Professional Documents
Culture Documents
Operation Management Assignment: SEPTEMBER 24, 2018
Operation Management Assignment: SEPTEMBER 24, 2018
MANAGEMENT
ASSIGNMENT
SECOND WANCI
Product Description
Movement Supplier
(Miyota 2035)
Rp. 250.000 -
Rp. 300.000
Supplier kaca jam Customer
VENDOR SELECTION ANALYSIS
We assessed the capability of our vendor by determining 6 factors that is critical for us on
choosing the vendor. Those are the vendor location, prici.ng, quality of product, commitment
& fast response servicing, work duration and track record. Bellow attached the result of the
assessment from our vendor:
Finished product
in Workshop
Craftmans in
Workshop Second Wanci
Watch Machine supplier from FSRD Company
ABC Street Bandung
Examine material
for Quality and Move materials by
Crystal Watch supplier from
Quantity Operation staff using
ABC Street Bandung
Motorcycle
Manufacturing
Supplier Customer
Management
Monthly
Monthly Daily
Production
Supervisor
Ship 1
Daily Communication
RAB
- Masal ;
1. Bamboo ; Bambu Tali dan Gombong 15 rb dan 20 rb harga pas. Sama harga
kirim jadi 20 dan 25. 20-30 buah dan 20-40 buah. Sekitar 5 meter dua
duanya. Tali lebih tipis seratnya juga lebih kecil, Gombong lebih tebel
seratnya juga. Garut no 1 dan subang.
2. Mesin ; 25rb
3. Kaca ; 25rb
4. Strap ; Kain cari harga.
5. Ongkos kerja pengrajin bamboo ; 100 rb
6. Biaya pengrajin kain ; 20 rb / strap
7. Treatment ; Rendem pake boraks. Hargaa boraks 1 kg 70 trs bisa dipake
untuk 10 bambu.
8. Finishing Glossy ; Spray using cat dasar and tinner. Pengencer cet 300rb +
Tinner 40rb. 380 rb for 30 produk. 15 rb an dah
9. Packaging + Finishing lucu ; 70 rb
10. Grafier : Untuk nama brand 20 rb.