P04 - General Arrangement Drawings.

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Notes:

3195 1. Skid Shall be provided with Roofing Sheets


(not Show here for Clear Viewing of the Skid)
2. Interconnecting Pipeline shall be as per
3170 P&ID
3. Discharge Tie in connection- 3/4" x 150#
RF, Tie in Dimensions will be confirmed during
detail Engg stage.
4. All Piping, Tanks Shall be heat traced &
Insulated as per Project Specifications
5. Skid Structural Shall be painted as per TCO
Coating System.
1600
1500

6. Tank Nozzles shall confirm to P&ID.


Skid Roofing
7. Tank shall be provided with Man-way of 600
mm Which shall be Non standard Fabricated
design.
8. Skid shall be provded with Drip tray
Designed for Tank Volume.
9 Skid shall be provided with 4 point Lifiting.
10. Skid shall have 4 Point Foundation Holes
Suitable for Mounting of the Skid.

TOP - VIEW

1560

Discharge
Dampeners 0 24.08.2019 ISSUED FOR APPROVAL HEM PSK GR
REV DATE DESCRIPTION DRN CHK APP
REVISIONS
CLIENT :
Tank-1500 Liters 3/4" x 900# RF- Discharge Tie In
TENGIZCHEVROIL
2200
2360
2300

PROJECT:
IOR KOROLEV LARGE SCALE PILOT
2860

PROJECT

TITLE:

CORROSION INHIBITOR GA DRAWING


SCALE = NTS DATE 24.08.2019 24.08.2019 24.08.2019
DRAWING/DOCUMENT NAME
490
500

DRIPTRAY- 1500 Liters (Tank Volume) FORMAT HEMNATH SAMPATH RAJAN


A0 A1 A2 A3 A4
SIDE - VIEW DRAWING No.
SIGN DRAWN CHECKED
SHEET
APPROVED
REVISION

FRONT - VIEW SHEET 1 OF 1