Sl.

Clause Clause Description Wabag Query Client


No. heading No Response
1 Clarification I t was queried by the bidder that since this is Kindly note that just recently Chittagong WASA
no.4, Replies to an item rate where design of the system has has tendered a similar item rate tender where
Query no.15. been done by the Client/Consultant, so the the system was designed by the
Process Guarantee ( as per the section SECTION Client/Consultant and they clearly mentioned
10040 OPERATIONAL PERFORMANCE that Process Performance guarantee is not in
MONITORING) with respect to the Water Bidder's Scope. Thus as the reply by your good
quality, rise rate, filtration rate at the outlet of department is not clear to us kindly confirm that
Process units like Sedimentation & Filtration Process Guarantee as specified in SECTION
units are not the responsibilities of the Bidder. 10040 OPERATIONAL PERFORMANCE
Only testing of the samples will be done as per MONITORING is not in scope of the Bidder.
contract. Bidder's scope is only limited to collection of
In reply to the same your good office replied" samples and testing as per contract. The Bidder
The Contractor is responsible for performance will not be held accountable if the process units
of all work provided him in accordance with the performance parameters does not match with
contract requirements." that specified in the above section.
2 Clarification The Raw Water quality was asked by the bidder We once again request your good office to send
no.4, Replies to and it was replied that " Raw water quality is us the design raw water quality, so that the
Query no.59. generally high but varies day-to-day. Water bidder can understand based on what quality
quality reports are on file and can be examined the process units have been designed. The
at the KWASA headquarters." system has been designed based on a design raw
water quality which has been arrived after
analysing the day to day water quality. Daily log
of water quality is not required by us. Kindly
provide the design raw water quality which shall
be of one or two pages only based on which the
process units are designed by the
Client/Consultant. Kindly provide the same.