Professional Documents
Culture Documents
17.12 ETP - Job Procedure For GRE Bonding & Installation of GRE Pipes GR B 1
17.12 ETP - Job Procedure For GRE Bonding & Installation of GRE Pipes GR B 1
17.12 ETP - Job Procedure For GRE Bonding & Installation of GRE Pipes GR B 1
B/M&P/11
: Construction and O&M of ETP & WIP Plants at
Project
ONGC Assam Asset.
Client : M/s. Oil & Natural Gas Corporation Limited
TPIA : M/s. TUV – SUD SOUTH ASIA PVT. LTD.
Contractor : M/s. HAL OFFSHORE LTD
JOB PROCEDURE
FOR
GRE BONDING & INSTALLATION OF
GRE PIPES
TABLE OF CONTENTS
1. SCOPE
2. RESPONSIBILITY
3.1 CUTTING
3.2 SHAVING
3.3 SURFACE PREPARATION
3.4 SPIGOT INSERTION DEPTHS
3.5 DRY FIT AND ALIGNMENT OF FITTING
3.6 APPLYING OF ADHESIVE
3.7 JOINT ASSEMBLY
3.8 CURING
4. IDENTIFICATION
7. REPORT SHEET
1. SCOPE
This description covers general procedures to be used for the fabrication of 1”-16” Quick-
lock fittings & flanges.
2. RESPONSIBILITY
QC inspector is responsible to review the production log sheet to ensure that the records are
complete and accurate.
Reviwed & Found in Order
H. Gandhi
Dt:17.12.2018
(safety procedure: Avoid inhaling dust produced by cutting and grinding operations)
Reviwed & Found in Order
H. Gandhi
Dt:17.12.2018
Notes:
1. Joint no. shall be provided as “Line No – JXX”. XX shall be continued in serial nos 01, 02, 03 etc.,
LEGEND: P: Perform R: Review W: Witness RW: Random Witness (10%) H: Hold Point
Site: