CURRENT SET-UP

EQUIPMENT MANPOWER
Item Equipment Scope of Work Item
1 Crane Lifting 2
1 Flatbed Hauling 1
1 Crane Unloading and Stockpiling 2
1 Crane Installation 2
1 Flatbed 3
3 Crane 3
1

1 Too many resources are needed


Equipment
Manpower
Diesel Consumption
2 Stockpiling at site which is the highest cause
of broken panels
PROPOSED SET-UP
MANPOWER EQUIPMENT
Manpower Item Equipment Scope of Work
Crane Operator/ Rigger 1 Crane_Flat Bed Lifting
Flatbed Driver Hauling
Crane Operator/ Rigger Installation
Crane Operator/ Rigger
Crane Operator 1 Crane_Flatbed
Rigger
Flatbed Driver

PROS 1 Less Resources Needed


Equipment
Manpower
Diesel Consumption
2 Eliminates stockpiling by Installing directly right after transport.
MANPOWER
Item Manpower
2 Crane Operator/ Rigger

1 Crane Operator
1 Rigger

ly right after transport.