COST PORTION
1 DESIGN
2 MAJOR EQUIPMENTS & MATERIALS 7,327,228
3 CONSTRUCTION INCLUDING MOBILIZATION & DEMOBILIZATION 2,443,090
Change order
WORKMEN
1 Surveyor 10000 1 10,000
2 Certified Heavy Equipment Operator 5000 2 10,000
3 Laborers/Helpers 2500 18 45,000
4 Instrument Technicians 3000 36 108,000
5 Rigger 10000 1 10,000
6 Driver 3000 15 45,000
Page 2 of 51
16 Snacks & Refreshment at Construction Phase Months 5000
17 Out side food exp for staf on outside visit Months 15000
18 Lunch for Contractor /Client staf Months 10000
Page 3 of 51
3 NC - OFFICE EQUIPMENT ,STATIONERY ETC.
Sl. Description Unit Durn. Rate Amount
1 (Xerox, Scanner & Printer) No. 1 10000 10,000
2 Plotter - Laser Jet No. 0
3 Cost of Toner cartridge No. 10 2500 25,000
4 Postage, courier etc. No. 10 100 1,000
5 Computer with Softwares. (MS office, Antivirus etc..) - CPR No. 4 3000 12,000
6 Server No. 1 5000 5,000
7 Primavera/MS Project Software No. 1 5000 5,000
8 Autocad Software - full version No. 1 5000 5,000
9 Autocad Software- lt version No. 1 2000 2,000
10 Adobe professional (PDF editor) No. 1 3500 3,500
11 Microstation, V 8.X No. 0
12 Word/Excel to PDF converter No. 0
13 Network switch, connecting cables and installation cost No. 1 1000 1,000
14 Digital camera No. 0
15 Bio Meteric Attendance System + Fire wall No. 5000 0
16 Projector No. 0
17 Maintenance of Office Equipments No. 0
18 Monthly running exp. stationery, etc. No. 15 2000 30,000
19 Network drive for file sharing No. 2 2000 4,000
20 A0 Plotter No. 0 0
21 Provision for Kick of meeting in Hotel Including lunch 0
NC - GRAND TOTAL 103,500
Page 4 of 51
18 Living charges and local transportation No. 4 5000 20,000
19 Travel Insurance No. 4 2500 10,000
20 Staf Mobilization and Demobilization No. 4 5000 20,000
ND - GRAND TOTAL 446,200
6 NF - LOCAL TRANSPORT
Sl. Description Durn. Rate Amount
1 Car, 4WD prado 0 4000 0
2 Car For Stafs, 4WD Fortrunner 0 3000 0
3 Car For Stafs 15 2500 37,500
4 Pickup Vehicle - Staf, 30 seater, TOYOTA-HIACE - Drop/Pickup 15 5000 75,000
5 4WD for Construction works, Pikup Nissan 5000 0
6 Ambulance + Driver 0 0 0
7 Fuel for all the above 15 10000 150,000
8 Local Hire Charges for long trips 0 0 0
NF - GRAND TOTAL 262,500
Page 5 of 51
Sl. Description Unit Durn. Rate Amount
1 From Subcontractor (Temporary facilities)
2 Others (Common workmen )
3 HSE Expenses 102,890
4 Male Nurse No 0
5 Medicines and Consumables No 15 1000 15,000
6 Janitorial Expenses (Maintenance)- Office & Accomodation No 15 3000 45,000
7 Workmen Leave Passage and Gratuity
NH - GRAND TOTAL 162,890
Page 6 of 51
4 ND - TRAVEL AND IMMIGRATION 446,200
Page 7 of 51
DACO
AIRPORT PROJECT
EHS DEPARTMENT
EHS Requirement - Monthly Breakup
YEAR 1
Duration
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 Year1 Guest Total Unit Rate
SAFETY MATERIALS/EQUIPT
1 Safety Helmet - White (Staff) Full Proj 5 2 2 2 11 4 15 80
