Professional Documents
Culture Documents
BIG Final Boards 140327 PDF
BIG Final Boards 140327 PDF
BIG Final Boards 140327 PDF
IT
TU
NN
EL W
34
ST
CLINTON
big team
SCHOOL OF CONSTRUCTED ENVIRONMENTS PARSONS THE NEW SCHOOL
THE BIG U E4
2S
T
IR
10 continuous miles of low-lying geography that comprise an incredibly dense,
TF
vibrant, and vulnerable urban area. The proposed system not only shields the city
LU
against floods and stormwater; it provides social and environmental benefits to
S
the community, and fosters an improved public realm. For Phase 3 of Rebuild
HI
NG
by Design, the Big U team created coordinated plans for three contiguous but
separate regions of the waterfront dubbed “compartments.” Each compartment
7
comprises a physically discrete flood-protection zone that can be isolated from
flooding in adjacent zones. Each presents unique opportunities for integrated
social and community planning. The compartments work in concert to protect
and enhance the city, but each compartment’s proposal is designed to stand
on its own. Proposed solutions for the components were designed in close
consultation with the associated communities and many local, municipal, State
and Federal stakeholders; each proposal has a benefit-cost ratio greater than
HOSPITAL ROW
one; and each is flexible, easily phased, and able to integrate with existing
projects in progress.
WHAT IS AT RISK?
The floodplain upland of Manhattan’s 10 miles of coastline is home to
approximately 200,000 people. This area contains some of the largest central
business districts in the country, which cumulatively form the core of an economy
with a $500 billion annual GDP, and influence economic activity throughout the STUYVESANT COVE PARK
world. More than 52 million annual visitors come to New York City to see the 9/11
memorial, The Battery, Wall Street, the Statue of Liberty, and Ellis Island. The
floodplain also contains 35,000 affordable housing units, home to over 95,000
E2
low-income, elderly, and disabled residents, the majority of whom live in a highly 3S
vulnerable area along the East River. T
Superstorm Sandy devastated much of this area. Infrastructure was disabled,
homes were flooded, and people, many elderly or disabled, were trapped in their COOPER STUYVESANT PAVILIONS
apartments. The economic heart of the Financial District stopped for a week.
Many residents are still struggling with the aftermath. In public housing units
PATH TU
affected by Sandy, mold infestation Nalmost
has NEL doubled, illustrating that global
climate change has increased the challenges of providing safe, livable, affordable
housing in Lower Manhattan. Rebuilding poses its own risks. In the worst case,
uncoordinated recovery actions could result in a chaotic set of atomized changes
that could prove destructive to the urban realm. A piecemeal approach would not
only cost much more than a coherent plan; it would also likely worsen economic
disparity in the city and leave low-income areas behind. Flood-protection
measures, if not intelligently designed, might sever communities’ connection to PEDESTRIAN LOOKOUT
the waterfront, an unacceptable loss.
SOBECA
The opportunities that rebuilding brings, however, are as great as the risks. This
occasion represents a priceless opportunity to rebuild better, to rebuild in such a
way that as the city grows more secure physically, it gains new social, aesthetic,
economic and environmental assets that enhance its reputation as the greatest
city in the world. HOLLA
ND TU BIKEWAY FLYOVER
NNEL
BM
TC
AN
HARBOR BATH AR
SI
EL
AM
BE BIKE PATH
RS
ST PEDESTRIAN BRIDGE
TWO BRIDGES/CHINATOWN
PATH
T UNN COMPARTMENT 2 C2 BRIDGING BERM
EL
C1 COASTLINE
2.19 MILES
BATTERY-FINANCIAL DISTRICT
COMPARTMENT 3
C3
EXISTING AMPHITHEATER
SUPERFIELD
MONTGOMER
GREEN STREETS
PROPOSED PIER 42 PARK
FLIP DOWN DEPLOYABLES
IND
Y ST.
