Professional Documents
Culture Documents
Federal Register / Vol. 82, No. 128 / Thursday, July 6, 2017 / Rules and Regulations
Federal Register / Vol. 82, No. 128 / Thursday, July 6, 2017 / Rules and Regulations
Federal Register / Vol. 82, No. 128 / Thursday, July 6, 2017 / Rules and Regulations
information on the availability of this U.S.C. 3501 et seq.), the OMB control
The following provisions also apply to this material at the FAA, call 425–227–1221.
number for the new collection
AD: (5) You may view this service information
(1) Alternative Methods of Compliance that is incorporated by reference at the requirements in the final rule.
(AMOCs): The Manager, New York Aircraft National Archives and Records Final subpart D contains three new
Certification Office (ACO), ANE–170, FAA, Administration (NARA). For information on collections of information. First, final
has the authority to approve AMOCs for this the availability of this material at NARA, call § 1910.23(b)(10) requires that employers
AD, if requested using the procedures found 202–741–6030, or go to: http:// ensure any ladder with structural or
VerDate Sep<11>2014 14:53 Jul 05, 2017 Jkt 241001 PO 00000 Frm 00012 Fmt 4700 Sfmt 4700 E:\FR\FM\06JYR1.SGM 06JYR1
Federal Register / Vol. 82, No. 128 / Thursday, July 6, 2017 / Rules and Regulations 31253
other defects be tagged immediately the hazard assessment and verification § 1910.8 OMB control numbers under the
with ‘‘Dangerous: Do Not Use’’ or requirements in 29 CFR 1910.132 to Paperwork Reduction Act.
similar language and removed from include assessments for workers who * * * * *
service until ‘‘repaired . . . or use personal fall protection systems (29
replaced.’’ The information will alert CFR 1910.140). These requirements are 29 CFR citation OMB control
employers and workers that the ladder contained in the Information Collection No.
is not safe and must not be used. Request (ICR) approved by OMB under
Second, final § 1910.27(b)(1)(i) control number 1218–0205, which * * * * *
requires, before any rope descent system OSHA included in the final rule 1910.27 ................................. 1218–0199
is used, that the building owner inform published in the Federal Register (81 1910.28 ................................. 1218–0199
the employer in writing that the FR 82978–80).
building owner has identified, tested, Additional public comment on the * * * * *
certified, and maintained each information collections in the final rule
anchorage so it is capable of supporting is not necessary. The public already has
[FR Doc. 2017–14122 Filed 7–5–17; 8:45 am]
at least 5,000 pounds (268 kg), in any had the opportunity to comment on the BILLING CODE 4510–26–P
direction for each employee attached. collections of information and OMB has
The information must be based on an approved them. This revision of
annual inspection by a qualified person § 1910.8 is a purely technical step to DEPARTMENT OF HOMELAND
and certification of each anchorage by a increase public awareness of OMB’s SECURITY
qualified person, as necessary, and at
approval of the collections of
least every 10 years. The information Coast Guard
information.
will assure employers and workers that
the building owner has inspected, tested Authority and Signature 33 CFR Part 117
and certified the anchorage, which the [Docket No. USCG–2017–0524]
employer may not own or have any Dorothy Dougherty, Deputy Assistant
control over, as safe to use. A related Secretary of Labor for Occupational
Safety and Health, directed the Drawbridge Operation Regulation; Mill
provision, final § 1910.27(b)(1)(ii), River, New Haven, CT
requires that the employer ensure no preparation of this notice under the
employee uses any anchorage before the authority of the Paperwork Reduction AGENCY: Coast Guard, DHS.
employer has obtained written Act of 1995 (44 U.S.C. 3506 et seq.) and ACTION:Notice of deviation from
information from the building owner Secretary of Labor’s Order No. 1–2012 drawbridge regulation.
indicating that each anchorage meets (77 FR 3912).
the requirements of § 1910.27(b)(1)(i). Signed at Washington, DC, on June 28, SUMMARY: The Coast Guard has issued a
The employer must keep the 2017. temporary deviation from the operating
information for the duration of the job. Dorothy Dougherty, schedule that governs the Chapel Street
The information will assure employers Deputy Assistant Secretary of Labor for Bridge across the Mill River, mile 0.4 at
and workers that the anchorages Occupational Safety and Health. New Haven, Connecticut. This deviation
employers use, but may not own or have is necessary to complete bridge deck
any control over, are safe to use. For the reasons stated in the replacement as well as various repairs.