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 Year1 Guest Total Unit Rate
Hand gloves (PVC) for concreting
23 As req 0 0 7
works
24 Hand gloves for Electricians 1 year 5 5 5 5 5 25 25 15
Hand Gloves (HV Protected Rubber
25 As req 2 2 2 6 6 850
Gloves)
26 Barricading Tape As req 3 3 3 3 3 3 3 3 3 3 30 30 15
Full Body Harness - Double Lanyard
27 Full Proj 2 2 2 300
with Shock Absorber
Full Body Harness with Back Rest -
28 Double Lanyard with Shock Full Proj 2 2 2 350
Absorber
29 Electrical Hood Full Proj 0 0 4,000
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 Year1 Guest Total Unit Rate
32 DCP Fire Extinguisher (6kg) Full Proj 2 2 2 6 6 75
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 Year1 Guest Total Unit Rate
56 First Aid Equipments Full Proj 0 0 7,000
SUB-TOTAL 0
YEAR 1
Duration
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 Year1 Guest Total Unit Rate
ENVIRONMENTAL PROTECTION 0
Secondary containment for
66 Full Proj 0 0 10,000
chemical storages
67 Spill Response Kit Full Proj 0 0 3,000
SUB-TOTAL 0
SAFETY RELATED ACTIVITIES 0
SUB-TOTAL
CONTINGENCY
YEAR 1
Duration
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 Year1 Guest Total Unit Rate
Total EHS Related Expenses
TOTAL COST (SR)
1,200
80
300
1,295
975
525
300
600
12,650
1,800
1,125
270
300
220
75
TOTAL COST (SR)
375
5,100
450
600
700
900
-
TOTAL COST (SR)
450
660
660
1,050
45
450
300
360
150
150
375
25,000
59,498
870
TOTAL COST (SR)
140
1,010
TOTAL COST (SR)
2,000
1,000
3,000
1,000
15,000
2,100
18,100
21,282
TOTAL COST (SR)
102,890
Projec Control System upgrade at Dammam Airport
CV:
Project
Start
Subcon-Workmen Mobilization Schedule
Sl.No Staff 1 2 3 4 5
30 60 90 120 150
Apr-18 May-18 Jun-18 Jul-18 Aug-18
Chiller Plant & Central Pumping Station
1 Project Manger 1 1 1 1 1
2 Instrumentation & Control System Engineer 1 1 1 1 1
3 QC Engineer - Instrumentation
4 Safety Engineer
5 Acad draftsman 1 1 1 1 1
Sewage Treatment Plant (STP)
1 Project Manger
2 Instrumentation & Control System Engineer 1 1 1 1 1
3 QC Engineer - Instrumentation
4 Safety Engineer
5 Acad draftsman
Water Treatment Plant (WTP)
1 Project Manger
2 Instrumentation & Control System Engineer 1 1 1 1 1
3 QC Engineer - Instrumentation
4 Safety Engineer
5 Acad draftsman
Apr-18 May-18 Jun-18 Jul-18 Aug-18
Total / Month 5 5 5 5 5
Cumulative 5 10 15 20 25
PM
I&C
Quality
Safety
Acad
MCC
6 7 8 9 10 11 12 13 14
180 210 240 270 300 330 360 390
Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19
1 1 1 1 1 1 1 1 1
1 1 1 1
1 1 1
1 1 1
1 1
1 1 1 1 1 1 1 1 1
1 1 1 1 1
1 1
1 1 1 1
1 1 1 1 1 1 1 1 1
1 1 1
1 1 1
1 1 1
Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19
5 7 7 7 6 6 5 5 5
30 37 44 51 57 63 68 73 78
Demob.
15 Total 1
2
Jun-19 3
4
1 15 5
9 6
3 7
3 8
7
9
10
1 15 11
1 6 12
2 13
4
14
15
1 15 16
1 4 17
1 4 18
1 4
Jun-19 19
5 20
83 21
28
29
15 30
39 31
13 32
9 33
15 34
35
36
37
38
39
40
41
42
43
44
45
OH
CV:
Project MCC Demob.
