Date: 08.08.2012 Natural Ventilation Calculation Sheet

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

Client Name : M/s Hindustan Coca-Cola Beverages Pvt.

Ltd
Project Name : Bangalore Green Field
Project Number : 012 - 01137 - 00
Date: 08.08.2012
NATURAL VENTILATION CALCULATION SHEET
Area Height Volume ACPH Ventilation Selected fan
SR NO Description of Area cfm Nos.
f2 f f3 cfm

1 Ground Floor 60,000 50 3,011,040 12 602,208 2,164 92.76

Total 60,000 602,208 200,736


12 ACPH TAKEN AS PER NBC CODE TO
MEET SMOKE EXHUAST REQUIREMENT TURBO VENTILATOR FANS ON ROOF
CAP: 2164 CFM EACH FOR ADDITIONAL
SR.NO AREA REMARK
NATURAL EXHAUST @4 ACPH

FRESH AIR OPENING REQUIRED 1,721 SQ.FT


1] 160 Sq.Mtr. 67 NOS. 2M x 1.2M VENTILATION LOUVERS TO BE PROVIDED ON BUILDING
WALL AT 1.0 MTR. FROM FFL
1.2MTR HIGH LOUVER REQUIRED 131 MTR LENGTH

EXHAUST AIR OPENING REQUIRED 2,581 SQ.FT 80 NOS. 2M x 1.5M VENTILATION LOUVERS TO BE PROVIDED ON BUILDING
2] 240 SQ.MTR. WALL + 91 NOS TURBO VENTILATIOR FANS COSIDERED ON THE ROOF
[ CAP:2161 CFM EACH ].EXHUAST LOUVER SHALL BE AT THE LEVEL OF 10 MTR
1.5MTR HIGH LOUVER REQUIRED 197 MTR LENGTH FROM FFL.

Required wall Opening for Natural Smoke VENTILATION EXHAUST AIR OPENING IS MORE THAN SMOKE EXHAUST
3] Ventilation 1,800 SQ.FT
OPENING, HENCE NO NEED ANOTHER OPENING.NATURAL VENTILATION WILL
SERVE DUAL PURPOSE OF NORMAL & SMOKE VENTILATION.
( As per NBC Chapter-4 FIRE AND LIFE
SAFETY ) 3% of total floor area.

Expected Tropical Summer Index (TSI) REF: NBC Part-8 , 2.2.23

TSI= 0.745 x DB + 0.308 x WB - 2.06 x √v + 0.841

TSI= 0.745 x 35.6 + 0.308 x 25.6 - 2.06 x √2.82 + 0.841

TSI= 31.8

31.8°C INSIDE EXPECTED TEMPRATURE IN PROCESS AREA DURING PEAK AMBIENT TEMPERATURE