BIG BENCH
6TH
ECO-PIER
AV
C2 COASTLINE
BR
E
OO
.78 MILES
F
K
C2 FLOODPLAIN
LY
N
Y PLACE
BATTER SOUTH STREET PAVILIONS
IN
D
8T
The resulting Phase 3 proposal envisions three compartments that function The communities of the Lower East Side have expressed their desires for the The Mayor’s Office has become a close collaborator of the BIG Team during
A-
independently to provide flood protection. Each responds to the problems the development of this third phase of Rebuild by Design, and has expressed
C
waterfront in seven separate visioning processes over the past decade, including
URBAN LIVING ROOM posed by a particular portion of the city, and to the needs and wishes of the the East River Esplanade Plan, A People’s Plan for the East River Waterfront (a enthusiasm for the emerging concepts of the Big U. As the intended grantee of
particular community concerned. direct response to the Esplanade Plan), and the East River Blueway Plan. Before CDBG-DR funding for the Big U, the City of New York has the final say regarding
BATTERY PARK BERM engaging residents in a new dialogue, the team reviewed these plans to better the project’s implementation.
understand local needs and desires.
GREEN INFRASTRUCTURE Implementation can begin in any of the three compartments. The Big U’s
MA
C3COASTLINE On the Lower East Side (LES), the BIG Team worked intensively with LES essential flexibility allows implementation to start swiftly, and facilitates
NH
Green infrastructure in the three compartments contributes to flood protection Ready!, an umbrella organization of twenty-six community groups focused dynamic response to any emergent issues by shifting implementation focus
1.37 MILES while providing social amenities. Climate-change models predict more frequent between compartments as necessary.
ATT
151 ACRES (2050 100-YEAR) overflows (CSO) – problems exacerbated by impervious city streets. The urban neighborhood. At the first workshops, the community debated the merits of In the most vulnerable areas of the U, further outreach and collaboration with
IRT
NB
182 ACRES (2050 500-YEAR) heat island effect will be worsened by longer heat waves. The Big U’s native various flood protection approaches, using the BIG Team’s models of different public housing communities will be needed to craft a solution that fulfils the
7TH
RN
species bioswales, rain gardens, and street plantings will absorb and clean prototypical solutions. In the second series of workshops, the results of these community’s needs and the Big U’s objectives. To achieve this, the BIG Team has
AV
E stormwater, cool the city, reduce air pollution, store carbon, buffer noise, discussions were incorporated in two possible integral design solutions for developed a ‘toolbox’ of resilience measures that provide multiple benefits in
HARBOR MUSEUM 2-3
-Q-
enhance recreational activities, improve mental health, and provide green jobs. each compartment. These designs were also discussed at length by community addition to flood protection: social and cultural amenities, housing preservation,
BMB PLAZA As a result, they will also reduce costs to both City and citizens. greater access to economic opportunity, jobs, ecological function, and improved
B-D
members, whose feedback was used to refine the final designs. Over 150
community members attended these workshops; many returned to join the public space. The team and community can work together to decide how best
to deploy these tools to create a refined, fine-grained, site-specific strategy to
BATTERY MARITIME BUILDING BM
TB
SOCIAL INFRASTRUCTURE team for a celebration at the end of the process.
address public housing’s ‘towers-in-the-park.’
RO
WHIEHALL TERMINAL IR AD Our major stakeholder, the City, saw the BIG Team’s approach on the LES as
BRO
States, as traditionally conceived, has not been built in a way that engages and as they arise, embracing new regulations that might allow in-water resiliency
GT responds to the intimate needs of the public; rather, it has been imposed from
efforts to include the Financial District and The Battery, where it began building
ON without on our cities on a large scale, dividing communities and fragmenting
a coalition among the area’s diverse stakeholders: City, State, and Federal measures and soft shoreline edges; rising to challenges posed by affordable
N BA
4- agencies, local elected and appointed officials, and public/private partnerships. housing legislation that could include new preservation imperatives; or simply
5 the urban experience. The Big U approaches the mandate to create large- adapting protection heights in response to future sea level rise. The Big U’s
scale protective infrastructure with a commitment to meaningful community flexible kit of parts will allow it to respond to these and other conditions as they
TTER
Across the project area, the BIG Team spoke with a vast array of officials,
engagement and fine-grained urban experiences. It fuses Robert Moses’ hard emerge.
