.071
0.26
= 0.274 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.137
2
h = √0,14
= 0.37 m → b = 0.3701 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.26
= 0.071 / 0.26 70 x 0.193 2/3

√(1+1
0.37 + 2 x 0.37 ²) i½ = 0.26
= 0.274 0.872
0.37 + 1.047 i½ = 0.298
√0,298
= 0.274 i =
1.417 i = 0.546
= 0.193
Dimensi Saluran T23 :
A = 48.42 ha
Q = 0.071 m3/det
V = 0.260 m/det
h = 0.37 m
b = 0.37 m
i = 0.546
Saluran Sekunder

a) Dimensi S1

Q = Q23
es
= 0.071
0.85
= 0.084 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.08 ⁰′¹⁸²
= 0.42 x 0.64
= 0.267 m/det

F = Q
F
= 0.084
0.267
= 0.313 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.156
2
√0,15
h = 6
= 0.396 m → b = 0.3955 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.267
= 0.084 / 0.267 70 x 0.207 2/3

√(1+1
0.396 + 2 x 0.396 ²) i½ = 0.267
= 0.313 0.996
0.396 + 1.119 i½ = 0.268
√0,268
= 0.313 i =
1.514 i = 0.518
= 0.207
Dimensi Saluran S1 :
Q = 0.084 m3/det
V = 0.267 m/det
h = 0.396 m
b = 0.396 m
i = 0.518
b) Dimensi S2

Q = Q21 + Q22 + QS1


es
= 0.037 + 0.037 + 0.084
0.85
= 0.157
0.85
= 0.184 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.18 ⁰′¹⁸²
= 0.42 x 0.74
= 0.309 m/det

F = Q
F
= 0.184
0.309
= 0.597 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.30
2
h = √0,30
= 0.547 m → b = 0.5466 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.309
= 0.184 / 0.309 70 x 0.286 2/3

√(1+1
0.547 + 2 x 0.547 ²) i½ = 0.309
= 0.597 1.902
0.547 + 1.546 i½ = 0.162
√0,162
= 0.597 i =
2.092 i = 0.403
= 0.286
Dimensi Saluran S2 :
Q = 0.184 m3/det
V = 0.309 m/det
h = 0.547 m
b = 0.547 m
i = 0.403
c) Dimensi S3

Q = Q20
es
= 0.07
0.85
= 0.083 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.08 ⁰′¹⁸²
= 0.42 x 0.64
= 0.267 m/det

F = Q
F
= 0.083
0.267
= 0.31 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.155
2
√0,15
h = 5
= 0.393 m → b = 0.3934 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.267
= 0.083 / 0.267 70 x 0.206 2/3

√(1+1
0.393 + 2 x 0.393 ²) i½ = 0.267
= 0.31 0.986
0.393 + 1.113 i½ = 0.271
√0,271
= 0.31 i =
1.506 i = 0.52
= 0.206
Dimensi Saluran S3 :
Q = 0.083 m3/det
V = 0.267 m/det
h = 0.393 m
b = 0.393 m
i = 0.52
d) Dimensi S4

Q = QS2 + QS3
es
= 0.184 + 0.083
0.85
= 0.267
0.85
= 0.314 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.31 ⁰′¹⁸²
= 0.42 x 0.81
= 0.34 m/det

F = Q
V
= 0.314
0.34
= 0.924 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.46
2
h = √0,46
0
= 0.68 m → b = 0.6795 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.34
= 0.314 / 0.34 70 x 0.355 2/3

√(1+1
0.68 + 2 x 0.68 ²) i½ = 0.34
= 0.924 2.94
0.68 + 1.922 i½ = 0.116
√0,116
= 0.924 i =
2.602 i = 0.34
= 0.355
Dimensi Saluran S4 :
Q = 0.314 m3/det
V = 0.340 m/det
h = 0.68 m
b = 0.68 m
i = 0.34
e) Dimensi S5

Q = QS4 + Q19
es
= 0.314 + 0.071
0.85
= 0.385
0.85
= 0.453 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.45 ⁰′¹⁸²
= 0.42 x 0.87
= 0.364 m/det

F = Q
F
= 0.453
0.364
= 1.245 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.62
2
h = √0,62
0
= 0.789 m → b = 0.789 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.364
= 0.453 / 0.364 70 x 0.412 2/3

√(1+1
0.789 + 2 x 0.789 ²) i½ = 0.364
= 1.245 3.964
0.789 + 2.232 i½ = 0.092
√0,092
= 1.245 i =
3.02 i = 0.303
= 0.412
Dimensi Saluran S5 :
Q = 0.453 m3/det
V = 0.364 m/det
h = 0.789 m
b = 0.789 m
i = 0.303
f) Dimensi S6

Q = QS5 + Q18
es
= 0.453 + 0.072
0.85
= 0.525
0.85
= 0.617 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.62 ⁰′¹⁸²
= 0.42 x 0.92
= 0.385 m/det

F = Q
F
= 0.617
0.385
= 1.604 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.80
2
h = √0,80
= 0.896 m → b = 0.8956 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.385
= 0.617 / 0.38 70 x 0.468 2/3

√(1+1
0.896 + 2 x 0.896 ²) i½ = 0.385
= 1.604 5.108
0.896 + 2.533 i½ = 0.075
√0,075
= 1.604 i =
3.429 i = 0.274
= 0.468
Dimensi Saluran S6 :
Q = 0.617 m3/det
V = 0.385 m/det
h = 0.896 m
b = 0.896 m
i = 0.274
g) Dimensi S7

Q = Q17
es
= 0.075
0.85
= 0.088 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.09 ⁰′¹⁸²
= 0.42 x 0.64
= 0.27 m/det

F = Q
F
= 0.088
0.27
= 0.326 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.163
2
√0,16
h = 3
= 0.404 m → b = 0.4038 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.27
= 0.088 / 0.27 70 x 0.211 2/3

√(1+1
0.404 + 2 x 0.404 ²) i½ = 0.27
= 0.326 1.038
0.404 + 1.142 i½ = 0.26
√0,26
= 0.326 i =
1.546 i = 0.51
= 0.211
Dimensi Saluran S7 :
Q = 0.088 m3/det
V = 0.270 m/det
h = 0.404 m
b = 0.404 m
i = 0.51
h) Dimensi S8

Q = QS7 + Q16
es
= 0.088 + 0.06
0.85
= 0.148
0.85
= 0.174 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.17 ⁰′¹⁸²
= 0.42 x 0.73
= 0.305 m/det

F = Q
F
= 0.174
0.305
= 0.568 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.28
2
h = √0,28
= 0.533 m → b = 0.5331 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.305
= 0.174 / 0.31 70 x 0.279 2/3

√(1+1
0.533 + 2 x 0.533 ²) i½ = 0.305
= 0.568 1.81
0.533 + 1.508 i½ = 0.169
√0,169
= 0.568 i =
2.041 i = 0.411
= 0.279
Dimensi Saluran S8 :
Q = 0.174 m3/det
V = 0.305 m/det
h = 0.533 m
b = 0.533 m
i = 0.411
i) Dimensi S9

Q = Q15
es
= 0.073
0.85
= 0.086 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.09 ⁰′¹⁸²
= 0.42 x 0.64
= 0.268 m/det

F = Q
F
= 0.086
0.268
= 0.319 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.159
2
√0,15
h = 9
= 0.399 m → b = 0.3992 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.268
= 0.086 / 0.268 70 x 0.209 2/3

√(1+1
0.399 + 2 x 0.399 ²) i½ = 0.268
= 0.319 1.015
0.399 + 1.129 i½ = 0.265
√0,265
= 0.319 i =
1.528 i = 0.514
= 0.209
Dimensi Saluran S9 :
Q = 0.086 m3/det
V = 0.268 m/det
h = 0.399 m
b = 0.399 m
i = 0.514
j) Dimensi S10

Q = Q13 + Q14 + QS9 + QS8


es
= 0.071 + 0.078 + 0.086 + 0.174
0.85
= 0.407
0.85
= 0.479 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.48 ⁰′¹⁸²
= 0.42 x 0.87
= 0.367 m/det

F = Q
F
= 0.479
0.367
= 1.305 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.65
2
h = √0,65
= 0.808 m → b = 0.8077 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.367
= 0.479 / 0.367 70 x 0.422 2/3

√(1+1
0.808 + 2 x 0.808 ²) i½ = 0.367
= 1.305 4.154
0.808 + 2.284 i½ = 0.088
√0,088
= 1.305 i =
3.092 i = 0.297
= 0.422
Dimensi Saluran S10 :
Q = 0.479 m3/det
V = 0.367 m/det
h = 0.808 m
b = 0.808 m
i = 0.297
k) Dimensi S11

Q = QS6 + Q12
es
= 0.617 + 0.069
0.85
= 0.686
0.85
= 0.807 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.81 ⁰′¹⁸²
= 0.42 x 0.96
= 0.404 m/det

F = Q
F
= 0.807
0.404
= 1.998 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 1.00
2
h = √1
= 1 m → b = 1 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.404
= 0.807 / 0.4 70 x 0.522 2/3

√(1+1
1 + 2 x 1 ²) i½ = 0.404
= 2 6.362
1 + 2.827 i½ = 0.063
√0,063
= 1.998 i =
3.827 i = 0.252
= 0.522
Dimensi Saluran S11 :
Q = 0.807 m3/det
V = 0.404 m/det
h = 1 m
b = 1 m
i = 0.252
l) Dimensi S12

Q = Q7 + Q8
es
= 0.071 + 0.074
0.85
= 0.145
0.85
= 0.171 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.17 ⁰′¹⁸²
= 0.42 x 0.73
= 0.305 m/det

F = Q
F
= 0.171
0.305
= 0.561 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.28
2
h = √0,28
= 0.53 m → b = 0.5297 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.305
= 0.171 / 0.3 70 x 0.277 2/3

√(1+1
0.53 + 2 x 0.53 ²) i½ = 0.305
= 0.561 1.787
0.53 + 1.498 i½ = 0.17
√0,17
= 0.561 i =
2.028 i = 0.413
= 0.277
Dimensi Saluran S12 :
Q = 0.171 m3/det
V = 0.305 m/det
h = 0.53 m
b = 0.53 m
i = 0.413
m) Dimensi S13

Q = Q4
es
= 0.062
0.85
= 0.072 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.62
= 0.261 m/det

F = Q
F
= 0.072
0.261
= 0.278 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.139
2
√0,13
h = 9
= 0.373 m → b = 0.373 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.261
= 0.072 / 0.261 70 x 0.195 2/3

√(1+1
0.373 + 2 x 0.373 ²) i½ = 0.261
= 0.278 0.886
0.373 + 1.055 i½ = 0.294
√0,294
= 0.278 i =
1.428 i = 0.542
= 0.195
Dimensi Saluran S13 :
Q = 0.072 m3/det
V = 0.261 m/det
h = 0.373 m
b = 0.373 m
i = 0.542
Saluran Primer

a) Dimensi P1

Q = Q10 + Q11
ep
= 0.479 + 0.807
0.90
= 1.287
0.90
= 1.429 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 1.43 ⁰′¹⁸²
= 0.42 x 1.07
= 0.448 m/det

