Three Years Rolling Plan 2010-2013 District Lahore
Contents
Acronyms ................................................................................................................................................. 4
Executive Summary................................................................................................................................ 5
LAHORE ................................................................................................................................................. 7
SECTION 1: DISTRICT HEALTH PROFILE ............................................................................................ 7
Vision of the District ................................................................................................................................ 7
Background of the District ..................................................................................................................... 7
Map to the District ................................................................................................................................... 8
Demography ........................................................................................................................................... 8
Socio-Economic Indicators .................................................................................................................. 10
Health Indicators .................................................................................................................................... 10
Organizational Structure of District Health Administration ............................................................ 10
Health Resources .................................................................................................................................. 11
1. Health Facilities ......................................................................................................................... 11
a) Public................................................................................................................................... 11
b) Private ................................................................................................................................. 12
2. Human Resource ....................................................................................................................... 12
a) Administrative .................................................................................................................... 12
b) Facility Based ...................................................................................................................... 13
c) Outreach .............................................................................................................................. 18
d) Training Institutions ........................................................................................................... 19
Health Financing................................................................................................................................... 19
Disease Pattern ..................................................................................................................................... 20
Status of Vertical Programs ................................................................................................................. 22
1. National Program for FP & PHC ............................................................................................... 22
2. EPI............................................................................................................................................... 22
3. MNCH Program .......................................................................................................................... 23
4. TB Control Program ................................................................................................................... 23
5. Malaria Control Program .......................................................................................................... 23
6. Hepatitis Control Program ....................................................................................................... 24
7. School Health Services Program .............................................................................................. 24
SECTION 2: PROBLEM ANALYSIS ....................................................................................................... 25
Objectives .............................................................................................................................................. 25
Plan Development Process .................................................................................................................. 25
Problem Identification ......................................................................................................................... 26
Health Problems ................................................................................................................................... 26
Problem Prioritization ........................................................................................................................ 27
Underlying causes of prioritized problems .................................................................................... 29
2
Three Years Rolling Plan 2010-2013 District Lahore
3
Three Years Rolling Plan 2010-2013 District Lahore
Acronyms
3YRP Three Years Rolling plan
ADB Asian Development Bank
APMO Additional Principal Medical Officer
ARI Acute Respiratory Infections
BHU Basic Health Center
BoD Burden of Dieses
CDC Communicable Disease Control
CDR Case Detection Rate
CPR Contraceptive Prevalence Rate
DHIS District Health Information System
DHQH District Head Quarter Hospital
DoH Department of Health
DR Default Rate
EDO(H) Executive District Officer Health
EPI Expended Program on Immunization
HSRP Health Sector Reforms Program
IMR Infant Mortality Rate
IPC Interpersonal Communication
M&E Monitoring and Evaluation
M&E Maintenance and Repair
MCH Maternal Child Health
MMR Maternal Mortality Ratio
MNCH Maternal Newborn and Child Health
MO Medical Officer
MoV Means of Verification
MSDS Minimum Service Delivery Standards
PDSSP Punjab Devolved Social Services Program
PHC Primary Health Care
PMO Principal Medial Officer
POL Petrol, Oil and Lubricant
RHC Rural Health Center
SCR Sputum Conversion Rate
SHC Secondary Health Care
SMO Senior Medical Officer
TAMA Technical Assistance Management Agency
TB Tuberculosis
THQH Tehsil Head Quarter Hospital
TNA Training Need Assessment
WHO World Health Organization
WMO Women Medical Officer
4
Three Years Rolling Plan 2010-2013 District Lahore
Executive Summary
Prior to devolution, planning process was carried out at provincial level. Districts were
supposed to implement plans and programs developed/designed at provincial and federal
levels. Devolution brought a paradigm shift where planning became a district responsibility. This
change provided an opportunity to the district at one hand and challenge on other due to their
limited capacity in planning and budgeting. Planning focus also changed from short term to
medium term planning recognizing the flexibility /adaptability it provided. Government
envisions that medium term plan .i.e. 3YRP will be instrumental in using health resources
effectively and efficiently through adapting Minimum Service Delivery Standards (MSDS) as the
strategy to achieve objectives of MDGs.
Districts have been preparing 3YRP (medium term plan) for last few years under the
auspices/patronage of Department of Health (DoH) Government of Punjab through technical
assistance of Punjab Devolved Program Social Services Programme (PDSSP). This year
government of the Punjab through Health Sector Reforms Program (HSRP) with the technical
assistance from a team of consultants (SP09) and wide consultations/inputs from all key stake
holders has established a bench mark in standardization of the format of 3YRP. Capacity
building of the districts has been done on the standardized format.
Current 3 Years Rolling Plan (3YRP) plan is first attempt by the district on that agreed format.
First section of the format (District Health Profile) contains all relevant information on
Geography, Demographic, Socioeconomic and Health indicators of the district. It also takes stock
of health resources in terms of human resource, infrastructure and others. District diseases
pattern compiled from DHIS Primary and Secondary Health Care reports and current status of
vertical /national programs is part of the profile. In fact district profile is a health related fact
sheet of the district and depicts the true picture of health status and health resources/services of
the district. An accurate district health profile provides a sound basis for evidence-based
planning.
3YRP plan has been developed by following the standard planning cycle approach. 3YRP details
the current year activities, physical targets and fiscal targets. Projections of second and third
year physical and financial targets are given. Section Two includes problems identification from
various perspectives, and their prioritization by applying WHO prioritization criteria. This
section also contains underlying causes of the prioritized problems. Section Three of the plan
relates to developing best possible interventions/activities and setting physical targets for each
5
Three Years Rolling Plan 2010-2013 District Lahore
year. Section Four consists of costing based on additional requirements taking account of
implementation of current status of activities. Best available estimates have been used to
accurately cost the activities. The detailed activity based costing of the Health and Service
Delivery problems has been developed on automated Excel sheets, and annexed for details as
ready reference. Last section of the 3YRP consists of Monitoring and Evaluation of plan to gauge
the progress of different activities and targets of the plan using reliable district data sources.
This permits timely remedial action for smooth implementation of planned activities.
6
Three Years Rolling Plan 2010-2013 District Lahore
LAHORE
_____________________________________________________________________________________________________________
The District Health Government Lahore is looking to provide efficient “Health Care Delivery
Services “through Primary and Secondary health facilities with the collaboration of Government
and non-government stake holders. The District Health Government is also committed to
improve the “Healthy Life Style” of the people of Lahore district.
The District Health Government Lahore has been providing promotive, preventive and curative
services through net work of Health Institutions. At present curative services are being utilized
by the population of the District, whereas in preventive programmes achievement of
Department has been 90% of the targets.
Lahore is the 5th largest city in South Asia and 30th largest city in the world. It is also the 2nd
largest as well as 2nd most populous city of Pakistan. The city of Lahore is bounded by
Sheikhupura district in the West and by Wagha on the east, while on South it is surrounded by
the Kasur district on the northern side it is bordered by Ravi River.
Lahore is well connected through a wide Road and rail networks. The city is easily accessible
from different parts of the country and world through air transport.
7
Three Years Rolling Plan 2010-2013 District Lahore
Demography
8
Three Years Rolling Plan 2010-2013 District Lahore
Gender-wise population
Gender Population Percentage
Male 3685690 45%
Female 4504731 55%
Source: Standard Demographic population groups based on DHIS
Population groups
Standard Estimated
Population Groups
Demographic (%) Population
Under 1 year of age 2.7 221141
Under 5 years 13.4 296329
Under 15 years 44 130385
Women in child bearing age (15-49 22 28685
years)
Married Child Bearing age Women 16 38437
Expected pregnancies 3.4 1307
Standard Demographic population groups based on DHIS
Languages: Urdu, Punjabi and English are the main languages spoken in the district.
