1 0.00 0.00
2 0.00 0.50
3 0.50 0.80
4 0.50 4.30
5 1.00 4.30
6 1.50 0.80
7 2.50 0.50
8 2.50 0.00
9 0.00 0.00
1 0.00 1.30
2 0.50 1.30
1 0.50 0.00
2 2.50 0.00
1 0.00 0.00
2 0.50 0.00
Location :
438985196.xls-09/25/2019
STABILITY
S
: D1 - Hulu
|e| = 0.28 m < B/6 = 0.42 m OK! |e| = 0.44 m < B/3 = 0.83 m OK!
q1 = 12.29 t/m2 < qa = 18.30 t/m2 OK! q1 = 15.08 t/m2 < qae = 27.45 t/m2 OK!
q2 = 3.01 t/m2 < qa = 18.30 t/m2 OK! q2 = 0.00 t/m2 < qae = 27.45 t/m2 OK!
438985196.xls-09/25/2019
Stressing of Reinforcement and Concrete
Name of Structure : D1 - Hulu
Location : 0
Normal Condition Allowable compressive stress (s ca) = 60 kg/cm2
Allowable tensile stress (s sa) = 1850 kg/cm2
Allowable shearing stress (t a) = 5.5 kg/cm2
Young's modulus ratio = 24
Item Section A-A Section B-B Section C-C Section D-D
b (cm) 100.0 100.0 100.0 100.0
A A
h (cm) 111.4 100.0 80.0 80.0
D C d1 (cm) 7.0 back 7.0 back 7.0 lower 7.0 upper
B B d2 (cm) 7.0 front 7.0 front 7.0 upper 7.0 lower
d (cm) 104.4 93.0 73.0 73.0
M (ton m) 5 5 1 2
S (ton) 4 4 5 3
D C
Bar size and spacing (mm)
Bar (As1) D 25 - 200 D 25 - 100 D 25 - 250 D 25 - 100
Section of Retaining wall Bar (As2) D 16 - 250 D 16 - 125 D 25 - 250 D 25 - 250
Stress sc 3 OK! 3 OK! 2 OK! 2 OK!
Stress ss 208 OK! 122 OK! 99 OK! 67 OK!
Stress t 0.37 OK! 0.42 OK! 0.67 OK! 0.48 OK!
438985196.xls-09/25/2019
Stability6/36
1. Design Data
1.1 Dimensions q (t/m2)
b11 b12 b13
B = 2.50 m H = 4.30 m
L = 1.00 m (unit length)
h1 = 4.30 m h4 = 1.30 m
h31 = 0.50 m hw1 = 0.00 m hw1
h32 = 0.30 m hw2 = 0.00 m hw2
h32
h4
1.2 Parameters h31
2. Stability Calculation
2.1 Case 1 (Normal condition, with vertical live load)
0.50
q = 0.50 t/m2 0.50
0.00
qa1
9
Pa1
Pa2 10 7
4.30 3.50
qa2 11
8
0.30
Pa3 6
0.00 12 5
Pw1 4
Pa4
1.30 0.00
1 2 3 Pp1 0.50 Pw2
Pu1 O
qw1 qa4 qa3 qp1 qw2
qu2 Pu2
qu1
1.00 1.00 0.50
438985196.xls-09/25/2019
Stability7/36
(1) Vertical Load
Cos2(f -a)
Ka =
Sin(f+d) x Sinf 2
Cos2a x Cos(a+d) x 1+
Cos(a+d) x Cosa
(for stability analysis)
a = 0.000 o
d = 0.000 o
Cos2(f+a)
Kp =
Sin(f+d) x Sinf 2
Cos2a x Cos(a -d) x 1-
Cos(a -d) x Cosa
a = 0.000 o
d = 0.000 o
Kp = 3.000
438985196.xls-09/25/2019
Stability8/36
B 2.50
e = - X = - 0.998 = 0.252 m < B/6 = 0.417 m OK !
2 2
a) -2 With Uplift
B = 2.50 m
B 2.50
e = - X = - 0.998 = 0.252 m < B/6 = 0.417 m OK !
2 2
HR 9.524
Fs = = = 2.784 > 2.00 OK !
SH 3.421
b)-2 With Uplift
Sliding force : SH = 3.421 ton
Resistance : HR = m x S W = 0.50 x 19.048 = 9.524 ton
(friction coefficient : m = 0.5 )
HR 9.524
Fs = = = 2.784 > 2.00 OK !
SH 3.421
19.048 6x 0.252
q1 = x (1 + ) = 12.227 t/m2 < qa = 18.300 t/m2 OK !
2.50 2.50
19.048 6x 0.252
q2 = x (1 - ) = 3.011 t/m2 < qa = 18.300 t/m2 OK !