F = Q
F
= 1.429
0.448
= 3.189 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 1.59
2
h = √1,59
= 1.263 m → b = 1.2628 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.448
= 1.429 / 0.45 70 x 0.66 2/3

√(1+1
1.263 + 2 x 1.263 ²) i½ = 0.448
= 3.189 10.15
1.263 + 3.572 i½ = 0.044
√0,044
= 3.189 i =
4.834 i = 0.21
= 0.66
Dimensi Saluran P1 :
Q = 1.429 m3/det
V = 0.448 m/det
h = 1.263 m
b = 1.263 m
i = 0.21
b) Dimensi P2

Q = Q10 + Q11 + QP1


ep
= 0.019 + 0.053 + 1.429
0.85
= 1.502
0.85
= 1.767 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 1.77 ⁰′¹⁸²
= 0.42 x 1.11
= 0.466 m/det

F = Q
F
= 1.767
0.466
= 3.793 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 1.90
2
h = √1,90
= 1.377 m → b = 1.3772 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.466
= 1.767 / 0.466 70 x 0.719 2/3

√(1+1
1.377 + 2 x 1.377 ²) i½ = 0.466
= 3.793 12.08
1.377 + 3.895 i½ = 0.039
√0,039
= 3.793 i =
5.273 i = 0.196
= 0.719
Dimensi Saluran P2 :
Q = 1.767 m3/det
V = 0.466 m/det
h = 1.377 m
b = 1.377 m
i = 0.196
c) Dimensi P3

Q = QP2 + Q9
ep
= 1.767 + 0.072
0.90
= 1.839
0.90
= 2.043 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 2.04 ⁰′¹⁸²
= 0.42 x 1.14
= 0.478 m/det

F = Q
F
= 2.043
0.478
= 4.272 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 2.14
2
h = √2,14
= 1.461 m → b = 1.4614 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.478
= 2.043 / 0.48 70 x 0.763 2/3

√(1+1
1.461 + 2 x 1.461 ²) i½ = 0.478
= 4.272 13.6
1.461 + 4.134 i½ = 0.035
√0,035
= 4.272 i =
5.595 i = 0.188
= 0.763
Dimensi Saluran P3 :
Q = 2.043 m3/det
V = 0.478 m/det
h = 1.461 m
b = 1.461 m
i = 0.188
d) Dimensi P4

Q = Q5 + Q6 + QS12 + QP3
ep
= 0.064 + 0.083 + 0.171 + 2.043
0.85
= 2.361
0.85
= 2.777 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 2.78 ⁰′¹⁸²
= 0.42 x 1.20
= 0.506 m/det

F = Q
F
= 2.777
0.506
= 5.491 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 2.75
2
h = √2,75
= 1.657 m → b = 1.6569 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.506
= 2.777 / 0.506 70 x 0.866 2/3

√(1+1
1.657 + 2 x 1.657 ²) i½ = 0.506
= 5.491 17.48
1.657 + 4.687 i½ = 0.029
√0,296
= 5.491 i =
6.344 i = 0.17
= 0.866
Dimensi Saluran P4 :
Q = 2.777 m3/det
V = 0.506 m/det
h = 1.657 m
b = 1.657 m
i = 0.17
e) Dimensi P5

Q = Q2 + Q3 + QS13 + QP4
ep
= 0.086 + 0.058 + 0.072 + 2.777
0.85
= 2.994
0.85
= 3.522 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 3.52 ⁰′¹⁸²
= 0.42 x 1.26
= 0.528 m/det

F = Q
F
= 3.522
0.528
= 6.669 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 3.33
2
h = √3,33
= 1.826 m → b = 1.826 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.528
= 3.522 / 0.528 70 x 0.954 2/3

√(1+1
1.826 + 2 x 1.826 ²) i½ = 0.528
= 6.669 21.23
1.826 + 5.165 i½ = 0.025
√0,025
= 6.669 i =
6.991 i = 0.158
= 0.954
Dimensi Saluran P5 :
Q = 3.522 m3/det
V = 0.528 m/det
h = 1.826 m
b = 1.826 m
i = 0.158
f) Dimensi P6

Q = Q1 + QP5
ep
= 0.072 + 3.522
0.85
= 3.594
0.85
= 4.228 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 4.23 ⁰′¹⁸²
= 0.42 x 1.30
= 0.546 m/det

F = Q
F
= 4.228
0.546
= 7.743 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 3.87
2
h = √3,87
= 1.968 m → b = 1.9676 m

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2
h√(1+𝑚²)) i½ = 0.546
= 4.228 / 0.546 70 x 1.028 2/3

√(1+1
1.968 + 2 x 1.968 ²) i½ = 0.546
= 7.743 24.65
1.968 + 5.565 i½ = 0.022
√0,022
= 7.743 i =
7.533 i = 0.149
= 1.028
Dimensi Saluran P6 :
Q = 4.228 m3/det
V = 0.546 m/det
h = 1.968 m
b = 1.968 m
i = 0.149
PERHITUNGAN SALURAN PEMBUANGAN DAN DIMENSI
Qd = 1.62 x Dm x A0,92

1) Saluran Pembuangan T1 (A= 48.79 ha ; b = 0.371 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 48.79 0.92
= 1.62 x 35.75
= 57.913 l/det
= 0.058 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2501 m/det

F = Q
V
= 0.058
0.2501
= 0.2316 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.116
2
h = √0,11
6
= 0.3403 m → b = 0.3403 m
Jadi b saluran Tersier 1 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.25
h√(1+𝑚²))
= 0.058 / 0.25 70 x 0.178 2/3

√(1+1
0.3403 + 2 x 0.34 ²) i½ = 0.25
= 0.232 0.737
0.3403 + 0.962 i ½
= 0.339
√0,296
= 0.2316 i =
1.3027 i = 0.582
= 0.1778
Dimensi Pembuangan :
A = 48.79 ha
Q = 0.058 m3/det
V = 0.250 m/det
h = 0.34 m
b = 0.34 m
i = 0.582
2) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T2 (A= 58.36 ha ;b= 0.4 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 58.36 0.92
= 1.62 x 42.15
= 68.287 l/det
= 0.068 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.61
= 0.2577 m/det

F = Q
V
= 0.068
0.2577
= 0.265 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.132
2
h = √0,13
2
= 0.364 m → b = 0.364 m
Jadi b saluran Tersier 2 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.258
h√(1+𝑚²))
= 0.068 / 0.258 70 x 0.19 2/3

√(1+1
0.364 + 2 x 0.364 ²) i½ = 0.258
= 0.265 0.844
0.364 + 1.03 i½ = 0.305
√0,305
= 0.265 i =
1.3936 i = 0.553
= 0.1902
Dimensi Pembuangan :
A = 58.36 ha
Q = 0.068 m3/det
V = 0.258 m/det
h = 0.364 m
b = 0.364 m
i = 0.553
3) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T3 (A= 39.58 ha ; b = 0.341 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 39.58 0.92
= 1.62 x 29.49
= 47.774 l/det
= 0.048 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.05 ⁰′¹⁸²
= 0.42 x 0.57
= 0.2415 m/det

F = Q
V
= 0.048
0.2415
= 0.1978 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.099
2
h = √0,09
9
= 0.3145 m → b = 0.3145 m
Jadi b saluran Tersier 3 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.241
h√(1+𝑚²))
= 0.048 / 0.241 70 x 0.164 2/3

√(1+1
0.3145 + 2 x 0.315 ²) i½ = 0.241
= 0.198 0.63
0.3145 + 0.89 i½ = 0.383
√0,383
= 0.1978 i =
1.2041 i = 0.619
= 0.1643
Dimensi Pembuangan :
A = 39.58 ha
Q = 0.048 m3/det
V = 0.241 m/det
h = 0.315 m
b = 0.315 m
i = 0.619
4) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T4 (A= 41.95 ha ; b = 0.349 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 41.95 0.92
= 1.62 x 31.11
= 50.4 l/det
= 0.050 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.05 ⁰′¹⁸²
= 0.42 x 0.58
= 0.2438 m/det

F = Q
V
= 0.050
0.2438
= 0.2067 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.103
2
h = √0,09
9
= 0.3215 m → b = 0.3215 m
Jadi b saluran Tersier 4 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.244
h√(1+𝑚²))
= 0.050 / 0.244 70 x 0.168 2/3

√(1+1
0.3215 + 2 x 0.321 ²) i½ = 0.244
= 0.207 0.658
0.3215 + 0.909 i½ = 0.37
√0,383
= 0.2067 i =
1.2308 i = 0.609
= 0.1679
Dimensi Pembuangan :
A = 41.95 ha
Q = 0.050 m3/det
V = 0.244 m/det
h = 0.321 m
b = 0.321 m
i = 0.609
5) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T5 (A= 43.38 ha ; b = 0.354 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 43.38 0.92
= 1.62 x 32.09
= 51.978 l/det
= 0.052 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.05 ⁰′¹⁸²
= 0.42 x 0.58
= 0.2452 m/det

F = Q
V
= 0.052
0.2452
= 0.212 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.106
2
h = √0,10
6
= 0.3256 m → b = 0.3256 m
Jadi b saluran Tersier 5 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.245
h√(1+𝑚²))
= 0.052 / 0.245 70 x 0.17 2/3

√(1+1
0.3256 + 2 x 0.326 ²) i½ = 0.245
= 0.212 0.675
0.3256 + 0.921 i½ = 0.363
√0,368
= 0.212 i =
1.2464 i = 0.603
= 0.1701
Dimensi Pembuangan :
A = 43.38 ha
Q = 0.052 m3/det
V = 0.245 m/det
h = 0.326 m
b = 0.326 m
i = 0.603
6) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T6 (A= 56.49 ha ; b = 0.394 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 56.49 0.92
= 1.62 x 40.91
= 66.272 l/det
= 0.066 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.07 ⁰′¹⁸²
= 0.42 x 0.61
= 0.2563 m/det

F = Q
V
= 0.066
0.2563
= 0.2586 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.129
2
h = √0,12
9
= 0.3596 m → b = 0.3596 m
Jadi b saluran Tersier 6 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.256
h√(1+𝑚²))
= 0.066 / 0.256 70 x 0.188 2/3

√(1+1
0.3596 + 2 x 0.36 ²) i½ = 0.256
= 0.259 0.823
0.3596 + 1.017 i½ = 0.311
√0,311
= 0.2586 i =
1.3766 i = 0.558
= 0.1878
Dimensi Pembuangan :
A = 56.49 ha
Q = 0.066 m3/det
V = 0.256 m/det
h = 0.36 m
b = 0.36 m
i = 0.558
7) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T7 (A= 48.65 ha ; b = 0.371 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 48.65 0.92
= 1.62 x 35.65
= 57.761 l/det
= 0.058 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.25 m/det

