 What is PERT and what is CPM?

PERT AND CPM

 PERT means Program Evaluation and  CPM was designed as a tool for planning,
Review Technique scheduling, and control of construction work. Its
emphasis was on the work or activities to be
 CPM means Critical Path Method
managed. The network diagram defined and
focused attention on the job to be accomplished.
The schedule derives the earliest and the latest
 PERT and CPM were developed independently in times for their start and finish.
the later part of 1950’s . These two are networks.
Techniques , used for planning and coordinating  PERT was developed as a result of looking for an
large scale projects. improved method of planning and evaluating
progress of a large scale research and
PERT development program. It was designed to
 The use of PERT began in 1958 through the joint provide the management a periodic reporting of
efforts of the Lockhead Aircraft, the U.S. Navy current status and an outlook for the future on
Special Project Office and the consulting from meeting approved plans and schedules. It
the Booz , Allen and Hamilton in the efforts of the answers the questions such as: “Is this a feasible
U.S. government to speed up the Polaris Missile schedule?” and “What are the probabilities of
project. making it?

 The U.S. government’s apprehension that the  For instance , PERT originally stressed
Soviet Union, might gain nuclear superiority over probabilistic activity time estimate because the
the U.S., early completion of the project was field in which it was developed was typified by
given top priority. A special operations research high uncertainty. In contrast, CPM originally
team was directed to formulate a new approach made no provisions for variable time estimates.
considering that the management concepts and However , from a conceptual analysis, most of
methods at that time were not adequate. The these differences are the same. For practical
concept was formulated by the research team purposes, the two techniques are the same.
and is then called Program Evaluation and Thus, comments and procedure described will
Review Technique, which is simply called PERT. apply to both PERT and CPM project analysis.

 The Polaris Missile project is a large one involving  PERT/CPM is a control tool for defining the parts
over 3,000 contractors and 11,000 sub- of construction job and then putting them
contractors with several thousand of work together in a network form. It serves as an aid to
activities. The use of PERT in this large scale the construction manager but it does not make
project was proven successful in shortening the decision for him it guarantee good management.
length of the project completion time. PERT/CPM only serves the project manager to
see the whole picture of the entire job. It
CPM encourages periodic re-evaluation and providing
 In 1956, prior to the development of PERT, the an accurate measure of progress. Thus, a person
Critical Path Method which is simply called CPM in charge of each work and the project manager
was developed by J.E. Kelly of the Remington know what is supposed to happen and when it is
Rand Corp. and M.R. Walker of Du Pont in an supposed to happen.
effort by commercial industry to make an
advanced scheduling and cost control methods.
By April 1958, CPM in application was
demonstrated in a real success.
 Under Presidential Decree (PD) 1594, Prescribing  With the use of PERT/CPM, the project manager
Policies, Guidelines, Rules and Regulations for can easily obtain the following information:
government infrastructure contracts provides that: o The graphical display of project activities
o An estimate of how long will the project
“The program of work shall include, among other last
things, estimates of the work items, quantities, costs o Determine which activities are the most
and PERT/CPM network of the project activities ,,, in critical to timely project completion.
the preparation of the bidding documents, the o Determine how long any activity can be
government shall make and estimate of the actual delayed without lengthening the
number of working days required to complete the project.
project through PERT/CPM analysis of the project  Three Phases of PERT/CPM
activities and corrected for holidays and weekends” o Planning
o Scheduling
 On January 27, 1968, president Ferdinand E. Marcos o Control-Monitor
issued Memorandum Circular No. 153 which
provides that:  PLANNING- It is defined as determining the
relationship between the work operation and
“In order that the performance discipline on the field
the sequence in which they are to be performed.
could be controlled and easy reporting system could be
 Scheduling- is defined as the process of
made to facilitate the monitoring, evaluation, inspection
translating the arrow diagram into time table of
completion of infrastructure projects, all heads of
calendar days.
departments and chief of bureaus and offices concerned
 The PERT/CPM diagram should be updated
are hereby required to change the old system of
periodically to account for:
preparing the work programs of said projects from the
o Time discrepancies
Grantt Chart to the PERT/CPM network. Strict
o Deliveries
compliance herewith is enjoined.”
o Weather
 On June 19, 1968, the Executive Committee for o Change orders
Infrastructure Program implemented the o Unexpected events or conditions
Presidential Order in a letter to all implementing  Precedence diagram- clearly indicate which of
agencies to wit: the activities must be performed independently
with each other.
“ Your attention is invited to a Presidential Order  Network diagram- composed of a number of
requiring the preparation of a PERT/CPM arrows and nodes
diagram for every major project prior to their  The Nodes in the AOA approach represents the
actual construction” beginning and the end of activities, which are
called event.
 Activities can be referred to in two ways:
 Section 6 of R.A. 5979 requires the application of o By their end points such as activity 1-2
PERT/CPM technique to all projects with an o By a letter assigned to an arrow such as
estimated cost of P100,000 or more. Thus, activity a,b,c, etc
PERT/CPM now has become an integral part as
requirement of project construction
management.
Principle No. 1

That everything in the network or arrow diagram must


have a meaning.

a) Every arrow represents a item of work and is called


Activity.

b) An Event is the starting point of an activity


represented by a circle , square or any geometrical form.

c) An Activity is dependent upon and cannot begin until


after the completion of all preceding Activities.

d) All activities that start with same event cannot begin


until after the completion of all activities that enter that
event

Principle No. 2

That an activity has a single definite starting point and


a single definite ending point.

Principle No. 3

The network (arrow diagram) does not describe time


relationships but rather dependency relationships.