Professional Documents
Culture Documents
Time Sheet Mei 2014
Time Sheet Mei 2014
Time Sheet Mei 2014
SERVIS
Ruko balikpapan Baru Sentra Eropa III, Block AC.6 No.3
Balikpapan 76115, East Kalimantan - Indonesia
Phone / Fax +62 542 - 7204212, +62 8125558245
TIME Offshore
DATE Description Day off
FROM TO Days
26-May-14 8:00 17:00 PT. EXPRO (LGI Job)
27-May-14 ~ ~ PT. EXPRO (LGI Job)
28-May-14 8:00 17:00 PT. EXPRO (LGI Job)
29-May-14 ~ ~ PT. EXPRO (LGI Job)
30-May-14 8:00 17:00 Office
31-May-14 ~ ~ Day Off
1-Jun-14 ~ ~ Day Off
2-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
3-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
4-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
5-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
6-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
7-Jun-14 ~ ~ Day Off
8-Jun-14 ~ ~ Day Off
9-Jun-14 8:00 17:00 Day Off 1
10-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
11-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
12-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
13-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
14-Jun-14 ~ ~ Day Off
15-Jun-14 ~ ~ Day Off
16-Jun-14 8:00 17:00 Sakit 1
17-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
18-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
19-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
20-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
21-Jun-14 ~ ~ Day Off
22-Jun-14 ~ ~ Day Off
23-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
24-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
25-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
TOTAL 0 Days
Made by, Checked and Approved by,
OPERATION
Signature : Signature :
25-Jun-14
onshore Overtime
Days Hrs
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
20 Days hours
PT LD. SERVIS
Ruko balikpapan Baru Sentra Eropa III, Block AC.6 No.3
Balikpapan 76115, East Kalimantan - Indonesia
Phone / Fax +62 542 - 7204212, +62 8125558245
TIME Offshore
DATE Description Day off
FROM TO Days
26-May-14 8:00 17:00 PT. EXPRO (LGI Job)
27-May-14 8:00 17:00 PT. EXPRO (LGI Job)
28-May-14 8:00 17:00 PT. EXPRO (LGI Job)
29-May-14 8:00 17:00 PT. EXPRO (LGI Job)
30-May-14 8:00 17:00 PT. FMC (LGI Job)
31-May-14 ~ ~ Day Off
1-Jun-14 ~ ~ Day Off
2-Jun-14 8:00 17:00 PT. FMC (LGI Job)
3-Jun-14 8:00 17:00 PT. FMC (LGI Job)
4-Jun-14 8:00 17:00 PT. FMC (LGI Job)
5-Jun-14 8:00 17:00 PT. FMC (LGI Job)
6-Jun-14 8:00 17:00 PT. FMC (LGI Job)
7-Jun-14 8:00 17:00 PT. FMC (LGI Job)
8-Jun-14 ~ ~ Day Off
9-Jun-14 8:00 17:00 PT. FMC (LGI Job)
10-Jun-14 8:00 17:00 PT. FMC (LGI Job)
11-Jun-14 8:00 17:00 PT. FMC (LGI Job)
12-Jun-14 8:00 17:00 PT. FMC (LGI Job)
13-Jun-14 8:00 17:00 PT. FMC (LGI Job)
14-Jun-14 ~ ~ Day Off
15-Jun-14 ~ ~ Day Off
16-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
17-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
18-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
19-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
20-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
21-Jun-14 3:30 22:00 RIG RANIWORO 1
22-Jun-14 ~ ~ Day Off
23-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
24-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
25-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
TOTAL 1 Days
Made by, Checked and Approved by,
OPERATION
Signature : Signature :
25-Jun-14
onshore Overtime
Days Hrs
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
23 Days hours
PT LD. SERVIS
Ruko balikpapan Baru Sentra Eropa III, Block AC.6 No.3
Balikpapan 76115, East Kalimantan - Indonesia
Phone / Fax +62 542 - 7204212, +62 8125558245
TIME Offshore
DATE Description Day off
FROM TO Days
26-May-14 8:00 17:00 PT. EXPRO (LGI Job)
27-May-14 8:00 17:00 PT. EXPRO (LGI Job)
28-May-14 8:00 17:00 PT. EXPRO (LGI Job)
29-May-14 8:00 17:00 PT. EXPRO (LGI Job)
30-May-14 8:00 17:00 Office
31-May-14 ~ ~ Day Off
1-Jun-14 ~ ~ Day Off
2-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
3-Jun-14 8:00 17:00 PT.FMC (LGI Job)
4-Jun-14 8:00 17:00 PT.FMC (LGI Job)
5-Jun-14 8:00 17:00 PT.FMC (LGI Job)
6-Jun-14 8:00 17:00 PT.FMC (LGI Job)
7-Jun-14 ~ ~ Day Off