F = Q
V
= 0.058
0.25
= 0.2311 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.116
2
h = √0,11
6
= 0.3399 m → b = 0.3399 m
Jadi b saluran Tersier 7 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.25
h√(1+𝑚²))
= 0.058 / 0.25 70 x 0.178 2/3

√(1+1
0.3399 + 2 x 0.34 ²) i½ = 0.25
= 0.231 0.736
0.3399 + 0.961 i½ = 0.34
√0,34
= 0.2311 i =
1.3013 i = 0.583
= 0.1776
Dimensi Pembuangan :
A = 48.65 ha
Q = 0.058 m3/det
V = 0.250 m/det
h = 0.34 m
b = 0.34 m
i = 0.583
8) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T8 (A= 50.25 ha ; b = 0.376 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 50.25 0.92
= 1.62 x 36.73
= 59.506 l/det
= 0.060 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2513 m/det

F = Q
V
= 0.060
0.2513
= 0.2368 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.118
2
h = √0,11
8
= 0.3441 m → b = 0.3441 m
Jadi b saluran Tersier 8 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.251
h√(1+𝑚²))
= 0.060 / 0.251 70 x 0.18 2/3

√(1+1
0.3441 + 2 x 0.344 ²) i½ = 0.251
= 0.237 0.754
0.3441 + 0.973 i½ = 0.333
√0,333
= 0.2368 i =
1.3173 i = 0.577
= 0.1797
Dimensi Pembuangan :
A = 50.25 ha
Q = 0.060 m3/det
V = 0.251 m/det
h = 0.344 m
b = 0.344 m
i = 0.577
9) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T9 (A= 48.83 ha ; b = 0.371 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 48.83 0.92
= 1.62 x 35.78
= 57.957 l/det
= 0.058 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2501 m/det

F = Q
V
= 0.058
0.2501
= 0.2317 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.116
2
h = √0,11
6
= 0.3404 m → b = 0.3404 m
Jadi b saluran Tersier 9 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.25
h√(1+𝑚²))
= 0.058 / 0.25 70 x 0.178 2/3

√(1+1
0.3404 + 2 x 0.34 ²) i½ = 0.25
= 0.232 0.738
0.3404 + 0.963 i½ = 0.339
√0,339
= 0.2317 i =
1.3031 i = 0.582
= 0.1778
Dimensi Pembuangan :
A = 48.83 ha
Q = 0.058 m3/det
V = 0.250 m/det
h = 0.34 m
b = 0.34 m
i = 0.582
10) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T10 (A= 13.19 ha ; b = 0.217 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 13.19 0.92
= 1.62 x 10.73
= 17.384 l/det
= 0.017 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.02 ⁰′¹⁸²
= 0.42 x 0.48
= 0.2009 m/det

F = Q
V
= 0.017
0.2009
= 0.0865 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.043
2
h = √0,04
3
= 0.208 m → b = 0.208 m
Jadi b saluran Tersier 10 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.201
h√(1+𝑚²))
= 0.017 / 0.201 70 x 0.109 2/3

√(1+1
0.208 + 2 x 0.208 ²) i½ = 0.201
= 0.087 0.276
0.208 + 0.588 i½ = 0.729
√0,729
= 0.0865 i =
0.7963 i = 0.854
= 0.1087
Dimensi Pembuangan :
A = 13.19 ha
Q = 0.017 m3/det
V = 0.201 m/det
h = 0.208 m
b = 0.208 m
i = 0.854
11) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T11 (A= 36.27 ha ; b = 0.329 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 36.27 0.92
= 1.62 x 27.21
= 44.086 l/det
= 0.044 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.04 ⁰′¹⁸²
= 0.42 x 0.57
= 0.238 m/det

F = Q
V
= 0.044
0.238
= 0.1853 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.093
2
h = √0,09
3
= 0.3044 m → b = 0.3044 m
Jadi b saluran Tersier 11 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.238
h√(1+𝑚²))
= 0.044 / 0.238 70 x 0.159 2/3

√(1+1
0.3044 + 2 x 0.304 ²) i½ = 0.238
= 0.185 0.59
0.3044 + 0.861 i½ = 0.403
√0,403
= 0.1853 i =
1.1652 i = 0.635
= 0.159
Dimensi Pembuangan :
A = 36.27 ha
Q = 0.044 m3/det
V = 0.238 m/det
h = 0.304 m
b = 0.304 m
i = 0.635
12) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T12 (A= 46.97 ha ; b = 0.366 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 46.97 0.92
= 1.62 x 34.52
= 55.923 l/det
= 0.056 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.59
= 0.2485 m/det

F = Q
V
= 0.056
0.2485
= 0.2251 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.113
2
h = √0,11
3
= 0.3354 m → b = 0.3354 m
Jadi b saluran Tersier 12 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.248
h√(1+𝑚²))
= 0.056 / 0.248 70 x 0.175 2/3

√(1+1
0.3354 + 2 x 0.335 ²) i½ = 0.248
= 0.225 0.717
0.3354 + 0.949 i½ = 0.347
√0,347
= 0.2251 i =
1.2842 i = 0.589
= 0.1752
Dimensi Pembuangan :
A = 46.97 ha
Q = 0.056 m3/det
V = 0.248 m/det
h = 0.335 m
b = 0.335 m
i = 0.589
13) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T13 (A= 48.07 ha ; b = 0.369 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 48.07 0.92
= 1.62 x 35.26
= 57.127 l/det
= 0.057 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.59
= 0.2495 m/det

F = Q
V
= 0.057
0.2495
= 0.229 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.115
2
h = √0,11
5
= 0.3384 m → b = 0.3384 m
Jadi b saluran Tersier 13 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.249
h√(1+𝑚²))
= 0.057 / 0.249 70 x 0.177 2/3

√(1+1
0.3384 + 2 x 0.338 ²) i½ = 0.249
= 0.229 0.729
0.3384 + 0.957 i½ = 0.342
√0,342
= 0.229 i =
1.2955 i = 0.585
= 0.1768
Dimensi Pembuangan :
A = 48.07 ha
Q = 0.057 m3/det
V = 0.249 m/det
h = 0.338 m
b = 0.338 m
i = 0.585
14) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T14 (A= 52.9 ha ; b = 0.384 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 52.9 0.92
= 1.62 x 38.51
= 62.387 l/det
= 0.062 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2535 m/det

F = Q
V
= 0.062
0.2535
= 0.2461 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.123
2
h = √0,12
3
= 0.3508 m → b = 0.3508 m
Jadi b saluran Tersier 14 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.253
h√(1+𝑚²))
= 0.062 / 0.253 70 x 0.183 2/3

√(1+1
0.3508 + 2 x 0.351 ²) i½ = 0.253
= 0.246 0.784
0.3508 + 0.992 i½ = 0.323
√0,323
= 0.2461 i =
1.343 i = 0.569
= 0.1833
Dimensi Pembuangan :
A = 52.9 ha
Q = 0.062 m3/det
V = 0.253 m/det
h = 0.351 m
b = 0.351 m
i = 0.569
15) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T15 (A= 49.51 ha ; b = 0.373 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 49.51 0.92
= 1.62 x 36.23
= 58.699 l/det
= 0.059 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2507 m/det

F = Q
V
= 0.059
0.2507
= 0.2341 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.117
2
h = √0,11
7
= 0.3422 m → b = 0.3422 m
Jadi b saluran Tersier 15 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.251
h√(1+𝑚²))
= 0.059 / 0.251 70 x 0.179 2/3

√(1+1
0.3422 + 2 x 0.342 ²) i½ = 0.251
= 0.234 0.746
0.3422 + 0.968 i½ = 0.336
√0,336
= 0.2341 i =
1.3099 i = 0.58
= 0.1787
Dimensi Pembuangan :
A = 49.51 ha
Q = 0.059 m3/det
V = 0.251 m/det
h = 0.342 m
b = 0.342 m
i = 0.58
16) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T16 (A= 40.55 ha ; b = 0.344 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 40.55 0.92
= 1.62 x 30.15
= 48.85 l/det
= 0.049 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.05 ⁰′¹⁸²
= 0.42 x 0.58
= 0.2425 m/det

F = Q
V
= 0.049
0.2425
= 0.2015 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.101
2
h = √0,10
1
= 0.3174 m → b = 0.3174 m
Jadi b saluran Tersier 16 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.242
h√(1+𝑚²))
= 0.049 / 0.242 70 x 0.166 2/3

√(1+1
0.3174 + 2 x 0.317 ²) i½ = 0.242
= 0.201 0.642
0.3174 + 0.898 i½ = 0.378
√0,378
= 0.2015 i =
1.2151 i = 0.615
= 0.1658
Dimensi Pembuangan :
A = 40.55 ha
Q = 0.049 m3/det
V = 0.242 m/det
h = 0.317 m
b = 0.317 m
i = 0.615
17) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T17 (A= 50.92 ha ; b = 0.378 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 50.92 0.92
= 1.62 x 37.18
= 60.235 l/det
= 0.060 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2519 m/det

F = Q
V
= 0.060
0.2519
= 0.2391 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.12
2
h = √0,12
= 0.3458 m → b = 0.3458 m
Jadi b saluran Tersier 17 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.252
h√(1+𝑚²))
= 0.060 / 0.252 70 x 0.181 2/3

√(1+1
0.3458 + 2 x 0.346 ²) i½ = 0.252
= 0.239 0.761
0.3458 + 0.978 i½ = 0.331
√0,331
= 0.2391 i =
1.3239 i = 0.575
= 0.1806
Dimensi Pembuangan :
A = 50.92 ha
Q = 0.060 m3/det
V = 0.252 m/det
h = 0.346 m
b = 0.346 m
i = 0.575
18) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T18 (A= 48.98 ha ; b = 0.372 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 48.98 0.92
= 1.62 x 35.88
= 58.121 l/det
= 0.058 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2502 m/det

F = Q
V
= 0.058
0.2502
= 0.2323 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.116
2
h = √0,11
6
= 0.3408 m → b = 0.3408 m
Jadi b saluran Tersier 18 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.25
h√(1+𝑚²))
= 0.058 / 0.25 70 x 0.178 2/3

√(1+1
0.3408 + 2 x 0.341 ²) i½ = 0.25
= 0.232 0.74
0.3408 + 0.964 i½ = 0.338
√0,338
= 0.2323 i =
1.3046 i = 0.582
= 0.178
Dimensi Pembuangan :
A = 48.98 ha
Q = 0.058 m3/det
V = 0.250 m/det
h = 0.341 m
b = 0.341 m
i = 0.582
19) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T19 (A= 48.02 ha ; b = 0.369 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 48.02 0.92
= 1.62 x 35.23
= 57.072 l/det
= 0.057 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.59
= 0.2494 m/det

