1 Removing single country tiled roof with Sq.m. 22.00 22.00


BDW battens and stacking the materials as
8 -3E directed with all leads and lifts etc.
complete.
Spec.No.: As directed by Engineer- in-
charge.

2 Removing double country tiled roof and Sq.m. 29.00 29.00


BDW ridge tiles with ridge and battens and
8B stacking the materials as directed with all
leads and lifts, complete including
removing wood work below.

Spec.No.: As directed by Engineer- in-


charge.

3 Removing Manglore tiled roof and ridge Sq.m. 26.00 25.00


BDW tiles with battens, ridge and barge boards,
8A eaves boards etc. and stacking the
materials as directed with all leads and
lifts complete. Including removing wood
work below.
Spec.No.: As directed by Engineer- in-
charge.
4 Removing and resetting Manglore tiles Sq.m. 13.50 13.00
from roof including refixing loose battens.

Spec.No.: As directed by Engineer- in-


charge
5 Removing G.I. and A.C sheet roof Sq.m. 14.50 14.00
covering and stacking them as and
where directed in the compound, including
scaffolding etc. complete.
Spec.No.: As directed by Engineer- in-
charge.

170
SR.NO. DESCRIPTION OF ITEMS UNIT RATES FOR 2009-2010
& CODE (In Rs)
NO.
Completed Labour

6 Removing G.I. and A.C sheet roofing Sq.m. 19.00 19.00


including purlins and rafters etc.
including sorting out serviceable and
unserviceable material and stacking the
same as and where directed in the
compound, including scaffolding etc.
complete.
Spec.No.: As directed by Engineer- in-
charge.

7 Removing R.S.girders of any size and M.T. 607.00 585.00


span lowering the same and stacking
neatly where ever directed in
compound,scaffolding etc. complete for all
height.
Spec.No.: As directed by Engineer- in-
charge.

8 Dismantling the R.C.C. work 1:2:4 and Cu.m. 502.00 502.00


BDW sorting out the materials such as steel etc.
8-3D as directed and stacking them within the
specified lead as directed.

Spec.No.: As directed by Engineer- in-


charge.

9 Removing planking from roof or ceiling Sq.m. 12.00 11.00


BDW and stacking them as directed with all
8D leads and lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

10 Removing queen post truss from roof No. 112.00 107.00


BDW and stacking the materials as directed with
8E all leads and lifts etc. complete.

171
SR.NO. DESCRIPTION OF ITEMS UNIT RATES FOR 2009-2010
& CODE (In Rs)
NO.
Completed Labour

Spec.No.: As directed by Engineer- in-


charge.

11 Removing king post truss from roof and No. 100.00 98.00
BDW stacking the materials as directed with all
8F leads and lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

12 Removing other type truss below 5 M No. 84.00 84.00


BDW span from roof and stacking the materials
8G as directed with all leads and lifts etc.
complete.
Spec.No.: As directed by Engineer- in-
charge.
13 Dismantling flat wooden or A.C. sheet Sq.m. 22.00 22.00
BDW ceiling with frame work including stacking
8J the materials as directed with all leads,
lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.
14 Removing cloth ceiling including frame Sq.m. 6.00 6.00
BDW work and stacking the materials as
8K directed with all leads, lifts etc.complete.

Spec.No.: As directed by Engineer- in-


charge.
15 Removing the tiles battens and dungree Sq.m. 20.00 20.00
cloth, purlins, rafters, ridges etc. from
roof, sorting out serviceable and
unserviceable materials and stacking the
same as and where directed in the
compound scaffolding etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

172
SR.NO. DESCRIPTION OF ITEMS UNIT RATES FOR 2009-2010
& CODE (In Rs)
NO.
Completed Labour

16 Removing battens from roof and Rmt. 2.00 2.00


BDW stacking them as directed with all leads
8-3F and lifts etc. complete.
Spec.No.: As directed by Engineer- in-
charge.

17 Removing matting from roof and Sq.m. 1.50 1.50


BDW stacking as directed with all leads and lifts
8 -3G etc. complete.
Spec.No.: As directed by Engineer- in-
charge.

18 Removing purlins from roof including Rmt. 2.00 2.00


BDW stacking as directed with all leads, lifts etc.
8-3H complete.

Spec.No.: As directed by Engineer- in-


charge.

19 Removing rafters from roof including the Rmt. 2.00 2.00


BDW materials as directed with all leads, lifts
8-3I etc. complete.
Spec.No.: As directed by Engineer- in-
charge.

20 Removing cloth partition with frame Sq.m. 1.00 1.00


BDW work and stacking the materials as
8-4 directed with all leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

21 Removing doors and windows with No. 50.00 50.00


BDW frames and stacking the materials as
8-1G directed with all leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

173
SR.NO. DESCRIPTION OF ITEMS UNIT RATES FOR 2009-2010
& CODE (In Rs)
NO.
Completed Labour

22 Removing ventilators and small No. 50.00 50.00


BDW windows with frame and stacking the
8-1H materials with all leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

23 Removing wooden or A.C. partition Sq.m. 8.00 8.00


BDW including frame work and stacking the
9-1I material as directed with all leads, lifts etc.
complete.
Spec.No.: As directed by Engineer- in-
charge.

24 Removing teak wood trellies work with Sq.m. 8.00 8.00


BDW frame including stacking the materials as
8-2 directed with frame all leads, lifts etc.
complete.
Spec.No.: As directed by Engineer- in-
charge.

25 Dismantling wooden floor including Sq.m. 5.30 5.30


BDW beams and joists, stacking the materials
8-2C as directed with all leads, lifts etc.
complete.
Spec.No.: As directed by Engineer- in-
charge.