Third, final § 1910.28(b)(1)(ii) preamble, the Occupational Safety and This deviation allows the bridge to open
specifies that when employers can Health Administration amends 29 CFR for the passage of vessels upon two
demonstrate that it is not feasible or part 1910 as follows: hours of advance notice as well as a ten
creates a greater hazard to use guardrail, day closure of the draw to all vessel
safety net, or personal fall protection PART 1910—OCCUPATIONAL SAFETY traffic.
systems on residential roofs, they must AND HEALTH STANDARDS
DATES: This deviation is effective from
develop and implement a written fall Subpart A—[Amended] 12:01 a.m. on July 10, 2017 through
protection plan that meets the 11:59 p.m. on September 9, 2017.
requirements of 29 CFR 1926.502(k) and 1. Revise the authority citation for
■ ADDRESSES: The docket for this
training that meets the requirements of subpart A to read as follows: deviation, USCG–2017–0524, is
29 CFR 1926.503(a) and (c). The
Authority: 29 U.S.C. 653, 655, 657; available at http://www.regulations.gov.
information collection ensures that
Secretary of Labor’s Order Numbers 12–71 Type the docket number in the
employers and workers will know what
(36 FR 8754), 8–76 (41 FR 25059), 9–83 (48 ‘‘SEARCH’’ box and click ‘‘SEARCH’’.
alternative measures will be used at a FR 35736),1–90 (55 FR 9033), 6–96 (62 FR Click on Open Docket Folder on the line
given worksite to provide an 111), 3–2000 (65 FR 50017), 5–2002 (67 FR associated with this deviation.
appropriate level of protection when 65008), 5–2007 (72 FR 31159), 4–2010 (75 FR
conventional fall protection is not FOR FURTHER INFORMATION CONTACT: If
55355), or 1–2012 (77 FR 3912), as
feasible. applicable.
you have questions on this temporary
These requirements are contained in Sections 1910.6, 1910.7, 1910.8 and 1910.9 deviation, call or email James M. Moore,
the Information Collection Request (ICR) also issued under 29 CFR 1911. Section Bridge Management Specialist, First
approved by OMB under control 1910.7(f) also issued under 31 U.S.C. 9701; District Bridge Branch, U.S. Coast
number 1218–0199, which OSHA 29 U.S.C. 9a; 5 U.S.C. 553; Public Law 106– Guard; telephone 212–514–4334, email
included in the final rule published in 113 (113 Stat. 1501A–222); Public Law 11– james.m.moore2@uscg.mil.
jstallworth on DSK7TPTVN1PROD with RULES
8 and 111–317; and OMB Circular A–25 SUPPLEMENTARY INFORMATION: The City
the Federal Register (81 FR 82978–80). (dated July 8, 1993) (58 FR 38142, July 15,
The collections of information in final 1993).
of New Haven, the owner of the bridge,
subpart D are necessary to ensure requested a temporary deviation from
workers are protected from death or ■ 2. Amend § 1910.8 by adding to the the normal operating schedule to
injury from falls from elevated heights. table, in the proper numerical sequence, facilitate rehabilitation of the bridge,
Final subpart I expands the existing the entries for ‘‘1910.27,’’ and specifically replacement of the bridge
collections of information contained in ‘‘1910.28,’’ to read as follows: deck. The Chapel Street Bridge, across
VerDate Sep<11>2014 14:53 Jul 05, 2017 Jkt 241001 PO 00000 Frm 00013 Fmt 4700 Sfmt 4700 E:\FR\FM\06JYR1.SGM 06JYR1