The load CT is only required when there is more than one 5560
on the same system.
When the load CT is fitted the 5560 transfers the right amount
of load to the grid before disconnecting the generators,
preventing the generators from being shock loaded.
Without the CT the 5560 does not know how much load to
transfer to the grid when other 5560’s are still in island mode.
The 5560 would transfer a pre determined amount of load
before disconnecting the generators from the grid. This would
lead to there being too much load or not enough load
transferred, and the generators would be shock loaded as the
generators are disconnected from the grid.