Start
Subcon-Workmen Mobilization Schedule
30 60 90 120 150 180 210 240 270 300 330 360 390 420 450
Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Total
1 Surveyor 1 1
2 Certified Heavy Equipment Operator 1 1 2
3 Laborers/Helpers 2 2 2 2 2 2 2 2 2 18
4 Instrument Technicians 4 4 4 4 4 4 4 4 4 36
5 Rigger 1 1
6 Driver 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15
Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 Total
Total / Month 1 1 1 1 1 1 8 7 7 9 7 7 8 73
Cumulative 1 2 3 4 5 6 14 21 28 37 44 51 59
09/28/201910:54:15
OH
Remarks
09/28/201910:54:15
LIST OF RATES CONSIDERED IN ACE WORKING (ANNEX- RATES)
Rates Monthly
OT (4 hrs/day) for 26 Holiday working wages (4
SN DESCRIPTION 8 hrs
days hrs/day for 4 days)
MANPOWER
1 Foreman 4000
2 Winch operator 3000
3 Gang leader 2700 2025 312
4 Senior Fitter 2500 1875 288
5 Junior Fitter 2000 1500 231
6 Helper 1600 1200 185
7 Labor 1500 1125 173
8 Cook 2000
9 Cook helper 1600
10 Rigger for crane 20000
80
11 Elecrician 4050
12 Plumber 4050
13 Time office assistant 4050
14 Account assistant 4050
15 Store assistant 4050
16 Planning assistant 4050
17 Store labor 2000 231
18 Drivers 1500 1688 173
19 Office boy 2000 231
20 Watch man 2400
21 Saudi's 3500
22 Security gaurds (Saudi's) 5000
23 Surveyor 1000
24 Work permit receiver 7000 808
25 Cleaner 1600 185
26 Watchman 1600
27 Plumber 1600
28 Electrician 1600
Rates Monthly
MATERIALS
1 Steel 5000
2 Sand 50
3 Ready mix concreate 425
4 Tiles (400 X 200) 4
5 Sweet sand for filling 50
6 Selected backfill 35
7 PVC coated steel wire mesh, 1.5 m width) 36
8 Warning Tape 1.05
9 110 mm PVC conduit 22.33
10 32 mm OD HDPE with 3 sub-duct 5.08
EQUIPMENTS
1 Dump Trucks 12000
2 Cranes (Cable) 10000
3 Cranes (Boom) 10000
4 Backhoe 8000
5 Compactors (Plate) 8000
6 Front End Loaders 8000
7 Tractor Trailer 6000
8 Welding Machines 800
9 Pouring pump 4000
10 Needle Vibrator 1000
11 Fork lift 6000
12 Mobile crane 15 ton 10000
13 Saw tooth Machine 5000
VEHICLES
1 Car for PM, 4WD prado (Without driver) 3675
2 Car For Staffs, 4WD Fortuner (Without driver) 3525
3 4WD for Civil works, Pikup Nissan 10000
4 4WD for Electrical works, Pickup Nissan 10000
5 Pickup Vehicle - Staff, 14 seater, TOYOTA-HIACE 7598
6 Pickup Vehicle - Labor, 14 seater 7598
7 Ambulance 12000
Rates Monthly
Others
1 Jacks 220
2 Template set 6000
3 Bus 20 seater with driver and fuel 14300
4 Pickup with driver including fuel 8500
5 High up including diesel 12000
6 Dump truck 19000
7 50 T crane with Man Basket 80000
8 Trailor 17000
9 Front loader 45000
10 Tensioner 20000
11 Puller 20000
12 Compressor M/C motorized 500
13 Toyota parado without driver 4925
14 Toyata Hilux Pickup double cabin 4 X 4 without driver 4750
15 Toyota Highace 14 seat with driver 11600
16 Coaster 30 seater with driver 14300
17
18
19
20
21
22
23
24
25
26
Total Monthly Day Rate,
rates, SAR SAR
Food
Expenses
4000
200 3200
200 5237
200 4863
200 3931
200 3185
200 2998
200 2200
200 1800
200 20200
200 280
200 4250
200 4250
200 4250
200 4250
200 4250
200 4250
200 2431
200 3561
200 2431
200 2600
200 3700
200 5200
200 1200
200 8008
200 1985
200 1800
200 1800
200 1800
Total Monthly Day Rate,
rates, SAR SAR
Total Monthly Day Rate,
rates, SAR SAR
DACO Cost Sheet
SN Item Qty UOM Manufacturer
A Central Plant (Chiller)
Procurment charges
1 Supply of new Vibration Monitoring System 3 Nos. Bently Nevada
5 Cables 1 Lot
Preventive Maintenance of existing Compressors
6 1 Lot
and dryers
Replacement of Instrument tubing, fittings and
7 1 Lot
accessories (Bulk Material)
D Water Treatment Plant (WTP)
Allen Bradly &
1 New PLC & SCADA System 1 Lot
Rockwell
Chlorination System (Including Chlorine
2 1 Lot De-nora
Analyzers and Detectors)
3 Instruments 28 Nos. Endress Hauser
Mesonilan/Flowserv
4 Valves, 2" 7 Nos.
e
Mesonilan/Flowserv
5 Valves, 6" 2 Nos.
e
6 Valves, Pumping Station 1 No. KOSO, Japan
9 Cables. 1 Lot
Replacement of Instrument tubing, fittings and
10
accessories (Bulk Material)
Total Cost
Legend
Quotation received
Supply Including 5% VAT Logistics VAT @ 5% Installation services from Vendor
Cost/Unit Cost Days Unit Rate
166,923.25 175,269.41
238,710.46 250,645.98
69,075.00 72,528.75
Payment Terms Warranty
Advance
ENGINEERING
PROCUREMENT
Central Plant (Chiller)
Procurment charges
Supply of new Vibration Monitoring System 1,365,564.38
New SCADA for Chillers Plant 420,000.00
Cables. Accessories & Bulk Material 52,500.00
Sewage Treatment Plant (STP) -
New PLC & SCADA System 892,500.00
Chlorination System (Including Chlorine Analyzers and Detectors) 1,018,999.80
Instruments 175,269.41
Speed Control Panels 63,000.00
Cables 52,500.00
Preventive Maintenance of existing Compressors and dryers 10,500.00
Replacement of Instrument tubing, fittings and accessories (Bulk Material) 105,000.00
Water Treatment Plant (WTP) -
New PLC & SCADA System 1,050,000.00
Chlorination System (Including Chlorine Analyzers and Detectors) 945,392.70
Instruments 250,645.98
Valves, 2" 212,065.88
Valves, 6" 109,360.13
Valves, Pumping Station 163,900.80
Communication system (RTU/GPRS) 52,500.00
Speed Control Panels 126,000.00
Cables. 52,500.00
Replacement of Instrument tubing, fittings and accessories (Bulk Material) 105,000.00
Total Cost 7,223,199.07
CONSTRUCTION
INVOICING PLAN
CUM - INVOICIING 9,390,158.79
CASH-IN PLAN
Advance
ENGINEERING
PROCUREMENT
Central Plant (Chiller)
Procurment charges
Supply of new Vibration Monitoring System 1,365,564.38
New SCADA for Chillers Plant 420,000.00
Cables. Accessories & Bulk Material 52,500.00
Sewage Treatment Plant (STP) -
New PLC & SCADA System 892,500.00
Chlorination System (Including Chlorine Analyzers and Detectors) 1,018,999.80
Instruments 175,269.41
Speed Control Panels 63,000.00
Cables 52,500.00
Preventive Maintenance of existing Compressors and dryers 10,500.00
Replacement of Instrument tubing, fittings and accessories (Bulk Material) 105,000.00
Water Treatment Plant (WTP) -
New PLC & SCADA System 1,050,000.00
Chlorination System (Including Chlorine Analyzers and Detectors) 945,392.70
Instruments 250,645.98
Valves, 2" 212,065.88
Valves, 6" 109,360.13
Valves, Pumping Station 163,900.80
Communication system (RTU/GPRS) 52,500.00
Speed Control Panels 126,000.00
Cables. 52,500.00
Replacement of Instrument tubing, fittings and accessories (Bulk Material) 105,000.00
Total Cost 7,223,199.07
CONSTRUCTION
CASH-IN PLAN
CUM-CASH IN
RETENTION
CUM-RETENTION
CASH-OUT PLAN
ENGINEERING 0
PROCUREMENT
Central Plant (Chiller)
Supply of new Vibration Monitoring System 1,365,564.38
New SCADA for Chillers Plant 420,000.00
