Work Program For Consolidated COS Work 13.09.2019
Work Program For Consolidated COS Work 13.09.2019
Work Program For Consolidated COS Work 13.09.2019
2.350
1.110
1.110
1.110
2.460 2.350
2.460 2.350
3.400 2.460 2.350
8 8 8 8
625.4 625.4 625.4 625.4
312.7 312.7 312.7 312.7
12 12 18 9
290 290 432 216
HSD
Capacity Consump
Equipment Units/hr tion
Unit Quanitiy Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20
Per Hr.
Clearing & Grubbing Ha 24.65 10.21 7.39 7.06
Dozer 0.16 10.00 Ha 8.210 64 46 44 0 0 0 0 0
Loader 1.5 cum 0.15 10.00 Ha 68 49 47 0 0 0 0 0
Tractor troli 0.15 Ha 68 49 47 0 0 0 0 0
Roadway Excavation cum - - - - - -
Excavator 80.00 cum - - - - - -
Dumper Excavation 8.00 cum - - - - - - - -
Embankment / Subgrade cum 0 - - - -
Excavator 100.00 cum 8.210 0 0 0 0 0 0 0 0
Dumper EW BA 9.00 cum 0 0 0 0 0 0 0 0
Grader 120.00 cum 0 0 0 0 0 0 0 0
Vibratory Roller 64.00 cum 0 0 0 0 0 0 0 0
Water Tanker Lit/cum 12Km 130.00 cum 0 0 0 0 0 0 0 0
Water Tanker Lit/cum 12Km 130.00 cum 0 0 0 0 0 0 0 0
Granular Sub Base cum 23994 9,200.02 9,200.02 4,118.00 1,476.00
Loader 1.5 cum 48.00 cum 8.210 192 192 86 31 0 0 0 0
Dumper GSB 10.00 cum 920 920 412 148 0 0 0 0
Grader 48.00 cum 192 192 86 31 0 0 0 0
Vibratory Roller 60.00 cum 153 153 69 25 0 0 0 0
Water Tanker Lit/cum 12Km 120.00 cum 110 110 49 18 0 0 0 0
GSB Crusher Plant 200.00 cum 46 46 21 7 0 0 0 0
Wet Mix Macadam 18840 7,389.66 7,389.66 1,730.63 1,717.00
Loader 1.5 cum 30.00 cum 8.210 246 246 58 0 0 57 0 0
WMM Plant 100 TPH (125Kva 100.00 Tonne 74 74 17 0 0 17 0 0
Dumper WMM 10.00 cum 739 739 173 0 0 172 0 0
WMM paver 30.00 cum 246 246 58 0 0 57 0 0
Vibratory Roller 30.00 cum 246 246 58 0 0 57 0 0
Water Tanker Lit/cum 8.48 176.00 cum 130 130 30 0 0 30 0 0
Prime coat/Tack coat 543957
10.364
Mech Brommer 900.00 Sqm 0 0 0 0 0 0 0 0
Air compressor 900.00 Sqm 0 0 0 0 0 0 0 0
Bitumin Browzer 1400.00 Sqm 0 0 0 0 0 0 0 0
Water Tanker Lit/cum 12Km 5.00 Sqm 0 0 0 0 0 0 0 0
cum 65014 9,802 24,252 30,961 - 60 2,956 2,957 1
Total Asphaltic work (DBM+BC)
10.364 15% 37% 48% 0% 0% 5% 5% 0%
Loader 1.5 cum 40.00 cum 245 606 774 0 2 74 74 0
Hot mix Plant 120.00 Tonne 82 202 258 0 1 25 25 0
Dumper BT 8.00 cum 1225 3031 3870 0 8 369 370 0
Bit Sensor paver 40.00 cum 245 606 774 0 2 74 74 0
Pneumatic Roller 24.00 cum 408 1010 1290 0 3 123 123 0
Tandom Roller 24.00 cum 408 1010 1290 0 3 123 123 0
Note: The Avg Working hrs mentioned will be changed depending on the site requirement
Four/Two Laning with paved shoulder of Gadu- Porbandar Section of NH-8E from Km 263.200(Design Chainage Km 287.430) to Km
356.766 (Design Chainage Km 379.100) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode
Net (+Ve COOS) Estimated Cost for Strengthening of Bypass & Realignment
Sr No. Iteam No. Description Unit Net Qty. Rate Amount
1 2 3 4 5 6=4X5
A. Road Work
1 2.3 (ii) A C&G Ha. 24.65 ₹ 35,253.00 ₹ 868,968.82
5 5.2 Tack Coat for DBM SQ. MT. 136175.00 ₹ 20.00 ₹ 2,723,500.00
10 Road Furniture
e. Kilometer Stone
8.4 (ii) ii) Ordinary Kilometer Stone (Precast) Nos. 17.98 ₹ 2,003.00 ₹ 4,448.40
8.4 (iii) ii) Hectometer Stone (Precast) Every 200 Mtr. Nos. 63.80 ₹ 578.00 ₹ 36,876.40
Total #REF!
