COMMENT RESOLUTION SHEET(CRS)

Project Name JIGCC Project, Package No. 06, Sea Water System CHEC Job Order No. 10-01525-0006

Document Title: Pile Integrity Testing – Heavy Haul Road Bridge Doc No: CHEC-JIGCC6IK-72-QC-TER-0076 Doc Rev. No: A00

CR
S
CRS No.: CRS Date Prepared By Checked By Reviewed By
Rev.
No.
CRS-CHEC-JIGCC6IK-72-QC-TER-0076-A00 A00 26-Oct-2016 HZX YH CM
7-Sep-
Comment / Transmittal Reference: JIGCCPD-SWSD-IK-T-0725/0771-16 Comment / Transmittal Date : 2016/10-Oct-
2016
Section or CHEC Status
Sr. AOC Remarks
Clause No. Client (SAPMT) Comments Contractor (CHEC) Response – Closed/
No. (if any)
and Page No. Open/ Hold

In section 5 Add SAES-H-l0lV -Approved Complied


1
-References protective coating system
Mention the Surface profile
In section 6.6 inspection requirements in
2 Surface Complied
Preparation accordance to SAES-H-l0lV, and
SAES-H-002V.

09-06-15 Page 1 of 1 CHEC-JIGCC6-71-QA-USC-0006_A02-Form - 11