Cables. Accessories & Bulk Material 52,500.00
Sewage Treatment Plant (STP) 0
New PLC & SCADA System 892,500.00
Chlorination System (Including Chlorine Analyzers and Detectors) 1,018,999.80
Instruments 175,269.41
Speed Control Panels 63,000.00
Cables 52,500.00
Preventive Maintenance of existing Compressors and dryers 10,500.00
Replacement of Instrument tubing, fittings and accessories (Bulk Material) 105,000.00
Water Treatment Plant (WTP) 0
New PLC & SCADA System 1,050,000.00
Chlorination System (Including Chlorine Analyzers and Detectors) 945,392.70
Instruments 250,645.98
Valves, 2" 212,065.88
Valves, 6" 109,360.13
Valves, Pumping Station 163,900.80
Communication system (RTU/GPRS) 52,500.00
Speed Control Panels 126,000.00
Cables. 52,500.00
Replacement of Instrument tubing, fittings and accessories (Bulk Material) 105,000.00
Transportation 31,500.00
Vendor Specialist Charges 72,528.75
CONSTRUCTION 2,443,089.50
CASH-OUT PLAN
CUM-CASH OUT
MONTH
CUM MONTHS
CUM INVOICING
CUM CASH-IN
CUM CASH-OUT
NET CASH
16000000
14000000
12000000
10000000
8000000
6000000
4000000
2000000
0
Apr-18
-2000000
Instruments
Vendor E&H
With PO 10%
Approval of Design Documents/Drawings 30%
Prior to Delivery 50%
Commissioning 10%
Delivery 20 to 22 weeks after receipt of advance
Valves
Vendor Flowserve
With PO
Approval of Design Documents/Drawings 50%
Prior to Delivery 50%
Commissioning 26 weeks after drawing approval
Delivery
Valves
Vendor KOSO
With PO 10%
Approval of Design Documents/Drawings 30%
Prior to Delivery 60%
Commissioning
Delivery 7 months after drawing approval
1 2 3 4 5 6
Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18
2,795,378.04
792,710.12
243,810.00
30,476.25 50,793.75
518,096.25
591,529.38
101,743.89
36,571.50
30,476.25
60,952.50
609,525.00
548,800.46
145,499.99
123,104.24
63,483.55
95,144.41
30,476.25
73,143.00
30,476.25
60,952.50
1 2 3 4 5 6
Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18
2,795,378.04
1,227,115.27
195,048.00
24,381.00
414,477.00
473,223.51
81,395.12
487,620.00
439,040.37
116,399.99
1 2 3 4 5 6
Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18
341,391.09 341,391.09
42,000.00 84,000.00
13,125.00
89,250.00 178,500.00
509,499.90
17,526.94 52,580.82
15,750.00 15,750.00
13,125.00 13,125.00
105,000.00 210,000.00
472,696.35
25,064.60 75,193.79
106,032.94
54,680.06
81,950.40
26,250.00 26,250.00
31,500.00 31,500.00
13,125.00 13,125.00
21,000.00 21,000.00 21,000.00 21,000.00
16000000
CUM CASH-IN CUM CASH-OUT
14000000
12000000
10000000
8000000
6000000
4000000
2000000
0
Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18
-2000000
1,321,183.53 528,473.41
406,350.00 81,270.00 81,270.00
20,317.50
1,036,192.50 172,698.75
985,882.31 394,352.92
169,573.16 33,914.63 33,914.63
60,952.50 12,190.50 12,190.50
50,793.75 10,158.75 10,158.75
20,317.50
101,587.50 20,317.50 20,317.50
1,219,050.00
914,667.44
242,499.99 48,500.00
