MARATHON CONSTRUCTION COMPANY (PVT) LTD

METHOD STATEMENT FOR APPLICATION OF HSS

Document # Date Rev Prepared By MCCL Checked By MCCL Approved By BHP

Mudasar M Zakaria Qureshi Sajid Imran


QA/QC Coordinator HSEQ Manager BHP QA/QC
MCCL/QA/QC/SOP/05 02-01-2014 01
MARATHON CONSTRUCTION COMPANY (PVT) LTD

1.0 PURPOSE

The purpose of this procedure is to ensure that all Pipe Joint Coating
(Including Inspection activities) meets the requirements set forth in BHP
Construction Specifications.

2.0 SCOPE

This procedure applies to all Pipe Joint Coating (HSS) application


operations (with their relevant inspection) of Flow Line Construction in
BHP.

3.0 DOCUMENT PRECEDENCE

Where conflicting requirements occur in the documents, the order of


precedence shall be:

 The Pakistan Oil and Gas Regulations 1974 and the Standards and
Codes listed therein

 Project Standards and Specifications

 ASME B31.4

 API 5L

 NACE NO. 2 (SA 2 ½)

All conflicting requirements within BHP documentation shall be brought


to the attention of BHP prior to the commencement of related work.

Page 2 of 6
MARATHON CONSTRUCTION COMPANY (PVT) LTD

4.0 RESPONSIBILITIES

Project engineer, Mechanical supervisor is the responsible for the


application of HSS as per required specification. Product / QA-QC
compliance and assurance is the responsibility of QA/QC site In-charge
along with the QA/QC Inspectors.

5.0 APPLICABLE CODES, STANDARDS AND


SPECIFICATIONS

Following codes, standards and specifications shall be followed:

Codes

 ASME B31.4
 API 5L
 SSPC SP1 thro’ SP10
 NACE NO. 2 (SA 2 ½)

6.0 ABBREVIATIONS

 MCCL – Marathon Construction (pvt) Ltd.


 BHP - BHP Pakistan.

7.0 DOCUMENTATION AND RECORDS

 As per approved Quality Inspection Plan.

Page 3 of 6
MARATHON CONSTRUCTION COMPANY (PVT) LTD

8.0 RESOURCES

 Power Generator
 Heavy Duty Grinders
 Pipe Rollers
 Heating Torch with accessories
 Crane
 Holiday Tester
 Grit Blasting Equipment with dead man switch
 Air Compressor
 Burshine gas cylinders
 Blasting Hood

9.0 HEAT SHRINK SLEEVE APPLICATION


METHODOLOGY
Weld area shall be thoroughly cleaned with Granet/Sand blasting and the
profile achieved after blasting shall be in between 50-100 micron.
Blasting material shall be garnet or sand. During blasting compliance of
proper PPEs (Ex. Sand blasting hood) will be followed. The exposed steel
and coated area should be cleaned of all Foreign Materials. Either sides
of weld joint coating shall be protected with fire blanket wrap around.
Using heating torch with Brushing gas cylinder and adjusting the flame
length to produce controlled flame. Heat the pipe evenly until required
temperature (230-245°C) is achieved.

Wrap the issued sheet around the pipe weld, the sheet should over-lap the
sheet by 2” minimum. This will make a tube larger than the pipe diameter.
Sheet end that comes over the top of pipe should be on the top of over-
lap.

With Gloved hand, patch down the closure and smooth any wrinkles by
gently working them outward from the center of the closure. Press the

Page 4 of 6
MARATHON CONSTRUCTION COMPANY (PVT) LTD

sleeve in position centering over the exposed sheet end. Pre heat the bare
pipe surface up to required temperature, adjacent line coating must be
heated per manufacture recommendations. Using a pyrometer ensure that
proper pre heat has been achieved. Slide the sleeve over the joint area
centering it over the weld.

Continue shrinking the sleeve until it is completely recovered. When the


sleeve has been shrunk onto the joint area and is still hot and soft. Run a
small hand roller over the sleeve to push out any trapped air. When the
sleeve has cooled, examine the edge for proper adhesion.

At the end needs to ensure the following.


 The sleeve has fully conformed to the pipe and adjacent coating.

 Here are no cold spots or dimples on the sleeve surface.

 Weld bead profile can be seen through the sleeve.

 After sleeve is cool, adhesive flow is evident on both edges.

Proposed section shall be checked with Holiday Detector before lower-in.


Detected area will be marked for epoxy coating repair by using client
recommended material and per manufacturer procedure.

Coating surface shall be abraded and clean. The particular area to be


repaired shall be roughening using wire brushes, grinding disks etc shall
be suitable stainless steel types for brushes and negative carbon or
ceramic grinding disks. sandpaper / half round file and wipe to clean all
dust.

Page 5 of 6
MARATHON CONSTRUCTION COMPANY (PVT) LTD

10. WASTE AND RUBBISH

The Site supervisor shall ensure all rubbish due to coating operations
(food scraps, waste materials etc.) is collected and returned to camp for
disposal with camp waste.

11.0 INCIDENT REPORTING

The Site supervisor shall report all incidents in accordance with the
Accident/incident Reporting procedure in the Safety Management Plan.
Such incidents shall be assessed for corrective and preventive measures
to be adopted.

Page 6 of 6