planners, and agency representatives, whose invaluable input enabled the plans
infrastructure with Jane Jacobs’ locally-based, community-driven sensibility.
to deftly handle a wide range of issues that concerned different entities and
Y
The Big U’s flood-protection will not look like a wall, and it will not divide In order to support this adaptive framework and reap the benefits it can
geographies. The BIG Team would like to express its profound gratitude for the
TUN
the community from itself or its waterfront. Rather, the very structures that provide, there must be leadership structures in place to guide its growth. Part
kind attention and constructive criticism the proposals received. This feedback
protect us from the elements will embrace those protected, becoming attractive of this proposal, therefore, is to develop a Big U Lower Manhattan Waterfront
fostered a fine-grained responsiveness in the Big U that the team always hoped
NEL
centers of social and recreational activity that enhance the city and lay a positive Planning Leadership Council, which will streamline the adaptation of all
to achieve.
groundwork for its future. planning initiatives to preserve resiliency, and address the long-term needs and
The component designs that emerged from this collaborative process have possibilities of Lower Manhattan as these inevitably evolve. A high-capacity
The multivalent U consists of linked compartments, each built according to public agency with both authority and resources must be identified to serve as a
captured the communities’ interest, contain protective elements that can be
its own scale of time, size, and investment. This compartmentalization allows coordinating planning and implementation agency lead for the Big U, supported
implemented quickly, are well-positioned to pass permitting and regulatory
neighborhoods to tailor protective elements to fit their own needs, with cultural by an interagency Technical Working Group and a broadly representative
reviews, and have positive benefit-cost ratios. Furthermore, they are designed
offerings, programming, and civic spaces as diverse as the City’s population. Community Advisory Committee.
for growth: the designs are flexible enough to accommodate further community
Protection can be strategically phased: small, relatively simple projects will
input and refinement, as well as future adjustments necessitated by changes in
provide immediate protection and maintain the post-Sandy momentum while The request for CDBG-DR funds, therefore, includes not only funding for
regulations, ongoing climate conditions, or other unforeseen needs. The designs
laying the groundwork for intelligent long-term solutions. implementation of the three compartments, but also the funding for the Big
anticipate continued future growth, and provide physical and social elements to
support the city for decades to come. U comprehensive planning leadership structure and continued community
Upon selection by the Rebuild by Design Jury for the 3rd phase of the competition, engagement over a long period of time. This is the only way to preserve the
the Big U concept was greeted enthusiastically by many stakeholders on effectiveness of resiliency measures such as those contemplated here, and it is
the West Side, at the Battery, and on the Lower East Side (LES). In order to the only way to maximize the funding leverage, benefits, and public engagement
focus resources during the relatively short planning period, the BIG Team, at which form the essence of the Big U. The Big U thus serves as an exemplary
the suggestion of the Mayor’s Office, decided to focus first on the Lower East project: it shows how to integrate resiliency with city making.
Side. Here a large, vulnerable population (intended to be a major beneficiary of
CDBG-DR funding), lives in the floodplain.
