PROJECT MANAGER: RAHEELA MHEMOOD DATE: 21/3/2019

work breakdown structure

WBS LEVEL WBS CODE WBS NAME

1 1 PREPARATION
2 1.1 INITIAL STANDING STATUS
2 1.1.1 FORM HSE TEAM
3 1.1.2 IDENTIFY GAPS
3 1.1.3 KPI's
2 1.2 IDENTIFY TASK OF EACH PROCESS
1 2 RISK MANAGEMENT PLAN
2 2.1 HAZARD IDENTIFICATION
3 2.1.1 CATEGORY OF HAZARDS
3 2.1.2 HAZARD CHECKLIST
3 2.1.3 DEVELOP RISK MATRIX
3 2.1.4 RISK REGISTER & CONTROL CATLOG
1 3 IMPLEMENTATION STRATEGY
2 3.1 MD APPROVAL
3 3.1.1 RESOUCES ALLOCATION
2 3.2 IMPLEMENT CONTROL MEASURES
3 3.2.1 MACHINES GUARDING
3 3.2.2 SYSTEM MANUALS
3 3.3.3 LABELLING AND FLOOR DEMARCATIONS
2 3.3 COMMUNICATE HAZARDS AND THEIR CONTROLS
3 3.3.1 LABELS, PICTOGRAMS, AND POSTERS
3 3.3.2 DEFINE WORK PHASE CYCLES
3 3.3.4 TRAININGS
1 4 SYSTEM ASSESSMENT
2 4.1 MANAGEMENT REVIEW AND AUDIT
3 4.1.1 SYSTEM MATURITY ASSESSMENT
1 5 DOCUMENTATION AND RECORD CONTROL PROCESS
2 5.1 DEVELOP HSE MANUAL
2 5.2 CONFORMANCE WITH OH&S SYSTEM