JSA Form For Erection of Scrubber

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

JOB SAFETY ANALYSIS (JSA) FORM

Job Description: Cutting of existing Analysis by Name: Shrikrishna


Dept. - Development duct dia 750 NB for connection of Mishra
new suction & discharge line to
Permit to Work Reviewed by Name: Bipin Sabut
scrubber duct dia 600 NB and
No.: ………………………. additional 750 NB dia damper for Approved by Name: Varad
bypass arrangement in TC spinbath. Bhatkhande
Date: 09.09.2019
General Safeguards Checklist :
 Area barricaded, cordoned off√  Manpower deployed is trained √  All PPEs, Tools & Equipment
inspected (Esp. Electrical,
Height work) √
 Isolations done as per LOTO (If  Special Work Permits being  This JSA explained to the
application) √ deployed (if applicable) √ workmen during Tool Box Talks

PPE Checklist :
 Safety Helmet √  Safety Helmet with Welders  Safety Helmet with Face Shield
Mask √ √
 Safety Shoes √  Safety Shoes (Electrical work)  Safety Glass – Cutting, grinding,
etc. √
 Safety Goggles (For Chemicals) √  Dust Mask, Cartridge Mask  Supplied Breathing Air, SCBA-
Applicable
 Ear Plugs, Ear Muffs -NA  Gloves – Ordinary, Cut Resistant,  Protective suit – Hot Work,
Chemical, Hot Work, Electrical √ Chemical, Electrical -NA
Fire Protection Checklist :
 Area free of Flammables and  Fire Hose laid out and ready  Fire Extinguisher (Type, Size
Combustibles, Gas Tests done √ (Quantity), Fire Water available and Quantity) Both water CO2
√ type available
 Fire Blankets- NA  Sand Buckets (Quantity)- 2 nos  Sprinkler / detectors in are
working- NA

Sequence of Basic Job Steps Potential Safeguard / controls to be put in place


Hazards
Cutting of existing duct dia 750 Hazards gasses like CS2 & Use SCBA and ambulance ready in case of any
NB for connection of new H2S injuries & Area barricading
suction & discharge line to
scrubber duct dia 600 NB and Physical injury, fall from Uses of suitable PPE’s & scaffoldings
additional 750 NB dia damper height
for bypass arrangement
Lifting of 600 dia bend pieces Hazards gasses like CS2 & Use SCBA and ambulance ready in case of any
& 750 dia damper by the help H2S, Fall of damper and injuries & Area barricading
of hydra or chain block bend
arrangements Physical injury, fall from Uses of suitable PPE’s & scaffoldings
height

You might also like