9
Three Years Rolling Plan 2010-2013 District Lahore
Socio-Economic Indicators
Health Indicators
There exists a three-tier system in the health sector in the country. At federal level, Federal
Secretary of Health is responsible to administer and supervise the health related activities and
programs. Major function of federal tier is to provide policy guidelines and ensure quality of
health care standards through federal legislation. After the 18th amendment in the constitution,
and announcement of National Finance Award, most of the existing federal level programs will
be transferred to the provincial level. At provincial level, provincial Secretary of Health along
with Director General Health Services is responsible for managing and supervising health care
services. The district is still an administrative entity in the system and EDO (Health) acts as head
of the district health department, under overall supervision of DCO. The organizational structure
at district level is as under:
10
Three Years Rolling Plan 2010-2013 District Lahore
ORGANOGRAM
DISTRICT COORDINATION OFFICER
SENIOR DRUG MS
DOH – (HQ) DOH-I DO(PH) DOH-II DOH-III
INSPECTOR/ DHQ/THQ
EDO(H) OFFICE LAHORE LAHORE LAHORE LAHORE
SEC. DQCB HOSPITALS
MCH CENTERS
(55)
Health Resources
1. Health Facilities
a) Public
A Detail of physical infrastructure of public health facilities under the administrative control of
EDO (health) in the district is given below.
No. of
Bed
Facility Type Name of Facility Functional Remarks
Strength
Beds
BHUs 37 74 74
------
11
Three Years Rolling Plan 2010-2013 District Lahore
b) Private
The district has town wise exhaustive lists of private service providers including hospitals, clinics,
laboratories and maternity homes. These private providers are used for providing support in
preventive programs like Polio and other EPI activities. With the passage of time, role of private
providers will expand, and there is a need to develop an effective coordination between public
and private sector. It is not possible to annex at all the lists of private providers working in mega
city of Lahore.
2. Human Resource
The Human resource of district health department has been placed in following
Categories:
a) Administrative
b) Facility based
c) Outreach
d) Training institutions
a) Administrative
14 Inspector Vaccination 3 3
b) Facility Based
Sr.
Name of Post/Designation Sanctioned Filled Vacant
#
1 Medical Officer 37 37 0
9 1
3 Medical Assistant 10
4 Computer Operator 37 - -
5 Medical Technician 34 34 0
6 LHV 33 33 0
7 Dispenser 37 37 0
8 Midwife 37 37 0
37 0
9 N/Qasid 37
10 Chowkidar 37 37 0
11 Sanitary Worker 43 43 0
- No information available
Sr.
Name of Post/Designation Sanctioned Filled Vacant
#
1 Senior Medical Officers 6 6 0
3 Dental Surgeons 6 6 0
4 Medical Officers 7 7 0
5 Charge Nurses 36 36 0
6 Homeo Doctors 3 3 0
7 Hakeems 2 2 0
8 Computer Operators 6 6 0
9 Medical / Technician 4 4 0
13
Three Years Rolling Plan 2010-2013 District Lahore
Sr.
Name of Post/Designation Sanctioned Filled Vacant
#
10 LHV 12 12 0
11 Lab. Technician 6 6 0
12 Dental Technician 6 6 0
13 29 14 15
R.H.I
14 Junior Clerk 6 6 0
15 Vaccinator 0 0 0
16 Homeo Dispenser 3 3 0
17 Dawasaz 2 2 0
18 Radiographer/X-Ray Asstt. 6 6 0
19 0 0 0
Dresser
20 Anesthesia Assistant 6 6 0
21 O.T.A 6 6 0
22 Dispenser 24 24 0
23 Dental Assistant 0 0 0
24 Laboratory Assistant 6 6 0
25 27 27 0
Midwife
26 Driver 7 7 0
27 T.O 6 6 0
29 Dawa Kob 2 2 0
30 Ward Servant 12 12 0
31 24 24 0
Sweepers
32 Sanitary Worker 0 0 0
33 Sanitary Patrol 29 29 0
34 Naib Qasid 18 18 0
35 Mali 6 6 0
36 Cook 6 0 0
37 12 12 0
Chowkidar
38 Water Career/Bhashthi 6 6 0
14
Three Years Rolling Plan 2010-2013 District Lahore
1 Medical Superintendent 2 2
2 APMO. 3 3
3 APWMO. 2 0
4 Gynecologist 2 2
5 Pediatrician 2 2
6 Surgeon 2 0
18 14
7 MO/CMO
7 5
8 WMO
9 Dental Surgeon 1 1
10 Hospital Pharmacist 2 2
11 Head Nurse 2 1
12 Charge Nurses 21 21
13 Homeo Doctor 0 0
14 Hakim 0 0
15 LHV. 2 2
16 Clerk 4 4
17 Dispenser/Dresser 8 2
18 Homeo Dispenser 0 0
19 Dawasaz 0 0
20 OTA. 3 1
21 Radiographer/X-Ray Assistant 3 2
22 Laboratory Assistant 2 2
23 Dental Assistant 0 0
24 Driver 4 4
26 Midwife 3 3
27 Ward servant 16 16
28 NQ/Dawakob 10 10
29 Bearer 3 3
30 Dhobi 2 2
31 Gate Keeper 4 4
15
Three Years Rolling Plan 2010-2013 District Lahore
32 Mashki 0 0
33 Baildar 0 0
34 Chowkidar 4 4
35 Cook 2 2
1 Medical Superintendent 2 2
2 Chief Consultant 0 0
3 PMO 0 0
4 PWMO 0 0
5 AMS 1 0
6 APMO 12 5
7 APWMO 9 2
8 Physician 4 4
9 Anesthetist 6 5
10 Cardiologist 4 0
11 Chest specialist 2 0
12 DMS 3 0
SMO 2 1
13 Neuro Surgeon 0 0
14 Nursing Superintendent 5 3
15 Nephrologist 1 1
16 Pediatrician 2 2
17 Pathologist 2 0
18 Radiologist 2 2
19 Surgeon 4 2
20 E.N.T. Specialist 2 0
21 Eye Specialist 2 2
16
Three Years Rolling Plan 2010-2013 District Lahore
23 Urologist 2 0
24 Dental Surgeon 2 2
25 Internees 0 0
27 Pharmacist 6 6
28 Physiotherapist 2 2
29 W.M.O 40 19
31 Head Nurse 16 8
32 Male Nurse 0 0
33 Hakeem 0 0
34 Homeo Doctor 2 2
35 Almoner 1 1
36 Computer Operator 4 4
37 Stenographer 2 2
38 Accountant 2 1
39 E.C.G. Technician 8 6
Haemo Technician 0 0
CT Technician 0 0
40 Senior Clerk 4 2
41 Sanitary Inspector 6 6
42 Junior Clerk 9 9
43 Dawasaz 0 0
44 Dispenser 33 26
45 Homeo Dispenser 2 1
47 Physiotherapist Aid 1 1
48 Radiographer 2 2
49 Dental Assistant 0 0
50 Lab. Assistant 8 5
51 Store Keeper 6 5
52 Driver 15 13
17
Three Years Rolling Plan 2010-2013 District Lahore
53 Midwife 2 2
54 Tailor Master 4 4
56 Lab. Attendant 9 9
57 O.T. Attendant 14 14
58 X-Ray Attendant 2 2
59 Ambulance Cleaner 0 0
60 Bearer 0 0
61 Baildar 5 5
62 Chowkidar 18 18
63 Cook 8 8
64 Dawakob 0 0
65 Dhobi 8 8
66 Gate Man 18 18
67 Mali 8 8
68 Masalchi 1 1
69 Sanitary Worker 90 90
70 Ward Cleaner 40 40
71 Ward Servant 75 75
72 Water Carrier 0 0
73 Naib Qasid 29 29
c) Outreach
This information is about outreach program workers such as Vaccinators, CDC Supervisors and
Sanitary Inspectors which are not part of above mentioned health facilities.