Four/Two Laning with paved shoulder of Gadu- Porbandar Section of NH-8E from Km 263.200(Design Chainage Km 287.430) to Km 356.766
(Design Chainage Km 379.100) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode
10 Road Furniture
a. Retro-Reflective Traffic Signs
1) 90 Cm Equilateral Triangle Nos. #REF! 8.4 (i)
2) 80 Cm X 60 Cm Rectangular Nos. #REF! 8.4 (iv)
b. Road marking (Thermoplastic) Sq. Mtr. 11160 3720.00 8.130
c. Road Stud Nos. 11160 6696.00 8.350
d. Road Delinators/Hazard Marker Nos. #REF! 8.150
e. Kilometer Stone
i) 5th Kilometer Stone (Precast) Nos. 5580 0.0
ii) Ordinary Kilometer Stone (Precast) Nos. 5580 12
Four/Two Laning with paved shoulder of Gadu- Porbandar Section of NH-8E from Km 263.200(Design Chainage Km 287.430) to Km 356.766
(Design Chainage Km 379.100) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode
10 Road Furniture
a. Retro-Reflective Traffic Signs
1) 90 Cm Equilateral Triangle Nos. 2.00 8.4 (i)
2) 80 Cm X 60 Cm Rectangular Nos. 1.00 8.4 (iv)
Four/Two Laning with paved shoulder of Gadu- Porbandar Section of NH-8E from Km 263.200(Design Chainage Km 287.430) to Km 356.766
(Design Chainage Km 379.100) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode
10 Road Furniture
a. Retro-Reflective Traffic Signs
1) 90 Cm Equilateral Triangle Nos. #REF! 8.4 (i)
2) 80 Cm X 60 Cm Rectangular Nos. #REF! 8.4 (iv)
b. Road marking (Thermoplastic) Sq. Mtr. 1110 370.00 8.130
c. Road Stud Nos. 1110 666.00 8.350
d. Road Delinators/Hazard Marker Nos. #REF! 8.150
e. Kilometer Stone
i) 5th Kilometer Stone (Precast) Nos. 1110 0.0
Four/Two Laning with paved shoulder of Gadu- Porbandar Section of NH-8E from Km 263.200(Design Chainage Km 287.430) to Km 356.766
(Design Chainage Km 379.100) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode
1 Kukashwada 296.600 299.700 3.100 296.600 300.000 3.280 0.040 0.080 13.728 12.77 0.958 40 10.784 8.742 2.042 80
Bypass 3.400
2 Arena Village 301.958 302.500 0.542 301.880 302.540 0.580 0.040 0.040 12.024 11.087 0.937 40 9.498 8.462 1.036 40
0.660
3 Husenabad Village 304.100 305.400 1.300 303.900 305.700 1.720 0.040 0.040 9.457 8.617 0.84 40 8.861 8.439 0.422 40
1.800 1.56
4 Mangrol Village 308.800 309.739 0.939 308.800 310.040 1.160 0.040 0.040 13.022 12.112 0.91 40 14.742 14.522 0.22 40
1.240
5 Madhavpur Village 330.820 331.830 1.010 330.820 331.930 1.030 0.040 0.040 6.319 5.563 0.756 40 7.258 6.481 0.777 40
1.110
6.891 7.770 0.200 0.240 8.210
SINGLE CELL BOX TYPE UNDERPASS : 12.00 x 4.0m
NH 8E_315+765
S.No. Item Description No. L B D/A Quantity Units
(m) (m) (m/m^2) (m^3)
1 Earthwork in excavation
In box portion 1 13.70 13.20 1.20 217.01 cum.
For RE Wall levelling pad (cutting OGL to
as per attached sheet 4492.12 cum.
TLP)
Total Quantity Total quantity 4709.1 cum.
5 Box (M-30)
a Deck slab 1 13.50 13.00 0.65 114.08 cum.
b Vertical wall LHS 1 13.50 0.75 4.19 42.39 cum.
Vertical wall RHS 1 13.50 0.75 4.19 42.39 cum.
c Bottom slab 1 13.50 13.00 0.80 140.40 cum.
d Haunches 4 13.50 0.30 0.30 2.43 cum.
e Bracket 2 13.50 0.30 0.30 2.43 cum.
f Bracket 2 13.50 0.15 0.30 0.61 cum.
Total quantity 344.73 cum.
6 HYSD reinforcement
In Box 1 26.75 (as per BBS) 26.75 M.T
10 M30 grade concrete in approach slab 2 12.00 3.50 0.30 25.20 cum
13 Fillter Media
Behind Box 2 11.06 0.60 4.995 66.29
as per qty sheet 2620.44
Total quantity 2686.74 cum
A Main Carriageway for Mangrol Village 4 Lane +Ve Positive COS (19.50 mt. W
Clearing and grubbing road land including uprooting rank vegetation, grass,
bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of
trees cut earlier and disposal of unserviceable materials and stacking of
1 serviceable material to be used or auctioned, up to a lead of 1000 metres Ha.
including removal and disposal of top organic soil not exceeding 150 mm in
thickness. By Mechanical Means
Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including clearing of road surface and spraying primer at the
6 rate of 0.60 kg/sqm using mechanical means.
Sq. mt
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
7 bituminous/granular surface cleaned with mechanical broom.
Sq. mt
Providing and laying dense graded bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @
4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with sensor control to the
8 required grade, level and alignment, rolling with smooth wheeled, vibratory Cum.
and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects. For GradingII(19 mm
nominal size)
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
9 bituminous/granular surface cleaned with mechanical broom.
Sq. mt
Providing and laying bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6
per cent of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and
10 alignment, rolling with smooth wheeled, vibratory and tandem rollers to Cum.
achieve the desired compaction as per MORTH specification clause No. 509
complete in all respects
for Grading-II(10 mm nominal size)
Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including clearing of road surface and spraying primer at the
5 rate of 0.60 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
6 bituminous/granular surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @
4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with sensor control to the
7 required grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects. For GradingII(19 mm
nominal size)
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
8 bituminous/granular surface cleaned with mechanical broom.
Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including clearing of road surface and spraying primer at the
5 rate of 0.60 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
6 bituminous/granular surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @
4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with sensor control to the
7 required grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects. For GradingII(19 mm
nominal size)
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
8 bituminous/granular surface cleaned with mechanical broom.
Providing and laying bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6
per cent of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and
9 alignment, rolling with smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per MORTH specification clause No. 509
complete in all respects for Grading-II(10 mm nominal size)
Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including clearing of road surface and spraying primer at the
5 rate of 0.60 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
6 bituminous/granular surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @
4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with sensor control to the
7 required grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects. For GradingII(19 mm
nominal size)
Providing and laying bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6
per cent of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and
9 alignment, rolling with smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per MORTH specification clause No. 509
complete in all respects for Grading-II(10 mm nominal size)
Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including clearing of road surface and spraying primer at the
5 rate of 0.60 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
6 bituminous/granular surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @
4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with sensor control to the
7 required grade, level and alignment, rolling with smooth wheeled, vibratory
and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects. For GradingII(19 mm
nominal size)
Decelaration Lane Cum.
Taper Portion Cum.
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
8 bituminous/granular surface cleaned with mechanical broom.
Providing and laying bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6
per cent of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and
9 alignment, rolling with smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per MORTH specification clause No. 509
complete in all respects for Grading-II(10 mm nominal size)
G Positive Change of Scope For T Junction at Gadu Village (Merging section including Tapering
Construction of sub-grade and earthen shoulders with approved material
obtained from borrow pits with all lifts & leads, transporting to site, spreading,
2 grading to required slope and compacted to meet requirement of table No. Cum.