8-Jun-14 ~ ~ Day Off
9-Jun-14 8:00 17:00 PT.FMC (LGI Job)
10-Jun-14 8:00 17:00 PT.FMC (LGI Job)
11-Jun-14 8:00 17:00 PT.FMC (LGI Job)
12-Jun-14 8:00 17:00 PT.FMC (LGI Job)
13-Jun-14 8:00 17:00 PT.FMC (LGI Job)
14-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
15-Jun-14 ~ ~ Day Off
16-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
17-Jun-14 8:00 17:00 PT.FMC (LGI Job)
18-Jun-14 8:00 17:00 PT.FMC (LGI Job)
19-Jun-14 8:00 17:00 PT.FMC (LGI Job)
20-Jun-14 8:00 17:00 PT.FMC (LGI Job)
21-Jun-14 ~ ~ PT.FMC (LGI Job)
22-Jun-14 ~ ~ Day Off
23-Jun-14 8:00 17:00 PT.FMC (LGI Job)
24-Jun-14 8:00 17:00 PT.FMC (LGI Job)
25-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
TOTAL 0 Days
Made by, Checked and Approved by,
OPERATION
Signature : Signature :
25-Jun-14
onshore Overtime
Days Hrs
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
24 Days hours
PT LD. SERVIS
Ruko balikpapan Baru Sentra Eropa III, Block AC.6 No.3
Balikpapan 76115, East Kalimantan - Indonesia
Phone / Fax +62 542 - 7204212, +62 8125558245
TIME Offshore
DATE Description Day off
FROM TO Days
26-May-14 8:00 17:00
27-May-14 ~ ~ Isra' Mi'Raj Nabi Muhammad
28-May-14 8:00 17:00
29-May-14 ~ ~ Kenaikan Isa Al-masih
30-May-14 8:00 17:00
31-May-14 ~ ~ Day Off
1-Jun-14 ~ ~ Day Off
2-Jun-14 8:00 17:00
3-Jun-14 8:00 17:00
4-Jun-14 8:00 17:00
5-Jun-14 8:00 17:00
6-Jun-14 8:00 17:00
7-Jun-14 ~ ~ Day Off
8-Jun-14 ~ ~ Day Off
9-Jun-14 8:00 17:00
10-Jun-14 8:00 17:00
11-Jun-14 8:00 17:00
12-Jun-14 8:00 17:00
13-Jun-14 8:00 17:00
14-Jun-14 ~ ~ Day Off
15-Jun-14 ~ ~ Day Off
16-Jun-14 8:00 17:00
17-Jun-14 8:00 17:00
18-Jun-14 8:00 17:00
19-Jun-14 8:00 17:00
20-Jun-14 8:00 17:00
21-Jun-14 ~ ~ Day Off
22-Jun-14 ~ ~ Day Off
23-Jun-14 8:00 17:00
24-Jun-14 8:00 17:00
25-Jun-14 8:00 17:00
TOTAL 0 Days
Made by, Checked and Approved by,
OPERATION
Signature : Signature :
28-May-14
onshore Overtime
Days Hrs
Days hours
PT LD. SERVIS
Ruko balikpapan Baru Sentra Eropa III, Block AC.6 No.3
Balikpapan 76115, East Kalimantan - Indonesia
Phone / Fax +62 542 - 7204212, +62 8125558245
TIME Offshore
DATE Description Day off
FROM TO Days
26-May-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
27-May-14 ~ ~ Isra' Mi'Raj Nabi Muhammad
28-May-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
29-May-14 ~ ~ Kenaikan Isa Al-masih
30-May-14 8:00 17:00 Inspection of LGI (W/S P.BHI CHEVRON PENAJAM) 1
31-May-14 ~ ~ Day Off
1-Jun-14 ~ ~ Day Off
2-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
3-Jun-14 8:00 17:00 Hydrotest CEH & LGI (W/S P.BHI Facility 2 Bppn)
4-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
5-Jun-14 8:00 17:00 Hydrotest CEH and Change Colour Code all unit (Facilicity 2)
6-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
7-Jun-14 8:00 17:00 Floresend Of Packer (W/S P.BHI Facility 2 Bppn)
8-Jun-14 ~ ~ Day Off
9-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
10-Jun-14 8:00 17:00 MPI CEH and Change Colour Code all unit (Facilicity 2)
11-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
12-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
13-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
14-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
15-Jun-14 ~ ~ Day Off
16-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
17-Jun-14 ~ ~ Pel.Pembinaan Teknis Kualifikasi Inspektur Katup Pengaman Migas
18-Jun-14 ~ ~ Pel.Pembinaan Teknis Kualifikasi Inspektur Katup Pengaman Migas
19-Jun-14 ~ ~ Pel.Pembinaan Teknis Kualifikasi Inspektur Katup Pengaman Migas
20-Jun-14 ~ ~ Pel.Pembinaan Teknis Kualifikasi Inspektur Katup Pengaman Migas
21-Jun-14 ~ ~ Pel.Pembinaan Teknis Kualifikasi Inspektur Katup Pengaman Migas
22-Jun-14 ~ ~ Pel.Pembinaan Teknis Kualifikasi Inspektur Katup Pengaman Migas
23-Jun-14 ~ ~ Pel.Pembinaan Teknis Kualifikasi Inspektur Katup Pengaman Migas
24-Jun-14 ~ ~ Istirahat 1
25-Jun-14 13:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
OPERATION
Signature : Signature :
25-Jun-14
onshore Overtime
Days Hrs
1
1
1
1
1
1
1
1
1
1
1
1
1
16 Days hours
PT LD. SERVIS
Ruko balikpapan Baru Sentra Eropa III, Block AC.6 No.3
Balikpapan 76115, East Kalimantan - Indonesia