CDC Supervisors 37 37
Sanitary Inspectors 45 45
18
Three Years Rolling Plan 2010-2013 District Lahore
d) Training Institutions
A number of training institutions are working in the district which includes the following:
i. DHDC
Post Sanctioned Filled
Programme Director 1 1
MPPT 0 0
LHV Trainer 1 1
Assistant 1 1
Driver 0 0
Naib Qasid 1 1
Chowkidar 1 1
Sanitary Worker 0 0
Health Financing
Year
Source of funding 2007-08 2008-09 2009-10 up to 02/2010
Allocation Exp. Allocation Exp. Allocation Exp.
Non-Development 673.061 611.802 836.053 821.332 1060.273 611.891
19
Three Years Rolling Plan 2010-2013 District Lahore
Disease Pattern
The disease pattern is determined through regular and periodic reporting through surveys and
studies. Punjab health department has adopted DHIS as regular reporting mechanism to collect
information on diseases and other variables. Currently, DHIS is in transitional stage, and is
establishing itself as a tool to be used for evidence based planning and management. The
following trend of the diseases has been taken from the consolidated DHIS reports that include
reports from PHC and SHC facilities.
20
Three Years Rolling Plan 2010-2013 District Lahore
Cardiovascular Diseases
23 Ischemic heart disease 1017 0%
24 Hypertension 19076 3%
Skin Diseases
25 Scabies 60544 10%
26 Dermatitis 29592 5%
27 Cutaneous Leishmaniasis 51 0%
Endocrine Disease
28 Diabetes Mellitus 21703 4%
Neuro-Psychiatric Diseases
29 Depression 0%
1741
30 Drug Dependence 0%
96
31 Epilepsy 0%
12
Eye & ENT
32 Cataract 1031 0%
33 Trachoma 1110 1%
34 Glaucoma 4335 1%
21
Three Years Rolling Plan 2010-2013 District Lahore
Injuries/Poisoning
37 Road traffic accidents 12722 2%
38 Fractures 2117 0%
39 Burns 1660 0%
The following paragraphs depict the current status of the program being implemented in
the district. The indicators and their values have been taken from the program reports.
2. EPI
3. MNCH Program
4. TB Control Program
23
Three Years Rolling Plan 2010-2013 District Lahore
24
Three Years Rolling Plan 2010-2013 District Lahore
Objectives
The objectives would guide in problem analysis, designing interventions, setting /phasing
the targets, costing and monitoring the plan activities.
Plan development has been a systematic and consultative process. A core planning team
consisting of EDO (H), DOH, MS DHQ and THQs, Statistical officer, and Budget and Accounts
Officer, was designated by Director General Health Services Punjab. This team received three
days customized training from SP-09 team at divisional headquarters. The main components of
the trainings were: (i) developing a three-year rolling health sector plan using the standard
three year rolling plan format; (ii) costing of the plan; (iii) preparing related budget projections;
(iv) accounting procedures; (v) preparing adequate financial reports on the use of funds.
The district planning team adopted the following steps for the preparation of three years rolling
plan:
25
Three Years Rolling Plan 2010-2013 District Lahore
Problem identification
Prioritization of identified problems
Identifying underlying causes of prioritized problems
Developing interventions and activities
Setting targets
Determining resource requirements, costing and budgeting
Preparing action plans
Preparing monitoring plan
Problem Identification
This step involved assessment of the current situation from various perspectives to establish the
actual health situation in terms of health and service delivery/management problems. Problem
identification is based on the district health profile, review of previous plans, MIS (DHIS,
Program reports and periodic reports etc.); District specific surveys (MICS), MSDS, and national
and provincial policy guidelines.
The district planning team held meetings and started with identification of problem using the
training received from SP-09 team and consulting the above mentioned documents. The
problems identified were broadly divided into two categories i.e.
a) Health Problems
b) Health Service Delivery or Management Problems
Health Problems
The district specific health problems identification process started during the three years
rolling plans workshop. The planning team in the initial stage prepared a long list of the
health problems. The identification of health problems was based on various information
sources including DHIS, and district specific reports. The enlisted health problems of the
district are given in the following table.
13. Road side accident & 14. Peptic Ulcer Diseases 15. Asthma
Injuries
16. UTI 17. Dental Caries
26
Three Years Rolling Plan 2010-2013 District Lahore
Problem Prioritization
WHO has developed standard criteria for prioritization of health problems; which is based on
the following five elements:
Magnitude
Severity/danger
Vulnerability to intervention (feasibility)
Cost-effectiveness of the intervention
Political expediency
Each element has been assigned a score from 1 to 4 depending upon grade/scale of that element
i.e. Very High=4, High=3, Medium=2 and Low=1.
Elements of the prioritization criteria were applied to each of the enlisted health problems. The
aggregate of individual scores assigned to the elements of the prioritization criteria gave the
total score for a health problem. This total score was then used to prioritize the health problems.
A cut-off point of was decided, to establish the priority health problems of the district. These
problems will be addressed in the three years rolling plan.
27
Three Years Rolling Plan 2010-2013 District Lahore
Diarrheal Diseases 4 3 4 4 2 17 1
ARI (under 5) 4 3 4 4 2 17 2
Pulmonary Tuberculosis 3 1 4 4 3 15 8
Hepatitis 4 3 2 2 4 15 6
High under five mortality 3 4 3 3 3 16 4
Ischemic Heart disease 3 4 2 2 2 13 11
High maternal mortality 3 4 3 3 4 17 3
Diabetes mellitus 3 2 3 3 2 13 9
Anemia ( including in
2 2 4 4 4 16 5
pregnancy)
Dog Bite 1 1 4 4 2 12 13
Scabies 4 2 4 3 2 15 7
Hypertension 2 3 2 3 1 11 15
Road side accident & Injuries 2 3 3 2 2 12 12
Peptic ulcer Disease 2 2 3 2 1 10 16
Asthma 2 2 3 3 1 11 14
Urinary Tract Infections 2 2 3 2 1 10 17
Dental Caries 2 3 3 3 2 13 10
28
Three Years Rolling Plan 2010-2013 District Lahore
Health problems have their underlying causes. It is important to know the underlying causes of
the health problems so that appropriate interventions are developed. There may be a long list of
these causes but only few of them are vital ones; and rectifying these causes can resolve the
problem to a large extent. Following table gives common causes of the prioritized health
problems pertaining to the district.