300-2
Construction of granular sub-base by providing coarse graded material,
spreading in uniform layers with motor grader on prepared surface, mixing by
mix in place method with rotavator at OMC, and compacting with vibratory
3 roller to achieve the desired density, complete as per clause 401. Granular Cum.
Sub-Base with Coarse Graded Material (Table:- 400- 2)
Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including clearing of road surface and spraying primer at the
5 rate of 0.60 kg/sqm using mechanical means. Sq. mt
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
6 bituminous/granular surface cleaned with mechanical broom. Sq. mt
Providing and laying dense graded bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @
4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with sensor control to the
7 required grade, level and alignment, rolling with smooth wheeled, vibratory Cum.
and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects. For GradingII(19 mm
nominal size)
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
8 bituminous/granular surface cleaned with mechanical broom. Sq. mt
Providing and laying bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6
per cent of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and
9 Cum.
alignment, rolling with smooth wheeled, vibratory and tandem rollers to
achieve the desired compaction as per MORTH specification clause No. 509
complete in all respects for Grading-II(10 mm nominal size)
11 Kerbing Rmt
12 Kerb painting Sq. mt
13 Median Filling Cum.
H Positive Change of Scope For Junction at Mangrol (Merging section including Tapering) (Ch.
Construction of sub-grade and earthen shoulders with approved material
obtained from borrow pits with all lifts & leads, transporting to site, spreading,
2 grading to required slope and compacted to meet requirement of table No. Cum.
300-2
Construction of granular sub-base by providing coarse graded material,
spreading in uniform layers with motor grader on prepared surface, mixing by
mix in place method with rotavator at OMC, and compacting with vibratory
3 roller to achieve the desired density, complete as per clause 401. Granular Cum.
Sub-Base with Coarse Graded Material (Table:- 400- 2)
Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including clearing of road surface and spraying primer at the
5 rate of 0.60 kg/sqm using mechanical means. Sq. mt
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
6 bituminous/granular surface cleaned with mechanical broom. Sq. mt
Providing and laying dense graded bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @
4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix
to work site, laying with a hydrostatic paver finisher with sensor control to the
7 required grade, level and alignment, rolling with smooth wheeled, vibratory Cum.
and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects. For GradingII(19 mm
nominal size)
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared
8 bituminous/granular surface cleaned with mechanical broom. Sq. mt
Providing and laying bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6
per cent of mix and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade, level and
9
alignment, rolling with smooth wheeled, vibratory and tandem rollers to
Cum.
achieve the desired compaction as per MORTH specification clause No. 509
complete in all respects for Grading-II(10 mm nominal size)
11 Kerbing Rmt
12 Kerb painting Sq. mt
13 Median Filling Cum.
n of NH-8E from Km. 287.430 to Km 379.100 in
ship(PPP) on Hybrid(Annuity) mode
1618.0 1078.67
2 809.0 1618
2 809.0 1618
2 809.0 1618
2 809.0 1618
2 809.0 1618
2 809.0 0.300 485.4
1 809.0 1.200 0.575 558.21
2 809.0 1618
2 809.0 0.300 485.4
1 809.0 1.200 0.575 558.21
420.0 126.00
2 100.0 60.00
2 50.0 30.00
90
2 100.0 60.00
2 50.0 30.00
90
2 100.0 60.00
2 50.0 30.00
90
2 100.0 60.00
2 50.0 30.00
90
1 1364.9 1364.93
1 1364.9 1364.93
1 1364.9 1364.93
2 1362.8 2725.60
2 1363.8 2727.60
2 1364.8 0.060 163.78
2 1365.8 2731.60
2 30.0 9.00
2 50.0 33.33
2 51.7 3.44
2 91.8 27.53
Total 73.31
2 185.6 371.12
2 185.6 0.300 111.34
2 167.6 0.575 192.69
Four/Two laning with paved shoulder of Gadu – Porbandar section of NH-8E from Km 263.200 (design chainage km 287.430) to Km 356.766 (design chainage Km 379.100) in the State of Gujarat
through Public Private Partnership (PPP) on Hybrid (Annuity)mode.
Main Carriageway - - -
Junction - - -
Kerb - - -
Construction of cement concrete kerb with top and
1 8.1
bottom width 75 and 150 mm respectively, 425 mm Rmt. 1,780.000
high in M 20 grade , laid with kerb laying machine,, all 230.00 1,780.000 409,400.00
complete as per clause 408