B
YS
ST
E 9 ST
T
MA
E 13 ST
DI S
RIDGE ST RIDGE ST
ON
E 6 ST
ST
E 7 ST
E 2 ST
RIVINGTON ST
C1 PLAN: THE BRIDGING BERM AT EAST RIVER PARK
E 5 ST
C1 COMPARTMENT 1 ELEMENTS: L.E.S. NORTH - EAST RIVER PARK
E 12 ST
SAMUEL DICKS
CH
E 3 ST
TEIN PZ
E 11 ST
ER
MO
NT
RY
PITT ST
GO
ME
ST
RY
T S AV C
GRAND ST
DELANCEY ST
AV C
STANTON ST
E 4 ST
N
O NAME
NO BIALYSTOKER PL BIALYSTOKER PL
NA
DELANCEY ST S
ME
AV C
E HOUSTON ST
E 5 ST
GO
E 4 ST
E 10 ST
E 7 ST
UV
ER SHERIFF ST
E 6 ST
NE
E 8 ST
UR
ST
HE
E 9 ST
N RY
NO NAME
E 3 ST
E 12 ST
S T
E 5 ST
SZOLD PL
E 14 ST
ABRAHAM KAZAN ST
E 13 ST
COLUMBIA ST COLUMBIA ST
AV D
RIVINGTON ST
WA
TER
E 12 ST
FD
3'-2" STRENGTHENED
ST
MA
DR
GREEN STREETS
DIS
CANNON ST
O
AV D
LA
NS
E HOUSTON
T
DELANCEY ST S
BROOME ST
3'-10" CON-ED
JACOB RIIS BRIDGE
+9’ FOOT SPLASH ALLOWANCE
DEPLOYABLE BARRIER
ST
JAC
E 6 ST
KS
LEWIS ST
ON
+8’ FEMA 2050 100 YEAR FLOODPLAN LEWIS ST BARUCH DR
NO
16'-0"
ST
6TH ST. RIDGE 10TH ST. BRIDGE
E 10 ST
NA
ME
+5’ SANDY
9'-0"
DELANCEY ST
+4’ FEMA 2050 50 YEAR FLOOD PLAN
CH
LILIAN WALD BRIDGE
ER
JAC
HOUSTON ST. BRIDGE
RY
KS
ON
ST
S
BARUCH PL
T
EX
BARUCH DR
8" MAINTAINED EXISTING
DELANCEY ST S
GRAND ST.BRIDGE DELANCEY ST.BRIDGE BERNARD BARUCH BRIDGE SPORTS FIELDS
CORLEARS HOOK BRIDGE GREEN
GRAND ST
6'-10"
THE BRIDGING BERM CONCRETE BLOCK BRIDGES
CH
TOP SOIL MANGIN ST MANGIN ST
ER
CONRETE CAP WALL AND
RY
CLAY CAP SHEET PILE
ST
DELANCEY ST
BERM NICHES
COMPACTED EMBANKMENT CON-ED
ALONG EXISTING TREES RECYCLED ASPHALT BIKEWAY
SLURRY WALL 9'-8" FLYOVER
PASSAGE
PLAZAS
HARBOR BATH
BIKEWAY ALONG
NEW BERMSCAPE LOOK-OUT
16'-0" 28'-11" 8'-0" 11'-4"
RAMPS BIKEWAY ALONG
NEW BERMSCAPE
10TH ST. BRIDGE EAST RIVER PARK
BALL FIELD GRASS BIKEWAY BERM RAMP GREEN WALL CAR ROAD FERRY
THE BRIDGING BERM
HISTORIC
FISHING
EXISTING SPACE WITH SHIP DOCK
NEWLY REQUIRED PROGRAMS SWIMMING POOL
HARBOR BATH
MAINTAINED EXISTING
SPORTS FIELDS
LE BA
ON YA
AR
ST
R DS
D T
ST
ER
PL
XT
ST
T
DS
ER
BA
EX
RY
K
AR
ESS
TO
WE
CH
LYS
BO
BA
OR
YA
BIA
ST
R DS GR
T AN
LOW
DS
ST
T
BAXTER ST
CA
EN
PZ
NA
LUD
LS
T
ALL
EIN