29
Three Years Rolling Plan 2010-2013 District Lahore
4 High under 5 Mortality Poor antenatal natal and post natal coverage
Neo-natal Infections
Birth Trauma & Asphyxia
Prematurity
Poor feeding and weaning practices
Diarrhea
ARI
Lack of capacity of staff for provision of proper child health care
(diagnostic and timely referrals)
Low socio economic status
Malnutrition
Lack of birth spacing
Low EPI Coverage
5 Anemia ( including Lack of awareness about balanced diet
pregnancy)
Gender discrimination
Social taboos and norms
Worm infestation
Infections
Poor quality of MNCH services
Poverty/ Low socio economic status
This segment entails the district specific management problems. Management problems are
result of deficiency/lack of resources; these problems range from administrative to financial
issues, and cause hindrance in the smooth delivery of health services in the district. It was
observed that solution of some of these problems lies with the provincial government; whereas
remaining can be addressed at the district level. While proposing the interventions, their action
30
Three Years Rolling Plan 2010-2013 District Lahore
at provincial or district level has been specifically mentioned. The planning team discussed these
problems in detail and enlisted the main problems as under
Sr.No Problem/cause
1 Shortage of human resource due to:
Ban on permanent postings
Non availability of incentivized pay package and career structure
Medico-legal work for WMOs
Non sanctioning of posts according to MSDS
5 Shortage of equipment
General equipment( for various facilities)
MNCH related
The government is committed to achieve the MDGs targets. For this purpose, the government of
Punjab has decided to adopt Minimum Service Delivery Standards (MSDS) as strategy to achieve
the MDGs within the province. Health Department of Punjab is especially focusing on MNCH
related component of MSDS for which substantial resources are coming from Asian
Development Program funded Punjab Millennium Development Goal Program (PMDGP). MSDS
entails a level-specific service delivery package (for primary and secondary health care) along
with their standards and system specifications including human, infrastructure, equipment,
medical supplies, medicine and other consumables.
In order to achieve the MDGs, the government of Punjab has adopted MSDS as strategic
framework. During the development of three years rolling plans, gaps under MSDS focusing on
MNCH interventions have been identified. Most essential areas for which gaps have been
identified are human resource and equipment of DHQ and THQ hospitals, as per lists notified by
the government in accordance with MSDS standards.
31
Three Years Rolling Plan 2010-2013 District Lahore
a) Human Resource
With regard to MSDS gap analysis for human resource, the difference between the standards
proposed in MSDS and filled posts has been calculated as the vacancy gap. The hospitals have
been categorized based on their bed strength as follows:
32
Three Years Rolling Plan 2010-2013 District Lahore
33
Three Years Rolling Plan 2010-2013 District Lahore
b) Equipment
Government of Punjab has notified a standard list as yard-stick of MNCH related equipment to
provide comprehensive EmONC services in the DHQ and THQ hospitals. Provision of
comprehensive EmONC services is essentially required to decrease the high MMR and IMR
prevailing in the province.
34
Three Years Rolling Plan 2010-2013 District Lahore
Gaps in relation to the MNCH related equipment have been identified taking into account the
equipment purchased or under process of purchase from all funds including PMDGP funds
allocated/sanctioned to the district. The cost of equipment gap has been included in the
equipment portion of the Management/Service delivery problems.
1 CTG (Cardiac 1 1 2 2 0
Tocography)
2 Foetal Doppler 3 5 5 5 0
3 Diagnostic Laparoscope 1 1 2 1 0
4 Bulb Sucker 10 20 20 29 0
5 Baby Warmer 3 3 6 2 1
6 Mechanical Sucker 3 3 6 1 2
7 Fetal Stethoscope 4 4 4 2 2
8 Delivery Table 2 2 3 2 0
9 D&C Set 2 3 4 13 0
10 Outlet forceps 4 4 4 11 0
11 Myoma Screw 2 2 2 10 0
12 Kochers forceps 4 4 8 27 0
13 Volselum forceps 6 8 10 23 0
16 Polypectomy forceps 2 2 2 4 0
17 Sponge holder 10 15 20 30 0
18 Uterine elevator 1 1 1 1 0
19 CosCo Speculum 6 10 10 25 0
Small, Medium, Large
(for each category)
20 Examination light 3 3 6 7 0
21 Suction Curette 1 2 2 5 0
35
Three Years Rolling Plan 2010-2013 District Lahore
22 Infant Resuscitation 1 1 2 5 0
Trolley (with life saving
medicines, baby
laryngoscope, Endo-
tracheal tube, Infant BP
Apparatus, Chargeable
Light)
23 Mother Resuscitation 1 1 2 0 1
Trolley (with life saving
medicines,
Laryngoscope, Endo-
tracheal tube, BP
Apparatus, Chargeable
light)
24 Cardiac Monitor 1 1 2 4 0
26 Vaginal Hysterectomy 2 2 4
Set
26.1 Toothed Tissue Forceps 2 2 4 67 0
(8”)
26.2 Non-Tooted Tissue 2 2 4 34 0
Forceps (8”)
26.3 Dissection Scissors 2 2 4 27 0
(Curved 7”)
26.4 Dissection Scissors 2 2 4 13 0
(Straight 7”)
26.5 Hysterectomy Clamps 8 8 16 6 2
(Straight)
26.6 Hysterectomy Clamps 8 8 16 16 0
(Curved)
26.7 Uterine Sound 2 2 4 13 0
36
Three Years Rolling Plan 2010-2013 District Lahore
27 Delivery Sets 10 10 15
28 Caesarian Section 6 8 10
28.1 Scalpel 6 8 10 63 0
37
Three Years Rolling Plan 2010-2013 District Lahore
29 MNCH Related
Radiology Equipments
29.1 Ultrasound Machine 1 2 3 2 0
30.2 Incubator 1 1 2 2 0
30.7 Nebulizer 1 1 2 4 0
30.8 Billiubino-meter 1 1 2 0 1
31 Anaesthesia/ICU
31.2 Ventilators 1 1 1 3 0
31.3 Nebulizer 1 1 1 8 0
38
Three Years Rolling Plan 2010-2013 District Lahore
31.5 Defibrillator 1 1 1 2 0
32.8 Micro-pipette 4 6 8 1 3
32.13 Microscopes 1 1 2 1 0
39
Three Years Rolling Plan 2010-2013 District Lahore
33.5 Haemoglobino-meter 2 2 4 1 1
33.6 Centrifuge 1 1 2 2 0
1 CTG (Cardiac 1 1 2 1 0
Tocography)
2 Foetal Doppler 3 5 5 11 0
3 Diagnostic Laparoscope 1 1 2 0 1
4 Bulb Sucker 10 20 20 6 4
5 Baby Warmer 3 3 6 2 1
6 Mechanical Sucker 3 3 6 3 0
7 Fetal Stethoscope 4 4 4 20 0
8 Delivery Table 2 2 3 4 0