2.50 2.50
Reaction of Foundation Soil in Case 1
438985196.xls-09/25/2019
Stability10/36
2.2 Case 2 (Normal condition, without vertical live load)
0.50
q = 0.50 t/m2 0.50
0.00
qa1
9
Pa1
Pa2 10 7
4.30 3.50
qa2 11
8
0.30
Pa3 6
0.00 12 4 5
Pw1 Pa4
1.30 0.00
1 2 3 Pp1 0.50 Pw2
Kp = 3.000
qa1 = Ka x q = 0.167 ton/m
qa2 = Ka x (h1- hw1) x gsoil = 2.437 ton/m
qa3 = qa1 + qa2 = 2.603 ton/m
qa4 = Ka x hw1 x (gsat - gw) = 0.000 ton/m
qw 1 = hw1 x gw = 0.000 ton/m
qw2 = hw2 x gw = 0.000 ton/m
qp1 = Kp x h4 x (gsat - gw) = 3.900 ton/m
438985196.xls-09/25/2019
Stability11/36
Total 3.421 7.95
438985196.xls-09/25/2019
Stability12/36
(3) Stability Calculation
HR 9.149
Fs = = = 2.67 > 2.00 OK !
SH 3.421
b)-2 with Uplift Pressure
Sliding force : SH = 3.421 ton
Resistance : HR = m x S W = 0.50 x 18.298 = 9.149 ton
(friction coefficient : m = 0.5 )
HR 9.149
Fs = = = 2.67 > 2.00 OK !
SH 3.421
SW 6xe
q1,2 = x (1 + )
B B
18.298 6x 0.283
q1 = x (1 + ) = 12.290 t/m2 < qa = 18.300 t/m2 OK !
2.50 2.50
18.298 6x 0.283
q2 = x (1 - ) = 2.348 t/m2 < qa = 18.300 t/m2 OK !
2.50 2.50
438985196.xls-09/25/2019
Stability13/36
2.3 Case 3 (Seismic condition)
0.50
0.50
0.00
10 7
4.30 Pa1 3.50
qa1 11
8
0.30
6
0.00 Pa2
12 4 5
Pw1
Pa3 1.30 0.00
1 2 3 Pp1 0.50 Pw2
Cos2(f-F-a)
Kae =
2
Sin(f+d) x Sin(f-b-F)
CosF x Cos2a x Cos(a+d+F) x 1+
Cos(a+d+F) x Cos(a-b)
438985196.xls-09/25/2019
Stability14/36
Kae = 0.493 (for structural analysis)
Cos2(f-F+a)
Kpe =
2
Sin(f-d) x Sin(f+b-F)
CosF x Cos2a x Cos(a+d-F) x 1-
Cos(a+d-F) x Cos(a-b)
a = 0.000 o
d = 23.44 o
Kpe = 1.442
438985196.xls-09/25/2019
Stability15/36
b) Stability against sliding
b)-1 Without Uplift
Sliding force : SH = 7.303 ton
Resistance : HR = m x S W = 0.50 x 18.298 = 9.149 ton
(friction coefficient : m = 0.50 )
HR 9.149
Fs = = = 1.25 > 1.25 OK !
SH 7.303
b)-2 With Uplift
Sliding force : SH = 7.303 ton
Resistance : HR = m x S W = 0.50 x 18.298 = 9.149 ton
(friction coefficient : m = 0.50 )
HR 9.149
Fs = = = 1.25 > 1.25 OK !
SH 7.303
c) Reaction of foundation soil
2xSW 2x 18.298
q1' = = = 15.079 t/m2 < qae = 27.450 t/m2 OK !