C2 PLAN: NEAR AND LONG-TERM OPTIONS AT TWO BRIDGES - CHINATOWN
MULBERRY ST
PELL
T
ST
KS
FO
DIC
RS
MA
ST
YT
EL
MOTT ST
HS
MU
GE
HA
PE
LL
SA
TTA
RID
ST
ELD
N
BR
MOSCO ST
AP
DO DIVISION ST
YE DWAY
RS EAST BROA
ST
RY
WE
BO
ST
DIVISION
CLINTON
HENR
JEFFERSO
DWAY
EAST BROA
ST
CATH
WO
RT
H
N ST
ST
ERINE
HENRY ST
ST
CH
SQ
NO NAME
AT
M DWAY
TH
A EAST BROA
HA
HA
M
FO
SQ
OADWAY
RS
MONTGO
EAST BR
YT
HS
HENRY ST
MERY ST
ROW
PARK PARK
ROW
RUTGERS
D STRENGTHENED
ST
ST
MADISON
HENRY ST
PIKE ST
HENRY ST
ST
MARKET ST
MADISON
CO
OLIVE
RT
T ST
L AN
R ST
GOUVERNE
DT
WES
COMMUNITY USES IN S
JAME
T
GROUND FLOORS
ST
ON S
MADISON
S ST
UR ST
PL
C COMPREHENSIVE PLANNING
PEARL ST
ES
4'-4" 4'-4"
M
JA
INGT
ALBA
ST
H
N ST
B
MADISO
CATH
WAS
BARRIER
ST
ERINE
20'-0" 20'-0"
ICH
ST
CHERRY
ST
PL
+8’ FEMA 2050 100 YEAR FLOODPLAN +8’ FEMA 2050 100 YEAR FLOODPLAN
ENW
15'-8" 15'-8" DA
AY
R
TY
DW
ST THE ELASTIC BERM WATER ST
INI
NO NAME
ST
+5’ SANDY +5’ SANDY CHERRY
GRE
OA
+4’ FEMA 2050 50 YEAR FLOOD PLAN +4’ FEMA 2050 50 YEAR FLOOD PLAN
GOUVERNEUR
AL
TR
GOUVERNE
BR
BA
STRENGTHEN NY O2 OPT2
T ST
CA
RUTGERS
ST BIG BENCH
RETAINING WALL RLISL TH
UR SL W
SL E
PERMANENT FOUNDATION PERMANENT FOUNDATION REC
WES
5'-0" 5'-0" TOR ES AM
SL
RAISED MARTIN T ES FDR DR W LA
PL ST O1 OPT1
NO NAME
PL
STABILIZATION SLAB STABILIZATION SLAB
CATH
PIKE SL
TY
ERINE
ER
NO N
MA
MA
SL
TY
LIB
NH
AME
BENCH BREAKS ST
ATT
RY ST
IDE
CHER
ANB
DRILLED H-PILLING DRILLED H-PILLING
PRESERVE VIEWS
N
RA
P
12'-11" 12'-11" SOUTH
ST DOG RUN
WATE
RS T
BUS STOP PINGPONG
MARKET SL
SKATE PARK
CE
FD
R
DA
DR
R
ET
ST
1: FLIP-DOWN DEPLOYABLE MOUNTED UNDER FDR
DR
FD
FDR
R
AV
D
R
H ST
SOUT
EN
FD
SWIMMING POOL
ND
R
Y
R
DR
R
F
P
W
ET
HE
AG
BK
SB
NE
BR
D
R
O
UT
SR
VE
EN T
WE YOGA
R
PL
RP
S
AY
SO
ST
TH NEW WATER
T
DW
AM
S
BASKETBALL
T
AU
ON S
ES -TAXI LANDING
OA
FOOD TRUCK ST NEW PARK SPACE
SS
REC
BR
BK
ST
TOR
NA
BR
BK
INGT
BK B
PARKING
R EN
DO
TAICHI
BR
AP
RP
ST SUPER FIELD
BK
VE
ICH
EN
MA
RS
BR
UNDERNEATH
RP
NH
BIKEWAY
H
AP
ATT
ENW
WAS
ANB
GRE
JOS
EPH
PW
PL
RELOCATED ECO DOCK AR
DS
TY
BALLFIELDS 3P T INI W
AND GARDENS L AL
LS
TR
SB
R
DR
EN
T
FD
PI