9 D&C Set 2 3 4 14 0
10 Outlet forceps 4 4 4 5 0
11 Myoma Screw 2 2 2 0 2
12 Kochers forceps 4 4 8 0 4
13 Volselum forceps 6 8 10 0 6
16 Polypectomy forceps 2 2 2 6 0
17 Sponge holder 10 15 20 0 10
18 Uterine elevator 1 1 1 0 1
40
Three Years Rolling Plan 2010-2013 District Lahore
19 CosCo Speculum 6 10 10 25 0
Small, Medium, Large
(for each category)
20 Examination light 3 3 6 6 0
21 Suction Curette 1 2 2 84 0
22 Infant Resuscitation 1 1 2 1 0
Trolley (with life saving
medicines, baby
laryngoscope, Endo-
tracheal tube, Infant BP
Apparatus, Chargeable
Light)
23 Mother Resuscitation 1 1 2 0 1
Trolley (with life saving
medicines,
Laryngoscope, Endo-
tracheal tube, BP
Apparatus, Chargeable
light)
24 Cardiac Monitor 1 1 2 1 0
26 Vaginal Hysterectomy 2 2 4 2
Set
26.1 Toothed Tissue Forceps 2 2 4 0 2
(8”)
26.2 Non-Tooted Tissue 2 2 4 0 2
Forceps (8”)
26.3 Dissection Scissors 2 2 4 0 2
(Curved 7”)
26.4 Dissection Scissors 2 2 4 0 2
(Straight 7”)
26.5 Hysterectomy Clamps 8 8 16 15 0
(Straight)
26.6 Hysterectomy Clamps 8 8 16 12 0
(Curved)
26.7 Uterine Sound 2 2 4 0 2
41
Three Years Rolling Plan 2010-2013 District Lahore
27 Delivery Sets 10 10 15 13
28 Caesarian Section 6 8 10 18
28.1 Scalpel 6 8 10 0 6
42
Three Years Rolling Plan 2010-2013 District Lahore
29 MNCH Related
Radiology Equipments
29.1 Ultrasound Machine 1 2 3 2 0
30.2 Incubator 1 1 2 7 0
30.7 Nebulizer 1 1 2 15 0
30.8 Billiubino-meter 1 1 2 0 1
31 Anaesthesia/ICU
43
Three Years Rolling Plan 2010-2013 District Lahore
31.2 Ventilators 1 1 1 4 0
31.3 Nebulizer 1 1 1 0 1
31.5 Defibrillator 1 1 1 4 0
32.8 Micro-pipette 4 6 8 1 3
32.13 Microscopes 1 1 2 5 0
44
Three Years Rolling Plan 2010-2013 District Lahore
33.5 Haemoglobino-meter 2 2 4 1 1
33.6 Centrifuge 1 1 2 5 0
1 CTG (Cardiac 1 1 2 2 0
Tocography)
2 Foetal Doppler 3 5 5 6 0
3 Diagnostic Laparoscope 1 1 2 0 1
4 Bulb Sucker 10 20 20 20 0
5 Baby Warmer 3 3 6 1 2
6 Mechanical Sucker 3 3 6 4 0
7 Fetal Stethoscope 4 4 4 8 0
8 Delivery Table 2 2 3 2 0
9 D&C Set 2 3 4 18 0
10 Outlet forceps 4 4 4 2 2
11 Myoma Screw 2 2 2 1 1
12 Kochers forceps 4 4 8 8 0
13 Volselum forceps 6 8 10 24 0
45
Three Years Rolling Plan 2010-2013 District Lahore
16 Polypectomy forceps 2 2 2 0 2
17 Sponge holder 10 15 20 8 2
18 Uterine elevator 1 1 1 0 1
19 CosCo Speculum 6 10 10 11 0
Small, Medium, Large
(for each category)
20 Examination light 3 3 6 16 0
21 Suction Curette 1 2 2 0 1
22 Infant Resuscitation 1 1 2 1 0
Trolley (with life saving
medicines, baby
laryngoscope, Endo-
tracheal tube, Infant BP
Apparatus, Chargeable
Light)
23 Mother Resuscitation 1 1 2 0 1
Trolley (with life saving
medicines,
Laryngoscope, Endo-
tracheal tube, BP
Apparatus, Chargeable
light)
24 Cardiac Monitor 1 1 2 4 0
26 Vaginal Hysterectomy 2 2 4 5
Set
26.1 Toothed Tissue Forceps 2 2 4 10 0
(8”)
26.2 Non-Tooted Tissue 2 2 4 12 0
Forceps (8”)
26.3 Dissection Scissors 2 2 4 9 0
(Curved 7”)
26.4 Dissection Scissors 2 2 4 9 0
(Straight 7”)
26.5 Hysterectomy Clamps 8 8 16 20 0
(Straight)
26.6 Hysterectomy Clamps 8 8 16 15 0
(Curved)
26.7 Uterine Sound 2 2 4 5 0
46
Three Years Rolling Plan 2010-2013 District Lahore
27 Delivery Sets 10 10 15 24
28 Caesarian Section 6 8 10
28.1 Scalpel 6 8 10 18 0
47
Three Years Rolling Plan 2010-2013 District Lahore
29 MNCH Related
Radiology Equipments
29.1 Ultrasound Machine 1 2 3 2 0
30.2 Incubator 1 1 2 2 0
30.7 Nebulizer 1 1 2 5 0
30.8 Billiubino-meter 1 1 2 0 1
48
Three Years Rolling Plan 2010-2013 District Lahore
31 Anaesthesia/ICU
31.2 Ventilators 1 1 1 0 1
31.3 Nebulizer 1 1 1 0 1
31.5 Defibrillator 1 1 1 1 0
32.8 Micro-pipette 4 6 8 5 0
49
Three Years Rolling Plan 2010-2013 District Lahore
32.13 Microscopes 1 1 2 1 0
33.5 Haemoglobino-meter 2 2 4 1 1
33.6 Centrifuge 1 1 2 3 0
1 CTG (Cardiac 1 1 1 0 1
Tocography)
2 Foetal Doppler 2 2 3 1 1
3 Diagnostic Laparoscope 1 1 1 0 1
4 Bulb Sucker 5 10 20 0 5
5 Baby Warmer 2 2 3 1 1
6 Mechanical Sucker 3 3 3 0 3
7 Fetal Stethoscope 2 3 4 3 0
8 Delivery Table 2 2 2 3 0
9 D&C Set 2 2 2 1 1
10 Outlet forceps 4 4 4 0 4
11 Myoma Screw 2 2 2 0 2
12 Kochers forceps 4 4 4 0 4
13 Volselum forceps 4 4 6 0 4
50
Three Years Rolling Plan 2010-2013 District Lahore
16 Polypectomy forceps 2 2 2 0 2
17 Sponge holder 10 10 15 5 5
18 Uterine elevator 1 1 1 0 1
19 CosCo Speculum 4 6 6 0 4
Small, Medium, Large
(for each category)
20 Examination light 3 3 3 4 0
21 Suction Curette 1 1 2 0 1
22 Infant Resuscitation 1 1 1 0 1
Trolley (with life saving
medicines, baby
laryngoscope, Endo-
tracheal tube, Infant BP
Apparatus, Chargeable
Light)
23 Mother Resuscitation 1 1 1 0 1
Trolley (with life saving
medicines,
Laryngoscope, Endo-
tracheal tube, BP
Apparatus, Chargeable
light)
24 Cardiac Monitor 1 1 1 0 1
26 Vaginal Hysterectomy 2 2 2 0
Set
26.1 Toothed Tissue Forceps 2 2 2 0 2
(8”)
26.2 Non-Tooted Tissue 2 2 2 0 2
Forceps (8”)
26.3 Dissection Scissors 2 2 2 0 2
(Curved 7”)
26.4 Dissection Scissors 2 2 2 0 2
(Straight 7”)
26.5 Hysterectomy Clamps 8 8 8 0 8
(Straight)
26.6 Hysterectomy Clamps 8 8 8 0 8
(Curved)
26.7 Uterine Sound 2 2 2 1 1
51
Three Years Rolling Plan 2010-2013 District Lahore
27 Delivery Sets 6 6 10
28 Caesarian Section 4 4 6
28.1 Scalpel 4 4 6 0 4
52
Three Years Rolling Plan 2010-2013 District Lahore
29 MNCH Related
Radiology Equipments
29.1 Ultrasound Machine 1 1 2 2 0
30.2 Incubator 1 1 1 1 0
30.7 Nebulizer 1 1 1 2 0
30.8 Billiubino-meter 1 1 1 0 1
53
Three Years Rolling Plan 2010-2013 District Lahore
31 Anaesthesia/ICU
31.2 Ventilators 1 1 1 0 1
31.3 Nebulizer 1 1 1 0 1
31.5 Defibrillator 1 1 1 0 1
32.8 Micro-pipette 4 4 6 0 4
54
Three Years Rolling Plan 2010-2013 District Lahore
32.13 Microscopes 1 1 1 0 1
33.5 Haemoglobino-meter 1 1 1 1 0
33.6 Centrifuge 1 1 1 1 0
1 CTG (Cardiac 1 1 1 0 1
Tocography)
2 Foetal Doppler 2 2 3 0 2
3 Diagnostic Laparoscope 1 1 1 0 1
4 Bulb Sucker 5 10 20 0 5
5 Baby Warmer 2 2 3 0 2
6 Mechanical Sucker 3 3 3 0 3
7 Fetal Stethoscope 2 3 4 0 2
8 Delivery Table 2 2 2 1 1
9 D&C Set 2 2 2 1 1
10 Outlet forceps 4 4 4 1 3
