Professional Documents
Culture Documents
Material Reconciliation Sheet: Project Name: Reconciled Upto: 31st AUGUST 2012
Material Reconciliation Sheet: Project Name: Reconciled Upto: 31st AUGUST 2012
PROJECT NAME :
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
a THEORITICAL CONSUMPTION AS ON Date: Bags 0.00 CUM 0.00 CUM 0.00 CUM 0.00 CUM 0.00 CUM 0.00
b CONVERSIONS Bags 0.00 CUM 0.00 CUM 0.00 CUM 0 CUM 0.00 CUM 0.00
Page 1 of 4
MATERIAL RECONCILIATION SHEET
PROJECT NAME :
c Quantity received as on Dt. As per Stock Statement Bags 0.00 CUM 0.00 CUM 0.00 CUM 0 CUM 0.00 CUM 0.00
d Balance Stock as on Dt. As per Stock Statement Bags 0.00 CUM 0.00 CUM 0.00 CUM 0.00 CUM 0.00 CUM 0.00
e NET Actual consumption as on Dt. (c-d) Bags 0.00 CUM 0.00 CUM 0.00 CUM 0.00 CUM 0.00 CUM 0.00
f NET WASTAGE / SAVINGS Bags 0.00 CUM 0.00 CUM 0.00 CUM 0.00 CUM 0.00 CUM 0.00
Rs / Rs / Rs / Rs / Rs / Rs /
h AVG . PURCHASE RATE IN RS
Bag Cum Cum Cum Cum Cum
Page 2 of 4
ONCILIATION SHEET
18 19 20 21 22 23 24 25
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
Page 3 of 4
ONCILIATION SHEET
Rs / Rs / Rs / Rs /
Nos Nos Nos Nos
0 0 0 0
Page 4 of 4