3 x (B/2-|e|) 3x 0.809
3 x |e| - B/2 = 0.073 m
- t/m2
- t/m2
- t/m2 - t/m2
in case, e < 0 and |e| < B/6 in case, e < 0 and B/6 < |e| < B/3
(not applicable) (not applicable)
438985196.xls-09/25/2019
Stability16/36
2.4 Bearing Capacity of soil
(a x c x Nc) = 0.000
qu = 54.900 t/m2
(4) Distribution vertical load to wooden pile, (Vp) (Not applicable for this Project)
a) Normal condition
qa x B
Ws = = 29 ton
( 1 + (6 x e)/B )
b) Seismic condition
qae x B
Ws = = 33 ton
438985196.xls-09/25/2019
Stability17/36
( 1 + (6 x e)/B )
438985196.xls-09/25/2019
Structure18/36
3. Structure Calculation
3.1 Normal Condition
qa1
Pa1
3.50 Pa2
A A 0.9
qa2
0.00 Pw1 Pa4 Pw2 0.00
Pa3 B B
0.30
qw1 qa4 qa3 qw2
0.50 0.50
d = 20.00 o
a) Section A - A
h = 3.50 m
K
qa1 = ha x q = 0.159 ton/m
qa2 = Kha x h x gsoil = 1.892 ton/m
b) Section B - B
438985196.xls-09/25/2019
Structure19/36
(2) Footing
Case 1 (with vertical live load) Case 2 (without vertical live load)
q = 0.50 t/m2 q = 0.50 t/m2
3.50 3.50
4 4
0.00 0.00
D C D C
0.30 0.30
0.50 0.50
3 1 3 1
D C D C
1.00 1.00 0.50 1.00 1.00 0.50
5
4 4
3 3 1
1
6 6
9.216 2 2
10.614 3.011 t/m2 2.348 t/m2
6.697 t/m2 6.325 t/m2
10.384 t/m2 10.302 t/m2
12.227 t/m2 12.290 t/m2
2 2
6 6
a) Section C - C
438985196.xls-09/25/2019
Structure20/36
b) Section D - D
Pa1 1 2 3
3.50
3.80
A A
qa1
Pa2
0.00 Pw1 Pa3 Pw2 0.00
B B
0.30 qw2
0.50 qw1 qa3 qa2 0.50
d = 15.00 o
a) Section A - A
h = 3.50 m
qa1 = Khae x h x gsoil = 2.698 t/m
No. Description Hae Y (from A-A) Hae x Y
1 0.500 x 3.500 x 0.500 x 2.400 x 0.170 0.357 1.167 0.417
2 3.500 x 0.500 x 2.400 x 0.170 0.714 1.750 1.250
3 0.500 x 3.500 x 0.000 x 2.400 x 0.170 0.000 1.167 0.000
Pa1 2.698 x 3.500 x 0.500 4.721 1.167 5.508
Total 5.792 7.174
438985196.xls-09/25/2019
Structure21/36
b) Section B - B
(2) Footing
in case, e < B/6 in case, B/6 < e < B/3
3.50 3.50
4 4
0.00 0.00
D C D C
0.30 0.30
0.50 0.50
3 1 3 1
D C D C
1.00 1.00 0.50 1.00 1.00 0.50
4 4
3 1 3 1
in case, e > 0 ande < B/6 in case, e > 0 and B/6 < e < B/3
5 6
2 3 |e| - B/2 = 0.073 2
in case, e < 0 and |e| < B/6 in case, e < 0 and B/6 < |e| < B/3
2
2 6
6
438985196.xls-09/25/2019
Structure22/36
a) Section C - C
b) Section D - D
438985196.xls-09/25/2019
Structure (2)23/36
3. Structure Calculation
3.1 Normal Condition
qa1
Pa1
3.50 Pa2
A A 0.9
qa2
0.00 Pw1 Pa4 Pw2 0.00
Pa3 B B
0.30
qw1 qa4 qa3 qw2
0.50 0.50
d = 20.00 o
a) Section A - A
h = 3.50 m
K
qa1 = ha x q = 0.159 ton/m
qa2 = Kha x h x gsoil = 1.892 ton/m
b) Section B - B
438985196.xls-09/25/2019
Structure (2)24/36
(2) Footing
Case 1 (with vertical live load) Case 2 (without vertical live load)
q = 0.50 t/m2 q = 0.50 t/m2
3.50 3.50
4 4
0.00 0.00
D C E D C
0.30 E 0.30
0.50 0.50
3 1 3 1
E D C E D C
1.00 1.00 0.50 1.00 1.00 0.50
5
4 4
3 3 1
1
6 6
9.216 2 2
10.614 3.011 t/m2 2.348 t/m2
6.697 t/m2 6.325 t/m2
4.854 10.384 t/m2 4.336 10.302 t/m2
12.227 t/m2 12.290 t/m2
2 2
6 6
a) Section C - C
438985196.xls-09/25/2019
Structure (2)25/36
c) Section E - E
Pa1 1 2 3
3.50
3.80
A A
qa1
Pa2
0.00 Pw1 Pa3 Pw2 0.00
B B
0.30 qw2
0.50 qw1 qa3 qa2 0.50
d = 15.00 o
a) Section A - A
h = 3.50 m
qa1 = Khae x h x gsoil = 2.698 t/m
No. Description Hae Y (from A-A) Hae x Y
1 0.500 x 3.500 x 0.500 x 2.400 x 0.170 0.357 1.167 0.417