F = Q
V
= 0.057
0.2494
= 0.2288 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.114
2
h = √0,11
4
= 0.3382 m → b = 0.3382 m
Jadi b saluran Tersier 19 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.249
h√(1+𝑚²))
= 0.057 / 0.249 70 x 0.177 2/3

√(1+1
0.3382 + 2 x 0.338 ²) i½ = 0.249
= 0.229 0.729
0.3382 + 0.957 i½ = 0.342
√0,342
= 0.2288 i =
1.295 i = 0.585
= 0.1767
Dimensi Pembuangan :
A = 48.02 ha
Q = 0.057 m3/det
V = 0.249 m/det
h = 0.338 m
b = 0.338 m
i = 0.585
20) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T20 (A= 47.79 ha ; b = 0.368 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 47.79 0.92
= 1.62 x 35.07
= 56.821 l/det
= 0.057 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.59
= 0.2492 m/det

F = Q
V
= 0.057
0.2492
= 0.228 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.114
2
h = √0,11
4
= 0.3376 m → b = 0.3376 m
Jadi b saluran Tersier 20 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.249
h√(1+𝑚²))
= 0.057 / 0.249 70 x 0.176 2/3

√(1+1
0.3376 + 2 x 0.338 ²) i½ = 0.249
= 0.228 0.726
0.3376 + 0.955 i½ = 0.343
√0,343
= 0.228 i =
1.2926 i = 0.586
= 0.1764
Dimensi Pembuangan :
A = 47.79 ha
Q = 0.057 m3/det
V = 0.249 m/det
h = 0.338 m
b = 0.338 m
i = 0.586
21) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T21 (A= 24.86 ha ; b = 0.282 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 24.86 0.92
= 1.62 x 19.22
= 31.144 l/det
= 0.031 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.03 ⁰′¹⁸²
= 0.42 x 0.53
= 0.2234 m/det

F = Q
V
= 0.031
0.2234
= 0.1394 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.07
2
h = √0,00
7
= 0.264 m → b = 0.264 m
Jadi b saluran Tersier 21 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.223
h√(1+𝑚²))
= 0.031 / 0.223 70 x 0.138 2/3

√(1+1
0.264 + 2 x 0.264 ²) i½ = 0.223
= 0.139 0.444
0.264 + 0.747 i½ = 0.503
√0,503
= 0.1394 i =
1.0108 i = 0.709
= 0.1379
Dimensi Pembuangan :
A = 24.86 ha
Q = 0.031 m3/det
V = 0.223 m/det
h = 0.264 m
b = 0.264 m
i = 0.709
22) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T22 (A= 24.94 ha ; b = 0.282 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 24.94 0.92
= 1.62 x 19.28
= 31.236 l/det
= 0.031 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.03 ⁰′¹⁸²
= 0.42 x 0.53
= 0.2235 m/det

F = Q
V
= 0.031
0.2235
= 0.1398 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.07
2
h = √0,00
7
= 0.2643 m → b = 0.2643 m
Jadi b saluran Tersier 22 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.223
h√(1+𝑚²))
= 0.031 / 0.223 70 x 0.138 2/3

√(1+1
0.2643 + 2 x 0.264 ²) i½ = 0.223
= 0.14 0.445
0.2643 + 0.748 i½ = 0.502
√0,502
= 0.1398 i =
1.012 i = 0.709
= 0.1381
Dimensi Pembuangan :
A = 24.94 ha
Q = 0.031 m3/det
V = 0.223 m/det
h = 0.264 m
b = 0.264 m
i = 0.709
23) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan T23 (A= 48.42 ha ; b = 0.370 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 48.42 0.92
= 1.62 x 35.5
= 57.509 l/det
= 0.058 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.59
= 0.2498 m/det

F = Q
V
= 0.058
0.2498
= 0.2303 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.115
2
h = √0,11
5
= 0.3393 m → b = 0.3393 m
Jadi b saluran Tersier 23 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.25
h√(1+𝑚²))
= 0.058 / 0.25 70 x 0.177 2/3

√(1+1
0.3393 + 2 x 0.339 ²) i½ = 0.25
= 0.23 0.733
0.3393 + 0.96 i½ = 0.341
√0,341
= 0.2303 i =
1.299 i = 0.584
= 0.1773
Dimensi Pembuangan :
A = 48.42 ha
Q = 0.058 m3/det
V = 0.250 m/det
h = 0.339 m
b = 0.339 m
i = 0.584
24) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S1 (A= 48.42 ha ; b = 0.396 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 48.42 0.92
= 1.62 x 35.5
= 57.509 l/det
= 0.058 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.59
= 0.2498 m/det

F = Q
V
= 0.058
0.2498
= 0.2303 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.115
2
h = √0,11
5
= 0.3393 m → b = 0.339307 m
Jadi b saluran Sekunder 1 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.25
h√(1+𝑚²))
= 0.058 / 0.25 70 x 0.177 2/3

√(1+1
0.3393 + 2 x 0.339 ²) i½ = 0.25
= 0.23 0.733
0.3393 + 0.96 i½ = 0.341
√0,341
= 0.2303 i =
1.299 i = 0.584
= 0.1773
Dimensi Pembuangan :
A = 48.42 ha
Q = 0.058 m3/det
V = 0.250 m/det
h = 0.339 m
b = 0.339 m
i = 0.584
25) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S2 (A= 98.22 ha ; b = 0.547 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 98.22 0.92
= 1.62 x 68.05
= 110.24 l/det
= 0.110 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.11 ⁰′¹⁸²
= 0.42 x 0.67
= 0.2812 m/det

F = Q
V
= 0.110
0.2812
= 0.3921 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.196
2
h = √0,19
6
= 0.4428 m → b = 0.443 m
Jadi b saluran Sekunder 2 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.281
h√(1+𝑚²))
= 0.110 / 0.281 70 x 0.231 2/3

√(1+1
0.4428 + 2 x 0.443 ²) i½ = 0.281
= 0.392 1.248
0.4428 + 1.252 i½ = 0.225
√0,225
= 0.3921 i =
1.6951 i = 0.475
= 0.2313
Dimensi Pembuangan :
A = 98.22 ha
Q = 0.110 m3/det
V = 0.281 m/det
h = 0.443 m
b = 0.443 m
i = 0.475
26) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S3 (A= 47.79 ha ; b = 0.393 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 47.79 0.92
= 1.62 x 35.07
= 56.821 l/det
= 0.057 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.59
= 0.2492 m/det

F = Q
V
= 0.057
0.2492
= 0.228 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.114
2
h = √0,11
4
= 0.3376 m → b = 0.338 m
Jadi b saluran Ssekunder 3 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.249
h√(1+𝑚²))
= 0.057 / 0.249 70 x 0.176 2/3

√(1+1
0.3376 + 2 x 0.338 ²) i½ = 0.249
= 0.228 0.726
0.3376 + 0.955 i½ = 0.343
√0,343
= 0.228 i =
1.2926 i = 0.586
= 0.1764
Dimensi Pembuangan :
A = 47.79 ha
Q = 0.057 m3/det
V = 0.249 m/det
h = 0.338 m
b = 0.338 m
i = 0.586
27) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S4 (A= 146.01 ha ; b = 0.680 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 146.01 0.92
= 1.62 x 98
= 158.76 l/det
= 0.159 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.16 ⁰′¹⁸²
= 0.42 x 0.72
= 0.3005 m/det

F = Q
V
= 0.159
0.3005
= 0.5284 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.264
2
h = √0,11
4
= 0.514 m → b = 0.514003 m
Jadi b saluran Sekunder 4 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.3
h√(1+𝑚²))
= 0.159 / 0.3 70 x 0.269 2/3

√(1+1
0.514 + 2 x 0.514 ²) i½ = 0.3
= 0.528 1.682
0.514 + 1.454 i½ = 0.179
√0,343
= 0.5284 i =
1.9678 i = 0.423
= 0.2685
Dimensi Pembuangan :
A = 146.01 ha
Q = 0.159 m3/det
V = 0.300 m/det
h = 0.514 m
b = 0.514 m
i = 0.4226
28) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S5 (A= 194.03 ha ; b = 0.789 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 194.03 0.92
= 1.62 x 127.3
= 206.23 l/det
= 0.206 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.21 ⁰′¹⁸²
= 0.42 x 0.75
= 0.3151 m/det

F = Q
V
= 0.206
0.3151
= 0.6545 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.327
2
h = √0,32
7
= 0.572 m → b = 0.572046 m
Jadi b saluran Sekunder 5 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.315
h√(1+𝑚²))
= 0.206 / 0.315 70 x 0.299 2/3

√(1+1
0.572 + 2 x 0.572 ²) i½ = 0.315
= 0.654 2.084
0.572 + 1.618 i½ = 0.151
√0,151
= 0.6545 i =
2.19 i = 0.389
= 0.2988
Dimensi Pembuangan :
A = 194.03 ha
Q = 0.206 m3/det
V = 0.315 m/det
h = 0.572 m
b = 0.572 m
i = 0.3889
29) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S6 (A= 243.01 ha ; b = 0.896 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 243.01 0.92
= 1.62 x 156.6
= 253.68 l/det
= 0.254 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.25 ⁰′¹⁸²
= 0.42 x 0.78
= 0.3272 m/det

F = Q
V
= 0.254
0.3272
= 0.7753 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.388
2
h = √0,38
8
= 0.6226 m → b = 0.623 m
Jadi b saluran Sekunder 6 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.327
h√(1+𝑚²))
= 0.254 / 0.327 70 x 0.325 2/3

√(1+1
0.6226 + 2 x 0.6226²) i½ = 0.327
= 0.775 2.468
0.6226 + 1.761 i½ = 0.133
√0,133
= 0.7753 i =
2.3836 i = 0.364
= 0.3253
Dimensi Pembuangan :
A = 243.01 ha
Q = 0.254 m3/det
V = 0.327 m/det
h = 0.6226 m
b = 0.6226 m
i = 0.3641
30) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S7 (A= 50.92 ha ; b = 0.404 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 50.92 0.92
= 1.62 x 37.18
= 60.235 l/det
= 0.060 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2519 m/det

F = Q
V
= 0.060
0.2519
= 0.2391 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.12
2
h = √0,38
8
= 0.3458 m → b = 0.346 m
Jadi b saluran Sekunder 7 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.252
h√(1+𝑚²))
= 0.060 / 0.252 70 x 0.181 2/3

√(1+1
0.3458 + 2 x 0.3458²) i½ = 0.252
= 0.239 0.761
0.3458 + 0.978 i½ = 0.331
√0,133
= 0.2391 i =
1.3239 i = 0.575
= 0.1806
Dimensi Pembuangan :
A = 50.92 ha
Q = 0.060 m3/det
V = 0.252 m/det
h = 0.3458 m
b = 0.3458 m
i = 0.5751
31) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S8 (A= 91.47 ha ; b = 0.533 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 91.47 0.92
= 1.62 x 63.73
= 103.25 l/det
= 0.103 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.10 ⁰′¹⁸²
= 0.42 x 0.66
= 0.2778 m/det