26 Removing cement or lime plaster Sq.m. 11.00 11.00


BDW including disposing of the spoils as
8-2D directed with all leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

174
SR.NO. DESCRIPTION OF ITEMS UNIT RATES FOR 2009-2010
& CODE (In Rs)
NO.
Completed Labour

27 Removing mud plaster including Sq.m. 3.00 3.00


BDW disposing of the spoils as directed with all
8-2E leads, lifts etc. complete.
Spec.No.: As directed by Engineer- in-
charge.
28 Dismantling brick masonry in mud Cu.m. 57.00 57.00
BDW mortar and stacking the materials as
8-1 directed with all leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.
29 Dismantling brick masonry in lime or Cu.m. 103.00 103.00
BDW cement mortar and stacking the
8-1A materials as directed with all leads, lifts
etc. complete.
Spec.No. : As directed by Engineer-in-
charge.
30 Dismantling stone masonry in mud Cu.m. 63.00 63.00
BDW including stacking the materials as
8-1B directed with all leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.
31 Dismantling stone masonry in lime or Cu.m. 117.00 117.00
BDW cement mortar including stacking the
8-1C materials as directed with all leads, lifts
etc. complete.
Spec.No.: As directed by Engineer- in-
charge.
32 Removing cement tiles, or marble or Sq.m. 29.00 29.00
BDW polished shahabad floor or dado
8-2.1 without bed concrete including stacking
the materials as directed with all leads,
lifts etc. complete.
Spec.No.: As directed by Engineer- in-
charge.

175
SR.NO. DESCRIPTION OF ITEMS UNIT RATES FOR 2009-2010
& CODE (In Rs)
NO.
Completed Labour

33 Removing Shahabad or Tandur stones Sq.m. 24.00 24.00


BDW from floor without bed concrete including
8-2B stacking the materials as directed with all
leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

34 Removing rich mix cement concrete Cu.m. 543.00 543.00


BDW including stacking the spoils as directed
8-1E with all leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

35 Removing brick bat coba including Cu.m. 74.00 74.00


BDW stacking the spoils as directed with all
8-1F leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

36 Removing lime or lean cement concrete Cu.m. 219.00 219.00


BDW including stacking the spoils as directed
8-1D with all leads, lifts etc.complete.

Spec.No.: As directed by Engineer- in-


charge.

37 Removing trap stone from floor without Sq.m. 22.00 22.00


BDW bed concrete including stacking the
8-2A materials as directed with all leads, lifts
etc. complete.
Spec.No.: As directed by Engineer- in-
charge.

176
SR.NO. DESCRIPTION OF ITEMS UNIT RATES FOR 2009-2010
& CODE (In Rs)
NO.
Completed Labour

38 Removing wire fencing with wooden Rmt. 3.00 3.00


BDW post and stacking the material with all
8-2F leads, lifts etc. complete.

Spec.No.: As directed by Engineer- in-


charge.
39 Removing wire fencing with iron/ C.C. Rmt. 4.00 4.00
BDW fencing posts and stacking the materials
8-2G as directed with all leads, lifts etc.
complete.

Spec.No.: As directed by Engineer- in-


charge.
40 Removing iron pipe railing having Rmt. 4.00 4.00
BDW wooden R.C.C. or C.C. or iron posts and
8-2H stacking the materials as directed.

Spec.No.: As directed by Engineer- in-


charge.
41 Removing old paint from steel and Sq.m. 12.00 12.00
BDO other metal surface with flame, cleaning
8B and making the surface even and
scaffolding etc. complete.

Spec.No.: As directed by Engineer- in-


charge.
42 Removing old paint from steel and Sq.m. 4.00 4.00
BDO other metal surface with hand
82 scrapping, cleaning and making the
surface even and scaffolding etc.
complete.
Spec.No.: As directed by Engineer- in-
charge.

177
SR.NO. DESCRIPTION OF ITEMS UNIT RATES FOR 2009-2010
& CODE (In Rs)
NO.
Completed Labour

43 Removing Urinal Pans or W.H.B. with No. 34.00 34.00


BDW frame including disconnecting the sanitary
15 and water supply connections, removing
the same carefully and stacking the
serviceable materials as and where
directed including throwing the
unserviceable materials outside.

Spec.No.: As directed by Engineer- in-


charge.

44 Removing W.C. Pan including No. 75.00 75.00


BDW disconnecting the sanitary and water
16 supply connections, removing and
breaking flooring and bed concrete
around pan centre to centre including
removing the same carefully and stacking
serviceable materials as and where
directed including throwing the
unserviceable material out side etc
complete

Spec.No.: As directed by Engineer- in-


charge.

45 Scraping out old white wash/colour Sq.m. 1.00 1.00


BDW wash by, brushing and or scraping by
16 sand paper and preparing the wall surface
smooth including necessary repairs to
scratches etc. complete.

Spec.No.: As directed by Engineer- in-


charge.

178
SR.NO. DESCRIPTION OF ITEMS UNIT RATES FOR 2009-2010
& CODE (In Rs)
NO.
Completed Labour

46 Scraping out old white wash/colour Sq.m. 6.00 6.00


BDW wash/distemper by brushing and or
16 scraping by sand paper and preparing
the wall surface for applying full putty
of approved make to complete surface,
scraping with sand paper and making
smooth surface to receive further painting
coats etc. complete.

Spec.No.: As directed by Engineer- in-


charge.
47 Transportation of material obtained
BDW from debris of various sorts including
16 necessary excavation/ loosing including
loading, unloading and conveying and
disposing as directed.
(a) For 1 Km. Cu.m. 123.00
(b) For 2 Km. Cu.m. 136.00
(c ) For 3 Km. Cu.m. 148.00
(d) For 4 Km. Cu.m. 160.00
(e) For 5 Km. Cu.m. 173.00

Spec.No.: As directed by Engineer- in-