Phone / Fax +62 542 - 7204212, +62 8125558245
TIME Onshore
DATE Description Day off
FROM TO Days
26-May-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn) 1
27-May-14 ~ ~ Isra' Mi'Raj Nabi Muhammad
28-May-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn) 1
29-May-14 ~ ~ Kenaikan Isa Al-masih
30-May-14 8:00 17:00 Inspection of LGI (W/S P.BHI CHEVRON PENAJAM)
31-May-14 ~ ~ Day Off
1-Jun-14 ~ ~ Day Off
2-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn) 1
3-Jun-14 8:00 17:00 Hydrotest CMT & LGI (W/S P.BHI Facility 2 Bppn) 1
4-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn) 1
5-Jun-14 8:00 17:00 Hydrotest CMT and Change Colour Code all unit (Facilicity 2) 1
6-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn) 1
7-Jun-14 8:00 17:00 Floresend Of Packer (W/S P.BHI Facility 2 Bppn) 1
8-Jun-14 ~ ~ Day Off
9-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn) 1
10-Jun-14 8:00 17:00 MPI CMT and Change Colour Code all unit (Facilicity 2) 1
11-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
12-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
13-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
14-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
15-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
16-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
17-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
18-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
19-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
20-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
21-Jun-14 ~ ~ Day Off
22-Jun-14 ~ ~ Day Off
23-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn) 1
24-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn) 1
25-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn) 1
TOTAL 13 Days
Made by, Checked and Approved by,
OPERATION
Signature : Signature :
25-Jun-14
Offshore Overtime
Days Hrs
1
1
1
1
1
1
1
1
1
1
11 Days
PT LD. SERVIS
Ruko balikpapan Baru Sentra Eropa III, Block AC.6 No.3
Balikpapan 76115, East Kalimantan - Indonesia
Phone / Fax +62 542 - 7204212, +62 8125558245
TIME Offshore
DATE Description Day off
FROM TO Days
26-May-14
27-May-14
28-May-14
29-May-14
30-May-14
31-May-14
1-Jun-14
2-Jun-14
3-Jun-14
4-Jun-14
5-Jun-14
6-Jun-14
7-Jun-14
8-Jun-14
9-Jun-14
10-Jun-14
11-Jun-14
12-Jun-14 8:00 17:00 Office
13-Jun-14 8:00 17:00 Office
14-Jun-14 ~ ~ Day Off
15-Jun-14 ~ ~ Day Off
16-Jun-14 8:00 17:00 PT.FMC (LGI Job)
17-Jun-14 8:00 17:00 PT.FMC (LGI Job)
18-Jun-14 8:00 17:00 Day Off 1
19-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
20-Jun-14 8:00 17:00 PT. EXPRO (LGI Job)
21-Jun-14 ~ ~ Day Off
22-Jun-14 ~ ~ Day Off
23-Jun-14 8:00 17:00 PT.FMC (LGI Job)
24-Jun-14 8:00 17:00 PT.FMC (LGI Job)
25-Jun-14 14:00 17:00 Inspection of LGI (W/S P.BHI Facility 2 Bppn)
OPERATION
Signature : Signature :
25-Jun-14
onshore Overtime
Days Hrs
1
1
1
1
1
1
1
7 Days hours
PT LD. SERVIS
Ruko balikpapan Baru Sentra Eropa III, Block AC.6 No.3
Balikpapan 76115, East Kalimantan - Indonesia
Phone / Fax +62 542 - 7204212, +62 8125558245
TIME Onshore
DATE Description Day off
FROM TO Days
26-May-14
27-May-14
28-May-14
29-May-14
30-May-14
31-May-14
1-Jun-14
2-Jun-14
3-Jun-14
4-Jun-14
5-Jun-14
6-Jun-14
7-Jun-14
8-Jun-14
9-Jun-14
10-Jun-14
11-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
12-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
13-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
14-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
15-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
16-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
17-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
18-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
19-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
20-Jun-14 8:00 17:00 Inspection of LGI (W/S P.BHI Muara Badak)
21-Jun-14 ~ ~ Day Off
22-Jun-14 ~ ~ Day Off
23-Jun-14 8:00 17:00 PT. EXPRO (LGI Job) 1
24-Jun-14 8:00 17:00 PT. EXPRO (LGI Job) 1
25-Jun-14 8:00 17:00 PT. EXPRO (LGI Job) 1
TOTAL 3 Days
Made by, Checked and Approved by,
OPERATION
Signature : Signature :
25-Jun-14
Offshore Overtime
Days Hrs
1
1
1
1
1
1
1
1
1
1
10 Days