Property PEB Buildings Conventional Buildings: Structure Weight
Property PEB Buildings Conventional Buildings: Structure Weight
SEISMIC RESISTANCE The low weight flexible frames offer Rigid heavy frames do not perform
higher resistance to seismic forces. well in seismic zones.
OVER ALL PRICE Price per square meter may be as Higher price per square meter.
low as by 30 % than the conventional
building.
ARCHITECTURE Outstanding architectural design can Special architectural design and
be achieved at low cost using features must be developed for each
standard architectural details and project which often require research
interfaces. and thus resulting in higher cost.
SOURCING AND COORDINATION Building is supplied complete with all Many sources of supply are there so
accessories including erection for a it becomes difficult to co ordinate
single “ONE STOP SOURCE”. and handle the things.
COST OF CHARGE ORDER 1) PEB manufactures usually stock a 1) Substitution of hot rolled sections
large amount of that can be flexibly infrequently rolled by mills is
used in many types of PEB projects. expensive and time consuming.
2) Change orders are easily 2) Change orders that are made after
accommodated at all stages of the the dispatch of hot rolled sections
order fulfilment process. Little or no result in increasing the time and cost
material is wasted even if a change involved in the project.
order is made after fabrication starts.
BUILDING ACCESSORIES Designed to fit the system with Every project requires different and
standardized and inter changeable special design fro accessories and
parts. Including pre designed flashing special sourcing for each item.
and trims. Building accessories are Flashing and trims must be uniquely
mass produced for economy and are designed and fabricated.
available with the building.
FUTURE EXPANSIONS 1)All project records are safely and 1) It would be difficult to obtain
orderly kept in electronic format project records after a long period of
which makes it easy for the owner to time. It is required to contact more
obtain a copy of his building record than one number of parties.
at any time.
2)Future expansion is most tedious
2) Future expansion is very easy and and more costly.
simple.
SAFETY AND RESPONSIBILTY Single source of responsibility is Multiple responsibilities can result in
there because all the job is being question of who is responsible when
done by one supplier. the components do not fit in
properly, insufficient material is
supplied or parts fail to perform
particularly at the
supplier/contractor interface.
PERFORMANCE 1) All components have been 1) Components are custom designed
specified and designed specially to for a specific application on a specific
act together as a system for job. Design and detailing errors are
maximum efficiency, precise fir and possible when assembling the
ABHAY ROOFING SOLUTIONS
peak performance in the field. diverse components into unique
buildings.
2)Experience with similar buildings,
in actual field conditions worldwide, 2) Each building design is unique, so
has resulted in design improvements predication, of how components will
over time, which allow dependable perform together is uncertain.
prediction of performance. Materials which have performed well
in some climates may not do well in
other conditions.