+9’ FOOT SPLASH ALLOWANCE NE
+4’ FEMA 2050 50 YEAR FLOOD PLAN
4'-0"
B DEPLOYABLE ST
T
ED
WS
SLURRY WALL
TOP SOIL
CLAY CAP BARRIER GA
RS EX
T
CH
9'-0" COMPACTED EMBANKMENT
NE
S
AN
AD
+9’ FOOT SPLASH ALLOWANCE
+8’ FEMA 2050 100 YEAR FLOODPLAN GE
AL
BRO
UNDER FDR VIADUCT CAR ROAD SIDEWALK BERM HOUSING BUILDING
BR
O
O
+5’ SANDY
KL
4'-0"
ST
2P
M
L
PERMANENT FOUNDATION 5'-0"
IA
MOR
T ST
ILL
L
STABILIZATION SLAB
-6’ SEA LEVEL
RIS
YP
W
OR SLURRY WALL
TER
WES
DRILLED H-PILLING
BAT
TOP SOIL
EXC
HA
SLURRY WALL
WES
CLAY CAP
W
COMPACTED EMBANKMENT
NG
9'-0"
MO EP AL
RR L LS
FLOOD SIDE PROTECTED SIDE
1P IS S T
L
UNDER FDR VIADUCT CAR ROAD SIDEWALK BERM SWIMMING POOL LANDSCAPE HOUSING BUILDING
T
T S
ICH
2: THE BIG BENCH - +4’ PERMANENT FOUNDATION 3: THE ELASTIC BERM - +4’ OPTION AND
ST
ENW
R
+9’ OPTION, WITH INTEGRATED AMENITIES
OVE
WITH DEPLOYABLE EXTENSION TO +9’
GRE
HAN
ST
AY
T
NEW
ON S
DW
OA
INGT
BR
ST
BEAVER
BEAVER ST
P
BIKEWAY
COMPARTMENT OUTDOOR
BATT
BROADWA
IL
ST
LL
M
LIA
A
IL
Y
SW
ST
COMMUNITY
E
ON
HA
TREE GARDENS
ST
NO
GARDEN ELEVATED
VE
GARDEN
R
SQ
STATE ST
STONE ST
16'-8" ELEVATED ST
ER
+9’ FOOT SPLASH ALLOWANCE
+8’ FEMA 2050 100 YEAR FLOODPLAN
+5’ SANDY
+4’ FEMA 2050 50 YEAR FLOOD PLAN
PARK PROMENADE AT
W
-6’ SEA LEVEL
18'-8"
PERMANENT FOUNDATION
NT
T
GROVE RL S
PEA
ORE
ER
NATIONAL MONUMENT SHRUB WAT
GARDEN
SO
T
. BATTERY MARITIME BUILDING FLYING OVER PLAZA BIKE AND PEDESTRIAN RAMP CITY
STATE ST
+9’ FOOT SPLASH ALLOWANCE
+8’ FEMA 2050 100 YEAR FLOODPLAN
+5’ SANDY
9'-0"
ELEVATED
+4’ FEMA 2050 50 YEAR FLOOD PLAN
WATER PROMENADE BATTERY PARK BOSQUE BATTERY BERM BOSQUE BIKEWAY BATTERY BERM AND SEEGLASS CAROUSEL
+5’ SANDY
40'-0" 9'-0" NEW HARBOR
WHITEHALL TERMINAL
+4’ FEMA 2050 50 YEAR FLOOD PLAN
D ST
MIDDEL SCHOOL
-6’ SEA LEVEL
COMPACTED
FLOOD WALL
EMBANKMENT
CLAY CAP
RESTAURANT
REVERSED
AQUARIUM
MUSEUM
HARBOR BERM - THE REVERSE AQUARIUM AND HARBOR MIDDLE SCHOOL
NEW LANDING FOR
THE STATUE OF LIBERTY
FERRY
120'-0" 30'-0" 56'-0" 49'-0"
COMPARTMENT 1 (C1)
The compartment connects to Hospital Row at 23rd Street with a deployable barrier.