205,173.73
105,805.92
158,574.02
50,793.75
121,905.00
50,793.75
101,587.50
7 8 9 10 11 12
Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19
1,056,946.83 422,778.73
325,080.00 65,016.00 65,016.00
40,635.00 16,254.00
828,954.00
788,705.85
135,658.53 27,131.71
731,733.95
193,999.99 38,800.00
164,138.99
84,644.74
126,859.22
40,635.00
97,524.00
40,635.00
81,270.00
7 8 9 10 11 12
Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19
614,503.97 68,278.22
210,000.00 84,000.00
13,125.00 13,125.00 13,125.00
446,250.00
509,499.90
87,634.71 17,526.94
15,750.00 15,750.00
13,125.00 13,125.00
10,500.00
21,000.00
525,000.00 210,000.00
472,696.35
125,322.99 25,064.60
106,032.94
54,680.06
81,950.40
31,500.00 31,500.00
13,125.00 13,125.00
21,000.00
15,750.00 15,750.00
18,132.19 18,132.19
ut deductions
voice submission
13 14 15
Apr-19 May-19 Jun-19
2,642,367.07 2,642,367.07 -
812,700.00 812,700.00 -
101,587.50 101,587.50 -
- - -
1,726,987.50 1,726,987.50 -
1,971,764.61 1,971,764.61 -
339,146.31 339,146.31 -
121,905.00 121,905.00 -
101,587.50 101,587.50 -
20,317.50 20,317.50 -
203,175.00 203,175.00 -
- - -
203,175.00 2,031,750.00 2,031,750.00 -
182,933.49 182,933.49 1,829,334.87 1,829,334.87 -
48,500.00 484,999.98 484,999.98 -
41,034.75 41,034.75 410,347.47 410,347.47 -
21,161.18 21,161.18 211,611.84 211,611.84 -
31,714.80 31,714.80 317,148.05 317,148.05 -
10,158.75 10,158.75 101,587.50 101,587.50 -
24,381.00 24,381.00 243,810.00 243,810.00 -
10,158.75 10,158.75 101,587.50 101,587.50 -
20,317.50 20,317.50 203,175.00 203,175.00 -
-
- -
- 341,860.22 593,535.22
13,041,494.76 13,383,354.98 13,976,890.20
13 14 15
Apr-19 May-19 Jun-19
2,706,840.82 2,113,893.65
650,160.00 650,160.00
81,270.00 81,270.00
- -
138,159.00 1,381,590.00 1,381,590.00
315,482.34 1,577,411.69 1,577,411.69
27,131.71 271,317.05 271,317.05
- 97,524.00
- 81,270.00
- 16,254.00
- 162,540.00
- -
975,240.00 162,540.00 1,625,400.00 1,625,400.00
292,693.58 1,463,467.90 1,463,467.90
38,800.00 387,999.98 387,999.98
65,655.59 229,794.58 328,277.97
33,857.89 118,502.63 169,289.47
50,743.69 177,602.91 253,718.44
16,254.00 56,889.00 81,270.00
39,009.60 136,533.60 195,048.00
16,254.00 56,889.00 81,270.00
32,508.00 113,778.00 162,540.00
-
- -
- -
342,614.04 1,113,399.00 748,316.36
11,969,109.85 13,082,508.85 13,830,825.21
- 68,372.04 118,707.04
2,608,298.95 2,676,671.00 2,795,378.04
13 14 15 Total Cost
Apr-19 May-19 Jun-19
- -
1,365,564.38 -
420,000.00 -
52,500.00 -
-
178,500.00 892,500.00 -
1,018,999.80 -
175,269.41 -
63,000.00 -
52,500.00 -
10,500.00 -
105,000.00 -
-
1,050,000.00 -
945,392.70 -
250,645.98 -
212,065.88 -
109,360.13 -
163,900.80 -
52,500.00 -
126,000.00 -
52,500.00 -
105,000.00 -
31,500.00 -
18,132.19 18,132.19 72,528.75 -
-
174,506.39 174,506.39 174,506.39 2,443,089.50 -
192,638.58 371,138.58 174,506.39
9,224,672.35 9,595,810.93 9,770,317.32