F = Q
V
= 0.103
0.2778
= 0.3716 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.186
2
h = √0,19
9
= 0.4311 m → b = 0.431 m
Jadi b saluran Sekunder 8 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.278
h√(1+𝑚²))
= 0.103 / 0.278 70 x 0.225 2/3

√(1+1
0.4311 + 2 x 0.4311²) i½ = 0.278
= 0.372 1.183
0.4311 + 1.219 i½ = 0.235
√0,223
= 0.3716 i =
1.6503 i = 0.485
= 0.2252
Dimensi Pembuangan :
A = 91.47 ha
Q = 0.103 m3/det
V = 0.278 m/det
h = 0.4311 m
b = 0.4311 m
i = 0.4846
32) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S9 (A= 49.51 ha ; b = 0.399 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 49.51 0.92
= 1.62 x 36.23
= 58.699 l/det
= 0.059 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2507 m/det

F = Q
V
= 0.059
0.2507
= 0.2341 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.117
2
h = √0,11
7
= 0.3422 m → b = 0.342 m
Jadi b saluran Sekunder 9 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.251
h√(1+𝑚²))
= 0.059 / 0.251 70 x 0.179 2/3

√(1+1
0.3422 + 2 x 0.3422²) i½ = 0.251
= 0.234 0.746
0.3422 + 0.968 i½ = 0.336
√0,336
= 0.2341 i =
1.3099 i = 0.58
= 0.1787
Dimensi Pembuangan :
A = 49.51 ha
Q = 0.059 m3/det
V = 0.251 m/det
h = 0.3422 m
b = 0.3422 m
i = 0.5799
33) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S10 (A= 241.95 ha ; b = 0.808 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 241.95 0.92
= 1.62 x 156
= 252.66 l/det
= 0.253 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.25 ⁰′¹⁸²
= 0.42 x 0.78
= 0.327 m/det

F = Q
V
= 0.253
0.327
= 0.7727 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.386
2
h = √0,38
6
= 0.6216 m → b = 0.622 m
Jadi b saluran Sekunder 10 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.327
h√(1+𝑚²))
= 0.253 / 0.327 70 x 0.325 2/3

√(1+1
0.6216 + 2 x 0.6216²) i½ = 0.327
= 0.773 2.46
0.6216 + 1.758 i½ = 0.133
√0,133
= 0.7727 i =
2.3797 i = 0.365
= 0.3247
Dimensi Pembuangan :
A = 241.95 ha
Q = 0.253 m3/det
V = 0.327 m/det
h = 0.6216 m
b = 0.6216 m
i = 0.3646
35) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S11 (A= 289.98 ha ; b = 1.000 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 289.98 0.92
= 1.62 x 184.2
= 298.47 l/det
= 0.298 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.30 ⁰′¹⁸²
= 0.42 x 0.80
= 0.337 m/det

F = Q
V
= 0.298
0.337
= 0.8856 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.443
2
h = √0,44
3
= 0.6654 m → b = 0.665 m
Jadi b saluran Sekunder 11 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.337
h√(1+𝑚²))
= 0.298 / 0.337 70 x 0.348 2/3

√(1+1
0.6654 + 2 x 0.6654²) i½ = 0.337
= 0.886 2.82
0.6654 + 1.882 i½ = 0.12
√0,12
= 0.8856 i =
2.5475 i = 0.346
= 0.3476
Dimensi Pembuangan :
A = 289.98 ha
Q = 0.298 m3/det
V = 0.337 m/det
h = 0.6654 m
b = 0.6654 m
i = 0.3457
36) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S12 (A= 98.90 ha ; b = 0.530 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 98.9 0.92
= 1.62 x 68.48
= 110.94 l/det
= 0.111 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.11 ⁰′¹⁸²
= 0.42 x 0.67
= 0.2815 m/det

F = Q
V
= 0.111
0.2815
= 0.3941 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.197
2
h = √0,19
7
= 0.4439 m → b = 0.444 m
Jadi b saluran Sekunder 12 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.281
h√(1+𝑚²))
= 0.111 / 0.281 70 x 0.232 2/3

√(1+1
0.4439 + 2 x 0.4439²) i½ = 0.281
= 0.394 1.255
0.4439 + 1.256 i½ = 0.224
√0,224
= 0.3941 i =
1.6995 i = 0.474
= 0.2319
Dimensi Pembuangan :
A = 98.90 ha
Q = 0.111 m3/det
V = 0.281 m/det
h = 0.4439 m
b = 0.4439 m
i = 0.4736
37) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan S13 (A= 48.79 ha ; b = 0.373 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 48.79 0.92
= 1.62 x 35.75
= 57.913 l/det
= 0.058 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.06 ⁰′¹⁸²
= 0.42 x 0.60
= 0.2501 m/det

F = Q
V
= 0.058
0.2501
= 0.2316 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.116
2
h = √0,11
6
= 0.3403 m → b = 0.340 m
Jadi b saluran Sekunder 13 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.25
h√(1+𝑚²))
= 0.058 / 0.25 70 x 0.178 2/3

√(1+1
0.3403 + 2 x 0.3403²) i½ = 0.25
= 0.232 0.737
0.3403 + 0.962 i½ = 0.339
√0,339
= 0.2316 i =
1.3027 i = 0.582
= 0.1778
Dimensi Pembuangan :
A = 48.79 ha
Q = 0.058 m3/det
V = 0.250 m/det
h = 0.3403 m
b = 0.3403 m
i = 0.5824
38) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan P1 (A= 531.93 ha ; b = 1.263 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 531.93 0.92
= 1.62 x 321.9
= 521.56 l/det
= 0.522 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.52 ⁰′¹⁸²
= 0.42 x 0.89
= 0.3731 m/det

F = Q
V
= 0.522
0.3731
= 1.398 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.699
2
h = √0,69
9
= 0.8361 m → b = 0.836 m
Jadi b saluran Primer 1 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.373
h√(1+𝑚²))
= 0.522 / 0.373 70 x 0.437 2/3

√(1+1
0.8361 + 2 x 0.8361²) i½ = 0.373
= 1.398 4.451
0.8361 + 2.365 i½ = 0.084
√0,084
= 1.398 i =
3.2008 i = 0.29
= 0.4368
Dimensi Pembuangan :
A = 531.93 ha
Q = 0.522 m3/det
V = 0.373 m/det
h = 0.8361 m
b = 0.8361 m
i = 0.2895
39) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan P2 (A= 581.39 ha ; b = 1.377 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 581.39 0.92
= 1.62 x 349.4
= 566.01 l/det
= 0.566 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.57 ⁰′¹⁸²
= 0.42 x 0.90
= 0.3787 m/det

F = Q
V
= 0.566
0.3787
= 1.4947 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.747
2
h = √0,74
7
= 0.8645 m → b = 0.865 m
Jadi b saluran Primer 2 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.379
h√(1+𝑚²))
= 0.566 / 0.379 70 x 0.452 2/3

√(1+1
0.8645 + 2 x 0.8645²) i½ = 0.379
= 1.495 4.759
0.8645 + 2.445 i½ = 0.08
√0,08
= 1.4947 i =
3.3097 i = 0.282
= 0.4516
Dimensi Pembuangan :
A = 581.39 ha
Q = 0.566 m3/det
V = 0.379 m/det
h = 0.8645 m
b = 0.8645 m
i = 0.2821
40) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan P3 (A= 630.22 ha ; b = 1.461 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 630.22 0.92
= 1.62 x 376.3
= 609.6 l/det
= 0.610 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.61 ⁰′¹⁸²
= 0.42 x 0.91
= 0.3838 m/det

F = Q
V
= 0.610
0.3838
= 1.5883 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.794
2
h = √0,79
4
= 0.8911 m → b = 0.891 m
Jadi b saluran Primer 3 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.384
h√(1+𝑚²))
= 0.610 / 0.384 70 x 0.466 2/3

√(1+1
0.8911 + 2 x 0.8911²) i½ = 0.384
= 1.588 5.057
0.8911 + 2.521 i½ = 0.076
√0,076
= 1.5883 i =
3.4117 i = 0.275
= 0.4655
Dimensi Pembuangan :
A = 630.22 ha
Q = 0.610 m3/det
V = 0.384 m/det
h = 0.8911 m
b = 0.8911 m
i = 0.2755
41) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan P4 (A= 828.99 ha ; b = 1.657 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 828.99 0.92
= 1.62 x 484.2
= 784.48 l/det
= 0.784 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.78 ⁰′¹⁸²
= 0.42 x 0.96
= 0.4018 m/det

F = Q
V
= 0.784
0.4018
= 1.9522 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 0.976
2
h = √0,97
6
= 0.988 m → b = 0.988 m
Jadi b saluran Primer 4 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.402
h√(1+𝑚²))
= 0.784 / 0.402 70 x 0.516 2/3

√(1+1
0.988 + 2 x 0.988 ²) i½ = 0.402
= 1.952 6.216
0.988 + 2.794 i½ = 0.065
√0,065
= 1.9522 i =
3.7824 i = 0.254
= 0.5161
Dimensi Pembuangan :
A = 828.99 ha
Q = 0.784 m3/det
V = 0.402 m/det
h = 0.988 m
b = 0.988 m
i = 0.2543
42) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan P5 (A= 975.72 ha ; b = 1.826 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 975.72 0.92
= 1.62 x 562.6
= 911.37 l/det
= 0.911 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.91 ⁰′¹⁸²
= 0.42 x 0.98
= 0.413 m/det

F = Q
V
= 0.911
0.413
= 2.2069 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 1.103
2
h = √1,10
3
= 1.0504 m → b = 1.050 m
Jadi b saluran Primer 5 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.413
h√(1+𝑚²))
= 0.911 / 0.413 70 x 0.549 2/3

√(1+1
1.0504 + 2 x 1.0504²) i½ = 0.413
= 2.207 7.027
1.0504 + 2.971 i½ = 0.059
√0,059
= 2.2069 i =
4.0216 i = 0.242
= 0.5488
Dimensi Pembuangan :
A = 975.72 ha
Q = 0.911 m3/det
V = 0.413 m/det
h = 1.0504 m
b = 1.0504 m
i = 0.2424
43) Qd = 1.62 x Dm x A0,92

Saluran Pembuangan P6 (A= 1024.51 ha ; b = 1.968 m)


Misal : Dm = 1

Qd = 1.62 x Dm x A0,92
= 1.62 x 1 x 1024.51 0.92
= 1.62 x 588.4
= 953.21 l/det
= 0.953 m³/det

