The document outlines an estimation training schedule from August 22nd to September 5th, 2019. Over the two week period, trainees will receive an introduction to oil and gas production processes, gas processing and LNG, and utility systems. They will learn about the estimation department structure and workflows. The majority of the training will involve a detailed review and study of a tender document to understand the technical and commercial requirements of a project, including scope of work, specifications, drawings, and commercial terms. On the last day, trainees will participate in a case study and submit a report. The goal is to teach the procedure for developing accurate cost estimates.
The document outlines an estimation training schedule from August 22nd to September 5th, 2019. Over the two week period, trainees will receive an introduction to oil and gas production processes, gas processing and LNG, and utility systems. They will learn about the estimation department structure and workflows. The majority of the training will involve a detailed review and study of a tender document to understand the technical and commercial requirements of a project, including scope of work, specifications, drawings, and commercial terms. On the last day, trainees will participate in a case study and submit a report. The goal is to teach the procedure for developing accurate cost estimates.
The document outlines an estimation training schedule from August 22nd to September 5th, 2019. Over the two week period, trainees will receive an introduction to oil and gas production processes, gas processing and LNG, and utility systems. They will learn about the estimation department structure and workflows. The majority of the training will involve a detailed review and study of a tender document to understand the technical and commercial requirements of a project, including scope of work, specifications, drawings, and commercial terms. On the last day, trainees will participate in a case study and submit a report. The goal is to teach the procedure for developing accurate cost estimates.
Introduction to Oil & Gas production Process Overview Reservoir & Well Heads Oil & Gas Process ABB Oil & Gas production 1 22/08/2019 Manifolds & Gatherings handbook Separation Gas Treatment & Compression Oil & Gas Storage, Metering & export Introduction to Oil & Gas production Gas Processing & LNG Utility Systems Control & safety systems ABB Oil & Gas production 2 23/08/2019 Integrated operations handbook Power generation, Distribution & Drives HVAC Water Systems Briefing of estimation department 3 26/08/2019 Department Structure Workflow Briefing of various activities 4 27/08/2019 Deliverables Inter Department Co-ordination Review & Study of Tender Document 5 28/08/2019 Technical Overview Tender Document Background of Project Page | 1 Basic Scope of work Functional Specifications Material Specifications Drawings & Documents Electrical (Single Line Diagram) Equipment layout Field layout Instrumentation Data 6 29/08/2019 P&ID Tender Document Marked up P&ID Soil Investigation report Review & Study of Tender Document Commercial Overview Invitation for Bids Instruction to Bidders General conditions of contract 7 30/08/2019 Tender Document Appendix A3 - Price format Appendix A10 - Payment milestone Appendix B12 - Integrity pact Appendix A16 - List of Agencies Appendix A11 - Suggested vendor list Understanding of estimation procedure 8 03/09/2019 Format for estimation Cost’s needed to be considered 9 04/09/2019 Case Study & Report Submission 10 05/09/2019