Engineering Consultant : Contractor : Prepared by: Approved by : Consultant Drawing Title : Drawing No.

:
MINISTRY OF PUBLIC WORKS & HOUSING Contractor Engineering Section MCC/SD/CSD/B-08/49
PT. CECI In Collaboration with
SHOP PT. DAYA CREASI MITRAYASA METALURGICAL CORPORATION OF Ref. Dwg : REV DED
GENERAL DIRECTORATE OF HIGHWAY CILEUNYI - SUMEDANG - DAWUAN TOLL WAY PT. INDRA KARYA (Persero)
Cross Section STA 17+950
CHINA Ltd.-WIKA-NINDYA-WASKITA B-08
DRAWING Sumedang Sub-Provincce, West Java PT. PARAMA KARYA MANDIRI
DIRECTORATE OF TOLLWAY AND URBAN ROAD PT. CIRIATAMA NUSAWIDYA CONSULT Xie Ding Ding Chen, Shyh - wen Scale : NTS
JOINT OPERATION
PT. SEECONS Chief Engineer Team Leader Professional Engineer Rev. : 01

41.079 272.73

10.297 30.782 35.551 237.18

780
ROW

ROW
770 FINAL STAGE 2.50 FINAL STAGE
7.20 1.50 1.50 7.20 3.00 1.50 3.60
3.60 1.50 3.00
3.60 3.60 0.40 3.60 3.60
ROW

ROW
EL.CL 754.795
0.50 0.50
760

1.50

0.84
3.00
TMP 755.396

2.00
3.50

TMP 753.396
EL. BC 751.847 1.15
ROW

ROW
1.00

750
ROW

ROW
740

730
-40 -30 -20 -10 0 10 20 30 40 50 270