V = 0.42 x Q ⁰′¹⁸²
= 0.42 x 0.95 ⁰′¹⁸²
= 0.42 x 0.99
= 0.4164 m/det

F = Q
V
= 0.953
0.4164
= 2.2894 m

m = 1
F = 2 h²
1 = 2 h²
h² = 1 → 1.145
2
h = √1,14
5
= 1.0699 m → b = 1.070 m
Jadi b saluran Primer 6 > b saluran pembuangannya ===============> OK

R = F V = K R 2/3 i 1/2

O i½ = V
= Q/V K R 2/3
(b + 2 i½ = 0.416
h√(1+𝑚²))
= 0.953 / 0.416 70 x 0.559
√(1+1
1.0699 + 2 x 1.06991
²) i½ = 0.416
= 2.289 7.289
1.0699 + 3.026 i½ = 0.057
√0,057
= 2.2894 i =
4.0961 i = 0.239
= 0.5589
Dimensi Pembuangan :
A = 1024.51 ha
Q = 0.953 m3/det
V = 0.416 m/det
h = 1.06991 m
b = 1.06991 m
i = 0.23899
2/3
PERHITUNGAN PINTU PENGAMBILAN

a) Bagunan Bagi 1 (BB1)


1 Saluran T7
Q 100% hulu = 0.171 m3/det ; V = 0.305 m/det ; b = 0.53 m ; h =
Q 100% hilir = 0.071 m /det 3 ;
V = 0.260 m/det ; b = 0.371 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.071 2/3 = 0.071 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.171
= 0.12 m /det
3

h70% = Q70% 2/3


= 0.12 2/3 = 0.12 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.12 = 0.12 = 0.1399 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.1399 = 0.14 = 0.007 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.191 + 0.0071
= 0.198 m

Z = 1/3 x H
= 1/3 x 0.1983
= 0.066 m

2 Saluran T8
Q 100% hulu = 0.171 m3/det ; V = 0.305 m/det ; b = 0.53 m ; h =
;
Q 100% hilir = 0.074 m3/det V = 0.261 m/det ; b = 0.376 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.074 2/3 = 0.074 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.171
= 0.12 m /det
3

h70% = Q70% 2/3


= 0.12 2/3 = 0.12 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.12 = 0.12 = 0.1399 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.1399 = 0.14 = 0.007 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.195 + 0.0071
= 0.202 m

Z = 1/3 x H
= 1/3 x 0.2024
= 0.067 m
0.530 m ; g = 9.81 m3/det
0.371 m

0.191 m

0.269 m

0.530 m ; g = 9.81 m3/det


0.376 m

0.195 m
0.269 m
b) Bagunan Bagi 2 (BB2)
1 Saluran S10
Q 100% hulu = 1.429 m3/det ; V = 0.448 m/det ; b = 1.263 m ; h =
Q 100% hilir = 0.479 m3/det ; V = 0.367 m/det ; b = 0.808 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.75 m

hi = Q hilir 2/3
= 0.479 2/3 = 0.479 =
( 1.71 x b pintu ) ( 1.71 x 0.75 ) 1.283

Q70% = 0.70 x Qhulu


= 0.70 x 1.429
= 1.001 m3/det

h70% = Q70% 2/3


= 1.001 2/3 = 1.001 =
( 1.71 x b pintu ) ( 1.71 x 0.75 ) 1.283

V = Q70% = 1.001 = 1.001 = 0.7802 m2/det


h70% x bHulu 1.71 x 0.75 1.283

hfi = V2 = 0.7802 = 0.78 = 0.04 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.519 + 0.0398
= 0.559 m

Z = 1/3 x H
= 1/3 x 0.5586
= 0.186 m

2 Saluran S11
Q 100% hulu = 1.429 m3/det ; V = 0.448 m/det ; b = 1.263 m ; h =
;
Q 100% hilir = 0.807 m3/det V = 0.404 m/det ; b = 1 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 1m

hi = Q hilir 2/3
= 0.807 2/3 = 0.807 =
( 1.71 x b pintu ) ( 1.71 x 1 ) 1.71
Q70% = 0.70 x Qhulu
= 0.70 x 1.429
= 1.001 m3/det

h70% = Q70% 2/3


= 1.001 2/3 = 1 =
( 1.71 x b pintu ) ( 1.71 x 1 ) 1.71

V = Q70% = 1.71 = 1.71 = 1 m2/det


h70% x bHulu 1.71 x 1 1.71

hfi = V2 = 1 = 1 = 0.051 m
2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.606 + 0.051
= 0.657 m

Z = 1/3 x H
= 1/3 x 0.6572
= 0.219 m
1.263 m ; g = 9.81 m3/det
0.808 m

0.519 m

0.847 m

1.263 m ; g = 9.81 m3/det


1 m

0.606 m
0.7 m
c) Bagunan Bagi 3 (BB3)
1 Saluran S2
Q 100% hulu = 0.314 m3/det ; V = 0.340 m/det ; b = 0.68 m ; h =
Q 100% hilir = 0.184 m3/det ; V = 0.309 m/det ; b = 0.547 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.184 2/3 = 0.184 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.314
= 0.22 m3/det

h70% = Q70% 2/3


= 0.22 2/3 = 0.220 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.220 = 0.22 = 0.2572 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.2572 = 0.257 = 0.013 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.36 + 0.0131
= 0.373 m

Z = 1/3 x H
= 1/3 x 0.3728
= 0.124 m

2 Saluran S11
Q 100% hulu = 0.314 m3/det ; V = 0.340 m/det ; b = 0.68 m ; h =
;
Q 100% hilir = 0.083 m3/det V = 0.267 m/det ; b = 0.393 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.083 2/3 = 0.083 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 0.314
= 0.22 m3/det

h70% = Q70% 2/3


= 0.22 2/3 = 0.22 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 1.71 = 1.71 = 2 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 2 = 2 = 0.102 m
2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.21 + 0.1019
= 0.312 m

Z = 1/3 x H
= 1/3 x 0.3124
= 0.104 m
0.680 m ; g = 9.81 m3/det
0.547 m

0.36 m

0.404 m

0.680 m ; g = 9.81 m3/det


0.393 m

0.21 m
0.404 m
d) BagunanSadap 1 (BS1)
1 Saluran T23
Q 100% hulu = 0.084 m3/det ; V = 0.267 m/det ; b = 0.396 m ; h =
Q 100% hilir = 0.071 m3/det ; V = 0.260 m/det ; b = 0.370 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.071 2/3 = 0.071 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.084
= 0.059 m3/det

h70% = Q70% 2/3


= 0.059 2/3 = 0.059 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.059 = 0.059 = 0.0685 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.0685 = 0.068 = 0.003 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.191 + 0.0035
= 0.194 m

Z = 1/3 x H
= 1/3 x 0.194
= 0.065 m
0.396 m ; g = 9.81 m3/det
0.370 m

0.191 m

0.167 m
e) Bagunan Sadap 2 (BS2)
1 Saluran T21
Q 100% hulu = 0.184 m3/det ; V = 0.309 m/det ; b = 0.547 m ; h =
Q 100% hilir = 0.037 m3/det ; V = 0.230 m/det ; b = 0.282 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.037 2/3 = 0.037 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.184
= 0.129 m3/det

h70% = Q70% 2/3


= 0.129 2/3 = 0.129 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.129 = 0.129 = 0.151 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.151 = 0.151 = 0.008 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.122 + 0.0077
= 0.13 m

Z = 1/3 x H
= 1/3 x 0.1299
= 0.043 m

2 Saluran T22
Q 100% hulu = 0.184 m3/det ; V = 0.309 m/det ; b = 0.547 m ; h =
;
Q 100% hilir = 0.037 m3/det V = 0.230 m/det ; b = 0.282 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.037 2/3 = 0.037 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 0.184
= 0.129 m3/det

h70% = Q70% 2/3


= 0.129 2/3 = 0.129 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 1.71 = 1.71 = 2 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 2 = 2 = 0.102 m
2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.122 + 0.1019
= 0.224 m

Z = 1/3 x H
= 1/3 x 0.2244
= 0.075 m
0.547 m ; g = 9.81 m3/det
0.282 m

0.122 m

0.284 m

0.547 m ; g = 9.81 m3/det


0.282 m

0.122 m
0.284 m
f) Bagunan Sadap 3 (BS3)
1 Saluran T20
Q 100% hulu = 0.083 m3/det ; V = 0.267 m/det ; b = 0.680 m ; h =
Q 100% hilir = 0.070 m3/det ; V = 0.259 m/det ; b = 0.368 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.07 2/3 = 0.07 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.083
= 0.058 m3/det

h70% = Q70% 2/3


= 0.058 2/3 = 0.058 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.058 = 0.058 = 0.0676 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.0676 = 0.068 = 0.003 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.189 + 0.0034
= 0.192 m

Z = 1/3 x H
= 1/3 x 0.1923
= 0.064 m
0.680 m ; g = 9.81 m3/det
0.368 m

0.189 m

0.166 m
g) Bagunan Sadap 4 (BS4)
1 Saluran T19
Q 100% hulu = 0.453 m3/det ; V = 0.364 m/det ; b = 0.789 m ; h =
Q 100% hilir = 0.071 m3/det ; V = 0.259 m/det ; b = 0.369 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.071 2/3 = 0.071 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.453
= 0.317 m3/det

h70% = Q70% 2/3


= 0.317 2/3 = 0.317 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.317 = 0.317 = 0.3706 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.3706 = 0.371 = 0.019 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.189 + 0.0189
= 0.208 m

Z = 1/3 x H
= 1/3 x 0.2084
= 0.069 m

2 Saluran S4
Q 100% hulu = 0.453 m3/det ; V = 0.364 m/det ; b = 0.789 m ; h =
;
Q 100% hilir = 0.314 m3/det V = 0.340 m/det ; b = 0.680 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.314 2/3 = 0.314 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 0.453
= 0.317 m3/det

h70% = Q70% 2/3


= 0.317 2/3 = 0.317 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.317 = 0.317 = 0.3706 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.3706 = 0.371 = 0.019 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.513 + 0.0189
= 0.532 m

Z = 1/3 x H
= 1/3 x 0.5319
= 0.177 m
0.789 m ; g = 9.81 m3/det
0.369 m

0.189 m

0.516 m

0.789 m ; g = 9.81 m3/det


0.680 m

0.513 m
0.516 m
h) Bagunan Sadap 5 (BS5)
1 Saluran T18
Q 100% hulu = 0.617 m3/det ; V = 0.385 m/det ; b = 0.896 m ; h =
Q 100% hilir = 0.072 m3/det ; V = 0.260 m/det ; b = 0.372 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.072 2/3 = 0.072 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.617
= 0.432 m3/det

h70% = Q70% 2/3


= 0.432 2/3 = 0.432 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.432 = 0.432 = 0.5052 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.5052 = 0.505 = 0.026 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.192 + 0.0258
= 0.218 m

