Method Statement For Application of HSS: Marathon Construction Company (PVT) LTD
Method Statement For Application of HSS: Marathon Construction Company (PVT) LTD
1.0 PURPOSE
The purpose of this procedure is to ensure that all Pipe Joint Coating
(Including Inspection activities) meets the requirements set forth in BHP
Construction Specifications.
2.0 SCOPE
The Pakistan Oil and Gas Regulations 1974 and the Standards and
Codes listed therein
ASME B31.4
API 5L
Page 2 of 6
MARATHON CONSTRUCTION COMPANY (PVT) LTD
4.0 RESPONSIBILITIES
Codes
ASME B31.4
API 5L
SSPC SP1 thro’ SP10
NACE NO. 2 (SA 2 ½)
6.0 ABBREVIATIONS
Page 3 of 6
MARATHON CONSTRUCTION COMPANY (PVT) LTD
8.0 RESOURCES
Power Generator
Heavy Duty Grinders
Pipe Rollers
Heating Torch with accessories
Crane
Holiday Tester
Grit Blasting Equipment with dead man switch
Air Compressor
Burshine gas cylinders
Blasting Hood
Wrap the issued sheet around the pipe weld, the sheet should over-lap the
sheet by 2” minimum. This will make a tube larger than the pipe diameter.
Sheet end that comes over the top of pipe should be on the top of over-
lap.
With Gloved hand, patch down the closure and smooth any wrinkles by
gently working them outward from the center of the closure. Press the
Page 4 of 6
MARATHON CONSTRUCTION COMPANY (PVT) LTD
sleeve in position centering over the exposed sheet end. Pre heat the bare
pipe surface up to required temperature, adjacent line coating must be
heated per manufacture recommendations. Using a pyrometer ensure that
proper pre heat has been achieved. Slide the sleeve over the joint area
centering it over the weld.
Page 5 of 6
MARATHON CONSTRUCTION COMPANY (PVT) LTD
The Site supervisor shall ensure all rubbish due to coating operations
(food scraps, waste materials etc.) is collected and returned to camp for
disposal with camp waste.
The Site supervisor shall report all incidents in accordance with the
Accident/incident Reporting procedure in the Safety Management Plan.
Such incidents shall be assessed for corrective and preventive measures
to be adopted.