2 3.500 x 0.500 x 2.400 x 0.170 0.714 1.750 1.250
3 0.500 x 3.500 x 0.000 x 2.400 x 0.170 0.000 1.167 0.000
Pa1 2.698 x 3.500 x 0.500 4.721 1.167 5.508
Total 5.792 7.174
438985196.xls-09/25/2019
Structure (2)26/36
b) Section B - B
(2) Footing
in case, e < B/6 in case, B/6 < e < B/3
3.50 3.50
4 4
0.00 0.00
D C D C
0.30 0.30
0.50 0.50
3 1 3 1
D C D C
1.00 1.00 0.50 1.00 1.00 0.50
4 4
3 1 3 1
in case, e > 0 ande < B/6 in case, e > 0 and B/6 < e < B/3
5 6
2 3 |e| - B/2 = 0.073 2
in case, e < 0 and |e| < B/6 in case, e < 0 and B/6 < |e| < B/3
2
2 6
6
438985196.xls-09/25/2019
Structure (2)27/36
a) Section C - C
b) Section E - E
438985196.xls-09/25/2019
Re-bar 28/36
Normal Condition
Name of Structure : D1 - Hulu
Location : 0
R-bar arrangement 25~200 16~250 25~100 16~125 25~250 25~250 25~100 25~250
Reinforcement As cm2 24.54 8.04 49.09 16.08 19.63 19.63 49.09 19.63
Perimeter of R-bar U cm 39.27 ok 78.54 ok 31.42 ok 78.54 ok
438985196.xls-09/25/2019
Re-bar 29/36
Seismic Condition
Name of Structure : D1 - Hulu
Location : 0
R-bar arrangement 25~200 16~250 25~100 16~125 25~250 25~250 25~100 25~250
Reinforcement As cm2 24.54 8.04 49.09 16.08 19.63 19.63 49.09 19.63
Perimeter of R-bar U cm 39.27 78.54 31.42 78.54
Distribution bar (>As/6 and >Asmin) 16~250 16~250 16~125 16~250 16~200 16~200 16~200 16~200
Reinforcement As cm2 8.04 8.04 16.08 8.04 10.05 10.05 10.05 10.05
438985196.xls-09/25/2019
Re-bar 30/36
170 71 30 178
Total 353 kg
438985196.xls-09/25/2019
Re-bar 31/36
438985196.xls-09/25/2019
Re-bar 32/36
65.0
7.0
58.0
100.0
16
#VALUE!
25~200 25~250
#VALUE!
24.54 19.63
39.27
17.77
#VALUE!
90.0
#VALUE!
#VALUE!
2,775
#VALUE!
#VALUE!
8.25
#VALUE!
1,596,493
1,596,493
13
2,296
3,640,404
16
168
16~200 16~300
10.05 6.70
438985196.xls-09/25/2019
Reinforcement Bar Arrangement
( D1 - Hulu )
+ 0.00
D25~200
4.30 D16~250
D16~250
4.30 D16~250
A A
D25~100 D16~125
D16~250
D16~125
D16~200 D16~200
0.00 D25~100 C D25~250 + -3.00
D
B B 0.30
0.50
+ -4.30
D25~250 D C
D16~200 D25~250 D16~200
2.50
concrete = 4 m3
reinforcement = 370 kg
cost estimate = 4,536,489
438985196.xls-09/25/2019
4. Wooden Pile (Not applicable for this Project)
qu = (40 x N x A) + (W x fi x li)
= ( 40 x 30.0 x 0.018 )+( 0.471 x 6.00 x 2.0 )
= 21.206 + 5.655 = 26.861 ton/pile
(safety factor : n = 3)
p x D4
I = = 2,485.0 cm4 (I : Moment of Inertia for a pile)
64
a = 0.20 E = 28 x N
Kh = a x E x D-3/4
= 0.20 x( 28 x 30.0 )x( 15.0 )-3/4 = 22.041 kg/cm3
4 Kh x D 4 22.041 x 15.0
b = = = 0.025 cm
4 EI 4 x 80,000 x 2,485.0
Kh x D 22.041 x 15.0
Ha = x d = x 1 = 13,020.22 kg
b 0.025
= 13.020 ton
(3) Allowable horizontal bearing capacity due to the stress of a pile itself
Ha = 2 x b x Ma
p x D3
W = = 331.34 cm3 ; (W : section modulus of a pile)
32
Ha = 2 x b x Ma
= 2 x 0.025 x 24,850.5 = 1,262.06 kg/pile = 1.262 ton/pile
Allowable horizontal bearing capacity acting on the pile top depend upon the allowable
stress of pile itself.
Ha 1.262
Spacing of pile = = = 3.41 m
Hr 0.370
qa 8.954
Spacing of pile = = = 0.47 m
V 19.048
qa 8.954
Spacing of pile = = = -0.95 m
Vp -9.460
Structure
Calculation formula in case of (B/6 < e < B/3) under seismic condition are corrected.
(distributed width of reaction of foundation soil)