Z = 1/3 x H
= 1/3 x 0.2177
= 0.073 m

2 Saluran S5
Q 100% hulu = 0.617 m3/det ; V = 0.385 m/det ; b = 0.896 m ; h =
;
Q 100% hilir = 0.453 m3/det V = 0.340 m/det ; b = 0.680 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.453 2/3 = 0.453 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 0.617
= 0.432 m3/det

h70% = Q70% 2/3


= 0.432 2/3 = 0.432 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.432 = 0.432 = 0.5052 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.5052 = 0.505 = 0.026 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.654 + 0.0258
= 0.68 m

Z = 1/3 x H
= 1/3 x 0.6801
= 0.227 m
0.896 m ; g = 9.81 m3/det
0.372 m

0.192 m

0.634 m

0.896 m ; g = 9.81 m3/det


0.680 m

0.654 m
0.634 m
i) Bagunan Sadap 6 (BS6)
1 Saluran T17
Q 100% hulu = 0.088 m3/det ; V = 0.270 m/det ; b = 0.404 m ; h =
Q 100% hilir = 0.075 m3/det ; V = 0.262 m/det ; b = 0.378 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.075 2/3 = 0.075 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.088
= 0.062 m3/det

h70% = Q70% 2/3


= 0.062 2/3 = 0.062 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.062 = 0.062 = 0.072 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.072 = 0.072 = 0.004 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.197 + 0.0037
= 0.201 m

Z = 1/3 x H
= 1/3 x 0.2007
= 0.067 m
0.404 m ; g = 9.81 m3/det
0.378 m

0.197 m

0.173 m
j) Bagunan Sadap S7 (BS7)
1 Saluran T16
Q 100% hulu = 0.174 m3/det ; V = 0.305 m/det ; b = 0.533 m ; h =
Q 100% hilir = 0.060 m3/det ; V = 0.251 m/det ; b = 0.344 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.06 2/3 = 0.06 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.174
= 0.122 m3/det

h70% = Q70% 2/3


= 0.122 2/3 = 0.122 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.122 = 0.122 = 0.1421 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.1421 = 0.142 = 0.007 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.169 + 0.0072
= 0.177 m

Z = 1/3 x H
= 1/3 x 0.1765
= 0.059 m

2 Saluran S7
Q 100% hulu = 0.174 m3/det ; V = 0.305 m/det ; b = 0.533 m ; h =
;
Q 100% hilir = 0.088 m3/det V = 0.270 m/det ; b = 0.404 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.088 2/3 = 0.088 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 0.174
= 0.122 m3/det

h70% = Q70% 2/3


= 0.122 2/3 = 0.122 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.122 = 0.122 = 0.1421 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.1421 = 0.142 = 0.007 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.22 + 0.0072
= 0.227 m

Z = 1/3 x H
= 1/3 x 0.2268
= 0.076 m
0.533 m ; g = 9.81 m3/det
0.344 m

0.169 m

0.272 m

0.533 m ; g = 9.81 m3/det


0.404 m

0.22 m
0.272 m
k) Bagunan Sadap 8 (BS8)
1 Saluran T15
Q 100% hulu = 0.086 m3/det ; V = 0.268 m/det ; b = 0.399 m ; h =
Q 100% hilir = 0.073 m3/det ; V = 0.261 m/det ; b = 0.373 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.073 2/3 = 0.073 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.086
= 0.06 m3/det

h70% = Q70% 2/3


= 0.06 2/3 = 0.060 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.060 = 0.06 = 0.07 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.07 = 0.07 = 0.004 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.193 + 0.0036
= 0.197 m

Z = 1/3 x H
= 1/3 x 0.197
= 0.066 m
0.399 m ; g = 9.81 m3/det
0.373 m

0.193 m

0.17 m
l) Bagunan Sadap 9 (BS9)
1 Saluran T13
Q 100% hulu = 0.479 m3/det ; V = 0.367 m/det ; b = 0.808 m ; h =
Q 100% hilir = 0.071 m3/det ; V = 0.259 m/det ; b = 0.369 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.071 2/3 = 0.071 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.479
= 0.336 m3/det

h70% = Q70% 2/3


= 0.336 2/3 = 0.336 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.336 = 0.336 = 0.3924 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.3924 = 0.392 = 0.02 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.19 + 0.02
= 0.21 m

Z = 1/3 x H
= 1/3 x 0.2096
= 0.070 m

2 Saluran T14
Q 100% hulu = 0.479 m3/det ; V = 0.367 m/det ; b = 0.808 m ; h =
;
Q 100% hilir = 0.078 m3/det V = 0.264 m/det ; b = 0.384 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.078 2/3 = 0.078 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 0.479
= 0.336 m3/det

h70% = Q70% 2/3


= 0.336 2/3 = 0.336 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.336 = 0.336 = 0.3924 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.3924 = 0.392 = 0.02 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.202 + 0.02
= 0.222 m

Z = 1/3 x H
= 1/3 x 0.2221
= 0.074 m

3 Saluran S8
Q 100% hulu = 0.479 m3/det ; V = 0.367 m/det ; b = 0.808 m ; h =
Q 100% hilir = 0.174 m3/det ; V = 0.305 m/det ; b = 0.533 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.174 2/3 = 0.174 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.479
= 0.336 m3/det

h70% = Q70% 2/3


= 0.336 2/3 = 0.336 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.336 = 0.336 = 0.3924 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.3924 = 0.392 = 0.02 m


2g 2 x 9.81 19.62
H1 = hi + hfi
= 0.345 + 0.02
= 0.365 m

Z = 1/3 x H
= 1/3 x 0.3654
= 0.122 m

4 Saluran S9
Q 100% hulu = 0.479 m3/det ; V = 0.367 m/det ; b = 0.808 m ; h =
Q 100% hilir = 0.086 m3/det ; V = 0.268 m/det ; b = 0.399 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.086 2/3 = 0.086 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.479
= 0.336 m3/det

h70% = Q70% 2/3


= 0.336 2/3 = 0.336 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.336 = 0.336 = 0.3924 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.3924 = 0.392 = 0.02 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.216 + 0.02
= 0.236 m

Z = 1/3 x H
= 1/3 x 0.2355
= 0.079 m
0.808 m ; g = 9.81 m3/det
0.369 m

0.19 m

0.536 m

0.808 m ; g = 9.81 m3/det


0.384 m

0.202 m
0.536 m

0.808 m ; g = 9.81 m3/det


0.533 m

0.345 m

0.536 m
0.808 m ; g = 9.81 m3/det
0.399 m

0.216 m

0.536 m
m) Bagunan Sadap 10 (BS10)
1 Saluran T12
Q 100% hulu = 0.807 m3/det ; V = 0.404 m/det ; b = 1.000 m ; h =
Q 100% hilir = 0.069 m3/det ; V = 0.258 m/det ; b = 0.366 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.069 2/3 = 0.069 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.807
= 0.565 m3/det

h70% = Q70% 2/3


= 0.565 2/3 = 0.565 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.565 = 0.565 = 0.6609 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.6609 = 0.661 = 0.034 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.187 + 0.0337
= 0.22 m

Z = 1/3 x H
= 1/3 x 0.2204
= 0.073 m

2 Saluran S6
Q 100% hulu = 0.807 m3/det ; V = 0.404 m/det ; b = 1.000 m ; h =
;
Q 100% hilir = 0.617 m3/det V = 0.385 m/det ; b = 0.896 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.617 2/3 = 0.617 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 0.807
= 0.565 m3/det

h70% = Q70% 2/3


= 0.565 2/3 = 0.565 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.565 = 0.565 = 0.6609 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.6609 = 0.661 = 0.034 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.805 + 0.0337
= 0.838 m

Z = 1/3 x H
= 1/3 x 0.8383
= 0.279 m
1.000 m ; g = 9.81 m3/det
0.366 m

0.187 m

0.759 m

1.000 m ; g = 9.81 m3/det


0.896 m

0.805 m
0.759 m
n) Bagunan Sadap 11 (BS11)
1 Saluran T10
Q 100% hulu = 1.767 m3/det ; V = 0.466 m/det ; b = 1.377 m ; h =
Q 100% hilir = 0.019 m3/det ; V = 0.205 m/det ; b = 0.217 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.019 2/3 = 0.019 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 1.767
= 1.237 m3/det

h70% = Q70% 2/3


= 1.237 2/3 = 1.237 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 1.237 = 1.237 = 1.4468 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 1.4468 = 1.447 = 0.074 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.08 + 0.0737
= 0.154 m

Z = 1/3 x H
= 1/3 x 0.1538
= 0.051 m

2 Saluran T11
Q 100% hulu = 1.767 m3/det ; V = 0.466 m/det ; b = 1.377 m ; h =
;
Q 100% hilir = 0.053 m3/det V = 0.246 m/det ; b = 0.329 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.053 2/3 = 0.053 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 1.767
= 1.237 m3/det

h70% = Q70% 2/3


= 1.237 2/3 = 1.237 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 1.237 = 1.237 = 1.4468 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 1.4468 = 1.447 = 0.074 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.157 + 0.0737
= 0.231 m

Z = 1/3 x H
= 1/3 x 0.2309
= 0.077 m

3 Saluran P1
Q 100% hulu = 1.767 m3/det ; V = 0.466 m/det ; b = 1.377 m ; h =
Q 100% hilir = 1.429 m3/det ; V = 0.448 m/det ; b = 1.263 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 1m

hi = Q hilir 2/3
= 1.429 2/3 = 1.429 =
( 1.71 x b pintu ) ( 1.71 x 1 ) 1.71

Q70% = 0.70 x Qhulu


= 0.70 x 1.767
= 1.237 m3/det

h70% = Q70% 2/3


= 1.237 2/3 = 1.237 =
( 1.71 x b pintu ) ( 1.71 x 1 ) 1.71

V = Q70% = 1.237 = 1.237 = 0.7234 m2/det


h70% x bHulu 1.71 x 1 1.71

hfi = V2 = 0.7234 = 0.723 = 0.037 m


2g 2 x 9.81 19.62
H1 = hi + hfi
= 0.887 + 0.0369
= 0.924 m

Z = 1/3 x H
= 1/3 x 0.9243
= 0.308 m
1.377 m ; g = 9.81 m3/det
0.217 m

0.08 m

1.279 m

1.377 m ; g = 9.81 m3/det


0.329 m

0.157 m
1.279 m

1.377 m ; g = 9.81 m3/det


1.263 m

0.887 m

0.806 m
0) Bagunan Sadap 12 (BS12)
1 Saluran T9
Q 100% hulu = 2.043 m3/det ; V = 0.478 m/det ; b = 1.461 m ; h =
Q 100% hilir = 0.072 m3/det ; V = 0.260 m/det ; b = 0.371 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.072 2/3 = 0.072 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 2.043
= 1.43 m3/det

h70% = Q70% 2/3


= 1.43 2/3 = 1.430 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 1.430 = 1.43 = 1.6728 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 1.6728 = 1.673 = 0.085 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.192 + 0.0853
= 0.277 m

