Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Our contracts with the iraqi government from 3003 -2018

1- Supply 10 FIBO mobile concrete batching plant to MWR cost 1890000 $

2- Supply 5 FIBO mobile concrete batching plant to MWR cost. 990000 $

3- Supply 3 FIBO mobile concrete batching plant MWR cost 780000 $

4- Supply and install cement silo at mousl dam to MWR cost 2618000 $

5- Supply and install Massenza machines for concrete paving the canals 4 machines to MWR cost
32000000$

6- Supply and install trenchers machines German origin, Quantities 8 cost 1800 000 $ to MWR.

7- Supply SBH shoring system for privet sector cost 1200000 $.

8- Supply and operation and after sale service PVC factory with cost 3800000 $ to MWR.

9- Supply and install FIBO 6 mobile concrete batching plants to privet sector with cost 1200000 $.

10- Supply and install FIBO stationary concrete batching plants to privet sector with cost 2000000 $.

11- Supply chemical additives form CONMIX Company to privet sector in Iraq

12- Supply Dewatering system - Wellpoint system German origin with cost 400000$.

13- Supply Formwork Systems NOE company German origin with cost 400000$.

14- Supply omme lifts 4 equipment cost 280000 $.

15- Supply omme lifts 2 cars cost 320000 $.

16- Supply 2 mobile batching plant PLC and 4 concrete pumps (stationery ) for SOC cost 1800000$.

FZE
DIB FZE (Das Deutsch-Irakische Buro) Bani yas Road, Twin Tower Building, Second Floor, office nr. 217
P.O.Box: 4404 Dubai - UAE
Tel Office: +971 4 2088348,Fax Office: +971 4 2088699
e-mail: info@dib-iraq.com, www.dib-iraq.com

You might also like