11 Myoma Screw 2 2 2 0 2
12 Kochers forceps 4 4 4 0 4
13 Volselum forceps 4 4 6 0 4
55
Three Years Rolling Plan 2010-2013 District Lahore
16 Polypectomy forceps 2 2 2 0 2
17 Sponge holder 10 10 15 0 10
18 Uterine elevator 1 1 1 0 1
19 CosCo Speculum 4 6 6 0 4
Small, Medium, Large
(for each category)
20 Examination light 3 3 3 2 1
21 Suction Curette 1 1 2 0 1
22 Infant Resuscitation 1 1 1 0 1
Trolley (with life saving
medicines, baby
laryngoscope, Endo-
tracheal tube, Infant BP
Apparatus, Chargeable
Light)
23 Mother Resuscitation 1 1 1 0 1
Trolley (with life saving
medicines,
Laryngoscope, Endo-
tracheal tube, BP
Apparatus, Chargeable
light)
24 Cardiac Monitor 1 1 1 0 1
26 Vaginal Hysterectomy 2 2 2 0
Set
26.1 Toothed Tissue Forceps 2 2 2 0 2
(8”)
26.2 Non-Tooted Tissue 2 2 2 0 2
Forceps (8”)
26.3 Dissection Scissors 2 2 2 0 2
(Curved 7”)
26.4 Dissection Scissors 2 2 2 0 2
(Straight 7”)
26.5 Hysterectomy Clamps 8 8 8 0 8
(Straight)
26.6 Hysterectomy Clamps 8 8 8 0 8
(Curved)
26.7 Uterine Sound 2 2 2 0 2
56
Three Years Rolling Plan 2010-2013 District Lahore
27 Delivery Sets 6 6 10 0
28 Caesarian Section 4 4 6
28.1 Scalpel 4 4 6 0 4
57
Three Years Rolling Plan 2010-2013 District Lahore
29 MNCH Related
Radiology Equipments
29.1 Ultrasound Machine 1 1 2 2 0
30.2 Incubator 1 1 1 0 1
30.7 Nebulizer 1 1 1 1 0
30.8 Billiubino-meter 1 1 1 0 1
58
Three Years Rolling Plan 2010-2013 District Lahore
31 Anaesthesia/ICU
31.2 Ventilators 1 1 1 0 1
31.3 Nebulizer 1 1 1 0 1
31.5 Defibrillator 1 1 1 0 1
32.8 Micro-pipette 4 4 6 1 3
59
Three Years Rolling Plan 2010-2013 District Lahore
32.13 Microscopes 1 1 1 1 0
33.5 Haemoglobino-meter 1 1 1 1 0
33.6 Centrifuge 1 1 1 1 0
THQ Shahdara
1 CTG (Cardiac 1 1 1 0 1
Tocography)
2 Foetal Doppler 2 2 3 0 2
3 Diagnostic Laparoscope 1 1 1 0 1
4 Bulb Sucker 5 10 20 10 0
5 Baby Warmer 2 2 3 0 2
6 Mechanical Sucker 3 3 3 1 2
7 Fetal Stethoscope 2 3 4 0 2
8 Delivery Table 2 2 2 1 1
9 D&C Set 2 2 2 2 0
60
Three Years Rolling Plan 2010-2013 District Lahore
10 Outlet forceps 4 4 4 0 4
11 Myoma Screw 2 2 2 0 2
12 Kochers forceps 4 4 4 0 4
13 Volselum forceps 4 4 6 0 4
16 Polypectomy forceps 2 2 2 0 2
17 Sponge holder 10 10 15 2 8
18 Uterine elevator 1 1 1 0 1
19 CosCo Speculum 4 6 6 0 4
Small, Medium, Large
(for each category)
20 Examination light 3 3 3 1 2
21 Suction Curette 1 1 2 0 1
22 Infant Resuscitation 1 1 1 0 1
Trolley (with life saving
medicines, baby
laryngoscope, Endo-
tracheal tube, Infant BP
Apparatus, Chargeable
Light)
23 Mother Resuscitation 1 1 1 0 1
Trolley (with life saving
medicines,
Laryngoscope, Endo-
tracheal tube, BP
Apparatus, Chargeable
light)
24 Cardiac Monitor 1 1 1 0 1
26 Vaginal Hysterectomy 2 2 2
Set
26.1 Toothed Tissue Forceps 2 2 2 0 2
(8”)
26.2 Non-Tooted Tissue 2 2 2 0 2
Forceps (8”)
26.3 Dissection Scissors 2 2 2 0 2
(Curved 7”)
26.4 Dissection Scissors 2 2 2 4 0
(Straight 7”)
26.5 Hysterectomy Clamps 8 8 8 0 8
(Straight)
61
Three Years Rolling Plan 2010-2013 District Lahore
27 Delivery Sets 6 6 10 2
28 Caesarian Section 4 4 6
62
Three Years Rolling Plan 2010-2013 District Lahore
28.1 Scalpel 4 4 6 0 4
29 MNCH Related
Radiology Equipments
29.1 Ultrasound Machine 1 1 2 1 0
30.2 Incubator 1 1 1 0 1
63
Three Years Rolling Plan 2010-2013 District Lahore
30.7 Nebulizer 1 1 1 2 0
30.8 Billiubino-meter 1 1 1 0 1
31 Anaesthesia/ICU
31.2 Ventilators 1 1 1 0 1
31.3 Nebulizer 1 1 1 2 0
31.5 Defibrillator 1 1 1 0 1
64
Three Years Rolling Plan 2010-2013 District Lahore
32.8 Micro-pipette 4 4 6 0 4
32.13 Microscopes 1 1 1 1 0
33.5 Haemoglobino-meter 1 1 1 1 0
33.6 Centrifuge 1 1 1 1 0
65
Three Years Rolling Plan 2010-2013 District Lahore
66
Three Years Rolling Plan 2010-2013 District Lahore
Health Problems
67
Three Years Rolling Plan 2010-2013 District Lahore
68
Three Years Rolling Plan 2010-2013 District Lahore
69
Three Years Rolling Plan 2010-2013 District Lahore
Capacity Replacement of - - - -
Issues related the non functional
to maternal ambulances for
care timely
transportation of
pregnant mother
Maternal Procurement of - - - -
Anemia the MNCH related
equipment and
Instruments
70
Three Years Rolling Plan 2010-2013 District Lahore
Pregnancy Implementation - - - -
following of the referrals
chronic severe protocols
diseases
71
Three Years Rolling Plan 2010-2013 District Lahore
72
Three Years Rolling Plan 2010-2013 District Lahore
Lack of birth - - - -
spacing
Low EPI - - - -
Coverage
73
Three Years Rolling Plan 2010-2013 District Lahore
Poverty/ Low
socio economic
status
74
Three Years Rolling Plan 2010-2013 District Lahore
Documentation of
expense of
disposable syringes
75
Three Years Rolling Plan 2010-2013 District Lahore
Supportive
supervision to
ensure above
activities
Unhygienic Improving water Printing and Brochure 800,000 400,000 200,000 800,000
practices and sanitation distribution of IPC
material
Over- Proper diagnosis Procurement and Lotion 300,000 150,000 75,000 300,000
crowding/Poor and treatment distribution of
housing Benzyl Benzoate
facilities Lotion
76
Three Years Rolling Plan 2010-2013 District Lahore
77
Three Years Rolling Plan 2010-2013 District Lahore
Management Problems
Human Resource Plan to bridge the Gaps between MSDS Proposed and Sanctioned Posts
Physical Targets
Basic Requirement as per
Sr.No. Name of Post Basic Pay Allowances
Scale Gap
Year I Year II Year III
78
Three Years Rolling Plan 2010-2013 District Lahore
The planning team has used the best available data sources, for calculation of estimates for
the intervention/activities. It is pertinent to mention that the costing of the plan is based on
additional needs and activities. The detailed activity based costing of the Health and Service
Delivery problems has been performed on automated Excel sheets, which are hyperlinked as
H & M Sheet. A moderate estimate of equipment cost has been taken, as there is wide
variation between the minimum and maximum cost. The detailed cost of MNCH equipment
has been annexed as Annex I
The summary of problem and activity wise costing is given below.
