Gantt Chart

PROJECT TITLE Reverse Engineering Period 2


PROJECT MANAGER Holly Jossart DATE September 2019

PHASE ONE PHASE TWO PHASE THREE


Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9
TASK START DUE PCT OF TASK
TASK # TASK TITLE OWNER DATE DATE DURATION COMPLETE 0 25 50 75 100 0 25 50 75 100 0 25 50 75 100 0 25 50 75 100 0 25 50 75 100 0 25 50 75 100 0 25 50 75 100 0 25 50 75 100 0 25 50 75 100
1 Project Conception
2 blueprint individual parts holly 9/11/19 9/12/19 100%
3 blueprint new pieces everyone 9/11/19 9/15/19 100%
4 create a gantt chart john/sage 9/6/19 9/13/19 100%
5 Step By Step engineerging everyone 9/6/19 9/19/19 100%
6 Step 1: Purpose jovais 9/11/19 9/11/19 100%
7 step 2: Hypothesis jovais 9/11/19 9/11/19 100%
8 step 3: Disasemble sage/holly 9/11/19 9/12/19 100%
9 step 4: analyze elements everyone 9/11/19 9/18/19 100%
10 step 5: prepare the report john 9/15/19 9/18/19 100%
11 Redesign everyone 9/15/19 9/18/19 100%
12 create doc for steps everyone 9/11/19 9/19/19 100%
13 new design holly 9/16/19 9/19/19 100%
presentation everyone 9/18/19 9/19/19 100%
3 possible mentors everyone 10/3/19
first draft cover letter everyone 10/4/19