• MSE Settlement
• Several Case Studies
• Granular backfill
• Tested and made into design theory, formulas, and methods of design by a
German engineer Gustav Adolph Wayss 1879
• Scale Models
• Full Scale Tests
• Measurements on Actual
Projects
• Experimental Walls
• Finite Element Studies
• Behavior of Walls Research
• Development of current
Design Methods
B / H ≥ 0.7
• Bearing Resistance
• Global Stability
Project Location
The Bayonne Bridge spans the Kill Van Kull and connects Bayonne, New Jersey with Staten
Island, New York. The Kill Van Kull is a major shipping channel for cargo ships accessing the
ports of Newark and Elizabeth, NJ. The Bayonne Bridge carries NY State Route 440 and New
Jersey State Route 440. Connecting Perth Amboy to Jersey City.
Bridge History
New Construction
When complete, the bridge roadway will be raised by 64 ft
Allowing larger container ships to access the ports
Project Information
Awarded to:
Design Only:
• 1,075 LF of Precast Coping
• 168 LF of Precast Half Connector
• 1,772 LF of Precast Traffic Barrier for TL-5 Loading
Temporary Wire Wall at Wall 3 (New York Side) with gantry crane.
Accommodating Settlement
On the New York side, anticipated wall settlements were a concern. RECo provided slip joint panels at regular intervals to
increase the ability of the wall to withstand differential settlements.
Reinforced Earth
Reinforced Earth
• MSE Walls:
• Changes in backfill and reinforcement location
• Possible additional stresses to connection
• Possible damage to panels
• Single Stage MSE wall built in phases 6”-18” (w/ Surcharge if necessary)
Slip
Joint
10/14/2001
10/24/2001
11/13/2001
11/23/2001
12/13/2001
12/23/2001
8/15/2001
8/25/2001
9/14/2001
9/24/2001
10/4/2001
11/3/2001
12/3/2001
1/12/2002
1/22/2002
8/5/2001
9/4/2001
1/2/2002
3.00
1.00
SETTLEMENT, INCHES
-1.00
-3.00
-5.00
-7.00
-9.00
DATE
COL. 116 COL. 149
• Walls constructed on wick drains with preloading using Geotrel Wire Wall
0.6
0.5
0.4
0.3
Series1
0.2
0.1
0
10
13
16
19
22
25
28
31
34
37
40
43
46
49
52
55
58
61
64
67
70
73
76
79
82
85
88
91
94
97
1
4
7
100
APC November 2016 41
Belt Parkway over Mill Basin, Brooklyn NY 2016
Wall 2 with Wire Wall Surcharge
with
IBC 13-83
FULL SCALE LOAD TEST PROGRAM FOR SUPPORT OF MSE WALL USING
RIGID INCLUSIONS / CMC IN NEW JERSEY
Frederic MASSE – Alex POTTER-WEIGHT MENARD USA
Sherif AZIZ – John SANKEY – Susan RAFALKO REINFORED EARTH
Mike WALKER – Mary NODINE GEI CONSULTANTS
Loads and Stresses