79
Three Years Rolling Plan 2010-2013 District Lahore
a) Health Problems
Define Financial Targets
Total
Sr. Problem Activity
Year II Year III Cost
Unit Rate Quantity Year I
(10 %) (10 %)
1 Diarrhea Quarterly co- Meeting 3,000 12 12,000 13,200 14,520 39,720
ordination
Meeting under the
chairmanship of
DCO with TMA
and other
agencies
80
Three Years Rolling Plan 2010-2013 District Lahore
81
Three Years Rolling Plan 2010-2013 District Lahore
82
Three Years Rolling Plan 2010-2013 District Lahore
83
Three Years Rolling Plan 2010-2013 District Lahore
84
Three Years Rolling Plan 2010-2013 District Lahore
85
Three Years Rolling Plan 2010-2013 District Lahore
86
Three Years Rolling Plan 2010-2013 District Lahore
Distribution Already - - -
distributed
through LHWs and
health facilities
87
Three Years Rolling Plan 2010-2013 District Lahore
88
Three Years Rolling Plan 2010-2013 District Lahore
Documentation of
expense of
disposable syringes
Supportive
supervision to
ensure above
activities
89
Three Years Rolling Plan 2010-2013 District Lahore
90
Three Years Rolling Plan 2010-2013 District Lahore
91
Three Years Rolling Plan 2010-2013 District Lahore
2 POL
2,000,000 - - 2,000,000
4 Deficient Infrastructure
4,620,500 - - 4,620,500
5 Shortage of Vehicles
22,250,000 10,200,000 - 32,450,000
Total
233,015,391 45,631,450 55,579,614 267,776,455
92
Three Years Rolling Plan 2010-2013 District Lahore
b) Management Problems
Human Resource Plan to bridge the Gaps between MSDS Proposed and Sanctioned Posts
Financial Targets
6 Lady Health 9 3,820 4,750 58 916,800 1,140,000 2,016,960 2,508,000 3,217,051 4,000,260
Visitors
93
Three Years Rolling Plan 2010-2013 District Lahore
94
Three Years Rolling Plan 2010-2013 District Lahore
95
Three Years Rolling Plan 2010-2013 District Lahore
2,000,000 2,000,000
3 Capacity issues Financial Management No. of 39000 3 39,000 39,000 39,000 117,000
of the staff workshops trainings
96
Three Years Rolling Plan 2010-2013 District Lahore
- 4,620,500 - - 4,620,500
- 66,450,000 - - 66,450,000
97
Three Years Rolling Plan 2010-2013 District Lahore
121,161,615 121,161,615
98
Three Years Rolling Plan 2010-2013 District Lahore
Financial Outlay
The costing of the plan includes routine recurring budget with 15% price escalation for
subsequent years and additional cost involved on the basis of health and management problems;
which is essentially required to bring visible improvement in the health system. Other financial
resources expected from provincial level through ADP and PMDGP are also part of this plan.
Details of the financial estimates for three years rolling plan are attached as Annex-II. Overall
financial outlay of the plan is as under:
Budget Summary
Proposed additional
budget based on 268,122,091 72,231,720 83,389,367
problem identification
99
Three Years Rolling Plan 2010-2013 District Lahore
M&E of Plan
100
Three Years Rolling Plan 2010-2013 District Lahore
101
Three Years Rolling Plan 2010-2013 District Lahore
102
Three Years Rolling Plan 2010-2013 District Lahore
Annex-I
Cost of MNCH related equipment gaps for DHQ and THQ
Hospitals
DHQ Mian Munshi Hospital
Unit
Sr. No. Equipment Gap Total cost(Rs.)
Cost
5 Baby Warmer 1 850000
850,000.00
23 Mother Resuscitation Trolley (with life saving medicines, 1 110000
Laryngoscope, Endo-tracheal tube, BP Apparatus, Chargeable 110,000.00
light)
103
Three Years Rolling Plan 2010-2013 District Lahore
Unit
Sr. No. Equipment Gap Total cost(Rs.)
Cost
36,000.00
30.9 Exchange Blood Transfusion Set 1 2000
2,000.00
30.1 Nasal Probe Paed size 2 7000
14,000.00
32.2 Packed cell machine 1 600000
600,000.00
32.3 Cell Separator 1 5225000
5,225,000.00
32.4 Freezer for Fresh Frozen Plasma 1 1150000
1,150,000.00
32.5 Blood bag shaker 1 10000
10,000.00
32.6 RH view box 1 1000
1,000.00
32.8 Micro-pipette 3 8000
24,000.00
32.9 Blood grouping tiles 1 3000
3,000.00
32.1 Plasma Extractor 1 1000000
1,000,000.00
32.11 Platelets agitator 1 1000000
1,000,000.00
33.2 Electrolyte Analyzer 1 625000
625,000.00
33.5 Haemoglobino-meter 1 1000
1,000.00
Unit
Sr. No. Equipment Gap Total cost(Rs.)
cost
3 Diagnostic Laparoscope 1 1200000 1,200,000.00
4 Bulb Sucker 4 45 180.00
104
Three Years Rolling Plan 2010-2013 District Lahore
Unit
Sr. No. Equipment Gap Total cost(Rs.)
cost
5 Baby Warmer 1 850000 850,000.00
11 Myoma Screw 2 320 640.00
12 Kochers forceps 4 235 940.00
13 Volselum forceps 6 235 1,410.00
15 Vaginal Retractors 4 350 1,400.00
17 Sponge holder 10 300 3,000.00
18 Uterine elevator 1 150 150.00
23 Mother Resuscitation Trolley (with life saving medicines, 1 110000 110,000.00
Laryngoscope, Endo-tracheal tube, BP Apparatus, Chargeable
light)
105
Three Years Rolling Plan 2010-2013 District Lahore
Unit
Sr. No. Equipment Gap Total cost(Rs.)
