Quality document
No
Project quality plan 0r Quality assurance plan (PQP)
Work procedure (WP)
Inspection test plan (ITP)

General work procedure

Building structure erection


Structural floor erection (for equipment)
Pipe rack erection
Operating platform erection
dedusting duct erection
Shell, vessel, tank etc erection (Petal form)
Shell, vessel, tank etc erection (ring form)
Shell, vessel, tank etc erection (completely preassembled)
Static equipment erection
Rail erection
Rotary equipment erection
Piping erection
Hydraulic piping erection
Chemical cleaning of piping
Oil flushing of piping
Pressure testing of piping
Ultrasound tesing of wels seam
Dye penetration test of weld seam
Radiography of weld seam
Magnetic particle test of weld seam
Stress relieving of weld seam

Specific work procedure


Battery anchorage
Flush plate
Buckstay with tie rod and spring
Door frame
Door

Mixed gas reversing system


Flue bend
Connecting duct
Waste heat box
Revesing system

COG reversing system


Revesing system
Hydraulic unit

Gas collecting system


Ascension pipe
Water seal valve
Water seal lead
WSV and WSL switching device
Gas collecting main
COG flaring system

Oven machine
SCP machine
Coke guide car (CGC/CTC)
Coke gas transfer car (CGT)
Quenching car and loco