- THE FOUNDATION LOADS HAVE BEEN EXTRACTED FROM THE FOLLOWING
FOUNDATION. DOCUMENT, SUPPLIED BY SIEMENS - GAMESA:
0
6.5
Ø1
6.30
0.40 0.40
5.50
0.40
MATERIALS
5.50
6.30
- -
970
m³ CONCRETE IN PEDESTAL f'c=31MPa 23.70
Kg STEEL
N
ELECTRICAL ASTM AG15 G60 27 964
CONDUITS
D I O
0.40
TOWER FLANGES
I
Ø5
L T
.50
2x70Ø36
BLINDING CONCRTE
GROUT 10 cm
TOWER DOOR A
V RU C MATERIAL PROPERTIES ACCORDING TO
T
E 060 AND ACI-318
CONCRETE STEEL
EXECUTION
CONTROL
Ø
O STRUCTURAL
COVER cm
N NS
CONTROL
17
NOMINAL
.5 ELEMENT
N / mm²
0
TYPE
TYPE
1.60 PEDESTAL f´c = 40 MPa 5.0 ASTM A615 G60 N I
2'
-
R
DESIGN AT GROUND LEVEL
- CEMENTS WITH LOW HEAT OF HYDRATION SHALL BE USED
SECTION 1-1' - CEMENT TYPE V SHALL BE USED. THE MAXIMUM WATER / CEMENT RATIO SHALL BE 0.45.
SCALE 1 : 125 5.50 Ø5.50 5.50
CONCRETE
f´c=31Mpa
CONCRETE
f´c=40Mpa
GROUT
PVC DRAINAGE TUBE
COMPACTED SOIL
MINIMUM DENSITY 16.50 kN/m³
F O
1.00
0.15
2% 2% L BOLT = 4000mm
2% 2%
3.00
3.00
1.60
2%
3.40
1 1
0A 15/03/2019 VRM MPJ JMV
1 1
Rev. Description Date ep
Pdra edifV
ier Apoevrd
0.40
0.40
BLINDING CONCRETE
10 cm Promoter Design
Rua do Louredo, 447 T. (+351) 253 559 210
5.10 L 5.50x5.50 5.10
ELECTRICAL CONDUITS
Selho S. Lourenço F. (+351) 253 559 211
0.50
0.50 0.40 0.40 4800-214 Guimarães www.cjr-renewables.com
Ø16.50 (SHOULD BE DEFINED ACCORDING TO
SIEMENS-GAMESA´S SPECIFICATIÓN) Location
P.E. DUNA & HUAMBOS (36,75 MW) TÉCNICA Y PROYECTOS S.A. T. (+034) 963 379 220
Botiguers, 5 - 5º
CHOTA, CAJAMARCA, PERU 46980 - Paterna www.typsa.com
Phase Prepared by Verified by Approved by
PRELIMINARY DEFINITION VRM MPJ JMV
Drawing Title Drawing No. Revision
0A
PRELIMINARY DESIGN OF FOUNDATION D=16.50m
GENERAL DEFINITION
CJR101314.W.CD.D.C.041001