Z = 1/3 x H
= 1/3 x 0.2769
= 0.092 m

2 Saluran P2
;
Q 100% hulu = 2.043 m3/det V = 0.478 m/det ; b = 1.461 m ; h =
Q 100% hilir = 1.767 m3/det ; V = 0.466 m/det ; b = 1.377 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 1.25 m

hi = Q hilir 2/3
= 1.767 2/3 = 1.767 =
( 1.71 x b pintu ) ( 1.71 x 1.25 ) 2.138
Q70% = 0.70 x Qhulu
= 0.70 x 2.043
= 1.43 m3/det

h70% = Q70% 2/3


= 1.43 2/3 = 1.430 =
( 1.71 x b pintu ) ( 1.71 x 1.25 ) 2.138

V = Q70% = 1.430 = 1.43 = 0.6691 m2/det


h70% x bHulu 1.71 x 1.25 2.138

hfi = V2 = 0.6691 = 0.669 = 0.034 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.881 + 0.0341
= 0.915 m

Z = 1/3 x H
= 1/3 x 0.915
= 0.305 m
1.461 m ; g = 9.81 m3/det
0.371 m

0.192 m

1.409 m

1.461 m ; g = 9.81 m3/det


1.377 m

0.881 m
0.765 m
p) Bagunan Sadap 13 (BS13)
1 Saluran T5
Q 100% hulu = 2.777 m3/det ; V = 0.506 m/det ; b = 1.657 m ; h =
Q 100% hilir = 0.064 m3/det ; V = 0.254 m/det ; b = 0.354 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.064 2/3 = 0.064 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 2.777
= 1.944 m3/det

h70% = Q70% 2/3


= 1.944 2/3 = 1.944 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 1.944 = 1.944 = 2.2739 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 2.2739 = 2.274 = 0.116 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.177 + 0.1159
= 0.293 m

Z = 1/3 x H
= 1/3 x 0.293
= 0.098 m

2 Saluran T6
;
Q 100% hulu = 2.777 m3/det V = 0.506 m/det ; b = 1.657 m ; h =
Q 100% hilir = 0.083 m3/det ; V = 0.267 m/det ; b = 0.394 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.083 2/3 = 0.083 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 2.777
= 1.944 m3/det

h70% = Q70% 2/3


= 1.944 2/3 = 1.944 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 1.944 = 1.944 = 2.2739 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 2.2739 = 2.274 = 0.116 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.211 + 0.1159
= 0.327 m

Z = 1/3 x H
= 1/3 x 0.3271
= 0.109 m

3 Saluran S12
Q 100% hulu = 2.777 m3/det ; V = 0.506 m/det ; b = 1.657 m ; h =
Q 100% hilir = 0.171 m3/det ; V = 0.305 m/det ; b = 0.530 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.171 2/3 = 0.171 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 2.777
= 1.944 m3/det

h70% = Q70% 2/3


= 1.944 2/3 = 1.944 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 1.944 = 1.944 = 2.2739 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 2.2739 = 2.274 = 0.116 m


2g 2 x 9.81 19.62
H1 = hi + hfi
= 0.342 + 0.1159
= 0.458 m

Z = 1/3 x H
= 1/3 x 0.4577
= 0.153 m

4 Saluran P3
Q 100% hulu = 2.777 m3/det ; V = 0.506 m/det ; b = 1.657 m ; h =
Q 100% hilir = 2.043 m3/det ; V = 0.478 m/det ; b = 1.461 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 1.25 m

hi = Q hilir 2/3
= 2.043 2/3 = 2.043 =
( 1.71 x b pintu ) ( 1.71 x 1.25 ) 2.138

Q70% = 0.70 x Qhulu


= 0.70 x 2.777
= 1.944 m3/det

h70% = Q70% 2/3


= 1.944 2/3 = 1.944 =
( 1.71 x b pintu ) ( 1.71 x 1.25 ) 2.138

V = Q70% = 1.944 = 1.944 = 0.9096 m2/det


h70% x bHulu 1.71 x 1.25 2.138

hfi = V2 = 0.9096 = 0.91 = 0.046 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.97 + 0.0464
= 1.017 m

Z = 1/3 x H
= 1/3 x 1.0167
= 0.339 m
1.657 m ; g = 9.81 m3/det
0.354 m

0.177 m

1.729 m

1.657 m ; g = 9.81 m3/det


0.394 m

0.211 m
1.729 m

1.657 m ; g = 9.81 m3/det


0.530 m

0.342 m

1.729 m
1.657 m ; g = 9.81 m3/det
1.461 m

0.97 m

0.939 m
q) Bagunan Sadap 14 (BS14)
1 Saluran T4
Q 100% hulu = 0.072 m3/det ; V = 0.261 m/det ; b = 0.373 m ; h =
Q 100% hilir = 0.062 m3/det ; V = 0.253 m/det ; b = 0.349 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.062 2/3 = 0.062 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 0.072
= 0.051 m3/det

h70% = Q70% 2/3


= 0.051 2/3 = 0.051 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 0.051 = 0.051 = 0.0593 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 0.0593 = 0.059 = 0.003 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.173 + 0.003
= 0.176 m

Z = 1/3 x H
= 1/3 x 0.1762
= 0.059 m
0.373 m ; g = 9.81 m3/det
0.349 m

0.173 m

0.152 m
r) Bagunan Sadap 15 (BS15)
1 Saluran T5
Q 100% hulu = 3.522 m3/det ; V = 0.528 m/det ; b = 1.826 m ; h =
Q 100% hilir = 0.086 m3/det ; V = 0.269 m/det ; b = 0.399 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.086 2/3 = 0.086 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 3.522
= 2.465 m3/det

h70% = Q70% 2/3


= 2.465 2/3 = 2.465 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 2.465 = 2.465 = 2.8836 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 2.8836 = 2.884 = 0.147 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.216 + 0.147
= 0.363 m

Z = 1/3 x H
= 1/3 x 0.3628
= 0.121 m

2 Saluran T3
;
Q 100% hulu = 3.522 m3/det V = 0.528 m/det ; b = 1.826 m ; h =
Q 100% hilir = 0.058 m3/det ; V = 0.250 m/det ; b = 0.341 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.058 2/3 = 0.058 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855
Q70% = 0.70 x Qhulu
= 0.70 x 3.522
= 2.465 m3/det

h70% = Q70% 2/3


= 2.465 2/3 = 2.465 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 2.465 = 2.465 = 2.8836 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 2.8836 = 2.884 = 0.147 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.167 + 0.147
= 0.314 m

Z = 1/3 x H
= 1/3 x 0.3135
= 0.105 m

3 Saluran S13
Q 100% hulu = 3.522 m3/det ; V = 0.528 m/det ; b = 1.826 m ; h =
Q 100% hilir = 0.072 m3/det ; V = 0.261 m/det ; b = 0.373 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.072 2/3 = 0.072 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 3.522
= 2.465 m3/det

h70% = Q70% 2/3


= 2.465 2/3 = 2.465 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 2.465 = 2.465 = 2.8836 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 2.8836 = 2.884 = 0.147 m


2g 2 x 9.81 19.62
H1 = hi + hfi
= 0.193 + 0.147
= 0.34 m

Z = 1/3 x H
= 1/3 x 0.3399
= 0.113 m

4 Saluran P4
Q 100% hulu = 3.522 m3/det ; V = 0.528 m/det ; b = 1.826 m ; h =
Q 100% hilir = 2.777 m3/det ; V = 0.506 m/det ; b = 1.657 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 1.5 m

hi = Q hilir 2/3
= 2.777 2/3 = 2.777 =
( 1.71 x b pintu ) ( 1.71 x 1.5 ) 2.565

Q70% = 0.70 x Qhulu


= 0.70 x 3.522
= 2.465 m3/det

h70% = Q70% 2/3


= 2.465 2/3 = 2.465 =
( 1.71 x b pintu ) ( 1.71 x 1.5 ) 2.565

V = Q70% = 2.465 = 2.465 = 0.9612 m2/det


h70% x bHulu 1.71 x 1.5 2.565

hfi = V2 = 0.9612 = 0.961 = 0.049 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 1.054 + 0.049
= 1.103 m

Z = 1/3 x H
= 1/3 x 1.1035
= 0.368 m
1.826 m ; g = 9.81 m3/det
0.399 m

0.216 m

2.026 m

1.826 m ; g = 9.81 m3/det


0.341 m

0.167 m
2.026 m

1.826 m ; g = 9.81 m3/det


0.373 m

0.193 m

2.026 m
1.826 m ; g = 9.81 m3/det
1.657 m

1.054 m

0.974 m
s) Bagunan Sadap 16 (BS16)
1 Saluran T1
Q 100% hulu = 4.228 m3/det ; V = 0.546 m/det ; b = 1.968 m ; h =
Q 100% hilir = 0.072 m3/det ; V = 0.260 m/det ; b = 0.371 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 0.5 m

hi = Q hilir 2/3
= 0.072 2/3 = 0.072 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

Q70% = 0.70 x Qhulu


= 0.70 x 4.228
= 2.96 m3/det

h70% = Q70% 2/3


= 2.96 2/3 = 2.960 =
( 1.71 x b pintu ) ( 1.71 x 0.5 ) 0.855

V = Q70% = 2.960 = 2.96 = 3.4614 m2/det


h70% x bHulu 1.71 x 0.5 0.855

hfi = V2 = 3.4614 = 3.461 = 0.176 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 0.192 + 0.1764
= 0.368 m

Z = 1/3 x H
= 1/3 x 0.3679
= 0.123 m

2 Saluran P5
Q 100% hulu = 4.228 m3/det ; V = 0.546 m/det ; b = 1.968 m ; h =
Q 100% hilir = 3.522 m3/det ; V = 0.528 m/det ; b = 1.826 m ; h =
Standar Pintu Romijin, Lebar pintu 0,5m ; 0,75m; 1m; 1,25m; 1,50m
Jadi memakai 1 pintu dengan b pintu 1.5 m

hi = Q hilir 2/3
= 3.522 2/3 = 3.522 =
( 1.71 x b pintu ) ( 1.71 x 1.5 ) 2.565
Q70% = 0.70 x Qhulu
= 0.70 x 4.228
= 2.96 m3/det

h70% = Q70% 2/3


= 2.96 2/3 = 2.960 =
( 1.71 x b pintu ) ( 1.71 x 1.5 ) 2.565

V = Q70% = 2.960 = 2.96 = 1.1538 m2/det


h70% x bHulu 1.71 x 1.5 2.565

hfi = V2 = 1.1538 = 1.154 = 0.059 m


2g 2 x 9.81 19.62

H1 = hi + hfi
= 1.235 + 0.0588
= 1.294 m

Z = 1/3 x H
= 1/3 x 1.2942
= 0.431 m
1.968 m ; g = 9.81 m3/det
0.371 m

0.192 m

2.288 m

1.968 m ; g = 9.81 m3/det


1.826 m

1.235 m
1.1 m