cost
30.1 Paediatric Ventilator 1 1200000 1,200,000.00
30.4 Over-head Radiant Warmer 1 910000 910,000.00
30.5 Infant Length Measuring Scale 2 5000 10,000.00
30.8 Billiubino-meter 1 36000 36,000.00
30.9 Exchange Blood Transfusion Set 1 2000 2,000.00
30.1 Nasal Probe Paed size 2 7000 14,000.00
31.3 Nebulizer 1 165000 165,000.00
31.7 Tracheostomy tube (adult and paeds) 2 1000 2,000.00
31.8 Face mask of all sizes 2 1000 2,000.00
31.9 Double Cuff Tourniquet (for regional block) 1 320 320.00
31.12 Red Rubber Nasal tubes all sizes without cuff 4 1000 4,000.00
32.2 Packed cell machine 1 600000 600,000.00
32.3 Cell Separator 1 5225000 5,225,000.00
32.4 Freezer for Fresh Frozen Plasma 1 1150000 1,150,000.00
32.6 RH view box 1 1000 1,000.00
32.7 Water bath 1 3000 3,000.00
32.8 Micro-pipette 3 8000 24,000.00
32.9 Blood grouping tiles 2 3000 6,000.00
32.1 Plasma Extractor 1 1000000 1,000,000.00
32.11 Platelets agitator 1 1000000 1,000,000.00
32.12 Blood thawing bath 1 3000 3,000.00
33.5 Haemoglobino-meter 1 1000 1,000.00
106
Three Years Rolling Plan 2010-2013 District Lahore
107
Three Years Rolling Plan 2010-2013 District Lahore
Unit Total
Sr. No. Equipment Gap
cost cost(Rs.)
1 CTG (Cardiac Tocography) 1 285000 285,000.00
2 Foetal Doppler 2 10000 20,000.00
3 Diagnostic Laparoscope 1 1200000 1,200,000.00
4 Bulb Sucker 5 45 225.00
5 Baby Warmer 2 850000 1,700,000.00
6 Mechanical Sucker 3 28000 84,000.00
7 Fetal Stethoscope 2 1500 3,000.00
8 Delivery Table 1 17500 17,500.00
9 D&C Set 1 2100 2,100.00
10 Outlet forceps 3 900 2,700.00
11 Myoma Screw 2 320 640.00
12 Kochers forceps 4 235 940.00
13 Volselum forceps 4 235 940.00
14 Lanes Tissue holding forceps 2 400 800.00
15 Vaginal Retractors 4 350 1,400.00
16 Polypectomy forceps 2 750 1,500.00
17 Sponge holder 10 300 3,000.00
18 Uterine elevator 1 150 150.00
19 CosCo Speculum 4 550 2,200.00
Small, Medium, Large (for each category) -
108
Three Years Rolling Plan 2010-2013 District Lahore
109
Three Years Rolling Plan 2010-2013 District Lahore
110
Three Years Rolling Plan 2010-2013 District Lahore
111
Three Years Rolling Plan 2010-2013 District Lahore
112
Three Years Rolling Plan 2010-2013 District Lahore
113
Three Years Rolling Plan 2010-2013 District Lahore
Total
Sr. No. Equipment Gap Unit cost
cost(Rs.)
1 CTG (Cardiac Tocography) 1 285000 285,000
2 Foetal Doppler 1 10000 10,000
3 Diagnostic Laparoscope 1 1200000 1,200,000
4 Bulb Sucker 5 45 225
5 Baby Warmer 1 850000 850,000
6 Mechanical Sucker 3 28000 84,000
9 D&C Set 1 2100 2,100
10 Outlet forceps 4 900 3,600
11 Myoma Screw 2 320 640
12 Kochers forceps 4 235 940
13 Volselum forceps 4 235 940
14 Lanes Tissue holding forceps 2 400 800
15 Vaginal Retractors 4 350 1,400
16 Polypectomy forceps 2 750 1,500
17 Sponge holder 5 300 1,500
18 Uterine elevator 1 150 150
19 CosCo Speculum 4 550 2,200
Small, Medium, Large (for each category) -
21 Suction Curette 1 95 95
22 Infant Resuscitation Trolley (with life saving medicines, baby 1 95000 95,000
laryngoscope, Endo-tracheal tube, Infant BP Apparatus,
Chargeable Light)
114
Three Years Rolling Plan 2010-2013 District Lahore
Total
Sr. No. Equipment Gap Unit cost
cost(Rs.)
26.3 Dissection Scissors (Curved 7”) 2 150 300
26.4 Dissection Scissors (Straight 7”) 2 150 300
26.5 Hysterectomy Clamps (Straight) 8 150 1,200
26.6 Hysterectomy Clamps (Curved) 8 175 1,400
26.7 Uterine Sound 1 90 90
26.9 Needle Holder (10”) 2 300 600
26.1 Artery Forceps (Straight 6”) 8 110 880
26.11 Artery Forceps (Curved 6”) 10 125 1,250
26.12 Allis Forceps 8 230 1,840
26.13 Towel Clamps 8 125 1,000
26.14 Single blade Sims speculum 4 275 1,100
26.15 Double blade Sims speculum 4 250 1,000
26.16 Sponge holding forceps 8 200 1,600
26.17 Volselum forceps 4 250 1,000
26.18 Uterine Sound 1 1500 1,500
26.19 Bladder Sound 2 1500 3,000
27.1 Episiotomy Scissors 6 125 750
27.4 Non-toothed tissue forceps 8 inches 6 100 600
27.5 Toothed tissue forceps 8 inches 6 100 600
27.6 Sims Speculum single blade 12 275 3,300
27.7 Sims Speculum double blade 12 250 3,000
27.8 Sponge holding forceps 40 250 10,000
27.9 Artery forceps 5 275 1,375
27.1 Straight clamps (cord) 20 175 3,500
27.11 Vacuum Extractor pump 1 19000 19,000
27.12 Towel clip 40 125 5,000
28 Caesarian Section -
28.1 Scalpel 4 50 200
28.2 Artery Forceps Straight 6 inches 16 125 2,000
28.3 Artery Forceps Curved 6 inches 16 125 2,000
28.4 Artery forceps 8 inches 16 175 2,800
28.5 Myoma Scissors straight 7 inches 4 150 600
28.6 Dissecting scissors (curved) 7 inches 4 270 1,080
28.7 Green Armtage forceps 8 inches 16 300 4,800
28.8 Obstetric outlet forceps (pair) 4 900 3,600
28.9 Doyene’s Retractor 4 200 800
28.1 Small Retractors 8 300 2,400
28.11 Towel Clippers 16 125 2,000
28.12 Suction Nozzle 4 250 1,000
115
Three Years Rolling Plan 2010-2013 District Lahore
Total
Sr. No. Equipment Gap Unit cost
cost(Rs.)
29.2 X-Ray Unit 500 kw 1 6000000 6,000,000
29.4 Lead Screen for X-Ray Unit 1 30000 30,000
29.5 0.5 MN Lead Apron. Lead Gloves, Goggles and Thyroid and 1 100000 100,000
Gonadal Sheets
116
Three Years Rolling Plan 2010-2013 District Lahore
117