Under the FDR Drive at Peter Cooper Village, a series of pavilions are placed. At
the land-side, these can be programmed with the commercial functions and other
amenities the area now lacks. On the water side, they can be programmed with
EXISTING - EAST RIVER PARK AND FDR BRIDGING BERM ALONG FDR LONG TERM - COVERED FDR, NEW TRANSIT OPTIONS FOR THE L.E.S.!
recreational amenities that enhance the adjacent park. Between the pavilions,
deployables maintain the relationship with the waterfront. Around the Con-Ed
plant, a new flyover with an integrated levee provides a link between sections of the
waterfront.
At East River Park, an undulating berm at the location of the existing service road
provides flood protection. Shaped so that the existing sports fields are maintained,
the berm provides topographic relief and new vistas for the back of the park. New
landscape also increases the resiliency of the park through more diverse, salt-
tolerant trees and plantings. Generous landscaped bridges connect East River
Park to the community, enhancing existing bridges and adding additional bridges
between major streets. Generous ADA accessible ramps bring visitors gently down
into the park from atop the bridges, where plazas make connections to a new, scenic
bikeway and out to the water for a series of new waterfront programs. The flood
protection continues to Montgomery St. by fortifying the new Pier 42 Park, where a
deployable will help maintain the on-ramp to the FDR Drive.
The flood protection in L.E.S. North - East River Park protects $780,000,000 in
potential damages (NPV). With a design height of 15ft, the system has a benefit
cost ratio of 2.08.
FLIP DOWN DEPLOYABLE PANELS AS ART! - TWO BRIDGES FLIP DOWN DEPLOYABLE PANELS - THE STORM
COMPARTMENT 2 (C2)
At Two bridges, the relative lack of space between the residential areas and
the waterfront favors a mixed flood-protection strategy. Limited-height flood
protection shields the area against most recurrent floods while allowing for views to
the waterfront. This is complemented by systematic measures to raise generators,
etc., in a so-called ‘wet-feet’ (building waterproofing) strategy that will allow the
community to deal with the much rarer, bigger flood. The BIG Team has given special
attention to ensuring that the resiliency measures add much-needed amenities for
public housing.
Moving south from Montgomery Street, in front of the Pier 36 Sanitation Department THE BIG BENCH LOCAL PROGRAM - A PLATFORM FOR TAI CHI! THE BIG BENCH - DAILY RECREATION THE BIG BENCH - SWIMMING POOL
facility, deployables will be attached to the underside of the FDR Drive. These
deploybables, in part a public art project, are designed so as to provide lighting and
security in these now-dark spaces. Opposite the Smith Houses, this flood protection
gives way to a system of benches, skate parks, tai-chi platforms and a pool, the
latter enclosed in glass from 4 feet up. The flood protection enlivens the Smith
Houses’ waterfront and provides recreational amenities such as laundromats,
shops, and spaces for community functions. One of the ground floors is fortified
and will house a Co-Gen plant serving the entire campus. A new public housing
project compensates for the evacuated apartments.
As a final possibility, the team has also looked at the potential for The Elastic Berm:
a gently raised landscape element winding its way through open space upland,
simultaneously protecting the area while protecting views to the water and providing
new amenities for the NYCHA campuses. Each of the options for Two Bridges –
Chinatown have different benefits, and choices will need to be developed through
continued in-depth discussion with the community.
COMPARTMENT 3 (C3)