Description 2 - Shift

Jan Feb
Number of day 31 28
Public holiday - -
Available day 31.0 28
Available hours 24 Jam/Hari 744 672
Physical Availability (PA) 85% 632 571
Total standby (min) / Day 1.00 295 304
90 Friday Loss 6 6
90 Adjust Fasting - -
10 Setting Line Alat 5 5
15 Refueling + Reposisi 8 7
15 Greasing 8 7
10 Move Equip. 5 5
10 Wait Equip. 5 5
10 Wait Insruction PTBA For Coal Banko 5 5
8 Wait Blast 4 4
90 Monthly General Safety Talk 2 2
15 Weekly Safety Talk 1 1
120 Meal & Rest 62 56
15 P5M 8 7
15 Shift Change 8 7
20 Praying 10 9
Rain 66 69
Frekuensi Hujan 37 44
Slippery 56 66
Effective hours - 2 shift BANKO BARAT Over Burden 380 316
Daily Working Hour 12.25 11.29
Utilization Availibility (UA) 60% 55%
Mechanical Availibility (MA) 77% 76%

Effective hours - 2 shift BANKO BARAT Coal Getting 375 312


Daily Working Hour 12.08 11.13
Utilization Availibility (UA) 59% 55%
Mechanical Availibility (MA) 76% 75%

Effective hours - 2 shift TAL OB / COAL 339 296


Daily Working Hour 10.94 10.57
Utilization Availibility (UA) 54% 52%
Mechanical Availibility (MA) 75% 75%
-

-
Working Hours
Total
Mar Apr Mei Jun Jul Agu Sep Okt Nov Des
31 30 31 30 31 31 30 31 30 31 365
- - - 1.0 - 0.5 - - - 1.0 3
31 30 31 29 31 30.5 30 31 30 30 363
744 720 744 696 744 732 720 744 720 720 8,700
632 612 632 592 632 622 612 632 612 612 7,395
280 259 255 212 219 219 220 221 308 317 3,108
8 6 6 8 6 6 8 6 6 8 78
- - 38 8 - - - - - - 45
5 5 5 5 5 5 5 5 5 5 60
8 8 8 7 8 8 8 8 8 8 91
8 8 8 7 8 8 8 8 8 8 91
5 5 5 5 5 5 5 5 5 5 60
5 5 5 5 5 5 5 5 5 5 60
5 5 5 5 5 5 5 5 5 5 60
4 4 4 4 4 4 4 4 4 4 48
2 2 2 2 2 2 2 2 2 2 18
1 1 1 1 1 1 1 1 1 1 12
62 60 62 58 62 61 60 62 60 60 725
8 8 8 7 8 8 8 8 8 8 91
8 8 8 7 8 8 8 8 8 8 91
10 10 10 10 10 10 10 10 10 10 121
59 54 31 25 27 27 23 35 63 65 544
33 29 20 20 22 23 25 20 45 47 365
50 44 30 30 33 35 38 30 68 71 548
391 387 402 404 441 431 422 436 354 348 4,712
12.61 12.89 12.98 13.93 14.22 14.14 14.08 14.07 11.80 11.58 13.00
62% 63% 64% 68% 70% 69% 69% 69% 58% 57% 64%
78% 78% 78% 79% 80% 80% 80% 80% 77% 76% 78%

386 382 389 391 427 418 409 422 342 336 4,588
12.45 12.73 12.56 13.49 13.78 13.69 13.63 13.62 11.40 11.19 12.66
61% 62% 62% 66% 68% 67% 67% 67% 56% 55% 62%
77% 77% 76% 77% 77% 77% 77% 77% 74% 74% 76%

383 396 402 404 441 431 422 436 354 348 4,652
12.35 13.20 12.98 13.93 14.22 14.14 14.08 14.07 11.80 11.58 12.83
61% 65% 64% 68% 70% 69% 69% 69% 58% 57% 63%
77% 79% 78% 79% 80% 80% 80% 80% 77% 76% 78%
REMARK

Jumlah Hari jumat setiap bulan


Start Puasa 5 Mei 2019, Idul Fitri 5 - 6 Juni 2019
10 menit dialokasikan untuk pengecekan setting alat selama sistem belum terbentuk.
50% dari total loading unit dilakukan di luar jam istirahat, 50% harus dilakukan pada jam istirahat
(termasuk turun dari bench ke lantai bawah)
Delay 10 Menit per hari dengan asumsi tidak semua alat pindah lokasi

Hanya Untuk Fleet Batubara


Peledakan hanya dilakukan pada jam istirahat.

Rest Time per Shift @1 Jam


Dialokasikan 20 Menit per Minggu, jika butuh lebih dari 20 menit maka harus dimulai di awal shift.
10 Menit Per Shift.
3x Waktu Sholat @8 Menit (Pengaturan waktu sholat disesuaikan dengan kebutuhan lapangan).